B7 N_F Floor Structural Upgrades combined Rev. 1.pdf

PDF 4 MB Posted

Attached to
Z2DA--Project 666-25-105 Bldg. 7 N&F Floor Structural Upgrades Federal contract opportunity
Solicitation number
36C25924Q0075
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This set of construction drawings and specifications is for a federal project to upgrade structural flooring in Building 7 at the Sheridan VA Medical Center in Wyoming. The project, numbered 666-25-105, will strengthen existing floor joists in the basement and first floor by sistering in additional lumber beams. Drawings show demolition plans, architectural plans, structural details, and mechanical, plumbing and electrical plans. Work includes removing sections of ceiling and flooring, installing new suspended ceilings and flooring, and reinstalling mechanical and electrical systems. The related solicitation is numbered 36C25924Q0075 and seeks bids from contractors to complete the project upgrades per the specifications. Award is anticipated in early 2024 following the response deadline.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Project 666-25-105 Bldg. 7 N&F Floor Structural Upgrades, newest first.
File Type Posted
36C25924Q0075 0003.docx DOCX document
VCT Specs.pdf PDF
Site Visit Sign-In Sheet 666-25-105.pdf PDF
36C25924Q0075 0002.docx DOCX document
Bldg 7 Asbestos Report- Part 1 or 2.pdf PDF
Site Visit Meeting Doc_666-25-105_B7 Floor Upgrades.docx DOCX document
36C25924Q0075 0001.docx DOCX document
S02-3-10-2021 Past Performance Questionnaire_Blank_Fillable PDF.pdf PDF
092900_Gypsum Specs.docx DOCX document
6 Drawings B7 Floor Structural Upgrades 25-105.pdf PDF
36C25924Q0075.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheridan VAMC Map

Sheridan VAMC B7 N&F Floor Structrual Upgrades

Sheridan, Wyoming

SHEET INDEX:

G-0 COVER SHEET AND DRAWING INDEX

GENERAL

#666-25-105

Project Location:

Building 7

AD-1 Demolition Plan Basement AD-2 Demolition Plans 1st Floor A-1 Architectural Plan Basement A-2 Architectural Plan 1st Floor A-3 1st Floor Ceiling Plan

ARCHITECTURAL

W

C

FS

M A

RIN

E CO

RPS

COAST GUARD LANE

FORT ROAD

FREEDOM LANE

FREEDOM LANE

FREEDO

M

LA

N

E

FREEDOM LANE

IN

D

E

PE

N D

E N

C E

L A

N E

A

IR

F O

R C

E L

A N

E

A R

M Y

L A

N E

C A

V A

L R

Y L

A N

E

AIR FORCE LANE

A R

M Y

L A

N E

N A

V

Y LA

N E

NAVY LANE

N A

V Y

L A

N E

FR

E

E D

O M

LA

N

E

MARIN

E CORPS LANE

COAST GUARD LANE

N

EW

S

LANE

0' 300'200'100' 400' 500'

Contractors Field Office Location

E-1 Electrical Plan Basement E-2 Electrical Plan 1st Floor

ELECTRICAL

P/M-1 Plumbing - Mechanical Plan Basement P/M-1 Plumbing - Mechanical Plan 1st Floor

PLUMBING AND MECHANICAL

S-1 Structural

STRUCTURAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

COVER SHEET & DRAWING

INDEX

A

Fi le

P at h 6/

/2

:3

9:

P M

Site Map Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

C

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B7 N&F Floor Structural Upgrades

VA Medical Center, Sheridan WY

666-25-105

Building 7 Project Director

01-02-24 J Bergstrom Revisions: Date:

on e ei gh th in ch o ne fo ot

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot

G-0

AutoCAD SHX Text

NTS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 71N

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S71

AutoCAD SHX Text S8

AutoCAD SHX Text S6

AutoCAD SHX Text S86

AutoCAD SHX Text S4

AutoCAD SHX Text

CATHY REICHERT, SUPERVISORY GENERAL ENGINEER PHONE: (307)675-3411

0' 8'4'2'

