36C25918R0592 Water Drawing Part2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25918C0325-000.docx | DOCX document | |
| 36C25918R0592-0002003.pdf | ||
| 36C25918R0592-0002002.pdf | ||
| 36C25918R0592-0002000.docx | DOCX document | |
| 36C25918R0592-0002001.pdf | ||
| 36C25918R0592-0001000.docx | DOCX document | |
| 36C25918R0592-020.docx | DOCX document | |
| 36C25918R0592-012.docx | DOCX document | |
| 36C25918R0592-014.pdf | ||
| 36C25918R0592-017.pdf | ||
| 36C25918R0592-019.docx | DOCX document | |
| 36C25918R0592-013.docx | DOCX document | |
| 36C25918R0592-024.pdf | ||
| 36C25918R0592-021.pdf | ||
| 36C25918R0592-023.pdf | ||
| 36C25918R0592-015.pdf | ||
| 36C25918R0592-018.pdf | ||
| 36C25918R0592-022.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NC BY-PASS
EX 2" DEAD
EX 4"
EX 1 1/2"
EX 6"
EX 6"
EX 3"
EX 3"
EX 6"
EX 4"
EX 3"
EX 3"
EX 2"
EX 6"
EX 2"
EX 2" DEAD LEG
UP 32"
EX 4"
LEG-DN 20"
EX 4"
EX 1 1/2"
EX 6"
EX DHWR PUMP
STEAM FIRED WATER
HEATER
EX INSTANTANEOUS
STEAM FIRED WATER
HEATER
EX 1 1/2"CW-UP
EX 1 1/2" DEAD
LEG-UP 18"
EX 3/4"HW
EX 3/4"-UP
EX 3"
EX 4" DHW
EX 1 1/2" DHWR
EX 6" DCW
EX 3/4"DCW
EX ELECTRIC
WATER HEATER
EX 3/8"
EX TRI-PLEX DOMESTIC
WATER BOOSTER PUMP
SYSTEM
EX 1 1/2"
EX 1 1/2"
EX 3/4"-DN
EX 1 1/2"
EX 4"
EX 4"
EX 4" CW TO
BLDG 1C
EX 1 1/2"
EX 1 1/2"
EX 2"CW
FROM BELOW
EX 1 1/2"CW
DOWN
EX 1"
EX 1"CW FOR
FUTURE
IRRIGATION
EX 1" RPZ FOR
FUTURE IRRIGATION
EX WATER METER
EX 6" SERVICE ENTRANCE
TO HOSE BIB
6EX BFP
EX 3/4"CW-UP
EX HOSE BIB
EX HOSE BIB
BLDG. 1C
BLDG. 52
BLDG. 1C
BLDG. 52
B L
D G
B L
D G
BLDG. 52
BLDG. 53
B L
D G
B L
D G
B L
D G
B L
D G
B L
D G
B L
D G
BLDG. 52
BLDG. 53
B L
D G
B L
D G
B L
D G
B L
D G
EX 4" DHW
EX 1 1/2" DHWR
EX 6" DCW
EX BACKFLOW PREVENTORS
EX 4"CW UP
EX ELECTRIC
WATER HEATER
EX 4"CW DN
EX INSTANTANEOUS
EXISTING 3" UP TO UNDER ROOF
EX SITRANS 2 CHANNEL METER
CONTROLLER
EX 3"DCW
EXISTING 3" DCW UP FROM BFP'S BELOW
EXISTING SITRANS WATER METER
FOR DOMESTIC SERVICE
EXISTING SITRANS
WATER METER FOR
COOLING TOWER
EX 3/4"
FOR
TOWER
DRAIN
EX 3" CW MAKE-UP
UP THRU ROOF TO
EX 1 1/2"
EX 3"
EX 3"
COOLING TOWERS
EX 3/4"-DN WITH
EX 1-1/2" FILL DOWN
INTO CHILLED
WATER MAIN
EX 1/2" FILL TO AHU
HUMIDIFIER
EX 1/2" FILL TO AHU
HUMIDIFIER
PIPING DOWN TO FIRST FLOOR
EX 1/2"
PIPING UP TO SECOND FLOOR
VALVE AT 5' AFF
EX 3/4"DHW DOWN
TO/FROM BLDG. 53
EX 2" DCW DL 4
1 1/2" DCW UP TO SECOND FLOOR
EX 1 1/2"DCW DOWN
EX 3/4"DHW UP
EX 3/4"DHW
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
52-PD101
WLFDJR
PLUMBING DEMOLITION PLANS
1. REMOVE EXISTING DOMESTIC WATER
BOOSTER PUMP SYSTEM, CONTROLS, SKID,
AND ACCESSORIES COMPLETE. PROVIDE
TEMPORARY BOOSTER PUMP AND PIPING AS
REQUIRED TO KEEP THE FACILITY ACTIVE
UNTIL THE NEW SYSTEM IS INSTALLED AND
ACTIVE.
2. REWORK EXISTING DOMESTIC WATER HEATER
PIPING AS REQUIRED TO ACCOMMODATE
INSTALLATION OF NEW MASTER
THERMOSTATIC MIXING VALVE.
3. REFERENCE DETAIL 1/P-501.
4. REMOVE EXISTING PIPING TO POINT
INDICATED. REMOVE ALL FITTINGS, VALVES,
PIPE HANGERS, SUPPORTS AND
ACCESSORIES COMPLETE.
5. REMOVE EXISTING ELECTRIC WATER HEATER
AND ASSOCIATED PIPING, FITTINGS, VALVES
AND ACCESSORIES COMPLETE. COORDINATE
DEMOLITION OF ELECTRICAL CONNECTION
WITH E.C.
6. REMOVE EXISTING UNDER-COUNTER
ELECTRIC WATER HEATER AND ASSOCIATED
PIPING, FITTINGS, VALVES AND ACCESSORIES
COMPLETE. COORDINATE DEMOLITION OF
ELECTRICAL CONNECTION WITH E.C.
1. THE ENTIRE PLUMBING SYSTEM SHALL
CONFORM WITH ALL VA STANDARDS.
2. COORDINATE WORKING HOURS ALLOWED
WITH VA COR AS INSTRUCTED IN GENERAL
REQUIREMENTS.
3. THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO CUTTING
EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT /
DAMAGED, PATCH AND REPAIR THE SERVICE
AT NO ADDITIONAL COST TO THE VA.
