B7 N_F Floor Structural Upgrades combined Rev. 1.pdf
PDF 4 MB Posted
- Attached to
- Z2DA--Project 666-25-105 Bldg. 7 N&F Floor Structural Upgrades Federal contract opportunity
- Solicitation number
- 36C25924Q0075
About this file
This set of construction drawings and specifications is for a federal project to upgrade structural flooring in Building 7 at the Sheridan VA Medical Center in Wyoming. The project, numbered 666-25-105, will strengthen existing floor joists in the basement and first floor by sistering in additional lumber beams. Drawings show demolition plans, architectural plans, structural details, and mechanical, plumbing and electrical plans. Work includes removing sections of ceiling and flooring, installing new suspended ceilings and flooring, and reinstalling mechanical and electrical systems. The related solicitation is numbered 36C25924Q0075 and seeks bids from contractors to complete the project upgrades per the specifications. Award is anticipated in early 2024 following the response deadline.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25924Q0075 0003.docx | DOCX document | |
| Bldg 7 Asbestos Report- Part 1 or 2.pdf | ||
| VCT Specs.pdf | ||
| Site Visit Sign-In Sheet 666-25-105.pdf | ||
| 36C25924Q0075 0002.docx | DOCX document | |
| Site Visit Meeting Doc_666-25-105_B7 Floor Upgrades.docx | DOCX document | |
| 36C25924Q0075 0001.docx | DOCX document | |
| S02-3-10-2021 Past Performance Questionnaire_Blank_Fillable PDF.pdf | ||
| 092900_Gypsum Specs.docx | DOCX document | |
| 6 Drawings B7 Floor Structural Upgrades 25-105.pdf | ||
| 36C25924Q0075.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheridan VAMC Map
Sheridan VAMC B7 N&F Floor Structrual Upgrades
Sheridan, Wyoming
SHEET INDEX:
G-0 COVER SHEET AND DRAWING INDEX
GENERAL
#666-25-105
Project Location:
Building 7
AD-1 Demolition Plan Basement AD-2 Demolition Plans 1st Floor A-1 Architectural Plan Basement A-2 Architectural Plan 1st Floor A-3 1st Floor Ceiling Plan
ARCHITECTURAL
W
C
FS
M A
RIN
E CO
RPS
COAST GUARD LANE
FORT ROAD
FREEDOM LANE
FREEDOM LANE
FREEDO
M
LA
N
E
FREEDOM LANE
IN
D
E
PE
N D
E N
C E
L A
N E
A
IR
F O
R C
E L
A N
E
A R
M Y
L A
N E
C A
V A
L R
Y L
A N
E
AIR FORCE LANE
A R
M Y
L A
N E
N A
V
Y LA
N E
NAVY LANE
N A
V Y
L A
N E
FR
E
E D
O M
LA
N
E
MARIN
E CORPS LANE
COAST GUARD LANE
N
EW
S
LANE
0' 300'200'100' 400' 500'
Contractors Field Office Location
E-1 Electrical Plan Basement E-2 Electrical Plan 1st Floor
ELECTRICAL
P/M-1 Plumbing - Mechanical Plan Basement P/M-1 Plumbing - Mechanical Plan 1st Floor
PLUMBING AND MECHANICAL
S-1 Structural
STRUCTURAL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
COVER SHEET & DRAWING
INDEX
A
Fi le
P at h 6/
/2
:3
9:
P M
Site Map Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
C
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B7 N&F Floor Structural Upgrades
VA Medical Center, Sheridan WY
666-25-105
Building 7 Project Director
01-02-24 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
G-0
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 71N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S71
AutoCAD SHX Text S8
AutoCAD SHX Text S6
AutoCAD SHX Text S86
AutoCAD SHX Text S4
AutoCAD SHX Text
CATHY REICHERT, SUPERVISORY GENERAL ENGINEER PHONE: (307)675-3411
0' 8'4'2'
CORRIDOR
C002
CORRIDOR
CORRIDOR
HAC
UP
C003
ELEV EQUIP
DATA
MECHANICAL CLOSET
C001
FAN UNIT FAN UNIT
STAIR
ST001
ELEVATOR
E001
SECURE
PHARMACY
CACHE
NUTRITION
BREAKROOM
WAREHOUSE
SOUTH
EXISTING 2'X2' LED TROFFER LIGHT
EXISTING FAN
EXISTING RETURN GRILL
EXISTING DIFFUSER
EXISTING FIRE SUPPRESSION HEAD
EXISTING SMOKE DETECTOR S
SYMBOLS
EXISTING FIRE ALARM STROBE LIGHT SL
S
NEW HOSPITAL GRADE LIGHT SWITCH 20 AMP
WITH OCCUPANCY SENSOR
WAP Wifi Access Point
WAP
EXISTING OCCUPANCY SENSOR O
O
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Demolition Plans
A
Fi le
P at h 6/
/2
:3
9:
P M
Demolition Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B7 N&F Floor Structural Upgrades
VA Medical Center, Sheridan WY
Building 7 Project Director
01-02-24 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
DEMOLITION NOTES:
1 Disassemble suspended ceiling and grid. Manipulate items in ceiling and walls such as lights, fire suppression sprinkler lines and heads, occupancy sensors, fans, VAV's, duct, cabinets, sanitary sewer, steam piping, hydronic piping etc. as required to level floor above and to install new sister floor joists. Note that the 4" sanitary sewer, VAV, and ducting are not shown on this drawing but are below the plaster ceiling and above suspended ceiling.