CORRIDOR

C002

CORRIDOR

CORRIDOR

HAC

UP

C003

ELEV EQUIP

DATA

MECHANICAL CLOSET

C001

FAN UNIT FAN UNIT

STAIR

ST001

ELEVATOR

E001

SECURE

PHARMACY

CACHE

NUTRITION

BREAKROOM

WAREHOUSE

SOUTH

EXISTING 2'X2' LED TROFFER LIGHT

EXISTING FAN

EXISTING RETURN GRILL

EXISTING DIFFUSER

EXISTING FIRE SUPPRESSION HEAD

EXISTING SMOKE DETECTOR S

SYMBOLS

EXISTING FIRE ALARM STROBE LIGHT SL

S

NEW HOSPITAL GRADE LIGHT SWITCH 20 AMP

WITH OCCUPANCY SENSOR

WAP Wifi Access Point

WAP

EXISTING OCCUPANCY SENSOR O

O

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Demolition Plans

A

Fi le

P at h 6/

/2

:3

9:

P M

Demolition Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B7 N&F Floor Structural Upgrades

VA Medical Center, Sheridan WY

Building 7 Project Director

01-02-24 J Bergstrom Revisions: Date:

on e ei gh th in ch o ne fo ot

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot

DEMOLITION NOTES:

1 Disassemble suspended ceiling and grid. Manipulate items in ceiling and walls such as lights, fire suppression sprinkler lines and heads, occupancy sensors, fans, VAV's, duct, cabinets, sanitary sewer, steam piping, hydronic piping etc. as required to level floor above and to install new sister floor joists. Note that the 4" sanitary sewer, VAV, and ducting are not shown on this drawing but are below the plaster ceiling and above suspended ceiling.

2. Remove enough plaster ceiling as required to correct floor sag as per the Structural Plan and details 1&2/S-1.

AD-1

666-25-105

1 BSMT Floor Demolition Plan

B7 Basement Floor Key Plan:

GENERAL NOTES:

1. Coordinate sections of ceiling and other removal with all trades.

2. VA IRCA requirements must be followed.

3. Work hours will be limited to 7:30 am to 5:00 pm. Work can not be performed over weekends and during Federal Holidays. Contractor shall minimize disruption to Food and Nutrition operations.

4.

UP

DN

115 116

CHIEF

NUTRITION &

FOOD

SERVICES

NUTRITION/

FOOD SERVICES

FOOD

OFFICE

FOOD

STORAGE

STOR

118A

CORR.

C102

CORR

C101

STAIR

ST101

ELEVATOR

E101

STOR

117B

OFFICE

117A

Sheridan Wyoming VA Building 7 -Joist Location

KITCHEN FOOD

SERVICE LINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Demolition Plans

A

Fi le

P at h 6/

/2

:3

9:

P M

Demolition Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B7 N&F Floor Structural Upgrades

VA Medical Center, Sheridan WY

Building 7 Project Director

01-02-24 J Bergstrom Revisions: Date:

on e ei gh th in ch o ne fo ot

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot

DEMOLITION NOTES:

1 Demolition wall and doors.

2. Remove all flooring and enough sub-floor to expose the floor joist to sister in additional floor joists to correct floor sag as per the Structural Plan S-1.

3. Remove suspended ceiling and grid to demolition wall. Items in ceiling such as sprinkler heads, diffuser/grills, occupancy sensors, fans etc. shall be protected so that they can be placed back into service in the new ceiling. The lighting system will be replaced new reusing the existing electrical circuits.

4. The flooring under the carpet in rooms 117 and room 117A is a VCT that has asbestos. Remove only the carpet.

5. The VA will empty this room prior to demolition except for items attached to the walls, ceilings and floors such as shelves, signage, white boards. The Contractor is responsible to remove attached items, protect and store and then reattach those items after construction has finished and the rooms are painted.

6. The VA will empty this room prior to demolition

AD-2

666-25-105

1 1st Floor Demolition Plan

B7 1st Floor Key Plan:

3 3

GENERAL NOTES:

1. Coordinate sections of wall and ceiling removal with other trades.

2. VA IRCA requirements must be followed.

3. Work hours will be limited to 7:30 am to 5:00 pm. Work can not be performed over weekends and during Federal Holidays. Contractor shall minimize disruption to Food and Nutrition operations.

