36C25918R0592-015.pdf

PDF 4 MB Posted

Attached to
Upgrade Site Water Systems (VA-18-00071315)
Solicitation number
36C25918R0592
Issued by

About this file

36C25918R0592 Water Drawings Part1.pdf

View the file

Other files

File Type Posted
36C25918C0325-000.docx DOCX document
36C25918R0592-0002003.pdf PDF
36C25918R0592-0002002.pdf PDF
36C25918R0592-0002000.docx DOCX document
36C25918R0592-0002001.pdf PDF
36C25918R0592-0001000.docx DOCX document
36C25918R0592-020.docx DOCX document
36C25918R0592-012.docx DOCX document
36C25918R0592-014.pdf PDF
36C25918R0592-017.pdf PDF
36C25918R0592-019.docx DOCX document
36C25918R0592-013.docx DOCX document
36C25918R0592-024.pdf PDF
36C25918R0592-021.pdf PDF
36C25918R0592-023.pdf PDF
36C25918R0592-018.pdf PDF
36C25918R0592-022.pdf PDF
36C25918R0592-016.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECTURE ENGINEERING CONSTRUCTION

PROJECT NUMBER 623-16-113

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

GENERAL NOTES

VA PROJECT TEAM

OWNER: OWNER'S CONTRACTING OFFICER:

INDEX OF DRAWINGS

DRAWING TITLEDWG NO.

GENERAL INFORMATION OF

SHEET OF #

ABBREVIATIONS

GI001

PHASING

GENERAL

1 43

SITE PLAN

OF2

OF 3

OF18

PS101

PLUMBING

PLUMBING SITE PLAN

P-001 PLUMBING AND ELECTRICAL SYMBOLS AND NOTES

52-PP101 PLUMBING PLANS

GI001

WLFDJR, JAV

GENERAL INFORMATION

NORTH

52-PD101 PLUMBING DEMOLITION PLANS

OF19

OF4

18-PD101 PLUMBING DEMOLITION PLANS

18-PP101

OF5

PLUMBING PLANS

OF14

22-P-101 SUB-BASEMENT PLUMBING PLANS

OF15

OF16

24-PD101 SUB-BASEMENT PLUMBING DEMOLITION PLAN

OF17

24-PP101 SUB-BASEMENT PLUMBING PLAN

OF10

1C-PD101 CRAWL SPACE PLUMBING DEMOLITION PLAN

OF11

1C-PD131 THIRD FLOOR FLOOR PLUMBING DEMOLITION PLAN

OF12

1C-PP101 CRAWL SPACE PLUMBING PLAN

OF13

1C-PP131 THIRD FLOOR FLOOR PLUMBING PLAN

OF6

1AB-PD111 FIRST FLOOR PLUMBING DEMOLITION PLAN

OF7

OF8

1AB-PP111 FIRST FLOOR PLUMBING PLAN

OF

OF21

OF20

53-PD100 SUB-BASEMENT PLUMBING DEMOLITION PLAN

OF

53-PD101

OF22

BASEMENT MEZZANINE PLUMBING DEMOLITION PLAN

OF23 43

OF24 43

OF25 43

SECOND FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - WEST HALF

THIRD FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - WEST HALF

FOURTH FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - WEST HALF

FOURTH FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - EAST HALF

FIFTH FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - WEST HALF

OF39 43

OF40 43

P-401

PLUMBING EQUIPMENT AND FIXTURE SCHEDULES

OF41 43

53-PD121

53-PD122

53-PD131

53-PD132

SECOND FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - EAST HALF

THIRD FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - EAST HALF

53-PD141

53-PD142

53-PD151

53-PD152 FIFTH FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - EAST HALF

OF26 43

OF27 43

OF28 43

OF29 43

OF30 43

OF31 43

OF32 43

OF33 43

OF34 43

OF35 43

OF36 43

OF37 43

OF38 43

OF9

BUILDING 1AB

BUILDING 18

BUILDING 1C

BUILDING 22

BUILDING 24

BUILDING 52

BUILDING 53

53-PP100 SUB-BASEMENT PLUMBING PLAN

53-PP101 BASEMENT MEZZANINE PLUMBING PLAN

SECOND FLOOR INTERSTITIAL PLUMBING PLAN - WEST HALF

THIRD FLOOR INTERSTITIAL PLUMBING PLAN - WEST HALF

FOURTH FLOOR INTERSTITIAL PLUMBING PLAN - WEST HALF

FOURTH FLOOR INTERSTITIAL PLUMBING PLAN - EAST HALF

FIFTH FLOOR INTERSTITIAL PLUMBING PLAN - WEST HALF

53-PP121

53-PP122

53-PP131

53-PP132

SECOND FLOOR INTERSTITIAL PLUMBING PLAN - EAST HALF

THIRD FLOOR INTERSTITIAL PLUMBING PLAN - EAST HALF

53-PP141

53-PP142

53-PP151

53-PP152 FIFTH FLOOR INTERSTITIAL PLUMBING PLAN - EAST HALF

58-P-101 PLUMBING PLANS

BUILDING 58

GENERAL

SIGNATURE BLOCK

P-501 PLUMBING DETAILS

OF

P-601 PLUMBING CONTROLS

PS102 PLUMBING CONTROLS SITE PLAN

OF 43

P-602 INSTRUMENTATION DETAILS

P-502 PLUMBING DETAILS

S

ELECTRICAL LEGEND

JUNCTION BOX, PURPOSE AS NOTED

JUNCTION BOX IN WALL, PURPOSE AS NOTED:

18" AFF STANDARD UNO

DISCONNECT SWITCH NON-FUSED

DISCONNECT SWITCH FUSED

SWITCH: 44" AFF STANDARD UNO

SWITCH MODIFIERS:

M - MOTOR RATED

3 - THREE-WAY

T - DIGITAL TIMER SWITCH

PANELBOARD

VARIABLE FREQUENCY DRIVE, PROVIDED BY MECHANICAL

CONTRACTOR

EQUIPMENT ELECTRICAL CONNECTION

HOMERUN - 120V OR 277V

HOMERUN - 208V OR 480V

120V DUPLEX RECEPTACLE: 18" AFF STANDARD, UNO

RECEPTACLE MODIFIERS:

GFCI - GROUND FAULT CIRCUIT INTERRUPTER

WP - WEATHERPROOF

DED - DEDICATED

TELEPHONE OUTLET

KIRK-KEY MANUAL INTERLOCK

CABLE TRAY

CONNECTION POINT FOR NEW TO EXISTING

CONDUIT, CABLE TRAY, JUNCTION BOXES ETC.

POINT OF DEMOLITION FOR EXISTING

CONDUIT, CABLE TRAY, JUNCTION BOXES ETC.

