About this file
This notice solicits bids for a construction project at the Loma Linda VA Healthcare System. The project involves beautification of approximately 14,000 square feet of space in 2 Northeast, including replacing flooring and televisions, adding video conferencing equipment, and other finishes work. The contract is a firm-fixed-price construction contract with a period of performance of 240 days from notice to proceed. The estimated value is between $500,000 and $1,000,000. The solicitation will be a total set-aside for service-disabled veteran-owned small businesses. Bids are due approximately 30 days after solicitation 36C25821B0003 is issued on Beta SAM.gov. Interested parties should monitor the website for issue of the solicitation and additional details on requirements. The Department of Veterans Affairs Network Contracting Office NCO 22 Gilbert will administer the contract.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 01-29-2021 605-21-406 Department of Veterans Affairs NCO22-Gilbert Network Contracting 3601 S. 6th Avenue Tucson
AZ
85723 Department of Veterans Affairs NCO22-Gilbert Network Contracting 3601 S. 6th Avenue Tucson
AZ
85723 To all Offerors/Bidders
36C25821B0003 01-29-2021
X X X
See Block 14 X The purpose of this amendment is to:
1. Adjust the Period of Performance of this project from 90 days after the issue of Notice to Proceed to 240 days.
2. Adjust the timeline for this solicitation to the following due to a 3 week delay of the site visit caused by a COVID outbreak at the site. The new schedule is below:
Pre-Bid Virtual Conference: 2/15/2021 10:00 AM PST, Pre-BidSite Walk: 2/16/2021 1:00PM PST RFI's Due: 2/26/2021 3:00PM MST, Bids Due 3/04/2021 11:00 AM MST, Bid Opening 3/04/2021 2:00PM MST
3. Answer RFI's 001-030, (Note: Some RFI's which have been recieved already will be answered in later amendments)
John Kamerer Contracting Officer
NCO1815L2-0307
Request for Information (RFI) Log Upgrade IT Closet Areas Construction Project:
29 January 2021 Loma Linda VA Medical Center (605)
| RFI Number |
| Question |
| Answer |
| 001 |
| Scope of Work 1-A-i, notes that this work will take place in the Acute Psychiatric Unit. Will the VA provide any and all needed escorts for the work to take place or will the Contractor need to employ escort observers for all workers / work crews? Will any other special requirements be enforced for working in this unit? |
The VA cannot provide a dedicated escort for the entirety of the work to be performed in 2NE, and as such the contractor is directed to employ additional personnel for escorting purposes.
| 002 |
| Scope of Work 1-A-i, notes that televisions are to be replaced. Will the VA confirm that only the bedside TVs are to be provided and installed by a separate Contractor and that the new common area TVs are to be Contractor Furnished Contractor Installed? |
| All televisions there are moving to the bedside television platform and as such will be contractor furnished contractor installed. Acceptable televisions are provided by Allen Technologies and will be purchased out of the VA maintenance fund. |
| 003 |
| Scope of Work 1-A-i, notes that televisions are to be replaced and that the old coaxial network is to be removed and the new televisions will be IP-based. Will the VA or the Contractor be responsible for integrating the new TVs into the existing IP network? |
| These televisions are being integrated into the existing bedside television platform and as such digital integration will be handled by Allen technologies. Their TVs will use data that is installed as part of this contract, and will be terminated into the Allen Technologies patch panel in the TR. The contractor providing the televisions is Allen Technologies. |
| 004 |
| Scope of Work 1-A-i, notes that “Because of COVID-19, providers and patients are not able to meet face-to-face, and a request is made to provide a video-conferencing solution. This solution will consist of a monitor, webcam, and keyboard/video/mouse interface, with the computer itself remoted into the nurses’ station.” Will the VA provide the quantities for each of the listed components and either specifications or basis of design for each component? Will the VA confirm that all of these equipment components are to be Contractor Furnished? |
The computer in the nurses station, the keyboard and the mouse will be VA provided as they must go onto the existing VA network and we are unable to place computers that process VA patient data on the network when provided from a source OTHER than VA National.