5 5 5

C002

CORRIDOR

CORRIDOR

HAC

UP

C003

ELEV EQUIP

DATA

MECHANICAL CLOSET

C001

FAN UNIT FAN UNIT

STAIR

ST001

ELEVATOR

E001

SECURE

PHARMACY

CACHE

NUTRITION

BREAKROOM

EXISTING 2'X2' LED TROFFER LIGHT

EXISTING FAN

EXISTING RETURN GRILL

EXISTING DIFFUSER

EXISTING FIRE SUPPRESSION HEAD

EXISTING SMOKE DETECTOR S

SYMBOLS

EXISTING FIRE ALARM STROBE LIGHT SL

S

NEW HOSPITAL GRADE LIGHT SWITCH 20 AMP

WITH OCCUPANCY SENSOR

WAP Wifi Access Point

WAP

EXISTING OCCUPANCY SENSOR O

O

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Architectural Plans

A

Fi le

P at h 6/

/2

:3

9:

P M

Architectural Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B7 N&F Floor Structural Upgrades

VA Medical Center, Sheridan, WY

Building 7 Project Director

01-02-24 J Bergstrom Revisions: Date:

on e ei gh th in ch o ne fo ot

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot

1 Basement Floor Plan

NOTES:

1 Reassemble ceiling grid, replace the ceiling tile removed with new panels to match what was removed, reinstalled all items that were removed to install floor structure so that they are fully functional. The dropped ceiling panels are Armstrong 895 white.

A-1

GENERAL NOTES:

1. Coordinate sections of wall and ceiling removal with other trades. See Electrical and Plumbing Plans.

2. VA ICRA requirements must be followed.

666-25-105

Revision 1 1/23/2024

DN

115 116

CHIEF

NUTRITION &

FOOD

SERVICES

NUTRITION/

FOOD SERVICES

FOOD

OFFICE

FOOD

STORAGE

STOR

118A

CORR.

C102

CORR

C101

STAIR

ST101

ELEVATOR

E101

STOR

117B

OFFICE

117A

KITCHEN FOOD

SERVICE LINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Architectural Plans

A

Fi le

P at h 6/

/2

:3

9:

P M

Architectural Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B7 N&F Floor Structural Upgrades

VA Medical Center, Sheridan, WY

Building 7 Project Director

01-02-24 J Bergstrom Revisions: Date:

on e ei gh th in ch o ne fo ot

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot

1 1st Floor Plan

A-2

GENERAL NOTES:

1. Coordinate sections of wall and ceiling removal with other trades. See Electrical and Plumbing Plans.

2. Remove items from the walls such as shelve and marker board from the of rooms 116, and C102. Paint all walls in these room and then reinstall the items back on the walls. Reinstall items in ceiling such as sprinkler heads, occupancy sensors, fans etc. and make them fully functional in the new ceiling. The lighting system will be replaced new reusing the existing electrical circuits.

3. VA ICRA requirements must be followed.

666-25-105

1 1 1

NOTES:

1. Install new 12x12 vinyl composite tile (VCT) in these rooms/corridors with 4" vinyl base. Colors to be selected by VA.

2. New walls. Two layers of 5/8" TYP X Gypsum Board on each side. 4" steel studs, 18 ga.. Install sound proofing batts in the wall stud space. Finish, and texture and to match existing finishes. Paint all walls.

3. No wood door, install new hollow metal frame 36Wx80H with screwed on hinge plate. Paint.

4. Not used

5. Install new suspended ceiling grid at the same heights and configuration as the ceiling that was removed.

6. Install a 1/4 plywood with sanded finish over the asbestos VCT. Install new VCT floor with 4" vinyl base with a transition strip at the doorway.

NUTRITION &

UP

DN

CHIEF

NUTRITION &

FOOD

SERVICES

NUTRITION/

FOOD SERVICES

FOOD

OFFICE

FOOD

STORAGE

STOR

118A

CORR.

C102

CORR

C101

STAIR

ST101

ELEVATOR

E101

STOR

117B

OFFICE

117A

KITCHEN FOOD

SERVICE LINE

NEW 2'X2' LED TROFFER LIGHT

EXISTING FAN

TWO EXISTING FIRE SUPPRESSION HEAD.

EXISTING SMOKE DETECTOR REUSE EXISTING CIRCUIT S

S

SYMBOLS

EXISTING WALL MOUNTED FIRE ALARM STROBE LIGHT BELOW CEILING SL

NEW HOSPITAL GRADE RECEPTACLE 20 AMP

S

NEW HOSPITAL GRADE LIGHT SWITCH 20 AMP

WITH OCCUPANCY SENSOR

ABOVE AND BELOW CEILING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

1st Floor Ceilings

A

Fi le

P at h 6/

/2

:3

9:

P M

Architectural Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B7 N&F Floor Structural Upgrades

VA Medical Center, Sheridan, WY

Building 7 Project Director

01-02-25 J Bergstrom Revisions: Date:

on e ei gh th in ch o ne fo ot

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot

GENERAL NOTES:

1. Install a drop ceiling well at window where the ceiling is lower than the top of the window. Match how the ceiling wells were before demolition.