UNDERGROUND ELECTRICALUGE

POWER METER/MONITOR

CONTACTOR OR MOTOR STARTER

FIRE SYSTEM SMOKE DETECTOR AS INDICATED

LOAD BREAK JUNCTION

DELTA

1PH SINGLE-PHASE

1P SINGLE POLE

2/C TWO-CONDUCTOR

3/C THREE-CONDUCTOR

3PH THREE-PHASE

4/C FOUR-CONDUCTOR

4W FOUR-WIRE

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAP ALARM ANNUNCIATOR PANEL

AC ALTERNATING CURRENT OR ARMORED CABLE

ACC ACCESSIBLE

ADDL ADDITIONAL

ADJ ADJACENT, ADJOINING

ADO AUTOMATIC DOOR OPENER

AF AMPERE FRAME OR AMP FUSE

AFC ABOVE FINISHED COUNTER, AUTOMATIC FREQUENCY

CONTROL, OR AVAILABLE FAULT CURRENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIC AMPERE INTERRUPTING CAPACITY

ALT ALTERNATE

AMB AMBIENT

AMP OR A AMPERE

ASC AMPS SHORT CIRCUIT

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AV AUDIO VISUAL

BATT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISH FLOOR

BFG BELOW FINISH GRADE

BLDG BUILDING

BPIP BOILER PLANT INSTRUMENTATION PANEL

BRKR BREAKER

BYP BYPASS

C CONDUIT

CAB CABINET

CALC CALCULATE

CAP CAPACITY

CATV COMMUNITY ANTENNA TELEVISION

CCTV CLOSED CIRCUIT TELEVISION

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CHW CHILLED WATER

CHWP CHILLED WATER PUMP

CKT CIRCUIT

CLG CEILING

CMU CONCRETE MASONRY UNIT

COAX COAX CABLE

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CU COPPER

CU FT CUBIC FEET

CUR CURRENT

D DEEP / DEPTH

DB DECIBEL OR DIRECT BURIAL

DC DIRECT CURRENT

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLITION

DIAG DIAGRAM

DISC DISCONNECT

DISTR DISTRIBUTION

DN DOWN

DPDT DOUBLE POLE, DOUBLE THROW

DPST DOUBLE POLE, SINGLE THROW

DRSW DOOR SWITCH

DS DISCONNECT SWITCH

DWG DRAWING

EC EMPTY CONDUIT

EG EQUIPMENT GROUND

EL ELEVATION

ELEC ELECTRIC OR ELECTRICAL

ELEV ELEVATOR

EMI ELECTROMAGNETIC INTERFERENCE

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EPO EMERGENCY POWER OFF

ESMT EASEMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EX, EXIST EXISTING

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FLA FULL LOAD AMPS

FMC FLEXIBLE METALLIC CONDUIT

FP FIRE PROTECTION

FT FEET OR FOOT

FS FUSED SWITCH

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

G OR GND GROUND

GEN GENERATOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GRS GALVANIZED RIGID STEEL

GTB GROUND TERMINAL BOX

H HIGH / HEIGHT

HID HIGH INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HZ HERTZ

IMC INTERMEDIATE METAL CONDUIT

IR INFRARED

J-BOX JUNCTION BOX

kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kW KILOWATT kWH KILOWATT HOUR kWHM KILOWATT HOUR METER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LRA LOCKED ROTOR AMPS

LTCP LOCAL TEMPERATURE CONTROL PANEL

LTG LIGHTING

LTNG LIGHTNING

LV LOW VOLTAGE

MAX MAXIMUM

MC METAL-CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MG MOTOR GENERATOR

MH MANHOLE

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT PROTECTION

MLO MAIN LUGS ONLY

MTD MOUNTED

MTG MOUNTING

MTS MANUAL TRANSFER SWITCH

MV MEDIUM VOLTAGE

MVA MEGAVOLT-AMPERE

MW MEGAWATT OR MICROWAVE

NA NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

NEUT OR N NEUTRAL

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NS NO SCALE

NTS NOT TO SCALE

OC ON CENTER

P POLE

PA PUBLIC ADDRESS

PB PANELBOARD, PULL BOX, OR PUSHBUTTON

PCB POLYCHLORINATED BIPHENYL

PC PHOTOELECTRIC CELL

PF POWER FACTOR

PH PHASE

PNL PANEL

POD POWER OPERATED DAMPER

POS POSITION

PRI, PRIM PRIMARY

PVC POLYVINYL CHLORIDE (PLASTIC)

REC RECESSED

RECPT RECEPTACLE

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

REQD REQUIRED

SCC SHORT CIRCUIT CAPACITY

SEC SECONDARY

SES SERVICE ENTRANCE SECTION

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SPEC SPECIFICATION

SPST SINGLE POLE, SINGLE THROW

SWBD SWITCHBOARD

SWGR SWITCHGEAR

ELECTRICAL ABBREVIATION

TEL TELEPHONE

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UNO UNLESS NOTED OTHERWISE

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

V VOLT

VA VOLT AMPERE

VAR VOLT AMPERE REACTIVE

VFD VARIABLE FREQUENCY DRIVE

VOLT VOLTAGE

W WATT OR WIDTH IN DIMENSION STRING

WH WATER HEATER

WP WEATHERPROOF

WQMP WATER QUALITY MONITORING PANEL

XFER TRANSFER

XFMRTRANSFORMER

P-001

WLFDJR

PLUMBING AND ELECTRICAL

SYMBOLS AND NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

NORTH

EXISTING 8" CITY

WATER METER IN

PIT

EXISTING 8" WATER LOOP

EXISTING 8" HIGH PRESSURE (60 PSI)

CITY WATER SERVICE (BACK-UP

SERVICE LINE).

EXISTING 8" LOW PRESSURE (730 GPM @

20 PSI) CITY WATER SERVICE FROM 24"

CITY MAIN SERVING HOSPITAL.

EXISTING 8" PRV IN PIT

(VALVED OFF) TO BE

REMOVED - SEE DETAIL

THIS SHEET

6"

6"

6"

NEW FIRE HYDRANT

EXISTING 8" WATER LOOP

6"

6"

3"

EXISTING 8" WATER LOOP

EXISTING 8" WATER

SERVICE FROM METER PIT

EXISTING 8" WATER LOOP

EXISTING

WATER

SERVICES

EXISTING

WATER

SERVICES

EXISTING FDC

NEW 2" BRANCH

2"

EXISTING 8" WATER LOOP

4"

EXISTING FDC

EXISTING FDC

EXISTING

FDC

6"

EXISTING FIRE HYDRANT

EXISTING

FIRE

HYDRANT

EXISTING

FIRE

HYDRANT

EXISTING

FDC

EXISTING 8" TO WATER TOWER

EXISTING

8" WATER

LOOP

EXISTING

WATER SERVICE

TO BUILDINGS

22 & 24

EXISTING FDC

EXISTING FIRE HYDRANT

EXISTING FDC

EXISTING FDC

EXISTING FDC

EXISTING FDC

EXISTING FIRE HYDRANT

EXISTING FIRE HYDRANT

EXISTING FIRE HYDRANT

EXISTING FIRE HYDRANT

EXISTING 8" WATER LOOP

EXISTING 4" CURB STOP

VALVE TO BE REPLACED

EXISTING

FDC

4"

EXISTING 1" IRRIGATION

METER IN PIT

EXISTING 1" ANTI-

SIPHON PRESSURE

VACUUM BREAKER

EXISTING FIRE

SERVICE PIV

NC

NO

2"

EXISTING

PIV

EXISTING PIV

EXISTING PIV

EXISTING 2"

SERVICE

EX 8" WATER LOOPEX 8" WATER LOOP EX VAULT

REPLACE EXISTING PRV, ETC.