| 005 |
| Will the VA clarify if any materials scheduled for demolition or disturbance contain asbestos? Will the VA provide the current Hazardous Materials Survey for all areas within this project’s work area, including the interstitial space? |
| The VA will provide the Mabbett report, which details our asbestos findings in all areas. |
| 006 |
| Scope of Work 1-A-ii-6, notes that only (2) rooms will be made available at any one time. This phasing will extend the time required to complete this project. Will the VA extend the Period of Performance from 90 days to at least 150 days? |
| The period of performance for this requirement has been adjust to 240 days after issue of NTP by this amendment. See attached revised SOW and Bid Schedule. |
| 007 |
| Scope of Work 1-A-ii-6, notes that (2) rooms will be made available at any one time. How will the corridors, non-patient rooms, and common areas be scheduled? Will any of the specified work require after hours performance? |
None of the specified work should require after-hours performance. Ordering of corridors and non-patient rooms will be left to the installers and coordinated with the local staff so as to ensure that needs are being met without impeding work. Common areas are going to require the new walls with the inset televisions, and should not be done simultaneously.
| 008 |
| Scope of Work 1-A-ii-19 requires a new drop-in sink and the assumed required fixtures. Will the VA provide the specifications or basis of design for the new drop-in sink and fixtures? |
2B-700 is the staff lounge. The VA at Loma Linda does not have an established standard for sinks in non-medical areas.
| 009 |
| Scope of Work 1-A-ii-20 requires the fabrication & installation of a new 60” lower cabinet. Will the VA provide the specifications, elevation drawing, section drawing and/or the basis of design for this 60” cabinet and the assumed countertop? The Contractor will need more information to price this requirement correctly. |
The 60” lower cabinet will be VA Provided Contractor Installed.
| 010 |
| Scope of Work 1-A-ii-21 requires the provision and installation of an outdoor quality vinyl mural. Will the VA clarify what the exiting exterior wall surface consists of and provide a specification on the mural thickness and quality level? Since the mural requires a submittal of several choices for the VA to approve, will the VA establish an allowance dollar amount for this requirement to facilitate a fair bidding process? |
The wall is assumed to be painted concrete at 112’ long by 12-12.5’ tall, and expected to be mostly non-porous. Basis of design for the wall mural is Coastal Creative high tack outdoor vinyl with matte lamination, and we will require the edges to be sealed. Previous estimates came in below $11K
| 011 |
| Scope of Work 1-A-ii-22 requires the courtyard surface cracks and perforations to be filled and sealed. Since there are no drawings for this element, will the VA provide a maximum linear footage for bidding purposes in order to accomplish this requirement? |
Approximately 240 LF of courtyard surface cracks to be filled and sealed.
| 012 |
| Scope of Work 1-A-ii-26, 27 requires the Contractor to provide wall build-outs to accommodate TV’s and recessed speakers. Will the VA clarify where the power is to be taken from for these installations and verify those panels have sufficient room for the new dedicated circuits? |
*Question has been received and will be answered in a later amendment to this solicitation
| 013 |
| Scope of Work 1-A-ii-26, 27 requires the Contractor to provide wall build-outs to accommodate TV’s and recessed speakers. The TV’s are to be covered by plexiglass. Will the VA provide the specifications or basis of design for the required plexiglass? |
| Plexiglass basis of design: Duraplex® Impact Modified Flat Sheet - DURAPLEX - Order Online (professionalplastics.com) |
| 014 |
| Scope of Work 1-A-ii-26, 27 requires the Contractor to provide wall build-outs to accommodate TV’s and recessed speakers. The TV’s are to be covered by plexiglass. Will the VA describe how the recessed TV spaces, covered by plexiglass, are to be vented to avoid component heat build-up? |
The VA will accept louvered vents above the televisions to vent heat up into the plenum space and drilled perforations in the plexiglass near the base to facilitate fresh air and air flow.
