36C25918R0592-016.pdf

PDF 4 MB Posted

Attached to
Upgrade Site Water Systems (VA-18-00071315)
Solicitation number
36C25918R0592
Issued by

About this file

36C25918R0592 Water Drawing Part2.pdf

View the file

Other files

File Type Posted
36C25918C0325-000.docx DOCX document
36C25918R0592-0002003.pdf PDF
36C25918R0592-0002002.pdf PDF
36C25918R0592-0002000.docx DOCX document
36C25918R0592-0002001.pdf PDF
36C25918R0592-0001000.docx DOCX document
36C25918R0592-020.docx DOCX document
36C25918R0592-012.docx DOCX document
36C25918R0592-014.pdf PDF
36C25918R0592-017.pdf PDF
36C25918R0592-019.docx DOCX document
36C25918R0592-013.docx DOCX document
36C25918R0592-024.pdf PDF
36C25918R0592-021.pdf PDF
36C25918R0592-023.pdf PDF
36C25918R0592-015.pdf PDF
36C25918R0592-018.pdf PDF
36C25918R0592-022.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NC BY-PASS

EX 2" DEAD

EX 4"

EX 1 1/2"

EX 6"

EX 6"

EX 3"

EX 3"

EX 6"

EX 4"

EX 3"

EX 3"

EX 2"

EX 6"

EX 2"

EX 2" DEAD LEG

UP 32"

EX 4"

LEG-DN 20"

EX 4"

EX 1 1/2"

EX 6"

EX DHWR PUMP

STEAM FIRED WATER

HEATER

EX INSTANTANEOUS

STEAM FIRED WATER

HEATER

EX 1 1/2"CW-UP

EX 1 1/2" DEAD

LEG-UP 18"

EX 3/4"HW

EX 3/4"-UP

EX 3"

EX 4" DHW

EX 1 1/2" DHWR

EX 6" DCW

EX 3/4"DCW

EX ELECTRIC

WATER HEATER

EX 3/8"

EX TRI-PLEX DOMESTIC

WATER BOOSTER PUMP

SYSTEM

EX 1 1/2"

EX 1 1/2"

EX 3/4"-DN

EX 1 1/2"

EX 4"

EX 4"

EX 4" CW TO

BLDG 1C

EX 1 1/2"

EX 1 1/2"

EX 2"CW

FROM BELOW

EX 1 1/2"CW

DOWN

EX 1"

EX 1"CW FOR

FUTURE

IRRIGATION

EX 1" RPZ FOR

FUTURE IRRIGATION

EX WATER METER

EX 6" SERVICE ENTRANCE

TO HOSE BIB

6EX BFP

EX 3/4"CW-UP

EX HOSE BIB

EX HOSE BIB

BLDG. 1C

BLDG. 52

BLDG. 1C

BLDG. 52

B L

D G

B L

D G

BLDG. 52

BLDG. 53

B L

D G

B L

D G

B L

D G

B L

D G

B L

D G

B L

D G

BLDG. 52

BLDG. 53

B L

D G

B L

D G

B L

D G

B L

D G

EX 4" DHW

EX 1 1/2" DHWR

EX 6" DCW

EX BACKFLOW PREVENTORS

EX 4"CW UP

EX ELECTRIC

WATER HEATER

EX 4"CW DN

EX INSTANTANEOUS

EXISTING 3" UP TO UNDER ROOF

EX SITRANS 2 CHANNEL METER

CONTROLLER

EX 3"DCW

EXISTING 3" DCW UP FROM BFP'S BELOW

EXISTING SITRANS WATER METER

FOR DOMESTIC SERVICE

EXISTING SITRANS

WATER METER FOR

COOLING TOWER

EX 3/4"

FOR

TOWER

DRAIN

EX 3" CW MAKE-UP

UP THRU ROOF TO

EX 1 1/2"

EX 3"

EX 3"

COOLING TOWERS

EX 3/4"-DN WITH

EX 1-1/2" FILL DOWN

INTO CHILLED

WATER MAIN

EX 1/2" FILL TO AHU

HUMIDIFIER

EX 1/2" FILL TO AHU

HUMIDIFIER

PIPING DOWN TO FIRST FLOOR

EX 1/2"

