P09 Equipment Schedule.pdf
PDF 237 KB Posted
- Attached to
- Boiler / Chiller Maintenance Services Federal contract opportunity
- Solicitation number
- 36C25726Q0073
About this file
This document is a comprehensive maintenance service contract for facility equipment at a VA healthcare facility, detailing annual and quarterly preventative maintenance requirements for multiple critical systems. The contract covers extensive maintenance tasks for three primary equipment categories: electric chillers (York YK models), cooling towers (6 Evapco and 1 Marley), and boilers (2 Cleaver-Brooks fire tube boilers). The maintenance scope includes detailed inspections, testing, and servicing for each equipment type, with specific requirements such as performing vibration analysis, megger motor testing, leak detection, oil sampling, refrigerant charge evaluation, and cleaning/disinfection of cooling tower basins.
Key performance requirements mandate that all maintenance be completed before May 1st each year, with quarterly and annual inspections following strict protocols. For each equipment type, contractors must provide comprehensive reports documenting inspection results, measurements, and recommendations for corrective actions. The contract includes specific technical requirements like Eddy Current Tube Inspection every three years for chillers, calibration of sensors and controls, and detailed logging of operational parameters such as temperature, pressure, oil levels, and electrical characteristics. The maintenance tasks are designed to ensure optimal performance, prevent potential failures, and maintain the reliability of critical mechanical systems supporting the VA healthcare facility's operations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| S02 36C25726Q0073 0002.pdf | ||
| 36C25726Q0073 0001.pdf | ||
| Questions and Answers.pdf | ||
| Equipment Schedule.pdf | ||
| S02 36C25726Q0073.pdf | ||
| Attachment A Equipment and Equipment Schedule.pdf | ||
| Attachment B Inspection Task Sheets.pdf | ||
| S02 36C25726Q0073.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Equipment Schedule
Garland Equipment
Equipment BLDG QTY SERIAL MONTHLY
INSPECTION
QUARTERLY SEMI
ANNUAL
ANNUAL EMERGENCY
COVERAGE
ADDITIONAL
TASKS
BOILER # 3&4
Cleaver Brooks Steam Fire Tube Boiler 5175 lbs per hour. Fireye
YB110/230
Burner Mgmt.
Boiler Plant
2 L94624
L94623 x x x x
CHILLER# 5
R-134a
YKHFGDJ1CZFS
900 ton
Equip
Room
1 SHMM037090
NOTE: Eddy Current Testing to be conducted every 3 years.
Next due: 5/2027 x x x Annual
Condenser and Evaporator
Tube Brushing
CHILLER# 1&4
York YK
YKQ2Q2H1CZ8S
YKQ4Q3H1CZC
R22
Centrifugal
Electric Driven 900 ton
Boiler Plant
Equip
Room
SCCM9315211801
SLFN612830
NOTE: Eddy Current Testing to be conducted every 3 years.
#1 next due: 12/2026
#4 next due: 11/2026 x x x x Annual
Condenser and Evaporator
Tube Brushing
Evapco Cooling Towers
USS212-724
Cooling Tower Yard
4 10348765
10348766
10348767
10348768 x x Tower
Basin
Cleaning
1-4
Before 5/1
Condenser Pumps 1-4
Cooling Tower Yard
4 Weinman 472979
Paco G821256 x x Annual Strainer Cleaning
Marley NC Series
Cooling Tower #5
Cooling Tower Yard
1 116726-002
NC6211GM-97
x x Tower
Pump #5
Cooling Tower Yard
1 Aurora
411-BF
Ser# 9713459 x x Annual Strainer
QUARTERLY SEMI
ANNUAL
ANNUAL EMERGENCY
COVERAGE
ADDITIONAL
TASKS
Evapco Cooling
USS 212-
724-S
Tower #6
Cooling Tower Yard
1 10348769 x x Tower
Pump #6
Yard
1 Paco 296012214007128921P x x Annual
Cleaning
Evapco
Cooling
USS 212-
724-S
Cooling Tower Yard
1 10348770 x x Tower
Tower #7
Pump #7
Yard
Paco
296012214007128921 x x Annual Strainer Cleaning
Main Chilled water pump #1
Boiler
Plant
1 Paco Inline
Model: 17-80123- 150101-191
Cleaning
Main Chilled water pump
#2
Boiler
Plant
1 Armstrong
10x12 Inline x x Annual Strainer Cleaning
Main chilled water pump
#3
Boiler
Plant
1 Aurora Split Case
Vertical 413 BF
97-43458 x x Annual Strainer Cleaning
Main chilled water pump
#4
Boiler
Plant
1 Aurora Split Case
Vertical 413 BF
97-43458 x x Annual Strainer Cleaning
East Tower
Secondary
Chilled water pump #1
Boiler
Plant
1 Weinman
Centrifugal x x Annual Strainer Cleaning
East Tower
Secondary
Chilled water pump #2
Boiler
Plant
1 Weinman
Centrifugal x x Annual Strainer Cleaning
Surgery secondary chilled
Equip
Taco T1A922AB2J1A2L
Split Case water pump #3