| 015 |
| Scope of Work 1-A-ii-26, 27 requires the Contractor to provide wall build-outs to accommodate TV’s and recessed speakers. Will the VA provide a specification or basis of design, including dimensions, for the speakers? Are the speakers Contractor furnished or VA furnished? Will the speakers be covered by plexiglass as are the TVs. |
Speakers are contractor furnished and the VA would like a powered water resistant solution. Amplified marine speakers secured with tamperproof screws would be ideal (Pyle 6.5in 4-Channel Waterproof Amplified Marine Speaker System (PLMRKT4A) (solidsignal.com)) and would not require installation behind plexiglass.
| 016 |
| Scope of Work 1-A-ii-27, 28 requires the Contractor to provide recessed monitor, webcam, and microphone for video conferencing. Will the VA provide specifications or a basis of design for these components? Will the VA clarify if these components are Contractor furnished or VA furnished? Will these components be covered by plexiglass |
0. Clarification: The monitor will be VA-provided and come from OIT. Dell 23” monitors are our current standard and for the purposes of buildout may be found here: Dell 23 Inch Monitor - FHD for Office: P2319H | Dell USA
0. A standard Logitech webcam sitting on top of the monitor will suffice, as the monitor will be behind security plexiglass and the camera will be unable to be tampered with.
0. Microphone basis of design (since it won’t work behind plexiglass) http://www.etsnm.com/pdfs/sm1-fe.pdf
| 017 |
| Scope of Work 1-A-ii-27, 28 requires the Contractor to provide recessed monitor, webcam, and microphone for video conferencing. Will the VA describe how these components are to be vented to avoid heat build-up? |
The VA will accept louvered vents above the televisions to vent heat up into the plenum space and drilled perforations in the plexiglass near the base to facilitate fresh air and air flow.
| 018 |
| Will the Superintendent of this project, if fully qualified, be able to serve as the Supt., Site Safety Officer, and Contractor Quality Control, or will separate individuals be required for any of those roles? |
If fully qualified, the superintendent may serve all of those roles.
| 019 |
| Scope of Work 1-A-xii states that the Contractor will not be required to provide a new patch panel if there is sufficient space. For fair bidding purposes, should the Contractor assume they will need to provide a new patch panel, or will the VA confirm there is sufficient space? |
For bidding purposes, please include the patch panel.
| 020 |
| Will the VA provide as-built plumbing, electrical, and communications reference drawings for this project? |
The VA will provide as-built plumbing and electrical, but cautions that they may be out of date and should be verified visually before work begins. There are no communications drawings to provide as we do not maintain communications as-builts.
| 021 |
| Will the ICRA negative pressure containment requirements for this project be able to be accomplished with hepa-carts and fire resistant plastic sheeting or will the much more expensive drywall or modular wall containment be required for each of the many small phases of the construction? Will hepa-filtered negative pressure exhaust be allowed to be vented into existing facility exhaust duct systems? |
HEPA carts and plastic sheeting are perfectly acceptable.
| 022 |
| Specification Section 01 35 26, Part 1.9-B requires monthly site safety inspection by and independent or corporate safety professional (CSP or CSHT). Will the VA confirm this requirement will be enforced for this project? |
The VA at Loma Linda will perform its own weekly construction safety rounds and the PM will perform daily site walkthroughs.
| 023 |
| Specification Section 01 35 26, Part 1.13 requires pre-placement tuberculosis screening for all contract employees. Will this be a requirement for this project? |
This will not be a requirement.
| 024 |
| Specification Section 07 84 00 Firestopping, Part 1.5-C – Inspector Qualifications requires a 3rd party independent ASTM E699 qualified inspection of all firestopping installations. Will the VA confirm this is a requirement for this project? |
This VA will perform this inspection in conjunction with the contractor and the installer.
