519-19-700_VABS_Outpatient Exam Rooms_Issue for Bid Drawings - Plumbing.pdf
PDF 5 MB Posted
- Solicitation number
- 36C25723B0053
About this file
This document provides details for a federal construction contract opportunity with the Department of Veterans Affairs. The solicitation is for renovation work at an outpatient clinic, with an acquisition value of $5-10 million. The work includes upgrades to exam rooms and support spaces. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation notice specifies a firm fixed price contract type. The performance period is 12 months. The solicitation number is 36C25723B0053 and will be awarded by VISN 17 in accordance with FAR Part 36 procedures. The last day for questions is two weeks from issuance, with bids due three weeks from issuance.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
1. GENERAL REQUIREMENTS
A. GENERAL
1. SUBMITTALS
a. CONTRACTOR SHALL MAKE ALL NECESSARY FIELD MEASUREMENTS AND INVESTIGATIONS TO ASSURE THAT THE EQUIPMENT
AND ASSEMBLIES WILL MEET CONTRACT REQUIREMENTS, AND ALL EQUIPMENT THAT REQUIRES REGULAR MAINTENANCE, CALIBRATION, ETC ARE ACCESSABLE FROM THE FLOOR OR PERMANENT WORK PLATFORM. IT IS THE CONTRACTOR’S RESPONSIBILITY TO ENSURE ALL SUBMITTALS MEET SPECIFICATIONS AND REQUIREMENTS AND IT IS ASSUMED BY THAT ALL SUBMITTALS DO MEET SPECIFICATIONS UNLESS THE CONTRACTOR HAS REQUESTED A VARIANCE IN WRITING AND APPROVED PRIOR TO THE SUBMITTAL. IF AT ANY TIME DURING THE PROJECT IT IS FOUND THAT ANY ITEM DOES NOT MEET SPECIFICATIONS AND THERE WAS NO VARIANCE APPROVAL THE CONTRACTOR SHALL CORRECT AT NO ADDITIONAL COST OR
TIME EVEN IF A SUBMITTAL WAS APPROVED.
b. SUBMITTALS AND SHOP DRAWINGS FOR INTERDEPENDENT ITEMS, CONTAINING APPLICABLE DESCRIPTIVE INFORMATION, SHALL BE FURNISHED TOGETHER AND COMPLETE IN A GROUP. COORDINATE AND PROPERLY INTEGRATE MATERIALS AND EQUIPMENT IN EACH GROUP TO PROVIDE A COMPLETELY COMPATIBLE AND EFFICIENT INSTALLATION. FINAL REVIEW AND
APPROVALS WILL BE MADE ONLY BY GROUPS.
2. COORDINATION/SHOP DRAWINGS:
a. SUBMIT COMPLETE CONSOLIDATED AND COORDINATED SHOP DRAWINGS FOR ALL NEW SYSTEMS, AND FOR EXISTING
SYSTEMS THAT ARE IN THE SAME AREAS.
b. THE COORDINATION/SHOP DRAWINGS SHALL INCLUDE PLAN VIEWS, ELEVATIONS AND SECTIONS OF ALL SYSTEMS AND SHALL
CLEARLY IDENTIFY AND DIMENSION THE PROPOSED LOCATIONS OF THE PRINCIPAL ITEMS OF EQUIPMENT. THE DRAWINGS SHALL CLEARLY SHOW LOCATIONS AND ADEQUATE CLEARANCE FOR ALL EQUIPMENT, PIPING, VALVES, CONTROL PANELS AND OTHER ITEMS. SHOW THE ACCESS MEANS FOR ALL ITEMS REQUIRING ACCESS FOR OPERATIONS AND MAINTENANCE.
PROVIDE DETAILED COORDINATION/SHOP DRAWINGS OF ALL PIPING AND DUCT SYSTEMS. THE DRAWINGS SHOULD INCLUDE ALL LOCKOUT/TAGOUT POINTS FOR ALL ENERGY/HAZARD SOURCES FOR EACH PIECE OF EQUIPMENT. COORDINATE
LOCKOUT/TAGOUT PROCEDURES AND PRACTICES WITH LOCAL AHJ REQUIREMENTS.
c. DO NOT INSTALL EQUIPMENT FOUNDATIONS, EQUIPMENT OR PIPING UNTIL COORDINATION/SHOP DRAWINGS HAVE BEEN
APPROVED.
3. QUALITY ASSURANCE:
a. ALL ITEMS SHALL BE APPLIED AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. CONFLICTS
BETWEEN THE MANUFACTURER'S INSTRUCTIONS AND THE CONTRACT DOCUMENTS SHALL BE REFERRED TO THE CLIENT PROJECT REPRESENTATIVE FOR RESOLUTION. PRINTED COPIES OR ELECTRONIC FILES OF MANUFACTURER’S INSTALLATION INSTRUCTIONS SHALL BE PROVIDED AT LEAST 10 WORKING DAYS PRIOR TO COMMENCING INSTALLATION OF ANY ITEM.
b. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINERS, TRANSMITTERS, AND CONTROL DEVICES. PRIOR TO COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN THIS REQUIREMENT AND CONTRACT DOCUMENTS FOR RESOLUTION. FAILURE OF THE CONTRACTOR TO RESOLVE OR CALL ATTENTION TO ANY DISCREPANCIES OR DEFICIENCIES WILL RESULT IN THE
CONTRACTOR CORRECTING AT NO ADDITIONAL COST OR TIME.
c. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY PARAGRAPH, SUBMITTALS. CONSTRUCTION WORK SHALL NOT START
ON ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED.
d. AS-BUILT DRAWINGS:
• THE INSTALLING CONTRACTOR SHALL MAINTAIN AS-BUILT DRAWINGS OF EACH COMPLETED PHASE FOR VERIFICATION; AND, SHALL PROVIDE THE COMPLETE SET AT THE TIME OF FINAL SYSTEMS CERTIFICATION TESTING.
• THE AS-BUILT DRAWINGS SHALL INDICATE THE LOCATION AND TYPE OF ALL LOCKOUT/TAGOUT POINTS FOR ALL ENERGY
SOURCES FOR ALL EQUIPMENT AND PUMPS TO INCLUDE BREAKER LOCATION AND NUMBERS, VALVE TAG NUMBERS, ETC.
COORDINATE LOCKOUT/TAGOUT PROCEDURES AND PRACTICES WITH LOCAL VA REQUIREMENTS.
e. JOB CONDITIONS: BUILDING WORKING ENVIRONMENT: MAINTAIN THE ARCHITECTURAL AND STRUCTURAL INTEGRITY OF THE BUILDING AND THE WORKING ENVIRONMENT AT ALL TIMES. MAINTAIN THE INTERIOR OF BUILDING AT 18 DEGREES C (65 DEGREES F) MINIMUM. LIMIT THE OPENING OF DOORS, WINDOWS OR OTHER ACCESS OPENINGS TO BRIEF PERIODS AS NECESSARY FOR RIGGING PURPOSES. STORM WATER OR GROUND WATER LEAKAGE IS PROHIBITED. PROVIDE DAILY CLEAN- UP OF CONSTRUCTION AND DEMOLITION DEBRIS ON ALL FLOOR SURFACES AND ON ALL EQUIPMENT BEING OPERATED BY BUILDING USERS/FACILITIES. MAINTAIN ALL EGRESS ROUTES AND SAFETY SYSTEMS/DEVICES.
B. PRODUCTS
1. COMPATBILITY OF RELATED EQUIPMENT: EQUIPMENT AND MATERIALS INSTALLED SHALL BE COMPATIBLE IN ALL RESPECTS
WITH OTHER ITEMS BEING FURNISHED AND WITH EXISTING ITEMS SO THAT THE RESULT WILL BE A COMPLETE AND FULLY
OPERATIONAL SYSTEM THAT CONFORMS TO CONTRACT REQUIREMENTS.
2. EQUIPMENT AND MATERIALS IDENTIFICATION
a. INTERIOR (INDOOR) EQUIPMENT: ENGRAVED NAMEPLATES, WITH LETTERS NOT LESS THAN 7 MM (3/16 INCH) HIGH OF BRASS
WITH BLACK-FILLED LETTERS, OR RIGID BLACK PLASTIC WITH WHITE LETTERS SPECIFIED IN PAINTING SHALL BE
PERMANENTLY FASTENED TO THE EQUIPMENT. UNIT COMPONENTS SUCH AS WATER HEATERS, TANKS, COILS, FILTERS, ETC.
SHALL BE IDENTIFIED.
b. CONTROL ITEMS: ALL TEMPERATURE, PRESSURE, AND CONTROLLERS SHALL BE LABELED AND THE COMPONENT’S FUNCTION
IDENTIFIED. IDENTIFY AND LABEL EACH ITEM AS THEY APPEAR ON THE CONTROL DIAGRAMS.
3. VALVE TAGS AND LISTS:
a. PLUMBING: ALL VALVES SHALL BE PROVIDED WITH VALVE TAGS AND LISTED ON A VALVE LIST (FIXTURE STOPS NOT
INCLUDED).
b. VALVE TAGS: ENGRAVED BLACK FILLED NUMBERS AND LETTERS NOT LESS THAN 15 MM (1/2 INCH) HIGH FOR NUMBER
DESIGNATION, AND NOT LESS THAN 8 MM (1/4 INCH) FOR SERVICE DESIGNATION ON 19 GAUGE, 40 MM (1-1/2 INCHES) ROUND
BRASS DISC, ATTACHED WITH BRASS "S" HOOK OR BRASS CHAIN.
