36C25821B0007 0005.docx
DOCX document 409 KB Posted
- Solicitation number
- 36C25821B0007
About this file
This solicitation is for construction services to convert the 8th floor north of Building 126 at the Long Beach VA Health Care System to single patient rooms. The solicitation calls for architectural finishes including flooring, ceiling, wall protection, plumbing, HVAC, emergency and normal power, nurse call, and low voltage signaling systems to be upgraded. Construction will include structural, mechanical, plumbing, material and fixtures, medical gases, electrical and low voltage work. Interested parties should attend an optional pre-bid site visit on March 17, 2021 and submit any requests for information by March 24, 2021. Bids are due by June 30, 2021 and will be publicly opened on the same date. The apparent low bidder must be able to provide payment and performance bonds if the contract value exceeds $150,000. This requirement has a 100% set-aside for service-disabled veteran-owned small businesses.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
05-18-2021
600-21-2-5975-0045
600-17-115
Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014
Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders
36C25821B0007 03-11-2021
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 06/30/2021 - 9:00AM PST
The Purpose of Amendment 0005 is to:
1. Post additional attachments 191-207 with revised clarifications v2 and a revised D.1 List of Attachments.
2. Post revised Instructions to Bidders as follows: #2 POC, #5 Bid Contents, #6 Bid Due Date & Time and #7 Public Bid Opening Meeting Date & Time with revised Virtual Meeting Links/Numbers, #11 Safety & added #14 DBA Wage Determination.
3. Extend solicitation to 06/30/2021 - 9:00AM PST and Bid Opening Date to 06/30/2021 - 12:00PM PST.
4. See continuation pages for List of Attachments, Instructions to Bidders for further details and all attachments.
CONTINUATION PAGE
D.1 LIST OF ATTACHMENTS
| ATTACHMENT NUMBER |
| DESCRIPTION |
| DATE |
| NUMBER OF PAGES |
| OTHER A |
| Davis Bacon General Decision Number CA20210022 |
Note: Contractors shall reference the most current version for DBA Wage Determination prior to submitting final bid. Go To: beta.SAM.gov | Search Search by the above decision number.
| 3/19/2021 |
| 34 |
| OTHER B |
| Material Approval Submittal Template |
| N/A |
| 02 |
| OTHER C |
| Meeting Minutes Template |
| N/A |
| 02 |
| OTHER D |
| VHA STANDARDIZED VENDOR FILE PROCEDURE |
| N/A |
| 01 |
| ATTACHMENT 01 |
| SPECIFICATIONS – Cover Page |
| 11/30/2020 |
| 01 |
| ATTACHMENT 02 |
| 00 01 10 TABLE OF CONTENTS |
| N/A |
| 10 |
| ATTACHMENT 03 |
| 00 01 15 LIST OF DRAWINGS |
| N/A |
| 05 |
| ATTACHMENT 04 |
| 01 00 00-R5-12-01-20 |
| N/A |
| 28 |
| ATTACHMENT 05 |
| 01 33 23 |
| N/A |
| 07 |
| ATTACHMENT 06 |
| 01 35 26 |
| N/A |
| 29 |
| ATTACHMENT 07 |
| 01 42 19 |
| N/A |
| 08 |
| ATTACHMENT 08 |
| 01 45 29 |
| N/A |
| 08 |
| ATTACHMENT 09 |
| 01 57 19 |
| N/A |
| 07 |
| ATTACHMENT 10 |
| 01 58 16 |
| N/A |
| 02 |
| ATTACHMENT 11 |
| 01 74 19 |
| N/A |
| 06 |
| ATTACHMENT 12 |
| 01 81 11 |
| N/A |
| 13 |
| ATTACHMENT 13 |
| 01 91 00 |
| N/A |
| 58 |
