519-19-700_VABS_Outpatient Exam Rooms_Issue for Bid Drawings - Mechanical.pdf
PDF 3 MB Posted
- Solicitation number
- 36C25723B0053
About this file
This solicitation notice is for an Invitation for Bids for a firm fixed price construction contract to renovate an outpatient clinic. The project will be a 100% Service Disabled Veteran Owned Small Business set-aside under NAICS code 236220. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 is the agency issuing this solicitation. The solicitation is for renovation work at an outpatient clinic located at VA-24-00004750. No other details are provided in the solicitation notice regarding required products, services, response dates, or pricing terms.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C. EXECUTION
1. ARRANGEMENT AND INSTALLATION OF EQUIPMENT
a. LOCATION OF PIPING, SLEEVES, INSERTS, HANGERS, AND EQUIPMENT, ACCESS
PROVISIONS SHALL BE COORDINATED WITH THE WORK OF ALL TRADES. THE
COORDINATION/SHOP DRAWINGS SHALL BE SUBMITTED FOR REVIEW. LOCATE PIPING,
SLEEVES, INSERTS, HANGERS, DUCTWORK AND EQUIPMENT CLEAR OF WINDOWS,
DOORS, OPENINGS, LIGHT OUTLETS, AND OTHER SERVICES AND UTILITIES. EQUIPMENT
COORDINATION/SHOP DRAWINGS SHALL BE PREPARED TO COORDINATE PROPER
LOCATION AND PERSONNEL ACCESS OF ALL FACILITIES. THE DRAWINGS SHALL BE
SUBMITTED FOR REVIEW. FOLLOW MANUFACTURER'S PUBLISHED RECOMMENDATIONS
FOR INSTALLATION METHODS NOT OTHERWISE SPECIFIED.
b. OPERATING PERSONNEL ACCESS AND OBSERVATION PROVISIONS: SELECT AND
ARRANGE ALL EQUIPMENT AND SYSTEMS TO PROVIDE CLEAR VIEW AND EASY ACCESS,
WITHOUT USE OF PORTABLE LADDERS, FOR MAINTENANCE AND OPERATION OF ALL
DEVICES INCLUDING, BUT NOT LIMITED TO: ALL EQUIPMENT ITEMS, VALVES, FILTERS,
STRAINERS, TRANSMITTERS, SENSORS, CONTROL DEVICES. ALL GAUGES AND
INDICATORS SHALL BE CLEARLY VISIBLE BY PERSONNEL STANDING ON THE FLOOR OR
ON PERMANENT PLATFORMS. DO NOT REDUCE OR CHANGE MAINTENANCE AND
OPERATING SPACE AND ACCESS PROVISIONS THAT ARE SHOWN ON THE CONTRACT
DOCUMENTS.
c. EQUIPMENT AND PIPING SUPPORT: COORDINATE STRUCTURAL SYSTEMS NECESSARY
FOR PIPE AND EQUIPMENT SUPPORT WITH PIPE AND EQUIPMENT LOCATIONS TO
PERMIT PROPER INSTALLATION.
d. LOCATION OF PIPE SLEEVES, TRENCHES AND CHASES SHALL BE ACCURATELY
COORDINATED WITH EQUIPMENT AND PIPING LOCATIONS.
e. CUTTING HOLES:
• CUT HOLES THROUGH CONCRETE AND MASONRY BY ROTARY CLIENT PROJECT
REPRESENTATIVEE DRILL. PNEUMATIC HAMMER, IMPACT ELECTRIC, AND HAND OR
MANUAL HAMMER TYPE DRILL IS PROHIBITED, EXCEPT AS PERMITTED BY CLIENT
PROJECT REPRESENTATIVE WHERE WORKING AREA SPACE IS LIMITED.
• LOCATE HOLES TO AVOID INTERFERENCE WITH STRUCTURAL MEMBERS SUCH AS
SLABS, COLUMNS, RIBS, BEAMS OR REINFORCING. HOLES SHALL BE LAID OUT IN
ADVANCE AND DRILLING DONE ONLY AFTER APPROVAL BY CLIENT PROJECT
REPRESENTATIVE. IF THE CONTRACTOR CONSIDERS IT NECESSARY TO DRILL
THROUGH STRUCTURAL MEMBERS, THIS MATTER SHALL BE REFERRED TO CLIENT
PROJECT REPRESENTATIVE FOR APPROVAL.
f. DO NOT PENETRATE MEMBRANE WATERPROOFING.
g. MINOR PIPING: GENERALLY, SMALL DIAMETER PIPE RUNS FROM DRIPS AND DRAINS, WATER COOLING, AND OTHER SERVICE ARE NOT SHOWN BUT MUST BE PROVIDED.
h. PROTECTION CLEANING
• EQUIPMENT AND MATERIALS SHALL BE CAREFULLY HANDLED, PROPERLY STORED,
AND ADEQUATELY PROTECTED TO PREVENT DAMAGE BEFORE AND DURING
INSTALLATION, IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS
AND AS APPROVED BY THE CLIENT PROJECT REPRESENTATIVE. DAMAGED OR
DEFECTIVE ITEMS IN THE OPINION OF THE CLIENT PROJECT REPRESENTATIVE,
SHALL BE REPLACED.
