36C25821B0007.1 CONSTRUCTION IFB FOR LONG BEACH, CA CONVERT BLDG 126.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25821B0007
About this file
This document is a solicitation for construction services to convert the eighth floor north of Building 126 at the Long Beach VA Health Care System in Long Beach, California to single patient rooms. The scope of work includes upgrading all architectural finishes, mechanical, plumbing, and electrical systems. Construction will provide structural, HVAC, medical gases, and low voltage work. The project is classified as a construction alteration with an estimated value between $5-10 million under NAICS 236220. The Department of Veterans Affairs is the contracting agency. The solicitation is expected to post in February 2021 with award by 465 calendar days after notice to proceed.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 103
36C25821B0007 X
600-21-2-5923-0003
Purchase Number:
600-17-115
Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014
Southern Arizona VA Healthcare System 3601 S. 6th Avenue Tucson AZ 85723
Lissette Fernandez 602-795-4217
Construction Long Beach, CA- 600-17-115 - Convert Bldg 126 8th North to Private rooms
Reference the Following Interested Items:
Section A: Price/Cost Schedule and A.4 Statement of Bid Items with Additives.
Section B: SOW and Magnitude.
Section C: All Clauses Section D: Specifications, Designs and All Other Attachments.
Section E: Provisions and Instructions Bidders to include the following:
E.1 - NAICS & Reps and Certs.
E.15 - Details for Contracting POC's, Site Visit, RFI's, Bid Contents, Bid Due Date, Bid Opening.
Bid amount shall list at a minimum Material cost, Labor cost, Overhead, Profit and list in a separate line a Grand Total. This information is required and will be used for possible future modifications.
The bids will be evaluated based on the Grand Total amount only.
Awardee shall perform work in strict accordance with Schedule, General Specifications, Statement of Work, Attachments, Site Drawings, and terms and Conditions set forth in the contract.
Type of Contract: Firm-Fixed-Price This requirement is 100% set-aside for SDVOSB concerns.
Magnitude of this project is between $5,000,000 and $10,000,000.
Applicable NAICS Code for this acquisition is 236220
10 See A.4
52.211-10
X 10
1 Electronic 01:00PM MDT
04-15-2021
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Purchase Order:
NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014
This is accomplished through the Tungsten Network located at:
http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.
Line Item 0001 - Firm-Fixed-Price $
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
A.4 STATEMENT OF BID ITEMS WITH DEDUCTIVES
Completion Time: 640 Calendar Days
A.5 DELIVERY SCHEDULE
SECTION B - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
B.1 INTRODUCTION:
B.2 BACKGROUND / DESCRIPTION OF WORK:
B.3 CONSTRUCTION DOCUMENT:
B.5 SPECIFIC REQUIREMENTS
1. Project Scope of Work
a. General
1. Convert offices in the 8th Floor of Building 126 into private patient rooms. All architectural finishes including flooring, ceiling, corner guards, wall protection, bumper rails/handrails, plumbing, HVAC, emergency and normal power, nurse call, and low voltage signaling systems shall be upgraded
2. Architectural partition walls shall be anchored to the floor and braced to the structure above to resist seismic lateral loads. The ceiling framing shall be braced to the structure above
3. The ceiling lifts in the rooms shall be anchored and braced to the concrete structure above. In general, the framing required for the support of the ceiling lifts shall be installed using modular channel units and structural steel where required
4. Contractor to furnish and install ceiling lifts. Contractor to coordinate ceiling lift installation and construction of this contract with GULDMANN (VA’s Sole Source Contractor)
5. Change Exterior windows on the 8th Floor North to Laminated Glass, with Smart Screen Switchable Privacy Glass, identified as O-11 on the Interior Finish Schedule. Provide Power to operate these windows. Test exterior windows for leaks. Reinstall/repair window until the installation meets VA’s approval
6. Mechanical equipment shall be supported the concrete floor and where required suspended from the structural deck as required. The mechanical equipment shall be anchored to the structure in accordance with VA H-18-8 and IBC
7. Dedicated Exhaust Shaft – Existing structural slab shall be cut to install the dedicated shaft from 9th Floor through to Roof. New structural framing shall be installed to reinforce the opening
8. Existing Trash and Linen Chutes shall be demolished and converted into 2-Hr shaft for new plumbing risers. All new/repaired wall/ceiling shall be painted to match existing properties
9. Maintain fire rating of existing and new construction (walls, floors, ceiling), utilize fire caulking and number (layers) of type “X” gyp-board similar to adjacent construction
10. An infrastructure shall be provided for the Domestic Cold Water (DCW) and Cold Water (DHW) Systems for the 8th Floor North private patient rooms so that in the future it will be simpler to convert these systems such that they will comply with the Department of Veterans Affairs, VHA Directive 1061, dated August 13, 2014 entitled “Prevention of Healthcare–Associated LEGIONELLA Disease and Scald Injury from Potable Water Distribution System.”
