36C25918R0592-018.pdf
PDF 2 MB Posted
- Attached to
- Upgrade Site Water Systems (VA-18-00071315)
- Solicitation number
- 36C25918R0592
About this file
36C25918R0592 Water Drawings Part4.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25918C0325-000.docx | DOCX document | |
| 36C25918R0592-0002003.pdf | ||
| 36C25918R0592-0002002.pdf | ||
| 36C25918R0592-0002000.docx | DOCX document | |
| 36C25918R0592-0002001.pdf | ||
| 36C25918R0592-0001000.docx | DOCX document | |
| 36C25918R0592-020.docx | DOCX document | |
| 36C25918R0592-012.docx | DOCX document | |
| 36C25918R0592-014.pdf | ||
| 36C25918R0592-017.pdf | ||
| 36C25918R0592-019.docx | DOCX document | |
| 36C25918R0592-013.docx | DOCX document | |
| 36C25918R0592-024.pdf | ||
| 36C25918R0592-021.pdf | ||
| 36C25918R0592-023.pdf | ||
| 36C25918R0592-015.pdf | ||
| 36C25918R0592-022.pdf | ||
| 36C25918R0592-016.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
P-401
WLFDJR
PLUMBING EQUIPMENT AND
FIXTURE SCHEDULES
CALCIUM SILICATE
INSULATION AT PIPE
HANGER
PIPE
INSULATION
HEAVY DUTY
CLEVIS HANGER
SUPPORT NUT
LOCKING NUT
HANGER ROD
14 GAUGE ZINC
COATED SHEET
STEEL SADDLE, AT
LEAST 6" LONG
VFD (TYPICAL OF 3)
MASTER CONTROL
PANEL
6" SUCTION6" DISCHARGE
PUMP (TYPICAL OF 3)
6" SUCTION
6" DISCHARGE 6" GROOVED CAP
6" GROOVED CAP
PUMPPUMPPUMP
VFD (TYPICAL OF 3)
MASTER CONTROL
PANEL
SHUTOFF VALVE (TYPICAL)
SHUTOFF VALVE (TYPICAL)
EX 6" BFP
EX 3" BFP
EX 3" BFP
EX PIPE STAND
EX 3"
EX 3"
EX PRESSURE GAUGE
EX 6"
EX 6"
EX 6"
EX 6"
EX 3"
EX 3"
EX FLOOR DRAIN
CONTRACTOR TO PROVIDE
3 ADDITIONAL VFD'S
EX 6" BFP
FLOOR
EAST ELEVATION
FLOORFLOOR
WEST ELEVATION
PLAN VIEW
NOTE:
1. PIPE PRV DISCHARGE PIPE TO
EXTERIOR OF THE BUILDING.
VFD (TYPICAL OF 4)
MASTER CONTROL
PANEL
8" DISCHARGE
PUMP (TYPICAL OF 4)
8" SUCTION
8" DISCHARGE 8" GROOVED CAP
8" GROOVED CAP
PUMPPUMPPUMP
VFD (TYPICAL OF 4)
MASTER CONTROL
PANEL
SHUTOFF VALVE (TYPICAL)
SHUTOFF VALVE (TYPICAL)
CONTRACTOR TO PROVIDE
4 ADDITIONAL VFD'S
EAST ELEVATION
FLOOR
FLOOR
WEST ELEVATION
PLAN VIEW
NOTE:
1. PIPE PRV DISCHARGE PIPE TO
EXTERIOR OF THE BUILDING.