4. PIPE AND EQUIPMENT SUPPORTS AND RESTRAINTS
a. SUSPENDED EQUIPMENT SUPPORT AND RESTRAINTS MAY BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE (IBC). SUBMITTALS BASED ON THE INTERNATIONAL BUILDING CODE (IBC) REQUIREMENTS, OR BASED UPON OTHER RELEVANT PARAGRAPH SECTIONS SHALL BE STAMPED AND SIGNED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE WHERE THE PROJECT IS LOCATED. THE SUPPORT SYSTEM OF SUSPENDED EQUIPMENT OVER 227 KG (500 POUNDS) SHALL BE SUBMITTED FOR APPROVAL IN ALL CASES. SEE SPECIFICATIONS FOR LATERAL FORCE DESIGN
REQUIREMENTS.
b. TYPE NUMBERS SPECIFIED: FOR MATERIALS, DESIGN, MANUFACTURE, SELECTION, APPLICATION, AND INSTALLATION REFER
TO MSS SP-58. REFER TO METAL FABRICATIONS, FOR MISCELLANEOUS METAL SUPPORT MATERIALS AND PRIME COAT
PAINTING.
c. FOR ATTACHMENT TO CONCRETE CONSTRUCTION: CONCRETE INSERT: TYPE 18, MSS SP-58.
d. FOR ATTACHMENT TO STEEL CONSTRUCTION: MSS SP-58.
e. ATTACHMENT TO METAL PAN OR DECK: AS REQUIRED FOR MATERIALS SPECIFIED IN SECTION STEEL DECKING, SECTION
COMPOSITE METAL DECKING OR PER METAL PAN OR DECK MANUFACTURER'S REQUIREMENTS.
f. HANGER RODS: HOT-ROLLED STEEL, ASTM A36/A36M OR ASTM A575 FOR ALLOWABLE LOAD LISTED IN MSS SP-58. FOR PIPING, PROVIDE ADJUSTMENT MEANS FOR CONTROLLING LEVEL OR SLOPE. TYPES 13 OR 15 TURN-BUCKLES SHALL PROVIDE 40 MM
(1-1/2 INCHES) MINIMUM OF ADJUSTMENT AND INCORPORATE LOCKNUTS. ALL-THREAD RODS ARE ACCEPTABLE.
g. MULTIPLE (TRAPEZE) HANGERS: GALVANIZED, COLD FORMED, LIPPED STEEL CHANNEL HORIZONTAL MEMBER, NOT LESS
THAN 43 MM BY 43 MM (1-5/8 INCHES BY 1-5/8 INCHES), 2.7 MM (NO. 12 GAUGE), DESIGNED TO ACCEPT SPECIAL SPRING HELD, HARDENED STEEL NUTS.
• ALLOWABLE HANGER LOAD: MANUFACTURERS RATING LESS 91KG (200 POUNDS).
• GUIDE INDIVIDUAL PIPES ON THE HORIZONTAL MEMBER OF EVERY OTHER TRAPEZE HANGER WITH 8 MM (1/4 INCH) U-BOLT
FABRICATED FROM STEEL ROD. PROVIDE TYPE 40 INSULATION SHIELD, SECURED BY TWO 15 MM (1/2 INCH) GALVANIZED STEEL BANDS, OR INSULATED CALCIUM SILICATE SHIELD FOR INSULATED PIPING AT EACH HANGER.
h. PIPE HANGERS AND SUPPORTS: (MSS SP-58), USE HANGERS SIZED TO ENCIRCLE INSULATION ON INSULATED PIPING. REFER
TO SECTION 22 07 11, PLUMBING INSULATION FOR INSULATION THICKNESS. TO PROTECT INSULATION, PROVIDE TYPE 39 SADDLES FOR ROLLER TYPE SUPPORTS OR INSULATED CALCIUM SILICATE SHIELDS. PROVIDE TYPE 40 INSULATION SHIELD OR INSULATED CALCIUM SILICATE SHIELD AT ALL OTHER TYPES OF SUPPORTS AND HANGERS INCLUDING THOSE FOR
INSULATED PIPING.
• GENERAL TYPES (MSS SP-58):
• STANDARD CLEVIS HANGER: TYPE 1; PROVIDE LOCKNUT.
• RISER CLAMPS: TYPE 8.
• WALL BRACKETS: TYPES 31, 32 OR 33.
• ROLLER SUPPORTS: TYPE 41, 43, 44 AND 46.
• SADDLE SUPPORT: TYPE 36, 37 OR 38.
• TURNBUCKLE: TYPES 13 OR 15.
• U-BOLT CLAMP: TYPE 24.
i. COPPER TUBE:
• HANGERS, CLAMPS AND OTHER SUPPORT MATERIAL IN CONTACT WITH TUBING SHALL BE PAINTED WITH COPPER COLORED
EPOXY PAINT, COPPER-COATED, PLASTIC COATED OR TAPED WITH ISOLATION TAPE TO PREVENT ELECTROLYSIS.
• FOR VERTICAL RUNS USE EPOXY PAINTED, COPPER-COATED OR PLASTIC COATED RISER CLAMPS.
• FOR SUPPORTING TUBE TO STRUT: PROVIDE EPOXY PAINTED PIPE STRAPS FOR COPPER TUBE OR PLASTIC INSERTED
VIBRATION ISOLATION CLAMPS.
• INSULATED LINES: PROVIDE PRE-INSULATED CALCIUM SILICATE SHIELDS SIZED FOR COPPER TUBE.
j. PLUMBING PIPING (OTHER THAN GENERAL TYPES):
• HORIZONTAL PIPING: TYPE 1, 5, 7, 9, AND 10.
k. CHROME PLATED PIPING: CHROME PLATED SUPPORTS.
l. HANGERS AND SUPPORTS IN PIPE CHASE: PREFABRICATED SYSTEM ABS SELF-EXTINGUISHING MATERIAL, NOT SUBJECT TO
ELECTROLYTIC ACTION, TO HOLD PIPING, PREVENT VIBRATION AND COMPENSATE FOR ALL STATIC AND OPERATIONAL
CONDITIONS.
m. BLOCKING, STAYS AND BRACING: ANGLE IRON OR PREFORMED METAL CHANNEL SHAPES, 1.3 MM (18 GAUGE) MINIMUM.
C. EXECUTION
1. INSTALLATION
a. LOCATION OF PIPING, SLEEVES, INSERTS, HANGERS, AND EQUIPMENT, ACCESS PROVISIONS SHALL BE COORDINATED WITH THE WORK OF ALL TRADES. PIPING, SLEEVES, INSERTS, HANGERS, AND EQUIPMENT SHALL BE LOCATED CLEAR OF WINDOWS, DOORS, OPENINGS, LIGHT OUTLETS, AND OTHER SERVICES AND UTILITIES. EQUIPMENT LAYOUT DRAWINGS SHALL BE PREPARED TO COORDINATE PROPER LOCATION AND PERSONNEL ACCESS OF ALL FACILITIES. THE DRAWINGS SHALL BE
SUBMITTED FOR REVIEW.
b. MANUFACTURER'S PUBLISHED RECOMMENDATIONS SHALL BE FOLLOWED FOR INSTALLATION METHODS NOT OTHERWISE
SPECIFIED.
c. OPERATING PERSONNEL ACCESS AND OBSERVATION PROVISIONS: ALL EQUIPMENT AND SYSTEMS SHALL BE ARRANGED TO PROVIDE CLEAR VIEW AND EASY ACCESS, WITHOUT USE OF PORTABLE LADDERS, FOR MAINTENANCE, TESTING AND OPERATION OF ALL DEVICES INCLUDING, BUT NOT LIMITED TO: ALL EQUIPMENT ITEMS, VALVES, BACKFLOW PREVENTERS, FILTERS, STRAINERS, TRANSMITTERS, SENSORS, METERS AND CONTROL DEVICES. ALL GAUGES AND INDICATORS SHALL BE CLEARLY VISIBLE BY PERSONNEL STANDING ON THE FLOOR OR ON PERMANENT PLATFORMS. MAINTENANCE AND OPERATING SPACE AND ACCESS PROVISIONS THAT ARE SHOWN IN THE DRAWINGS SHALL NOT BE CHANGED NOR REDUCED.
d. STRUCTURAL SYSTEMS NECESSARY FOR PIPE AND EQUIPMENT SUPPORT SHALL BE COORDINATED TO PERMIT PROPER
INSTALLATION.
e. LOCATION OF PIPE SLEEVES, TRENCHES AND CHASES SHALL BE ACCURATELY COORDINATED WITH EQUIPMENT AND PIPING
LOCATIONS.
f. CUTTING HOLES:
• HOLES SHALL BE LOCATED TO AVOID INTERFERENCE WITH STRUCTURAL MEMBERS SUCH AS BEAMS OR GRADE BEAMS.
HOLES SHALL BE LAID OUT IN ADVANCE AND DRILLING DONE ONLY AFTER APPROVAL BY COR. IF THE CONTRACTOR CONSIDERS IT NECESSARY TO DRILL THROUGH STRUCTURAL MEMBERS, THIS MATTER SHALL BE REFERRED TO COR FOR
APPROVAL.
• WATERPROOF MEMBRANE SHALL NOT BE PENETRATED. PIPE FLOOR PENETRATION BLOCK OUTS SHALL BE PROVIDED
OUTSIDE THE EXTENTS OF THE WATERPROOF MEMBRANE.
• HOLES THROUGH CONCRETE AND MASONRY SHALL BE CUT BY ROTARY CORE DRILL. PNEUMATIC HAMMER, IMPACT ELECTRIC, AND HAND OR MANUAL HAMMER TYPE DRILL WILL NOT BE ALLOWED, EXCEPT AS PERMITTED WHERE WORKING
AREA SPACE IS LIMITED.
g. MINOR PIPING: GENERALLY, SMALL DIAMETER PIPE RUNS FROM DRIPS AND DRAINS, WATER COOLING, AND OTHER SERVICES
ARE NOT SHOWN BUT MUST BE PROVIDED.
h. PROTECTION AND CLEANING:
• EQUIPMENT AND MATERIALS SHALL BE CAREFULLY HANDLED, PROPERLY STORED, AND ADEQUATELY PROTECTED TO
PREVENT DAMAGE BEFORE AND DURING INSTALLATION, IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND AS APPROVED. DAMAGED OR DEFECTIVE ITEMS IN THE OPINION OF THE CLIENT PROJECT REPRESENTATIVE, SHALL BE
REPLACED AT NO ADDITIONAL COST OR TIME.