2. Install a new suspended ceiling that matches the ceilings of the area which are an Armstrong 896 with 15

16" grid, Prelude XL Fire Guard - white.

A-3

1 1st Floor Reflective Ceiling Plan

666-25-105

EXISTING RETURN GRILL

EXISTING DIFFUSER

DN

115 116

CHIEF

NUTRITION &

FOOD

SERVICES

NUTRITION/

FOOD SERVICES

FOOD

OFFICE

FOOD

STORAGE

STOR

118A

CORR

C101

STAIR

ST101

ELEVATOR

E101

STOR

117B

OFFICE

117A

KITCHEN FOOD

SERVICE LINE

1-3/4"x?" LVL 12" O.C. Sistered to Existing Floor Joists

1-3/4"x ?"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Structural Plans

A

Fi le

P at h 6/

/2

:3

9:

P M

Structural Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B7 N&F Floor Structural Upgrades

VA Medical Center, Sheridan, WY

Building 7 Project Director

01-02-24 J Bergstrom Revisions: Date:

on e ei gh th in ch o ne fo ot

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot

1 1st Floor Plan

S-1

S-1

GENERAL NOTES:

1. Coordinate sections of wall and ceiling removal with other trades.

2. Floor Joist bearing minimum must be 3" on masonry or concrete

3. Building 7 is post and beam wood construction.

666-25-105

1 Joist Hanger Detail (TYP)

S-1

2 Joist Hanger Detail (TYP)

S-1

C002

CORRIDOR

CORRIDOR

HAC

UP

C003

ELEV EQUIP

DATA

MECHANICAL CLOSET

C001

FAN UNIT FAN UNIT

STAIR

ST001

ELEVATOR

E001

SECURE

PHARMACY

CACHE

NUTRITION

BREAKROOM

WAREHOUSE

SOUTH

EXISTING FAN

EXISTING RETURN GRILL

EXISTING DIFFUSER

EXISTING FIRE SUPPRESSION HEAD

SYMBOLS

Wifi Access Point

EXISTING OCCUPANCY SENSOR O

O

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Plumbing-Mechanical Plans

A

Fi le

P at h 6/

/2

:3

9:

P M

Plumbing - Mechanical Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B7 N&F Floor Structural Upgrades

VA Medical Center, Sheridan, WY

Building 7 Project Director

01-08-24 J Bergstrom Revisions: Date:

on e ei gh th in ch o ne fo ot

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot

1 Basement Floor Plan

P/M-1

PLUMBING/MECHANICAL NOTES:

1 Reinstall items that were moved such as sprinkler lines and heads, VAV's, duct, diffusers/grills, sanitary sewer, steam lines, hydronic lines etc. that had to be manipulated so floor could be access. See note #1 on page AD-1 and coordinate with General Contractor.

GENERAL NOTES:

1. .

666-25-105

GENERAL NOTES:

1 Reuse existing plumbing and mechanic system.

DN

CHIEF

NUTRITION &

FOOD

SERVICES

NUTRITION/

FOOD SERVICES

FOOD

OFFICE

FOOD

STORAGE

STOR

118A

CORR.

C102

CORR

C101

STAIR

ST101

ELEVATOR

E101

STOR

117B

OFFICE

117A

KITCHEN FOOD

SERVICE LINE

TWO EXISTING FIRE SUPPRESSION HEAD.

SYMBOLS

ABOVE AND BELOW CEILING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Plumbing-Mechanical Plans

A

Fi le

P at h 6/

/2

:3

9:

P M

Plumbing - Mechanical Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B7 N&F Floor Structural Upgrades

VA Medical Center, Sheridan, WY

Building 7 Project Director

01-08-24 J Bergstrom Revisions: Date:

on e ei gh th in ch o ne fo ot

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot

1 1st Floor Plan

P/M-2

PLUMBING/MECHANICAL NOTES:

1 Reinstall existing fire sprinkler heads, diffusers, return grills and other items removed to install new ceilings and wall. See note #3 on page AD-2 and coordinate with General Contractor.