| ATTACHMENT 14 |
| 02 41 00 |
| N/A |
| 03 |
| ATTACHMENT 15 |
| 02 82 13.19 |
| N/A |
| 41 |
| ATTACHMENT 16 |
| 03 30 53 |
| N/A |
| 10 |
| ATTACHMENT 17 |
| 05 40 00 |
| N/A |
| 08 |
| ATTACHMENT 18 |
| 05 50 00 |
| N/A |
| 10 |
| ATTACHMENT 19 |
| 06 06 60 Plastic Fabrications |
| N/A |
| 06 |
| ATTACHMENT 20 |
| 06 10 00 |
| N/A |
| 06 |
| ATTACHMENT 21 |
| 06 16 63 Cementitious Sheathing |
| N/A |
| 03 |
| ATTACHMENT 22 |
| 06 62 50 Eng Polymer Panels |
| N/A |
| 09 |
| ATTACHMENT 23 |
| 07 01 50 19 |
| N/A |
| 06 |
| ATTACHMENT 24 |
| 07 13 00 |
| N/A |
| 03 |
| ATTACHMENT 25 |
| 07 21 13 |
| N/A |
| 05 |
| ATTACHMENT 26 |
| 07 22 00 |
| N/A |
| 06 |
| ATTACHMENT 27 |
| 07 51 00-R |
| N/A |
| 11 |
| ATTACHMENT 28 |
| 07 60 00 |
| N/A |
| 15 |
| ATTACHMENT 29 |
| 07 84 00 |
| N/A |
| 05 |
| ATTACHMENT 30 |
| 07 92 00 |
| N/A |
| 09 |
| ATTACHMENT 31 |
| 08 11 13 |
| N/A |
| 07 |
| ATTACHMENT 32 |
| 08 14 00 |
| N/A |
| 06 |
| ATTACHMENT 33 |
| 08 14 23 |
| N/A |
| 08 |
| ATTACHMENT 34 |
| 08 31 13 |
| N/A |
| 06 |
| ATTACHMENT 35 |
| 08 33 13 |
| N/A |
| 06 |
| ATTACHMENT 36 |
| 08 41 13 |
| N/A |
| 05 |
| ATTACHMENT 37 |
| 08 42 43 |
| N/A |
| 07 |
| ATTACHMENT 38 |
| 08 71 00-R1 |
| N/A |
| 28 |
| ATTACHMENT 39 |
| 08 80 00-R2 |
| N/A |
| 08 |
| ATTACHMENT 40 |
| 08 88 00 |
| N/A |
| 14 |
| ATTACHMENT 41 |
| 09 05 16R1 |
| N/A |
| 06 |
| ATTACHMENT 42 |
| 09 06 00- 11-25-20-R2 |
| N/A |
| 16 |
| ATTACHMENT 43 |
| 09 06 00- 12-01-20-R2 |
| N/A |
| 17 |
| ATTACHMENT 44 |
| 09 22 16 |
| N/A |
| 07 |
| ATTACHMENT 45 |
| 09 29 00 |
| N/A |
| 06 |
| ATTACHMENT 46 |
| 09 30 13 |
| N/A |
| 11 |
| ATTACHMENT 47 |
| 09 51 00 |
| N/A |
| 08 |
| ATTACHMENT 48 |
| 09 54 16 Luminous Sky-Image Ceilings |
| N/A |
| 04 |
| ATTACHMENT 49 |
| 09 65 13 |
| N/A |
| 04 |
| ATTACHMENT 50 |
| 09 65 16-R |
| N/A |
| 07 |
| ATTACHMENT 51 |
| 09 65 19 Resilient Tile Flooring |
| N/A |
| 06 |
| ATTACHMENT 52 |
| 09 67 23 30-R |
| N/A |
| 12 |
| ATTACHMENT 53 |
| 09 67 23 50 |
| N/A |
| 13 |
| ATTACHMENT 54 |
| 09 72 16r1 Vinyl-Coated Fabric Wall Coverings |
| N/A |
| 06 |
| ATTACHMENT 55 |
| 09 91 00 |
| N/A |
| 18 |
| ATTACHMENT 56 |
| 10 11 13 |
| N/A |
| 04 |
| ATTACHMENT 57 |
| 10 14 00 |
| N/A |
| 09 |
| ATTACHMENT 58 |
| 10 25 13 |
| N/A |
| 07 |
| ATTACHMENT 59 |
| 10 26 00 |
| N/A |
| 05 |
| ATTACHMENT 60 |
| 10 28 00 |
| N/A |
| 09 |
| ATTACHMENT 61 |
| 10 44 13 |
| N/A |
| 02 |
| ATTACHMENT 62 |
| 10 51 13 Standard Steel Lockers |
| N/A |
| 05 |
| ATTACHMENT 63 |
| 11 31 13 |
| N/A |
| 03 |
| ATTACHMENT 64 |
| 11 73 00 |
| N/A |
| 04 |
| ATTACHMENT 65 |
| 12 24 00 |
| N/A |
| 05 |
| ATTACHMENT 66 |
| 12 32 00 |
| N/A |
| 09 |
| ATTACHMENT 67 |
| 12 36 00 |
| N/A |
| 07 |
| ATTACHMENT 68 |
| 12 36 61.19 |
| N/A |
| 06 |
| ATTACHMENT 69 |
| 130541 Seismic Restraint Requirements |
| N/A |
| 06 |
| ATTACHMENT 70 |
| 210511 - R |
| N/A |
| 08 |
| ATTACHMENT 71 |
| 210800 - |
| N/A |
| 03 |
| ATTACHMENT 72 |
| 211313 |
| N/A |
| 07 |
| ATTACHMENT 73 |
| 220511 - COMMON WORK RESULTS FOR PLUMBING |
| N/A |
| 26 |
| ATTACHMENT 74 |
| 220519 - METERS AND GAGES FOR PLUMBING PIPING |
| N/A |
| 04 |
| ATTACHMENT 75 |
| 220523 - GENERAL-DUTY VALVES FOR PLUMBING PIPING |