11. Structural:
12. Mechanical:
13. Plumbing:
14. Electrical and Low Voltage:
15. All scope of work above will be in compliance with VA Construction Standards
16. The selected Contractor shall furnish and install these in accordance with drawings and specifications developed by A/E Completion Time: 730 Calendar Days
1. Convert B126 North 8th Floor to Private Rooms as indicated in above, except for: Do not changing Exterior Window glazing Completion Time: 670 Calendar Days
1. Convert B126 North 8th Floor to Private Rooms as indicated in Deductive Bid Alternate 1 and deduct the following:
Completion Time: 640 Calendar Days
1. Convert B126 North 8th Floor to Private Rooms as indicated in Deductive Bid Alternate 2 and deduct the following:
Completion Time: 640 Calendar Days
b. Project Completion Schedule
a. The anticipated construction period services for construction phase will be in 730 calendar days as indicated below: the contractor will provide a schedule and schedule of value’s based construction duration. Contractor can propose an expedited schedule for government’s approval
b. Upon award of the construction contract. The Contractor is to submit the work plan how they plan to execute the contract
B.6 CONFORMANCE STANDARDS:
B.7 HOURS OF COVERAGE:
B.8 IDENTIFICATION, PARKING, NO SMOKING POLICY, & VA REGULATIONS:
A. The Contractor's FSEs shall wear visible identification issued by VAHCS Police Section at all times while on the premises of VAHCS. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. VAHCS will not invalidate or make reimbursement for parking violations of the Contractor under any conditions.
Smoking is strictly prohibited anywhere on the Veterans Affairs Health Care Facilities, to include main facility, and any other buildings at on the premises.
Possession of weapons is prohibited
B. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court
B.9 INFORMATION SECURITY:
B.10 POINTS OF CONTACT AND PHYSICAL LOCATION:
B.11 PERIOD OF PERFORMANCE:
B.12 SUBMITTALS:
B.13 COMMENCEMENT, COMPLETION, AND PAYMENT FOR WORK:
B.14 MODIFICATIONS:
SECTION C - CONTRACT CLAUSES
C.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984) ALTERNATE I (APR 1984)
C.2 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(NOV 2020)
C.3 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(NOV 2020) ALTERNATE I (MAR 2020)
C.4 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (FEB 2021)
C.5 52.236-4 PHYSICAL DATA (APR 1984)
C.6 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB
1997) ALTERNATE II (APR 1984)
C.7 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
C.8 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
C.9 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL (MAY 2020)
C.10 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)
C.11 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)
C.12 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND
COMPLIANCE (JUL 2018)
C.13 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)
C.14 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
C.15 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)
C.16 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS
(NOV 2018)
C.17 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
C.18 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
C.19 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
ALTERNATE I (APR 2019)
C.20 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (OCT 2020)
C.21 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) . 54
C.22 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
C.23 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN
2008)
C.24 IT CONTRACT SECURITY
C.25 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (INCLUDING NAS–CPM) (NOV 2018) (ALTERNATE I)
C.26 MANDATORY WRITTEN DISCLOSURES
C.27 SUPPLEMENTAL INSURANCE REQUIREMENTS
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
D.1 LIST OF ATTACHMENTS
SECTION E - SOLICITATION PROVISIONS
E.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) .. 85
E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)
E.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
E.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—
CERTIFICATION (FEB 2021)
E.5 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE
OF THE WORK (MAY 2014)
E.6 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999) 95
E.7 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014) ALTERNATE I (MAY 2014)
E.8 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)
(FEB 2021)
E.9 52.233-2 SERVICE OF PROTEST (SEP 2006)
E.10 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB
1995)
E.11 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
E.12 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES
INCORPORATED BY REFERENCE (JAN 2008)
E.13 VAAR 852.223-70 INSTRUCTIONS TO OFFERORS—SUSTAINABLE
ACQUISITION PLAN (SEP 2019)
E.14 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE
RESOLUTION (OCT 2018)
E.15 VAAR 852.236-92 NOTICE TO BIDDERS—ADDITIVE OR DEDUCTIVE BID
LINE ITEMS (APR 2019)
E.16 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS ... 101
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBE
R
DESCRIPTION OF
SUPPLIES/SERVI
CES
QUANTI
TY
UNI
T UNIT PRICE AMOUNT
1.00 JB _______________
PROJECT #600-17-115: CONSTRUCTION SERVICES FOR
TO CONVERT BUILDING-126, 8TH FLOOR NORTH TO
PROVIDE PRIVATE PATIENT ROOMS.