PIPING UP TO SECOND FLOOR

VALVE AT 5' AFF

EX 3/4"DHW DOWN

TO/FROM BLDG. 53

EX 2" DCW DL 4

1 1/2" DCW UP TO SECOND FLOOR

EX 1 1/2"DCW DOWN

EX 3/4"DHW UP

EX 3/4"DHW

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

52-PD101

WLFDJR

PLUMBING DEMOLITION PLANS

1. REMOVE EXISTING DOMESTIC WATER

BOOSTER PUMP SYSTEM, CONTROLS, SKID,

AND ACCESSORIES COMPLETE. PROVIDE

TEMPORARY BOOSTER PUMP AND PIPING AS

REQUIRED TO KEEP THE FACILITY ACTIVE

UNTIL THE NEW SYSTEM IS INSTALLED AND

ACTIVE.

2. REWORK EXISTING DOMESTIC WATER HEATER

PIPING AS REQUIRED TO ACCOMMODATE

INSTALLATION OF NEW MASTER

THERMOSTATIC MIXING VALVE.

3. REFERENCE DETAIL 1/P-501.

4. REMOVE EXISTING PIPING TO POINT

INDICATED. REMOVE ALL FITTINGS, VALVES,

PIPE HANGERS, SUPPORTS AND

ACCESSORIES COMPLETE.

5. REMOVE EXISTING ELECTRIC WATER HEATER

AND ASSOCIATED PIPING, FITTINGS, VALVES

AND ACCESSORIES COMPLETE. COORDINATE

DEMOLITION OF ELECTRICAL CONNECTION

WITH E.C.

6. REMOVE EXISTING UNDER-COUNTER

ELECTRIC WATER HEATER AND ASSOCIATED

PIPING, FITTINGS, VALVES AND ACCESSORIES

COMPLETE. COORDINATE DEMOLITION OF

ELECTRICAL CONNECTION WITH E.C.

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

SYSTEM. PROVIDE SUBMITTAL TO COR FOR

APPROVAL

NC BY-PASS

EX 4"

EX 1 1/2"

EX 6"

EX 6"

EX 3"

EX 3"

EX 6"

EX 4"

EX 3"

EX 3"

EX 2"

EX 6"

EX 2"

EX 4"

EX 4"

EX 1 1/2"

EX 6"

EX DHWR PUMP

STEAM FIRED WATER

HEATER

EX INSTANTANEOUS

STEAM FIRED WATER

HEATER

EX 1 1/2"CW-UP

EX 3/4"HW

EX 3/4"-UP

EX 3"

EX 4" DHW

EX 1 1/2" DHWR

EX 6" DCW

EX 3/4"DCW

EX ELECTRIC

WATER HEATER

EX 3/8"

EX 1 1/2"

EX 1 1/2"

EX 3/4"-DN

EX 1 1/2"

EX 4"

EX 4"

EX 4" CW TO

BLDG 1C

EX 1 1/2"

EX 1 1/2"

EX 1 1/2"CW

DOWN

EX 1"

EX 1"CW FOR

FUTURE

IRRIGATION

EX 1" RPZ FOR

FUTURE IRRIGATION

EX WATER METER

EX 6" SERVICE ENTRANCE

TO HOSE BIB

EX 3/4"CW-UP

EX HOSE BIB

EX HOSE BIB

BLDG. 1C

BLDG. 52

BLDG. 1C

BLDG. 52

B L

D G

B L

D G

BLDG. 52

BLDG. 53

B L

D G

B L

D G

B L

D G

B L

D G

B L

D G

B L

D G

BLDG. 52

BLDG. 53

B L

D G

B L

D G

B L

D G

B L

D G

EX 4" DHW

EX 1 1/2" DHWR

EX 6" DCW

TRI-PLEX DOMESTIC

WATER BOOSTER PUMP

SYSTEM

EX BACKFLOW PREVENTORS

BFP-3

1 2

EX 4"CW UP

EX ELECTRIC

WATER HEATER

EX 4"CW DN

EX INSTANTANEOUS

TOTALIZER METER

BFP-7

BFP-7

NEW WATER METER

SERVING BUILDING 1C

EXISTING 3" UP TO UNDER ROOF

EX SITRANS 2 CHANNEL METER

CONTROLLER

EX 3"DCW

EXISTING 3" DCW UP FROM BFP'S BELOW

EXISTING SITRANS WATER METER

FOR DOMESTIC SERVICE

EXISTING SITRANS

WATER METER FOR

COOLING TOWER

EX 3/4"