PUMP
REDUCED PRESSURE
BACKFLOW PREVENTER
HYPERCHLORINATION
INJECTION PORT
NC
DRAIN VALVE WITH
HOSE THREAD
ROUTE TO NEAREST FLOOR
OR HUB DRAIN WITH AIR GAP
NC
FULL LINE SIZE
BY-PASS
FULL LINE SIZE
BY-PASS
PRESSURE REDUCING
VALVE WITH PRESSURE
GAUGE
DRAIN VALVE WITH
HOSE THREAD
NC
EX SITRANS METER
EX PIPE STAND
EX SITRANS METER ON HORIZONTAL PIPE ABOVE
NC
NO
NO
NO
NO
NC
NO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
P-501
WLF / LLPDJR
PLUMBING DETAILS
INCOMING WATER SERVICE
BFP-7
PRESSURE GAUGE
4"
4"
4"
FLOOR DRAIN
BFP-7
FLOOR SLEEVE
BFP-1
1" TO HEATING WATER
INCOMING EX 6" WATER SERVICE
BFP-4
6"
6"
6"
BFP-8
EX 6" TO BUILDING
BFP-8
6"
2"
NEW 6" TO EXISTINGEXISTING 6" TO NEW EXISTING 6" TO BE REMOVED
SUPPORT NEW PIPING FROM WALL, TYP.
ROLL-OUT AND DOWN
WITH A 22.5 DEGREE
ELBOW TO GET CLEAR
OF THE EXISTING PIPING
ON THE WALL BELOW
ROLL-OUT AND DOWN WITH A 22.5
DEGREE ELBOW TO GET CLEAR OF
THE EXISTING PIPING ON THE
WALL BELOW
EX 1" TO HOSE BIBBS
EX 1" TO BE REMOVED
2" TO BLOW-DOWN AND HOSE BIBBS
NEW 1" TO EXISTING
2"
6"
2" TO EWS/SH AND SINK
BALL OR GATE ISOLATION VALVE, TYP.
2" TO EWS/SH AND SINK
PRESSURE GAUGE, TYP.
MAKEUP SUPPLY LINE
PRE-PIPED SKID MOUNTED
PIPE STAND SUPPORT, TYP.
SUPPORT UNDER P-TRAP
FINISHED FLOOR
SAN TEE
DEEP SEAL P-TRAP
DRAIN PIPES SECURELY
CENTERED OVER P-TRAP
SHORT REDUCER FITTING
NEW SAN TEE
NEW
COMBINATION
FITTING
EXISTING
SANITARY
WASTE RISER
EXISTING VENT RISER
1" AIR GAP
NOTE:
MIXING VALVES MUST ALLOW EASY CLEANING AND DISINFECTION OPERATION.
- DISMANTLE AND CLEAN HOSES, SHOWERHEADS AND MIXING VALVE ONCE A YEAR.
- HOT AND COLD WATER DISTRIBUTION PIPES MUST BE INSULATED IN ACCORDANCE WITH SECTION 220711.
ASSE 1070
CW
HW
H W
R
SAFETY VALVE
DRAIN (TYP.)
CHECK VALVE (TYP.)
MAIN WATER SUPPLY WITH
BACKFLOW PROTECTION
REGULATOR
VM1B
VM1A
BALANCING VALVE
(TYP.)
PUMP
MIXED WATER
RETURN OF THE LOOP
INDIVIDUAL
FIXTURES
DISTRIBUTION TO PATIENT CARE
ASSE
NC
WATER HAMMER
ARRESTOR
(TYP.)
TEMPERATURE
GAUGE
(TYP.)
ASSE 1017
HI-LOW
THERMOSTATIC
MIXING VALVE
(TYP.)
BY-PASS
FOR THERMAL
ERADICATION
N.C. VALVE
WATER DRAIN
COCK (TYP.)
C W
NOTES:
THERMOSTATIC BALANCING VALVE TO STABILIZE CIRCUIT TEMPERATURES.
VM1A: OPEN BETWEEN 124°F AND 90% OR MANUFACTURER'S INSTRUCTIONS.
VM1B: OPEN BETWEEN 124°F AND 10% OR MANUFACTURER'S INSTRUCTIONS.
KEY POINTS OF THE REGULATION:
USE OF RECIRCULATION SYSTEMS: CIRCULATING LOOP AND BALANCING VALVES.