| 025 |
| Drawing Sheet A1 – Floor Finish Schedule only indicates they type of flooring material for each of the depicted areas. Neither the Floor Finish Schedule nor the Specifications indicate the color, style, or basis of design flooring manufacturer. Pricing will vary based upon color, style and BOD manufacturer. Will the VA provide a complete flooring finish schedule that provides the color, style, & BOD manufacturer? |
*See Table A Below
| 026 |
| Scope of Work, Part 1-A-ii-15 requires corner guards at all outside corners. Will the VA provide a specification or a basis of design for the required corner guards? |
*See Table B Below
| 027 |
| Are there plans for the above-referenced project? Also, was there a mandatory walk through of the job? |
| Yes, there are plans and drawings attached to this solicitation. They are available at BETA.SAM.Gov in the same place you access the solicitation at. The site walk is not mandatory but attendance is highly encouraged. |
| 028 |
| Is it just the 1 arranged site visit or is there scope to arrange a separate one? |
Only one site visit is planned for this requirement.
| 029 |
| Is there an engineer’s estimate? |
| The magnitude of this project is disclosed on the first page of the solicitation. |
| 030 |
| Is the remodeling project of this specific job (2NE) including the renovations of the architectural equipment that has been up in the air for the last year or so? AKA division 11 / 10 equipment; patient lifts, capital equipment such as med gas booms or headwalls in the patient/ICU rooms? |
| Please review the solicitation and attached scope of work to see the requirements of this project. |
Table A
| Code |
| Material |
| MFR |
| Collection/Style |
| Color |
| Size |
| CPT |
| Carpet Tile |
| Interface Carpet |
| #1465202500 |
| #7776 |
| 20”x20” |
| PLK |
| Solid Vinyl Tile |
| Contour Series Tandus Centiva |
| Venue Abstracts |
| Jute #5142 |
| 12” x 9” x 36” |
| RSF-1 |
| Sheet Flooring |
| Johnsonite |
| Acczent Wood |
| Allover Wood Brown #29012 |
| RSF-3 |
| Welded Sheet Flooring |
| Johnsonite |
| Acczent Wood |
| French Oak Natural Brown #81002 |
Table B
| Code |
| Material |
| MFR |
| Collection/Style |
| Color |
| Size |
| CG |
| Corner Guard |
| CS Acrovyn |
| SM-20N, Acrovyn 4000 |
| Teton White #517 |
| 3” Suede Texture, Full height |
IFB Solicitation # 36C25821B0003 36C258-21-AP-0115 Project #605-21-406
REQUEST FOR PROPOSAL for construction services to refresh 2NE Main Hospital, Loma Linda Ca
1. OBJECTIVE
A. SCOPE OF WORK
i. General Requirement: Provide all labor, materials, tools, equipment, engineering, and services for beautification of approximately 14,000 square feet of space in 2 northeast (2NE) located at VA Loma Linda Main Hospital. The Loma Linda VAMC Acute Psychiatric Unit (APU) has a need to replace televisions on the old coaxial network with IP-based televisions to facilitate the removal of the coaxial network altogether. Additionally, the facility wishes to remove furniture with ligature points (currently housing the existing televisions) from the ward altogether. Because of COVID-19, providers and patients are not able to meet face-to-face, and a request is made to provide a video-conferencing solution. This solution will consist of a monitor, webcam, and keyboard/video/mouse interface, with the computer itself remoted into the nurses’ station.
ii. Specific Requirement: The contractor will furnish all materials, equipment, supervision, and personnel necessary to accomplish the project as per contractual documents. The project will involve but not be limited to trades required to accomplish the following:
1. Remove and dispose existing flooring and cove base per attached floor finish schedule. The rooms identified to receive new flooring will need to have existing flooring removed and disposed.
2. During construction, contractor shall provide all necessary protection of the construction area.
3. Do not start construction until all materials and equipment are on-hand.
4. Maintain containment area and provide negative air machine with HEPA filter. Maintain negative air pressure in construction area according to VA Loma Linda Infection prevention guidelines.
5. Corridors shall remain accessible during working hours.
6. Phasing schedule will be established to include two rooms per phase.
7. Protect IT antennas, wall plugs, sensors, directional mirrors, fire alarm equipment, cameras, phones, card readers, thermostats, exit signs, nurse call system components and speakers from damage.