4. CONTRACTOR SHALL REMOVE ALL EXISTING
PLUMBING SYSTEMS AND INSULATION WHERE
INDICATED AND MADE OBSOLETE BY NEW
CONSTRUCTION INCLUDING ALL PIPING,
HANGERS, SUPPORTS AND ACCESSORIES.
REFERENCE ALL DRAWINGS AND
SPECIFICATIONS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO START OF
WORK.
5. ALL EXISTING PIPING SHOWN ON THE
DOCUMENTS ARE FROM EXISTING
DRAWINGS AND FIELD OBSERVATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE EXACT LOCATION, SIZE AND
ELEVATION OF ALL EXISTING PIPING PRIOR
TO START OF NEW WORK.
6. THESE PLANS ARE DIAGRAMMATIC.
CONTRACTOR SHALL PROVIDE ALL
NECESSARY OFFSET, TEES, ELBOWS, ETC
FOR A COMPLETE WORKING PLUMBING
SYSTEM. PROVIDE SUBMITTAL TO COR FOR
APPROVAL
NC BY-PASS
EX 4"
EX 1 1/2"
EX 6"
EX 6"
EX 3"
EX 3"
EX 6"
EX 4"
EX 3"
EX 3"
EX 2"
EX 6"
EX 2"
EX 4"
EX 4"
EX 1 1/2"
EX 6"
EX DHWR PUMP
STEAM FIRED WATER
HEATER
EX INSTANTANEOUS
STEAM FIRED WATER
HEATER
EX 1 1/2"CW-UP
EX 3/4"HW
EX 3/4"-UP
EX 3"
EX 4" DHW
EX 1 1/2" DHWR
EX 6" DCW
EX 3/4"DCW
EX ELECTRIC
WATER HEATER
EX 3/8"
EX 1 1/2"
EX 1 1/2"
EX 3/4"-DN
EX 1 1/2"
EX 4"
EX 4"
EX 4" CW TO
BLDG 1C
EX 1 1/2"
EX 1 1/2"
EX 1 1/2"CW
DOWN
EX 1"
EX 1"CW FOR
FUTURE
IRRIGATION
EX 1" RPZ FOR
FUTURE IRRIGATION
EX WATER METER
EX 6" SERVICE ENTRANCE
TO HOSE BIB
EX 3/4"CW-UP
EX HOSE BIB
EX HOSE BIB
BLDG. 1C
BLDG. 52
BLDG. 1C
BLDG. 52
B L
D G
B L
D G
BLDG. 52
BLDG. 53
B L
D G
B L
D G
B L
D G
B L
D G
B L
D G
B L
D G
BLDG. 52
BLDG. 53
B L
D G
B L
D G
B L
D G
B L
D G
EX 4" DHW
EX 1 1/2" DHWR
EX 6" DCW
TRI-PLEX DOMESTIC
WATER BOOSTER PUMP
SYSTEM
EX BACKFLOW PREVENTORS
BFP-3
1 2
EX 4"CW UP
EX ELECTRIC
WATER HEATER
EX 4"CW DN
EX INSTANTANEOUS
TOTALIZER METER
BFP-7
BFP-7
NEW WATER METER
SERVING BUILDING 1C
EXISTING 3" UP TO UNDER ROOF
EX SITRANS 2 CHANNEL METER
CONTROLLER
EX 3"DCW
EXISTING 3" DCW UP FROM BFP'S BELOW
EXISTING SITRANS WATER METER
FOR DOMESTIC SERVICE
EXISTING SITRANS
WATER METER FOR
COOLING TOWER
EX 3/4"
FOR
TOWER
DRAIN
EX 3" CW MAKE-UP
UP THRU ROOF TO
EX 1 1/2"
EX 3"
EX 3"
COOLING TOWERS
EX 3/4"-DN WITH
EX 1-1/2" FILL DOWN
INTO CHILLED
WATER MAIN
EX 1/2" FILL TO AHU
HUMIDIFIER
EX 1/2" FILL TO AHU
HUMIDIFIER
PIPING DOWN TO FIRST FLOOR
EX 1/2"
PIPING UP TO SECOND FLOOR
VALVE AT 5' AFF
EX 3/4"DHW DOWN
TO/FROM BLDG. 53
1 1/2" DCW UP TO SECOND FLOOR
EX 1 1/2"DCW DOWN
1 1/2" DCW
EX 3/4"DHW UP
EX 3/4"DHW
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
52-PP101
WLFDJR
PLUMBING PLANS
1. CONNECT NEW PIPING TO EXISTING. FIELD
VERIFY EXACT LOCATION AND SIZE OF PIPE
PRIOR TO START OF NEW WORK.
2. SEE EQUIPMENT SCHEDULE ON SHEET P-401.
3. PROVIDE STRAINER, ISOLATION VALVES AND
FULL LINE SIZE BY-PASS.
4. PROVIDE A SITRANS WATER METER. PROVIDE
ALL WIRING, CONDUITS, FITTINGS AND
HARDWARE NECESSARY TO CONNECT METER TO
BUILDING AUTOMATION SYSTEM. BUILDING
AUTOMATION SYSTEM TO BE PROGRAMMED TO
LOG THE FOLLOWING DATA AND DISPLAY THE
DATA ON THE VA ACCESSIBLE BUILDING
AUTOMATION INTERFACE:
4.1. CURRENT FLOW RATE IN GALLONS PER
MINUTE (GPM).
4.2. AVERAGE FLOW AT DAILY, MONTHLY AND
YEARLY INTERVALS.
4.3. COMPARISON OF TOTAL FLOW OF
BRANCH METERS TO THE TOTAL OF ANY
METERS FEEDING THE BRANCH OVER
HOURLY, DAILY AND MONTHLY
INTERVALS.
CONTRACTOR MUST INTEGRATE
FUNCTIONALITY WITH AUTOMATED BUILDING
SYSTEMS - TULSA, INC., THE CURRENT
BUILDING AUTOMATION PROVIDER FOR THE
FACILITY. CONTACT JOEL KARSETTER -
918-665-3974, JKARSETTER@ABSCOMPANIES.COM.
5. DISCONNECT EXISTING PUMP SKID CONTROLLER
FROM EXISTING FEEDER TO REMAIN. CONNECT
NEW PUMP SKID CONTROLLER TO EXISTING
FEEDER. REWORK FEEDER AS NOTED ABOVE.