QUARTERLY SEMI
ANNUAL
ANNUAL EMERGENCY
COVERAGE
ADDITIONAL
TASKS
Surgery secondary chilled water pump #4
Equip
Taco T1A922AB2J1A2L
Split Case
Cleaning
CLC
Secondary chilled water pump #1
Equip
Room
1 Aurora Split Case
411-BF
97-13-60-1 x x Annual Strainer
Cleaning
CLC
Secondary chilled water pump #2
Equip
Room
1 Aurora Split Case
411-BF
97-13-60-1 x x Annual Strainer
Cleaning
CLC
Heating Hot
Water Pump
#1
Equip
Room
1 Aurora Split Case
411-BF
97-43164-2 x x Annual Strainer
Cleaning
CLC
Heating Hot
Water Pump
#2
Equip
Room
1 Aurora Split Case
411-BF
97-43164-2 x x Annual Strainer
Cleaning
CLC
Heating Hot Water Pump
#3
Equip
Room
1 Weinman
4l2-200P14G x x Annual
Annual Electric Chiller Operational Tests & Inspections - Preventative Maintenance
Electric Driven, Centrifugal 900-ton units. Model: York YK (2each R-22; 1each R-134a).
YORK YK. (Completed before May 1 of each year). Contractor shall provide all consumables, personnel, transportation, supplies, cranes, rigging, scaffolding and labor as required to successfully complete the Annual Preventative Maintenance inspections. Required tasks/check points are outlined below. One (1) report per each chiller is required and shall contain pertinent results and/or comments along with any recommendations for corrective maintenance actions. Contractor shall log any circumstances that may prevent completion of an inspection.
Inspections and Tasks to Perform
Draw oil sample for analysis each year and provide report.
Contractor to perform Eddy Current Inspection on Evaporator and Condenser Tubes every three (3) years.
Perform Vibration Analysis and provide report.
Measure mechanical seal leakage, document, and determine need for replacements.
Perform leak tests on machine and repair leaks.
Change oil filter and refrigerant dehydrators.
Evaluate refrigerant charge. Adjust / trim as necessary.
Calibrate and set chilled water and condensing water flows using ultrasonic meters.
Inspect all electrical controls.
Compressor
Oil Level %
Oil Pressure
Oil Added / Removed
Oil Temp
High Oil Pressure
Low Oil Pressure
Discharge Temp
Oil Supply Temp
Proximity Probe (MILS)
Discharge Superheat
Seal Bottle Level (IN)
Motor
Output Volts Phase A
Output Volts Phase B
Output Volts Phase C
Amps: Phase A
Amps: Phase B
Amps: Phase C
% of FLA
Run Hours
Number of Starts
Cooler Refrigerant
Evap Refrigerant Pressure Evap Saturation Temp
Evap Approach
Evap Refrigerant Level Refrigerant Added
Refrigerant
Cond Refrigerant Pressure High Pressure Liquid Temp
Cond Approach
Cond Refrigerant Level
Water
Cond Inlet Temp Cond Outlet Temp Delta T
Sub Cooler Temp
Cond Inlet Pressure Cond Outlet Pressure
Delta P
Electric Driven, Centrifugal 900-ton units. Model: York YK (2 each R-22; 1 each R-134a).
YORK YK. Contractor shall provide all consumables, personnel, transportation, supplies, cranes, rigging, scaffolding and labor as required to successfully complete eleven (11) monthly Preventative Maintenance inspections. Required tasks/check points are outlined below. One (1) report per each chiller is required and shall contain pertinent results and/or comments along with any recommendations for corrective maintenance actions. Contractor shall log any circumstances that may prevent completion of an inspection.
Entering Water Temp Purge Operation and Condition Leaving Water Temp Operation of Chiller Controls Entering Water Pressure Operation of lube system Leaving Water Pressure Motor & starter operation & condition Refrigerant Pressure System Operation Refrigerant Temperature Maintains leaving fluid setpoint Subcooled Liquid Temperature Present setting of leaving fluid setpoint Cooler Pressure Out Other operating conditions Refrigerant Level Reviewed with operator Approach Slide Valve/Vane Position % Delta T Discharge Temperature Delta P Discharge Superheat Actual GPM Oil Temperature Approximate Tons Oil Pressure Phase A: Volts & Amps Oil Level Phase B: Volts & Amps Hours of Operation Phase C: Volts & Amps Number of Starts % full Load Amps Purge
Purge Count Design FLA
HOP
LOP
Prox Sensor Pos / Ref Supply Oil Temperature
Heat Exchanger Data
Cooler and Condenser
Inspection
Motor Data Other Data
Annual Preventative Maintenance for Cooling Towers, Chill Water, Condenser and
Heating Hot Water Pumps
Garland – (6) Evapco & (1) Marley Cooling Towers.
