36C25919R0113-0002000.docx

DOCX document 27 KB Posted

Attached to
Demolish and remodel hazardous drug compounding area (VA-19-00046876)
Solicitation number
36C25919R0113
Issued by

About this file

36C25919R0113 0002 36C25919R0113 0002.docx

View the file

Other files

File Type Posted
36C25919R0113-0006001.pdf PDF
36C25919R0113-0006002.pdf PDF
36C25919R0113-0006003.pdf PDF
36C25919R0113-0006004.pdf PDF
36C25919R0113-0006000.docx DOCX document
36C25919R0113-0005000.docx DOCX document
36C25919R0113-0004000.docx DOCX document
36C25919R0113-0003000.docx DOCX document
36C25919R0113-0002001.pdf PDF
36C25919R0113-0001002.pdf PDF
36C25919R0113-0001000.docx DOCX document
36C25919R0113-0001001.pdf PDF
36C25919R0113-002.pdf PDF
36C25919R0113-003.pdf PDF
36C25919R0113-004.docx DOCX document
36C25919R0113-001.docx DOCX document
36C25919R0113-005.docx DOCX document
36C25919R0113-000.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-30-2019 575-18-110 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders

36C25919R0113

X x x

The purpose of this amendment is to provide answers to questions.

All other terms and conditions remain unchanged.

1. Door sizes on plans show for a 3'0 x 7'0 frame. To get a net slide of 36 inches the frame would need to be 7ft. wide and a standard height of automatic door is 7'6" Tall.

Response: The manufacture’s standard size for the 3'0 x 7'0 door is 7 ft.wide but we had spoken with the Basis of design manufacturer Assa Abbloy and they assured us that they could detail a frame in the existing space which the drawings call to be field verified. They would submit the required shop drawings with those modifications. The opening may need the door swung to provide hood access but that would be determined in shop drawings. The code required clearance is less than the 3 ft indicated.

Yes the door with the frame is 7’6” tall.

See attached basis of design manufacture’s installation drawing.

2. Threshold detail #8 for Door #1010 shows the track to be cut into the concrete. The door installer is not sure this can be done at this location. Can the same track as shown in Detail #9 be provided for this door location.

Response: The two doors are different systems. Verify with door manufacturer but I think the existing wall to too thick to accommodate that guide rail. We cannot have a raised threshold type track into the compounding area. Please describe the problem with the recessed threshold track installation.

3. Locking for these doors is calling for a fail secure auto lock. Do we need to have a throw bolt with a keyed cylinder as a back up to secure these doors? Also, are key switches acceptable to turn automatic on/off.

Response: The specification calls for these doors to fail safe not fail secure. They should only have the interlock systems in place. No throw bolts are allowed and the doors are not to be secured to my knowledge.

4. The existing floor is epoxy coated. This will extremely hard to remove possibly requiring cutting with a demo saw, chipping tool and/or grinding. Given the location and high probability of noise and dust is this going to be acceptable or could the new flooring be installed on top of the existing flooring/base?

Response: The new floor can be installed over the old per manufacturer’s directions and provided it is secure and stable..

5. The HEPA Cabinets and Interlocking doors will have significant lead time (8 – 12 weeks) – confirm that the contract days will not start until these items can be submitted/approved and shipped.

Response: That is a question for the Project Manager and the COR. The deadline for completion is probably fixed based on certification requirements. The other work can be done during the shop drawing and fabrication process.

6. Please verify the requirements for the temporary infection control barrier, type B – this wall appears to require insulation and cove base (Drawing G101). Can the wall be sealed with plastic/fire tape rather than installing cove base?

Response: Yes, provided a seal is obtained and the adhesive is removable.

7. Specifications section 01 35 26 22 calls for a 2 hour fire rated door/frame that is painted. Confirm that the existing door can be used until the new door is installed.

Response: Yes, with COR approval.

7. Plan page P-001 call for lav faucet only but P-101 calls for a new lav. Clarify which is correct. Also will this lav require a carrier or just a wall bracket. On G-001 The lay down area is currently being used for the 3rd floor remodel.

Response: Provide a new lavatory (deep sink) and faucet per the specifications.

8. Will Pro Press fittings be allowed?

Response: Pro Press fittings are acceptable.

9. A-101 Calls for a sink mounted eye wash and p-101 call for relocating eye wash to wall mounted above sink. Clarify which is correct.

Response: Relocate the existing wall mounted eye wash to a location near the new sink.

See attached document: Haz Drug Workspace - prebid RFIs - responses with door info 3.