Total Bid Material Cost: See Section A.4 to input main bid items totals & deductive totals.
Total Bid Labor Cost: See Section A.4 to input main bid items totals & deductive totals.
Total Bid Overhead: See Section A.4 to input main bid items totals & deductive totals.
Total Bid Profit: See Section A.4 to input main bid items totals & deductive totals.
Contract Period: Base POP Begin:
POP End:
LOCAL STOCK NUMBER: PROJECT #600-17-115
GRAND TOTAL _______________
A.4 STATEMENT OF BID ITEMS WITH DEDUCTIVES
A. MAIN BID ITEM: Work includes general construction, alterations to Convert B126 North 8th Floor to Private Patient Rooms as indicated on Statement of work, Drawings & Specifications.
Completion Time: 730 Calendar Days.
Total Bid Material Cost:
Total Bid Labor Cost:
Total Bid Overhead:
Total Bid Profit:
Total:
B. DEDUCTIVE ALTERNATE - 1: Convert B126 North 8th Floor to Private Rooms as indicated in above, except for: Do Not change Exterior Window Glazing.
Completion Time: 670 Calendar Days.
Total Bid Material Cost:
Total Bid Labor Cost:
Total Bid Overhead:
Total Bid Profit:
Grand Total:
C. DEDUCTIVE ALTERNATE – 2: Convert B126 North 8th Floor to Private Rooms as indicated in Deductive Bid Alternate 1 and deduct the following:
a. Change the Laminated Glass, with Smart Screen Switchable Privacy Glass, identified as O-11 and remove the associated power, provide tempered glass instead.
b. Change wall mural along corridor, across the reception and associated ceiling light above to painted wall with one of the accent colors as selected by VA Project engineer.
c. Decorative lighting at reception and patient rooms (Sky Factory or approved equal). Replace them with a similar size and shape LED light fixtures. Submit cutsheet for approval.
d. Make sensors for plumbing fixtures battery operated in lieu of hard wired.
Completion Time: 640 Calendar Days.
Total Bid Material Cost:
Total Bid Labor Cost:
Total Bid Overhead:
Grand Total:
D. DEDUCTIVE ALTERNATE – 3: Convert B126 North 8th Floor to Private Rooms as indicated in Deductive Bid Alternate 2 and deduct the following:
Procurement of Ceiling Lifts. VA will furnish and install ceiling lifts under a separate contract. Contractor to coordinate ceiling lift installation and construction of this contract with VA’s ceiling lift contractor. Contractor to provide utilities and structural anchorage for ceiling lift installation.
Completion Time: 640 Calendar Days Total Bid Material Cost:
Total Bid Labor Cost:
Total Bid Overhead:
Grand Total:
A.5 DELIVERY SCHEDULE
ITEM NUMBER QUANTITY
DELIVERY
DATE
0001 SHIP TO: LONG BEACH VA HEALTHCARE
SYSTEM
5901 E. 7TH STREET
LONG BEACH, CA 90822 5201
1.00 TBD -
CALENDAR
DAYS
SECTION B - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Statement of Work
CONVERT BLDG. 126, 8TH FLOOR NORTH TO SINGLE
PATIENT ROOMS Construction 01 December 2020
Long Beach, California VA Health Care System (600) 600-17-115
B.1 INTRODUCTION:
This requirement is for construction services to convert the 8th Floor North of Building 126 in the Long
Beach VA Health Care System (VALBHCS) to Single Patient Rooms. This requirement is classified under construction as it calls for the alteration of real property.