FOR

TOWER

DRAIN

EX 3" CW MAKE-UP

UP THRU ROOF TO

EX 1 1/2"

EX 3"

EX 3"

COOLING TOWERS

EX 3/4"-DN WITH

EX 1-1/2" FILL DOWN

INTO CHILLED

WATER MAIN

EX 1/2" FILL TO AHU

HUMIDIFIER

EX 1/2" FILL TO AHU

HUMIDIFIER

PIPING DOWN TO FIRST FLOOR

EX 1/2"

PIPING UP TO SECOND FLOOR

VALVE AT 5' AFF

EX 3/4"DHW DOWN

TO/FROM BLDG. 53

1 1/2" DCW UP TO SECOND FLOOR

EX 1 1/2"DCW DOWN

1 1/2" DCW

EX 3/4"DHW UP

EX 3/4"DHW

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

52-PP101

WLFDJR

PLUMBING PLANS

1. CONNECT NEW PIPING TO EXISTING. FIELD

VERIFY EXACT LOCATION AND SIZE OF PIPE

PRIOR TO START OF NEW WORK.

2. SEE EQUIPMENT SCHEDULE ON SHEET P-401.

3. PROVIDE STRAINER, ISOLATION VALVES AND

FULL LINE SIZE BY-PASS.

4. PROVIDE A SITRANS WATER METER. PROVIDE

ALL WIRING, CONDUITS, FITTINGS AND

HARDWARE NECESSARY TO CONNECT METER TO

BUILDING AUTOMATION SYSTEM. BUILDING

AUTOMATION SYSTEM TO BE PROGRAMMED TO

LOG THE FOLLOWING DATA AND DISPLAY THE

DATA ON THE VA ACCESSIBLE BUILDING

AUTOMATION INTERFACE:

4.1. CURRENT FLOW RATE IN GALLONS PER

MINUTE (GPM).

4.2. AVERAGE FLOW AT DAILY, MONTHLY AND

YEARLY INTERVALS.

4.3. COMPARISON OF TOTAL FLOW OF

BRANCH METERS TO THE TOTAL OF ANY

METERS FEEDING THE BRANCH OVER

HOURLY, DAILY AND MONTHLY

INTERVALS.

CONTRACTOR MUST INTEGRATE

FUNCTIONALITY WITH AUTOMATED BUILDING

SYSTEMS - TULSA, INC., THE CURRENT

BUILDING AUTOMATION PROVIDER FOR THE

FACILITY. CONTACT JOEL KARSETTER -

918-665-3974, JKARSETTER@ABSCOMPANIES.COM.

5. DISCONNECT EXISTING PUMP SKID CONTROLLER

FROM EXISTING FEEDER TO REMAIN. CONNECT

NEW PUMP SKID CONTROLLER TO EXISTING

FEEDER. REWORK FEEDER AS NOTED ABOVE.

COORDINATE WITH PLUMBING CONTRACTOR.

6. PROVIDE 120V DIRECT CONNECTION TO NEW

THERMOSTATIC MIXING VALVE. EXTEND

NEAREST NORMAL POWER RECEPTACLE CIRCUIT

TO LOCATION AND CONNECT. COORDINATE

EXACT LOCATION AND REQUIREMENTS WITH

PLUMBING CONTRACTOR.

7. APPROXIMATE LOCATION OF EXISTING PANEL

'MCC-EQB' WHICH INCLUDES EXISTING 125A

THERMAL MAGNETIC CIRCUIT BREAKER SERVING

PUMP SKID TO BE REPLACED BY MECHANICAL.

8. APPROXIMATE ROUTING OF EXISTING (3-1/0AWG,

6AWG EG IN 1-1/2 INCH CONDUIT) FEEDER

SERVING PUMP SKID. REWORK OR EXTEND

FEEDER BY BUTT SPLICE WITH COLD SHRINK

INSULATORS AS REQUIRED TO MAKE

CONNECTION TO NEW PUMP SKID CONTROLLER.

ADD SPLICE BOX AS NECESSARY. COORDINATE

EXACT REQUIREMENTS WITH PLUMBING

CONTRACTOR.

9. CONNECT TO 120V POWER SOURCE AT J-BOX

USING 2-12AWG, 12AWG EG IN 3/4" C.

