Guldmann 2E S SURG_101908_SET.pdf
PDF 530 KB Posted
- Attached to
- 2ES 2EN Renovation at Loma Linda VAMC
- Solicitation number
- 36C25820R0043
About this file
This package includes construction drawings and specifications for a renovation project at the Loma Linda VA Medical Center located in Loma Linda, California. The project involves demolishing and rebuilding the entire second floor, covering approximately 23,000 square feet, according to drawings from Davy Architecture and SC Engineers.
The related federal contract opportunity is a solicitation to furnish all labor and materials for the complete demolition and construction work on this renovation project. A Davis-Bacon wage determination applies, and the contractor must comply with all applicable wage, hour and labor laws. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is the contracting agency.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Guldmann Inc.
14401 McCormick Drive Tampa FL, 33626 Unit A
Toll Free: 1(800)-664-8834 Fax: 1(813)-880-9558
Email: Info@Guldmann.net
NOTES
APPROVED BY:
PROJECT NAME:
SHEET DESCRIPTION:
SHEET NO:
SIGNOFF / APPROVAL NOTES
1. The facility structure capacity must be able to support the load specified on the installation drawing.
2. Electrical power source provided by the facility, position to be verified in the field.
3. Guldmann Inc. reserves the right to slightly modify the track layout if necessary without Facility approval.
This includes lowering the system to avoid ceiling objects.
4. Guldmann Inc. will not be held responsible for any damages, inconvenience, resulting from hitting any non visible conduits during our installation process of which we have not been advised.
5. Modifications of door headers by the facility.
6. Signed drawings are required prior to ordering and installation of ceiling lifts.
This signature of each drawing confirms agreement of all the conditions listed above.
7. Systems are tested at 1.5 times capacity.
550 lbs. tested at 825 lbs.; 770 lbs. tested at 1155 lbs.; 825 lbs. tested at 1238 lbs.; 1100 lbs. tested at 1650 lbs.
MY SIGNATURE BELOW VERIFIES THAT I HAVE:
Reviewed all _____ pages, with a total quantity of _____ room(s), _____ system(s) for the approbation of layout for each room and the approbation of structure for each room.
CUSTOMER
APPROVAL: _____________________________________ DATE: _______________
DATE: DRAWN BY:
ACCURATE TO 4" BASED
ON PDF CONVERSION
VA Loma Linda Healthcare System
VALL 2E S SURG
11201 Benton St.
Loma Linda, CA 92357
PROJECT ID:101908
VALL 2E S SURG
FACILITY SIGNOFF
GUL101
ETS03/17/2020
8 4 4
HOIST = 770 LBS.1.
FLUSH RECESSED / ROOM COVERING2.
CEILING HEIGHT = 9' - 0"3.
INTERSTITIAL FLOOR = 9' - 10"
ATTACHMENT TYPE =4.
TOP OF I-BEAM IN INTERSTITIAL FLOOR
Revision Schedule
Date Issued by Letter Description
SPAN = 6' - 9" O.C.
EACH FIXED RAIL TO
HAVE x1 PARALLEL & x2 PERPENDICULAR
STABILIZERS
ALL JOINTS MUST HAVE x1 PARALLEL & x1
PERPENDICULAR STABILIZER
SEE SPAN CHART
S E
E S
P A
N C
H A
R T
SEE SPAN CHART
± 22°
STABILIZERS CAN BE ROTATED 180°
Fixed rail systems Fixed rail systems must be connected by Guldmann Service Team or by a qualified installer.
A Guldmann class I transformer must be used.
Installation to follow existing rules for authorized electricians and according to IEC/UL 60601-1.
Terminals on transformers Class I Double-insulated UL approved cable must be used (Cable specification: UL category: AVLV2, min.300V, min.
