36C25923R0066 0004.docx

DOCX document 26 KB Posted

Attached to
Z2DA--CON | 660-23-114 | Install Terrazzo Tile in Tunnels
Solicitation number
36C25923R0066
Issued by

About this file

This document outlines the requirements for a federal contract opportunity to install terrazzo tile in tunnels at the VA Salt Lake City Health Care System. The scope of work includes removing existing flooring, preparing the concrete substrate, and installing VA-supplied terrazzo tile using the wet set method. Offerors must submit pricing, product information, warranties, and estimates of man-hours required by June 6, 2023. The performance period is 280 calendar days from notice to proceed. The contractor will be required to develop a phasing plan to minimize disruptions, perform concrete testing, provide project management and installation supervision, and comply with all applicable regulations and standards.

View the file

Other files

File Type Posted
B.2 Basement Tunnel connection Floorazzo install.pdf PDF
36C25923R0066 0005.docx DOCX document
C05- Terrazzo Tile Questions responses.docx DOCX document
Plans for Floorazzo install in Tunnels as connected to buildings (all but B.2).pdf PDF
36C25923R0066 0003.docx DOCX document
36C25923R0066 0002.docx DOCX document
S04- Site Visit Attendance sheet.pdf PDF
S04- Site Visit Meeting Doc.docx DOCX document
36C25923R0066 0001.docx DOCX document
A-2 FLOOR PLAN TUNNEL A.pdf PDF
36C25923R0066_1.docx DOCX document
Doc-204-Technical-Data-12.20.2020.pdf PDF
A-5 FLOOR PLAN TUNNEL B.pdf PDF
S22- 852.219-75 LOS Certificaiton.docx DOCX document
Floorazzo-Tile-Sales-Brochure.pdf PDF
A-4 FLOOR PLAN TUNNEL C.pdf PDF
SitePlan-A101.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 660-23-114 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders

36C25923R0066 05-26-2023

X X X

See CONTINUATION Page X See page 2.

CONTINUATION PAGE

AN AMENDMENT TO SOLICITATION 36C25923R0066 POSTED ON MAY 26, 2023.

The purpose of this amendment is as follows:

A) Repost Responses to RFIs documents due to system error.

B) Due date is June 6, 2023 @ 10:30 AM MT.

C) All questions and offers will be emailed to Christina Beeler-Blackburn at Christina.Beeler-Blackburn@va.gov.

All other items and conditions remain the same.

A.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

Install Terrazzo Tile in the tunnels PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z2DA - Repair or Alteration of Hospitals and Infirmaries

GRAND TOTAL
__________________

A.2 DELIVERY SCHEDULE

ITEM NUMBER
QUANTITY
DELIVERY DATE
1.00
280 Calendar days after NTP

A.3 List of Attachments

See attached document: C05- Terrazzo Tile Questions responses.