| N/A |
| 10 |
| ATTACHMENT 76 |
| 220711 - PLUMBING INSULATION |
| N/A |
| 14 |
| ATTACHMENT 77 |
| 220800 - COMMISSIONING OF PLUMBING SYSTEMS |
| N/A |
| 03 |
| ATTACHMENT 78 |
| 221100 - FACILITY WATER DISTRIBUTION |
| N/A |
| 10 |
| ATTACHMENT 79 |
| 221300 - FACILITY SANITARY AND VENT PIPING |
| N/A |
| 12 |
| ATTACHMENT 80 |
| 224000 - PLUMBING FIXTURES-R |
| N/A |
| 08 |
| ATTACHMENT 81 |
| 226200 - Vacuum Systems for Healthcare Facilities |
| N/A |
| 16 |
| ATTACHMENT 82 |
| 226300 - Gas Systems for Healthcare Facilities |
| N/A |
| 17 |
| ATTACHMENT 83 |
| 226600 - Chem-Waste Sys for Lab and Hc Fac |
| N/A |
| 07 |
| ATTACHMENT 84 |
| 230511 - COMMON WORK RESULTS FOR HVAC |
| N/A |
| 22 |
| ATTACHMENT 85 |
| 230512 - GENERAL MOTOR REQUIREMENTS FOR HVAC EQUIPMENT |
| N/A |
| 06 |
| ATTACHMENT 86 |
| 230541 - |
| N/A |
| 04 |
| ATTACHMENT 87 |
| 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC |
| N/A |
| 09 |
| ATTACHMENT 88 |
| 230711 - HVAC AND BOILER PLANT INSULATION |
| N/A |
| 15 |
| ATTACHMENT 89 |
| 230800 - COMMISSIONING OF HVAC SYSTEMS |
| N/A |
| 03 |
| ATTACHMENT 90 |
| 230923 - DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC |
| N/A |
| 33 |
| ATTACHMENT 91 |
| 232113 - HYDRONIC PIPING |
| N/A |
| 16 |
| ATTACHMENT 92 |
| 233100 - HVAC DUCTS AND CASINGS |
| N/A |
| 11 |
| ATTACHMENT 93 |
| 233400 - HVAC FANS |
| N/A |
| 04 |
| ATTACHMENT 94 |
| 233600 - AIR TERMINAL UNITS |
| N/A |
| 05 |
| ATTACHMENT 95 |
| 233700 - AIR OUTLETS AND INLETS |
| N/A |
| 04 |
| ATTACHMENT 96 |
| 260511 - REQUIREMENTS FOR ELECTRICAL INSTALLATIONS |
| N/A |
| 08 |
| ATTACHMENT 97 |
| 260519 - LV EL PWR CONDUCTORS AND CABLES (600 VOLTS AND BELOW) |
| N/A |
| 06 |
| ATTACHMENT 98 |
| 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS |
| N/A |
| 06 |
| ATTACHMENT 99 |
| 260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS |
| N/A |
| 10 |
| ATTACHMENT 100 |
| 260923 - LIGHTING CONTROLS |
| N/A |
| 05 |
| ATTACHMENT 101 |
| 262416 - PANELBOARDS |
| Reference Doc |
| 05 |
| ATTACHMENT 102 |
| 262726 - WIRING DEVICES |
| Reference Doc |
| 06 |
| ATTACHMENT 103 |
| 262911 - MOTOR CONTROLLERS |
| Reference Doc |
| 07 |
| ATTACHMENT 104 |
| 262921 – ENCLOSED SWITCHES AND CIRCUIT BREAKERS |
| Reference Doc |
| 04 |
| ATTACHMENT 105 |
| 265100 - INTERIOR LIGHTING |
| Reference Doc |
| 07 |
| ATTACHMENT 106 |
| 270511 - REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS |
| Reference Doc |
| 33 |
| ATTACHMENT 107 |
| 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS |
| Reference Doc |
| 07 |
| ATTACHMENT 108 |
| 270533 - RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS-R |
| Reference Doc |
| 12 |
| ATTACHMENT 109 |
| 270800 - COMMISSIONING OF COMMUNICATIONS SYSTEMS |
| Reference Doc |
| 03 |
| ATTACHMENT 110 |
| 271000 - CONTROL, COMMUNICATION AND SIGNAL WIRING |
| Reference Doc |
| 11 |
| ATTACHMENT 111 |
| 271100 - TELECOMMUNICATIONS ROOM FITTINGS |
| Reference Doc |
| 14 |
| ATTACHMENT 112 |
| 271500 - COMMUNICATIONS STRUCTURED CABLING-R |
| Reference Doc |
| 12 |
| ATTACHMENT 113 |
| 274131 - MASTER ANTENNA TELEVISION EQUIPMENT AND SYSTEMS |
| Reference Doc |
| 25 |
| ATTACHMENT 114 |