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

BLDG. 53

BLDG. 52

B L

D G

B L

D G

(2) EX 3/4" CW FROM ABOVE

EX 3/4" CW BELOW SLAB -

LOCATION APPROXIMATED

EX WALL HYDRANT

EX WALL HYDRANT

EX 3/4" CW BELOW SLAB -

LOCATION APPROXIMATED

EX 6" FIRE SERVICE

EX 6" DOUBLE CHECK VALVE

BACKFLOW PREVENTOR

EX 6" FIRE TO FIRE PUMP

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

53-PD100

WLF / LLPDJR

SUB-BASEMENT PLUMBING

DEMOLITION PLAN

1. REMOVE EXISTING FIRE PROTECTION DOUBLE

CHECK VALVE ASSEMBLY AND PREPARE

EXISTING PIPE AND FITTINGS TO REMAIN TO

ACCOMMODATE NEW EQUIPMENT TO BE

INSTALLED. SEE SHEET 53-PP100 FOR

ADDITIONAL INFORMATION.

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

B L

D G

B L

D G

WALLS, ETC. BELOW

(DASHED), TYP.

EX 3/4" TO EYE

WASH BELOW

EX 3/4"CW DN

TO INT HOSE BIB

EX 1" RISER

DRAINS-DN 24"

EX 1 1/2"

EX 4"

EX 6"

EX 1/2"

EX 1/2"

EX 2"

EX 1 1/2"EX 2"

EX 2"

EX 3/4"

3/4" CW TO SUB-BASEMENT WALL HYDRANTS

EX 1"

EX 3/4"

EX 6"

EX 4"

EX 1 1/2"

EX 6"

EX 4"

EX 1 1/2"

SEE BUILDING 58 PLANS

FOR WORK IN THIS

AREA

EX 1 1/4"

EX 6"

EX 4"

EX 1 1/4"

PRV-4 1

PRV-1 1

PRV-6

PRV-1

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

53-PD101

WLF / LLPDJR

BASEMENT MEZZANINE PLUMBING

DEMOLITION PLAN

1. REMOVE EXISTING PRESSURE REDUCING

VALVE STATION, BY-PASS, VALVES, PIPING

AND ACCESSORIES COMPLETE. PREPARE

EXISTING PIPING TO REMAIN TO

ACCOMMODATE NEW EQUIPMENT TO BE

INSTALLED. REFERENCE SHEET 53-PP101 FOR

ADDITIONAL INFORMATION.

2. REMOVE EXISTING PRESSURE REDUCING

VALVE STATION, BYPASS AND VALVE

COMPLETE. PREPARE PIPING TO REMAIN TO

ACCOMMODATE NEW PIPING.

3. REMOVE PIPING TO ACCOMMODATE NEW PRV

STATION. SEE 53-PP101 FOR ADDITIONAL

INFORMATION.

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

EX 1 1/4"

EX 3/4"

EX 1 1/4"

EX 3/4"

EX 1 1/2"

EX 3/4"

EX 1 1/4"

EX 1"

EX 1"

EX 1 1/2"

EX 1/2"

EX 1/2"

EX 1 1/2"

EX 3/4"

EX 3/4"

EX 1/2"-DN

EX 1-1/4"-DN

EX 6" VENT RISER

EX 6" SOIL RISER

EX 6" RD RISER

EX 1/2"-DN

EX 1 1/4"-DN

EX 1/2"

EX 6" VENT RISER

EX 6" SOIL RISER

EX 6" RD RISER

EX 1/2"-DN

1/2" DEADLEG

BLDG. 52

B L

D G

W

E S

T

B L

D G

BLDG. 53 EAST

BLDG. 53 WEST

B L

D G

B L

D G

E

A S

T

BLDG. 60

BLDG. 53 WEST

BLDG. 53 EAST

WALLS, ETC. BELOW

(DASHED), TYP.

EX DHWR BALANCING VALVE

EX 2"

EX 1 1/2"

EX PRV'S

16" DEADLEG

EX 1 1/4"

EX (3")FD

EX 3"

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

53-PD121

WLF / LLPDJR

SECOND FLOOR INTERSTITIAL

PLUMBING DEMO PLAN - WEST HALF

1. REMOVE EXISTING PRESSURE REDUCING

VALVE STATION, BY-PASS, VALVES, PIPING

AND ACCESSORIES COMPLETE. PREPARE

EXISTING PIPING TO REMAIN TO

ACCOMMODATE NEW EQUIPMENT TO BE

INSTALLED. REFERENCE SHEET 53-PP121 FOR

ADDITIONAL INFORMATION.

