36C25821B0007 0005.docx

DOCX document 409 KB Posted

Attached to
SOLICITATION -CONSTRUCTION - 600-17-115 - CONVERT BLDG 126 8TH NORTH TO PRIVATE ROOMS
Solicitation number
36C25821B0007
Issued by

About this file

This solicitation is for construction services to convert the 8th floor north of Building 126 at the Long Beach VA Health Care System to single patient rooms. The solicitation calls for architectural finishes including flooring, ceiling, wall protection, plumbing, HVAC, emergency and normal power, nurse call, and low voltage signaling systems to be upgraded. Construction will include structural, mechanical, plumbing, material and fixtures, medical gases, electrical and low voltage work. Interested parties should attend an optional pre-bid site visit on March 17, 2021 and submit any requests for information by March 24, 2021. Bids are due by June 30, 2021 and will be publicly opened on the same date. The apparent low bidder must be able to provide payment and performance bonds if the contract value exceeds $150,000. This requirement has a 100% set-aside for service-disabled veteran-owned small businesses.

View the file

Other files

File Type Posted
OTHER A -- Davis Bacon General Decision Number CA20210022 - 07.23.2021.pdf PDF
ATTACH 215 - Re-Opened RFI Log - 36C25821B0007 v2.docx DOCX document
36C25821B0007 0008.docx DOCX document
36C25821B0007 0007.docx DOCX document
Amend 0007 Attachments.zip ZIP file
ATTACH 208 - Clarification Log v3 - 36C25821B0007 20210609.docx DOCX document
36C25821B0007 0006.docx DOCX document
Amend 0005 Attachments.zip ZIP file
36C25821B0007 0004_1.docx DOCX document
ATTACH 190 - Clarification Log - 36C25821B0007 20210420.docx DOCX document
36C25821B0007 0003.docx DOCX document
ATTACH 189 - 01 00 00-R6-04-20-21.docx DOCX document
36C25821B0007 0002 Amendment v2.docx DOCX document
36C25821B0007 0002 Amendment.docx DOCX document
Section D Attachments Amendment 0002.zip ZIP file
36C25821B0007 0001 Amendment.docx DOCX document
600-17-115 - 36C25821B0007 - Site Visit Sign In Sheet.pdf PDF
36C25821B0007.1 CONSTRUCTION IFB FOR LONG BEACH, CA CONVERT BLDG 126.pdf PDF
Section D Attachments.zip ZIP file
IFB Instructions to Bidders 3.08.2021.pdf PDF
36C25821B0007.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

05-18-2021

600-21-2-5975-0045

600-17-115

Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014

Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders

36C25821B0007 03-11-2021

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 06/30/2021 - 9:00AM PST

The Purpose of Amendment 0005 is to:

1. Post additional attachments 191-207 with revised clarifications v2 and a revised D.1 List of Attachments.

2. Post revised Instructions to Bidders as follows: #2 POC, #5 Bid Contents, #6 Bid Due Date & Time and #7 Public Bid Opening Meeting Date & Time with revised Virtual Meeting Links/Numbers, #11 Safety & added #14 DBA Wage Determination.

3. Extend solicitation to 06/30/2021 - 9:00AM PST and Bid Opening Date to 06/30/2021 - 12:00PM PST.

4. See continuation pages for List of Attachments, Instructions to Bidders for further details and all attachments.

CONTINUATION PAGE

D.1 LIST OF ATTACHMENTS

ATTACHMENT NUMBER
DESCRIPTION
DATE
NUMBER OF PAGES
OTHER A
Davis Bacon General Decision Number CA20210022

Note: Contractors shall reference the most current version for DBA Wage Determination prior to submitting final bid. Go To: beta.SAM.gov | Search Search by the above decision number.