| 275223 - NURSE CALL SYSTEMS |
| Reference Doc |
| 22 |
| ATTACHMENT 115 |
| 280500 - COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY |
| Reference Doc |
| 69 |
| ATTACHMENT 116 |
| 280511 - REQUIREMENTS FOR EL SAFETY AND SECURITY INSTLL |
| Reference Doc |
| 05 |
| ATTACHMENT 117 |
| 280513 - CONDUCTORS AND CABLES FOR EL SAFETY AND SEC |
| Reference Doc |
| 15 |
| ATTACHMENT 118 |
| 280526 - GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SEC |
| Reference Doc |
| 07 |
| ATTACHMENT 119 |
| 280528.33 - CONDUITS AND BACKBOXES FOR EL SAFETY AND SEC |
| Reference Doc |
| 12 |
| ATTACHMENT 120 |
| 280800 - COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS |
| Reference Doc |
| 04 |
| ATTACHMENT 121 |
| 281300 - PHYSICAL ACCESS CONTROL SYSTEM |
| Reference Doc |
| 46 |
| ATTACHMENT 122 |
| 281316 - PHYSICAL ACCESS CTRL SYSTEM AND DBASE MGMT |
| Reference Doc |
| 15 |
| ATTACHMENT 123 |
| 282600 - ELECTRONIC PERSONAL PROTECTION SYSTEM |
| Reference Doc |
| 16 |
| ATTACHMENT 124 |
| 1-( 600-17-115) PART A 01 - GEN |
| Reference Doc |
| 07 |
| ATTACHMENT 125 |
| 2-( 600-17-115) PART A 02 - LS |
| Reference Doc |
| 01 |
| ATTACHMENT 126 |
| 3-( 600-17-115) PART A 03 - ARCH |
| Reference Doc |
| 10 |
| ATTACHMENT 127 |
| 4-( 600-17-115) PART A 03 - ARCH |
| Reference Doc |
| 09 |
| ATTACHMENT 128 |
| 5-( 600-17-115) PART A 03 - ARCH |
| Reference Doc |
| 09 |
| ATTACHMENT 129 |
| 6-( 600-17-115) PART A 03 - ARCH |
| Reference Doc |
| 10 |
| ATTACHMENT 130 |
| 7-( 600-17-115) PART A 04 - STRUC |
| Reference Doc |
| 05 |
| ATTACHMENT 131 |
| 8-( 600-17-115) PART A 05 - MECH |
| Reference Doc |
| 07 |
| ATTACHMENT 132 |
| 9-( 600-17-115) PART A 05 - MECH |
| Reference Doc |
| 04 |
| ATTACHMENT 133 |
| 10-( 600-17-115) PART A 06 - PLUMB |
| Reference Doc |
| 12 |
| ATTACHMENT 134 |
| 11-( 600-17-115) PART A 07 - FP |
| Reference Doc |
| 04 |
| ATTACHMENT 135 |
| 12-( 600-17-115) PART A 08 - ELECT |
| Reference Doc |
| 08 |
| ATTACHMENT 136 |
| 13-( 600-17-115) PART A 08 - ELECT |
| Reference Doc |
| 04 |
| ATTACHMENT 137 |
| 14-( 600-17-115) PART A 08 - ELECT |
| Reference Doc |
| 02 |
| ATTACHMENT 138 |
| 15-( 600-17-115) PART A 09 - FA |
| Reference Doc |
| 05 |
| ATTACHMENT 139 |
| 16-( 600-17-115) PART A 10 - TECH |
| Reference Doc |
| 10 |
| ATTACHMENT 140 |
| 17-( 600-17-115) PART A 11 - GULDMANN |
| Reference Doc |
| 09 |
| ATTACHMENT 141 |
| 18-( 600-17-115) PART A 11 - GULDMANN |
| Reference Doc |
| 01 |
| ATTACHMENT 142 |
| 19-( 600-17-115) PART A 11 - GULDMANN |
| Reference Doc |
| 05 |
| ATTACHMENT 143 |
| 20-( 600-17-115) PART A 11 - GULDMANN |
| Reference Doc |
| 06 |
| ATTACHMENT 144 |
| 21-(600-17-115) PART A Narrative |
| Reference Doc |
| 26 |
| ATTACHMENT 145 |
| 22-(600-17-115) PART A Exh A & Exb B |
| Reference Doc |
| 15 |
| ATTACHMENT 146 |
| 23-(600-17-115) PART A Apx A, B & C |
| Reference Doc |
| 77 |
| ATTACHMENT 147 |
| 23a-(600-17-115) PART A Apx A Struc Calc-1 |
| Reference Doc |
| 24 |
| ATTACHMENT 148 |
| 23b-(600-17-115) PART A Apx A Struc Calc-2 |
| Reference Doc |
| 25 |
| ATTACHMENT 149 |
| 24-(600-17-115) PART A Apx D ACM Surv Rpt-1 |
| Reference Doc |
| 133 |
| ATTACHMENT 150 |