2. REMOVE DEAD LEG PIPING AND CAP AS

CLOSE TO MAIN AS POSSIBLE.

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

EX 53-PRV-1-1

EX 53-PRV-1-2

EX 1"

EX 1"

EX 3/4"

EX 3/4"

EX 1/2"-DN

EX 1/2"-DN

EX 1/2"-DN

EX 1/2"-DN

EX 1/2"

EX 1/2"

EX 1/2"-DN

EX 1/2"-DN

EX 1/2"-DN

EX 3/4"-DN

EX 1 1/2"-DN

EX 1"-DN

EX 1 1/2"

EX 1"

EX 3/4"

EX 1/2"-DN

EX 2"

EX 1 1/4"

EX 1/2"

EX 1/2"

EX 1/2"

EX 1/2"-DN

EX 1 1/4"

EX 2"

EX 1/2"

EX 1 1/4"

EX 2"

EX 1"

EX 1 1/2"-DN

EX 3"FD

EX 3/4"-DN

EX 1/2"

EX 1/2"

EX 1"

EX 1"

EX 1"

EX 1"

EX 3/4"

EX 3/4"

EX 1/2"-DN

EX 1/2"-DN

EX 3/4"

EX 3/4"

EX 1/2"-DN

EX 1/2"-DN

EX 3/4"

EX 1/2"

EX 3/4"

EX 1/2"

EX 3/4"

EX 1"

EX 1/2"-DN

EX 1/2"

EX 1 1/2"-DN

EX 1/2"-DN

EX 1 1/2"

EX 1 1/2"

EX 2"

EX 1 1/4"

EX 2"

EX 1 1/4"

EX 2"

EX 3/4"-DN

EX 3/4"-DN

EX 1/2"

EX 1/2"

EX 1/2"EX 1/2"

EX 3/4"

EX 3/4"

EX 4"

EX 4"

EX 1 1/2"-DN

EX 1/2"-DN

EX 1"

EX 3/4"

EX 1/2"-DN

EX 3/4"

EX 3/4"-DN

EX 1/2"-DN

EX 3/4"-DN EX 3/4"-DN

EX 1/2"-DN

EX 1/2"-DN

NO CAPS

EX 8" STORM RISER

EX 6" VENT RISER

EX 6" SANITARY RISER

3" CRP VENT RISER

6" VENT STACK

6" SANITARY RISER

6" STORM RISER

6" ST-UP / 8"-DN

WALLS, ETC. BELOW

(DASHED), TYP.

BLDG. 52

BLDG. 53 EAST

BLDG. 53 WEST

BLDG. 60

BLDG. 53 WEST

BLDG. 53 EAST

B L

D G

B L

D G

W

E S

T

BLDG. 53 EAST

BLDG. 1C

B L

D G

C

B L

D G

E

A S

T

BLDG. 53 EAST

BLDG. 60

6" SANITARY RISER

6" VENT RISER

EX CW, HW & HWR RISERS

EX HWS & HWR RISERS

EX CWS & CWR RISERS

EX PRV

EX PRV

EX 3/4"

EX 2"

EX 3/4"

EX 1 1/2"

EX 1/2"CW & HW

UP TO SINK

EX 1/2"

EX 1/2"

EX 1 1/4"

EX 3"

EX (3")FD

6" DL WITH DRAIN VALVES

EX 1/2"-DN

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

53-PD122

WLF / LLPDJR

SECOND FLOOR INTERSTITIAL

PLUMBING DEMO PLAN - EAST HALF

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

SYSTEM. PROVIDE SUBMITTAL TO COR FOR

APPROVAL

1. REMOVE EXISTING PRESSURE REDUCING

VALVE STATION, BY-PASS, VALVES, PIPING

AND ACCESSORIES COMPLETE. PREPARE

EXISTING PIPING TO REMAIN TO

ACCOMMODATE NEW EQUIPMENT TO BE

INSTALLED. REFERENCE SHEET 53-PP122 FOR

ADDITIONAL INFORMATION.

2. REMOVE EXISTING PIPING TO ACCOMMODATE

INSTALLATION ON NEW DOMESTIC HOT

WATER BALANCE VALVE STATION.

3. REMOVE DEAD LEG PIPING AND CAP AS

CLOSE TO MAIN AS POSSIBLE.