WITH A NEW SECTION OF 8"

DIAMETER STRAIGHT PIPE

NO

NC - BYPASS VALVES TO

BE NORMALLY OPEN (NO)

AFTER REPLACEMENT OF

PRV WITH STRAIGHT PIPE

NC - BYPASS VALVES TO

BE NORMALLY OPEN (NO)

AFTER REPLACEMENT OF

PRV WITH STRAIGHT PIPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

1. EXISTING PLUMBING WORK TO REMAIN AS IS.

2. EXISTING PLUMBING WORK TO BE CAPPED

AND ABANDONED IN PLACE. PATCH

PAVEMENT, CURB, LANDSCAPING, ETC. AS

REQUIRED TO MATCH ADJACENT AREA

3. EXISTING DOMESTIC WATER SERVICE

ENTRANCE, SIZE AS NOTED.

4. EXISTING FIRE PROTECTION SERVICE

ENTRANCE, SIZE AS NOTED.

5. NEW DOMESTIC WATER SERVICE ENTRANCE,

SIZE AS NOTED.

6. NEW FIRE PROTECTION SERVICE LINE TO

EXISTING P.I.V BEING INSTALLED UNDER A

SEPARATE CONTRACT, NOT PART OF THIS

WORK.THIS CONTRACTOR TO PROVIDE NEW

6" LINE FROM P.I.V. TO FIRE PROTECTION

SERVICE FLANGE INSIDE BUILDING 6" A.F.F.

7. NEW DOMESTIC WATER SERVICE ENTRANCE

BEING INSTALLED UNDER A SEPARATE

CONTRACT, NOT PART OF THIS WORK.

8. EXISTING IRRIGATION WATER METER PIT TO

BE REWORKED TO PROVIDE A NEW WATER

METER WIRED TO THE BUILDING BMS.

9. INSTALL A 2" DRAIN LINE FROM INSIDE WATER

METER PIT SUMP AREA THRU PIT WALL WITH

PIPE SLEEVE, ROUTED BELOW GRADE 24" TO

RETAINING BLOCK WALL. TERMINATE DRAIN

LINE 6" ABOVE SIDEWALK DIRECTING FLOW TO

AREA DRAIN.

10. CURB STOP SERVING UNKNOWN PIPING -

SHOWN FOR REFERENCE ONLY.

11. NEW FIRE HYDRANT. CONNECT NEW 6" F TO

EXISTING 8" MAIN WITH CURB STOP VALVE.

12. PROVIDE 120V DIRECT CONNECTION TO NEW

WATER MONITORING TEST STATION (700W)

FROM EXISTING RECEPTACLE CIRCUIT WITHIN

BUILDING AT BASE OF WATER TOWER

(REPURPOSED ANTENNA EQUIPMENT

BUILDING). COORDINATE EXACT LOCATION

AND REQUIREMENTS WITH PLUMBING

CONTRACTOR.

13. INSTALL REMOTE CONTROL PANEL. CONNECT

TO EXISTING SIGNAL WIRING. SEE 00-EI501.

14. SKID CONTROL PANEL, CONNECT WITH

EXISTING SIGNAL WIRING. SEE 00-EI501.

SITE

PS101

WLFDJR

PLUMBING SITE PLAN

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

SYSTEM. PROVIDE SUBMITTAL TO COR FOR

APPROVAL

NEW PULSE METER FOR HEATING

WATER MAKE-UP WIRED TO BAS IN

5TH FLOOR INTERSTITIAL SPACE

NEW PULSE METER FOR CHILLED

WATER MAKE-UP WIRED TO BAS IN

5TH FLOOR INTERSTITIAL SPACE

NEW SITRANS WATER METER AND

WQMP-2. SEE SHEET 58-PP101 FOR

LOCATION.

NEW PULSE METER ON HEATING WATER MAKE-UP

PIPE, WIRED TO BAS

NEW PULSE METER ON HEATING WATER

MAKE-UP PIPE, WIRED TO BAS IN

CRAWLSPACE

NEW PULSE METER ON CHILLED WATER MAKE-UP

PIPE, WIRED TO BAS IN 4TH FLOOR PENTHOUSE

EXISTING SITRANS

DOMESTIC WATER METER

NEW PULSE METER ON HEATING WATER

MAKE-UP WATER PIPE, WIRED TO BAS IN

1B03-1

RELOCATED DOMESTIC WATER METER IN HOT WATER

TANK ROOM (1B03-1). METER WILL MONITOR DOMESTIC

COLD WATER FOR ALL OF BUILDING 1A & 1B.

NEW TOTALIZER IRRIGATION WATER METER

IN EXISTING PIT. RUN WIRING INTO HOT

WATER TANK ROOM (1B03-1) AND

CONNECTED TO NEW JACE AND BMS

EXISTING RELOCATED

DOMESTIC WATER METER

EXISTING SITRANS DOMESTIC

WATER METER LOCATED IN THE

SUB-BASEMENT

EXISTING SITRANS WATER METER

FOR BOILER WATER MAKE-UP IN

BASEMENT CORRIDOR (B15-18)

NEW SITRANS WATER METER SERVING BLDG 1C COLD

WATER, WIRED TO BAS

NEW PULSE METER ON HEATING

WATER M/V IN INTERSTITIAL 3COL-1

NEW PULSE METER ADD HEATING

WATER MAKE-UP METER, SB02-22

MOVE PROBES TO BLDG 18 INLET

DOM. WATER

WQMP-1 WQMP-1

WQMP-1

EXISTING SITRANS WATER

METER RADIO TRANSMITTER

LOCATED IN 1B PENTHOUSE

EXISTING SITRANS DOMESTIC WATER METER ON 1ST

FLOOR

EXISTING PULSE METER FOR CHILLED WATER

MAKE-UP, CONNECT TO BMS

EXISTING SITRANS COOLING TOWER MAKEUP WATER

METER CONTROLLER

NEW PULSE METER ON HEATING WATER MAKE-UP

METER B6-24

EXISTING UTILITY COMPANY

CAMPUS WATER METER IN PIT

WATER TOWER LEVEL AND PUMP

CONTROLS STAND ALONE

CONTROL SYSTEM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

1. WATER QUALITY MONITORING PANELS FOR

DOMESTIC COLD, HOT AND HOT WATER

RETURN IN THIS LOCATION ON THE EAST AND

WEST SIDES OF THE 5TH FLOOR INTERSTITIAL

SPACE. REFER TO DETAILS 1 & 2 ON SHEET

P-601 FOR CONNECTIVITY REQUIREMENTS.

2. QUADRUPLEX BOOSTER PUMP AND WATER

QUALITY MONITORING PANEL IN THIS BUILDING.

3. TRI-PLEX BOOSTER PUMP AND THERMOSTATIC

MIXING VALVE IN THIS LOCATION IN THE

SWITCH GEAR ROOM (101-52) ON THE 1ST

FLOOR.