3/19/2021
34
OTHER B
Material Approval Submittal Template
N/A
02
OTHER C
Meeting Minutes Template
N/A
02
OTHER D
VHA STANDARDIZED VENDOR FILE PROCEDURE
N/A
01
ATTACHMENT 01
SPECIFICATIONS – Cover Page
11/30/2020
01
ATTACHMENT 02
00 01 10 TABLE OF CONTENTS
N/A
10
ATTACHMENT 03
00 01 15 LIST OF DRAWINGS
N/A
05
ATTACHMENT 04
01 00 00-R5-12-01-20
N/A
28
ATTACHMENT 05
01 33 23
N/A
07
ATTACHMENT 06
01 35 26
N/A
29
ATTACHMENT 07
01 42 19
N/A
08
ATTACHMENT 08
01 45 29
N/A
08
ATTACHMENT 09
01 57 19
N/A
07
ATTACHMENT 10
01 58 16
N/A
02
ATTACHMENT 11
01 74 19
N/A
06
ATTACHMENT 12
01 81 11
N/A
13
ATTACHMENT 13
01 91 00
N/A
58
ATTACHMENT 14
02 41 00
N/A
03
ATTACHMENT 15
02 82 13.19
N/A
41
ATTACHMENT 16
03 30 53
N/A
10
ATTACHMENT 17
05 40 00
N/A
08
ATTACHMENT 18
05 50 00
N/A
10
ATTACHMENT 19
06 06 60 Plastic Fabrications
N/A
06
ATTACHMENT 20
06 10 00
N/A
06
ATTACHMENT 21
06 16 63 Cementitious Sheathing
N/A
03
ATTACHMENT 22
06 62 50 Eng Polymer Panels
N/A
09
ATTACHMENT 23
07 01 50 19
N/A
06
ATTACHMENT 24
07 13 00
N/A
03
ATTACHMENT 25
07 21 13
N/A
05
ATTACHMENT 26
07 22 00
N/A
06
ATTACHMENT 27
07 51 00-R
N/A
11
ATTACHMENT 28
07 60 00
N/A
15
ATTACHMENT 29
07 84 00
N/A
05
ATTACHMENT 30
07 92 00
N/A
09
ATTACHMENT 31
08 11 13
N/A
07
ATTACHMENT 32
08 14 00
N/A
06
ATTACHMENT 33
08 14 23
N/A
08
ATTACHMENT 34
08 31 13
N/A
06
ATTACHMENT 35
08 33 13
N/A
06
ATTACHMENT 36
08 41 13
N/A
05
ATTACHMENT 37
08 42 43
N/A
07
ATTACHMENT 38
08 71 00-R1
N/A
28
ATTACHMENT 39
08 80 00-R2
N/A
08
ATTACHMENT 40
08 88 00
N/A
14
ATTACHMENT 41
09 05 16R1
N/A
06
ATTACHMENT 42
09 06 00- 11-25-20-R2
N/A
16
ATTACHMENT 43
09 06 00- 12-01-20-R2
N/A
17
ATTACHMENT 44
09 22 16
N/A
07
ATTACHMENT 45
09 29 00
N/A
06
ATTACHMENT 46
09 30 13
N/A
11
ATTACHMENT 47
09 51 00
N/A
08
ATTACHMENT 48
09 54 16 Luminous Sky-Image Ceilings
N/A
04
ATTACHMENT 49
09 65 13
N/A
04
ATTACHMENT 50
09 65 16-R
N/A
07
ATTACHMENT 51
09 65 19 Resilient Tile Flooring
N/A
06
ATTACHMENT 52
09 67 23 30-R
N/A
12
ATTACHMENT 53
09 67 23 50
N/A
13
ATTACHMENT 54
09 72 16r1 Vinyl-Coated Fabric Wall Coverings
N/A
06
ATTACHMENT 55
09 91 00
N/A
18
ATTACHMENT 56
10 11 13
N/A
04
ATTACHMENT 57
10 14 00
N/A
09
ATTACHMENT 58
10 25 13
N/A
07
ATTACHMENT 59
10 26 00
N/A
05
ATTACHMENT 60
10 28 00
N/A
09
ATTACHMENT 61
10 44 13
N/A
02
ATTACHMENT 62
10 51 13 Standard Steel Lockers
N/A
05
ATTACHMENT 63
11 31 13
N/A
03
ATTACHMENT 64
11 73 00
N/A
04
ATTACHMENT 65
12 24 00
N/A
05
ATTACHMENT 66
12 32 00
N/A
09
ATTACHMENT 67
12 36 00
N/A
07
ATTACHMENT 68
12 36 61.19
N/A
06
ATTACHMENT 69
130541 Seismic Restraint Requirements
N/A
06
ATTACHMENT 70
210511 - R
N/A
08
ATTACHMENT 71
210800 -
N/A
03
ATTACHMENT 72
211313
N/A
07
ATTACHMENT 73
220511 - COMMON WORK RESULTS FOR PLUMBING
N/A
26
ATTACHMENT 74
220519 - METERS AND GAGES FOR PLUMBING PIPING
N/A
04
ATTACHMENT 75
220523 - GENERAL-DUTY VALVES FOR PLUMBING PIPING
