This document is an Architectural Supplemental Instruction (ASI) issued by Barker & Associates, Inc., a consulting engineering firm, for the Audie Murphy Hospital Ward Upgrades/Expansion 4A project. The ASI, numbered 001 and issued on March 5, 2015, is directed to Roland Ibarra at WestEast Design Group and incorporates specific construction document requirements into the project.
The instruction addresses supply ductwork and hydronic piping installations on the partial fourth floor interstitial space for new construction. Item No. 1 requires the contractor to furnish and install a 26x10 supply duct as shown on the attached drawing and to offset the exhaust air ductwork and position VAV boxes as required to accommodate the existing structure, in accordance with General Note 3 on sheet MHZ.2. Item No. 2 requires routing of hydronic piping to VAV boxes positioned as necessary to accommodate the existing structure as shown on the attached drawing. The document references two detailed sheets (MHZ.2 for HVAC specifications and MHZ.3 for hydronic piping) and includes comprehensive architectural drawings with keyed notes, general notes, details, and cross-sectional diagrams for ductwork routing and interstitial coordination. The document is signed by Don Barker, PE, LEED AP, Project Engineer, and carries the project file designation WEDG-0706.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Environmental Liability ACM Worksheet FY26 Q3_rsp.xlsx | XLSX spreadsheet | |
| Second Site Visit sign-in sheet.pdf | ||
| 36C25726Q0769 0005.pdf | ||
| 36C25726Q0769 0005_1.docx | DOCX document | |
| 1st Floor Interstitial - 8 Pictures.pdf | ||
| Asbestos Bulk Analysis Reports - 9 Rpts.pdf | ||
| Total Report.pdf | ||
| 36C25726Q0769 0004_1.docx | DOCX document | |
| 36C25726Q0769-RFI-Technical Questions.pdf | ||
| 36C25726Q0769-RFI-Technical Questions-Second Site Visit.pdf | ||
| 36C25726Q0769 0004.pdf | ||
| 36C25726Q0769 0003_1.docx | DOCX document | |
| 36C25726Q0769 0003.pdf | ||
| 36C25726Q0769 0002.pdf | ||
| SOW - Repair Duct and Chilled Water Insulation - v3.pdf | ||
| 36C25726Q0769 0002_1.docx | DOCX document | |
| Site Visit - Repair Duct and Chilled Water Lines - Sign-in.pdf | ||
| 36C25726Q0769 0001_1.docx | DOCX document | |
| 36C25726Q0769 0001.pdf | ||
| SOW - Repair Duct and Chilled Water Insulation - v2.pdf | ||
| 36C25726Q0769_1.docx | DOCX document | |
| 36C25726Q0769.pdf | ||
| Attachment 1 Wage Determination No 2015-5253.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20150305075624445
| MH2.2 |
| MH2.3 |
File details come from the government source that posted it. Updated .