666-25-105

GENERAL NOTES:

1. Reuse the existing mechanical and plumbing systems.

1 1

EXISTING RETURN GRILL

EXISTING DIFFUSER

C002

CORRIDOR

CORRIDOR

HAC

UP

C003

ELEV EQUIP

DATA

MECHANICAL CLOSET

C001

FAN UNIT FAN UNIT

STAIR

ST001

ELEVATOR

E001

SECURE

PHARMACY

CACHE

NUTRITION

BREAKROOM

WAREHOUSE

SOUTH

EXISTING 2'X2' LED TROFFER LIGHT

EXISTING RETURN GRILL

EXISTING DIFFUSER

NEW ELECTRICAL JUNCTION BOX J

SYMBOLS

WAP EXISTING Wifi ACCESS POINT

J J

WAP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Electrical Plan

A

Fi le

P at h 6/

/2

:3

9:

P M

Electrical Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B7 N&F Floor Structural Upgrades

VA Medical Center, Sheridan, WY

Building 7 Project Director

01-02-24 J Bergstrom Revisions: Date:

on e ei gh th in ch o ne fo ot

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot

1 1ST Electrical Floor Plan

E-1

GENERAL NOTES:

1. All conductors to be in conduit. Provide with ground conductor.

Installation shall comply with the National Electrical Code.

ELECTRICAL NOTES:

1. Reinstall existing lights, occupancy sensors, fans, Wifi Access Points, VAV etc. that were disassembled to access floor system in the Break Room. Reuse existing circuits. See note #1 on page AD-1 and coordinate with General Contractor.

2. Relocate the electrical conduit and it's conductors out of the existing flooring joists and below the floor's plaster ceiling.

Route conduit path around other items above the drop ceiling. See picture detail on this page.

666-25-105

E-1

1 Exisitng Conduit Picture Detail

NO SCALE

DN

CHIEF

NUTRITION &

FOOD

SERVICES

NUTRITION/

FOOD SERVICES

FOOD

OFFICE

FOOD

STORAGE

STOR

118A

CORR.

C102

CORR

C101

STAIR

ST101

ELEVATOR

E101

STOR

117B

OFFICE

117A

KITCHEN FOOD

SERVICE LINE

NEW 2'X2' LED TROFFER LIGHT, 120V, LOW PROFILE

EXISTING FAN

EXISTING SMOKE DETECTOR REUSE EXISTING CIRCUIT S

S

SYMBOLS

EXISTING WALL MOUNTED FIRE ALARM STROBE LIGHT BELOW CEILING SL

SL

NEW HOSPITAL GRADE RECEPTACLE 20 AMP

S

NEW HOSPITAL GRADE LIGHT SWITCH 20 AMP

WITH OCCUPANCY SENSOR

S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Electrical Plan

A

Fi le

P at h 6/

/2

:3

9:

P M

Electrical Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B7 N&F Floor Structural Upgrades

VA Medical Center, Sheridan, WY

Building 7 Project Director

01-02-24 J Bergstrom Revisions: Date:

on e ei gh th in ch o ne fo ot

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot

1 1ST Electrical Floor Plan

E-2

GENERAL NOTES:

1. Reinstall existing lights, fans, VAV etc. that were saved. Reuse existing circuits. See note #3 on page AD-2 and coordinate with General Contractor.

2. Where symbols are called out as new, submit those items for approved.

Reuse the existing circuit.

3. All conductors to be in conduit. Provide with ground conductor.

Installation shall comply with the National Electrical Code.

ELECTRICAL NOTES:

1 Reuse existing circuits.

2 Reuse existing circuit and connect into existing light switch.

666-25-105

1 2

Binder2.pdf
B7 N&F Floor Structural Upgrades combined.pdf
Sheets and Views
Cover Sheet
B7 N&F Floor Structural Upgrades 1-9-24b-A-2.pdf
Sheets and Views
A-2
B7 N&F Floor Structural Upgrades 1-9-24b-A-3.pdf
Sheets and Views
A-3
B7 N&F Floor Structural Upgrades 1-9-24b-AD-1.pdf
Sheets and Views
AD-1
B7 N&F Floor Structural Upgrades 1-9-24b-AD-2.pdf
Sheets and Views
AD-2
B7 N&F Floor Structural Upgrades 1-9-24b-E-1.pdf
Sheets and Views
E-1
B7 N&F Floor Structural Upgrades 1-9-24b-E-2.pdf
Sheets and Views
E-2
B7 N&F Floor Structural Upgrades 1-9-24b-PM-1.pdf
Sheets and Views
PM-1
B7 N&F Floor Structural Upgrades 1-9-24b-PM-2.pdf
Sheets and Views
PM-2
B7 N&F Floor Structural Upgrades 1-9-24b-Structural.pdf
Sheets and Views
Structural
B7 N&F Floor Structural Upgrades 1-9-24b-A-1 Rev. 1.pdf
Sheets and Views
A-1 Rev. 1

File details come from the government source that posted it. Updated .