N/A
10
ATTACHMENT 76
220711 - PLUMBING INSULATION
N/A
14
ATTACHMENT 77
220800 - COMMISSIONING OF PLUMBING SYSTEMS
N/A
03
ATTACHMENT 78
221100 - FACILITY WATER DISTRIBUTION
N/A
10
ATTACHMENT 79
221300 - FACILITY SANITARY AND VENT PIPING
N/A
12
ATTACHMENT 80
224000 - PLUMBING FIXTURES-R
N/A
08
ATTACHMENT 81
226200 - Vacuum Systems for Healthcare Facilities
N/A
16
ATTACHMENT 82
226300 - Gas Systems for Healthcare Facilities
N/A
17
ATTACHMENT 83
226600 - Chem-Waste Sys for Lab and Hc Fac
N/A
07
ATTACHMENT 84
230511 - COMMON WORK RESULTS FOR HVAC
N/A
22
ATTACHMENT 85
230512 - GENERAL MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
N/A
06
ATTACHMENT 86
230541 -
N/A
04
ATTACHMENT 87
230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
N/A
09
ATTACHMENT 88
230711 - HVAC AND BOILER PLANT INSULATION
N/A
15
ATTACHMENT 89
230800 - COMMISSIONING OF HVAC SYSTEMS
N/A
03
ATTACHMENT 90
230923 - DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC
N/A
33
ATTACHMENT 91
232113 - HYDRONIC PIPING
N/A
16
ATTACHMENT 92
233100 - HVAC DUCTS AND CASINGS
N/A
11
ATTACHMENT 93
233400 - HVAC FANS
N/A
04
ATTACHMENT 94
233600 - AIR TERMINAL UNITS
N/A
05
ATTACHMENT 95
233700 - AIR OUTLETS AND INLETS
N/A
04
ATTACHMENT 96
260511 - REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
N/A
08
ATTACHMENT 97
260519 - LV EL PWR CONDUCTORS AND CABLES (600 VOLTS AND BELOW)
N/A
06
ATTACHMENT 98
260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
N/A
06
ATTACHMENT 99
260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
N/A
10
ATTACHMENT 100
260923 - LIGHTING CONTROLS
N/A
05
ATTACHMENT 101
262416 - PANELBOARDS
Reference Doc
05
ATTACHMENT 102
262726 - WIRING DEVICES
Reference Doc
06
ATTACHMENT 103
262911 - MOTOR CONTROLLERS
Reference Doc
07
ATTACHMENT 104
262921 – ENCLOSED SWITCHES AND CIRCUIT BREAKERS
Reference Doc
04
ATTACHMENT 105
265100 - INTERIOR LIGHTING
Reference Doc
07
ATTACHMENT 106
270511 - REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS
Reference Doc
33
ATTACHMENT 107
270526 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
Reference Doc
07
ATTACHMENT 108
270533 - RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS-R
Reference Doc
12
ATTACHMENT 109
270800 - COMMISSIONING OF COMMUNICATIONS SYSTEMS
Reference Doc
03
ATTACHMENT 110
271000 - CONTROL, COMMUNICATION AND SIGNAL WIRING
Reference Doc
11
ATTACHMENT 111
271100 - TELECOMMUNICATIONS ROOM FITTINGS
Reference Doc
14
ATTACHMENT 112
271500 - COMMUNICATIONS STRUCTURED CABLING-R
Reference Doc
12
ATTACHMENT 113
274131 - MASTER ANTENNA TELEVISION EQUIPMENT AND SYSTEMS
Reference Doc
25
ATTACHMENT 114
275223 - NURSE CALL SYSTEMS
Reference Doc
22
ATTACHMENT 115
280500 - COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY
Reference Doc
69
ATTACHMENT 116
280511 - REQUIREMENTS FOR EL SAFETY AND SECURITY INSTLL
