6 Drawings B7 Floor Structural Upgrades 25-105.pdf
PDF 2 MB Posted
- Attached to
- Z2DA--Project 666-25-105 Bldg. 7 N&F Floor Structural Upgrades Federal contract opportunity
- Solicitation number
- 36C25924Q0075
About this file
This document package includes architectural drawings and specifications for a federal construction project. The project involves structural upgrades to the floors in Building 7 at the Department of Veterans Affairs Medical Center in Sheridan, Wyoming. Work includes demolishing sections of walls and ceilings, removing existing flooring, and sistering in additional floor joists at 12-inch spacing to address sagging in the first and basement floors. The specifications provide details for the 1-3/4x7-1/4 inch laminated veneer lumber joists to be installed and specify the use of joist hangers. Solicitation number 36C25924Q0075 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 seeks offers for this project to upgrade the nutrition and food service floors at the specified location.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25924Q0075 0003.docx | DOCX document | |
| VCT Specs.pdf | ||
| B7 N_F Floor Structural Upgrades combined Rev. 1.pdf | ||
| Site Visit Sign-In Sheet 666-25-105.pdf | ||
| 36C25924Q0075 0002.docx | DOCX document | |
| Site Visit Meeting Doc_666-25-105_B7 Floor Upgrades.docx | DOCX document | |
| Bldg 7 Asbestos Report- Part 1 or 2.pdf | ||
| 36C25924Q0075 0001.docx | DOCX document | |
| 36C25924Q0075.docx | DOCX document | |
| S02-3-10-2021 Past Performance Questionnaire_Blank_Fillable PDF.pdf | ||
| 092900_Gypsum Specs.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0' 8'4'2'
UP
DN
115 116
CHIEF
NUTRITION &
FOOD
SERVICES
NUTRITION/
FOOD SERVICES
FOOD
OFFICE
FOOD
STORAGE
STOR
118A
CORR.
C102
CORR
C101
STAIR
ST101
ELEVATOR
E101
STOR
117B
OFFICE
117A
KITCHEN FOOD
SERVICE LINE
A-3
A-3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Architectural Plans
A
Fi le
P at h 6/
/2
:3
9:
P M
Architectural Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Joist Repair B7
VA Medical Center, Sheridan, WY
Quarters 28 Project Director
06-06-20 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
1 1st Floor Plan
1 Basement Floor Plan
NOTES:
1 Custom
A-1
GENERAL NOTES:
1. Coordinate sections of wall and ceiling removal with other trades. See Electrical and Plumbing Plans.
2. The walls, ceilings, window sealants, flooring and other materials have an asbestos content. See Asbestos report in specifications.
3. Trim bottom doors so that they clear flooring without rubbing.
666-20-110
AutoCAD SHX Text
CATHY REICHERT, SUPERVISORY GENERAL ENGINEER PHONE: (307)675-3411
DN
115 116
CHIEF
NUTRITION &
FOOD
SERVICES
NUTRITION/
FOOD SERVICES
FOOD
OFFICE
FOOD
STORAGE
STOR
118A
CORR.
C102
CORR
C101
STAIR
ST101
ELEVATOR
E101
STOR
117B
OFFICE
117A
KITCHEN FOOD
SERVICE LINE
A-3
A-3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Architectural Plans
A
Fi le
P at h 6/
/2
:3
9:
P M
Architectural Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Joist Repair B7
VA Medical Center, Sheridan, WY
Quarters 28 Project Director
06-06-20 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
1 1st Floor Plan
NOTES:
1 INSTALL NEW VINYL COMPOSITE TILE (VCT) IN THESE ROOMS
2 NEW WALL. 58 TYP X GYPSUM BOARD ON EACH SIDE. 3-5/8" STEEL STUD, 20 GA.
3 NEW 48' DOOR
A-1
GENERAL NOTES:
1. Coordinate sections of wall and ceiling removal with other trades. See Electrical and Plumbing Plans.
2. The walls, ceilings, window sealants, flooring and other materials have an asbestos content. See Asbestos report in specifications.
3. Trim bottom doors so that they clear flooring without rubbing.
666-20-110
1 1 1
2 2
3 3
Sheridan VAMC Map
Sheridan VAMC Building 7 Floor Repair
Sheridan, Wyoming
SHEET INDEX:
G-0 COVER SHEET AND DRAWING INDEX
GENERAL
#666-xx-xxx
Project Location:
Building 7
AD-1 Demolition Plans A-1 Architectural Plans A-2 Exterior Architectural Plans (Add Alternate No. 1) A-3 Cabinet Sections and Details A-4 Porch Details
ELECTRICAL
ED-1 Electrical Demolition E-1 Electrical Plans
ARCHITECTURAL
PLUMBING AND MECHANICAL
PD/MD-1 Plumbing and Mechanical Demolition P/M-1 Plumbing-Mechanical Plans
W
C
FS
M A
RIN
E CO
RPS
COAST GUARD LANE
FORT ROAD
FREEDOM LANE
FREEDOM LANE
FREEDO
M
LA
N
E
FREEDOM LANE
IN
D
E
PE
N D
E N
C E
L A
N E
A
IR
F O
R C
E L
A N
E
A R
M Y
L A
N E
C A
V A
L R
Y L
A N
E
AIR FORCE LANE
A R
M Y
L A
N E
N A
V
Y LA
N E
NAVY LANE
N A
V Y
L A
N E
FR
E
E D
O M
LA
N
E
MARIN
E CORPS LANE
COAST GUARD LANE
N
EW
S
LANE
0' 300'200'100' 400' 500'
Contractors Field Office Location
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
COVER SHEET & DRAWING
INDEX
A
Fi le
P at h 6/
/2
:3
9:
P M
Site Map Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
C
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Building 58 Restoration
VA Medical Center, Sheridan WY
666-XX-XXX
Building 58 Project Director
06-06-20 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
G-0
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 71N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S71
AutoCAD SHX Text S8
AutoCAD SHX Text S6
AutoCAD SHX Text S86
AutoCAD SHX Text S4
DN
115 116
CHIEF
NUTRITION &
FOOD
SERVICES
NUTRITION/
FOOD SERVICES
FOOD
OFFICE
FOOD
STORAGE
STOR
118A
CORR.