B.2 BACKGROUND / DESCRIPTION OF WORK:
The Veterans Affairs Healthcare System located in Long Beach, California (600) requires construction services to prepare the area and convert the designated area to Single Patient Rooms. This project was designed through awarded government contract VA262-16-D-0158 | 36C25818N0315 to the AE firm KAL Architects.
B.3 CONSTRUCTION DOCUMENT:
Contractor shall furnish all labor, equipment, certification, supervision, and materials necessary to perform all operations in connections with this order. Contractor shall perform work in strict accordance with the General Specifications, Statement of Work, schedule, and all other supporting documents for this contract to include, but not limited to the following documents:
See Section D.1 List of Attachments
B.4 SPECIFICATIONS
A. The VA Master Construction Specifications contain work procedures and material requirements designed to meet regulatory compliance requirements. The VA Master Construction Specifications was used as the basis of project design. Project specific specifications are included and part of this scope of work.
B. For additional guidance a complete list of these specifications can be viewed at the following website: http://www.cfm.va.gov.
B.5 SPECIFIC REQUIREMENTS
1. Project Scope of Work
a. General The selected Contractor shall:
BASE BID: Convert B126 North 8th Floor to Private Rooms
The Scope of work includes:
http://www.cfm.va.gov/
1. Convert offices in the 8th Floor of Building 126 into private patient rooms. All architectural finishes including flooring, ceiling, corner guards, wall protection, bumper rails/handrails, plumbing, HVAC, emergency and normal power, nurse call, and low voltage signaling systems shall be upgraded.
2. Architectural partition walls shall be anchored to the floor and braced to the structure above to resist seismic lateral loads. The ceiling framing shall be braced to the structure above.
3. The ceiling lifts in the rooms shall be anchored and braced to the concrete structure above. In general, the framing required for the support of the ceiling lifts shall be installed using modular channel units and structural steel where required.
4. Contractor to furnish and install ceiling lifts. Contractor to coordinate ceiling lift installation and construction of this contract with GULDMANN (VA’s Sole Source Contractor).
5. Change Exterior windows on the 8th Floor North to Laminated Glass, with Smart Screen Switchable Privacy Glass, identified as O-11 on the Interior Finish Schedule. Provide Power to operate these windows.
Test exterior windows for leaks. Reinstall/repair window until the installation meets VA’s approval.
6. Mechanical equipment shall be supported the concrete floor and where required suspended from the structural deck as required. The mechanical equipment shall be anchored to the structure in accordance with VA H-18-8 and IBC.
7. Dedicated Exhaust Shaft – Existing structural slab shall be cut to install the dedicated shaft from 9th Floor through to Roof. New structural framing shall be installed to reinforce the opening.
8. Existing Trash and Linen Chutes shall be demolished and converted into 2-Hr shaft for new plumbing risers. All new/repaired wall/ceiling shall be painted to match existing properties.
9. Maintain fire rating of existing and new construction (walls, floors, ceiling), utilize fire caulking and number (layers) of type “X” gyp-board similar to adjacent construction.
10. An infrastructure shall be provided for the Domestic Cold Water (DCW) and Cold Water (DHW) Systems for the 8th Floor North private patient rooms so that in the future it will be simpler to convert these systems such that they will comply with the Department of Veterans Affairs, VHA Directive 1061, dated August 13, 2014 entitled “Prevention of Healthcare–Associated LEGIONELLA Disease and Scald Injury from Potable Water Distribution System.”
11. Structural:
i. Seismic supports for all equipment, mechanical, plumbing and electrical equipment and accessories (e.g. piping, conduits, etc.)
anchoring from existing concrete slab with expansion bolts shall be provided.
ii. A new housekeeping pad and anchorage to pad using expansion bolts shall be provided for the new roof-top mechanical equipment and plumbing equipment in the basements.
iii. Slab openings shall be provided for dedicated mechanical shaft and plumbing risers.
iv. Anchorage of mechanical equipment shall conform to the latest VA Seismic Design Requirements H-18-8 and the latest International Building Code.
12. Mechanical:
a. The new zone supply HVAC distribution system shall be variable volume terminal units with reheat coils, supply air distribution devices and equipped with DDC thermostats. Anticipated Total Supply Air of 12,135 CFM served by Terminal Units shall be provided.
b. Patient Isolation Rooms and some of the interior zones shall be provided with constant volume terminal units with reheat coils to maintain code required minimum outside air.
c. Return air terminal units (total 15) shall be provided for variable air volume operation and maintain the individual space pressurization.