Reference Doc
05
ATTACHMENT 117
280513 - CONDUCTORS AND CABLES FOR EL SAFETY AND SEC
Reference Doc
15
ATTACHMENT 118
280526 - GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SEC
Reference Doc
07
ATTACHMENT 119
280528.33 - CONDUITS AND BACKBOXES FOR EL SAFETY AND SEC
Reference Doc
12
ATTACHMENT 120
280800 - COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS
Reference Doc
04
ATTACHMENT 121
281300 - PHYSICAL ACCESS CONTROL SYSTEM
Reference Doc
46
ATTACHMENT 122
281316 - PHYSICAL ACCESS CTRL SYSTEM AND DBASE MGMT
Reference Doc
15
ATTACHMENT 123
282600 - ELECTRONIC PERSONAL PROTECTION SYSTEM
Reference Doc
16
ATTACHMENT 124
1-( 600-17-115) PART A 01 - GEN
Reference Doc
07
ATTACHMENT 125
2-( 600-17-115) PART A 02 - LS
Reference Doc
01
ATTACHMENT 126
3-( 600-17-115) PART A 03 - ARCH
Reference Doc
10
ATTACHMENT 127
4-( 600-17-115) PART A 03 - ARCH
Reference Doc
09
ATTACHMENT 128
5-( 600-17-115) PART A 03 - ARCH
Reference Doc
09
ATTACHMENT 129
6-( 600-17-115) PART A 03 - ARCH
Reference Doc
10
ATTACHMENT 130
7-( 600-17-115) PART A 04 - STRUC
Reference Doc
05
ATTACHMENT 131
8-( 600-17-115) PART A 05 - MECH
Reference Doc
07
ATTACHMENT 132
9-( 600-17-115) PART A 05 - MECH
Reference Doc
04
ATTACHMENT 133
10-( 600-17-115) PART A 06 - PLUMB
Reference Doc
12
ATTACHMENT 134
11-( 600-17-115) PART A 07 - FP
Reference Doc
04
ATTACHMENT 135
12-( 600-17-115) PART A 08 - ELECT
Reference Doc
08
ATTACHMENT 136
13-( 600-17-115) PART A 08 - ELECT
Reference Doc
04
ATTACHMENT 137
14-( 600-17-115) PART A 08 - ELECT
Reference Doc
02
ATTACHMENT 138
15-( 600-17-115) PART A 09 - FA
Reference Doc
05
ATTACHMENT 139
16-( 600-17-115) PART A 10 - TECH
Reference Doc
10
ATTACHMENT 140
17-( 600-17-115) PART A 11 - GULDMANN
Reference Doc
09
ATTACHMENT 141
18-( 600-17-115) PART A 11 - GULDMANN
Reference Doc
01
ATTACHMENT 142
19-( 600-17-115) PART A 11 - GULDMANN
Reference Doc
05
ATTACHMENT 143
20-( 600-17-115) PART A 11 - GULDMANN
Reference Doc
06
ATTACHMENT 144
21-(600-17-115) PART A Narrative
Reference Doc
26
ATTACHMENT 145
22-(600-17-115) PART A Exh A & Exb B
Reference Doc
15
ATTACHMENT 146
23-(600-17-115) PART A Apx A, B & C
Reference Doc
77
ATTACHMENT 147
23a-(600-17-115) PART A Apx A Struc Calc-1
Reference Doc
24
ATTACHMENT 148
23b-(600-17-115) PART A Apx A Struc Calc-2
Reference Doc
25
ATTACHMENT 149
24-(600-17-115) PART A Apx D ACM Surv Rpt-1
Reference Doc
133
ATTACHMENT 150
25-(600-17-115) PART A Apx D ACM Surv Rpt-2
Reference Doc
34
ATTACHMENT 151
26-(600-17-115) PART A Apx E Equip CS-1
Reference Doc
28
ATTACHMENT 152
27-(600-17-115) PART A Apx E Equip CS-2
Reference Doc
49
ATTACHMENT 153
28-(600-17-115) PART A Apx E Equip CS-2a
Reference Doc
03
ATTACHMENT 154
29-(600-17-115) PART A Apx E Equip CS-2b
Reference Doc
02
ATTACHMENT 155
30-(600-17-115) PART A Apx E Equip CS-3
Reference Doc
35