• PROTECT ALL FINISHED PARTS OF EQUIPMENT, SUCH AS SHAFTS AND BEARINGS WHERE ACCESSIBLE, FROM RUST PRIOR TO OPERATION BY MEANS OF PROTECTIVE GREASE COATING AND WRAPPING. CLOSE PIPE OPENINGS WITH CAPS OR PLUGS DURING INSTALLATION. PIPE OPENINGS, EQUIPMENT, AND PLUMBING FIXTURES SHALL BE TIGHTLY COVERED AGAINST DIRT OR MECHANICAL INJURY. AT COMPLETION OF ALL WORK THOROUGHLY CLEAN FIXTURES, EXPOSED
MATERIALS AND EQUIPMENT.
i. WORK IN BATHROOMS, RESTROOMS, HOUSEKEEPING CLOSETS: ALL PIPE PENETRATIONS BEHIND ESCUTCHEONS SHALL BE
SEALED WITH PLUMBERS’ PUTTY.
j. SWITCHGEAR DRIP PROTECTION: EVERY EFFORT SHALL BE MADE TO ELIMINATE THE INSTALLATION OF PIPE ABOVE DATA EQUIPMENT, AND ELECTRICAL AND TELEPHONE SWITCHGEAR. IF THIS IS NOT POSSIBLE, ENCASE PIPE IN A SECOND PIPE WITH A MINIMUM OF JOINTS. DRAIN VALVE SHALL BE PROVIDED IN LOW POINT OF CASEMENT PIPE.
k. INACCESSIBLE EQUIPMENT:
• WHERE THE CLIENT REPRESENTATIVE DETERMINES THAT THE CONTRACTOR HAS INSTALLED EQUIPMENT NOT
CONVENIENTLY ACCESSIBLE FOR OPERATION AND MAINTENANCE, EQUIPMENT SHALL BE REMOVED AND REINSTALLED OR
REMEDIAL ACTION PERFORMED AS DIRECTED AT NO ADDITIONAL COST OR ADDITIONAL TIME.
• THE TERM "CONVENIENTLY ACCESSIBLE" IS DEFINED AS CAPABLE OF BEING REACHED WITHOUT THE USE OF LADDERS, OR WITHOUT CLIMBING OR CRAWLING UNDER OR OVER OBSTACLES SUCH AS ELECTRICAL CONDUIT, MOTORS, FANS, PUMPS, BELT GUARDS, TRANSFORMERS, HIGH VOLTAGE LINES, PIPING, AND DUCTWORK.
2. PIPE EQUIPMENT AND SUPPORTS
a. WHERE HANGER SPACING DOES NOT CORRESPOND WITH JOIST OR RIB SPACING, USE STRUCTURAL STEEL CHANNELS
SECURED DIRECTLY TO JOIST AND RIB STRUCTURE THAT WILL CORRESPOND TO THE REQUIRED HANGER SPACING, AND THEN SUSPEND THE EQUIPMENT AND PIPING FROM THE CHANNELS. HOLES SHALL BE DRILLED OR BURNED IN STRUCTURAL STEEL
ONLY WITH THE PRIOR WRITTEN APPROVAL.
b. THE USE OF CHAIN PIPE SUPPORTS, WIRE OR STRAP HANGERS; WOOD FOR BLOCKING, STAYS AND BRACING, OR HANGERS SUSPENDED FROM PIPING ABOVE SHALL NOT BE PERMITTED. RUSTY PRODUCTS SHALL BE REPLACED.
c. HANGER RODS SHALL BE USED THAT ARE STRAIGHT AND VERTICAL. TURNBUCKLES FOR VERTICAL ADJUSTMENTS MAY BE OMITTED WHERE LIMITED SPACE PREVENTS USE. A MINIMUM OF 15 MM (1/2 INCH) CLEARANCE BETWEEN PIPE OR PIPING
COVERING AND ADJACENT WORK SHALL BE PROVIDED.
d. FOR HORIZONTAL AND VERTICAL PLUMBING PIPE SUPPORTS, REFER TO THE INTERNATIONAL PLUMBING CODE (IPC) AND
THESE SPECIFICATIONS.
e. OVERHEAD SUPPORTS:
• THE BASIC STRUCTURAL SYSTEM OF THE BUILDING IS DESIGNED TO SUSTAIN THE LOADS IMPOSED BY EQUIPMENT AND
PIPING TO BE SUPPORTED OVERHEAD.
• PROVIDE STEEL STRUCTURAL MEMBERS, IN ADDITION TO THOSE SHOWN, OF ADEQUATE CAPABILITY TO SUPPORT THE
IMPOSED LOADS, LOCATED IN ACCORDANCE WITH THE FINAL APPROVED LAYOUT OF EQUIPMENT AND PIPING.
• TUBING AND CAPILLARY SYSTEMS SHALL BE SUPPORTED IN CHANNEL TROUGHS.
f. FLOOR SUPPORTS:
• PROVIDE CONCRETE BASES, CONCRETE ANCHOR BLOCKS AND PEDESTALS, AND STRUCTURAL STEEL SYSTEMS FOR
SUPPORT OF EQUIPMENT AND PIPING. CONCRETE BASES AND STRUCTURAL SYSTEMS SHALL BE ANCHORED AND DOWELED TO RESIST FORCES UNDER OPERATING AND SEISMIC CONDITIONS (IF APPLICABLE) WITHOUT EXCESSIVE DISPLACEMENT OR
STRUCTURAL FAILURE.
• BASES AND SUPPORTS SHALL NOT BE LOCATED AND INSTALLED UNTIL EQUIPMENT MOUNTED THEREON HAS BEEN APPROVED. BASES SHALL BE SIZED TO MATCH EQUIPMENT MOUNTED THEREON PLUS 50 MM (2 INCH) EXCESS ON ALL EDGES. STRUCTURAL DRAWINGS SHALL BE REVIEWED FOR ADDITIONAL REQUIREMENTS. BASES SHALL BE NEATLY FINISHED AND SMOOTHED, SHALL HAVE CHAMFERED EDGES AT THE TOP, AND SHALL BE SUITABLE FOR PAINTING.
• ALL EQUIPMENT SHALL BE SHIMMED, LEVELED, FIRMLY ANCHORED, AND GROUTED WITH EPOXY GROUT. ANCHOR BOLTS SHALL BE PLACED IN SLEEVES, ANCHORED TO THE BASES. FILL THE ANNULAR SPACE BETWEEN SLEEVES AND BOLTS WITH
A GROUT MATERIAL TO PERMIT ALIGNMENT AND REALIGNMENT.
3. PLUMBING SYSTEM DEMOLITION
a. RIGGING ACCESS, OTHER THAN INDICATED IN THE DRAWINGS, SHALL BE PROVIDED AFTER APPROVAL FOR STRUCTURAL
INTEGRITY BY CLIENT PROJECT REPRESENTATIVE. SUCH ACCESS SHALL BE PROVIDED AT NO ADDITIONAL COST OR TIME.
WHERE WORK IS IN AN OPERATING PLANT, APPROVED PROTECTION FROM DUST AND DEBRIS SHALL BE PROVIDED AT ALL TIMES FOR THE SAFETY OF PLANT PERSONNEL AND MAINTENANCE OF PLANT OPERATION AND ENVIRONMENT OF THE PLANT.
b. UNLESS SPECIFIED OTHERWISE, ALL PIPING, WIRING, CONDUIT, AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK SHALL BE COMPLETELY REMOVED FROM PER SECTION CONSTRUCTION WASTE MANAGEMENT.
THIS INCLUDES ALL CONCRETE EQUIPMENT PADS, PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN ROOF, WALLS, FLOORS, IN AN APPROVED MANNER AND IN ACCORDANCE WITH PLANS AND SPECIFICATIONS WHERE SPECIFICALLY COVERED. STRUCTURAL INTEGRITY OF THE BUILDING SYSTEM SHALL BE MAINTAINED. REFERENCE SHALL ALSO BE MADE TO THE DRAWINGS AND SPECIFICATIONS OF THE OTHER DISCIPLINES IN THE PROJECT FOR ADDITIONAL FACILITIES TO BE DEMOLISHED OR HANDLED.
4. CLEANING AND PAINTING
a. PRIOR TO FINAL INSPECTION AND ACCEPTANCE OF THE PLANT AND FACILITIES FOR BENEFICIAL USE, THE PLANT FACILITIES, EQUIPMENT AND SYSTEMS SHALL BE THOROUGHLY CLEANED AND PAINTED. REFER TO SECTION PAINTING.
• CLEANING SHALL BE THOROUGH. SOLVENTS, CLEANING MATERIALS AND METHODS RECOMMENDED BY THE
MANUFACTURERS SHALL BE USED FOR THE SPECIFIC TASKS. ALL RUST SHALL BE REMOVED PRIOR TO PAINTING AND FROM SURFACES TO REMAIN UNPAINTED. SCRATCHES, SCUFFS, AND ABRASIONS SHALL BE REPAIRED PRIOR TO APPLYING PRIME
AND FINISH COATS.
• THE FINAL RESULT SHALL BE A SMOOTH, EVEN-COLORED, EVEN-TEXTURED FACTORY FINISH ON ALL ITEMS. THE ENTIRE PIECE OF EQUIPMENT SHALL BE REPAINTED, IF NECESSARY, TO ACHIEVE THIS. LEAD BASED PAINTS SHALL NOT BE USED.
8. PIPE PENETRATIONS
a. PIPE PENETRATION SLEEVES SHALL BE INSTALLED FOR ALL PIPE OTHER THAN RECTANGULAR BLOCKED OUT FLOOR
OPENINGS FOR RISERS IN MECHANICAL BAYS.
b. PIPE PENETRATION SLEEVE MATERIALS SHALL COMPLY WITH ALL FIRESTOPPING REQUIREMENTS FOR EACH PENETRATION.
c. TO PREVENT ACCIDENTAL LIQUID SPILLS FROM PASSING TO A LOWER LEVEL, PROVIDE THE FOLLOWING:
• FOR SLEEVES: EXTEND SLEEVE 25 MM (1 INCH) ABOVE FINISHED FLOOR AND PROVIDE SEALANT FOR WATERTIGHT JOINT.