4. THERMOSTATIC MIXING VALVE AND WATER

QUALITY MONITORING PANEL IN THIS LOCATION

IN THE INTERSTITIAL EQUIPMENT ROOM

(3C01-1) ON THE 3RD FLOOR. THERMOSTATIC

MIXING VALVE LOCATED IN THE CRAWLSPACE

WATER HEATER ROOM (ALCOVE).

5. THERMOSTATIC MIXING VALVE, HOT WATER

RECIRC PUMP AND HOT WATER HEAT

EXCHANGER IN THIS LOCATION IN THE HW

TANK ROOM (1B03-1) ON THE 1ST FLOOR.

6 WATER QUALITY MONITORING PANEL FOR THE

WATER TOWER LOCATED IN THE BOILER ROOM

(SB01-18). REFER TO DETAILS 1 & 2 ON SHEET

P-601 FOR CONNECTIVITY REQUIREMENTS.

7. WATER QUALITY ENGINEER CONTRACTOR

PROVIDED COMPUTER STATION LOCATED IN

OFFICE (13C1A1-18).

8. THERMOSTATIC MIXING VALVE LOCATED IN

SUB-BASEMENT MECHANICAL ROOM.

9. THERMOSTATIC MIXING VALVE IN BASEMENT

MECHANICAL ROOM (B10-18).

10. WATER QUALITY MONITORING PANEL FOR

DOMESTIC WATER CONDITIONS FROM CITY

WATER SUPPLY. REFER TO DETAILS 1 & 2 ON

SHEET P-601 FOR CONNECTIVITY

REQUIREMENTS.

11. WATER QUALITY MONITORING PANEL FOR

DOMESTIC COLD, HOT AND HOT WATER

RETURN WATER SERVICE CONDITIONS ON THE

3RD FLOOR INTERSTITIAL EQUIPMENT ROOM

3C01-1. REFER TO DETAILS 1 & 2 ON SHEET

P-601 FOR CONNECTIVITY REQUIREMENTS.

12. WATER QUALITY MONITORING PANEL FOR

DOMESTIC COLD WATER SUPPLY CONDITIONS

FROM THE WATER TOWER. REFER TO DETAILS

1 & 2 ON SHEET P-601 FOR CONNECTIVITY

REQUIREMENTS.

13. PLUMBING SHOP CONTRACTOR PROVIDED

COMPUTER STATION LOCATED IN OFFICE

(B08-18-18). COMPUTER STATION TO DISPLAY

THE WATER QUALITY CONTROL PANELS

AND THERMOSTATIC MIXING VALVE STATION

DATA.

14. THERMOSTATIC MIXING VALVE STATION

LOCATED IN THE BASEMENT / CRAWL SPACE OF

BUILDING 1C.

15. THERMOSTATIC MIXING VALVE STATION

LOCATED ON THE FIRST FLOOR OF BUILDING

52 NEXT TO THE EXISTING DOMESTIC WATER

HEATERS.

16. WATER TOWER LEVEL AND PUMP CONTROL

STAND ALONE SYSTEM INTEGRATED WITH

CONTROL PANEL IN BUILDING 58.

17. WATER TOWER LEVEL AND PUMP CONTROL

STAND ALONE SYSTEM INTEGRATED WITH

CONTROL PANEL IN BUILDING 18.

18. PATIENT TOWER LEVEL AND PUMP CONTROLS

SHALL BE A STAND ALONE SYSTEM.

SITE

PS102

WLFDJR

PLUMBING CONTROLS SITE PLAN

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

SYSTEM. PROVIDE SUBMITTAL TO COR FOR

APPROVAL

1. CONTACT TL SERVICES JOHN SIDES 479-719-7631 FOR REPAIR/RECONFIG OF EXISTING

SITRANS WATER METER INTERFACES AND EXISTING INTEGRATION TO ABS NIAGARA

AX INTERFACE. ALL JACK POINTS WILL BE REINTEGRATED TO NIAGARA AX.

2. ALL NEW METERS SHALL BE INTEGRATE TO ABS NIAGARA AX INTERFACE DIRECTLY.

CONTACT AUTOMATED BUILDING SYSTEMS JOEL KARSTETTER @ 918-665-3974.

3. ALL WATER QUALITY MONITORING SHALL BE PLACED ON THE ENGINEERING NETWORK

WITH THE ENTERPRISE SOFTWARE INSTALLED ON A CONTRACTOR PROVIDED PC IN

ROOM 13C1A1-18 AND THE PLUMBING FOREMAN'S SHOP ROOM B06-18

4. ALL EXISTING SITRANS WATER METERS SHALL HAVE PROPER SETUP VERIFIED BY A

FACTORY AUTHORIZED SIEMENS INSTALLER. ALL NEW SITRANS METERS (TO MATCH

EXISTING METERS) SHALL BE INSTALLED BY A FACTORY AUTHORIZED SIEMENS

INSTALLER.

5. ALL BUILDING WATER METERS SHALL TOTALIZE AND COMPARE TO SITE WATER METER

ON NIAGARA AX ENTERPRISE SERVER GRAPHICS.

5.1. AVERAGE FLOW

5.2. CURRENT FLOW

5.3. TOTAL FLOW

6. FOR INTEGRATION, PROGRAMMING AND PRICING OF ALL EQUIPMENT TO BE

CONNECTED TO THE BAS CONTACT:

JOEL KARSETER

AUTOMATED BUILDING SYSTEMS - TULSA, INC.

918-665-3974

JKARSTETTER@ABSCOMPANIES.COM

EX FDC

EX FDC (ABANDONED?)

EX FDC

B L

D G

A B

B L

D G

C

BLDG. 1AB

BLDG. 1E

BLDG. 1E

B L

D G

A B

B L

D G

C

F

EX DOM WATER HEATER

EX 4" DOM WATER

SERVICE - UP & DN

EX 4"

EX 4" DOM WATER

SERVICE IN HW TANK

ROOM CRAWL SPACE

EX HVAC HOT WATER

HEX TO REMAIN

EX 4" WATER SERVICE

TO BUILDING

EX 1" HWR FROM SPS

EX 3"

13 13

1AB

1AB-PD111

WLF / LLPDJR

FIRST FLOOR PLUMBING

DEMOLITION PLAN

1. EXISTING DOMESTIC SERVICE, VALVING AND

WATER METERS TO BE REMOVED AND OR

REWORKED AS REQUIRED TO ACCOMMODATE

NEW WATER SERVICE ENTRANCE INTO ROOM,

BACKFLOW PREVENTORS AND REPAIR OF THE

WATER METER SYSTEM.

2. REMOVE EXISTING DOMESTIC WATER

HEATER, PIPING AND ASSOCIATED

ACCESSORIES COMPLETE. PREPARE PIPING

TO REMAIN TO ACCOMMODATE INSTALLATION

OF NEW EQUIPMENT.

3. WATER HEATER IS TO BE REMOVED AND NEW

INSTALLED WITHIN FOUR HOURS COORDINATE

WITH COR TWO WEEKS PRIOR TO START OF

WORK.