80° C, min. 18AWG (1 mm2 )) Transformer DK-13991 In:
Terminal 1 = N Terminal 2 = 100-115V AC Terminal 3 = 230V AC Terminal 4 = Protective ground Out:
Terminal 5 = 33V AC Terminal 6 = 33V AC
POWER TO BE WITHIN 15 FT OF END OF FIXED RAIL
Guldmann permanent mounted ceiling aluminium rail
Hoist with trolleys movable in rail
Protective Plast Enclosure
UL approved 400V cable, green, min. 14 AWG
Protective Ground
M1
UL approved 400V double isolated cable, min. 18 AWG
ON/OFF
UL approved 400V double isolated cable, min. 18 AWG
T ra n s fo rm e r
D K
-1
Main power Permanent installation Specification of breaker:
> 1 Amp capacity Line must always be broken
L1
AC/DC charger
Main Motor Control
Emergency Stop
Safety Circuit Emergency down
Motor Function Selector Switch0 1
V A
C
U S
V
A C
P ro te c ti ve
G ro u n d
V A
C
V A
C1 A
T
.5
A T
Green Light ON (or ON / OFF - sign)
MAX
PROJECTION
MAX DISTANCE BETWEEN VERTICAL SUPPORTS
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
X
X
X
RAIL
RAIL
RAIL
RAIL
RAIL
RAIL
INCH
METER
,23
,7
1,2
39 49 59 68 78 118 137 147 157 177 187 206 215 236 246 264
1,0 1,25 1,5 1,75 2,0 3,0 3,5 3,75 4,0 4,5 4,75 5,25 5,5 6,0 6,25 6,75
MAX. 175 KG (385 LBS.)
MAX. 205 KG (450 LBS.)
MAX. 255 KG (560 LBS.)
MAX. 300 KG (660 LBS.)
MAX. 350 KG (770 LBS.)
MAX. 375 KG (825 LBS.)
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
A-RAIL
WEIGHT: 2.6 KG/M
(1.75 LBS/FT)
B-RAIL
WEIGHT: 5.0 KG/M
(3.36 LBS/FT)
C-RAIL
WEIGHT: 6.0 KG/M
(4.03 LBS/FT)
(2 1/2")
62 mm.
(2
/4
,5 m m
(2 1/2")
62 mm.
(5 m m
(2 1/2")
62 mm.
(6
/3 m m
A
B
C
RAIL MAX. 400 KG (880 LBS.)
X
X
X
A
B
C
RAIL MAX. 500 KG (1100 LBS.)
X
X
X
7,25
8,0
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SPRING PLATE
AVAILABLE FOR A & B RAIL
FLUSH CEILING PROFILE LIP IS 7/16" X 3/8"
CUT 12 - 15 MM OF THE 2 LONGITUDE
SCREW FOR
PROFILE END
m m
/2 m m
/4
,5 m m
M
IN
m m
/4
DEPTH = 205 mm (8 1/4")
345 mm (13 3/4")
A
B
C
D
E
F
G
H
I
J
K
Ceiling bracket standard
A / B / C
Basic High M
Basic High M
Dimensions
205 mm
580 mm
345 mm
24 mm
58.5 / 125 / 170 mm
156 mm
184 mm
284 mm
2500 mm
970 mm
340 mm
8"
22.8"
13.5"
1.5"
2.2 / 4.9 / 6.6"
6.29"
7.2"
11.38"
98"
38"
13.3"
H
A
E D
F
C
G I
B
K J
Guldmann Inc.
14401 McCormick Drive Tampa FL, 33626 Unit A
Toll Free: 1(800)-664-8834 Fax: 1(813)-880-9558
Email: Info@Guldmann.net
NOTES
APPROVED BY:
PROJECT NAME:
SHEET DESCRIPTION:
SHEET NO:
DATE: DRAWN BY:
VALL 2E S SURG
GEN. INFO
GUL102
ETS03/17/2020
PROJECT ID:101908
NTS
BRACING + SUPPORT
NTS
GH3 TRANSFORMER
HOIST = 770 LBS.1.
FLUSH RECESSED / ROOM COVERING2.
CEILING HEIGHT = 9' - 0"3.
INTERSTITIAL FLOOR = 9' - 10"
ATTACHMENT TYPE =4.
NTS
RAIL SPAN CHART
Revision Schedule
Date Issued by Number
TOP OF I-BEAM IN INTERSTITIAL FLOOR
NTS
FLUSH CEILING PROFILE
NTS
GH3 HOIST DIMS
NTS
GH3 PATIENT SLING DIMS
SUSPENSION ROD MAY ATTACH
ANYWHERE BETWEEN CLAMPS
1. THIS OSHPD PREAPPROVAL OF MANUFACTURER'S CERTIFICATION (OPA) IS BASED ON THE CBC 2013. THE DEMAND (DESIGN FORCES)
FOR USE WITH THIS OPA SHALL BE BASED ON THE CBC 2013.