8. Patch and paint walls as identified per attached paint finish schedule drawing. Color finishes shall be matched with VA color standard and approved by the Contracting Officer and the COR in accordance with VA Interior Design standards or as shown on the attached paint plan. Patching will occur on any surface that is to be painted. Finished painted surface to be smooth. Patch walls to level 5 finish. Paint walls one coat primer and 2 topcoats. Paint colors to match VA interior design standards.
9. Provide for and maintain all necessary protection of building systems and services during construction, to include the use of temporary power sources as needed.
10. Properly dispose of all demolition materials.
11. Provide cover to any equipment in construction areas to protect from dust buildup while performing work.
12. Thoroughly clean effected areas including interstitial space disposing of all construction debris, trash, and vacuum overhead beams.
13. All trash and debris to be removed from site daily and as requested by COR.
14. Install new flooring and cove base see attached drawing for location. All flooring transitions to be even and heat welded.
15. Install new corner guards at all wall corner locations in corridors.
16. Install new carpet tile with carpet tac tiles. See attached drawing for location. Carpet tile to be Interface Architectural Plans “To Scale” Product Number 1465202500. Installation method to be per manufacturer recommendation.
17. Relocate lockers in 2B-700 staff lounge to opposite wall.
18. Repair/replace flooring in 2B-700 staff lounge under lockers.
19. Add drop-in sink along east wall in 2B-700. Sink to be approved by COR and CO prior to install. Install to include all necessary plumbing. One sink currently exists inside of bathroom in the staff lounge.
20. Install 60” lower cabinet with solid surface countertop along east wall in 2B-700. Cabinet to have bottom storage. Sink will be installed in this 60” cabinet. Provide all trim, kickplates, and cove base as needed for proper finished look.
21. Provide and install an outdoor quality, vinyl, laminated mural on wall located outdoors in the courtyard area. Wall is approximately 112 feet long x 16 feet tall. Prepare wall and install in accordance with manufacturer’s recommendations. Mural will need to fill exterior wall, located in 2NE courtyard, facing the dining room. Mural graphic to be some form of landscape to be approved by COR and CO prior to purchase and install. Contractor to source and provide multiple options to COR for approval. Contractor to provide installation of mural by specialized mural/wall art installer, not by general laborer.
a. Basis of Design, Contact Mark with Coastal Creative www.coastalcreative.com, 619-672-0969, mark@coastalcreative.com
22. Courtyard surface cracks and perforations to be filled and sealed.
23. Courtyard surface to have two lane stripes, 42 inches between stripes, painted along perimeter of courtyard. Each stripe will be 2 inches in width. The first stripe will be located 48” from wall. The second stripe will be located 42” from edge of first stripe.
24. Remove and dispose of existing courtyard seating.
25. Remove existing painted maze on concrete floor of courtyard. Pressure wash or sand blast as needed to remove lines from concrete prior to painting of walking lanes, if conflict exists.
26. Dining Room: Build out the eastern wall and create a recess to house a 65” television behind plexiglass. The recess will contain power and data connections that connect to Second floor, service bay 2 (2SB2). Sound will be provided by speakers inset into the same wall.
27. Group Room: Build out the eastern wall and create a recess to house a 65” television behind plexiglass. The recess will contain power and data connections that connect to 2SB2. The recess will be covered by inset plexiglass mounted with security screws. Sound will be provided by speakers inset into the same wall. Additionally, the group room will need to have a recessed space connected to a VA-provided computer housed in the nurses’ station. This space will contain power and conduit to the nurses’ station, as well as a 32” monitor, and a webcam to facilitate video conferencing. A microphone will be needed under the recessed area and should be flush with the new wall. Virtual Video Conferencing and television in the group room will not share the same recess, and will be a minimum of three feet apart.
28. Female Patient Living Area: Build out the North-West wall to house a recessed space connected to a VA-provided computer housed in the nurses’ station. This space will contain power and conduit to the nurses’ station, as well as a 32” monitor, and a webcam to facilitate video conferencing. A microphone will be needed under the recessed area and should be flush with the new wall.