| 25-(600-17-115) PART A Apx D ACM Surv Rpt-2 |
| Reference Doc |
| 34 |
| ATTACHMENT 151 |
| 26-(600-17-115) PART A Apx E Equip CS-1 |
| Reference Doc |
| 28 |
| ATTACHMENT 152 |
| 27-(600-17-115) PART A Apx E Equip CS-2 |
| Reference Doc |
| 49 |
| ATTACHMENT 153 |
| 28-(600-17-115) PART A Apx E Equip CS-2a |
| Reference Doc |
| 03 |
| ATTACHMENT 154 |
| 29-(600-17-115) PART A Apx E Equip CS-2b |
| Reference Doc |
| 02 |
| ATTACHMENT 155 |
| 30-(600-17-115) PART A Apx E Equip CS-3 |
| Reference Doc |
| 35 |
| ATTACHMENT 156 |
| 31-(600-17-115) PART A Apx E Equip CS-3a |
| Reference Doc |
| 08 |
| ATTACHMENT 157 |
| 32-(600-17-115) PART A Apx E Equip CS-4 |
| Reference Doc |
| 52 |
| ATTACHMENT 158 |
| 33-(600-17-115) PART A Apx E Equip CS-5 |
| Reference Doc |
| 04 |
| ATTACHMENT 159 |
| 34-(600-17-115) PART A Apx E Exh Fan CS |
| Reference Doc |
| 03 |
| ATTACHMENT 160 |
| 35-(600-17-115)) PART A Apx E Finishes |
| Reference Doc |
| 18 |
| ATTACHMENT 161 |
| 36-(600-17-115) PART A Apx E Elec CS |
| Reference Doc |
| 32 |
| ATTACHMENT 162 |
| 37-(600-17-115) PART A Apx E Plumb CS |
| Reference Doc |
| 13 |
| ATTACHMENT 163 |
| 38-(600-17-115) PART A Specs - 1 |
| Reference Doc |
| 632 |
| ATTACHMENT 164 |
| 39-(600-17-115) PART A Specs - 2 |
| Reference Doc |
| 676 |
| ATTACHMENT 165 |
| 102-ACM Rpt_1 |
| 05/15/2015 |
| 133 |
| ATTACHMENT 166 |
| 03-ACM Rpt_2 |
| March 2015 |
| 34 |
| ATTACHMENT 167 |
| 00 01 10 R1 |
| N/A |
| 04 |
| ATTACHMENT 168 |
| 01 33 23 R1 |
| N/A |
| 07 |
| ATTACHMENT 169 |
| 01 -600-17-115_B126 SPR _ADDENDUM A |
| 04/02/2021 |
| 03 |
| ATTACHMENT 170 |
| 02 -600-17-115 DWG ADNM - A |
| 02/26/2021 |
| 10 |
| ATTACHMENT 171 |
| 03 -600-17-115 DWG ADNM - A |
| 02/26/2021 |
| 07 |
| ATTACHMENT 172 |
| 04 -600-17-115 DWG ADNM - A |
| 02/26/2021 |
| 01 |
| ATTACHMENT 173 |
| 05 -600-17-115 DWG ADNM - A |
| 02/26/2021 |
| 05 |
| ATTACHMENT 174 |
| 06 -600-17-115 DWG ADNM - A |
| 02/26/2021 |
| 04 |
| ATTACHMENT 175 |
| 07 -600-17-115 DWG ADNM - A |
| 02/26/2021 |
| 02 |
| ATTACHMENT 176 |
| 08 42 43-R1 |
| N/A |
| 07 |
| ATTACHMENT 177 |
| 08 -600-17-115_B126 SPR_SPECS_ADNM A |
| 04/02/2021 |
| 123 |
| ATTACHMENT 178 |
| 08 71 00-R3 |
| N/A |
| 28 |
| ATTACHMENT 179 |
| 08 81 80 |
| N/A |
| 06 |
| ATTACHMENT 180 |
| 08 88 00-R1 |
| N/A |
| 14 |
| ATTACHMENT 181 |
| 21 13 13-R1 |
| N/A |
| 07 |
| ATTACHMENT 182 |
| 22 62 00 |
| N/A |
| 16 |
| ATTACHMENT 183 |
| 22 63 00 |
| N/A |
| 17 |
| ATTACHMENT 184 |
| 28 31 00 |
| N/A |
| 16 |
| ATTACHMENT 185 |
| 01A-APPENDIX - D_IT-SOP 07-015 Cable Installation Labeling and Testing |
| 04/12/2010 |
| 08 |
| ATTACHMENT 186 |
| ATTACH 186 - 01C-IMS SOP 07-013 Cable Installation Labeling and Testing Ver 2 |
| 10/31/2019 |
| 15 |
| ATTACHMENT 187 |
| RFI Log - 36C25821B0007 |
| 04/12/2021 |
| 07 |
| ATTACHMENT 188 |
| 600-17-115_ SITE WALK SIGN IN_ 3-17-2021 |
| 03/17/2021 |
| 03 |
| ATTACHMENT 189 |
| 01 00 00-R6-04-20-21 |
| 04-20-2021 |
| 28 |
| ATTACHMENT 190 |
| Clarification Log - 36C25821B0007 20210420 |
| 04-20-2021 |
| 01 |
| ATTACHMENT 191 |
| Clarification Log v2 - 36C25821B0007 20210518 |
| 05-18-2021 |
| 03 |
| ATTACHMENT 192 |
| 01 00 00-R6-04-20-21 |