C102
CORR
C101
STAIR
ST101
ELEVATOR
E101
STOR
117B
OFFICE
117A
Sheridan Wyoming VA Building 7 -Joist Location
KITCHEN FOOD
SERVICE LINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Demolition Plans
A
Fi le
P at h 6/
/2
:3
9:
P M
Demolition Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Building 28 Upgrade
VA Medical Center, Sheridan WY
Building 28 Project Director
06-06-20 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
DEMOLITION NOTES:
1 Demolition walls and doors.
2. Remove all flooring and enough subfloor to expose the floor joist to sister in additional floor joists to correct floor sag as per the Structural Plan and detail x/xxx.
3. Disassemble enough suspended ceiling and grid to demolition walls. Manipulate items in ceiling such as lights, sprinkler heads, occupancy sensors, fans etc. so that walls can demolitioned. Reassemble ceiling grid, replace the ceiling tile removed with new panels to match what was removed, reinstalled items that were removed back in the reassembled ceiling so that they are fully functional.
AD-1
GENERAL NOTES:
1. Coordinate sections of wall and ceiling removal with other trades.
666-20-110
1 1st Floor Demolition Plan
B7 1st Floor Key Plan:
3 3 3
CORRIDOR
C002
CORRIDOR
CORRIDOR
HAC
UP
C003
ELEV EQUIP
DATA
MECHANICAL CLOSET
C001
FAN UNIT FAN UNIT
STAIR
ST001
ELEVATOR
E001
SECURE
PHARMACY
CACHE
NUTRITION
BREAKROOM
WAREHOUSE
SOUTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Demolition Plans
A
Fi le
P at h 6/
/2
:3
9:
P M
Demolition Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Building 28 Upgrade
VA Medical Center, Sheridan WY
Building 28 Project Director
06-06-20 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
DEMOLITION NOTES:
1 Disassemble suspended ceiling and grid. Manipulate items in ceiling such as lights, sprinkler heads, occupancy sensors, fans etc. so that sections of the plaster ceiling above can be removed (if necessary) to install new sister floor joists. Reassemble ceiling grid, replace the ceiling tile removed with new panels to match what was removed, reinstalled items that were removed back in the reassembled ceiling so that they are fully functional.
2. Expose enough floor joist to sister in additional floor joists to correct floor sag as per the Structural Plan and detail x/xxx.
AD-1
GENERAL NOTES:
1. Coordinate sections of wall and ceiling removal with other trades.
666-20-110
1 BSMT Floor Demolition Plan
B7 Basement Floor Key Plan:
DN
115 116
CHIEF
NUTRITION &
FOOD
SERVICES
NUTRITION/
FOOD SERVICES
FOOD
OFFICE
FOOD
STORAGE
STOR
118A
CORR
C101
STAIR
ST101
ELEVATOR
E101
STOR
117B
OFFICE
117A
KITCHEN FOOD
SERVICE LINE
1-3/4"x7-1/4" LVL 12" O.C. Sistered to Existing Floor Joists
1-3/4"x7-1/4"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Structural Plans
A
Fi le
P at h 6/
/2
:3
9:
P M
Structural Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Joist Repair B7
VA Medical Center, Sheridan, WY
Quarters 28 Project Director
`12-06-21 J Bergstrom Revisions: Date:
on e ei gh th in ch o ne fo ot
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
1 1st Floor Plan
1 Basement Floor Plan
NOTES:
1 Custom
S-1
S-1
A-3
GENERAL NOTES:
1. Coordinate sections of wall and ceiling removal with other trades. See Electrical and Plumbing Plans.
2. The walls, ceilings, window sealants, flooring and other materials have an asbestos content. See Asbestos report in specifications.
3. Trim bottom doors so that they clear flooring without rubbing.
666-20-110
1 Joist Hanger Detail (TYP)
S-1
2 Joist Hanger Detail (TYP)
| B7 Floor Repair-A-1 |
| Sheets and Views |
| A-1 |
| B7 Floor Repair-A-2 |
| Sheets and Views |
| A-2 |
| B7 Floor Repair-Cover Sheet |
| Sheets and Views |
| Cover Sheet |
| B7 Floor Repair-Demo 1st |
| Sheets and Views |
| Demo 1st |
| B7 Floor Repair-Demo BSMT |
| Sheets and Views |
| Demo BSMT |
| B7 Floor Repair-Structural |
| Sheets and Views |
| Structural |
File details come from the government source that posted it. Updated .