4. EXISTING 4" DOMESTIC COLD WATER SERVICE

LOCATED IN CRAWL SPACE TO REMAIN AS IS.

EXACT PATH HAS NOT BEEN VERIFIED.

5. EXISTING SITRANS THREE CHANNEL METER

CONTROLLER.

6. EXISTING HOT WATER RE-CIRCULATION PUMP

TO REMAIN.

7. EXISTING 3" HW AND 1" HWR LINES DOWN TO

CRAWL SPACE. (C-WING BY PASS N.C.)

8. REMOVE EXISTING PIPE FITTINGS, VALVES,

AND SUPPORTS COMPLETELY. PATCH FLOOR

AT EXISTING 4" CW SERVICE ENTRANCE TO

MATCH EXISTING FLOOR FIRE RATING.

9. REMOVE EXISTING HEATING WATER MAKE UP

PIPING AND ACCESSORIES COMPLETE.

PREPARE 1" CW PIPING TO REMAIN TO

ACCOMMODATE NEW EQUIPMENT. SEE SHEET

1-PP111 FOR ADDITIONAL INFORMATION.

10. EXISTING 4" CW, 3" HW, 1

" HWR, 1

" CW AND

" HW PIPING UP IN CHASE.

11. EXISTING SITRANS METER ON EXISTING 4"

DCW LINE TO BE REMOVED AND STORED FOR

RELOCATION. CONTRACTOR IS RESPONSIBLE

FOR ANY DAMAGE AND ASSOCIATED COSTS

FOR REPAIRS.

12. EXISTING SITRANS METER ON EXISTING 3"

DHW LINE TO BE REMOVED AND STORED FOR

RELOCATION. CONTRACTOR IS RESPONSIBLE

FOR ANY DAMAGE AND ASSOCIATED COSTS

FOR REPAIRS.

13. REMOVE EXISTING 2

" GAS PIPING STUBBED

AND CAPPED AT 36" A.F.F. TO BELOW SLAB

CAPPED. PATCH FLOOR TO MATCH EXISTING

AND EXISTING RATING OF FLOOR ASSEMBLY.

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

EX FDC

EX FDC (ABANDONED?)

EX FDC

B L

D G

A B

B L

D G

C

BLDG. 1AB

BLDG. 1E

BLDG. 1E

B L

D G

A B

B L

D G

C

F

EX 4"

EX 4" WATER SERVICE

TO BUILDING

EX 3" HW

EX 4"

EX 1 1/2" HWR

EX 3" HW

EX 1 1/2"

EX 4" CW

EX 3" HW

EX 1"

EX 3"

EX 1 1/2"

EX 1" HWR FROM SPSEX 4" CW-UP

HWR

EX 3"

F

DHWH-1

BFP-7 X (2)

4"

TMV-2

EX HVAC HOT

WATER HEAT

EXCHANGER

WATER METER

SENSOR

EX FIRE PROTECTION

RISER AND ALARMED

CHECK VALVE TO REMAIN

7 8

EX HWRP

EX 3" HW

EX 4"

EX 1 1/2" HWR

EX 3" HW

EX 1 1/2"

EX 4" CW

EX 3" HW

EX 1"

EX 3"

EX 1 1/2"

EX 1" HWR FROM SPS

EX 1"HWR & 3"HW-DN

(C WING BY-PASS) NC

EX 4" CW-UP

HWR

EX 3"

BFP-1

FRV-1

1"

EX 4"

BELOW GRADE

1AB

1AB-PP111

WLF / LLPDJR

FIRST FLOOR PLUMBING PLAN

1. CUT EXISTING FLOOR SLAB AS REQUIRED TO

CONNECT TO EXISTING GALVANIZED DOMESTIC

WATER SERVICE LINE BELOW IN CRAWL SPACE.

PATCH FLOOR TO MATCH EXISTING ROOM

RATING.

2. EXISTING WATER RISER TO BE REWORKED AS

REQUIRED TO ACCOMMODATE NEW WATER

SERVICE LOCATION AND ACCESSORIES.

3. CONNECT NEW DOMESTIC WATER HEATER TO

EXISTING DOMESTIC WATER AND STEAM PIPING.

NEW DOMESTIC WATER HEATER REPLACEMENT

NOT TO EXCEED FOUR HOURS AND SHALL BE

SCHEDULE WITH COR TWO WEEKS PRIOR TO

START OF WORK.

4. EXISTING 4" DOMESTIC COLD WATER SERVICE

LOCATED IN CRAWL SPACE TO REMAIN AS IS.

EXACT PATH HAS NOT BEEN VERIFIED.

5. A SIEMENS FACTORY TRAINED AND CERTIFIED

TECHNICIAN SHALL RELOCATE THE EXISTING

SITRANS WATER METER. PROVIDE ALL WIRING,

CONDUITS, FITTINGS AND HARDWARE

NECESSARY TO CONNECT METER TO BUILDING

AUTOMATION SYSTEM. CONTRACTOR MUST

INTEGRATE FUNCTIONALITY WITH AUTOMATED

BUILDING SYSTEMS - TULSA, INC., THE CURRENT

BUILDING AUTOMATION PROVIDER FOR THE

FACILITY. CONTACT JOEL KARSETTER -

918-665-3974, JKARSETTER@

ABSCOMPANIES.COM. BUILDING

AUTOMATION SYSTEM TO BE PROGRAMMED TO

LOG THE FOLLOWING DATA AND DISPLAY THE

DATA ON THE VA ACCESSIBLE BUILDING

AUTOMATION INTERFACE:

5.1. CURRENT FLOW RATE IN GALLONS PER MINUTE

(GPM).

5.2. AVERAGE FLOW AT DAILY, MONTHLY AND

YEARLY INTERVALS.

5.3. COMPARISON OF TOTAL FLOW OF BRANCH

METERS TO THE TOTAL OF ANY METERS

FEEDING THE BRANCH OVER HOURLY,

DAILY AND MONTHLY INTERVALS.

6. EXISTING 4" CW, 3" HW, 1

" HWR, 1

" CW, AND 1

" HW PIPING UP IN CHASE.

7. EXISTING SITRANS METER CONTROLLER

8. TL SERVICES TO REMAP ALL POINTS

CURRENTLY CONNECTED TO THE SITRANS

SYSTEM.

9. SEE DETAILS 7/P-502 AND 8/P-502 FOR

INSTALLATION OF THERMOSTATIC MIXING

VALVE STATION AND WATER HEATER.

10. PROVIDE A PULSE METER INTEGRATED

DIRECTLY TO NIAGARA AX GUI. SEE SHEET

PS102 FOR ADDITIONAL INFORMATION. PROVIDE

STRAINER, ISOLATION VALVES, AND FULL LINE

SIZE BY-PASS AT METER.

11. CONNECT NEW PIPING TO EXISTING. FIELD

VERIFY EXACT LOCATION AND SIZE OF PIPE

PRIOR TO START OF NEW WORK.

12. PROVIDE FULL LINE SIZE BY-PASS WITH

NORMALLY CLOSED (NC) BALL VALVE. SEE

DETAIL 4/P-501.