ENSURE THAT THE TARGET TEMPERATURE IS ACHIEVED THROUGHOUT ALL LEVELS OF THE LOOP.
MIXING OF HWR WITH CW ENSURES PROPER FUNCTION OF 1017 MIXING VALVE IN ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS.
MIXING VALVES MUST BE AS CLOSE AS POSSIBLE TO THE POINT IN USE.
A
B
C
D
ΔT = 3.3° C [6° F]
TEMP. >54.4° C [130° F]
19.4° C [67° F]
OR LESS
B
INSTANTANEOUS
WATER HEATER(S)
≥ 71° C
[160° F]
1 1/2"
130° F
DIGITAL THERMOSTATIC MIXING
VALVE (TMV-1 0R 2)
160° F
NO
NOTE:
- PROVIDE AN ADDITION HEAT EXCHANGER TUBE BUNDLE AND CONTROL HEAD
WITH EACH WATER HEATER.
ELECTRONIC CONTROL
130°F OUT TO BLDG
124°F HOT WATER RETURN
TEST PORT/PURGE VALVE
SOLENOID VALVE
HW RETURN TO COLD WATER
FEED OF HOT WATER SOURCE
COLD WATER INLET
HOT WATER INLET
SOLENOID (NC)
SOLENOID (NO)
NORMALLY CLOSED
CONNECTED TO BAS
NOTES:
1. VALVE TO REMAIN CLOSED DURING NORMAL OPERATION.
2. VALVE TO BE OPENED DURING THERMAL ERADICATION.
3. VALVE TO BE CLOSED DURING THERMAL ERADICATION.
4. ALARM TO BE SENT TO BAS WHEN TEMPERATURE FALLS
BELOW 124°F OR ABOVE 130°F.
1 2
FROM BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
P-502
WLF / LLPDJR
PLUMBING DETAILS
HARDWARE POINTS SOFTWARE POINTS
POINT NAME AI AO BI BO AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC
BUILDING DOMESTIC HOT WATER SUPPLY TEMP X X X X
BUILDING DOMESTIC HOT WATER FLOW X X X
TOTALS
2 2 2 2
FLOW METER:
FLOW METER SHALL PROVIDE CONTINUOUS FLOW RATE READINGS (GPM) AND TOTALIZATION OF USAGE PER HOUR, DAY, MONTH, AND YEAR. FLOW METER SHALL REPORT TO THE TL SYSTEMS CONTROLS.
DOMESTIC HOT WATER MIXING VALVE:
MIXING VALVES SHALL MODULATE TO MAINTAIN 130°F BUILDING WATER SUPPLY.
DOMESTIC HOT WATER BUILDING SUPPLY TEMPERATURE:
TEMPERATURE SENSOR SHALL REPORT TO THE BAS CONTROL SYSTEM.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
TEMPERATURE EXCEEDS 140°F
TEMPERATURE FALLS BELOW 124°F
SEQUENCE OF OPERATION
POINTS LIST
MIXING
VALVE
STATION
DOMESTIC
COLD
WATER
DOMESTIC
HOT
WATER
FROM
HEATERS
FM
T
AI - DOMESTIC HOT WATER
BUILDING SUPPLY TEMP
DOMESTIC
HOT
WATER TO
BUILDING
AI - DOMESTIC HOT WATER
BUILDING FLOW
CONTROL DIAGRAM
HARDWARE POINTS SOFTWARE POINTS
POINT NAME AI AO BI BO AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC
COLD WATER OXIDANT RESIDUAL BUILDING 58 X X X X
COLD WATER OXIDANT RESIDUAL FIFTH FLOOR EAST
BUILDING 53