• PROTECT ALL FINISHED PARTS OF EQUIPMENT, SUCH AS SHAFTS AND BEARINGS
WHERE ACCESSIBLE, FROM RUST PRIOR TO OPERATION BY MEANS OF PROTECTIVE
GREASE COATING AND WRAPPING. CLOSE PIPE OPENINGS WITH CAPS OR PLUGS
DURING INSTALLATION. TIGHTLY COVER AND PROTECT FIXTURES AND EQUIPMENT
AGAINST DIRT, WATER CHEMICAL, OR MECHANICAL INJURY. AT COMPLETION OF ALL
WORK THOROUGHLY CLEAN FIXTURES, EXPOSED MATERIALS AND EQUIPMENT.
i. INSTALL GAUGES, THERMOMETERS, VALVES AND OTHER DEVICES WITH DUE REGARD
FOR EASE IN READING OR OPERATING AND MAINTAINING SAID DEVICES. LOCATE AND
POSITION THERMOMETERS AND GAUGES TO BE EASILY READ BY OPERATOR OR STAFF
STANDING ON FLOOR OR WALKWAY PROVIDED. SERVICING SHALL NOT REQUIRE
DISMANTLING ADJACENT EQUIPMENT OR PIPE WORK.
j. SWITCHGEAR/ELECTRICAL EQUIPMENT DRIP PROTECTION: EVERY EFFORT SHALL BE
MADE TO ELIMINATE THE INSTALLATION OF PIPE ABOVE ELECTRICAL AND
DATA/TELEPHONE SWITCHGEAR. IF THIS IS NOT POSSIBLE, ENCASE PIPE IN A SECOND
PIPE WITH A MINIMUM OF JOINTS. INSTALLATION OF PIPING, DUCTWORK, LEAK
PROTECTION APPARATUS OR OTHER INSTALLATIONS FOREIGN TO THE ELECTRICAL
INSTALLATION SHALL NOT BE LOCATED IN THE SPACE EQUAL TO THE WIDTH AND DEPTH
OF THE EQUIPMENT AND EXTENDING FROM TO A HEIGHT OF 1.8 M (6 FEET) ABOVE THE
EQUIPMENT OR TO CEILING STRUCTURE, WHICHEVER IS LOWER (NFPA 70).
2. PIPE AND EQUIPMENT SUPPORTS
a. USE OF CHAIN PIPE SUPPORTS; WIRE OR STRAP HANGERS; WOOD FOR BLOCKING, STAYS AND BRACING; OR HANGERS SUSPENDED FROM PIPING ABOVE ARE PROHIBITED.
REPLACE OR THOROUGHLY CLEAN RUSTY PRODUCTS AND PAINT WITH ZINC PRIMER.
b. HANGER RODS SHALL BE USED THAT ARE STRAIGHT AND VERTICAL. TURNBUCKLES FOR
VERTICAL ADJUSTMENTS MAY BE OMITTED WHERE LIMITED SPACE PREVENTS USE.
PROVIDE A MINIMUM OF 15 MM (1/2 INCH) CLEARANCE BETWEEN PIPE OR PIPING
COVERING AND ADJACENT WORK.
c. HVAC HORIZONTAL PIPE SUPPORT SPACING: REFER TO MSS SP-58. PROVIDE
ADDITIONAL SUPPORTS AT VALVES, STRAINERS, IN-LINE PUMPS AND OTHER HEAVY
COMPONENTS. PROVIDE A SUPPORT WITHIN ONE FOOT OF EACH ELBOW.
d. HVAC VERTICAL PIPE SUPPORTS:
• UP TO 150 MM (6-INCH PIPE), 9 M (30 FEET) LONG, BOLT RISER CLAMPS TO THE PIPE
BELOW COUPLINGS, OR WELDED TO THE PIPE AND RESTS SUPPORTS SECURELY ON
THE BUILDING STRUCTURE.