13. ROUTE DRAIN LINE TO EXISTING FLOOR DRAIN

WITH AIR GAP. SEE DETAIL 5/P-501.

14. CONNECT TO 120V POWER SOURCE AT J-BOX

USING 2-12AWG, 12AWG EG IN 3/4" C.

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

B L

D G

A B

B L

D G

C

BLDG. 1C

BLDG. 1E

BLDG. 1E

B L

D G

A B

B L

D G

C

BLDG. 1C

BLDG. 52

BLDG. 1C

BLDG. 52

B L

D G

B L

D G

C

D

BLDG. 1C (D)

BLDG. 53

BLDG. 53

B L

D G

B L

D G

C

D

EX 2" DCW UP

EX 2"-BYPASS TO BUILDING 1AB

EX DCW, DHW, & DHWR CAPPED DEAD LEG, TYP.

EX 1/2" DHW UPEX 4" DCW FROM BUILDING 52EX 2-PUMP BOOSTER PUMP SYSTEM

EX DOMESTIC WATER HEATER

EX 6" DCW

EX 2-1/2" DCW

EX 8" DCW

EX 6" DCW

EX 4" DCW

EX 1"

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

1C

1C-PD101

WLF / LLPDJR

CRAWL SPACE PLUMBING

DEMOLITION PLAN

1. REMOVE EXISTING METER AND PREPARE

PIPING TO ACCOMMODATE NEW PULSE

METER. SEE 1C-PP101 FOR ADDITIONAL

INFORMATION.

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

D G

A B

B L

D G

C

BLDG. 1C

BLDG. 1E

BLDG. 1E

B L

D G

A B

B L

D G

C

B L

D G

B L

D G

C

D

BLDG. 1C (D)

BLDG. 53

BLDG. 53

B L

D G

B L

D G

C

D

EX 3/4"

EX 3/4"

EX 2"

EX 3/4"

EX 1"

EX 1"

EX 3/4"

EX 3/4"

EX 1 1/4"

DEAD LEG

EX 2"

EX AHU

EX (3")FD

EX 3/4"

EX 3/4" DCW-DN TO HUMIDIFIER

DISCHARGE COOLER

EX 3/4" DCW-DN TO HUMIDIFIER

DISCHARGE COOLER

EX (3")FD

EX 2"CW-DN

EX 2

" 140°F UP & DN

EX 2

" 130°F UP & DN

EX 1

" HWR UP & DN

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

1C

1C-PD131

WLF / LLPDJR

THIRD FLOOR PLUMBING

DEMOLITION PLAN

1. REWORK EXISTING 2" CW, 2 1/2" 140°F HW,

2 1/2" 130°F HW AND 1 1/4"HWR PIPING,

HANGERS AND SUPPORTS AS REQUIRED TO

ACCOMMODATE INSTALLATION OF NEW

THERMOSTATIC MIXING VALVE STATION. SEE

SHEET 1C-PP131 FOR ADDITIONAL

INFORMATION.

2. REMOVE PIPING TO POINT INDICATED AND

PREPARE PIPING TO ACCOMMODATE

INSTALLATION OF NEW BACKFLOW

PREVENTOR PIPING. SEE SHEET 1C-PP131

FOR ADDITIONAL INFORMATION.

3. REMOVE EXISTING DEAD LEG PIPING BACK TO

MAIN. CAP PIPING AS CLOSE TO MAIN AS

POSSIBLE.

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

D G

A B

B L

D G

C

BLDG. 1C

BLDG. 1E

BLDG. 1E

B L

D G

A B

B L

D G

C

BLDG. 1C

BLDG. 52

BLDG. 1C

BLDG. 52

B L

D G

B L

D G

C

D

BLDG. 1C (D)

BLDG. 53

BLDG. 53

B L

D G

B L

D G

C

D

EX 2" DCW UP

EX 2"-BYPASS TO BUILDING 1AB

EX DCW, DHW, & DHWR CAPPED DEAD LEG, TYP.

EX 1/2" DHW UPEX 4" DCW FROM BUILDING 52EX 2-PUMP BOOSTER PUMP SYSTEM

EX DOMESTIC WATER HEATER

EX 6" DCW

EX 2-1/2" DCW

EX 8" DCW

EX 6" DCW

EX 4" DCW

EX 1"

PULSE

METER

TMV-1

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

1C

1C-PP101

WLF / LLPDJR

CRAWL SPACE PLUMBING PLAN

1. SEE DETAILS 7/P-502 AND 8/P-502 FOR

INSTALLATION OF THE THERMOSTATIC MIXING

VALVE STATION AT THE EXISTING WATER

HEATER.

2. PROVIDE NEW PULSE METER INTEGRATED

DIRECTLY TO NIAGARA AX GU1. SEE SHEET

PS102 FOR ADDITIONAL INFORMATION.

PROVIDE STRAINER, ISOLATION VALVES, AND

FULL LINE SIZE BY-PASS AT METER.

3. CONNECT TO 120V POWER SOURCE AT J-BOX

USING 2-12AWG, 12AWG EG IN 3/4" C.

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

D G

A B

B L

D G

C

BLDG. 1C

BLDG. 1E

BLDG. 1E

B L

D G

A B

B L

D G

C

B L

D G

B L

D G

C

D

BLDG. 1C (D)

BLDG. 53

BLDG. 53

B L

D G

B L

D G

C

D

EX 3/4"

EX 3/4"

EX 2"

EX 3/4"

EX 1"

EX 1"

EX 3/4"

EX 3/4"

EX 2"

EX AHU

2"

2"

EX (3")FD

EX 3/4"

EX 3/4" DCW-DN TO HUMIDIFIER

DISCHARGE COOLER

EX 3/4" DCW-DN TO HUMIDIFIER

DISCHARGE COOLER

EX (3")FD

EX 2"CW-DN

EX 2

" 140°F UP & DN

EX 2

" 130°F UP & DN

EX 1

" HWR UP & DN

T

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

1C

1C-PP131

WLF / LLPDJR

THIRD FLOOR PLUMBING PLAN

1. CONNECT NEW PIPING TO EXISTING. FIELD

VERIFY EXACT LOCATION AND SIZE PRIOR TO

START OF NEW WORK.

2. SEE EQUIPMENT SCHEDULE FOR ADDITIONAL

INFORMATION.

3. ROUTE DRAIN LINE TO NEAREST FLOOR DRAIN

NEAR EXISTING WATER HEATER SKIDS OR

CONDENSATE PUMP.

4. SEE DETAILS 7/P-502 AND 8/P-502.

5. SEE DETAIL 5/P-501.

6. ROUTE A

" COPPER LINE FROM THE WATER

QUALITY MONITOR PANEL TO THE DOMESTIC

COLD, HOT AND HOT WATER RETURN RISERS

ALONG WEST WALL EACH LINE 20'-0" LONG.

7. PROVIDE OXIDANT RESIDUAL MONITOR

STATION WIRED BACK TO WQMP-1

8. PROVIDE DOMESTIC HOT WATER

TEMPERATURE SENSING STATION ON THE

130°F RISER. WIRED BACK TO WQMP-1.