• FOR BLOCKED OUT FLOOR OPENINGS: PROVIDE 40 MM (1-1/2 INCH) ANGLE SET IN SILICONE ADHESIVE AROUND OPENING.
• FOR DRILLED PENETRATIONS: PROVIDE 40 MM (1-1/2 INCH) ANGLE RING OR SQUARE SET IN SILICONE ADHESIVE AROUND
PENETRATION.
d. PENETRATIONS ARE PROHIBITED THROUGH BEAMS OR RIBS, BUT MAY BE INSTALLED IN CONCRETE BEAM FLANGES, WITH
STRUCTURAL ENGINEER PRIOR APPROVAL. ANY DEVIATION FROM THESE REQUIREMENTS MUST RECEIVE PRIOR APPROVAL.
e. SHEET METAL, PLASTIC, OR MOISTURE RESISTANT FIBER SLEEVES SHALL BE PROVIDED FOR PIPE PASSING THROUGH
FLOORS, INTERIOR WALLS, AND PARTITIONS, UNLESS BRASS OR STEEL PIPE SLEEVES ARE SPECIFICALLY CALLED FOR
BELOW.
f. CAST IRON OR ZINC COATED PIPE SLEEVES SHALL BE PROVIDED FOR PIPE PASSING THROUGH EXTERIOR WALLS BELOW GRADE. THE SPACE BETWEEN THE SLEEVE AND PIPE SHALL BE MADE WATERTIGHT WITH A MODULAR OR LINK RUBBER SEAL.
THE LINK SEAL SHALL BE APPLIED AT BOTH ENDS OF THE SLEEVE.
g. GALVANIZED STEEL OR AN ALTERNATE BLACK IRON PIPE WITH ASPHALT COATING SLEEVES SHALL BE FOR PIPE PASSING THROUGH CONCRETE BEAM FLANGES, EXCEPT WHERE BRASS PIPE SLEEVES ARE CALLED FOR. A GALVANIZED STEEL SLEEVE SHALL BE PROVIDED FOR PIPE PASSING THROUGH FLOOR OF MECHANICAL ROOMS, LAUNDRY WORK ROOMS, AND ANIMAL ROOMS ABOVE BASEMENT. EXCEPT IN MECHANICAL ROOMS, SLEEVES SHALL BE CONNECTED WITH A FLOOR PLATE.
h. BRASS PIPE SLEEVES SHALL BE PROVIDED FOR PIPE PASSING THROUGH QUARRY TILE, TERRAZZO OR CERAMIC TILE
FLOORS. THE SLEEVE SHALL BE CONNECTED WITH A FLOOR PLATE.
i. SLEEVE CLEARANCE THROUGH FLOORS, WALLS, PARTITIONS, AND BEAM FLANGES SHALL BE 25 MM (1 INCH) GREATER IN DIAMETER THAN EXTERNAL DIAMETER OF PIPE. SLEEVE FOR PIPE WITH INSULATION SHALL BE LARGE ENOUGH TO ACCOMMODATE THE INSULATION PLUS 25 MM (1 INCH) IN DIAMETER. INTERIOR OPENINGS SHALL BE CAULKED TIGHT WITH FIRESTOPPING MATERIAL AND SEALANT TO PREVENT THE SPREAD OF FIRE, SMOKE, WATER AND GASES.
j. SEALANT AND ADHESIVES: SHALL BE AS SPECIFIED IN JOINT SEALANTS. BIO-BASED MATERIALS SHALL BE UTILIZED WHEN
POSSIBLE.
k. PIPE PASSING THROUGH ROOF SHALL BE INSTALLED THROUGH A 4.9 KG PER SQUARE METER COPPER FLASHING WITH AN INTEGRAL SKIRT OR FLANGE. SKIRT OR FLANGE SHALL EXTEND NOT LESS THAN 200 MM (8 INCHES) FROM THE PIPE AND SET IN A SOLID COATING OF BITUMINOUS CEMENT. EXTEND FLASHING A MINIMUM OF 250 MM (10 INCHES) UP THE PIPE. PIPE PASSING THROUGH A WATERPROOFING MEMBRANE SHALL BE PROVIDED WITH A CLAMPING FLANGE. THE ANNULAR SPACE
BETWEEN THE SLEEVE AND PIPE SHALL BE SEALED WATERTIGHT.
9. WALL, FLOOR, CEILING PLATES
a. MATERIAL AND TYPE: CHROME PLATED BRASS OR CHROME PLATED STEEL, ONE PIECE OR SPLIT TYPE WITH CONCEALED
HINGE, WITH SET SCREW FOR FASTENING TO PIPE, OR SLEEVE. USE PLATES THAT FIT TIGHT AROUND PIPES, COVER
OPENINGS AROUND PIPES AND COVER THE ENTIRE PIPE SLEEVE PROJECTION.
b. LOCATIONS: USE WHERE PIPE PENETRATES FLOORS, WALLS AND CEILINGS IN EXPOSED LOCATIONS, IN FINISHED AREAS ONLY. WALL PLATES SHALL BE USED WHERE INSULATION ENDS ON EXPOSED WATER SUPPLY PIPE DROP FROM OVERHEAD. A WATERTIGHT JOINT SHALL BE PROVIDED IN SPACES WHERE BRASS OR STEEL PIPE SLEEVES ARE SPECIFIED.
5. IDENTIFICATION SIGNS
a. LAMINATED PLASTIC SIGNS, WITH ENGRAVED LETTERING NOT LESS THAN 7 MM (3/16 INCH) HIGH, SHALL BE PROVIDED THAT
DESIGNATES EQUIPMENT FUNCTION, FOR ALL EQUIPMENT, SWITCHES, MOTOR CONTROLLERS, RELAYS, METERS, CONTROL DEVICES, INCLUDING AUTOMATIC CONTROL VALVES. NOMENCLATURE AND IDENTIFICATION SYMBOLS SHALL CORRESPOND TO THAT USED IN MAINTENANCE MANUAL, AND IN DIAGRAMS SPECIFIED ELSEWHERE. ATTACH BY CHAIN, ADHESIVE, OR SCREWS.
b. FACTORY BUILT EQUIPMENT: METAL PLATE, SECURELY ATTACHED, WITH NAME AND ADDRESS OF MANUFACTURER, SERIAL NUMBER, MODEL NUMBER, SIZE, AND PERFORMANCE DATA SHALL BE PLACED ON FACTORY-BUILT EQUIPMENT.
6. STARTUP
a. STARTUP OF EQUIPMENT SHALL BE PERFORMED AS DESCRIBED IN THE EQUIPMENT SPECIFICATIONS. VIBRATION WITHIN
SPECIFIED TOLERANCE SHALL BE VERIFIED PRIOR TO EXTENDED OPERATION.
7. TESTS
a. PRIOR TO THE FINAL INSPECTION, ALL REQUIRED TESTS SHALL BE PERFORMED AS SPECIFIED IN SPECIFICATION SECTION
GENERAL REQUIREMENTS, ARTICLE, TESTS AND SUBMIT THE TEST REPORTS AND RECORDS.
8. OPERATION AND MAINTENANCE MANUALS
a. MANUFACTURER’S INSTALLATION, MAINTENANCE, REPAIR, AND OPERATION INSTRUCTIONS FOR EACH DEVICE SHALL BE
INCLUDED. ASSEMBLY DRAWINGS AND PARTS LISTS SHALL ALSO BE INCLUDED. A SUMMARY OF OPERATING PRECAUTIONS AND REASONS FOR PRECAUTIONS SHALL BE INCLUDED IN THE OPERATIONS AND MAINTENANCE MANUAL.
b. SCHEMATIC DIAGRAMS AND WIRING DIAGRAMS OF ALL CONTROL SYSTEMS CORRECTED TO INCLUDE ALL FIELD
MODIFICATIONS SHALL BE INCLUDED.
c. SET POINTS OF ALL INTERLOCK DEVICES SHALL BE LISTED.
d. THE CONTROL SYSTEM SEQUENCE OF OPERATION CORRECTED WITH SUBMITTAL REVIEW COMMENTS SHALL BE INSERTED
INTO THE OPERATIONS AND MAINTENANCE MANUAL.
e. EMERGENCY PROCEDURES FOR SHUTDOWN AND STARTUP OF EQUIPMENT AND SYSTEMS.
4. GENERAL-DUTY VALVES FOR PLUMBING PIPING
A. GENERAL
1. DESCRIPTION: GENERAL-DUTY VALVES FOR DOMESTIC WATER AND SEWER SYSTEMS: BALL VALVES BALANCING
VALVES CHECK VALVES THERMOSTATIC MIXING VALVES. RE: SPECIFICATIONS.
2. SUBMITTALS
a. MANUFACTURER'S LITERATURE AND DATA INCLUDING: FULL ITEM DESCRIPTION AND OPTIONAL FEATURES AND
ACCESSORIES. INCLUDE DIMENSIONS, WEIGHTS, MATERIALS, APPLICATIONS, STANDARD COMPLIANCE, MODEL NUMBERS, SIZE, AND CAPACITY.
3. DELIVERY AND STORAGE: VALVES SHALL BE PREPARED FOR STORAGE AS FOLLOWS:
a. MAINTAIN VALVE END PROTECTION.
b. STORE VALVES INDOORS AND MAINTAIN AT HIGHER THAN AMBIENT DEW POINT TEMPERATURE.
B. PRODUCTS
1. SHUT-OFF VALVES
a. COLD, HOT AND RE-CIRCULATING HOT WATER:
b. BALL, MSS SP-110, BALL VALVE SHALL BE FULL PORT THREE PIECE OR TWO PIECE WITH A UNION DESIGN WITH ADJUSTABLE
STEM PACKAGE.