COORDINATE WITH PLUMBING CONTRACTOR.
6. PROVIDE 120V DIRECT CONNECTION TO NEW
THERMOSTATIC MIXING VALVE. EXTEND
NEAREST NORMAL POWER RECEPTACLE CIRCUIT
TO LOCATION AND CONNECT. COORDINATE
EXACT LOCATION AND REQUIREMENTS WITH
PLUMBING CONTRACTOR.
7. APPROXIMATE LOCATION OF EXISTING PANEL
'MCC-EQB' WHICH INCLUDES EXISTING 125A
THERMAL MAGNETIC CIRCUIT BREAKER SERVING
PUMP SKID TO BE REPLACED BY MECHANICAL.
8. APPROXIMATE ROUTING OF EXISTING (3-1/0AWG,
6AWG EG IN 1-1/2 INCH CONDUIT) FEEDER
SERVING PUMP SKID. REWORK OR EXTEND
FEEDER BY BUTT SPLICE WITH COLD SHRINK
INSULATORS AS REQUIRED TO MAKE
CONNECTION TO NEW PUMP SKID CONTROLLER.
ADD SPLICE BOX AS NECESSARY. COORDINATE
EXACT REQUIREMENTS WITH PLUMBING
CONTRACTOR.
9. CONNECT TO 120V POWER SOURCE AT J-BOX
USING 2-12AWG, 12AWG EG IN 3/4" C.
1. THE ENTIRE PLUMBING SYSTEM SHALL
CONFORM WITH ALL VA STANDARDS.
2. COORDINATE WORKING HOURS ALLOWED
WITH VA COR AS INSTRUCTED IN GENERAL
REQUIREMENTS.
3. THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO CUTTING
EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT /
DAMAGED, PATCH AND REPAIR THE SERVICE
AT NO ADDITIONAL COST TO THE VA.
4. CONTRACTOR SHALL REMOVE ALL EXISTING
PLUMBING SYSTEMS AND INSULATION WHERE
INDICATED AND MADE OBSOLETE BY NEW
CONSTRUCTION INCLUDING ALL PIPING,
HANGERS, SUPPORTS AND ACCESSORIES.
REFERENCE ALL DRAWINGS AND
SPECIFICATIONS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO START OF
WORK.
5. ALL EXISTING PIPING SHOWN ON THE
DOCUMENTS ARE FROM EXISTING
DRAWINGS AND FIELD OBSERVATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE EXACT LOCATION, SIZE AND
ELEVATION OF ALL EXISTING PIPING PRIOR
TO START OF NEW WORK.
6. THESE PLANS ARE DIAGRAMMATIC.
CONTRACTOR SHALL PROVIDE ALL
NECESSARY OFFSET, TEES, ELBOWS, ETC
FOR A COMPLETE WORKING PLUMBING
BLDG. 53
BLDG. 52
B L
D G
B L
D G
(2) EX 3/4" CW FROM ABOVE
EX 3/4" CW BELOW SLAB -
LOCATION APPROXIMATED
EX WALL HYDRANT
EX WALL HYDRANT
EX 3/4" CW BELOW SLAB -
LOCATION APPROXIMATED
EX 6" FIRE SERVICE
EX 6" DOUBLE CHECK VALVE
BACKFLOW PREVENTOR
EX 6" FIRE TO FIRE PUMP
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
53-PD100
WLF / LLPDJR
SUB-BASEMENT PLUMBING
DEMOLITION PLAN
1. REMOVE EXISTING FIRE PROTECTION DOUBLE
CHECK VALVE ASSEMBLY AND PREPARE
EXISTING PIPE AND FITTINGS TO REMAIN TO
ACCOMMODATE NEW EQUIPMENT TO BE
INSTALLED. SEE SHEET 53-PP100 FOR
ADDITIONAL INFORMATION.
1. THE ENTIRE PLUMBING SYSTEM SHALL
CONFORM WITH ALL VA STANDARDS.
2. COORDINATE WORKING HOURS ALLOWED
WITH VA COR AS INSTRUCTED IN GENERAL
REQUIREMENTS.
3. THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO CUTTING
EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT /
DAMAGED, PATCH AND REPAIR THE SERVICE
AT NO ADDITIONAL COST TO THE VA.
4. CONTRACTOR SHALL REMOVE ALL EXISTING
PLUMBING SYSTEMS AND INSULATION WHERE
INDICATED AND MADE OBSOLETE BY NEW
CONSTRUCTION INCLUDING ALL PIPING,
HANGERS, SUPPORTS AND ACCESSORIES.
REFERENCE ALL DRAWINGS AND
SPECIFICATIONS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO START OF
WORK.
5. ALL EXISTING PIPING SHOWN ON THE
DOCUMENTS ARE FROM EXISTING
DRAWINGS AND FIELD OBSERVATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE EXACT LOCATION, SIZE AND
ELEVATION OF ALL EXISTING PIPING PRIOR
TO START OF NEW WORK.
6. THESE PLANS ARE DIAGRAMMATIC.
CONTRACTOR SHALL PROVIDE ALL
NECESSARY OFFSET, TEES, ELBOWS, ETC
FOR A COMPLETE WORKING PLUMBING
B L
D G
B L
D G
WALLS, ETC. BELOW
(DASHED), TYP.
EX 3/4" TO EYE
WASH BELOW
EX 3/4"CW DN
TO INT HOSE BIB
EX 1" RISER
DRAINS-DN 24"
EX 1 1/2"
EX 4"
EX 6"
EX 1/2"
EX 1/2"
EX 2"
EX 1 1/2"EX 2"
EX 2"
EX 3/4"
3/4" CW TO SUB-BASEMENT WALL HYDRANTS
EX 1"
EX 3/4"
EX 6"
EX 4"
EX 1 1/2"
EX 6"
EX 4"
EX 1 1/2"
SEE BUILDING 58 PLANS
FOR WORK IN THIS
AREA
EX 1 1/4"
EX 6"
EX 4"
EX 1 1/4"
PRV-4 1
PRV-1 1
PRV-6
PRV-1
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
53-PD101
WLF / LLPDJR
BASEMENT MEZZANINE PLUMBING
DEMOLITION PLAN
1. REMOVE EXISTING PRESSURE REDUCING
VALVE STATION, BY-PASS, VALVES, PIPING
AND ACCESSORIES COMPLETE. PREPARE
EXISTING PIPING TO REMAIN TO
ACCOMMODATE NEW EQUIPMENT TO BE
INSTALLED. REFERENCE SHEET 53-PP101 FOR
ADDITIONAL INFORMATION.