X X X X
COLD WATER OXIDANT RESIDUAL FIFTH FLOOR WEST
BUILDING 53
X X
COLD WATER OXIDANT RESIDUAL BUILDING 18 X X
COLD WATER OXIDANT RESIDUAL THIRD FLOOR
MEZZANINE MECHANICAL ROOM BUILDING 1 C
X X
HOT WATER TEMPERATURE FIFTH FLOOR EAST BLDG 53 X X
HOT WATER TEMPERATURE FIFTH FLOOR WEST BLDG 53 X X X
HOT WATER TEMPERATURE THIRD FLOOR MEZZANINE
MECHANICAL ROOM BUILDING 1 C
X
TOTALS
8 8 8 8
AI - TEMPERATURE
NEW
RESIDUAL
OXIDANT
MONITOR
(TYP
OF 4)
NEW
TEMPERATURE
MONITOR
(TYP
OF 4)
AI - OXIDANT RESIDUAL
WATER QUALITY MONITORING
STATION
TEMPERATURE
MONITOR
PRESSURE
MONITOR
PH
MONITOR
CONDUCTIVITY
MONITOR
COM TO ENGINEERING
WORKSTATION
TURBIDITY
MONITOR
THIS SYSTEM MONITORS THE REMOTE DOMESTIC COLD WATER OXIDANT RESIDUAL AND REMOTE DOMESTIC HOT
WATER TEMPERATURE FOR LEGIONELLA GUIDELINE COMPLIANCE.
MONITORING CONDITIONS: THE REMOTE DOMESTIC COLD WATER OXIDANT RESIDUAL AND REMOTE DOMESTIC HOT
WATER TEMPERATURE SHALL BE MONITORED AND TRENDED AT ALL TIMES.
REMOTE OXIDANT RESIDUAL:
ALARMS SHALL BE PROVIDED AS FOLLOWS:
ALARM IF RESIDUAL OXIDANT LEVEL FALLS BELOW 0.5 mg/L.
REMOTE HOT WATER TEMPERATURE:
ALARMS SHALL BE PROVIDED AS FOLLOWS:
ALARM IF TEMPERATURE FALLS BELOW 124 F.
POINTS LISTCONTROL DIAGRAM
CHLORINE
LEVEL
MONITOR
WATER QUALITY
ENGINEER
WORKSTATION
BUILDING 18
WATER QUALITY
MONITORING PANEL
BUILDING 18
BUILDING 58
CONTROLLER
WATER QUALITY
MONITORING PANEL
BUILDING 1C
CONTROLLER
WATER QUALITY
MONITORING PANEL
BUILDING 53
CONTROLLER
WATER QUALITY
MONITORING PANEL
WATER QUALITY
MONITORING PANEL
SEQUENCE OF OPERATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
P-601
WLF / JBDJR
PLUMBING CONTROLS
PUMP 1 PUMP 2 PUMP 3 PUMP 4
RUN
STOP
H-OA
ELAPSED TIME METER
HH:MM:SS
RUN
STOP
H-OA
ELAPSED TIME METER
HH:MM:SS
RUN
STOP
H-OA
ELAPSED TIME METER
HH:MM:SS
RUN
STOP
H-OA
ELAPSED TIME METER
HH:MM:SS
LCD DISPLAY
FLOW METER
PT
PUMP 1 PUMP 2
H-OA H-OA
PT
LCD DISPLAY
H-OA H-OA
PUMP 3 PUMP 4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
ALL
FULLY SPRINKLERED P-602
BDBCAS
INSTRUMENTATION DETAILS
1. PROVIDE PRESSURE TRANSDUCER AND PRESSURE SENSOR (MOORE INDUSTRIES SPA
OR EQUAL.
2. PROVIDE REMOTE HOA CONTROL OF 4 PUMPS. HAND CONTROL SHALL RUN PUMP AT
MAXIMUM SET POINT ON VFD. TYPICAL.
3. PROVIDE PRESSURE TRANSDUCER CONNECTED TO EXISTING 3/4" PORT AT CONTROL
PANEL LOCATION.