2. MANUAL BALANCING VALVES
a. HOT WATER RE-CIRCULATING MANUAL BALANCING VALVE SHALL BE OF BRONZE BODY, BRASS BALL CONSTRUCTION WITH GLASS AND CARBON FILLED TFE SEAT RINGS AND DESIGNED FOR POSITIVE SHUTOFF. THE MANUAL BALANCING VALVE SHALL
HAVE DIFFERENTIAL PRESSURE READ-OUT PORTS ACROSS THE VALVE SEAT AREA.
b. MANUAL BALANCING VALVES SHALL BE OF HEAVY DUTY CAST IRON FLANGED CONSTRUCTION WITH 861 KPA (125 PSIG) FLANGE CONNECTIONS. THE FLANGED MANUAL BALANCING VALVES SHALL HAVE EITHER A BRASS BALL WITH GLASS AND CARBON FILLED TFE SEAL RINGS OR FITTED WITH A BRONZE SEAT, REPLACEABLE BRONZE DISC WITH EPDM SEAL INSERT
AND STAINLESS STEEL STEM.
3. CHECK VALVES
a. SHALL BE CLASS 125, BRONZE SWING CHECK VALVES WITH NON-METALLIC DISC SUITABLE FOR TYPE OF SERVICE. THE
CHECK VALVE SHALL MEET MSS SP-80 TYPE 4 STANDARD. THE CHECK VALVE SHALL HAVE A Y PATTERN HORIZONTAL BODY DESIGN WITH BRONZE BODY MATERIAL CONFORMING TO ASTM B62, SOLDER JOINTS, AND PTFE OR TFE DISC.
b. CHECK VALVES SHALL BE CLASS 125, IRON SWING CHECK VALVE WITH LEVER AND WEIGHT CLOSURE CONTROL. THE CHECK VALVE SHALL MEET MSS SP-71 TYPE I STANDARD. THE CHECK VALVE SHALL HAVE A CLEAR OR FULL WATERWAY BODY DESIGN WITH GRAY IRON BODY MATERIAL CONFORMING TO ASTM A126, BOLTED BONNET, FLANGED ENDS, BRONZE TRIM.
4. WATER TEMPERATURE LIMITING DEVICES:
a. APPLICATION: SINGLE PLUMBING FIXTURE POINT-OF-USE SUCH AS SINKS OR LAVATORIES.
b. STANDARD: ASSE 1070.
c. PRESSURE RATING: 861 KPA (125 PSIG).
d. TYPE: THERMOSTATICALLY CONTROLLED WATER MIXING VALVE SET AT 43 DEGREES C (110 DEGREES F).
e. CONNECTIONS: THREADED UNION, COMPRESSION OR SOLDERED INLETS AND OUTLET.
C. EXECUTION
1. EXAMINATION
a. VALVES SHALL BE OPERATED IN POSITIONS FROM FULLY OPEN TO FULLY CLOSED. GUIDES AND SEATS SHALL BE EXAMINED
AND MADE ACCESSIBLE BY SUCH OPERATIONS.
b. MATING FLANGE FACES SHALL BE EXAMINED FOR CONDITIONS THAT MIGHT CAUSE LEAKAGE. BOLTING SHALL BE CHECKED FOR PROPER SIZE, LENGTH, AND MATERIAL. GASKETS SHALL BE VERIFIED FOR PROPER SIZE AND THAT ITS MATERIAL
COMPOSITION IS SUITABLE FOR SERVICE AND FREE FROM DEFECTS AND DAMAGE.
c. DO NOT ATTEMPT TO REPAIR DEFECTIVE VALVES; REPLACE WITH NEW VALVES.
2. INSTALLATION
a. INSTALL VALVES WITH UNIONS OR FLANGES AT EACH PIECE OF EQUIPMENT ARRANGED TO ALLOW SERVICE, MAINTENANCE, AND EQUIPMENT REMOVAL WITHOUT SYSTEM SHUTDOWN.
b. VALVES SHALL BE LOCATED FOR EASY ACCESS AND SHALL BE PROVIDE WITH SEPARATE SUPPORT. VALVES SHALL BE ACCESSIBLE WITH ACCESS DOORS WHEN INSTALLED INSIDE PARTITIONS OR ABOVE HARD CEILINGS.
c. VALVES SHALL BE INSTALLED IN HORIZONTAL PIPING WITH STEM AT OR ABOVE CENTER OF PIPE.
3. LABELING AND IDENTIFYING
a. EQUIPMENT NAMEPLATES AND SIGNS: INSTALL ENGRAVED PLASTIC-LAMINATE EQUIPMENT NAMEPLATE OR SIGN ON OR
NEAR EACH OF THE FOLLOWING:
• CALIBRATED BALANCING VALVES.
4. STARTUP AND TESTING: PERFORM TESTS AS RECOMMENDED BY PRODUCT MANUFACTURER AND LISTED STANDARDS AND UNDER ACTUAL OR SIMULATED OPERATING CONDITIONS AND PROVE FULL COMPLIANCE WITH DESIGN AND SPECIFIED REQUIREMENTS. TESTS OF THE VARIOUS ITEMS OF EQUIPMENT SHALL BE PERFORMED SIMULTANEOUSLY WITH THE SYSTEM
OF WHICH EACH ITEM IS AN INTEGRAL PART.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
O'Brien Engineering, Inc.
2340 E. Trinity Mills Rd. Ste 200
Carrollton, TX 75006
972-233-2288 www.obrieneng.com
OEI-LBL Joint Venture LLC
2340 E. Trinity Mills Rd. Ste 200
Carrollton, TX 75006
972-233-2288 www.obrieneng.com
O'Brien Engineering, Inc., Managing Partner
COR, Mr. JOSHUA JUNKIN
MICHAEL J. SENUTA
TEXAS P.E #126093
B
IM
/V
A B ig S p ri n g
O u tp a ti e n t E x a m R o o m s /0
.0
V A
B S
O u tp a ti e n t E x a m R o o m s P
L B
G
R
.r v t
/1
/2
:5
:0
A
M
P001
PLUMBING COVER SHEET,
GENERAL NOTES
OUTPATIENT CLINIC
Big Spring, TX
519-19-700
03/17/2023 MJS DMB
ISSUE FOR BID
SHEET INDEX
NUMBER NAME
P001 PLUMBING COVER SHEET, GENERAL NOTES
P002 PLUMBING COVER SHEET, GENERAL NOTES & LEGENDS
PD101 PLUMBING WASTE & VENT DEMOLITION PLAN
PD102 PLUMBING WATER DEMOLITION PLAN
PL101 PLUMBING PROPOSED WASTE & VENT PLAN
PL102 PLUMBING PROPOSED WATER PLAN
PL601 PLUMBING SCHEDULES
PL901 PLUMBING WASTE & VENT ISOMETRIC
PL902 PLUMBING WATER ISOMETRIC
SHEET LOG
SHEET REVISION
NUMBER NAME REV DATE DESCRIPTION
P001 PLUMBING COVER SHEET, GENERAL NOTES 1 03/17/2023 ISSUE FOR BID
P002 PLUMBING COVER SHEET, GENERAL NOTES & LEGENDS 1 03/17/2023 ISSUE FOR BID
PD101 PLUMBING WASTE & VENT DEMOLITION PLAN 1 03/17/2023 ISSUE FOR BID
PD102 PLUMBING WATER DEMOLITION PLAN 1 03/17/2023 ISSUE FOR BID
PL101 PLUMBING PROPOSED WASTE & VENT PLAN 1 03/17/2023 ISSUE FOR BID
PL102 PLUMBING PROPOSED WATER PLAN 1 03/17/2023 ISSUE FOR BID
PL601 PLUMBING SCHEDULES 1 03/17/2023 ISSUE FOR BID
PL901 PLUMBING WASTE & VENT ISOMETRIC 1 03/17/2023 ISSUE FOR BID
PL902 PLUMBING WATER ISOMETRIC 1 03/17/2023 ISSUE FOR BID
WEST TEXAS VA HEALTHCARE SYSTEM
OUTPATIENT EXAM ROOMS
519-19-700
BIG SPRING, TEXAS
Revisions: Date:
35% PROGRESS SCHEMATIC DESIGN 05/10/2021
65% PROGRESS DESIGN DEVELOPMENT 10/18/2021
95% PROGRESS CONSTRUCTION DOCUMENTS 03/18/2022
100% CONSTRUCTION DOCUMENTS 10/21/2022
ISSUE FOR BID 03/17/2023
PLUMBING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
BOTTOM CONNECTION, 45° OR 90°
PIPE DOWN
PIPE CONTINUES
POINT OF CONNECTION BETWEEN
NEW AND EXISTING WORK
LIMIT OF DEMOLITION
FLOOR DRAIN
FLOOR SINK
ROOF DRAIN
STRAINER
THERMOMETER
PRESSURE GAUGE
WALL CLEANOUT
FLOOR OR GRADE CLEANOUT
HOSE BIBB
CO
ABBREVIATIONS
ABS ACRYLONITRILE BUTADIENE STYRENE
AC ALTERNATING CURRENT
ACR AIR CONDITIONING AND REFRIGERATION
A/E ARCHITECT/ENGINEER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AG AIR GAP
AI ANALOG INPUT
AISI AMERICAN IRON AND STEEL INSTITUTE
AO ANALOG OUTPUT
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION, AIR
CONDITIONING ENGINEERS
ASJ ALL SERVICE JACKET
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AWG AMERICAN WIRE GAUGE
BACNET BUILDING AUTOMATION AND CONTROL NETWORK
BAG SILVER-COPPER-ZINC BRAZING ALLOY
BAS BUILDING AUTOMATION SYSTEM
BCUP SILVER-COPPER-PHOSPHORUS BRAZING ALLOY
BFP REDUCED PRESSURE BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
BTU/H BRITISH THERMAL UNIT PER HOUR
BSG BOROSILICATE GLASS PIPE
C CELSIUS
CD COMPACT DISK
CDA COPPER DEVELOPMENT ASSOCIATION
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CO CLEANOUT
COR CONTRACTING OFFICER'S REPRESENTATIVE
CPVC CHLORINATED POLYVINYL CHLORIDE
CR CHLOROPRENE
CRS CORROSION RESISTENT STEEL
CV CONTROL VALVE
CXA COMMISSIONING AGENT
DB DECIBELS
DB(A) DECIBELS (A WEIGHTED)
DDC DIRECT DIGITAL CONTROL
DFU DRAINAGE FIXTURE UNITS
DI DIGITAL INPUT
DI DEIONIZED WATER
DISS DIAMETER INDEX SAFETY SYSTEM
DN DIAMETER NOMINAL
DO DIGITAL OUTPUT
DOE DEPARTMENT OF ENERGY
DVD DIGITAL VIDEO DISC
DW DISHWASHER
DWG DRAWING