2. REMOVE EXISTING PRESSURE REDUCING
VALVE STATION, BYPASS AND VALVE
COMPLETE. PREPARE PIPING TO REMAIN TO
ACCOMMODATE NEW PIPING.
3. REMOVE PIPING TO ACCOMMODATE NEW PRV
STATION. SEE 53-PP101 FOR ADDITIONAL
INFORMATION.
1. THE ENTIRE PLUMBING SYSTEM SHALL
CONFORM WITH ALL VA STANDARDS.
2. COORDINATE WORKING HOURS ALLOWED
WITH VA COR AS INSTRUCTED IN GENERAL
REQUIREMENTS.
3. THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO CUTTING
EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT /
DAMAGED, PATCH AND REPAIR THE SERVICE
AT NO ADDITIONAL COST TO THE VA.
4. CONTRACTOR SHALL REMOVE ALL EXISTING
PLUMBING SYSTEMS AND INSULATION WHERE
INDICATED AND MADE OBSOLETE BY NEW
CONSTRUCTION INCLUDING ALL PIPING,
HANGERS, SUPPORTS AND ACCESSORIES.
REFERENCE ALL DRAWINGS AND
SPECIFICATIONS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO START OF
WORK.
5. ALL EXISTING PIPING SHOWN ON THE
DOCUMENTS ARE FROM EXISTING
DRAWINGS AND FIELD OBSERVATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE EXACT LOCATION, SIZE AND
ELEVATION OF ALL EXISTING PIPING PRIOR
TO START OF NEW WORK.
6. THESE PLANS ARE DIAGRAMMATIC.
CONTRACTOR SHALL PROVIDE ALL
NECESSARY OFFSET, TEES, ELBOWS, ETC
FOR A COMPLETE WORKING PLUMBING
EX 1 1/4"
EX 3/4"
EX 1 1/4"
EX 3/4"
EX 1 1/2"
EX 3/4"
EX 1 1/4"
EX 1"
EX 1"
EX 1 1/2"
EX 1/2"
EX 1/2"
EX 1 1/2"
EX 3/4"
EX 3/4"
EX 1/2"-DN
EX 1-1/4"-DN
EX 6" VENT RISER
EX 6" SOIL RISER
EX 6" RD RISER
EX 1/2"-DN
EX 1 1/4"-DN
EX 1/2"
EX 6" VENT RISER
EX 6" SOIL RISER
EX 6" RD RISER
EX 1/2"-DN
1/2" DEADLEG
BLDG. 52
B L
D G
W
E S
T
B L
D G
BLDG. 53 EAST
BLDG. 53 WEST
B L
D G
B L
D G
E
A S
T
BLDG. 60
BLDG. 53 WEST
BLDG. 53 EAST
WALLS, ETC. BELOW
(DASHED), TYP.
EX DHWR BALANCING VALVE
EX 2"
EX 1 1/2"
EX PRV'S
16" DEADLEG
EX 1 1/4"
EX (3")FD
EX 3"
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
53-PD121
WLF / LLPDJR
SECOND FLOOR INTERSTITIAL
PLUMBING DEMO PLAN - WEST HALF
1. REMOVE EXISTING PRESSURE REDUCING
VALVE STATION, BY-PASS, VALVES, PIPING
AND ACCESSORIES COMPLETE. PREPARE
EXISTING PIPING TO REMAIN TO
ACCOMMODATE NEW EQUIPMENT TO BE
INSTALLED. REFERENCE SHEET 53-PP121 FOR
ADDITIONAL INFORMATION.
2. REMOVE DEAD LEG PIPING AND CAP AS
CLOSE TO MAIN AS POSSIBLE.
1. THE ENTIRE PLUMBING SYSTEM SHALL
CONFORM WITH ALL VA STANDARDS.
2. COORDINATE WORKING HOURS ALLOWED
WITH VA COR AS INSTRUCTED IN GENERAL
REQUIREMENTS.
3. THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO CUTTING
EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT /
DAMAGED, PATCH AND REPAIR THE SERVICE
AT NO ADDITIONAL COST TO THE VA.
4. CONTRACTOR SHALL REMOVE ALL EXISTING
PLUMBING SYSTEMS AND INSULATION WHERE
INDICATED AND MADE OBSOLETE BY NEW
CONSTRUCTION INCLUDING ALL PIPING,
HANGERS, SUPPORTS AND ACCESSORIES.
REFERENCE ALL DRAWINGS AND
SPECIFICATIONS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO START OF
WORK.
5. ALL EXISTING PIPING SHOWN ON THE
DOCUMENTS ARE FROM EXISTING
DRAWINGS AND FIELD OBSERVATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE EXACT LOCATION, SIZE AND
ELEVATION OF ALL EXISTING PIPING PRIOR
TO START OF NEW WORK.