29.
B. General Requirements:
i. All employees of the general contractor and subcontractors shall comply with the VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
ii. Prior to commencing work, the general contractor shall provide proof that an OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.
iii. Prior to the commencement of work, the general contractor shall conduct a site walk with the VA COR and VA Interior Designer.
iv. The general contractor shall establish and maintain a fire protection program in accordance with 29 CFR 1926.
v. The general contractor shall implement and maintain a dust control program.
vi. Contractor will provide all documentation per Specifications and validated by the submittal registry to the COR prior to work.
vii. All copper cabling and connectors will be terminated according to EIA/TIA 568-A standards. And will be plenum rated CAT6A U/FTP. Copper cabling will be terminated to CAT6A modular jacks capable of accepting and functioning with other modular (i.e.: RJ11) plugs without damage to the jack.
viii. All copper cabling will be in conduit within the interstitial spaces from the point where it deviates from the cable tray to the point where it penetrates the gypsum. Below the interstitial space, cabling may be hung using j-hooks and will use existing pathway where possible.
ix. Vendor will utilize Tripp Lite 4-Port Quad Outlet RJ45 Universal Keystone Jack Face Plate UNSPSC 43201612 or approved equivalent, with three CAT6A U/FTP cables (red/blue/yellow) terminating to CAT6A keystones (yellow/grey/ivory) and the fourth port covered with a keystone blank. Data face plate will be electrical ivory. Each face plate will have two labels. The top label on the plate will denote the plate’s sequence number (such labeling will be mirrored in the TR), and the bottom label will denote the TR room number. Example for drops “2SB2-34” is below:
Data plate number (34, for example)
Drops 1-3, plus blank cover
TR Room Number (2SB2)
x. Vendor will plan for and install four new dedicated circuits, connecting to 4 (four) new electrical double gang outlets, for a total of 8 power sockets total. These new electrical circuits will be for the video conferencing (VVC) in the female living area, the VVC in the group room, the television in the group room, and the television in the dining area. Each duplex box is to have its own circuit breaker within 2SB2’s electrical panel. All electrical wall plates and boxes for electrical installed under this contract will include the circuit that the outlet connects to etched into the faceplate or otherwise engraved on a stainless-steel sign affixed directly above the outlet and within 2 inches of the installation. The final project will include an updated electrical single line provided to the facility along with testing and certification documents for all installed electrical hardware. Vendor will remove existing power sockets currently in use for the cabinet mounted televisions and re-use those locations within the circuit panel for the new circuits, but is instructed not to reuse the breakers (replace with new).
xi. Vendor will utilize CAT 6a 48 Port Flat (non-angled) patch panels in the telecommunications space within 2SB2 that are sized to conform to EIA/ECA 310-E dimensions and suitable for installation in standard racks, cabinets, and enclosures. Patch panels will have holes for RJ45 jacks aligned in two horizontal rows per panel. Labeling of jacks on the panels will be done in a manner to reflect the face plate sequence number as well as the individual jack on the face plate. Examples are provided below:
| 13-1 |
| 13-2 |
| 13-3 |
| 14-1 |
| 14-2 |
| 14-3 |
| 37-1 |
| 37-2 |
| 37-3 |
| 38-1 |
| 38-2 |
| 38-3 |
xii. If there is sufficient space in the existing telecommunications patch panels, the vendor is not required to provide new patch panels and will instead install in the existing space, continuing the existing number scheme. Vendor will work with local IT for final approval before commencing data work in the telecommunications area.
xiii. All recessed areas will include a second, shallower recess to accommodate for the plexiglass installation. All recesses will be covered by 1/2” thick inset plexiglass mounted with security screws. All speakers will be recessed and installed with security screws. No plexiglass, microphones, or speaker edges are to protrude past the wall or in such a manner that they may be grabbed by a patient, used as a ligature point, or be installed in a manner where a patient could conceivably hurt themselves on the edges (this includes cutting or otherwise breaking pieces of installed equipment or plastic off).