DWV DRAIN, WASTE AND VENT
ECC ENGINEERING CONTROL CENTER AKA BAS
EL ELEVATION
EPA ENVIRONMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EPT ETHYLENE PROPYLENE TERPOLYMER
ETO ETHYLENE OXIDE
EX EXISTING
F FAHRENHEIT
FAR FEDERAL ACQUISITION REGULATIONS
FCO FLOOR CLEANOUT
FD FLOOR DRAINS
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FNPT FEMALE NATIONAL PIPE THREAD
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FPM FLUOROELASTOMER POLYMER
FS FLOW SWITCH
FSK FOIL-SCRIM-KRAFT FACING
FSS VA CONSTRUCTION & FACILITIES MANAGEMENT,
FACILITIES STANDARDS SERVICE
FU FIXTURE UNITS
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
HEX HEAT EXCHANGER
HG MERCURY
HOA HANDS-OFF-AUTOMATIC
HP HORSEPOWER
HVE HIGH VOLUME EVACUATION
HWCP HOT WATER CIRCULATING PUMP
HYD HYDRANT
HZ HERTZ
ID INSIDE DIAMETER
IE INVERT ELEVATION
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IPS IRON PIPE SIZE
KG KILOGRAM
KPA KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
LAV LAVATORY
LB POUND
LBS/HR POUNDS PER HOUR
LNG LIQUID NATURAL GAS
L/MIN LITERS PER MINUTE
L/S LITERS PER SECOND
M METER
MA MEDICAL AIR
MAV MEDICAL AIR VENT
MAX MAXIMUM
MBH 1,000 BTU PER HOUR
MER MECHANICAL EQUIPMENT ROOM
MFG MANUFACTURER
MG MILLIGRAM
MG/L MILLIGRAM PER LITER
ML MILLILITER
MM MILLIMETER
MIN MINIMUM
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NF OIL FREE DRY (NITROGEN)
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPTF NATIONAL PIPE THREAD FEMALE
NPS NOMINAL PIPE SIZE
NPT NOMINAL PIPE THREAD
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OCAMES REPLACED BY HEFP
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSD OPEN SIGHT DRAIN
OS&Y OUTSIDE STEM & YOKE
OXY OXYGEN
PA PASCAL
PBPU PREFABRICATED BEDSIDE PATIENT UNITS
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PH POWER OF HYDROGEN
PID PROPORTIONAL-INTEGRAL-DIFFERENTIAL
PLC PROGRAMMABLE LOGIC CONTROLLERS
PP POLYPROPYLENE
PPB PARTS PER BILLION
PPM PARTS PER MILLION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE IN ATMOSPHERE
PSIG POUNDS PER SQUARE IN GAUGE
PTFE POLYTETRAFLUOROETHYLENE
PVC POLYVINYL CHLORIDE
PVDF POLYVINYLIDENE FLUORIDE
PW POTABLE WATER
RAD RADIANS
RD ROOF DRAIN
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RTD RESISTANCE TEMPERATURE DETECTORS
RTRP REINFORCED THERMOSETTING RESIN PIPE
SAN SANITARY
SCFM STANDARD CUBIC FEET PER MINUTE
SDI SILT DENSITY INDEX
SDMH STORM DRAINAGE MANHOLE
SF SQUARE FEET
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SPEC SPECIFICATION
SPS STERILE PROCESSING SERVICES
SQFT SQUARE FEET
SS STAINLESS STEEL
STD STANDARD
SUS SAYBOLT UNIVERSAL SECOND
SW STORM WATER
SWP STEAM WORKING PRESSURE
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEFC TOTALLY ENCLOSED FAN-COOLED
TEMP TEMPERATURE
TFE TETRAFLUOROETHYLENE
THERM 100,000 BTU
THHN THERMOPLASTIC HIGH-HEAT RESISTANT
NYLON COATED WIRE
THWN THERMOPLASTIC HEAT & WATER RESISTANT
NYLON COATED WIRE
TMV THERMOSTATIC MIXING VALVE
T/P TEMPERATURE AND PRESSURE
TP TRAP PRIMER
TSTAT THERMOSTAT
TYP TYPICAL
USDA U.S. DEPARTMENT OF AGRICULTURE
V VOLT
VA VETERANS ADMINISTRATION
VA CFM VA CONSTRUCTION & FACILITIES MANAGEMENT
VA CFM CSS VA CFM CONSULTING SUPPORT SERVICE
VAC VACUUM
VAC VOLTAGE IN ALTERNATING CURRENT
VAMC VETERANS ADMINISTRATION MEDICAL CENTER
VA TIL WWW.CFM.VA.GOV/TIL/INDEX.ASP
VHA VETERANS HEALTH ADMINISTRATION
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WASTE
WAGD WASTE ANESTHESIA GAS DISPOSAL
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WALL HYDRANT
WOG WATER, OIL, GAS
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
YCO YARD CLEANOUT
YH YARD HYDRANT
PLUMBING VALVE SYMBOLS
GATE VALVE
GLOBE VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO-POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
AUTOMATIC BALANCING CONTROL VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
AV
DRAWING SYMBOLS
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
SECTION LETTER
DRAWING NUMBER WHERE SHOWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
EQUIPMENT ABBREVIATION (PUMP)
PL105
PL105
PUMP NO. 3 IN BUILDING NO. 26
TYPICAL UNIT NO.
RISER SYSTEM
RISER NUMBER
SAN
-26 P 3EQUIPMENT TAG
SECTION
CALLOUT
(ENLARGED VIEW)
(Description) TAG
BUILDING NO. WHERE EQUIPMENT IS LOCATED
ITEM (TERMINAL UNIT SHOWN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
SERVED BY AIR HANDLER UNIT NO. 1
-26 P 3EQUIPMENT TAG - 3-
PLUMBING PIPING SYMBOLS
DOMESTIC COLD WATER, COLD WATER
MEDICAL AIR
MEDICAL VACUUM
LABORATORY AIR
LABORATORY VACUUM
ORAL EVACUATION
INDUSTRIAL AIR
DRAIN
VENT (SANITARY)
SOIL, WASTE, OR SANITARY SEWER
STORM WATER
STORM WATER, BELOW GRADE
SOFTENED COLD WATER
FILTERED COLD WATER
DRINKING WATER SUPPLY
DRINKING WATER RETURN
TEMPERED WATER SUPPLY
TEMPERED WATER RETURN
NITROUS OXIDE
OXYGEN
NITROGEN
NATURAL GAS
NATURAL GAS, BELOW GRADE
FUEL OIL DISCHARGE
FUEL OIL SUPPLY
FUEL OIL VENT
DOMESTIC HOT WATER, HOT WATER
DOMESTIC HOT WATER RETURN,
HOT WATER RETURN
FUEL OIL RETURNFOR
FOV
FOS
FOD
NG
NG
N
O
N2O
TWR
TWS
DWR
DWS
FCW
SCW
SD
SD
SS
D
IA
OA
LV
LA
MV
MA
SANITARY SEWER, BELOW GRADESAN
GENERAL NOTES
5. PLUMBING INSULATION
A. GENERAL
1. DESCRIPTION: FIELD APPLIED INSULATION FOR THERMAL EFFICIENCY AND CONDENSATION CONTROL FOR THE FOLLOWING:
a. PLUMBING PIPING AND EQUIPMENT.
b. ALL INSULATION SYSTEMS INSTALLED WITHIN SUPPLY, RETURN, EXHAUST, RELIEF AND VENTILATION AIR PLENUMS SHALL BE
LIMITED TO UNINHABITED CRAWL SPACES, AREAS ABOVE A CEILING OR BELOW THE FLOOR, ATTIC SPACES, INTERIORS OF AIR CONDITIONED OR HEATING DUCTS, AND MECHANICAL EQUIPMENT ROOMS SHALL BE NONCOMBUSTIBLE OR SHALL BE LISTED AND LABELED AS HAVING A FLAME SPREAD INDEXES OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM E84 OR UL 723. NOTE: ICC IMC, SECTION 602.2.1.
2. SUBMITTALS
a. ALL INFORMATION, CLEARLY PRESENTED, SHALL BE INCLUDED TO DETERMINE COMPLIANCE WITH DRAWINGS AND
SPECIFICATIONS AND ASTM DESIGNATION, FEDERAL AND MILITARY SPECIFICATIONS.
b. INSULATION MATERIALS: SPECIFY EACH TYPE USED AND STATE SURFACE BURNING CHARACTERISTICS.
c. INSULATION FACINGS AND JACKETS: EACH TYPE USED AND STATE SURFACE BURNING CHARACTERISTICS.
d. INSULATION ACCESSORY MATERIALS: EACH TYPE USED.
e. ALL INSULATION FITTINGS (EXCEPTION FLEXIBLE UNICELLULAR INSULATION) SHALL BE FABRICATED IN ACCORDANCE WITH
ASTM C450 AND THE REFERENCED ADJUNCT TO ASTM C450.
f. SUBMIT MANUFACTURER’S LITERATURE AND DATA UPDATED TO INCLUDE SUBMITTAL REVIEW COMMENTS AND ANY
EQUIPMENT SUBSTITUTIONS.
3. STORAGE AND HANDLING OF MATERIAL: STORE MATERIALS IN CLEAN AND DRY ENVIRONMENT, PIPE INSULATION JACKETS
SHALL BE CLEAN AND UNMARRED. PLACE ADHESIVES IN ORIGINAL CONTAINERS. MAINTAIN AMBIENT TEMPERATURES AND CONDITIONS AS REQUIRED BY PRINTED INSTRUCTIONS OF MANUFACTURERS OF ADHESIVES, MASTICS AND FINISHING
CEMENTS.