6. THESE PLANS ARE DIAGRAMMATIC.
CONTRACTOR SHALL PROVIDE ALL
NECESSARY OFFSET, TEES, ELBOWS, ETC
FOR A COMPLETE WORKING PLUMBING
EX 53-PRV-1-1
EX 53-PRV-1-2
EX 1"
EX 1"
EX 3/4"
EX 3/4"
EX 1/2"-DN
EX 1/2"-DN
EX 1/2"-DN
EX 1/2"-DN
EX 1/2"
EX 1/2"
EX 1/2"-DN
EX 1/2"-DN
EX 1/2"-DN
EX 3/4"-DN
EX 1 1/2"-DN
EX 1"-DN
EX 1 1/2"
EX 1"
EX 3/4"
EX 1/2"-DN
EX 2"
EX 1 1/4"
EX 1/2"
EX 1/2"
EX 1/2"
EX 1/2"-DN
EX 1 1/4"
EX 2"
EX 1/2"
EX 1 1/4"
EX 2"
EX 1"
EX 1 1/2"-DN
EX 3"FD
EX 3/4"-DN
EX 1/2"
EX 1/2"
EX 1"
EX 1"
EX 1"
EX 1"
EX 3/4"
EX 3/4"
EX 1/2"-DN
EX 1/2"-DN
EX 3/4"
EX 3/4"
EX 1/2"-DN
EX 1/2"-DN
EX 3/4"
EX 1/2"
EX 3/4"
EX 1/2"
EX 3/4"
EX 1"
EX 1/2"-DN
EX 1/2"
EX 1 1/2"-DN
EX 1/2"-DN
EX 1 1/2"
EX 1 1/2"
EX 2"
EX 1 1/4"
EX 2"
EX 1 1/4"
EX 2"
EX 3/4"-DN
EX 3/4"-DN
EX 1/2"
EX 1/2"
EX 1/2"EX 1/2"
EX 3/4"
EX 3/4"
EX 4"
EX 4"
EX 1 1/2"-DN
EX 1/2"-DN
EX 1"
EX 3/4"
EX 1/2"-DN
EX 3/4"
EX 3/4"-DN
EX 1/2"-DN
EX 3/4"-DN EX 3/4"-DN
EX 1/2"-DN
EX 1/2"-DN
NO CAPS
EX 8" STORM RISER
EX 6" VENT RISER
EX 6" SANITARY RISER
3" CRP VENT RISER
6" VENT STACK
6" SANITARY RISER
6" STORM RISER
6" ST-UP / 8"-DN
WALLS, ETC. BELOW
(DASHED), TYP.
BLDG. 52
BLDG. 53 EAST
BLDG. 53 WEST
BLDG. 60
BLDG. 53 WEST
BLDG. 53 EAST
B L
D G
B L
D G
W
E S
T
BLDG. 53 EAST
BLDG. 1C
B L
D G
C
B L
D G
E
A S
T
BLDG. 53 EAST
BLDG. 60
6" SANITARY RISER
6" VENT RISER
EX CW, HW & HWR RISERS
EX HWS & HWR RISERS
EX CWS & CWR RISERS
EX PRV
EX PRV
EX 3/4"
EX 2"
EX 3/4"
EX 1 1/2"
EX 1/2"CW & HW
UP TO SINK
EX 1/2"
EX 1/2"
EX 1 1/4"
EX 3"
EX (3")FD
6" DL WITH DRAIN VALVES
EX 1/2"-DN
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
53-PD122
WLF / LLPDJR
SECOND FLOOR INTERSTITIAL
PLUMBING DEMO PLAN - EAST HALF
1. THE ENTIRE PLUMBING SYSTEM SHALL
CONFORM WITH ALL VA STANDARDS.
2. COORDINATE WORKING HOURS ALLOWED
WITH VA COR AS INSTRUCTED IN GENERAL
REQUIREMENTS.
3. THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO CUTTING
EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT /
DAMAGED, PATCH AND REPAIR THE SERVICE
AT NO ADDITIONAL COST TO THE VA.
4. CONTRACTOR SHALL REMOVE ALL EXISTING
PLUMBING SYSTEMS AND INSULATION WHERE
INDICATED AND MADE OBSOLETE BY NEW
CONSTRUCTION INCLUDING ALL PIPING,
HANGERS, SUPPORTS AND ACCESSORIES.
REFERENCE ALL DRAWINGS AND
SPECIFICATIONS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO START OF
WORK.
5. ALL EXISTING PIPING SHOWN ON THE
DOCUMENTS ARE FROM EXISTING
DRAWINGS AND FIELD OBSERVATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE EXACT LOCATION, SIZE AND
ELEVATION OF ALL EXISTING PIPING PRIOR
TO START OF NEW WORK.
6. THESE PLANS ARE DIAGRAMMATIC.
CONTRACTOR SHALL PROVIDE ALL
NECESSARY OFFSET, TEES, ELBOWS, ETC
FOR A COMPLETE WORKING PLUMBING
SYSTEM. PROVIDE SUBMITTAL TO COR FOR
APPROVAL
1. REMOVE EXISTING PRESSURE REDUCING
VALVE STATION, BY-PASS, VALVES, PIPING
AND ACCESSORIES COMPLETE. PREPARE
EXISTING PIPING TO REMAIN TO
ACCOMMODATE NEW EQUIPMENT TO BE
INSTALLED. REFERENCE SHEET 53-PP122 FOR
ADDITIONAL INFORMATION.
2. REMOVE EXISTING PIPING TO ACCOMMODATE
INSTALLATION ON NEW DOMESTIC HOT
WATER BALANCE VALVE STATION.
3. REMOVE DEAD LEG PIPING AND CAP AS
CLOSE TO MAIN AS POSSIBLE.
4. REMOVE PIPING TO POINT INDICATED.
PREPARE PIPING TO REMAIN FOR
CONNECTION TO NEW PIPING. SEE SHEET
53-PP122 FOR ADDITIONAL INFORMATION.
BLDG. 53 WEST
BLDG. 53 EAST
BLDG. 53 WEST
BLDG. 53 EAST
BLDG. 53 WEST
BLDG. 53 EAST
WALLS, ETC. BELOW
(DASHED), TYP.
EX 1 1/2"
EX CW 1/2"-UP TO
DIALYSIS BFP
ON FLOOR ABOVE
6" DEAD LEG
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
53-PD131
WLF / LLPDJR
THIRD FLOOR INTERSTITIAL
PLUMBING DEMO PLAN - WEST HALF
1. THE ENTIRE PLUMBING SYSTEM SHALL
CONFORM WITH ALL VA STANDARDS.
2. COORDINATE WORKING HOURS ALLOWED
WITH VA COR AS INSTRUCTED IN GENERAL
REQUIREMENTS.
3. THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO CUTTING
EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT /
DAMAGED, PATCH AND REPAIR THE SERVICE
AT NO ADDITIONAL COST TO THE VA.
4. CONTRACTOR SHALL REMOVE ALL EXISTING
PLUMBING SYSTEMS AND INSULATION WHERE
INDICATED AND MADE OBSOLETE BY NEW
CONSTRUCTION INCLUDING ALL PIPING,
HANGERS, SUPPORTS AND ACCESSORIES.
REFERENCE ALL DRAWINGS AND
SPECIFICATIONS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO START OF
WORK.
5. ALL EXISTING PIPING SHOWN ON THE
DOCUMENTS ARE FROM EXISTING
DRAWINGS AND FIELD OBSERVATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE EXACT LOCATION, SIZE AND
ELEVATION OF ALL EXISTING PIPING PRIOR
TO START OF NEW WORK.