Constant volume exhaust air terminal units shall be provided for each of the Isolation Rooms (total 2).
d. The two (2) Isolation Rooms with adjoining Toilet and Ante Room shall be provided with new Exhaust Fan System (two fans, one stand-
by) located on roof above the 11th Floor Mechanical Room with Isolation exhaust duct, low exhaust registers by the Patient head, pressurization controls and monitoring /alarm system. New exhaust air shaft shall be required from the 8th floor up to the 11th floor. Bag-in-bag out HEPA filters shall be provided prior to the exhaust fan inlet.
Exhaust discharge air shall be through a stack at least 10 feet tall above roof. The discharge air outlet shall be located at least 25 feet away from outside air intakes and operable windows.
e. New exhaust branch distribution system and exhaust registers shall be provided for remodel areas.
f. New manual volume dampers for balancing shall be provided at each of the branch supply, return, and exhaust ducts.
g. Fire/Smoke Dampers shall be provided at the occupancy separation walls, shaft walls, and at rated corridor walls as required by code.
13. Plumbing:
a. Domestic Cold Water:
i. The cold water supply will be from a new 3” cold water riser from the basement feed up to the 8th Floor North.
ii. There will be cold-water isolation valve for each restroom.
These will be located above the ceiling.
iii. Valves 2-1/2 inches and larger shall be gate valves: MSSP-SP- 80 Class 125, cast iron body, bronze trim, outside screw and yoke, solid wedge disc with bronze seat rings, flanged ends.
Furnish chain-wheel operators for valves 6 inches and larger mounted over 8 feet above floor.
iv. Valves 2 inches and smaller shall be Class 150, bronze, two-piece body, type 316 stainless steel ball, full port, Teflon seats, blow-out proof stem, threaded or soldered with union, lever handle.
v. The access panels shall be stainless steel, with a keyed cylinder lock and be a minimum of 12” square in wet areas and in ceilings and non-wet areas the access panels shall be paint grade steel.
vi. All fast closing valves shall be provided with water hammer arrestors, ASSE 1010 compliant; copper construction, piston type sized in accordance with PDI WH- 201, pre-charged suitable for 35 to 120 degrees temperature range, 125 PSI maximum. The location of the water hammer arrestors will be per PDI, WH-201. The water hammer arrestors will be accessible through an access panel.
vii. Pressure type trap primers will be utilized on all shower drains.
The trap primer will be located behind an access panel. The trap primers will be located between 2 to 4 feet above the floor.
viii. The domestic water velocity will not exceed 5 feet per second for cold water.
ix. The pipe sizing will be based on limiting the velocity to 5 feet per second and a pressure loss of 3 psi per 100 feet.
x. The piping material used above ground shall be copper tubing:
ASTM B88, Type L hard drawn. The joints shall be soldered compliant with ASTM B32 E, Alloy Grade Sb5 tin-antimony
b. Hot Water:
i. The hot water will tie into the existing 4” hot water riser.
ii. There will be hot-water isolation valve for each restroom.
These will be located above the ceiling.
iii. Valves 2 inches and smaller shall be Class 150, bronze, two-piece body, type 316 stainless steel ball, full port, Teflon seats, blow-out proof stem, threaded or soldered with union, lever handle.
iv. Thermostatic mixing valves shall be provided for all fixtures limiting the temperature to 105 degrees. Point of use thermostatic mixing valves shall be used.
v. The domestic water velocity shall not exceed 4 feet per second.
vi. All fast closing valves shall be provided with water hammer arrestors, ASSE 1010 compliant; copper construction, piston type sized in accordance with PDI WH- 201, pre-charged suitable for 35 to 120 degrees temperature range, 125 PSI maximum. The location of the water hammer arrestors will be per PDI, WH-201. The water hammer arrestors will be accessible through an access panel.
vii. The piping material used above ground shall be copper tubing:
ASTM B88, Type L hard drawn. The joints shall be soldered compliant with ASTM B32 E, Alloy Grade Sb5 tin-antimony.
viii. The pipe insulation shall be molded fiberglass, ASTM C457, thermal conductivity of 0.23 at 75 degrees F, operating temperature range of 0 to 850 degrees F, vapor barrier jacket complying with ASTM C1136, Type I, factory applied, reinforced foil Kraft with self-sealing adhesive joints.
