Plans for Floorazzo install in Tunnels as connected to buildings (all but B.2).pdf
PDF 947 KB Posted
- Solicitation number
- 36C25923R0066
About this file
This solicitation document outlines requirements for a terrazzo tile flooring replacement project at the VA Salt Lake City Health Care System tunnels. The scope of work involves removing existing flooring and installing VA-stocked terrazzo tile using a wet-set method. The contractor must develop a phasing plan to minimize disruptions, comply with infection control and security procedures, and ensure installer training and certification. The terrazzo tile will be provided by the VA. The contractor is responsible for moisture testing, any necessary moisture remediation, and installing a self-leveling cementitious underlayment. The project also requires primers, adhesives, sealers, and protective coatings. The performance period is 280 calendar days. The selected contractor will be expected to meet quality standards and complete punchlist items, cleaning, and initial floor maintenance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.2 Basement Tunnel connection Floorazzo install.pdf | ||
| 36C25923R0066 0005.docx | DOCX document | |
| C05- Terrazzo Tile Questions responses.docx | DOCX document | |
| 36C25923R0066 0004.docx | DOCX document | |
| 36C25923R0066 0003.docx | DOCX document | |
| 36C25923R0066 0002.docx | DOCX document | |
| S04- Site Visit Attendance sheet.pdf | ||
| S04- Site Visit Meeting Doc.docx | DOCX document | |
| 36C25923R0066 0001.docx | DOCX document | |
| A-2 FLOOR PLAN TUNNEL A.pdf | ||
| 36C25923R0066_1.docx | DOCX document | |
| Doc-204-Technical-Data-12.20.2020.pdf | ||
| A-5 FLOOR PLAN TUNNEL B.pdf | ||
| S22- 852.219-75 LOS Certificaiton.docx | DOCX document | |
| Floorazzo-Tile-Sales-Brochure.pdf | ||
| A-4 FLOOR PLAN TUNNEL C.pdf | ||
| SitePlan-A101.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Callout The tunnel floorazzo will start at the double doors in B.3
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Callout New floorazzo tile to meet with existing floorazzo tile
VHASLCHillC Arrow
VHASLCHillC Line
VHASLCHillC Callout stairwell in floorazzo to butt to the floorazzo in the 2 side corridors
VHASLCHillC Callout Any adjoining doors to have the Floorazzo extend under the door. Floorazzo to be terminated with appropriate trim, Schluter, rubber,to be confirmed with COR. There will be different solutions required based on each circumstance. At no point is a floorazzo edge to be left raw, it will get damaged and break.
VHASLCHillC Arrow
VHASLCHillC Callout Stairwell floors on the same level of the tunnel to be replaced if there is enough product in stock.
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Callout Any adjoining doors to have the Floorazzo extend under the door. Floorazzo to be terminated with appropriate trim, Schluter, rubber,to be confirmed with COR. There will be different solutions required based on each circumstance. At no point is a floorazzo edge to be left raw, it will get damaged and break.
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Callout Stairwell floors on the same level of the tunnel to be replaced if there is enough product in stock.
VHASLCHillC Arrow
VHASLCHillC Arrow
Arrow
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Callout Stairwell floors on the same level of the tunnel to be replaced if there is enough product in stock.
VHASLCHillC Highlight
VHASLCHillC Highlight
VHASLCHillC Callout Any adjoining doors to have the Floorazzo extend under the door. Floorazzo to be terminated with appropriate trim, Schluter, rubber,to be confirmed with COR. There will be different solutions required based on each circumstance. At no point is a floorazzo edge to be left raw, it will get damaged and break.
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
VHASLCHillC Arrow
Arrow