6. THESE PLANS ARE DIAGRAMMATIC.
CONTRACTOR SHALL PROVIDE ALL
NECESSARY OFFSET, TEES, ELBOWS, ETC
FOR A COMPLETE WORKING PLUMBING
SYSTEM. PROVIDE SUBMITTAL TO COR FOR
APPROVAL
1. REMOVE EXISTING PRESSURE REDUCING
VALVE STATION, BY-PASS, VALVES, PIPING
AND ACCESSORIES COMPLETE. PREPARE
EXISTING PIPING TO REMAIN TO
ACCOMMODATE NEW EQUIPMENT TO BE
INSTALLED. REFERENCE SHEET 53-PP131 FOR
ADDITIONAL INFORMATION.
2. REMOVE DEAD LEG PIPING BACK TO MAIN, CAP
AS CLOSE AS POSSIBLE.
3. REMOVE EXISTING PIPING, HANGERS AND
SUPPORTS COMPLETE.
BLDG. 53 WEST
BLDG. 53 EAST
BLDG. 53 WEST
BLDG. 53 EAST
BLDG. 53 EAST
BLDG. 1C
B L
D G
C
B L
D G
E
A S
T
WALLS, ETC. BELOW
(DASHED), TYP.
EX 1 1/2"
EX 1/2"
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
53-PD132
WLF / LLPDJR
THIRD FLOOR INTERSTITIAL
PLUMBING DEMO PLAN - EAST HALF
1. THE ENTIRE PLUMBING SYSTEM SHALL
CONFORM WITH ALL VA STANDARDS.
2. COORDINATE WORKING HOURS ALLOWED
WITH VA COR AS INSTRUCTED IN GENERAL
REQUIREMENTS.
3. THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO CUTTING
EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT /
DAMAGED, PATCH AND REPAIR THE SERVICE
AT NO ADDITIONAL COST TO THE VA.
4. CONTRACTOR SHALL REMOVE ALL EXISTING
PLUMBING SYSTEMS AND INSULATION WHERE
INDICATED AND MADE OBSOLETE BY NEW
CONSTRUCTION INCLUDING ALL PIPING,
HANGERS, SUPPORTS AND ACCESSORIES.
REFERENCE ALL DRAWINGS AND
SPECIFICATIONS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO START OF
WORK.
5. ALL EXISTING PIPING SHOWN ON THE
DOCUMENTS ARE FROM EXISTING
DRAWINGS AND FIELD OBSERVATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE EXACT LOCATION, SIZE AND
ELEVATION OF ALL EXISTING PIPING PRIOR
TO START OF NEW WORK.
6. THESE PLANS ARE DIAGRAMMATIC.
CONTRACTOR SHALL PROVIDE ALL
NECESSARY OFFSET, TEES, ELBOWS, ETC
FOR A COMPLETE WORKING PLUMBING
SYSTEM. PROVIDE SUBMITTAL TO COR FOR
APPROVAL
1. REMOVE EXISTING PRESSURE REDUCING
VALVE STATION, BY-PASS, VALVES, PIPING
AND ACCESSORIES COMPLETE. PREPARE
EXISTING PIPING TO REMAIN TO
ACCOMMODATE NEW EQUIPMENT TO BE
INSTALLED. REFERENCE SHEET 53-PP132 FOR
ADDITIONAL INFORMATION.
2. REMOVE EXISTING PIPING TO ACCOMMODATE
INSTALLATION ON NEW DOMESTIC HOT WATER
BALANCE VALVE STATION.
3. REMOVE DEAD LEG PIPING BACK TO MAIN, CAP
PIPE AS CLOSE AS POSSIBLE.
4. REMOVE EXISTING PIPING HANGERS AND
SUPPORTS TO POINT AS INDICATED. PREPARE
PIPING TO REMAIN TO ACCOMMODATE NEW.
SEE SHEET 53-PP132 FOR ADDITIONAL
INFORMATION.
EX 1 1/4"
BLDG. 53 EAST
BLDG. 53 WEST
BLDG. 53 EAST
WALLS, ETC. BELOW
(DASHED), TYP.
BLDG. 53 EAST
BLDG. 53 WEST
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
53-PD141
WLF / LLPDJR
FOURTH FLOOR INTERSTITIAL
PLUMBING DEMO PLAN - WEST HALF
1. THE ENTIRE PLUMBING SYSTEM SHALL
CONFORM WITH ALL VA STANDARDS.
2. COORDINATE WORKING HOURS ALLOWED
WITH VA COR AS INSTRUCTED IN GENERAL
REQUIREMENTS.
3. THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO CUTTING
EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT /
DAMAGED, PATCH AND REPAIR THE SERVICE
AT NO ADDITIONAL COST TO THE VA.
4. CONTRACTOR SHALL REMOVE ALL EXISTING
PLUMBING SYSTEMS AND INSULATION WHERE
INDICATED AND MADE OBSOLETE BY NEW
CONSTRUCTION INCLUDING ALL PIPING,
HANGERS, SUPPORTS AND ACCESSORIES.
REFERENCE ALL DRAWINGS AND
SPECIFICATIONS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO START OF
WORK.
5. ALL EXISTING PIPING SHOWN ON THE
DOCUMENTS ARE FROM EXISTING
DRAWINGS AND FIELD OBSERVATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE EXACT LOCATION, SIZE AND
ELEVATION OF ALL EXISTING PIPING PRIOR
TO START OF NEW WORK.
6. THESE PLANS ARE DIAGRAMMATIC.
CONTRACTOR SHALL PROVIDE ALL
NECESSARY OFFSET, TEES, ELBOWS, ETC
FOR A COMPLETE WORKING PLUMBING
SYSTEM. PROVIDE SUBMITTAL TO COR FOR
APPROVAL
1. REMOVE EXISTING PIPING AND ACCESSORIES
COMPLETE. PREPARE EXISTING PIPING TO
REMAIN TO ACCOMMODATE NEW EQUIPMENT
TO BE INSTALLED. REFERENCE SHEET
53-PP141 FOR ADDITIONAL INFORMATION.
2. REMOVE EXISTING DOMESTIC HOT WATER
BALANCING STATION AND ACCESSORIES
COMPLETE AND PREPARE PIPING TO REMAIN
TO ACCOMMODATE PIPING TO BE INSTALLED.