Aluminum jackets shall be used in Mechanical spaces.
c. Material and Fixtures:
i. Plumbing fixtures will be vitreous china, institutional wall mounted type with floor-mounted fixture support and chrome plated valves.
ii. Flush valves, lavatory, and sink faucets will be electrically operated and activated by electric hard wire cables with transformer.
iii. Water Closets: Vitreous china, siphon jet, wall mounted with back outlet, 1.28 GPF flush valve (standard and disabled accessible type).
iv. Lavatories: Vitreous china, wall mounted with concealed floor mounted steel upright supports and gooseneck spout with electronic sensor faucet.
v. Sinks: Counter mounted, 18 gage, Type 304 stainless steel unit with underneath sound deadening and gooseneck spout and electronic sensor faucet.
d. Medical Gases:
i. All medical gas piping, equipment, monitoring alarms and execution will be in accordance with the latest edition of NFPA 99 or as adopted by VA Facilities. Each patient headwall will be provided with ½-inch oxygen (O2), ½-inch medical air (MA) and ¾-inch medical vacuum (MV).
ii. Medical gas outlets will be new and will match hospital standard.
iii. The monitoring alarm panel will be locally annunciated and located at the Nurses’ station for continuous supervision.
iv. Piping connections will be made to existing medical gas piping of adequate size.
v. Piping Materials:
vi. Medical Gas piping will be Type K seamless copper pipe with wrought copper fittings and brazed joints per NFPA 99.
e. Medical Gas Equipment:
i. Wall Mounted Outlets: Indexed positive pressure with primary and secondary integral check valve and DISS compatible outlet, UL listed CSI approved.
ii. Zone Valve Cabinet: Fully recessed steel valve box with security door, Zone Valve for multiple valve application with tube extensions and pressure gauge and see-through window panel with pull-out handle ring. Valve will be three (3) piece full port bronze-chrome plated ball type design and bronze body rated for 600 PSI.
iii. Medical Gas Alarm Panel: Digital Microprocessor Alarm type for each Medical Gas System in the project. Display sensor unit will be gas specific with an error message display for an incorrect connection. The panel will be modular type fan expansion capabilities.
iv. The box will be fully recessed, 18-gauge steel with ¼-inch Type K copper pipe connections to service line.
f. All piping will be seismically braced in accordance with VA Seismic Requirements H-18-8.
14. Electrical and Low Voltage:
a. Electrical and LV systems shall be installed accordingly for the conversion of medical offices to private rooms. Necessary coordination shall be done with Mechanical and Plumbing systems.
b. All electrical system design shall be in conformance to latest VAMC standards, and National Electrical Codes.
c. Normal Power:
d. All fire alarm systems renovation design shall be in conformance to latest NFPA-72 code requirements and VAMC standards.
i. Existing Edward EST3 fire alarm terminal cabinet and power supply are located in same floor/area IT and Telephone Room.
If any, additional hardware is required, this shall be added to existing fire alarm system and must match for proper compatibility. Contractor shall ensure that any new devices or hardware added can be supported by existing system. New wiring and devices shall be installed to accommodate renovated areas in proposed 8th Floor North to Single Patient Room Conversion Project space.
ii. New fire alarm devices: Power supply, manual pull stations, smoke detectors, strobe lights and speakers shall be added in proposed 8th Floor North to Single Patient Room Conversion Project space in compliance with VAMC requirements.
Contractor shall be required to provide shop drawings for VA and local AHJ approval.
e. Nurse Call: New Rauland Responder 5 Nurse Call system, devices and cabling shall be installed in the proposed 8th Floor conversion to Private and rooms with capability to connect to existing Hospital communication system. Any additional nurse-call panels required shall match existing system installed for proper compatibility. New dome lights, pull cords, etc. shall be provided in remodeled spaces or new spaces as part of the renovation in compliance with VAMC requirements.
15. All scope of work above will be in compliance with VA Construction Standards
16. The selected Contractor shall furnish and install these in accordance with drawings and specifications developed by A/E.
Completion Time: 730 Calendar Days
DEDUCTIVE BID ALTERNATE 1:
1. Convert B126 North 8th Floor to Private Rooms as indicated in above, except for: Do not changing Exterior Window glazing.
