This document contains a pre-solicitation notice and statement of work for a construction project. The Department of Veterans Affairs seeks construction services including all labor, materials, equipment, and supervision necessary to complete finishes and beautification work at the Loma Linda VA Healthcare System in Loma Linda, California. The project scope involves general construction with a magnitude between $500,000 and $1,000,000. Interested parties should monitor SAM.gov for solicitation number 36C25821B0003. Responses are due via email to the point of contact by the solicitation response date. The acquisition is a total set-aside for Service-Disabled Veteran-Owned Small Businesses. The contract will be firm-fixed-price with a performance period of 90 days after notice to proceed.

View the file

Other files

File Type Posted
36C25821B0003 0005.docx DOCX document
S05. Amendment 4 - IFB 36C25820B0015 Responses to RFI 001 - 074.docx DOCX document
36C25821B0003 0004.docx DOCX document
S05. Amendment 4 - IFB 36C25820B0015 Responses to RFI 001 - 073.docx DOCX document
LL-01-02PW.pdf PDF
LL-01-02AR.pdf PDF
Mabbet Report- Table-Volume III.zip ZIP file
Mabbet Report-Asbestos Figures 1 of 2.zip ZIP file
Mabbet Report- Lead Figures 1 of 2.zip ZIP file
Mabbet Report- Tables-Volume I- Volume II.zip ZIP file
Mabbet Report- Lead Figures 2 of 2.zip ZIP file
Mabbet Report- Asbestos Figures 2 of 2.zip ZIP file
Sink and Cabinet Specifications.zip ZIP file
Scaled Drawing Files.zip ZIP file
Plumbing As-Builts.zip ZIP file
Site Visit Materials.zip ZIP file
36C25821B0003 0003.docx DOCX document
S05. Amendment 3 - IFB 36C25820B0015 Responses to RFI 001 - 067.docx DOCX document
Pre-Bid Conference Materials.zip ZIP file
36C25821B0003 0002.docx DOCX document
Attachment 1 - 2NE Court Yard.pdf PDF
36C25821B0003 0001_1.docx DOCX document
P09. Atch 2 605-21-406 SOW REV1 12-3-2020 - 2NE Beautification.docx DOCX document
Atch 3b Dwg 2 - 2NE Paint Finish.pdf PDF
Atch 3a Dwg 1 - 2NE Floor Finish.pdf PDF
36C25821B0003_1.docx DOCX document
Atch 4 CA20210026 San Bernardino County (11-27-2020).pdf PDF
Atch 2 605-21-406 Specifications.pdf PDF
Atch 1 Self Performance Calculations.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

2C-400

ANTE ROOM

2C-401

DAY RM

2C-402A

PRI TOI

2B-710

ANTE

2B-600C

REST

2B-600B

SECLUSION

2B-615

PHYS RM

2B-505

MED RM

2B-605

CONSULT RM

2B-705

RECREATION

2B-710B

PRI TOI

2B-700A

RESTROOM

2B-710A

ISOL RM

2B-725A

PAT TOIL

2B-725

PAT RM 1B

2B-720

PAT RM 1B

2B-720A

PAT TOIL

2B-715A

PAT TOIL

2B-715

PAT RM 1B

2B-730A

PAT TOIL

C2-16

CORR

2B-510A

PAT TOIL

2B-610

NURSE STAT

2B-615A

PRI TOI

2B-620

EXAM RM

2C-403A

PRI TOI

2C-403

BED ROOM

2C-10

LAB

2C-402

BED ROOM

C2-12

CORR

2B-600

ANTE ROOM

2B-640

STORAGE

2B-650A

TOILET

2B-500

DINING

2B-600A

SECLUSION

2B-700

STAFF LNGE

2B-765

OFF

2B-760

2B-755

CONF RM

2B-750

PAT RM 2B

2B-745A

PAT TOIL

2B-745

PAT RM 2B

2B-740

PAT RM 2B

2B-735A

PAT TOIL

2B-735

PAT RM 2B

2B-730

PAT RM 2B

2B-535

LAUNDRY

2B-530

EMS

PAT TOIL

2B-525A

PAT TOIL

2B-525

PAT RM 2B

2B-540

PAT RM 2B

C2-15

CORR

C2-17

CORR

C2-13

CORR

C2-14

CORR

C2-11

CORR

2B-510

PAT RM 2B

2B-515

PAT RM 2B

2B-515A

PAT TOIL

2B-520A

PAT TOIL

2B-520

PAT RM 2B

2B-545

PSYCHOL.