4. REMOVE PIPING TO POINT INDICATED.

PREPARE PIPING TO REMAIN FOR

CONNECTION TO NEW PIPING. SEE SHEET

53-PP122 FOR ADDITIONAL INFORMATION.

BLDG. 53 WEST

BLDG. 53 EAST

BLDG. 53 WEST

BLDG. 53 EAST

BLDG. 53 WEST

BLDG. 53 EAST

WALLS, ETC. BELOW

(DASHED), TYP.

EX 1 1/2"

EX CW 1/2"-UP TO

DIALYSIS BFP

ON FLOOR ABOVE

6" DEAD LEG

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

53-PD131

WLF / LLPDJR

THIRD FLOOR INTERSTITIAL

PLUMBING DEMO PLAN - WEST HALF

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

SYSTEM. PROVIDE SUBMITTAL TO COR FOR

APPROVAL

1. REMOVE EXISTING PRESSURE REDUCING

VALVE STATION, BY-PASS, VALVES, PIPING

AND ACCESSORIES COMPLETE. PREPARE

EXISTING PIPING TO REMAIN TO

ACCOMMODATE NEW EQUIPMENT TO BE

INSTALLED. REFERENCE SHEET 53-PP131 FOR

ADDITIONAL INFORMATION.

2. REMOVE DEAD LEG PIPING BACK TO MAIN, CAP

AS CLOSE AS POSSIBLE.

3. REMOVE EXISTING PIPING, HANGERS AND

SUPPORTS COMPLETE.

BLDG. 53 WEST

BLDG. 53 EAST

BLDG. 53 WEST

BLDG. 53 EAST

BLDG. 53 EAST

BLDG. 1C

B L

D G

C

B L

D G

E

A S

T

WALLS, ETC. BELOW

(DASHED), TYP.

EX 1 1/2"

EX 1/2"

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

53-PD132

WLF / LLPDJR

THIRD FLOOR INTERSTITIAL

PLUMBING DEMO PLAN - EAST HALF

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

SYSTEM. PROVIDE SUBMITTAL TO COR FOR

APPROVAL

1. REMOVE EXISTING PRESSURE REDUCING

VALVE STATION, BY-PASS, VALVES, PIPING

AND ACCESSORIES COMPLETE. PREPARE

EXISTING PIPING TO REMAIN TO

ACCOMMODATE NEW EQUIPMENT TO BE

INSTALLED. REFERENCE SHEET 53-PP132 FOR

ADDITIONAL INFORMATION.

2. REMOVE EXISTING PIPING TO ACCOMMODATE

INSTALLATION ON NEW DOMESTIC HOT WATER

BALANCE VALVE STATION.

3. REMOVE DEAD LEG PIPING BACK TO MAIN, CAP

PIPE AS CLOSE AS POSSIBLE.

4. REMOVE EXISTING PIPING HANGERS AND

SUPPORTS TO POINT AS INDICATED. PREPARE

PIPING TO REMAIN TO ACCOMMODATE NEW.

SEE SHEET 53-PP132 FOR ADDITIONAL

INFORMATION.

EX 1 1/4"

BLDG. 53 EAST

BLDG. 53 WEST

BLDG. 53 EAST

WALLS, ETC. BELOW

(DASHED), TYP.

BLDG. 53 EAST

BLDG. 53 WEST

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

53-PD141

WLF / LLPDJR

FOURTH FLOOR INTERSTITIAL

PLUMBING DEMO PLAN - WEST HALF

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

SYSTEM. PROVIDE SUBMITTAL TO COR FOR

APPROVAL

1. REMOVE EXISTING PIPING AND ACCESSORIES

COMPLETE. PREPARE EXISTING PIPING TO

REMAIN TO ACCOMMODATE NEW EQUIPMENT

TO BE INSTALLED. REFERENCE SHEET

53-PP141 FOR ADDITIONAL INFORMATION.

2. REMOVE EXISTING DOMESTIC HOT WATER

BALANCING STATION AND ACCESSORIES

COMPLETE AND PREPARE PIPING TO REMAIN

TO ACCOMMODATE PIPING TO BE INSTALLED.

REFERENCE SHEET 53-PP141 FOR ADDITIONAL

INFORMATION.