Completion Time: 670 Calendar Days
DEDUCTIVE BID ALTERNATE 2:
1. Convert B126 North 8th Floor to Private Rooms as indicated in Deductive Bid Alternate 1 and deduct the following:
a. Change the Laminated Glass, with Smart Screen Switchable Privacy
Glass, identified as O-11 and remove the associated power, provide tempered glass instead.
b. Change wall mural along corridor, across the reception and associated ceiling light above to painted wall with one of the accent colors as selected by VA Project engineer.
c. Decorative lighting at reception and patient rooms (Sky Factory or approved equal). Replace them with a similar size and shape LED light fixtures. Submit cutsheet for approval.
d. Make sensors for plumbing fixtures battery operated in lieu of hard wired.
Completion Time: 640 Calendar Days
DEDUCTIVE BID ALTERNATE 3:
1. Convert B126 North 8th Floor to Private Rooms as indicated in Deductive Bid Alternate 2 and deduct the following:
a. Procurement of Ceiling Lifts. VA will furnish and install ceiling lifts under a separate contract. Contractor to coordinate ceiling lift installation and construction of this contract with VA’s ceiling lift contractor. Contractor to provide utilities and structural anchorage for ceiling lift installation.
Completion Time: 640 Calendar Days
b. Project Completion Schedule
a. The anticipated construction period services for construction phase will be in 730 calendar days as indicated below: the contractor will provide a schedule and schedule of value’s based construction duration.
Contractor can propose an expedited schedule for government’s approval.
b. Upon award of the construction contract. The Contractor is to submit the work plan how they plan to execute the contract.
c. List/Description of Bid Items and associated completion times
i. Mobilization – 15 calendar days
ii. Renovation of the 8th Floor North– 700 calendar days
iii. Close-out – 15 calendar days
d. Electronic Specifications (Word doc) and Drawings (pdf)
a. See attached specifications.
b. See attached plans.
e. Appendices
a. See D.1 List of attachments
B.6 CONFORMANCE STANDARDS:
A. All construction accomplished pursuant to this contract shall comply with the latest edition of the following documents unless the contractor is directed otherwise by the Contracting Officer. Any exceptions must be approved in writing by the Contracting Officer prior to construction startup.
B.
a. VA Master Construction Specifications See Section B.4 of this document
• https://www.cfm.va.gov/til/spec.asp#01
b. VA Construction Standards
c. VA Seismic Design Handbook
d. VA Space Planning Criteria
e. VA Design Manuals
f. VA CADD Standards https://www.cfm.va.gov/til/spec.asp#01
g. NFPA 101, Life Safety Code
h. NFPA 70, National Electric Code
i. NFPA 99, Health Care Facilities
j. NFPA 12, Installation of Sprinkler Systems
k. Accessibility Standards (ADAAG, ABAAS, VA’s Barrier Free
Design Guide)
l. AIA Guidelines for Construction and Equipment of Hospital and
Medical Facilities
m. International Building Codes
n. State and Local codes and guidelines (as applicable)
B.7 HOURS OF COVERAGE:
A. Normal hours of operation are Monday through Friday from 7:30 am to 4:00 pm California time (no daylight savings). All work is expected to be performed generally during normal hours of coverage unless requested or approved by the COR or his/her designee.
a. Work disturbing the surrounding areas (e.g. surgery suite) will be performed during un-occupied hours (evenings and/or weekends).
Vibration, noise and dust are examples of work which can disturb the surrounding areas.
B. Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building. All work performed, to include delivery of materials and equipment, shall be made with minimal interference to Government operations and personnel.
C. Work performed outside the normal hours of coverage must be approved by the COR or his/her designee.
D. Federal Holidays observed by VALBHCS are:
New Years' Day Labor Day Martin Luther King Day Columbus Day Presidents' Day Veterans' Day Memorial Day Thanksgiving Day Independence Day Christmas Day
B.8 IDENTIFICATION, PARKING, NO SMOKING POLICY, & VA
REGULATIONS:
A. The Contractor's FSEs shall wear visible identification issued by VAHCS Police Section at all times while on the premises of VAHCS. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. VAHCS will not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is strictly prohibited anywhere on the Veterans Affairs Health Care Facilities, to include main facility, and any other buildings at on the premises. Possession of weapons is prohibited
B. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
B.9 INFORMATION SECURITY:
In accordance with Appendix A, Handbook 6500.6 Checklist blocks 7, the C&A requirements do not apply to this requirement, and Security Accreditation Package is not required. The nature of this requirement is technical; however, there is no information to be protected.