2. Remove enough plaster ceiling as required to correct floor sag as per the Structural Plan and details 1&2/S-1.
AD-1
666-25-105
1 BSMT Floor Demolition Plan
B7 Basement Floor Key Plan:
GENERAL NOTES:
1. Coordinate sections of ceiling and other removal with all trades.
2. VA IRCA requirements must be followed.
3. Work hours will be limited to 7:30 am to 5:00 pm. Work can not be performed over weekends and during Federal Holidays. Contractor shall minimize disruption to Food and Nutrition operations.
4.
UP
DN
115 116
CHIEF
NUTRITION &
FOOD
SERVICES
NUTRITION/
FOOD SERVICES
FOOD
OFFICE
FOOD
STORAGE
STOR
118A
CORR.
C102
CORR
C101
STAIR
ST101
ELEVATOR
E101
STOR
117B
OFFICE
117A
Sheridan Wyoming VA Building 7 -Joist Location
KITCHEN FOOD
SERVICE LINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Demolition Plans
A
Fi le
P at h 6/
/2
:3
9:
P M
Demolition Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B7 N&F Floor Structural Upgrades
VA Medical Center, Sheridan WY
Building 7 Project Director
01-02-24 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
DEMOLITION NOTES:
1 Demolition wall and doors.
2. Remove all flooring and enough sub-floor to expose the floor joist to sister in additional floor joists to correct floor sag as per the Structural Plan S-1.
3. Remove suspended ceiling and grid to demolition wall. Items in ceiling such as sprinkler heads, diffuser/grills, occupancy sensors, fans etc. shall be protected so that they can be placed back into service in the new ceiling. The lighting system will be replaced new reusing the existing electrical circuits.
4. The flooring under the carpet in rooms 117 and room 117A is a VCT that has asbestos. Remove only the carpet.
5. The VA will empty this room prior to demolition except for items attached to the walls, ceilings and floors such as shelves, signage, white boards. The Contractor is responsible to remove attached items, protect and store and then reattach those items after construction has finished and the rooms are painted.
6. The VA will empty this room prior to demolition
AD-2
666-25-105
1 1st Floor Demolition Plan
B7 1st Floor Key Plan:
3 3
GENERAL NOTES:
1. Coordinate sections of wall and ceiling removal with other trades.
2. VA IRCA requirements must be followed.
3. Work hours will be limited to 7:30 am to 5:00 pm. Work can not be performed over weekends and during Federal Holidays. Contractor shall minimize disruption to Food and Nutrition operations.