| N/A |
| 28 |
| ATTACHMENT 193 |
| 01 -600-17-115_B126 SPR _ADDENDUM B |
| 04/23/2021 |
| 03 |
| ATTACHMENT 194 |
| 01 -600-17-115_B126 SPR _ADDENDUM B |
| 04/23/2021 |
| 03 |
| ATTACHMENT 195 |
| 02 -600-17-115 DWG ADNM - B |
| 04/23/2021 |
| 05 |
| ATTACHMENT 196 |
| 03 -600-17-115 DWG ADNM - B |
| 04/23/2021 |
| 03 |
| ATTACHMENT 197 |
| 04 -600-17-115 DWG ADNM - B |
| 04/23/2021 |
| 05 |
| ATTACHMENT 198 |
| EP101 - Electrical Floor Plan -Power-R1 Addendum 3. |
| 05/04/2021 |
| 01 |
| ATTACHMENT 199 |
| EQ37_Centrella-Bed |
| 2020 |
| 11 |
| ATTACHMENT 200 |
| EQ38-Compella-Bed |
| 2021 |
| 09 |
| ATTACHMENT 201 |
| EQ84-JanCart |
| 04/16/2021 |
| 01 |
| ATTACHMENT 202 |
| EQ96-PROJ |
| 2019 |
| 02 |
| ATTACHMENT 203 |
| EQ-97_AccessFitV |
| 2020 |
| 01 |
| ATTACHMENT 204 |
| EQ98_elexo_xxl |
| N/A |
| 04 |
| ATTACHMENT 205 |
| EQ99-_elexo |
| 12/20/2012 |
| 04 |
| ATTACHMENT 206 |
| 126-AE-201 |
| 11-25-2013 |
| 01 |
| ATTACHMENT 207 |
| 126-AE-202 |
| 02-21-2014 |
| 01 |
E.17 INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO BIDDERS
1. CONTRACTING OFFICER POC:
Lissette Fernandez Email – lissette.fernandez @va.gov
2. CONTRACTING SPECIALIST POC:
Dena Hallaren Email – dena.hallaren@va.gov
3. PRE-BID CONFERENCE / SITE VISIT:
a. An organized pre-bid conference and site visit have been scheduled for:
March 17, 2021 1:00pm PST at the following facility and location:
LONG BEACH VA HEALTH CARE SYSTEM (LBVAHCS):
5901 East 7th Street, Bldg 164 Long Beach, CA 90822
b. Meeting Place: Building 5C – Police Station
c. Badging: Badges shall be issued at this location and worn while on campus at all times. Attendees are encouraged to arrive early with anticipation of a large attendance and the badging processes.
d. Facilitator/Escorting - Mr. Richard Moss
e. Attendance is not mandatory; however, all interested bidders are encourage and expected to attend. No further site visits shall be scheduled.
f. Potential Offerors are responsible for reviewing the solicitation in its entirety prior to site visit. If the estimated POP is not feasible, attendees are encouraged to submit an RFI to the solicitation.
g. This site visit is NOT a Question and Answer Session. The Facilitator and VA employees DO NOT have the authority to answer verbal questions posed during the site walk.
See paragraph 4, for instructions for submitting RFI’s.
h. Pictures are authorized at the direction of the Facilitator/Escort only. Offerors shall not take photos in any patient or restricted areas.
i. All attendees are required to follow CDC guidance and social distancing guidelines with regards to COVID-19 prevention. Attendees are required to wear masks at all times at their own expense while on campus. With exception for medical justification, the attendees shall obtain prior approval a week before the site visit date.
j. The Site Visit Sign-In sheet will be published as an SF 30 Amendment.
k. Contractors are responsible for requesting access to intervening spaces or segments as needed. Government shall make access to interstitial available as applicable.
l. Attendees shall follow all directions given by Contracting and the COR/Facilitator while on this Site Visit.