9. PROVIDE NEW PULSE METER INTEGRATED

DIRECTLY TO NIAGARA GUI. SEE SHEET PS102

FOR ADDITIONAL INFORMATION. PROVIDE

STRAINER, ISOLATION VALVES, AND FULL SIZE

LINE BY-PASS AT METER.

10. PROVIDE 120V DIRECT CONNECTION TO NEW

WATER MONITORING TEST STATION (700W).

EXTEND NEAREST NORMAL POWER

RECEPTACLE CIRCUIT TO LOCATION AND

CONNECT. COORDINATE EXACT LOCATION

AND REQUIREMENTS WITH PLUMBING

CONTRACTOR.

11. PROVIDE 120V DIRECT CONNECTION TO NEW

THERMOSTATIC MIXING VALVE. EXTEND

NEAREST NORMAL POWER RECEPTACLE

CIRCUIT TO LOCATION AND CONNECT.

COORDINATE EXACT LOCATION AND

REQUIREMENTS WITH PLUMBING

CONTRACTOR.

12. CONNECT TO 120V POWER SOURCE AT J-BOX

USING 2-12AWG, 12AWG EG IN 3/4" C.

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

NORTH

EX 6" FIRE SERVICE FROM PIV

ABANDONED EX 6" FIRE SERVICE

EX FIRE DEPARTMENT CONNECTION

WITH EX 2" DRAIN BELOW

EX 4" F WITH EX 2" DRAIN BELOW

RACKED ON WALL AT 3' AFF

EX 4" F WITH CHECK VALVE IN

VERTICAL PIPE

EX 6" RISER CHECK VALVE IN

VERTICAL PIPE

EX 6" FLOW AND TAMPER (ABOVE CEILING)

EX 6" F TO BUILDING (ABOVE CEILING)

EX 6" WATER SERVICE

EX 6" CURB STOP VALVE

EX BOILER, TYP OF (3)

EX 6" WATER TO BUILDING AT 78" AFF

EX 1" DCW TO HOSE BIBBS AT 68" AFF

(SHOWN OFFSET FOR CLARITY)

EX 6" DCW

EX HOSE BIBB

EX DOMESTIC

WATER HEATER

EX 1" DCW HIGH ON WALL

EX WALL HYDRANT

CAP EX 2" BRANCH6

EX HB

EX SINK

EX EWH

EX EWS/SH

EX TMV

EX 6" MAIN

SHUT-OFF IN

VERTICAL PIPE

4 7

EX 3/4"

DEADLEG

EX 2" 8

EX 2" 8

EX 2" 6 EX 1" 6

EX ELECTRIC WATER COOLER

EX 3/4" DCW UP

EX 3/4" DCW DOWN TO COOLER FEED

EX 1-1/2" DCW HIGH ON WALL 2

EX 1" DCW DOWN ON WALL 2

EX 1-1/2" HOSE CONNECTION

EXISTING REMOTE

BOOSTER PUMP

CONTROL PANEL

EXISTING 2 CHANNEL

SITRANS CONTROLLER

EX SITRANS WATER METER

EX SITRANS WATER METER

ON MEZZANINE ABOVE FOR

SCW MAKE-UP TO BOILERS

1. EXISTING PLUMBING WORK TO REMAIN AS IS.

2. EXISTING HOSE BIB, PIPING, HANGERS AND

SUPPORTS TO BE REMOVED COMPLETE.

PREPARE EXISTING PIPING TO REMAIN TO

ACCOMMODATE NEW WORK. SEE SHEET

18-PP101 FOR ADDITIONAL INFORMATION.

3. REMOVE EXISTING FIRE PROTECTION RISER

CHECK VALVE ASSEMBLY AND PREPARE

EXISTING PIPE AND FITTINGS TO REMAIN TO

ACCOMMODATE NEW EQUIPMENT TO BE

INSTALLED. SEE SHEET 18-PP101 FOR

ADDITIONAL INFORMATION.

4. REMOVE BRANCH AND REPLACE TEE FITTING

WITH STRAIGHT CONNECTOR OR CAP BRANCH

PIPE AS CLOSE TO ACTIVE MAIN AS POSSIBLE.

5. SEE NEW PIPING AS INDICATED ON 18-PP101

FOR MORE INFORMATION REGARDING PIPING

TO BE REMOVED.

6. REMOVE EXISTING 6" MAIN PIPING, 2" BRANCH

FROM MAIN, AND 1" TO HOSE BIBBS AS

NEEDED FOR INSTALLATION OF NEW

BACKFLOW PREVENTORS.

7. REMOVE EXISTING 2" ISOLATION VALVE AND

1-1/2" HOSE CONNECTION AND STORE FOR

REINSTALLATION IN NEW LOCATION.

8. REMOVE SECTION OF 2" PIPE TO MAKE ROOM

FOR NEW CONNECTIONS. SEE SHEET

18-PP101 FOR ADDITIONAL INFORMATION.

9. REMOVE EXISTING STEAM FIRED WATER

HEATER, HWR PUMP, STORAGE TANK AND

ASSOCIATED PIPING AND ACCESSORIES

COMPLETE. PREPARE EXISTING STEAM, DCW,

DHW AND DHWR FOR CONNECTION TO NEW

WATER HEATER. SEE SHEET 18-PP101 FOR

ADDITIONAL INFORMATION.

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

18-PD101

WLF / LLPDJR

PLUMBING DEMOLITION PLANS

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

NORTH

EX 6" FIRE SERVICE FROM PIV

ABANDONED EX 6" FIRE SERVICE

EX FIRE DEPARTMENT CONNECTION

WITH EX 2" DRAIN BELOW

EX 4" F WITH EX 2" DRAIN BELOW

RACKED ON WALL AT 3' AFF

EX 4" F WITH CHECK VALVE IN

VERTICAL PIPE

EX 6" FLOW AND TAMPER (ABOVE CEILING)

EX 6" F TO BUILDING (ABOVE CEILING)

DCVA-343

EX 6" WATER SERVICE

EX 6" CURB STOP VALVE

EX BOILER, TYP OF (3)

EX 6" WATER TO BUILDING AT 78" AFF

EX 1" DCW TO HOSE BIBBS AT 68" AFF

(SHOWN OFFSET FOR CLARITY)

EX WALL HYDRANT

EX HB

EX SINK

EX EWH

EX EWS/SH

EX TMV

BFP-8

BFP-8

BFP-4

EX 6" MAIN

SHUT-OFF IN

VERTICAL PIPE

62" TO EX 2" 6

62" TO EX 2" 6

62" TO EX 2" 6

61" TO EX 1" 6

EX ELECTRIC WATER COOLER

EX 3/4" DCW UP

EX 1-1/2" HOSE CONNECTION

1" UP TO EX 1" AT TEE 6 8

2" TO BOILER BLOWDOWN

2" TO SINK

P-804 2

1" DCW DOWN ON WALL

1" DCW ON WALL ABOVE DOOR

1" DCW DOWN

DHWH-2

HWCP-1

TMV-1

REMOTE BOOSTER PUMP

CONTROL PANEL

WQMP-2

EXISTING 2 CHANNEL

SITRANS CONTROLLER

EX SITRANS WATER METER

EX SITRANS WATER METER

ON MEZZANINE ABOVE FOR

SCW MAKE-UP TO BOILERS

1/2"

1/2"

1. EXISTING PLUMBING WORK TO REMAIN AS

IS.UNLESS OTHERWISE NOTED

2. CONNECT NEW PIPING AND EQUIPMENT TO

EXISTING. FIELD VERIFY EXACT LOCATION

AND SIZE OF PIPING PRIOR TO START OF NEW

WORK.