ATTACHMENT 156
31-(600-17-115) PART A Apx E Equip CS-3a
Reference Doc
08
ATTACHMENT 157
32-(600-17-115) PART A Apx E Equip CS-4
Reference Doc
52
ATTACHMENT 158
33-(600-17-115) PART A Apx E Equip CS-5
Reference Doc
04
ATTACHMENT 159
34-(600-17-115) PART A Apx E Exh Fan CS
Reference Doc
03
ATTACHMENT 160
35-(600-17-115)) PART A Apx E Finishes
Reference Doc
18
ATTACHMENT 161
36-(600-17-115) PART A Apx E Elec CS
Reference Doc
32
ATTACHMENT 162
37-(600-17-115) PART A Apx E Plumb CS
Reference Doc
13
ATTACHMENT 163
38-(600-17-115) PART A Specs - 1
Reference Doc
632
ATTACHMENT 164
39-(600-17-115) PART A Specs - 2
Reference Doc
676
ATTACHMENT 165
102-ACM Rpt_1
05/15/2015
133
ATTACHMENT 166
03-ACM Rpt_2
March 2015
34
ATTACHMENT 167
00 01 10 R1
N/A
04
ATTACHMENT 168
01 33 23 R1
N/A
07
ATTACHMENT 169
01 -600-17-115_B126 SPR _ADDENDUM A
04/02/2021
03
ATTACHMENT 170
02 -600-17-115 DWG ADNM - A
02/26/2021
10
ATTACHMENT 171
03 -600-17-115 DWG ADNM - A
02/26/2021
07
ATTACHMENT 172
04 -600-17-115 DWG ADNM - A
02/26/2021
01
ATTACHMENT 173
05 -600-17-115 DWG ADNM - A
02/26/2021
05
ATTACHMENT 174
06 -600-17-115 DWG ADNM - A
02/26/2021
04
ATTACHMENT 175
07 -600-17-115 DWG ADNM - A
02/26/2021
02
ATTACHMENT 176
08 42 43-R1
N/A
07
ATTACHMENT 177
08 -600-17-115_B126 SPR_SPECS_ADNM A
04/02/2021
123
ATTACHMENT 178
08 71 00-R3
N/A
28
ATTACHMENT 179
08 81 80
N/A
06
ATTACHMENT 180
08 88 00-R1
N/A
14
ATTACHMENT 181
21 13 13-R1
N/A
07
ATTACHMENT 182
22 62 00
N/A
16
ATTACHMENT 183
22 63 00
N/A
17
ATTACHMENT 184
28 31 00
N/A
16
ATTACHMENT 185
01A-APPENDIX - D_IT-SOP 07-015 Cable Installation Labeling and Testing
04/12/2010
08
ATTACHMENT 186
ATTACH 186 - 01C-IMS SOP 07-013 Cable Installation Labeling and Testing Ver 2
10/31/2019
15
ATTACHMENT 187
RFI Log - 36C25821B0007
04/12/2021
07
ATTACHMENT 188
600-17-115_ SITE WALK SIGN IN_ 3-17-2021
03/17/2021
03
ATTACHMENT 189
01 00 00-R6-04-20-21
04-20-2021
28
ATTACHMENT 190
Clarification Log - 36C25821B0007 20210420
04-20-2021
01
ATTACHMENT 191
Clarification Log v2 - 36C25821B0007 20210518
05-18-2021
03
ATTACHMENT 192
01 00 00-R6-04-20-21
N/A
28
ATTACHMENT 193
01 -600-17-115_B126 SPR _ADDENDUM B
04/23/2021
03
ATTACHMENT 194
01 -600-17-115_B126 SPR _ADDENDUM B
04/23/2021
03
ATTACHMENT 195
02 -600-17-115 DWG ADNM - B
04/23/2021
05
ATTACHMENT 196
03 -600-17-115 DWG ADNM - B
04/23/2021
03
ATTACHMENT 197
04 -600-17-115 DWG ADNM - B
04/23/2021
05
ATTACHMENT 198
EP101 - Electrical Floor Plan -Power-R1 Addendum 3.
05/04/2021
01
ATTACHMENT 199
EQ37_Centrella-Bed
2020
11
ATTACHMENT 200
EQ38-Compella-Bed
2021
09
ATTACHMENT 201
EQ84-JanCart
04/16/2021
01
ATTACHMENT 202
EQ96-PROJ
2019
02
ATTACHMENT 203
EQ-97_AccessFitV
2020
01
ATTACHMENT 204
EQ98_elexo_xxl
N/A
04
ATTACHMENT 205
EQ99-_elexo
12/20/2012
04
ATTACHMENT 206
126-AE-201
11-25-2013
01
ATTACHMENT 207
126-AE-202
02-21-2014
01