2. THIS DOCUMENT MAY ONLY BE USED WITH THE EXPRESS WRITTEN CONSENT OF GULDMANN FOR EACH SPECIFIC SITE & LOCATION.
THIS DOCUMENT IS INVALID WITHOUT SUCH CONSENT. ONLY FITTERS APPROVED BY GULDMANN SHALL INSTALL THIS LIFT SYSTEM.
3. ANCHORAGE DESIGN PER 2013 CALIFORNIA BUILDING CODE - SECTION 1613A & ASCE 7-10 CHAPTERS 12 AND 13.
CALCULATIONS FOR ANCHORAGE TO BE CONDUCTED BY ENGINEER OF RECORDS FOR THIS PROJECT.
4. THIS PROJECT IS SUBJECT TO OSHPD INSPECTIONS PER CBC, TITLE 24. SUBMIT REPORTS TO THE ARCHITECT, OSHPD, ENGINEER AND HOSPITAL. THE FOLLOWING TESTING AND SPECIAL INSPECTION SERVICES SHALL BE PERFORMED BY A QUALIFIED TESTING
AGENCY OR IOR IN ACCORDANCE WITH THE CBC, TITLE 24:
4.1. REVIEW MILL CERTIFICATES
4.2. TEST UNIDENTIFIED STEEL
4.3. INSTALLATION TORQUE OF ALL BOLTING
4.3.1. 31 ft-lb FOR M10
4.3.2. 50 ft-lb FOR 1/2"�
4.4. INSTALLATION OF EXPANSION ANCHORS PER MANUFACTURES GUIDELINES.
4.5. LOAD TESTING OF INSTALLED SYSTEM
5. STEEL GRADES:
W SHAPES ASTM A-992
MISC SHAPES & PLATES ASTM A-36
PIPE ASTM A-53 GRADE B
MACHINE BOLTS ASTM A-307 (MB)
M10 BOLTS GRADE 8.8 (MANUF SUPPLIED)
6. WORKMANSHIP AND DETAILS SHALL CONFORM TO THE AISC SPECIFICATIONS AND THE CBC.
7. BOLT HOLES SHALL BE 1/16" LARGER IN DIAMETER THAN THE BOLT.
8. ANY FIREPROOFING REMOVED FROM (E) ELEMENTS SHALL BE REPLACED WITH THE SAME THICKNESS OF THE SAME OR BETTER
MATERIAL AND MEET ALL APPLICABLE CURRENT BUILDING CODE REQUIREMENTS. THIS SHALL BE PERFORMED BY GC APPOINTED
(CERTIFIED) INSTALLER.
9. ALL UNISTRUT PARTS SHALL BE ELECTRO-GALVANIZED (EG) OR PREGALVANIZED (PG). CUT ENDS AND SCRATCHING OF
GALVANIZING SHALL RECEIVE A COAT OF COLD GALVANIZING PAINT.
P1000 AND ROD STIFFENERS NOT REQUIRED
WHEN SUPPORT ROD LENGTH IS LESS THAN 10"
STEEL BEAM
1/2"� ALL THREAD ROD
BEAM CLAMP
P2787EG
1" MIN.
SOLID STRUT PER SPAN
REQUIREMENTS
1/2" HEX NUT, STRUT NUT,
1/4"THK.x1 5/8"SQ. STEEL WSHR.
GULDMANN CEILING
BRACKET KIT
ROD STIFFENER
P2486EG @ MAX 20" O.C.
15/8"x 15/8"x12GA. SLOTTED STRUT
GULDMANN
PARALLEL RAIL (SUPPORT RAIL)
1" MIN.
NOTE: STABILIZERS ONLY REQUIRED WHEN
DROP HEIGHT IS GREATER THAN 10"
GULDMANN
PARALLEL RAIL (SUPPORT RAIL)
GULDMANN
PARALLEL RAIL
GULDMANN
PARALLEL RAIL
SCHEMATIC PLAN (ROOM COVER SYSTEM)1
NOTES3SCHEMATIC SECTION ABOVE STEEL FRAMING
4 SCHEMATIC SECTION ABOVE STEEL FRAMING
CONNECTION AT CEILING6
SPLIT RAIL (FOR CURTAIN)8
GENERAL NOTES:
CEILING BRACKET DIMENSIONS2
PART# INCLUDES M10 BOLTS AND ALL PARTS FOR BRACKET TO RAIL CONN.
