This is Amendment 0004 to Solicitation 36C25726R0054, issued by the Department of Veterans Affairs Network Contracting Office (NCO17) on January 30, 2026. The amendment extends the proposal submission deadline from February 16, 2026, at 09:00 AM to February 18, 2026, at 09:00 AM CST and provides additional Consolidated Requests for Information (RFI) responses related to the NRM Replace and Correct Building 46 Roof project.

The RFI responses address technical clarifications for roof replacement work on Buildings 34 and 46 at the VA facility in Temple, Texas. Key responses confirm: as-built drawings are available for Building 34 with wood trusses at 24" centers and 5:12 pitch; a new Lightning Protection system is required; one layer of roofing currently exists on Building 34; existing roof drains at Building 46 will be replaced; new gray TPO will be installed on lower ground level roofs with tapered insulation; new copper gutters, downspouts, and flashings are specified for Building 34; two curbed roof penetrations will receive new gravity ventilators; and infrared roof moisture surveys will be provided. The amendment clarifies that materials from the Building 44 project are not acceptable, batten seam copper roofing is not required, no liquidated damages apply, and the upper balcony roof area will serve as an official sitting area without requiring walk pads. Offerors must acknowledge receipt of this amendment prior to the extended deadline.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 01-30-2026 504-26-116 Department of Veterans Affairs Network Contracting Office NCO17 1901 Veterans Memorial Dr. Building #171 Temple

TX

76504 Department of Veterans Affairs Network Contracting Office NCO17 1901 Veterans Memorial Dr. Building 171 Temple

TX

76504 To all Offerors/Bidders

36C25726R0054 01-23-2026

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 02-18-2026 09:00 CST X Amendment 0004 is to provide the additional request for information (RFI) responses.

Change the proposal due date from February 16, 2026, at 09:00AM to read February 18, 2026, at 09:00AM.

Additional Consolidated Requests for Information (RFI) for 504-26-116 NRM Replace and Correct Building 46 Roof

Q1. Are there As-Builts for Bldg. #34, if not please confirm the building roof structure.

A1. Yes, there are as-builts drawing available. The building’s roof structure are wood trusties at 24” centers at a 5 to 12 pitch.

Q2. Please confirm the number of roofs on Bldg. #34 currently.

A2. There is one layer of roofing material currently on building 34.

Q3. There currently is no LP system at Bldg. #34, is a new LP system required?

A3. Yes, a new Lightning Protection system is required for this project.

Q4. Is there a Hazardous Material Analysis available for the various roof assemblies?

A4. Currently there are no hazardous materials analysis available for the various roof assemblies.

Q5. Are there any As-Built details for the location and connection of concealed, interior, gutter drains or downspouts at Bldg. # 46 tile roofs?

A5. Yes, the as-built drawings are available for review and reproduction. They may be accessed for viewing by visiting the Engineering Drawing Room during normal business hours.

Q6. Are the existing roof drains at Bldg. #46 EPDM roof to be replaced or reused?

A6. The existing roof drains at building 46 are to be replaced.

Q7. Is an Infrared Roof Moisture Survey to be provided for roofs designated to be removed and replaced?

A7. Yes, an infrared roof moisture survey to be provided for roofs designated to be removed and replaced.

Q8. Are there roof structure As-Builts for the lower, ground level roofs at Bldg. #46 designated to receive new gray TPO?

A8. Yes, the ground level roofs for building 46 will receive a new gray TPO.

Q9. Is new tapered insulation to be added to the lower, ground level roofs at Bldg. # 46 designated to receive new gray TPO?

A9. Yes, new tapered insulation to be added to the lower, ground level roofs for building 46.

Q10. Are new gutters, downspouts, stepped flashings and counter-flashings at Bldg. #34 to be copper, stainless steel, or pre-finished metal?

A10. The new gutters, downspouts, stepped flashing and counter-flashings for building 34 are to be a copper finish.

Q11. There is a spec Section for Batten Seam Copper Roofing, where is this intended to be installed?

A11. This specification section is not required for this project.

Q12. Along the NE side of Bldg. #46 extending around the corner to the NW side of the building it appears there is a waterproofing membrane the extends above the concrete paving to either a building counterflashing or runs up under the balcony roof.

A12. Yes, that is correct and is not part of the project.

Q13. Are the existing exhaust fan (2 each) and condensing unit support curbs (1 each) on Bldg. #46 to be replaced with new?

A13. Yes, the equipment curbs and supports curbs for building 34 are to be replaced with new curbs.

Q14. Are the two curbed roof penetrations at Bldg. #34 to receive new curb supports or gravity ventilator per Spec Section 077200?

A14. Yes, the two curbed roof penetrations on building 34 are to receive new gravity ventilator per Spec Section 077200.

Q15. Will the upper portion of the existing balcony roof at Bldg. #46 require new walk pads for the table and chairs currently in place? Will this act as an official sitting area or pedestrian walkway?

A15. No, the upper portion of the existing balcony roof at building 46 will not require new walk pads for the table and chairs currently in place. This area will act as an official sitting area.

Q16. Are there liquidated damages for this contract?

A16. No, there are no liquidated damages for this contract.

Q17. Are the cut sheets available of materials used on Bldg. #44 project that would be acceptable on this project?

A17. No, the cut sheets of available materials used for building 44 project will not be acceptable for this project.

A.1 ADDITIONAL ATTACHMENTS

SOLICITATION DESCRIPTION

Amendment 0004 is to provide the Additional Request for information (RFI) responses and to extend the proposal from February 16, 2026, @ 09:00AM to read February 18, 2026, at 09:00AM.

Page 1 of