EX 1 1/2"

EX 1/2"

EX 1/2"

EX 1/2"

EX 1/2"

EX 1/2"

EX 2"

EX 1/2"

EX 1 1/2"

EX 1 1/4"

EX 2"

EX 1 1/4"

EX 1"

EX 1 1/4"

EX 1"

EX 2"

EX 1/2"

EX 1/2"

EX 3/4"

EX 1"

EX 2"

EX 1/2"

EX 1 1/2"-DN

EX 1"

EX 1/2"

EX 3/4"

EX 1/2"

EX 3/4"

EX 1 1/4"

EX 1/2"

EX 3/4"

EX 1/2"

EX 3/4"

EX 1 1/4"

EX 1 1/4"

EX 1/2"

EX 1/2"

EX 1 1/2"

EX 3/4"

EX 1/2"

EX 2"

EX 1 1/2"

EX 1/2"

EX 1/2"

EX 1/2"

EX 1/2"

EX 1/2"

EX 1/2"

EX 1 1/2"

EX 1/2"

EX 1 1/2"

EX 2"

EX 3/4"

EX 3/4"

EX 1 1/2"

EX 2"

EX 1 1/4"

EX 3/4"

EX 1 1/4"

EX 3/4"

EX 1/2"

EX 1/2"

EX 1 1/2"

EX 2"

3" CRP VENT RISER

6" STORM RISER

6" SANITARY RISER

6" VENT RISER

EX CW, HW & HWR RISERS

6" STORM RISER

6" SANITARY RISER

6" VENT RISER

EX 1/2"

EX 1/2"

EX 1/2"

EX CW, HW &

EX 4" VENT RISER

EX 4" SP RISER

EX 1/2"

EX 1/2"

EX 1/2"

EX 1 1/4"

EX 1 1/4"

EX 1/2"

EX 1/2"

EX 1 1/2"

EX 2"

EX 1 1/2"

EX 3/4"

EX 1/2"

HWR RISERS

VALVES CLOSED

VALVES OFF

18" DEAD LEG

EX 2"

EX 3/4"

EX 2"

EX 1/2"

EX 1 1/4"

BLDG. 53 WEST

BLDG. 53 EAST

BLDG. 53 WEST

BLDG. 53 EAST

BLDG. 53 EAST

BLDG. 1C

B L

D G

C

B L

D G

E

A S

T

WALLS, ETC. BELOW

(DASHED), TYP.

BLDG. 53 EAST

BLDG. 53 WEST

EX 1/2"

EX 1/2"

EX 1/2"

EX 1/2"

EX 1/2"

EX 1/2"

6" SANITARY RISER

6" VENT RISER

EX HWS & HWR RISERS

EX CWS & CWR RISERS

EX 3"

EX (3")FD

EX 1 1/2"

EX DHWR BALANCING VALVE

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

53-PD142

WLF / LLPDJR

FOURTH FLOOR INTERSTITIAL

PLUMBING DEMO PLAN - EAST HALF

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

SYSTEM. PROVIDE SUBMITTAL TO COR FOR

APPROVAL

1. REMOVE EXISTING PIPING AND ACCESSORIES

COMPLETE. PREPARE EXISTING PIPING TO

REMAIN TO ACCOMMODATE NEW EQUIPMENT

TO BE INSTALLED. REFERENCE SHEET

53-PP142 FOR ADDITIONAL INFORMATION.

2. REMOVE DEAD LEG OF PIPING BACK TO MAIN

AS CLOSE AS POSSIBLE WITH CAP.

BLDG. 53 WEST

BLDG. 53 EAST

BLDG. 53 EAST

BLDG. 53 WEST

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

53-PD151

WLF / LLPDJR

FIFTH FLOOR INTERSTITIAL

PLUMBING DEMO PLAN - WEST HALF

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

SYSTEM. PROVIDE SUBMITTAL TO COR FOR

APPROVAL

1. REMOVE EXISTING PIPING AND ACCESSORIES

COMPLETE. PREPARE EXISTING PIPING TO

REMAIN TO ACCOMMODATE NEW EQUIPMENT

TO BE INSTALLED. REFERENCE SHEET

53-PP141 FOR ADDITIONAL INFORMATION.

2. REMOVE EXISTING DOMESTIC HOT WATER

RETURN STATION AND ASSOCIATED

ACCESSORIES COMPLETE. PREPARE PIPING

TO REMAIN TO ACCOMMODATE NEW PIPING TO

BE INSTALLED. REFERENCE SHEET 53-PP151

FOR ADDITIONAL INFORMATION.