REFERENCE SHEET 53-PP141 FOR ADDITIONAL
INFORMATION.
EX 1 1/2"
EX 1/2"
EX 1/2"
EX 1/2"
EX 1/2"
EX 1/2"
EX 2"
EX 1/2"
EX 1 1/2"
EX 1 1/4"
EX 2"
EX 1 1/4"
EX 1"
EX 1 1/4"
EX 1"
EX 2"
EX 1/2"
EX 1/2"
EX 3/4"
EX 1"
EX 2"
EX 1/2"
EX 1 1/2"-DN
EX 1"
EX 1/2"
EX 3/4"
EX 1/2"
EX 3/4"
EX 1 1/4"
EX 1/2"
EX 3/4"
EX 1/2"
EX 3/4"
EX 1 1/4"
EX 1 1/4"
EX 1/2"
EX 1/2"
EX 1 1/2"
EX 3/4"
EX 1/2"
EX 2"
EX 1 1/2"
EX 1/2"
EX 1/2"
EX 1/2"
EX 1/2"
EX 1/2"
EX 1/2"
EX 1 1/2"
EX 1/2"
EX 1 1/2"
EX 2"
EX 3/4"
EX 3/4"
EX 1 1/2"
EX 2"
EX 1 1/4"
EX 3/4"
EX 1 1/4"
EX 3/4"
EX 1/2"
EX 1/2"
EX 1 1/2"
EX 2"
3" CRP VENT RISER
6" STORM RISER
6" SANITARY RISER
6" VENT RISER
EX CW, HW & HWR RISERS
6" STORM RISER
6" SANITARY RISER
6" VENT RISER
EX 1/2"
EX 1/2"
EX 1/2"
EX CW, HW &
EX 4" VENT RISER
EX 4" SP RISER
EX 1/2"
EX 1/2"
EX 1/2"
EX 1 1/4"
EX 1 1/4"
EX 1/2"
EX 1/2"
EX 1 1/2"
EX 2"
EX 1 1/2"
EX 3/4"
EX 1/2"
HWR RISERS
VALVES CLOSED
VALVES OFF
18" DEAD LEG
EX 2"
EX 3/4"
EX 2"
EX 1/2"
EX 1 1/4"
BLDG. 53 WEST
BLDG. 53 EAST
BLDG. 53 WEST
BLDG. 53 EAST
BLDG. 53 EAST
BLDG. 1C
B L
D G
C
B L
D G
E
A S
T
WALLS, ETC. BELOW
(DASHED), TYP.
BLDG. 53 EAST
BLDG. 53 WEST
EX 1/2"
EX 1/2"
EX 1/2"
EX 1/2"
EX 1/2"
EX 1/2"
6" SANITARY RISER
6" VENT RISER
EX HWS & HWR RISERS
EX CWS & CWR RISERS
EX 3"
EX (3")FD
EX 1 1/2"
EX DHWR BALANCING VALVE
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
53-PD142
WLF / LLPDJR
FOURTH FLOOR INTERSTITIAL
PLUMBING DEMO PLAN - EAST HALF
1. THE ENTIRE PLUMBING SYSTEM SHALL
CONFORM WITH ALL VA STANDARDS.
2. COORDINATE WORKING HOURS ALLOWED
WITH VA COR AS INSTRUCTED IN GENERAL
REQUIREMENTS.
3. THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO CUTTING
EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT /
DAMAGED, PATCH AND REPAIR THE SERVICE
AT NO ADDITIONAL COST TO THE VA.
4. CONTRACTOR SHALL REMOVE ALL EXISTING
PLUMBING SYSTEMS AND INSULATION WHERE
INDICATED AND MADE OBSOLETE BY NEW
CONSTRUCTION INCLUDING ALL PIPING,
HANGERS, SUPPORTS AND ACCESSORIES.
REFERENCE ALL DRAWINGS AND
SPECIFICATIONS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO START OF
WORK.
5. ALL EXISTING PIPING SHOWN ON THE
DOCUMENTS ARE FROM EXISTING
DRAWINGS AND FIELD OBSERVATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE EXACT LOCATION, SIZE AND
ELEVATION OF ALL EXISTING PIPING PRIOR
TO START OF NEW WORK.
6. THESE PLANS ARE DIAGRAMMATIC.
CONTRACTOR SHALL PROVIDE ALL
NECESSARY OFFSET, TEES, ELBOWS, ETC
FOR A COMPLETE WORKING PLUMBING
SYSTEM. PROVIDE SUBMITTAL TO COR FOR
APPROVAL
1. REMOVE EXISTING PIPING AND ACCESSORIES
COMPLETE. PREPARE EXISTING PIPING TO
REMAIN TO ACCOMMODATE NEW EQUIPMENT
TO BE INSTALLED. REFERENCE SHEET
53-PP142 FOR ADDITIONAL INFORMATION.
2. REMOVE DEAD LEG OF PIPING BACK TO MAIN
AS CLOSE AS POSSIBLE WITH CAP.
BLDG. 53 WEST
BLDG. 53 EAST
BLDG. 53 EAST
BLDG. 53 WEST
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
53-PD151
WLF / LLPDJR
FIFTH FLOOR INTERSTITIAL
PLUMBING DEMO PLAN - WEST HALF
1. THE ENTIRE PLUMBING SYSTEM SHALL
CONFORM WITH ALL VA STANDARDS.
2. COORDINATE WORKING HOURS ALLOWED
WITH VA COR AS INSTRUCTED IN GENERAL
REQUIREMENTS.
3. THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO CUTTING
EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT /
DAMAGED, PATCH AND REPAIR THE SERVICE
AT NO ADDITIONAL COST TO THE VA.
4. CONTRACTOR SHALL REMOVE ALL EXISTING
PLUMBING SYSTEMS AND INSULATION WHERE
INDICATED AND MADE OBSOLETE BY NEW
CONSTRUCTION INCLUDING ALL PIPING,
HANGERS, SUPPORTS AND ACCESSORIES.
REFERENCE ALL DRAWINGS AND
SPECIFICATIONS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO START OF
WORK.
5. ALL EXISTING PIPING SHOWN ON THE
DOCUMENTS ARE FROM EXISTING
DRAWINGS AND FIELD OBSERVATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE EXACT LOCATION, SIZE AND
ELEVATION OF ALL EXISTING PIPING PRIOR
TO START OF NEW WORK.
