Plans for Floorazzo install in Tunnels as connected to buildings (all but B.2).pdf

PDF 947 KB Posted

Attached to
Z2DA--CON | 660-23-114 | Install Terrazzo Tile in Tunnels
Solicitation number
36C25923R0066
Issued by

About this file

This solicitation document outlines requirements for a terrazzo tile flooring replacement project at the VA Salt Lake City Health Care System tunnels. The scope of work involves removing existing flooring and installing VA-stocked terrazzo tile using a wet-set method. The contractor must develop a phasing plan to minimize disruptions, comply with infection control and security procedures, and ensure installer training and certification. The terrazzo tile will be provided by the VA. The contractor is responsible for moisture testing, any necessary moisture remediation, and installing a self-leveling cementitious underlayment. The project also requires primers, adhesives, sealers, and protective coatings. The performance period is 280 calendar days. The selected contractor will be expected to meet quality standards and complete punchlist items, cleaning, and initial floor maintenance.

View the file

Other files

File Type Posted
B.2 Basement Tunnel connection Floorazzo install.pdf PDF
36C25923R0066 0005.docx DOCX document
C05- Terrazzo Tile Questions responses.docx DOCX document
36C25923R0066 0004.docx DOCX document
36C25923R0066 0003.docx DOCX document
36C25923R0066 0002.docx DOCX document
S04- Site Visit Attendance sheet.pdf PDF
S04- Site Visit Meeting Doc.docx DOCX document
36C25923R0066 0001.docx DOCX document
A-2 FLOOR PLAN TUNNEL A.pdf PDF
36C25923R0066_1.docx DOCX document
Doc-204-Technical-Data-12.20.2020.pdf PDF
A-5 FLOOR PLAN TUNNEL B.pdf PDF
S22- 852.219-75 LOS Certificaiton.docx DOCX document
Floorazzo-Tile-Sales-Brochure.pdf PDF
A-4 FLOOR PLAN TUNNEL C.pdf PDF
SitePlan-A101.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Callout The tunnel floorazzo will start at the double doors in B.3

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Callout New floorazzo tile to meet with existing floorazzo tile

VHASLCHillC Arrow

VHASLCHillC Line

VHASLCHillC Callout stairwell in floorazzo to butt to the floorazzo in the 2 side corridors

VHASLCHillC Callout Any adjoining doors to have the Floorazzo extend under the door. Floorazzo to be terminated with appropriate trim, Schluter, rubber,to be confirmed with COR. There will be different solutions required based on each circumstance. At no point is a floorazzo edge to be left raw, it will get damaged and break.

VHASLCHillC Arrow

VHASLCHillC Callout Stairwell floors on the same level of the tunnel to be replaced if there is enough product in stock.

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Callout Any adjoining doors to have the Floorazzo extend under the door. Floorazzo to be terminated with appropriate trim, Schluter, rubber,to be confirmed with COR. There will be different solutions required based on each circumstance. At no point is a floorazzo edge to be left raw, it will get damaged and break.

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Callout Stairwell floors on the same level of the tunnel to be replaced if there is enough product in stock.

VHASLCHillC Arrow

VHASLCHillC Arrow

Arrow

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Callout Stairwell floors on the same level of the tunnel to be replaced if there is enough product in stock.

VHASLCHillC Highlight

VHASLCHillC Highlight

VHASLCHillC Callout Any adjoining doors to have the Floorazzo extend under the door. Floorazzo to be terminated with appropriate trim, Schluter, rubber,to be confirmed with COR. There will be different solutions required based on each circumstance. At no point is a floorazzo edge to be left raw, it will get damaged and break.

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

VHASLCHillC Arrow

Arrow

File details come from the government source that posted it. Updated .