5 5 5
C002
CORRIDOR
CORRIDOR
HAC
UP
C003
ELEV EQUIP
DATA
MECHANICAL CLOSET
C001
FAN UNIT FAN UNIT
STAIR
ST001
ELEVATOR
E001
SECURE
PHARMACY
CACHE
NUTRITION
BREAKROOM
EXISTING 2'X2' LED TROFFER LIGHT
EXISTING FAN
EXISTING RETURN GRILL
EXISTING DIFFUSER
EXISTING FIRE SUPPRESSION HEAD
EXISTING SMOKE DETECTOR S
SYMBOLS
EXISTING FIRE ALARM STROBE LIGHT SL
S
NEW HOSPITAL GRADE LIGHT SWITCH 20 AMP
WITH OCCUPANCY SENSOR
WAP Wifi Access Point
WAP
EXISTING OCCUPANCY SENSOR O
O
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Architectural Plans
A
Fi le
P at h 6/
/2
:3
9:
P M
Architectural Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B7 N&F Floor Structural Upgrades
VA Medical Center, Sheridan, WY
Building 7 Project Director
01-02-24 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
1 Basement Floor Plan
NOTES:
1 Reassemble ceiling grid, replace the ceiling tile removed with new panels to match what was removed, reinstalled all items that were removed to install floor structure so that they are fully functional. The dropped ceiling panels are Armstrong 895 white.
A-1
GENERAL NOTES:
1. Coordinate sections of wall and ceiling removal with other trades. See Electrical and Plumbing Plans.
2. VA ICRA requirements must be followed.
666-25-105
Revision 1 1/23/2024
DN
115 116
CHIEF
NUTRITION &
FOOD
SERVICES
NUTRITION/
FOOD SERVICES
FOOD
OFFICE
FOOD
STORAGE
STOR
118A
CORR.
C102
CORR
C101
STAIR
ST101
ELEVATOR
E101
STOR
117B
OFFICE
117A
KITCHEN FOOD
SERVICE LINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Architectural Plans
A
Fi le
P at h 6/
/2
:3
9:
P M
Architectural Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B7 N&F Floor Structural Upgrades
VA Medical Center, Sheridan, WY
Building 7 Project Director
01-02-24 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
1 1st Floor Plan
A-2
GENERAL NOTES:
1. Coordinate sections of wall and ceiling removal with other trades. See Electrical and Plumbing Plans.
2. Remove items from the walls such as shelve and marker board from the of rooms 116, and C102. Paint all walls in these room and then reinstall the items back on the walls. Reinstall items in ceiling such as sprinkler heads, occupancy sensors, fans etc. and make them fully functional in the new ceiling. The lighting system will be replaced new reusing the existing electrical circuits.
3. VA ICRA requirements must be followed.
666-25-105
1 1 1
NOTES:
1. Install new 12x12 vinyl composite tile (VCT) in these rooms/corridors with 4" vinyl base. Colors to be selected by VA.
2. New walls. Two layers of 5/8" TYP X Gypsum Board on each side. 4" steel studs, 18 ga.. Install sound proofing batts in the wall stud space. Finish, and texture and to match existing finishes. Paint all walls.
3. No wood door, install new hollow metal frame 36Wx80H with screwed on hinge plate. Paint.
4. Not used
5. Install new suspended ceiling grid at the same heights and configuration as the ceiling that was removed.
6. Install a 1/4 plywood with sanded finish over the asbestos VCT. Install new VCT floor with 4" vinyl base with a transition strip at the doorway.
NUTRITION &
UP
DN
CHIEF
NUTRITION &
FOOD
SERVICES
NUTRITION/
FOOD SERVICES
FOOD
OFFICE
FOOD
STORAGE
STOR
118A
CORR.
C102
CORR
C101
STAIR
ST101
ELEVATOR
E101
STOR
117B
OFFICE
117A
KITCHEN FOOD
SERVICE LINE
NEW 2'X2' LED TROFFER LIGHT
EXISTING FAN
TWO EXISTING FIRE SUPPRESSION HEAD.
EXISTING SMOKE DETECTOR REUSE EXISTING CIRCUIT S
S
SYMBOLS
EXISTING WALL MOUNTED FIRE ALARM STROBE LIGHT BELOW CEILING SL
NEW HOSPITAL GRADE RECEPTACLE 20 AMP
S
NEW HOSPITAL GRADE LIGHT SWITCH 20 AMP
WITH OCCUPANCY SENSOR
ABOVE AND BELOW CEILING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
1st Floor Ceilings
A
Fi le
P at h 6/
/2
:3
9:
P M
Architectural Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B7 N&F Floor Structural Upgrades
VA Medical Center, Sheridan, WY
Building 7 Project Director
01-02-25 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
GENERAL NOTES:
1. Install a drop ceiling well at window where the ceiling is lower than the top of the window. Match how the ceiling wells were before demolition.
2. Install a new suspended ceiling that matches the ceilings of the area which are an Armstrong 896 with 15
16" grid, Prelude XL Fire Guard - white.
