This document contains a request for information log and related federal contract opportunity for construction services. The Long Beach VA Health Care System seeks to convert the 8th floor north wing of Building 126 to single patient rooms. Work includes architectural finishes, structural, mechanical, plumbing, materials and fixtures, medical gases, electrical and low voltage systems. The solicitation is expected to post in February 2021. The project will award in August to early September 2021. Key clarifications provided include following the electrical drawing in Addendum 7 for station quantities, accepting 3/4 inch panel dividers using the SK-2 panel installation method, and that there is no mental health component to the project. The related opportunity is for the Department of Veterans Affairs to provide construction services for converting the space to private patient rooms at the Long Beach, California location.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI) Log Convert Bldg 126 8th North to Private Rooms Project#: 600-17-115 07/22/2021 Long Beach, California VA Health Care System 600
| RFI Number |
| Question |
| Answer |
| 001. |
| Dwg. EP101 revised on 5/4/2021 was issued as Addendum No. 5 ATTCH 198 on 5/18/2021 and Dwg. EP101 revised on 5/3/21 was issued as Addendum No. 7 Attch 211 on 6/25/2021. |
Please clarify which drawing is the latest version.
Addendum 7, Attachment 211 is the latest version
| 002. |
| Does that project include a mental health component? |
The plans don't say anything about that. Just that it is a renovation of offices for 8 private patient rooms, including 2 Bariatric rooms.
No mental health component in this project.
| 003. |
| When will this project be awarded? |
| Estimated August to early September 2021. |
| 004. |
| Architectural Drawings |
Electrical Drawings: There is discrepancy in the station quantity at Team Room between architectural drawings and electrical drawings.
Please clarify the station quantity.
For the number of stations follow electrical drawing EP 101 issued in Addendum 7, Attachment 211.
| 005. |
| Drawing AF601 calls for ½” thick panel divider at Team Room and Attach 214 SK-2 of Addendum No. 7 calls for 42” high panel divider. According to the attached information from the manufacturer, 3 Form, ½” thick panel is for 30-36” height and ¾” thick panel is for 36-42” height in order to use cantilever installation method. |
Please let me know if the VA accepts ¾” thick panel divider using SK-2 panel installation method.
VA accepts using ¾-inch panel divider using SK-2 panel installation method.