4. PROVIDE LCD TOUCHSCREEN DISPLAY PANEL FOR REMOTE ANNUNCIATION OF PUMP
SKID INFORMATION. CONTRACTOR SHALL HIRE AUTOMATED BUILDING SYSTEMS
-TULSA, INC TO CONNECT SCREEN TO PUMP PLC AND PROGRAM DISPLAY. POC JOE
KARSETTER 918-665-3974. SCREEN TO DISPLAY THE FOLLOWING PARAMETERS:
A. PUMP TROUBLE SIGNALS FOR EACH PUMP WITH AUDIBLE ALARM AND
SILENCE FEATURE:
a. MOTOR OVER TEMP
b. OVERLOAD TRIPPED
c. MOTOR FAIL TO START
B. INDIVIDUAL PUMP RUNNING INDICATION SHOWING VFD SPEED
C. MANUAL SPEED ADJUSTMENT FOR EACH PUMP
D. PUMP SKID MANIFOLD DISCHARGE PRESSURE
E. PUMP SKID MANIFOLD FLOW RATE
1. LCD DISPLAY FOR THE FOLLOWING PARAMETERS:
A. SUCTION AND DISCHARGE PRESSURE
B. EVENT HISTORY LOG
C. INDIVIDUAL PUMP RUN DISPLAY
2. PROVIDE FOLLOWING INDICATION/CONTROL FOR EACH PUMP:
A. PUMP RUN LIGHT (GREEN)
B. PUMP STOP LIGHT (RED)
C. HAND-OFF-AUTO SWITCH
D. ANALOG ELAPSED TIME METER
3. INSTANTANEOUS DIGITAL FLOW METER
4. CONNECT PRESSURE TRANSDUCER TO DISCHARGE MANIFOLD OF
PUMP SYSTEM.
1. PROVIDE CONTROL OF THE QUADRUPLEX PUMP SYSTEM.
INSTALL "REMOTE CONTROL PANEL" IN THE BOILER PLANT
AND PROVIDE CONTROLS FUNCTIONS FOR "SKID CONTROL
PANEL" AS FEATURES OF THE PUMP CONTROL PANEL
PROVIDED WITH THE PUMP SKID.
2. REMOTE CONTROL PANEL AND SKID CONTROL PANEL TO
INTERFACE UTILIZING EXISTING WIRING BETWEEN BOILER
PLANT AND BUILDING 58.
3. OVERALL SYSTEM RUN COMMAND TO BE INITIATED BY
PRESSURE TRANSDUCER IN BOILER PLANT. TRANSDUCER
TO BE PROGRAMMABLE FOR STARTING AND STOPPING PSI.
4. REMOTE CONTROL PANEL TO ALLOW FOR OVERRIDE
CONTROL OF GROUPED PUMPS 1 & 2 AND 3 & 4. PANEL TO
ANNUNCIATE ALARM WHEN ANY TROUBLE INDICATION
EXISTS AT SKID CONTROL PANEL.
5. SKID CONTROL PANEL TO OPERATE PUMPS ON A LEAD, LAG,
LAG, LAG SEQUENCE. THE PUMPS SHALL ALTERNATE STARTS.
PUMPS SHALL RUN TO MAINTAIN PROGRAMMABLE
DISCHARGE PRESSURE ON THE SKID MANIFOLD USING PID
(PROPORTIONAL INTEGRAL DERIVATIVE) CONTROL. PUMPS
TO RAMP UP TO MAXIMUM OPERATING SPEED ONE AT A TIME
UNTIL DESIRED PRESSURE IS REACHED. ONCE DESIRED
PRESSURE IS REACHED, THE PUMPS REQUIRED TO REACH
THAT SPEED SHALL MODULATE SPEED TOGETHER TO
MAINTAIN CONSTANT PRESSURE.
| 2018-03-29T13:33:58-0700 | |
| DocuSign, Inc. | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it.