A-3
1 1st Floor Reflective Ceiling Plan
666-25-105
EXISTING RETURN GRILL
EXISTING DIFFUSER
DN
115 116
CHIEF
NUTRITION &
FOOD
SERVICES
NUTRITION/
FOOD SERVICES
FOOD
OFFICE
FOOD
STORAGE
STOR
118A
CORR
C101
STAIR
ST101
ELEVATOR
E101
STOR
117B
OFFICE
117A
KITCHEN FOOD
SERVICE LINE
1-3/4"x?" LVL 12" O.C. Sistered to Existing Floor Joists
1-3/4"x ?"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Structural Plans
A
Fi le
P at h 6/
/2
:3
9:
P M
Structural Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B7 N&F Floor Structural Upgrades
VA Medical Center, Sheridan, WY
Building 7 Project Director
01-02-24 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
1 1st Floor Plan
S-1
S-1
GENERAL NOTES:
1. Coordinate sections of wall and ceiling removal with other trades.
2. Floor Joist bearing minimum must be 3" on masonry or concrete
3. Building 7 is post and beam wood construction.
666-25-105
1 Joist Hanger Detail (TYP)
S-1
2 Joist Hanger Detail (TYP)
S-1
C002
CORRIDOR
CORRIDOR
HAC
UP
C003
ELEV EQUIP
DATA
MECHANICAL CLOSET
C001
FAN UNIT FAN UNIT
STAIR
ST001
ELEVATOR
E001
SECURE
PHARMACY
CACHE
NUTRITION
BREAKROOM
WAREHOUSE
SOUTH
EXISTING FAN
EXISTING RETURN GRILL
EXISTING DIFFUSER
EXISTING FIRE SUPPRESSION HEAD
SYMBOLS
Wifi Access Point
EXISTING OCCUPANCY SENSOR O
O
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Plumbing-Mechanical Plans
A
Fi le
P at h 6/
/2
:3
9:
P M
Plumbing - Mechanical Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B7 N&F Floor Structural Upgrades
VA Medical Center, Sheridan, WY
Building 7 Project Director
01-08-24 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
1 Basement Floor Plan
P/M-1
PLUMBING/MECHANICAL NOTES:
1 Reinstall items that were moved such as sprinkler lines and heads, VAV's, duct, diffusers/grills, sanitary sewer, steam lines, hydronic lines etc. that had to be manipulated so floor could be access. See note #1 on page AD-1 and coordinate with General Contractor.
GENERAL NOTES:
1. .
666-25-105
GENERAL NOTES:
1 Reuse existing plumbing and mechanic system.
DN
CHIEF
NUTRITION &
FOOD
SERVICES
NUTRITION/
FOOD SERVICES
FOOD
OFFICE
FOOD
STORAGE
STOR
118A
CORR.
C102
CORR
C101
STAIR
ST101
ELEVATOR
E101
STOR
117B
OFFICE
117A
KITCHEN FOOD
SERVICE LINE
TWO EXISTING FIRE SUPPRESSION HEAD.
SYMBOLS
ABOVE AND BELOW CEILING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Plumbing-Mechanical Plans
A
Fi le
P at h 6/
/2
:3
9:
P M
Plumbing - Mechanical Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B7 N&F Floor Structural Upgrades
VA Medical Center, Sheridan, WY
Building 7 Project Director
01-08-24 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
1 1st Floor Plan
P/M-2
PLUMBING/MECHANICAL NOTES:
1 Reinstall existing fire sprinkler heads, diffusers, return grills and other items removed to install new ceilings and wall. See note #3 on page AD-2 and coordinate with General Contractor.
666-25-105
GENERAL NOTES:
1. Reuse the existing mechanical and plumbing systems.
1 1
EXISTING RETURN GRILL
EXISTING DIFFUSER
C002
CORRIDOR
CORRIDOR
HAC
UP
C003
ELEV EQUIP
DATA
MECHANICAL CLOSET
C001
FAN UNIT FAN UNIT
STAIR
ST001
ELEVATOR
E001
SECURE
PHARMACY
CACHE
NUTRITION
BREAKROOM
WAREHOUSE
SOUTH
EXISTING 2'X2' LED TROFFER LIGHT
EXISTING RETURN GRILL
EXISTING DIFFUSER
NEW ELECTRICAL JUNCTION BOX J
SYMBOLS
WAP EXISTING Wifi ACCESS POINT
J J
WAP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Electrical Plan
A
Fi le
P at h 6/
/2
:3
9:
P M
Electrical Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B7 N&F Floor Structural Upgrades
VA Medical Center, Sheridan, WY
Building 7 Project Director
01-02-24 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
1 1ST Electrical Floor Plan
E-1
GENERAL NOTES:
1. All conductors to be in conduit. Provide with ground conductor.
Installation shall comply with the National Electrical Code.