SEE GENERAL NOTES FOR TORQUE REQUIREMENTS
SUSPENSION POINT AT OBSTRUCTION10
SUPPORT RAIL PROPERTIES7
PART# INCLUDES M10 BOLTS AND ALL PARTS FOR BRACKET TO RAIL CONN.
SEE GENERAL NOTES FOR TORQUE REQUIREMENTS
CROSS RAIL TO PARALLEL RAIL CONN9
SEE DETAIL 5 OTHERWISE
GULDMANN CEILING
BRACKET PER DETAIL 2
GULDMANN CEILING
BRACKET PER DETAIL 2
PROVIDE SUSPENSION ROD
EA SIDE OF GAP PER DETAIL 5
CROSS RAIL:
CAN BE MOUNTED FLUSH TO
OR BELOW SUPPORT RAIL
PER DETAIL 9
27" MAX
47" MAX
SEE DETAIL 1 FOR SPAN
TRAVERSE TROLLEY BY GULDMANN
(S235JRG2 STEEL)
PART# 550076 (880# cap)
(554189 FOR PARALLEL RAIL FLUSH TO CLG)
OR
550078 (1100# cap)
(554546 FOR PARALLEL RAIL FLUSH TO CLG)
Guldmann Inc.
14401 McCormick Drive Tampa FL, 33626 Unit A
Toll Free: 1(800)-664-8834 Fax: 1(813)-880-9558
Email: Info@Guldmann.net
NOTES
APPROVED BY:
PROJECT NAME:
SHEET DESCRIPTION:
SHEET NO:
DATE: DRAWN BY:
SEE 3/GUL102 FOR RAIL SPANS & ADDITIONAL DIMENSIONS
VALL 2E S SURG
ATTACHMENT
GUL103
ETS03/17/2020
PROJECT ID:101908
HOIST = 770 LBS.1.
FLUSH RECESSED / ROOM COVERING2.
CEILING HEIGHT = 9' - 0"3.
INTERSTITIAL FLOOR = 9' - 10"
ATTACHMENT TYPE =4.
Revision Schedule
Date Issued by Number
TOP OF I-BEAM IN INTERSTITIAL FLOOR
INTERSTITIAL SPACE ONLY 9 INCHES, NO STABILIZERS REQUIRED
/4
H O
IS
T
/2
T R
A V
E R
S E
C E
IL
IN
G
GUL104
/2
/8
CEILING
/4
Guldmann Inc.
14401 McCormick Drive Tampa FL, 33626 Unit A
Toll Free: 1(800)-664-8834 Fax: 1(813)-880-9558
Email: Info@Guldmann.net
NOTES
APPROVED BY:
PROJECT NAME:
SHEET DESCRIPTION:
SHEET NO:
DATE: DRAWN BY:
SEE 3/GUL102 FOR RAIL SPANS & ADDITIONAL DIMENSIONS
VALL 2E S SURG
PROJECT DETAILS
GUL104
ETS03/17/2020
PROJECT ID:101908
HOIST = 770 LBS.1.
FLUSH RECESSED / ROOM COVERING2.
CEILING HEIGHT = 9' - 0"3.
INTERSTITIAL FLOOR = 9' - 10"
ATTACHMENT TYPE =4.
Revision Schedule
Date Issued by Number
TOP OF I-BEAM IN INTERSTITIAL FLOOR
1" = 1'-0"
ELEVATION VIEW
1 1/2" = 1'-0"
CEILING DETAIL
/4
/4
7' - 5" 1"
CURTAIN TRACK
Guldmann Inc.
14401 McCormick Drive Tampa FL, 33626 Unit A
Toll Free: 1(800)-664-8834 Fax: 1(813)-880-9558
Email: Info@Guldmann.net
NOTES
APPROVED BY:
PROJECT NAME:
SHEET DESCRIPTION:
SHEET NO:
DATE: DRAWN BY:
SEE 3/GUL102 FOR RAIL SPANS & ADDITIONAL DIMENSIONS
ACCURATE TO 4" BASED
ON PDF CONVERSION
VALL 2E S SURG
ROOM 106
GUL105
ETS03/17/2020
PROJECT ID:101908
A rail
B rail
Ceiling bracket, Extended
Hoist
KEY
Hoist Transformer
HOIST = 770 LBS.1.
FLUSH RECESSED / ROOM COVERING2.
