Attachment A Equipment and Equipment Schedule.pdf
PDF 520 KB Posted
- Attached to
- Boiler / Chiller Maintenance Services Federal contract opportunity
- Solicitation number
- 36C25726Q0073
About this file
This document is a detailed maintenance specification for equipment at the Garland VA Medical Center, outlining comprehensive preventative maintenance requirements for multiple system types. The maintenance scope covers six Evapco and one Marley cooling towers, ten chilled water pumps, seven condenser pumps, three heating hot water pumps, and two Cleaver-Brooks fire tube boilers. Key maintenance activities include annual and quarterly inspections with specific tasks such as vibration analysis, motor testing, calibration of sensors and controls, combustion analysis, leak testing, and cleaning services. Most maintenance must be completed before May 1st of each year, with boiler-specific maintenance required between May 1 and October 31, and all tasks to be completed before November 1st. The document provides extensive checklists for operational tests, including detailed procedures for electric chillers, cooling towers, pumps, and boilers, with requirements for generating individual reports documenting inspection results and recommending any necessary corrective actions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P09 Equipment Schedule.pdf | ||
| S02 36C25726Q0073 0002.pdf | ||
| Questions and Answers.pdf | ||
| 36C25726Q0073 0001.pdf | ||
| Equipment Schedule.pdf | ||
| Questions and Answers.pdf | ||
| S02 36C25726Q0073.pdf | ||
| Attachment B Inspection Task Sheets.pdf | ||
| S02 36C25726Q0073.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Equipment and Equipment Schedule
BOILER# 3&4
Cleaver Brooks Steam Fire Tube Boiler 5175 lbs per hour. Fireye
YB110/230
Burner Mgmt.
Boiler Plant
2 L94624 L94623
X X X X
CHILLER# 5 Equip 1 SHMM037090 X X X Annual R-134a Room Note: Eddy Current Condenser YKHFGDJ1CZFS Testing to be and 900 ton conducted every 3 Evaporator years. Next due: Tube 5/2027 Brushing
CHILLER# 1&4
York YK
YKQ2Q2H1CZ8S
YKQ4Q3H1CZC
R22 Centrifugal
Electric Driven 900 ton
Boiler Plant
Equip Room
SCCM9315211801
SLFN612830
Eddie Current Testing to be conducted every 3 years.
#1 next due: 12/2026 #4 next due: 11/2026
X X X X Annual Condenser and Evaporator Tube Brushing
Evapco Cooling 4 10348765 X X Tower Cooling Towers
USS212-724
1-4
Tower Yard
10348766 10348767
Basin Cleaning
10348768 Before 5/1
Condenser Pumps 1-4
Cooling Tower Yard
4 Weinman 472979 Paco G821256
X X Annual Strainer Cleaning
Marley NC Series Cooling Tower #5
Cooling Tower Yard
1 116726-002
NC6211GM-97
X X Tower Basin Cleaning
Before 5/1
Condenser Pump#5
Cooling Tower Yard
1 Aurora
411-BF
Ser# 9713459
X X Annual Strainer Cleaning
Evapco Cooling Cooling Tower USS 212- Yard 724-S Tower#6
1 10348769 X X Tower Basin
Before 5/1
Condenser Pump#6
Cooling Tower Yard
1 Paco 296012214007128921P
X X Annual Strainer Cleaning
Evapco Cooling
USS 212-
724-S Tower #7 Condenser Pump #7
Cooling Tower Yard
Cooling
Yard
1 10348770
Paco 296012214007128921
X
Basin
Before 5/1 Annual Strainer Cleaning
Main Chilled water pump #1
Main Chilled water pump #2
Pacolnline Model: 17-80123- 150101-191
Armstrong 10x12 lnline
Cleaning
Main chilled water pump #3
Boiler Plant
1 Aurora Split Case Vertical 413 BF 97-43458
X X Annual Strainer Cleaning
Main chilled water pump #4
Boiler Plant
1 Aurora Split Case Vertical 413 BF 97-43458
X X Annual Strainer Cleaning
East Tower Secondary Chilled water pump #1
Boiler Plant
1 Weinman Centrifugal
X X Annual
East Tower Secondary Chilled water pump #2
Weinman Centrifugal
Surgery secondary chilled water pump #3
Equip Room
Taco T1A922AB2J1A2L Split Case
Cleaning
Surgery secondary chilled
Equip Room
1 Taco T1A922AB2J1A2L Split Case
X X Annual Strainer Cleaning water pump
#4
CLC
Secondary chilled water pump #1
Equip Room
1 Aurora Split Case
411-BF
97-13-60-1
X X Annual Strainer Cleaning
CLC Equip 1 Aurora Split Case X X Annual Secondary chilled
Room 411-BF 97-13-60-1
Strainer Cleaning water pump
#2 '
CLC
Heating Hot Water Pump #1
Equip Room
1 Aurora Split Case
411-BF
97-43164-2
X X Annual Strainer Cleaning
CLC Equip 1 Aurora Split Case X X Annual Heating Hot Water Pump
Room 411-BF 97-43164-2
Strainer Cleaning
#2
CLC
Heating Hot Water Pump #3
Equip Room
1 Weinman 412-200P14G
X X Annual
Annual Electric Chiller Operational Tests & Inspections - Preventative Maintenance
Electric Driven, Centrifugal 900-ton units. Model: York YK (2each R-22; 1each R-134a).