4. REQUEST FOR INFORMATION:
a. All Requests for Information (RFIs) regarding this solicitation shall be received no later than: March 24, 2021, 12:00 P.M. PST.
b. ALL RFI’s shall be e-mail to dena.hallaren@va.gov.
c. Contracting reserves the right not to respond to RFI’s at the Government’s discretion. The Government also reserves the right to consolidate questions and responses. Responses to RFI’s will only be accomplished through SF 30 amendments to the solicitation.
d. Zero solicitation RFI/questions via telephone calls or voicemails shall be considered or responded to.
e. No questions shall be asked during this solicitation to the COR or any VA personnel other than the Contracting POC’s listed in this solicitation.
See paragraph 1 and 2.
f. Government emails are “For Official Use Only” (FOUO) – zero marketing/spam emails will be reviewed and may be blocked by Gov’t network systems.
5. BID CONTENTS:
Shall include the following:
a. Standard Form (SF) 1442: From solicitation with blocks 14-20c fully completed and endorsed. Bidder shall not fill in any blocks from “Award” section - blocks 21 on down.
b. Bid Guarantee/Bond SF 24: With a current version fully executed SF 24 Bid Bond document. See paragraph 8 for further details.
c. SF 30 Amendments: Posted with same solicitation with signing/acknowledging all solicitation SF 30 amendments. See paragraph 10 for further details.
d. A.4 Statement of Bid Items with Deductives: Bid amount shall list at a minimum Material cost, Labor cost, Overhead, Profit and list in a separate line a Grand Total. This information is required and will be used for possible future modifications. The bids will be evaluated based on the Grand Total amount only.
See section A.4 to annotate bid offer.
e. Safety or Environmental violations and Experience Modification Rate (EMR): All Bidders shall include with their Bid, a complete past Safety and Environment record and current Experience Modification Rate. See paragraph 11 for further details.
f. VETS-4212 - Federal Contractor Veterans’ Employment Report: Bidders are required to provide a current verification of their annual submission VETS-4212 - Federal Contractor Veterans’ Employment Report.
See paragraph 20 for further details.
g. All bid contents shall be combined into one single Adobe PDF file document in the order listed in paragraph 11, a-f. Bidder shall ensure to reduce the file size if larger than five (5) megabytes.
6. BID DUE DATE:
a. Submit One (1) digital copy of Bids contents no later than:
June 30, 2021, 09:00 A.M. PST
b. Due to COVID-19 CDC GUIDANCE all bids shall be emailed
c. Bids shall be emailed directly to dena.hallaren@va.gov
d. Bids received after the time and date specified above, shall be rejected as late.
e. Due to Gov’t server security protocols and large bid attachments security/virus screening; bidders are responsible for submitting a timely bid to contracting POC’s email inbox by prescribe closing time.
7. PUBLIC BID OPENING:
a. Will be held on June 30, 2021, 12:00 P.M. PST
b. Bidders may join via MS TEAMS invite:
Microsoft Teams meeting Join on your computer or mobile app Click here to join the meeting Or call in (audio only) 1-872-701-0185 Phone Conference ID: 858 450 754#
8. OFFER GUARANTEE (BID BOND):
a. Referencing FAR 14.404-2(j) “When a bid guarantee is required and a bidder fails to furnish the guarantee in accordance with the requirements of the invitation for bids, the bid shall be rejected”.
b. Electronic/Digital Copies of the Bonding will be acceptable for bid opening so long as all other elements of the executed bond are present. See paragraph 12 for Bid Due Date and POC email for electronically submitting Bonding.
c. Further instructions for mailing the physical copy of the actual bonding, with the raised seal shall be provided at the time of pre-award phase. If apparent low bidder is unable to provide electronic and/or physical copy of Bonding, bidder will be ineligible for award.
d. Current SF 24 downloadable form can be located at: https://www.gsa.gov/forms-library/bid-bond
9. PAYMENT AND PERFORMANCE BONDS:
If the contract will exceed $150,000 (see FAR 28.102-1 for lesser amount), the bidder to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the solicitation.
10. AMENDMENTS:
All Amendments to the solicitation shall be acknowledged in the space provided in Block 19 of the SF1442 & SF 30 amendments by returning a signed copy of the amendment with the bid on the bid due date.
11. SAFETY OR ENVIRONMENTAL VIOLATIONS AND EMR:
1. All Bidders shall submit a complete past Safety and Environmental record. “Complete” means the past Safety and Environmental record should include information from all states in which the bidder conducted business. Provide safety violations which have not been abated regardless of date of identification of the violation. The information will be reviewed such that the bidder has no more than three (3) serious, or one (1) repeat or one (1) willful Occupational Safety and Health Administration (OSHA) or any Environmental Protection Agency (EPA) violation(s) which has not been abated and still in open status.
https://www.osha.gov/pls/imis/establishment.html
1. All Bidders/Offerors shall submit a complete past Environment Protection Agency (EPA) Enforcement and Compliance History record (ECH). Provide all open ECH violations regardless of date of identification of the violation. The information shall contain a self-certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) which has not been abated and still in open status.. The term “past three years” means three years prior to the time of bid submission. If such certification cannot be made, a Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations. https://echo.epa.gov/facilities/enforcement-case-search/results
1. All Bidders/Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Bidder’s/Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder/Offeror’s EMR is above 1.0, Bidder/Offeror shall submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.
1. Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead shall obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.
1. Failure to submit the information required in this section shall result in a finding of bid non-responsiveness.
12. REPRESENTATIONS AND CERTIFICATIONS:
1. This solicitation requires registration with the System for Award Management (SAM) pursuant to applicable regulations and guidelines. All bidders shall also complete an electronic annual representations and certifications. Registration information can be found at www.sam.gov. Bidders are strongly encouraged to check the SAM Gov website frequently to update as needed their SAM profile information and to ensure their firm’s information is current and not expired.
1. Bidders are required to provide a current annual verification of their submission of the annual form VETS-4212, Federal Contractor Veterans’ Employment Report. This verification shall be a copy of the DOL’s emailed confirmation of receipt notification sent to the bidder after successful submission of your firm’s report. Instructions and form can be located at https://www.dol.gov/agencies/vets/programs/vets4212
1. This solicitation is 100% Set-Aside for Service-Disabled Veteran Owned Small Business (SDVOSB). Public Law 109-461, 38 USC Sec. 8127 provides SDVOSB and VOSB Set Aside authority to the VA. Businesses shall be registered and verified in the VIP database at Vendor Information Pages (VetBiz).
13. PAYMENT VENDOR FILE:
Prospective Offerors are notified that verification of VA Form 10091 and the W-9 sent directly to the paying office in Austin, TX, shall be submitted with the offer unless the offeror has previously submitted these forms to VA Austin and provides certification of previous work. The FMS Vendor File Update form needs to be submitted in all cases to the Contracting Officer as part of the offer or proposal. Prior information sent to the VA Payment Center in Austin does not preclude submittal of the FMS Vendor File Update form. Failure to include this information could preclude the offeror from consideration for award or considerably delay award.
Reference Section D.1 attachments.
14. DAVIS BACON WAGE DETERMINATION:
a. Contractors shall reference the most current version of DBA Wage Determination per beta SAM Gov Wage Determination site prior to submitting final bid.
b. Click: beta.SAM.gov
c. Search by the General Decision Number posted with solicitation under:
D.1 List of Attachments - Davis Bacon General Decision Number CA20210022
- - END OF SECTION - -
image1.emf
600 Long Beach VAHCS MAP_.pdf
Tibor Rubin VA Medical Center Campus Map
E 7th St.
Parking Lot C
FREE
Veteran Valet
SCI
Bldg. 150
Vo lu nt ar y S vc s.
Bl dg . 5
VA
P ol ice
. 5 C
Community Living Center
Bldg. 133
Palm Rd.
Parking Lot
Lot N
Lot R
Lot S
Lot T
Lot V
Lot U
Parking Lot M
Parking Lot E
Bldg.
. 4
. 6
Bldg. 128
Patriot Park
“PIER”
Bldg. 136
Parking Lot D Parking Lot F Parking Lot G
Lot O
Parking Lot H
Bldg. 167 T
Canteen Patio
VA U.S. Department of Veterans Affairs
VA Long Beach Healthcare System
If you need a ride from the parking lot to your appointment location (and vice-versa), please call 562-826-5715 to request a golf-cart pickup.
FutureFuture OutpatientOutpatient
Mental HealthMental Health
Future Outpatient
Mental Health
FutureFuture Inpatient Inpatient
Mental HealthMental Health
Future Inpatient
Mental Health
Future CommunityFuture Community Living Center (CLC)Living Center (CLC) Future Community Living Center (CLC)
“The Tower” Bldg. 126
. 1
. 1
126-OP
“Pantages” Bldg. 2
. 8
“The Egg”
VA
CanteenBldg.
Fisher House
Bus Operational Time 6 a.m. - 6 p.m.
Under Construction Road OPEN Road CLOSED Parking Lot ADA Parking
Bus Stop Bus Route
EmergencyEmergency DepartmentDepartment Emergency Department
U pd at ed
J an ua ry
0, Patient Garden
Bus S top
Bus Stop Bus Stop
Bu s S to p
Ea st
R d.
Elm Rd.Elm Rd.Elm Rd.
Ca ro b Rd
Pi ne
Sam Johnson Rd.Sam Johnson Rd.Sam Johnson Rd.
Magnolia St.Magnolia St.Magnolia St.
N . B el lfl ow er
B lv
O ak
North Rd.North Rd.North Rd.
Lot P
File details come from the government source that posted it. Updated .