• VERTICAL PIPE LARGER THAN THE FOREGOING, SUPPORT ON BASE ELBOWS OR
TEES, OR SUBSTANTIAL PIPE LEGS EXTENDING TO THE BUILDING STRUCTURE.
e. FLOOR SUPPORTS:
• PROVIDE CONCRETE BASES, CONCRETE ANCHOR BLOCKS AND PEDESTALS, AND
STRUCTURAL STEEL SYSTEMS FOR SUPPORT OF EQUIPMENT AND PIPING.
CONCRETE BASES AND STRUCTURAL SYSTEMS SHALL BE ANCHORED AND DOWELED
TO RESIST FORCES UNDER OPERATING AND SEISMIC CONDITIONS (IF APPLICABLE)
WITHOUT EXCESSIVE DISPLACEMENT OR STRUCTURAL FAILURE.
• BASES AND SUPPORTS SHALL NOT BE LOCATED AND INSTALLED UNTIL EQUIPMENT
MOUNTED THEREON HAS BEEN APPROVED. BASES SHALL BE SIZED TO MATCH
EQUIPMENT MOUNTED THEREON PLUS 50 MM (2 INCH) EXCESS ON ALL EDGES.
CHILLER FOUNDATIONS SHALL HAVE HORIZONTAL DIMENSIONS THAT EXCEED
CHILLER BASE FRAME DIMENSIONS BY AT LEAST 150 MM (6 INCHES) ON ALL SIDES.
STRUCTURAL CONTRACT DOCUMENTS SHALL BE REVIEWED FOR ADDITIONAL
REQUIREMENTS. BASES SHALL BE NEATLY FINISHED AND SMOOTHED, SHALL HAVE
CHAMFERED EDGES AT THE TOP, AND SHALL BE SUITABLE FOR PAINTING.
• ALL EQUIPMENT SHALL BE SHIMMED, LEVELED, FIRMLY ANCHORED, AND GROUTED
WITH EPOXY GROUT. ANCHOR BOLTS SHALL BE PLACED IN SLEEVES, ANCHORED TO
THE BASES. FILL THE ANNULAR SPACE BETWEEN SLEEVES AND BOLTS WITH A
GRANULAR MATERIAL TO PERMIT ALIGNMENT AND REALIGNMENT.
3. MECHANICAL DEMOLITION
a. UNLESS SPECIFIED OTHERWISE, ALL PIPING, WIRING, CONDUIT, AND OTHER DEVICES
ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK SHALL BE
COMPLETELY REMOVED FROM PROJECT SITE PER SECTION CONSTRUCTION WASTE
MANAGEMENT. THIS INCLUDES ALL CONCRETE PADS, PIPE, VALVES, FITTINGS,
INSULATION, AND ALL HANGERS INCLUDING THE TOP CONNECTION AND ANY
FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED
AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN ROOF,
WALLS, FLOORS, IN AN APPROVED MANNER AND IN ACCORDANCE WITH CONTRACT
DOCUMENTS WHERE SPECIFICALLY COVERED. STRUCTURAL INTEGRITY OF THE
BUILDING SYSTEM SHALL BE MAINTAINED. REFERENCE SHALL ALSO BE MADE TO THE
CONTRACT DOCUMENTS OF THE OTHER DISCIPLINES IN THE PROJECT FOR ADDITIONAL
FACILITIES TO BE DEMOLISHED OR HANDLED.
b. ALL INDICATED VALVES INCLUDING GATE, GLOBE, BALL, BUTTERFLY AND CHECK, ALL
PRESSURE GAUGES AND THERMOMETERS WITH WELLS SHALL REMAIN CLIENT
PROPERTY AND SHALL BE REMOVED AND DELIVERED TO CLIENT PROJECT
REPRESENTATIVE AND STORED AS DIRECTED. THE CONTRACTOR SHALL REMOVE ALL
OTHER MATERIAL AND EQUIPMENT, DEVICES AND DEMOLITION DEBRIS UNDER THESE
CONTRACT DOCUMENTS. SUCH MATERIAL SHALL BE REMOVED FROM PROJECT SITE
EXPEDITIOUSLY AND SHALL NOT BE ALLOWED TO ACCUMULATE.
4. PAINT
a. PRIOR TO FINAL INSPECTION AND ACCEPTANCE OF THE PLANT AND FACILITIES FOR
BENEFICIAL USE BY THE PLANT FACILITIES, EQUIPMENT AND SYSTEMS SHALL BE
THOROUGHLY CLEANED AND PAINTED. REFER TO PAINTING SPECIFICATIONS.