xiv. All monitors and televisions will be mounted within the recesses on mounts that allow the device to be pulled from the wall for maintenance without being detached from the mount itself. All mounting hardware will be to facilitate “full motion” style mounts. Mounts for the television will be purchased by the facility under a separate procurement and are outside the scope of this project. Mounts for the monitors are the responsibility of the vendor.
xv. USB connections to facilitate keyboards, mice, and card readers will be set into the wall using connections and extenders similar to those for the Crestron units and or the video conference units in the rest of the hospital. This is to allow the staff to use and remove the USB devices without giving the patients access to them. The boxes that house the USB connections are to be flush with the new wall.
xvi. Monitors will be provided by the contractor, as will all cabling (to include patch cables).
xvii. Televisions for the bedside television program will be purchased by the facility under a separate procurement and installed by a separate contractor. Final connections to the bedside television switch will be made by that same contractor and everything in this paragraph is outside the scope of this current project.
xviii. All penetrations of smoke and fire barriers will be fire-stopped using materials in accordance with the local cabling standards.
xix. All data cabling will be tested and certified, with the certification documentation provided to the contracting officer’s representative to be kept on record.
xx. Storage of construction materials, monitors, and all associated products and materials will be at no cost to the government, and their delivery should be scheduled so as to coincide with the construction.
C. CONSTRUCTION COST
i. Per contracted amount, See Contract documents.
D. Contract Duration: 240 Days
E. ENVIRONMENTAL/OCCUPATIONAL SAFETY AND HEALTH (EOSH)
1. EXPECTATION: All General Contractor submissions for project shall contain language that addresses all applicable EOSH requirements.
2. Specifications
a. The VA Master Construction Specifications contain work procedures and material requirements designed to meet regulatory compliance requirements. Whenever possible, the Master Construction Specifications must be used as the basis for project designs.
b. A complete list of these specifications can be viewed at the following website: http://www.cfm.va.gov. Master Construction Specifications include, but are not limited to, the following:
i. SECTION 01 00 00 – General Requirements
ii. SECTION 01 57 19 – Temporary Environmental Controls
iii. SECTION 01 74 19 – Construction Waste Management
iv. SECTION 09 91 00 – Painting
F. SITE SURVEY
1. EXPECTATION: Contractor will make site visits as necessary to survey existing conditions.
2. Make site visits as required to determine existing as-built conditions affecting this project.
3. NOTE: Information including drawings and other documentation provided to the general contractor is used as reference only. All additional references and specifications are available in VHA’s Technical Information Library at address http://www.cfm.va.gov. AutoCAD background drawings will be provided by the VA upon request.
4. The general contractor shall field verify all dimensions. Coordinate site visits with the COR.
2. REFERENCES
A. Pertinent VA Criteria which can be downloaded from the Internet at http://www.cfm.va.gov/TIL including but not limited to:
i. VA Master Construction Specifications
ii. VA Construction Standards
iii. VA Seismic Design Handbook
iv. VA Space Planning Criteria
v. VA Design Manuals
vi. VA CADD Standards
vii. NFPA 101, Life Safety Code
viii. NFPA 70, National Electric Code
ix. NFPA 99, Health Care Facilities
x. NFPA 12, Installation of Sprinkler Systems
xi. Accessibility Standards (ADAAG, ABAAS, Barrier Free Design Guide)
xii. AIA Guidelines for Construction and Equipment of Hospital and Medical Facilities
xiii. International Building Codes
xiv. LLVAMC INTERIOR FINISHES STANDARDS
- - - END - - -
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
Project: 2 NE BEAUTIFICATION Project#: 605-21-406
CONSTRUCTION TO BE COMPLETED IAW ATTACHED SOW, DRAWINGS, AND SPECIFICATIONS.
Work includes general construction, alterations, and certain other items. Contractor shall provide services but not limited to furnish all supervision, labor, equipment, materials and transportation necessary to accomplish work for the demolition and replacement as required by specifications and drawings.
Contract Period: Base POP Begin: 240 Days After Issue of NTP
| GRAND TOTAL |
| __________________ |