YORK YK. (Completed before May 1 of each year). Contractor shall provide all consumables, personnel, transportation, supplies, cranes, rigging, scaffolding and labor as required to successfully complete the Annual Preventative Maintenance inspections. Required tasks/check points are outlined below. One (1) report per chiler is required and shall contain pertinent results and/or comments along with any recommendations for corrective maintenance actions. Contractor shall log in any circumstances that may prevent completion of an inspection.
Inspections and Tasks to Perform
Draw oil sample for analysis each year and provide report.
Contractor to perform Eddy Current Inspection on Evaporator and Condenser Tubes every three (3) years.
Perform Vibration Analysis and provide report.
Measure mechanical seal leakage, document, and determine need for replacements.
Perform leak tests on machine and repair leaks.
Change oil filter and refrigerant dehydrators.
Evaluate refrigerant charge. Adjust/ trim as necessary.
Calibrate and set chilled water and condensing water flows using ultrasonic meters.
Inspect all electrical controls.
I Oil Level
Cooler Water
Cooler Refrigerant
Evap Refrigerant Pressure Evap Saturation Temp Evap Approach Evap Refrigerant Level Refrigerant Added
To include - Brushing VSD/Starter external heat exchanger tubes.
Clean external heat exchanger condenser water strainer.
Check and if necessary, replace any cracked, dry rotted or leaking hoses, fittings, and clamps carrying VSD/Starter Coolant and Condenser Water.
Replace VSD/Starter Coolant and verify coolant pump(s) operation.
Electric Driven, Centrifugal 900-ton units. Model: York YK (2ea R-22 1ea R-134a) at Garland VAMC.
YORK YK. Contractor shall provide all consumables, personnel, transportation, supplies, cranes, rigging, scaffolding and labor as required to successfully complete eleven (11) monthly Preventative Maintenance inspections. Required tasks/check points are outlined below. One (1) report per chiller is required and shall contain pertinent results and/or comments along with any recommendations for corrective maintenance actions. Contractor shall log in any circumstances that may prevent completion of an inspection.
Heat Exchanger
Data Cooler and
Entering Water Temp
Inspection
Purge Operation and Condition Leaving Water Temp Operation of Chiller Controls Entering Water Pressure Operation of lube system Leaving Water Pressure Motor & starter operation & condition Refrigerant Pressure System Operation Refrigerant Temperature Maintains leaving fluid setpoint Subcooled Liquid Temperature Present setting of leaving fluid setpoint Cooler Pressure Out Other operating conditions Refrigerant Level Reviewed with operator Approach
Other Data
Slide Valve/Vane Position% Delta T Discharge Temperature Delta P Discharge Superheat Actual GPM Oil Temperature Approximate Tons Oil Pressure
Motor Data
Phase A: Volts & Amps Oil Level Phase B: Volts & Amps Hours of Operation Phase C: Volts & Amps Number of Starts % full Load Amps Purge
Purge Count Design FLA
HOP
LOP
Prox Sensor Pos / Ref Supply Oil Temperature
SECTION X. Annual Preventative Maintenance for Cooling Towers, Chill Water, Condenser and Heating Hot Water Pumps.
(6) Evapco & (1) Marley Cooling Towers.
(10) Chill Water
(7) Condenser
(3) Heating Hot Water Pumps.
(Completed before May 1 of each year). Contractor shall provide all consumables, personnel, transportation, supplies, cranes, rigging, scaffolding and labor as required to successfully complete the Annual Preventative Maintenance inspections. Required tasks/check points are outlined below. One (1) report is required per each Cooling Tower, Chill Water, Condenser and Heating Hot Water Pumps and shall contain pertinent results and/or comments along with any recommendations for corrective maintenance actions. Contractor shall log any circumstances that may prevent completion of an inspection.
NOTE: These PM inspections are to be scheduled within the same 2-4-week time frame each year, unless otherwise directed by the COR.
Cooling Tower PM tasks.
Perform vibration analysis of cooling tower fans.
Megger fan motor and inspect contacts Re-pitch blades and achieve optimum performance as required.
Balance cooling water flows, VA personnel to assist.