E.17 INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO BIDDERS

1. CONTRACTING OFFICER POC:

Lissette Fernandez Email – lissette.fernandez @va.gov

2. CONTRACTING SPECIALIST POC:

Dena Hallaren Email – dena.hallaren@va.gov

3. PRE-BID CONFERENCE / SITE VISIT:

a. An organized pre-bid conference and site visit have been scheduled for:

March 17, 2021 1:00pm PST at the following facility and location:

LONG BEACH VA HEALTH CARE SYSTEM (LBVAHCS):

5901 East 7th Street, Bldg 164 Long Beach, CA 90822

b. Meeting Place: Building 5C – Police Station

c. Badging: Badges shall be issued at this location and worn while on campus at all times. Attendees are encouraged to arrive early with anticipation of a large attendance and the badging processes.

d. Facilitator/Escorting - Mr. Richard Moss

e. Attendance is not mandatory; however, all interested bidders are encourage and expected to attend. No further site visits shall be scheduled.

f. Potential Offerors are responsible for reviewing the solicitation in its entirety prior to site visit. If the estimated POP is not feasible, attendees are encouraged to submit an RFI to the solicitation.

g. This site visit is NOT a Question and Answer Session. The Facilitator and VA employees DO NOT have the authority to answer verbal questions posed during the site walk.

See paragraph 4, for instructions for submitting RFI’s.

h. Pictures are authorized at the direction of the Facilitator/Escort only. Offerors shall not take photos in any patient or restricted areas.

i. All attendees are required to follow CDC guidance and social distancing guidelines with regards to COVID-19 prevention. Attendees are required to wear masks at all times at their own expense while on campus. With exception for medical justification, the attendees shall obtain prior approval a week before the site visit date.

j. The Site Visit Sign-In sheet will be published as an SF 30 Amendment.

k. Contractors are responsible for requesting access to intervening spaces or segments as needed. Government shall make access to interstitial available as applicable.

l. Attendees shall follow all directions given by Contracting and the COR/Facilitator while on this Site Visit.

4. REQUEST FOR INFORMATION:

a. All Requests for Information (RFIs) regarding this solicitation shall be received no later than: March 24, 2021, 12:00 P.M. PST.

b. ALL RFI’s shall be e-mail to dena.hallaren@va.gov.

c. Contracting reserves the right not to respond to RFI’s at the Government’s discretion. The Government also reserves the right to consolidate questions and responses. Responses to RFI’s will only be accomplished through SF 30 amendments to the solicitation.

d. Zero solicitation RFI/questions via telephone calls or voicemails shall be considered or responded to.

e. No questions shall be asked during this solicitation to the COR or any VA personnel other than the Contracting POC’s listed in this solicitation.

See paragraph 1 and 2.

f. Government emails are “For Official Use Only” (FOUO) – zero marketing/spam emails will be reviewed and may be blocked by Gov’t network systems.

5. BID CONTENTS:

Shall include the following:

a. Standard Form (SF) 1442: From solicitation with blocks 14-20c fully completed and endorsed. Bidder shall not fill in any blocks from “Award” section - blocks 21 on down.

b. Bid Guarantee/Bond SF 24: With a current version fully executed SF 24 Bid Bond document. See paragraph 8 for further details.

c. SF 30 Amendments: Posted with same solicitation with signing/acknowledging all solicitation SF 30 amendments. See paragraph 10 for further details.

d. A.4 Statement of Bid Items with Deductives: Bid amount shall list at a minimum Material cost, Labor cost, Overhead, Profit and list in a separate line a Grand Total. This information is required and will be used for possible future modifications. The bids will be evaluated based on the Grand Total amount only.