B. PRODUCTS: RE: SPECIFICATION FOR INSULATION AND INSULATION ACCESSORIES MATERIAL REQUIREMENTS
C. EXECUTION
1. GENERAL REQUIREMENTS
a. EXCEPT FOR SPECIFIC EXCEPTIONS OR AS NOTED, INSULATE ALL SPECIFIED EQUIPMENT, AND PIPING (PIPE, FITTINGS, VALVES, ACCESSORIES). INSULATE EACH PIPE INDIVIDUALLY. DO NOT USE SCRAP PIECES OF INSULATION WHERE A FULL
LENGTH SECTION WILL FIT.
b. INSULATION MATERIALS SHALL BE INSTALLED WITH SMOOTH AND EVEN SURFACES, WITH JACKETS AND FACINGS DRAWN TIGHT AND SMOOTHLY CEMENTED DOWN AND SEALED AT ALL LAPS. INSULATION SHALL BE CONTINUOUS THROUGH ALL
SLEEVES AND OPENINGS, EXCEPT AT FIRE DAMPERS AND DUCT HEATERS (NFPA 90A).
c. VAPOR RETARDERS SHALL BE CONTINUOUS AND UNINTERRUPTED THROUGHOUT SYSTEMS WITH OPERATING TEMPERATURE 15 DEGREES C (60 DEGREES F) AND BELOW. LAP AND SEAL VAPOR BARRIER OVER ENDS AND EXPOSED EDGES OF INSULATION. ANCHORS, SUPPORTS AND OTHER METAL PROJECTIONS THROUGH INSULATION ON COLD SURFACES SHALL BE
INSULATED AND VAPOR SEALED FOR A MINIMUM LENGTH OF 150 MM (6 INCHES).
d. INSTALL VAPOR STOPS WITH OPERATING TEMPERATURE 15 DEGREES C (60 DEGREES F) AND BELOW AT ALL INSULATION TERMINATIONS ON EITHER SIDE OF VALVES, PUMPS, FITTINGS, AND EQUIPMENT AND PARTICULARLY IN STRAIGHT LENGTHS EVERY 4.6 TO 6.1 METERS (APPROX. 15 TO 20 FEET) OF PIPE INSULATION. THE ANNULAR SPACE BETWEEN THE PIPE AND PIPE INSULATION OF APPROX. 25 MM (1 INCH) IN LENGTH AT EVERY VAPOR STOP SHALL BE SEALED WITH APPROPRIATE VAPOR
BARRIER SEALANT. BIO-BASED MATERIALS SHALL BE UTILIZED WHEN POSSIBLE.
e. CONSTRUCT INSULATION ON PARTS OF EQUIPMENT SUCH AS COLD WATER PUMPS AND HEAT EXCHANGERS THAT MUST BE OPENED PERIODICALLY FOR MAINTENANCE OR REPAIR, SO INSULATION CAN BE REMOVED AND REPLACED WITHOUT DAMAGE.
INSTALL INSULATION WITH BOLTED 1 MM THICK (20 GAGE) GALVANIZED STEEL OR ALUMINUM COVERS AS COMPLETE UNITS, OR IN SECTIONS, WITH ALL NECESSARY SUPPORTS, AND SPLIT TO COINCIDE WITH FLANGE/SPLIT OF THE EQUIPMENT. DO NOT
INSULATE OVER EQUIPMENT NAMEPLATE DATA.
f. INSULATION ON HOT PIPING AND EQUIPMENT SHALL BE TERMINATED SQUARE AT ITEMS NOT TO BE INSULATED, ACCESS OPENINGS AND NAMEPLATES. COVER ALL EXPOSED RAW INSULATION WITH WHITE SEALER COATING (CAUTION ABOUT
COATING’S MAXIMUM TEMPERATURE LIMIT) OR JACKET MATERIAL.
g. PROTECT ALL INSULATIONS OUTSIDE OF BUILDINGS WITH ALUMINUM JACKET USING LOCK JOINT OR OTHER APPROVED SYSTEM FOR A CONTINUOUS WEATHER TIGHT SYSTEM. ACCESS DOORS AND OTHER ITEMS REQUIRING MAINTENANCE OR
ACCESS SHALL BE REMOVABLE AND SEALABLE.
h. PLUMBING WORK NOT TO BE INSULATED UNLESS OTHERWISE NOTED:
• PIPING AND VALVES OF FIRE PROTECTION SYSTEM.
• CHROMIUM PLATED BRASS PIPING.
• WATER PIPING IN CONTACT WITH EARTH.
• DISTILLED WATER PIPING.
i. APPLY INSULATION MATERIALS SUBJECT TO THE MANUFACTURER'S RECOMMENDED TEMPERATURE LIMITS. APPLY ADHESIVES, MASTIC AND COATINGS AT THE MANUFACTURER'S RECOMMENDED MINIMUM WET OR DRY FILM THICKNESS. BIO-
BASED MATERIALS SHALL BE UTILIZED WHEN POSSIBLE.
j. ELBOWS, FLANGES AND OTHER FITTINGS SHALL BE INSULATED WITH THE SAME MATERIAL AS IS USED ON THE PIPE STRAIGHTS. USE OF POLYURETHANE OR POLYISOCYANURATE SPRAY-FOAM TO FILL A PVC ELBOW JACKET IS PROHIBITED ON
COLD APPLICATIONS.
k. FIRESTOP PIPE INSULATION:
l. PROVIDE FIRESTOPPING INSULATION AT FIRE AND SMOKE BARRIERS THROUGH PENETRATIONS. FIRESTOPPING INSULATION
SHALL BE UL LISTED AS DEFINED IN SECTION 07 84 00, FIRESTOPPING.
m. PIPE PENETRATIONS REQUIRING FIRE STOP INSULATION INCLUDING, BUT NOT LIMITED TO THE FOLLOWING:
• PIPE RISERS THROUGH FLOORS
• PIPE CHASE WALLS AND FLOORS
• SMOKE PARTITIONS
• FIRE PARTITIONS
• HOURLY RATED WALLS
n. PROVIDE VAPOR BARRIER SYSTEMS AS FOLLOWS:
• ALL PIPING EXPOSED TO OUTDOOR WEATHER.
• ALL INTERIOR PIPING CONVEYING FLUIDS EXPOSED TO OUTDOOR AIR (I.E. IN ATTICS, VENTILATED (NOT AIR CONDITIONED)
SPACES, ETC.) BELOW AMBIENT AIR TEMPERATURE IN HIGH HUMIDITY LOCATIONS.
o. PROVIDE METAL JACKETS OVER INSULATION AS FOLLOWS:
• ALL PLUMBING PIPING EXPOSED TO OUTDOOR WEATHER.
• PIPING EXPOSED IN BUILDING, WITHIN 1829 MM (6 FEET) OF THE FLOOR, THAT CONNECTS TO STERILIZERS, KITCHEN AND
LAUNDRY EQUIPMENT. JACKETS MAY BE APPLIED WITH POP RIVETS EXCEPT FOR COLD PIPE OR TUBING APPLICATIONS.
PROVIDE ALUMINUM ANGLE RING ESCUTCHEONS AT WALL, CEILING OR FLOOR PENETRATIONS.
• A 50 MM (2 INCH) JACKET OVERLAP IS REQUIRED AT LONGITUDINAL AND CIRCUMFERENTIAL JOINTS WITH THE OVERLAP AT
THE BOTTOM.
p. PROVIDE PVC JACKETS OVER INSULATION AS FOLLOWS:
• PIPING EXPOSED IN BUILDING, WITHIN 1829 MM (6 FEET) OF THE FLOOR, ON PIPING THAT IS NOT PRECLUDED IN PREVIOUS
SECTIONS.
• A 50 MM (2 INCH) JACKET OVERLAP IS REQUIRED AT LONGITUDINAL AND CIRCUMFERENTIAL JOINTS WITH THE OVERLAP AT
THE BOTTOM.
2. INSULATION INSTALLATION
a. MINERAL FIBER BOARD:
• VAPOR RETARDER FACED BOARD: APPLY BOARD ON PINS SPACED NOT MORE THAN 300 MM (12 INCHES) ON CENTER EACH
WAY, AND NOT LESS THAN 75 MM (3 INCHES) FROM EACH EDGE OF BOARD. IN ADDITION TO PINS, APPLY INSULATION BONDING ADHESIVE TO ENTIRE UNDERSIDE OF HORIZONTAL METAL SURFACES. (BIO-BASED MATERIALS SHALL BE UTILIZED WHEN POSSIBLE.) BUTT INSULATION EDGES TIGHTLY AND SEAL ALL JOINTS WITH LAPS AND BUTT STRIPS. AFTER APPLYING
SPEED CLIPS CUT PINS OFF FLUSH AND APPLY VAPOR SEAL PATCHES OVER CLIPS.
• COLD EQUIPMENT: 40 MM (1-1/2INCH) THICK INSULATION FACED WITH VAPOR RETARDER ASJ OR FSK. SEAL ALL FACINGS, LAPS, AND TERMINATION POINTS AND DO NOT USE STAPLES OR OTHER ATTACHMENTS THAT MAY PUNCTURE ASJ OR FSK.
• HOT EQUIPMENT: 40 MM (1-1/2 INCH) THICK INSULATION FACED WITH UNSEALED ASJ OR FSK.
b. MOLDED MINERAL FIBER PIPE AND TUBING COVERING:
• FIT INSULATION TO PIPE, ALIGNING ALL LONGITUDINAL JOINTS. SEAL LONGITUDINAL JOINT LAPS AND CIRCUMFERENTIAL BUTT STRIPS BY RUBBING HARD WITH A NYLON SEALING TOOL TO ASSURE A POSITIVE SEAL. STAPLES MAY BE USED TO ASSIST IN SECURING INSULATION EXCEPT FOR COLD PIPING. SEAL ALL VAPOR RETARDER PENETRATIONS ON COLD PIPING WITH A GENEROUS APPLICATION OF VAPOR BARRIER MASTIC. PROVIDE CELLAR GLASS INSERTS AND INSTALL WITH METAL INSULATION SHIELDS AT OUTSIDE PIPE SUPPORTS. INSTALL FREEZE PROTECTION INSULATION OVER HEATING CABLE.