3. REMOVE DEAD LEG PIPING, HANGERS, AND

SUPPORTS BACK TO MAIN AS CLOSE AS

POSSIBLE WITH CAP.

BLDG. 53 WEST

BLDG. 53 EAST

BLDG. 53 EAST

BLDG. 1C

B L

D G

C

B L

D G

E

A S

T

BLDG. 53 EAST

BLDG. 53 WEST

UP TO HOSE BIBB

ABOVE

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

53-PD152

WLF / LLPDJR

FIFTH FLOOR INTERSTITIAL

PLUMBING DEMO PLAN - EAST HALF

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

SYSTEM. PROVIDE SUBMITTAL TO COR FOR

APPROVAL

1. REMOVE EXISTING PIPING AND ACCESSORIES

COMPLETE. PREPARE EXISTING PIPING TO

REMAIN TO ACCOMMODATE NEW EQUIPMENT

TO BE INSTALLED. REFERENCE SHEET

53-PP152 FOR ADDITIONAL INFORMATION.

2. REMOVE EXISTING DOMESTIC HOT WATER

BALANCING STATION AND ACCESSORIES

COMPLETE AND PREPARE PIPING TO REMAIN

TO ACCOMMODATE PIPING TO BE INSTALLED.

REFERENCE SHEET 53-PP141 FOR ADDITIONAL

INFORMATION.

3. REMOVE DEAD LEG PIPING, HANGERS, AND

SUPPORTS BACK TO MAIN AS CLOSE AS

POSSIBLE WITH CAP.

B L

D G

B L

D G

(2) EX 3/4" CW FROM ABOVE

EX 3/4" CW BELOW SLAB -

LOCATION APPROXIMATED

EX WALL HYDRANT

EX WALL HYDRANT

EX 3/4" CW BELOW SLAB -

LOCATION APPROXIMATED

EX 6" FIRE SERVICE

EX 6" FIRE TO FIRE PUMP

DCVA-2 1 2

NORTH

KEY PLAN:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Apogee Project #

SHEET NOTES:

SHEET KEY NOTES:

100% CONSTRUCTION

DOCUMENTS

March 29, 2018

Upgrade Site Water Systems VA #623-16-113

FULLY SPRINKLERED

Muskogee, OK

Apogee Consulting Group 1152 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde

17-119

53-PP100

WLF / LLPDJR

SUB-BASEMENT PLUMBING PLAN

1. CONNECT NEW PIPING AND EQUIPMENT TO

EXISTING. FIELD VERIFY EXACT LOCATION

AND SIZE OF PIPING PRIOR TO START OF NEW

WORK.

2. SEE EQUIPMENT SCHEDULE ON SHEET P-401.

3. REPACK THE GLAND SEALS ON THE EXISTING

FIRE PUMP.

1. THE ENTIRE PLUMBING SYSTEM SHALL

CONFORM WITH ALL VA STANDARDS.

2. COORDINATE WORKING HOURS ALLOWED

WITH VA COR AS INSTRUCTED IN GENERAL

REQUIREMENTS.

3. THE CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS PRIOR TO CUTTING

EXISTING WALLS AND FLOOR SLABS. IF

EXISTING TO REMAIN SERVICES ARE CUT /

DAMAGED, PATCH AND REPAIR THE SERVICE

AT NO ADDITIONAL COST TO THE VA.

4. CONTRACTOR SHALL REMOVE ALL EXISTING

PLUMBING SYSTEMS AND INSULATION WHERE

INDICATED AND MADE OBSOLETE BY NEW

CONSTRUCTION INCLUDING ALL PIPING,

HANGERS, SUPPORTS AND ACCESSORIES.

REFERENCE ALL DRAWINGS AND

SPECIFICATIONS AND FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO START OF

WORK.

5. ALL EXISTING PIPING SHOWN ON THE

DOCUMENTS ARE FROM EXISTING

DRAWINGS AND FIELD OBSERVATIONS. THE

CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING THE EXACT LOCATION, SIZE AND

ELEVATION OF ALL EXISTING PIPING PRIOR

TO START OF NEW WORK.

6. THESE PLANS ARE DIAGRAMMATIC.

CONTRACTOR SHALL PROVIDE ALL

NECESSARY OFFSET, TEES, ELBOWS, ETC

FOR A COMPLETE WORKING PLUMBING

2018-03-29T13:34:33-0700
DocuSign, Inc.
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it.