ELECTRICAL NOTES:
1. Reinstall existing lights, occupancy sensors, fans, Wifi Access Points, VAV etc. that were disassembled to access floor system in the Break Room. Reuse existing circuits. See note #1 on page AD-1 and coordinate with General Contractor.
2. Relocate the electrical conduit and it's conductors out of the existing flooring joists and below the floor's plaster ceiling.
Route conduit path around other items above the drop ceiling. See picture detail on this page.
666-25-105
E-1
1 Exisitng Conduit Picture Detail
NO SCALE
DN
CHIEF
NUTRITION &
FOOD
SERVICES
NUTRITION/
FOOD SERVICES
FOOD
OFFICE
FOOD
STORAGE
STOR
118A
CORR.
C102
CORR
C101
STAIR
ST101
ELEVATOR
E101
STOR
117B
OFFICE
117A
KITCHEN FOOD
SERVICE LINE
NEW 2'X2' LED TROFFER LIGHT, 120V, LOW PROFILE
EXISTING FAN
EXISTING SMOKE DETECTOR REUSE EXISTING CIRCUIT S
S
SYMBOLS
EXISTING WALL MOUNTED FIRE ALARM STROBE LIGHT BELOW CEILING SL
SL
NEW HOSPITAL GRADE RECEPTACLE 20 AMP
S
NEW HOSPITAL GRADE LIGHT SWITCH 20 AMP
WITH OCCUPANCY SENSOR
S
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Electrical Plan
A
Fi le
P at h 6/
/2
:3
9:
P M
Electrical Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B7 N&F Floor Structural Upgrades
VA Medical Center, Sheridan, WY
Building 7 Project Director
01-02-24 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
1 1ST Electrical Floor Plan
E-2
GENERAL NOTES:
1. Reinstall existing lights, fans, VAV etc. that were saved. Reuse existing circuits. See note #3 on page AD-2 and coordinate with General Contractor.
2. Where symbols are called out as new, submit those items for approved.
Reuse the existing circuit.
3. All conductors to be in conduit. Provide with ground conductor.
Installation shall comply with the National Electrical Code.
ELECTRICAL NOTES:
1 Reuse existing circuits.
2 Reuse existing circuit and connect into existing light switch.
666-25-105
1 2
| Binder2.pdf |
| B7 N&F Floor Structural Upgrades combined.pdf |
| Sheets and Views |
| Cover Sheet |
| B7 N&F Floor Structural Upgrades 1-9-24b-A-2.pdf |
| Sheets and Views |
| A-2 |
| B7 N&F Floor Structural Upgrades 1-9-24b-A-3.pdf |
| Sheets and Views |
| A-3 |
| B7 N&F Floor Structural Upgrades 1-9-24b-AD-1.pdf |
| Sheets and Views |
| AD-1 |
| B7 N&F Floor Structural Upgrades 1-9-24b-AD-2.pdf |
| Sheets and Views |
| AD-2 |
| B7 N&F Floor Structural Upgrades 1-9-24b-E-1.pdf |
| Sheets and Views |
| E-1 |
| B7 N&F Floor Structural Upgrades 1-9-24b-E-2.pdf |
| Sheets and Views |
| E-2 |
| B7 N&F Floor Structural Upgrades 1-9-24b-PM-1.pdf |
| Sheets and Views |
| PM-1 |
| B7 N&F Floor Structural Upgrades 1-9-24b-PM-2.pdf |
| Sheets and Views |
| PM-2 |
| B7 N&F Floor Structural Upgrades 1-9-24b-Structural.pdf |
| Sheets and Views |
| Structural |
| B7 N&F Floor Structural Upgrades 1-9-24b-A-1 Rev. 1.pdf |
| Sheets and Views |
| A-1 Rev. 1 |
File details come from the government source that posted it. Updated .