See section A.4 to annotate bid offer.

e. Safety or Environmental violations and Experience Modification Rate (EMR): All Bidders shall include with their Bid, a complete past Safety and Environment record and current Experience Modification Rate. See paragraph 11 for further details.

f. VETS-4212 - Federal Contractor Veterans’ Employment Report: Bidders are required to provide a current verification of their annual submission VETS-4212 - Federal Contractor Veterans’ Employment Report.

See paragraph 20 for further details.

g. All bid contents shall be combined into one single Adobe PDF file document in the order listed in paragraph 11, a-f. Bidder shall ensure to reduce the file size if larger than five (5) megabytes.

6. BID DUE DATE:

a. Submit One (1) digital copy of Bids contents no later than:

June 30, 2021, 09:00 A.M. PST

b. Due to COVID-19 CDC GUIDANCE all bids shall be emailed

c. Bids shall be emailed directly to dena.hallaren@va.gov

d. Bids received after the time and date specified above, shall be rejected as late.

e. Due to Gov’t server security protocols and large bid attachments security/virus screening; bidders are responsible for submitting a timely bid to contracting POC’s email inbox by prescribe closing time.

7. PUBLIC BID OPENING:

a. Will be held on June 30, 2021, 12:00 P.M. PST

b. Bidders may join via MS TEAMS invite:

Microsoft Teams meeting Join on your computer or mobile app Click here to join the meeting Or call in (audio only) 1-872-701-0185 Phone Conference ID: 858 450 754#

8. OFFER GUARANTEE (BID BOND):

a. Referencing FAR 14.404-2(j) “When a bid guarantee is required and a bidder fails to furnish the guarantee in accordance with the requirements of the invitation for bids, the bid shall be rejected”.

b. Electronic/Digital Copies of the Bonding will be acceptable for bid opening so long as all other elements of the executed bond are present. See paragraph 12 for Bid Due Date and POC email for electronically submitting Bonding.

c. Further instructions for mailing the physical copy of the actual bonding, with the raised seal shall be provided at the time of pre-award phase. If apparent low bidder is unable to provide electronic and/or physical copy of Bonding, bidder will be ineligible for award.

d. Current SF 24 downloadable form can be located at: https://www.gsa.gov/forms-library/bid-bond

9. PAYMENT AND PERFORMANCE BONDS:

If the contract will exceed $150,000 (see FAR 28.102-1 for lesser amount), the bidder to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the solicitation.

10. AMENDMENTS:

All Amendments to the solicitation shall be acknowledged in the space provided in Block 19 of the SF1442 & SF 30 amendments by returning a signed copy of the amendment with the bid on the bid due date.

11. SAFETY OR ENVIRONMENTAL VIOLATIONS AND EMR:

1. All Bidders shall submit a complete past Safety and Environmental record. “Complete” means the past Safety and Environmental record should include information from all states in which the bidder conducted business. Provide safety violations which have not been abated regardless of date of identification of the violation. The information will be reviewed such that the bidder has no more than three (3) serious, or one (1) repeat or one (1) willful Occupational Safety and Health Administration (OSHA) or any Environmental Protection Agency (EPA) violation(s) which has not been abated and still in open status.

https://www.osha.gov/pls/imis/establishment.html

1. All Bidders/Offerors shall submit a complete past Environment Protection Agency (EPA) Enforcement and Compliance History record (ECH). Provide all open ECH violations regardless of date of identification of the violation. The information shall contain a self-certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) which has not been abated and still in open status.. The term “past three years” means three years prior to the time of bid submission. If such certification cannot be made, a Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations. https://echo.epa.gov/facilities/enforcement-case-search/results

1. All Bidders/Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Bidder’s/Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder/Offeror’s EMR is above 1.0, Bidder/Offeror shall submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.

1. Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead shall obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.