Check proper operation/adjust blowdown intervals if needed.
Water Pumps Meggar Motor Inspect /record voltage & amperage.
Chill Water Pumps
Meggar Motor Inspect/record voltage & amperage.
Heating Hot Water Pumps
Megger Motor
Inspect/record voltage & amperage.
SECTION X. Boilers. Annual Service, Cleaning & Testing
Contract covers a total of (2) Cleaver-Brooks fire tube boilers at the Garland VA Medical Center.
(To be performed between May 1 and October 31. Must be completed before November 1 of each year).
Contractors shall provide all consumables, personnel, transportation, supplies, cranes, rigging, scaffolding and labor as required to successfully complete the Annual Preventative Maintenance inspections, Cleaning and Testing.
Required tasks/check points are outlined below. One (1) report per boiler is required and shall contain pertinent results and/or comments along with any recommendations for corrective maintenance actions.
Contractor shall log in any circumstances that may prevent or delay completion of a task.
1. Annual PM Service for (5) Clever Brooks water tube & fire tube boilers. • Calibrate oxygen analyzer, provide two (2) certified Cal gases.
Test/adjust low oxygen level alarm. • Perform comb. analysis under gas& fuel oil operation. Calibrate fuel/air mixture . • Calibrate steam, oil, gas and feed water press. gauges & industrial controls. • Adjust Ignition electrode gap. • Vibration analysis of blower motors. • Operational test of all boiler safety devices.
Check vibration of burner fans • Calibrate instrumentation, monitoring, and control systems.
High-steam pressure cut-out (recycle) . • High-steam pressure cut-out (non-recycle) .
Check gas vents for leaks. • High-gas fuel pressure cut-off. • Low-gas fuel pressure cut-off . • Gas fuel safety shut-off valves proof closure .
Leak test gas fuel safety shut off valves. • Low-atomizing pressure for fuel oil. • High fuel oil pressure cut-off . • Fuel safety shut off valve proof of closure. • Leak test fuel oil safety shut off valve . • Check operation of liquid petroleum gas pilot.
Low pilot gas pressure cut off . • Forced draft fan motor interlock Forced fan damper wide open for purge. • Boiler outlet damper wide open for purge. • Purge airflow interlock. • Timing for pre-purge Timing for post purge. • Ignition timer. • Low fire position interlock. • Combustion air interlock. • Main flame out, i.e., time to close valves. • Ignition flame out, i.e., time to close valves.
Minimum ignition flame test. • Scanner not sensing ignition spark.
Low-oxygen alarm and/or cut-out. • Pre-purge setting of flue gas recirculation damper.
Burner Control.
Annual Cleaning of all boilers
I • Perform between May 1 and October 31. Complete before November 1.
Cleaning services (Mechanically punched tubes). Once each boiler per boiler.
1. Quarterly PM services. Four (4) times per year for each boiler.
Oct-Dec Jan-March Apr-June July-Sept • Inspect fuel-burning equipment. w/ Annual Calibrate all sensors w/ Annual • Calibrate operating controls. w/ Annual • Calibrate safety controls. w/ Annual Test and adjust low oxygen alarms. w/ Annual
• Perform combustion analysis in all fuel modes, gas and oil, with and without VFD.
w/ Annual
• Calibrate steam, feed water and gas flow transmitters, reset totalized values if directed by
Semi Annual and Annual Fuel Train and Air Train Testing.
Each boiler to undergo fuel train & air train testing Two (2) times per year as per current VHA DIRECTIVE 1810. Using the current VHA boiler and associated plant safety device testing manual and provide testing results on the forms provided in Appendix A of TESTING
MANUAL.
SECTION X. Boilers. Quarterly Preventative Maintenance
To be performed four (4) times per year during each calendar quarter. When conducting Semi- Annual and Annual PM tasks, the quarterly is to be added to the overall scope of work. • Contractor shall provide all consumables, personnel, transportation, supplies, cranes, rigging, scaffolding and labor as required to successfully complete the Quarterly Preventative Maintenance inspections. Required tasks/check points are outlined below.
One (1) report per boiler is required and shall contain pertinent results and/or comments along with any recommendations for corrective maintenance actions. Contractor shall log in any circumstances that may prevent or delay completion of a task.
1. Quarterly PM services. Four (4) times per year for each boiler. • Oct-Dec Jan-March Apr-June July-Sept • Inspect fuel-burning equipment. w/ Annual • Calibrate all sensors w/ Annual • Calibrate operating controls. w/ Annual • Calibrate safety controls. w/ Annual Test and adjust low oxygen alarms. w/ Annual
• Perform combustion analysis in all fuel modes, gas and oil, with and without VFD.
• Calibrate steam, feed water and gas flow transmitters, reset totalized values if directed by