6. THESE PLANS ARE DIAGRAMMATIC.
CONTRACTOR SHALL PROVIDE ALL
NECESSARY OFFSET, TEES, ELBOWS, ETC
FOR A COMPLETE WORKING PLUMBING
SYSTEM. PROVIDE SUBMITTAL TO COR FOR
APPROVAL
1. REMOVE EXISTING PIPING AND ACCESSORIES
COMPLETE. PREPARE EXISTING PIPING TO
REMAIN TO ACCOMMODATE NEW EQUIPMENT
TO BE INSTALLED. REFERENCE SHEET
53-PP141 FOR ADDITIONAL INFORMATION.
2. REMOVE EXISTING DOMESTIC HOT WATER
RETURN STATION AND ASSOCIATED
ACCESSORIES COMPLETE. PREPARE PIPING
TO REMAIN TO ACCOMMODATE NEW PIPING TO
BE INSTALLED. REFERENCE SHEET 53-PP151
FOR ADDITIONAL INFORMATION.
3. REMOVE DEAD LEG PIPING, HANGERS, AND
SUPPORTS BACK TO MAIN AS CLOSE AS
POSSIBLE WITH CAP.
BLDG. 53 WEST
BLDG. 53 EAST
BLDG. 53 EAST
BLDG. 1C
B L
D G
C
B L
D G
E
A S
T
BLDG. 53 EAST
BLDG. 53 WEST
UP TO HOSE BIBB
ABOVE
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
53-PD152
WLF / LLPDJR
FIFTH FLOOR INTERSTITIAL
PLUMBING DEMO PLAN - EAST HALF
1. THE ENTIRE PLUMBING SYSTEM SHALL
CONFORM WITH ALL VA STANDARDS.
2. COORDINATE WORKING HOURS ALLOWED
WITH VA COR AS INSTRUCTED IN GENERAL
REQUIREMENTS.
3. THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO CUTTING
EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT /
DAMAGED, PATCH AND REPAIR THE SERVICE
AT NO ADDITIONAL COST TO THE VA.
4. CONTRACTOR SHALL REMOVE ALL EXISTING
PLUMBING SYSTEMS AND INSULATION WHERE
INDICATED AND MADE OBSOLETE BY NEW
CONSTRUCTION INCLUDING ALL PIPING,
HANGERS, SUPPORTS AND ACCESSORIES.
REFERENCE ALL DRAWINGS AND
SPECIFICATIONS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO START OF
WORK.
5. ALL EXISTING PIPING SHOWN ON THE
DOCUMENTS ARE FROM EXISTING
DRAWINGS AND FIELD OBSERVATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE EXACT LOCATION, SIZE AND
ELEVATION OF ALL EXISTING PIPING PRIOR
TO START OF NEW WORK.
6. THESE PLANS ARE DIAGRAMMATIC.
CONTRACTOR SHALL PROVIDE ALL
NECESSARY OFFSET, TEES, ELBOWS, ETC
FOR A COMPLETE WORKING PLUMBING
SYSTEM. PROVIDE SUBMITTAL TO COR FOR
APPROVAL
1. REMOVE EXISTING PIPING AND ACCESSORIES
COMPLETE. PREPARE EXISTING PIPING TO
REMAIN TO ACCOMMODATE NEW EQUIPMENT
TO BE INSTALLED. REFERENCE SHEET
53-PP152 FOR ADDITIONAL INFORMATION.
2. REMOVE EXISTING DOMESTIC HOT WATER
BALANCING STATION AND ACCESSORIES
COMPLETE AND PREPARE PIPING TO REMAIN
TO ACCOMMODATE PIPING TO BE INSTALLED.
REFERENCE SHEET 53-PP141 FOR ADDITIONAL
INFORMATION.
3. REMOVE DEAD LEG PIPING, HANGERS, AND
SUPPORTS BACK TO MAIN AS CLOSE AS
POSSIBLE WITH CAP.
B L
D G
B L
D G
(2) EX 3/4" CW FROM ABOVE
EX 3/4" CW BELOW SLAB -
LOCATION APPROXIMATED
EX WALL HYDRANT
EX WALL HYDRANT
EX 3/4" CW BELOW SLAB -
LOCATION APPROXIMATED
EX 6" FIRE SERVICE
EX 6" FIRE TO FIRE PUMP
DCVA-2 1 2
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
March 29, 2018
Upgrade Site Water Systems VA #623-16-113
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-119
53-PP100
WLF / LLPDJR
SUB-BASEMENT PLUMBING PLAN
1. CONNECT NEW PIPING AND EQUIPMENT TO
EXISTING. FIELD VERIFY EXACT LOCATION
AND SIZE OF PIPING PRIOR TO START OF NEW
WORK.
2. SEE EQUIPMENT SCHEDULE ON SHEET P-401.
3. REPACK THE GLAND SEALS ON THE EXISTING
FIRE PUMP.
1. THE ENTIRE PLUMBING SYSTEM SHALL
CONFORM WITH ALL VA STANDARDS.
2. COORDINATE WORKING HOURS ALLOWED
WITH VA COR AS INSTRUCTED IN GENERAL
REQUIREMENTS.
3. THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO CUTTING
EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT /
DAMAGED, PATCH AND REPAIR THE SERVICE
AT NO ADDITIONAL COST TO THE VA.
4. CONTRACTOR SHALL REMOVE ALL EXISTING
PLUMBING SYSTEMS AND INSULATION WHERE
INDICATED AND MADE OBSOLETE BY NEW
CONSTRUCTION INCLUDING ALL PIPING,
HANGERS, SUPPORTS AND ACCESSORIES.
REFERENCE ALL DRAWINGS AND
SPECIFICATIONS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO START OF
WORK.
5. ALL EXISTING PIPING SHOWN ON THE
DOCUMENTS ARE FROM EXISTING
DRAWINGS AND FIELD OBSERVATIONS. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE EXACT LOCATION, SIZE AND
ELEVATION OF ALL EXISTING PIPING PRIOR
TO START OF NEW WORK.
6. THESE PLANS ARE DIAGRAMMATIC.
CONTRACTOR SHALL PROVIDE ALL
NECESSARY OFFSET, TEES, ELBOWS, ETC
FOR A COMPLETE WORKING PLUMBING
| 2018-03-29T13:34:33-0700 | |
| DocuSign, Inc. | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it.