1. Failure to submit the information required in this section shall result in a finding of bid non-responsiveness.

12. REPRESENTATIONS AND CERTIFICATIONS:

1. This solicitation requires registration with the System for Award Management (SAM) pursuant to applicable regulations and guidelines. All bidders shall also complete an electronic annual representations and certifications. Registration information can be found at www.sam.gov. Bidders are strongly encouraged to check the SAM Gov website frequently to update as needed their SAM profile information and to ensure their firm’s information is current and not expired.

1. Bidders are required to provide a current annual verification of their submission of the annual form VETS-4212, Federal Contractor Veterans’ Employment Report. This verification shall be a copy of the DOL’s emailed confirmation of receipt notification sent to the bidder after successful submission of your firm’s report. Instructions and form can be located at https://www.dol.gov/agencies/vets/programs/vets4212

1. This solicitation is 100% Set-Aside for Service-Disabled Veteran Owned Small Business (SDVOSB). Public Law 109-461, 38 USC Sec. 8127 provides SDVOSB and VOSB Set Aside authority to the VA. Businesses shall be registered and verified in the VIP database at Vendor Information Pages (VetBiz).

13. PAYMENT VENDOR FILE:

Prospective Offerors are notified that verification of VA Form 10091 and the W-9 sent directly to the paying office in Austin, TX, shall be submitted with the offer unless the offeror has previously submitted these forms to VA Austin and provides certification of previous work. The FMS Vendor File Update form needs to be submitted in all cases to the Contracting Officer as part of the offer or proposal. Prior information sent to the VA Payment Center in Austin does not preclude submittal of the FMS Vendor File Update form. Failure to include this information could preclude the offeror from consideration for award or considerably delay award.

Reference Section D.1 attachments.

14. DAVIS BACON WAGE DETERMINATION:

a. Contractors shall reference the most current version of DBA Wage Determination per beta SAM Gov Wage Determination site prior to submitting final bid.

b. Click: beta.SAM.gov

c. Search by the General Decision Number posted with solicitation under:

D.1 List of Attachments - Davis Bacon General Decision Number CA20210022

- - END OF SECTION - -

image1.emf

600 Long Beach VAHCS MAP_.pdf

Tibor Rubin VA Medical Center Campus Map

E 7th St.

Parking Lot C

FREE

Veteran Valet

SCI

Bldg. 150

Vo lu nt ar y S vc s.

Bl dg . 5

VA

P ol ice

. 5 C

Community Living Center

Bldg. 133

Palm Rd.

Parking Lot

Lot N

Lot R

Lot S

Lot T

Lot V

Lot U

Parking Lot M

Parking Lot E

Bldg.

. 4

. 6

Bldg. 128

Patriot Park

“PIER”

Bldg. 136

Parking Lot D Parking Lot F Parking Lot G

Lot O

Parking Lot H

Bldg. 167 T

Canteen Patio

VA U.S. Department of Veterans Affairs

VA Long Beach Healthcare System

If you need a ride from the parking lot to your appointment location (and vice-versa), please call 562-826-5715 to request a golf-cart pickup.

FutureFuture OutpatientOutpatient

Mental HealthMental Health

Future Outpatient

Mental Health

FutureFuture Inpatient Inpatient

Mental HealthMental Health

Future Inpatient

Mental Health

Future CommunityFuture Community Living Center (CLC)Living Center (CLC) Future Community Living Center (CLC)

“The Tower” Bldg. 126

. 1

. 1

126-OP

“Pantages” Bldg. 2

. 8

“The Egg”

VA

CanteenBldg.

Fisher House

Bus Operational Time 6 a.m. - 6 p.m.

Under Construction Road OPEN Road CLOSED Parking Lot ADA Parking

Bus Stop Bus Route

EmergencyEmergency DepartmentDepartment Emergency Department

U pd at ed

J an ua ry

0, Patient Garden

Bus S top

Bus Stop Bus Stop

Bu s S to p

Ea st

R d.

Elm Rd.Elm Rd.Elm Rd.

Ca ro b Rd

Pi ne

Sam Johnson Rd.Sam Johnson Rd.Sam Johnson Rd.

Magnolia St.Magnolia St.Magnolia St.

N . B el lfl ow er

B lv

O ak

North Rd.North Rd.North Rd.

Lot P

File details come from the government source that posted it. Updated .