CEILING HEIGHT = 9' - 0"3.
INTERSTITIAL FLOOR = 9' - 10"
ATTACHMENT TYPE =4.
TOP OF I-BEAM IN INTERSTITIAL FLOOR
Revision Schedule
Date Issued by Number
3/4" = 1'-0"
ROOM 106
/4
/2
/8
10' - 5 3/4" 1"
CURTAIN TRACK
Guldmann Inc.
14401 McCormick Drive Tampa FL, 33626 Unit A
Toll Free: 1(800)-664-8834 Fax: 1(813)-880-9558
Email: Info@Guldmann.net
NOTES
APPROVED BY:
PROJECT NAME:
SHEET DESCRIPTION:
SHEET NO:
DATE: DRAWN BY:
SEE 3/GUL102 FOR RAIL SPANS & ADDITIONAL DIMENSIONS
ACCURATE TO 4" BASED
ON PDF CONVERSION
VALL 2E S SURG
ROOM 135
GUL106
ETS03/17/2020
PROJECT ID:101908
HOIST = 770 LBS.1.
FLUSH RECESSED / ROOM COVERING2.
CEILING HEIGHT = 9' - 0"3.
INTERSTITIAL FLOOR = 9' - 10"
ATTACHMENT TYPE =4.
TOP OF I-BEAM IN INTERSTITIAL FLOOR
Revision Schedule
Date Issued by Number
A rail
B rail
Ceiling bracket, Extended
Hoist
KEY
Hoist Transformer
3/4" = 1'-0"
ROOM 135
1" 8' - 8 3/8"
CURTAIN TRACK
Guldmann Inc.
14401 McCormick Drive Tampa FL, 33626 Unit A
Toll Free: 1(800)-664-8834 Fax: 1(813)-880-9558
Email: Info@Guldmann.net
NOTES
APPROVED BY:
PROJECT NAME:
SHEET DESCRIPTION:
SHEET NO:
DATE: DRAWN BY:
SEE 3/GUL102 FOR RAIL SPANS & ADDITIONAL DIMENSIONS
ACCURATE TO 4" BASED
ON PDF CONVERSION
VALL 2E S SURG
ROOM 141
GUL107
ETS03/17/2020
PROJECT ID:101908
HOIST = 770 LBS.1.
FLUSH RECESSED / ROOM COVERING2.
CEILING HEIGHT = 9' - 0"3.
INTERSTITIAL FLOOR = 9' - 10"
ATTACHMENT TYPE =4.
TOP OF I-BEAM IN INTERSTITIAL FLOOR
Revision Schedule
Date Issued by Number
A rail
B rail
Ceiling bracket, Extended
Hoist
KEY
Hoist Transformer
3/4" = 1'-0"
ROOM 141
GUL104
/8
11' - 11" 1"
CURTAIN TRACK
Guldmann Inc.
14401 McCormick Drive Tampa FL, 33626 Unit A
Toll Free: 1(800)-664-8834 Fax: 1(813)-880-9558
Email: Info@Guldmann.net
NOTES
APPROVED BY:
PROJECT NAME:
SHEET DESCRIPTION:
SHEET NO:
DATE: DRAWN BY:
SEE 3/GUL102 FOR RAIL SPANS & ADDITIONAL DIMENSIONS
ACCURATE TO 4" BASED
ON PDF CONVERSION
VALL 2E S SURG
ROOM 145
GUL108
ETS03/17/2020
PROJECT ID:101908
HOIST = 770 LBS.1.
FLUSH RECESSED / ROOM COVERING2.
CEILING HEIGHT = 9' - 0"3.
INTERSTITIAL FLOOR = 9' - 10"
ATTACHMENT TYPE =4.
TOP OF I-BEAM IN INTERSTITIAL FLOOR
Revision Schedule
Date Issued by Number
A rail
B rail
Ceiling bracket, Extended
Hoist
KEY
Hoist Transformer
1/2" = 1'-0"
ROOM 145
| Sheets |
| GUL101 - FACILITY SIGNOFF |
| GUL102 - GEN. INFO |
| GUL103 - ATTACHMENT |
| GUL104 - PROJECT DETAILS |
| GUL105 - ROOM 106 |
| GUL106 - ROOM 135 |
| GUL107 - ROOM 141 |
| GUL108 - ROOM 145 |
File details come from the government source that posted it. Updated .