3. INSTALL NEW BFP IN VERTICAL PIPE IN

LOCATION SIMILAR TO REMOVED CHECK

VALVE. TIE IN MAIN DRAIN PER NFPA

REQUIREMENTS.

4. SEE EQUIPMENT SCHEDULE ON SHEET P-401.

5. SEE DETAIL ON SHEET P-502.

6. CONNECT NEW PIPING TO EXISTING IN THIS

LOCATION.

7. RELOCATE EXISTING 2" ISOLATION VALVE AND

1-1/2" HOSE CONNECTION AT THIS LOCATION.

8. ROTATE EXISTING TEE FITTING TO TIE NEW

PIPING INTO EXISTING.

9. PIPING SHOW OFFSET FOR CLARITY. RACK

ON WALL. FIELD VERIFY EXACT LOCATION

AND ROUTE BEFORE FABRICATION.

10. NEW HOSE BIB ON WALL AT 4 FEET AFF.

11. SEE DETAIL 7 / P502 AND 8/P502.

12. NEW REMOTE PUMP CONTROL PANEL.

CONNECT TO EXISTING SIGNAL WIRING. SEE

P-602.

13. EXISTING 2 CHANNEL SITRANS WATER METER

CONTROLLER TL SERVICES TO REPAIR /

REMAP ALL POINTS CURRENTLY CONNECTED

TO THE SITRANS SYSTEM.

14. EXISTING SITRANS WATER METER. CONTACT

TL SERVICES FOR REPAIR /

RECONFIGURATION OF EXISTING METER

INTERFACES AND EXISTING INTEGRATION TO

ABS NIAGARA AX INTERFACE.

15. EXISTING SITRANS BOILER MAKE-UP WATER

METER. CONTACT TL SERVICES FOR REPAIR /

RECONFIGURATION OF EXISTING METER

INTERFACES AND EXISTING INTEGRATION TO

ABS NIAGARA AX INTERFACE.

16. WATER QUALITY ENGINEER OFFICE. THIS

CONTRACTOR TO PROVIDE A PC WITH

WINDOWS 10 OPERATING SYSTEM TO RUN

THE WATER QUALITY MONITORING SYSTEM

SOFTWARE.

17. PLUMBING SHOP OFFICE - THIS CONTRACTOR

TO PROVIDE A PC WITH WINDOWS 10

OPERATING SYSTEM TO VIEW THE WATER

QUALITY MONITORING SYSTEM SOFTWARE

AND THERMOSTATIC MIXING VALVE BUILDING

AUTOMATION SYSTEM INFORMATION.

18. CONNECT TO 120V POWER SOURCE AT J-BOX

USING 2-12AWG, 12AWG EG IN 3/4" C.

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

18-PP101

WLF / LLPDJR

PLUMBING PLANS

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

EX DOMESTIC

WATER METER

EX 2 1/2" SERVICE LINE

EX FDC

EX 4" FIRE PROTECTION SERVICE LINE

F F

PIPING TO

BLDG. 24

EXISTING

EX 3/4"

EX 3/4"

EX 2 1/2"

EX CW, HWR, HW & CW

EX CW, HWR, HW & CW

NORTH

EX FDC

EX 4" FIRE PROTECTION SERVICE LINE

F

PIPING TO

BLDG. 24

EXISTING

EX 3/4"

EX 3/4"

F

F

EX CW, HWR, HW & CW

EX CW, HWR, HW & CW

EX 2 1/2"

BFP-5 x (2)

DCVA-1

WATER METER

SEE SHEET PS101

FOR CONTINUATION

SEE SHEET PS101

FOR CONTINUATION

EX SITRANS 1 CHANNEL

METER CONTROLLER

EX 1"

EX 1" BFP

EX HEATING MAKEUP

WATER METER

EX 1"

EX 1" BFP

TOTALIZER METER7

2 1/2"

F

8 9

4"

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

22-P-101

WLFDJR

PLUMBING PLANS

1. REMOVE EXISTING DOMESTIC WATER PIPING,

VALVES, FITTINGS, HANGERS AND SUPPORTS

COMPLETE.

2. REMOVE PIPING TO THE POINT INDICATED ON

DRAWING. FIELD VERIFY EXACT LOCATION AND

SIZE OF PIPE. FIELD VERIFY EXISTING

CONDITIONS PRIOR TO STARTING NEW WORK.

3. A SIEMENS FACTORY TRAINED AND CERTIFIED

TECHNICIAN SHALL RELOCATE THE EXISTING

SITRANS WATER METER. TL SERVICES TO

REMAP ALL POINTS CURRENTLY CONNECTED

TO THE SITRANS SYSTEM.

4. SEE EQUIPMENT SCHEDULE ON SHEET P-401

AND PIPING DETAIL ON 2 / P-502.

5. SEE EQUIPMENT SCHEDULE ON SHEET P-401

AND DETAIL 6 / P-502.

6. REMOVE EXISTING MAKEUP WATER METER AND

PREPARE PIPING TO ACCOMMODATE NEW

EQUIPMENT TO BE INSTALLED.

7. PROVIDE A PULSE METER INTEGRATED

DIRECTLY TO THE NIAGARA GUI. SEE SHEET

PS102 FOR ADDITIONAL INFORMATION.

PROVIDE STRAINER, ISOLATION VALVES, AND

FULL SIZE LINE BY-PASS AT METER.

8. CONNECT TO EXISTING 4" FIRE PROTECTION

RISER.

9. CONNECT TO EXISTING 3" FIRE PROTECTION

RISER.

10. CONNECT TO EXISTING PIPING. FIELD VERIFY

EXACT LOCATION AND SIZE OF PIPE PRIOR

TO START OF NEW WORK.

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

EX 3/4"

3/4"

EX 3/4"

3/4"

EX 2-1/2"

EX 2-1/2"

EX 2-1/2"

EX HWRC

PUMP

EX 1-1/2"UP

EX 3/4"

1-1/2" FROM ABOVE

SUMP PUMP

EX 2-1/2"2-1/2"

1/2"

EX 2 1/2" SERVICE LINE EX 4" DOMESTIC SERVICE LINE

WATER SOFTENERS

F

EX FDC

EX 6" FIRE PROTECTION SERVICE LINE

EX 3/4"

EX 4"

EX DOM WATER METER(SITRANS)

EX HWRC PUMP

SOFTENED

WATER HEATER FOR SPS

EX DOM WATER HEATER

EX 3/4"-UP

EXISTING

PIPING TO

BLDG. 22

EX 6" FP

EX 4"…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.