B.10 POINTS OF CONTACT AND PHYSICAL LOCATION:
Access to worksite shall be coordinated through:
Point of Contact – COR
LONG BEACH VA HEALTH CARE SYSTEM
(LBVAHCS):
5901 East 7th Street, Long Beach, CA 90822
B.11 PERIOD OF PERFORMANCE:
Commencement of work shall begin within 10 days after receipt of written Notice to Proceed (NTP) and should last no longer than a duration of 465 calendar days after date NTP is issued.
B.12 SUBMITTALS:
A. Contractor shall submit all required material/shop drawing submittals to the Contracting Officer within 10 calendar days of award, or as agreed to by the Contracting Officer for approval. No materials shall be installed prior to approval.
B. All material submittals and shop drawings shall contain, and have the Project Title, Project Number, and Contract number clearly indicated.
C. Material submittals and shop drawings shall be checked and signed by the Contractors Quality Control Manager prior to submission to the Government.
D. Submittals shall be legible and shall include all technical data needed to verify that the item meets requirements of listed specifications, and applicable codes.
E. Refer to Other B -- Material Approval Submittal for use as cover sheet when submitting to Government for approval.
F. TB testing will be required for all contractors working on the premised and will be part of the submittal.
B.13 COMMENCEMENT, COMPLETION, AND PAYMENT FOR WORK:
A. The Contractor shall be required to commence work required at the time specified on the Notice to Proceed (NTP), execute the work, and complete the entire work not later than the completion time specified on the NTP. The time stated for completion shall include final cleanup of the premises. At the government’s option, it may choose to specify a two-stage performance period. For example, separating material lead-time from construction days can considerably decrease the length of time occupied buildings are inconvenienced by construction.
B. Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building; space for storage of materials and equipment;
delivery of materials and use of approaches; use of corridors, stairways, elevators, and similar means of communications; location of partitions, eating spaces, and restrooms for the Contractor employees; and the like. Delivery of materials and equipment shall be made with minimal interference to Government operations and personnel.
C. The Contractor will be paid monthly upon submission of proper invoices for work completed. If the performance period exceeds 30 days and a progress schedule (approved by the Government) has been submitted, partial payment(s) may be authorized. Final payment will be withheld until all discrepancies are corrected and as-built drawings are approved by the Government.
D. The contractor shall attend weekly progress meetings with the COR and/or Contracting Officer to discuss at a minimum; progression of work, projected progress versus actual progress, action items due from the contractor, action items due from the government, and any other significant issues that require attention. The contractor also shall document the meeting minutes and forward a signed copy to the COR for concurrence of the documentation.
Copies of all minutes will be forwarded to the Contracting Officer. In the event of any discrepancies the Contracting Officer will be notified immediately for clarification. (Contractors should refer to “OTHER C-- Meeting Minutes for preferred format)
B.14 MODIFICATIONS:
Modifications for this project must be submitted to the assigned COR who will then submit a formal request to the Contracting Officer (CO). New work is not allowed to commence prior to Contracting Officer’s signed and written approval via fully executed Standard Form (SF) 30 modification.
SECTION C - CONTRACT CLAUSES
C.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984) ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than See A.4 days after receipt of award. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by . The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of Clause)
C.2 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM
REREPRESENTATION (NOV 2020)
(a) Definitions. As used in this clause—
Long-term contract means a contract of more than five years in duration, including options.
However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern—
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause. Such a concern is ‘‘not dominant in its field of operation’’ when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, upon occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts—
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, when the Contracting Officer explicitly requires it for an order issued under a multiple-award contract.
(d) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.
(e) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(f) Except as provided in paragraph (h) of this clause, the Contractor shall make the representation(s) required by paragraph (b) and (c) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause, or with its offer for an order (see paragraph
(c) of this clause), that the data have been validated or updated, and provide the date of the validation or update.
(g) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (f) or (h) of this clause.
https://www.sba.gov/document/support--table-size-standards
(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code 236220 assigned to contract number .
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.
(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.
(4) Women-owned small business (WOSB) concern eligible under the WOSB Program.
[Complete only if the Contractor represented itself as a women-owned small business concern in paragraph (h)(3) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and
(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(4)(i) of this clause is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture. [The Contractor shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: _____.] Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.
(5) Economically disadvantaged women-owned small business (EDWOSB) concern.
[Complete only if the Contractor represented itself as a…
This is the start of the file's text. The full file is on GovTribe.