ATTACH 208 - Clarification Log v3 - 36C25821B0007 20210609.docx
DOCX document 70 KB Posted
- Solicitation number
- 36C25821B0007
About this file
This clarification log pertains to a construction project to convert the eighth floor north of Building 126 at the Long Beach VA Health Care System to single patient rooms. The log addresses two clarification questions regarding interior finish details and the potential need for an alternate 75kVA transformer and distribution system from the basement main switchboard to accommodate increased electrical loads. For the normal power system, the new transformer and distribution work would support both new Panels 8XA and 8XB to power the project. For emergency power, the work would cover Panel 8EMXA and allow spare capacity for future use.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarification Log Convert Bldg 126 8th North to Private Rooms Project#: 600-17-115 06-092021 Long Beach, California VA Health Care System 600
| Number |
| Clarification |
| Answer |
| 001. |
| Referencing Installation detail panel for Interior Finish Legend W-5A1 of Dwg. AE601 calls for 3 Form ½” thick panel divider in Team Room through Amendment No. 5. |
Refer to detail 13 on sheet AE506 for guidance. Contractor to submit shop drawings for approval to indicate means and method of installation.
| 002. |
| Referencing drawing E-003 Addendum B dated 4/23/21, keynote 5 asking for an alternate to install a new 75kva transformer and Distribution system from the basement main switchboard "ML", if the 3-day load reading shows that the existing will not accommodate the new load. |
Will the 75kva transformer to be for new Panel 8XA only and for Panel 8EMXA?
On Addendum B drawings, added keynote #5 to both existing normal and emergency power for our 8th floor project use.
For Normal power, the new alternate 75KVA transformer and its Distribution system will be for both new Panels 8XA and 8XB load of our 8th floor project.
For Emergency power, the new alternate 75KVA transformer and its Distribution system will be for new Panel 8EMXA and spare capacity for other future use.