• NOMINAL THICKNESS IN MILLIMETERS AND INCHES SPECIFIED IN THE SCHEDULE AT THE END OF THIS SECTION.
c. FLEXIBLE ELASTOMERIC CELLULAR THERMAL INSULATION:
• APPLY INSULATION AND FABRICATE FITTINGS IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND FINISH WITH TWO COATS OF WEATHER RESISTANT FINISH AS RECOMMENDED BY THE INSULATION MANUFACTURER.
EXTERNAL VAPOR BARRIER JACKETING MAY BE REQUIRED FOR EXPECTED OR ANTICIPATED HIGH HUMIDITY EXPOSURES.
SEE ASTM C1710.
d. CALCIUM SILICATE:
• MINIMUM THICKNESS IN MILLIMETER (INCHES) SPECIFIED BELOW FOR PIPING OTHER THAN IN BOILER PLANT.
e. RE: INSULATION SCHEDULE: NOMINAL THICKNESS OF CALCIUM SILICATE INSULATION
f. RE: INSULATION SCHEDULE: PIPE INSULATION THICKNESS MILLIMETERS (INCHES)
6. FACILITY WATER DISTRIBUTION
A. GENERAL
1. DESCRIPTION: DOMESTIC WATER SYSTEMS, INCLUDING PIPING, EQUIPMENT AND ALL NECESSARY ACCESSORIES AS
DESIGNATED IN THIS SECTION.
B. PRODUCTS: RE: SPECIFICATION FOR PIPE, PIPE FITTING, PIPE JOINING MATERIAL REQUIREMENTS
C. EXECUTION
1. INSTALLATION: GENERAL: COMPLY WITH THE INTERNATIONAL PLUMBING CODE AND THE FOLLOWING:
a. INSTALL BRANCH PIPING FOR WATER FROM THE PIPING SYSTEM AND CONNECT TO ALL FIXTURES, VALVES, COCKS, OUTLETS, CASEWORK, CABINETS AND EQUIPMENT, INCLUDING THOSE FURNISHED BY THE GOVERNMENT OR SPECIFIED IN OTHER
SECTIONS.
b. ALL PIPE RUNS SHALL BE LAID OUT TO AVOID INTERFERENCE WITH OTHER WORK/TRADES.
c. INSTALL UNION AND SHUT-OFF VALVE ON PRESSURE PIPING AT CONNECTIONS TO EQUIPMENT.
d. PIPE HANGERS, SUPPORTS AND ACCESSORIES:
• ALL PIPING SHALL BE SUPPORTED PER THE IPC, H-18-8 SEISMIC DESIGN HANDBOOK, MSS SP-58, AND SMACNA AS
REQUIRED.
• SHOP PAINTING AND PLATING: HANGERS, SUPPORTS, RODS, INSERTS AND ACCESSORIES USED FOR PIPE SUPPORTS SHALL BE SHOP COATED WITH ZINC CHROMATE PRIMER PAINT. ELECTROPLATED COPPER HANGER RODS, HANGERS AND
ACCESSORIES MAY BE USED WITH COPPER TUBING.
• FLOOR, WALL AND CEILING PLATES, SUPPORTS, HANGERS:
• PIPE HANGERS: HEIGHT ADJUSTABLE CLEVIS TYPE.
• HANGERS AND SUPPORTS UTILIZED WITH INSULATED PIPE AND TUBING SHALL HAVE 180-DEGREE (MINIMUM) METAL
PROTECTION SHIELD CENTERED ON AND WELDED TO THE HANGER AND SUPPORT. THE SHIELD THICKNESS AND LENGTH SHALL BE ENGINEERED AND SIZED FOR DISTRIBUTION OF LOADS TO PRECLUDE CRUSHING OF INSULATION WITHOUT BREAKING THE VAPOR BARRIER. THE SHIELD SHALL BE SIZED FOR THE INSULATION AND HAVE FLARED EDGES TO PROTECT
VAPOR-RETARDANT JACKET FACING. TO PREVENT THE SHIELD FROM SLIDING OUT OF THE CLEVIS HANGER DURING PIPE
MOVEMENT, CENTER-RIBBED SHIELDS SHALL BE USED.
e. INSTALL CHROME PLATED CAST BRASS ESCUTCHEON WITH SET SCREW AT EACH WALL, FLOOR AND CEILING PENETRATION IN
EXPOSED FINISHED LOCATIONS AND WITHIN CABINETS AND MILLWORK.
2. PENETRATIONS:
a. FIRESTOPPING: WHERE PIPES PASS THROUGH FIRE PARTITIONS, FIRE WALLS, SMOKE PARTITIONS, OR FLOORS, INSTALL A FIRE STOP THAT PROVIDES AN EFFECTIVE BARRIER AGAINST THE SPREAD OF FIRE, SMOKE, AND GASES AS SPECIFIED IN SECTION FIRESTOPPING. COMPLETELY FILL AND SEAL CLEARANCES BETWEEN RACEWAYS AND OPENINGS WITH THE
FIRESTOPPING MATERIALS.
b. WATERPROOFING: AT FLOOR PENETRATIONS, COMPLETELY SEAL CLEARANCES AROUND THE PIPE AND MAKE WATERTIGHT WITH SEALANT AS SPECIFIED IN SECTION JOINT SEALANTS. BIO-BASED MATERIALS SHALL BE UTILIZED WHEN POSSIBLE.
c. ACOUSTICAL SEALANT: WHERE PIPES PASS THROUGH SOUND RATED WALLS, SEAL AROUND THE PIPE PENETRATION WITH AN
ACOUSTICAL SEALANT THAT IS COMPLIANT WITH ASTM C919.
3. DOMESTIC WATER PIPING SHALL CONFORM TO THE FOLLOWING:
a. GRADE ALL LINES TO FACILITATE DRAINAGE. PROVIDE DRAIN VALVES AT BOTTOM OF RISERS AND ALL LOW POINTS IN
SYSTEM. DESIGN DOMESTIC HOT AND COLD WATER CIRCULATING LINES WITH NO TRAPS.
b. CONNECT BRANCH LINES AT BOTTOM OF MAIN SERVING FIXTURES BELOW AND PITCH DOWN SO THAT MAIN MAY BE DRAINED
THROUGH FIXTURE. CONNECT BRANCH LINES TO TOP OF MAIN SERVING ONLY FIXTURES LOCATED ON FLOOR ABOVE.
4. TESTS: GENERAL: TEST SYSTEM EITHER IN ITS ENTIRETY OR IN SECTIONS. SUBMIT TESTING PLAN TO COR 10 WORKING DAYS
PRIOR TO TEST DATE.
5. STERILIZATION: AFTER TESTS HAVE BEEN SUCCESSFULLY COMPLETED, THOROUGHLY FLUSH AND STERILIZE THE INTERIOR
DOMESTIC WATER DISTRIBUTION SYSTEM IN ACCORDANCE WITH AWWA C651.
8. FACILITY SANITARY AND VENT PIPING
A. GENERAL
1. DESCRIPTION: THIS SECTION PERTAINS TO SANITARY SEWER AND VENT SYSTEMS, INCLUDING PIPING, EQUIPMENT AND ALL
NECESSARY ACCESSORIES AS DESIGNATED IN THIS SECTION.
2. SUBMITTALS
a. MANUFACTURER'S LITERATURE AND DATA INCLUDING: FULL ITEM DESCRIPTION AND OPTIONAL FEATURES AND
ACCESSORIES. INCLUDE DIMENSIONS, WEIGHTS, MATERIALS, APPLICATIONS, STANDARD COMPLIANCE, MODEL NUMBERS, SIZE, AND CAPACITY: PIPING, FLOOR DRAINS, GREASE REMOVAL UNIT, CLEANOUTS, TRAP SEAL PROTECTION, PENETRATION SLEEVES, PIPE FITTINGS, TRAPS, EXPOSED PIPING, AND FITTINGS
B. PRODUCTS: RE: SPECIFICATION FOR PLUMBING FIXTURES, PIPE, PIPE FITTING, PIPE ACCESSORIES, PIPE JOINING MATERIAL
REQUIREMENTS
C. EXECUTION
1. PIPE INSTALLATION
a. THE PIPE INSTALLATION SHALL COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL PLUMBING CODE (IPC) AND
THESE SPECIFICATIONS.
b. BRANCH PIPING SHALL BE INSTALLED FOR WASTE FROM THE RESPECTIVE PIPING SYSTEMS AND CONNECT TO ALL FIXTURES, VALVES, COCKS, OUTLETS, CASEWORK, CABINETS AND EQUIPMENT, INCLUDING THOSE FURNISHED BY THE
GOVERNMENT OR SPECIFIED IN OTHER SECTIONS.
c. ALL PIPE RUNS SHALL BE LAID OUT TO AVOID INTERFERENCE WITH OTHER WORK.
d. THE PIPING SHALL BE INSTALLED ABOVE ACCESSIBLE CEILINGS WHERE POSSIBLE.
e. THE PIPING SHALL BE INSTALLED TO PERMIT VALVE SERVICING OR OPERATION.
f. CAST IRON PIPING SHALL BE INSTALLED ACCORDING TO CISPI’S “CAST IRON SOIL PIPE AND FITTINGS HANDBOOK,”
CHAPTER IV, “INSTALLATION OF CAST IRON SOIL PIPE AND FITTINGS”
g. ABOVEGROUND COPPER TUBING SHALL BE INSTALLED ACCORDING TO COPPER DEVELOPMENT ASSOCIATION’S (CDA)
“COPPER TUBE HANDBOOK”.
2. JOINT CONSTRUCTION
a. HUB AND SPIGOT, CAST IRON PIPING WITH GASKET JOINTS SHALL BE JOINED IN ACCORDANCE WITH CISPI’S “CAST IRON
SOIL PIPE AND FITTINGS HANDBOOK” FOR COMPRESSION…
This is the start of the file's text. The full file is on GovTribe.