(10) Chill Water, (7) Condenser and
(3) Heating Hot Water Pumps.
To be completed before May 1 of each year. Contractor shall provide all consumables, personnel, transportation, supplies, cranes, rigging, scaffolding and labor as required to successfully complete the Annual Preventative Maintenance inspections. Required tasks/check points are outlined below. One (1) report is required per each Cooling Tower, Chill Water, Condenser and Heating Hot Water Pumps and shall contain pertinent results and/or comments along with any recommendations for corrective maintenance actions. Contractor shall log any circumstances that may prevent completion of an inspection.
NOTE: These PM inspections are to be scheduled within the same 2 – 4-week time frame each year;
unless otherwise directed by the COR.
Heating Hot Water Pumps
Megger Motor
Inspect/record voltage & amperage.
Additional Annual Tasks (Completed before May 1 of each year):
1. Cleaning and disinfection of (6) Evapco and (1) Marley Cooling Towers.
2. Cleaning or Replacement of all Chilled Water, Condenser and Heating Hot Water Pump Strainers (listed in equipment schedule).
Check proper operation/adjust blowdown intervals if needed.
Inspect /record voltage & amperage.
Annual Cooling Tower
PM tasks.
Perform vibration analysis of cooling tower fans.
Balance cooling water flows, VA personnel to assist.
Meggar Motor Inspect /record voltage & amperage.
Megger fan motor and inspect contacts Re-pitch blades and achieve optimum performance as required.
Condenser Water Pumps
Chill Water Pumps
Meggar Motor
Boilers: Annual Service, Cleaning, and Testing
Contract covers a total of two (2) Cleaver-Brooks fire tube boilers.
To be performed between May 1 and October 31 and must be completed before November 1 of each year.
Contractor shall provide all consumables, personnel, transportation, supplies, cranes, rigging, scaffolding and labor as required to successfully complete the Annual Preventative Maintenance Inspections, Cleaning and Testing. Required tasks/check points are outlined below.
One (1) report per each boiler is required and shall contain pertinent results and/or comments along with any recommendations for corrective maintenance actions. Contractor shall log any circumstances that may prevent or delay completion of a task.
Pre-purge setting of flue gas recirculation damper.
Burner Control.
Low-oxygen alarm and/or cut-out.
Boiler outlet damper wide open for purge.
Purge air flow interlock.
Timing for pre-purge Timing for post purge.
Ignition timer.
Low fire position interlock.
Combustion air interlock.
Main flame out, i.e., time to close valves.
Ignition flame out, i.e., time to close valves.
Minimum ignition flame test.
Scanner not sensing ignition spark.
High-steam pressure cut-out (non-recycle).
Forced fan damper wide open for purge.
High-gas fuel pressure cut-off.
Low-gas fuel pressure cut-off.
Gas fuel safety shut-off valves proof closure.
Leak test gas fuel safety shut off valves.
Low-atomizing pressure for fuel oil.
High fuel oil pressure cut-off.
Fuel safety shut off valve proof of closure.
Leak test fuel oil safety shut off valve.
Check operation of liquid petroleum gas pilot.
Low pilot gas pressure cut off.
Forced draft fan motor interlock
1. Annual PM Service for (5) Clever Brooks water tube & fire tube boilers.
Check gas vents for leaks.
Calibrate oxygen analyzer, provide two (2) certified Cal gases.
Test/adjust low oxygen level alarm.
Perform comb. analysis under gas & fuel oil operation. Calibrate fuel/air mixture.
Calibrate steam, oil, gas and feed water press. gauges & industrial controls.
Adjust ignition electrode gap.
Vibration analysis of blower motors.
Operational test of all boiler safety devices.
Check vibration of burner fans Calibrate instrumentation, monitoring, and control systems.
High-steam pressure cut-out (recycle).
Annual Cleaning of all boilers Perform between May 1 and October 31. Complete before November 1.
Cleaning services (Mechanically punched tubes). Once each per boiler.
Boilers Semi Annual, Annual Fuel Train, and Air Train Testing
Each boiler to undergo fuel train & air train testing two (2) times per year as per current VHA DIRECTIVE 1810. Using the current VHA boiler and associated plant safety device testing manual and provide testing results on the forms provided in Appendix A of TESTING MANUAL.