2B-06

LAB

C2-16A

CORR

2B-625

SOCIAL WRK

2B-630

PHYS RM

2B-650

CONG BATH

2B-635

STORAGE

2B-655

OFFICE

2B-660

OFFICE

2B-645

PAT EFFECT

C2-19

CORR

ACC02-2

ACCESS

ROOM

ROOM

DE6381

DE5844

DE6179

DE5694 DE5007

DE6381

DE5844

DE6179

DE5694

DE5844

DE5007

DE5488

DE5694

DE6179

DE5488

DE5497

DE5497

DE5497

DE5497

DE5497

DE5497

DE5497

NO CHANGE

DE6179

DE5007

DE5844

DE6179

NO CHANGE NO CHANGE

DE5844

DE6381

DE5497

PAINT FINISHES LEGEND

DE6179

SILVER BULLET

DE5694

SPLISH SPLASH

TAPERING LIGHT OVERALL FIELD COLOR

OAK HARBOR

DE5694

EAST CAPE

NOTES:

- TAPERING LIGHT OVERALL FIELD COLOR EXCEPT WHERE IDENTIFIED FOR ACCENT COLOR.

DE5007

PALE BLOSSOM

DE5694

DE5844

NO CHANGE

NO CHANGE

NO CHANGE

NO CHANGE

DE5007

DE6381

DE5844

DE5497

DE5007

DE5497 DE5497 DE5497

DE5497

DE5497

DE5497

DE5497

DE5497

DE5497

DE5497

DE5497

DE5497

DE5497

- ALL DOOR FRAMES TO BE PAINTED COCHISE DE761 TYPICAL THROUGHOUT UNIT.

DE5497

DE5844

- PAINT FROM BOTTOM OF SOFFIT TO FLOOR THROUGH OUT ENTIRE UNIT EXTERIOR ONLY - CORRIDORS

DE761

COCHISE

DE6381

- PAINT ENTIRE INTERIOR OF PATIENT ROOMS FROM CEILING TO FLOOR

- DISTANCE IN CORRIDORS FROM BOTTOM OF SOFFIT TO FLOOR IS 86"

- DISTANCE FROM CEILING TO FLOOR IN PATIENT ROOMS IS 108"

- PATIENT ROOM ACCENT WALLS ARE IDENTIFIED WITH FLAGS REMAINING WALLS IN ROOM ARE TO BE PAINTED TAPERING LIGHT

- USE DEW380 EXTERIOR FOR COURTYARD STRIPING

- CORRIDORS WILL BE PAINTED TAPERING LIGHT DE5497 FROM BOTTOM OF SOFFITT TO FLOOR

- ANY AREAS IDENTIFIED WITH NO CHANGE ARE NOT PART OF SCOPE OR BID

DEW380

WHITE

2NE - PAINT LAYOUT

SHEET

W:\EMS\INTERIOR DESIGN OPERATIONS\VA Logos\va seal bw.jpg

NAME:

PROJECT

ADDRESS:

PROJECT

A1

AutoCAD SHX Text

AutoCAD SHX Text A1

AutoCAD SHX Text

2NE - PAINT LAYOUT

AutoCAD SHX Text 11201 Benton St., Loma Linda CA 92354

AutoCAD SHX Text

2NE PAINT LAYOUT

AutoCAD SHX Text 3/32" = 1'0"

AutoCAD SHX Text 02/02/2021

AutoCAD SHX Text

APPROVED BY:_________________

AutoCAD SHX Text

DATE:_________

File details come from the government source that posted it. Updated .