Boilers: Quarterly Preventative Maintenance.
To be performed four (4) times per year during each calendar quarter. When conducting Semi-Annual and Annual PM tasks, the quarterly is to be added to the overall scope of work. Contractor shall provide all consumables, personnel, transportation, supplies, cranes, rigging, scaffolding and labor as required to successfully complete the Quarterly Preventative Maintenance inspections. Required tasks/check points are outlined below. One (1) report per each boiler is required and shall contain pertinent results and/or comments along with any recommendations for corrective maintenance actions. Contractor shall log any circumstances that may prevent or delay completion of a task.
Oct-Dec Jan-March Apr-June July-Sept w/ Annual w/ Annual w/ Annual w/ Annual w/ AnnualTest and adjust low oxygen alarms.
Perform combustion analysis in all fuel modes, gas and oil, with and without VFD.
1. Quarterly PM services. Four (4) times per year for each boiler.
Calibrate steam, feed water and gas flow transmitters, reset totalized values if directed by
Inspect fuel-burning equipment.
Calibrate all sensors Calibrate operating controls.
Calibrate safety controls.
CHILLERS
Location: Date of Service:
Chil ler #: Company:
Model #: Technician:
Serial #:
Heat Exchanger Data Cooler Condenser Inspected Checked Entering Water Temp Purge Operation and Condition Leaving Water Temp Operation of Chil ler Controls Entering Water Pressure Operation of lube system Leaving Water Pressure Motor and starter oper. and cond.
Refrigerant Pressure System Operation Refrigerant Temperature Maintains leaving fluid setpoint Subcooled Liquid Temperature Present setting of leaving fluid setpoint Cooler Pressure Out Other operating conditions Refrigerant Level Reviewed with operator Approach Delta T Delta P Actual GPM Approximate Tons
Motor Comp Data Volts Amps Other Data Check Phase A HOP Phase B LOP Phase C Prox Sensor Pos / Ref
Supply Oil Temperature % full Load Amps Slide Valve/Vane Position % Discharge Temperature Discharge Superheat Oil Temperature Oil Pressure Oil Level Hours of Operation Number of Starts Purge Purge Count Design FLA Comments: (Fill Out Refrigerant Logs each Month)
York ELECTRIC Chil ler. Monthly Run Inspection Service Task List
Location: Date of Service:
Chil ler#: Company:
Model # Technician:
Serial #
Check
Perform vibration analysis.
Comments:
Calibrate and set chil led water and condensing water flows using ultrasonic meters.
Change Oil fi lter and refrigerant dehydrators.
Evaluate refrigerant charge adjust /trim as needed.
Task Comments Consult COR for schedule verification
Instructions
Annual YK Electric Chil ler Inspection Service Task List
The scheduled annual inspection of each chil ler is to include all items as l isted on the monthly tasks l ists as well as the items l isted below as scheduled per contract agreement and/or as requested by the COR.
York YK Electric Chil lers
Inspect all electrical controls.
Perform Eddy Current Inspection on evaporator and condenser tubes every three (3) years or as contracted.
(VA staff to brush tubes) Measure mechanical leakage, document and determine need for replacement.
Draw Oil Samples and provide separate report to the VANTXHCS
Perform leak tests of machine and repair any leaks.
COOLING TOWERS, CONDENSER PUMPS, HEATING HOT WATER, AND CHILL WATER PUMPS
Annual Cooling Tower Inspections & Service Task List Location: Date:
CT #: Company:
Model # Technician:
Serial #
Instructions The scheduled inspections of each cooling tower is to include all items as listed below as scheduled per contract agreement and/or as requested by the COR.
Cooling Tower
Task Check Comments
Perform vibration analysis of cooling tower fans.
Megger fan motor and inspect contacts
Re-pitch blades and achieve optimum performance as required.
Balance cooling water flows, VA personnel to assist.
Check proper operation/adjust blowdown intervals if needed.
Vibration Analysis reports to be processed and submitted back to the VA within 2 weeks
Clean and Disinfect Cooling Tower basins
Additional Notes & Comments
Annual Chill, Condenser and Heating Hot Water Pumps Inspections & Service Task List Location: Date:
Pump #: Company:
Model # Technician:
Serial #
Instructions The scheduled inspections of each Pump is to include all items as listed below as scheduled per contract agreement and/or as requested by the COR.
Chill, Condenser and Heating Hot Water Pumps
Task Check Comments
Megger the Motor and record results
Inspect and record voltage and amperage
Clean or if Damaged Replace Strainers
Additional Notes & Comments