5. MOTOR DRIVES
a. USE SYNCHRONOUS BELT DRIVES ONLY ON EQUIPMENT CONTROLLED BY SOFT
STARTERS OR VARIABLE FREQUENCY DRIVE MOTOR CONTROLLERS WITHOUT A BYPASS
CONTACTOR. USE V-BELT DRIVES ON ALL OTHER APPLICATIONS.
b. ALL EQUIPMENT AND DEVICES REQUIRING LUBRICATION SHALL BE LUBRICATED PRIOR
TO INITIAL OPERATION. FIELD-CHECK ALL DEVICES FOR PROPER LUBRICATION.
c. STARTUP OF EQUIPMENT SHALL BE PERFORMED AS DESCRIBED IN EQUIPMENT
SPECIFICATIONS. VIBRATION WITHIN SPECIFIED TOLERANCE SHALL BE VERIFIED PRIOR
TO EXTENDED OPERATION. TEMPORARY USE OF EQUIPMENT IS SPECIFIED IN SECTION
GENERAL REQUIREMENTS, ARTICLE, TEMPORARY USE OF MECHANICAL AND
ELECTRICAL EQUIPMENT.
C. EXECUTION
1. INSTALLATION
a. GENERAL
• INSTALL EQUIPMENT, PIPING, WIRING /CONDUIT PARALLEL TO OR AT RIGHT ANGLES
TO BUILDING LINES.
• INSTALL ALL EQUIPMENT AND PIPING IN READILY ACCESSIBLE LOCATIONS. DO NOT
RUN TUBING AND CONDUIT CONCEALED UNDER INSULATION OR INSIDE DUCTS.
• MOUNT CONTROL DEVICES, TUBING AND CONDUIT LOCATED ON DUCTS AND
APPARATUS WITH EXTERNAL INSULATION ON STANDOFF SUPPORT TO AVOID
INTERFERENCE WITH INSULATION.
• PROVIDE SUFFICIENT SLACK AND FLEXIBLE CONNECTIONS TO ALLOW FOR
VIBRATION OF PIPING AND EQUIPMENT.
• RUN TUBING AND WIRE CONNECTING DEVICES ON OR IN CONTROL CABINETS
PARALLEL WITH THE SIDES OF THE CABINET NEATLY RACKED TO PERMIT TRACING.
• INSTALL EQUIPMENT LEVEL AND PLUMB.
b. ELECTRICAL WIRING
• ALL WIRING AND CABLING SHALL BE INSTALLED IN CONDUITS. INSTALL CONDUITS
AND WIRING IN ACCORDANCE WITH SPECIFICATION RACEWAY AND BOXES FOR
ELECTRICAL SYSTEMS. CONDUITS CARRYING CONTROL WIRING AND CABLING SHALL
BE DEDICATED TO THE CONTROL WIRING AND CABLING: THESE CONDUITS SHALL
NOT CARRY POWER WIRING. PROVIDE PLASTIC END SLEEVES AT ALL CONDUIT
TERMINATIONS TO PROTECT WIRING FROM BURRS.
• INSTALL ANALOG SIGNAL AND COMMUNICATION CABLES IN CONDUIT AND IN
ACCORDANCE WITH SPECIFICATION DIVISION 27 – COMMINICATIONS. INSTALL
DIGITAL COMMUNICATION CABLES IN CONDUIT AND IN ACCORDANCE WITH
SPECIFICATION SECTION COMMINICATIONS STRUCTURED CABLING.
• INSTALL ALL ELECTRICAL WORK REQUIRED FOR A FULLY FUNCTIONAL SYSTEM AND
NOT SHOWN ON ELECTRICAL PLANS OR REQUIRED BY ELECTRICAL SPECIFICATIONS.
WHERE LOW VOLTAGE (LESS THAN 50 VOLT) POWER IS REQUIRED, PROVIDE
SUITABLE CLASS B TRANSFORMERS.
• INSTALL ALL SYSTEM COMPONENTS IN ACCORDANCE WITH LOCAL BUILDING CODE
AND NATIONAL ELECTRIC CODE.
• GROUNDING: GROUND ELECTRICAL SYSTEMS PER MANUFACTURER’S WRITTEN
REQUIREMENTS FOR PROPER AND SAFE OPERATION.
c. SENSORS: INSTALL ALL SENSORS AND INSTRUMENTATION ACCLIENT PROJECT
REPRESENTATIVEDING TO MANUFACTURER’S WRITTEN INSTRUCTIONS. SENSOR
LOCATIONS SHALL BE READILY ACCESSIBLE, PERMITTING QUICK REPLACEMENT AND
SERVICING OF THEM WITHOUT SPECIAL SKILLS AND TOOLS.
GENERAL NOTES
1. GENERAL REQUIREMENTS
A. GENERAL
1. DESCRIPTION: EXPOSED: PIPING, DUCTWORK, AND EQUIPMENT EXPOSED TO VIEW IN
FINISHED ROOMS.
2. EXTERIOR: PIPING, DUCTWORK, AND EQUIPMENT EXPOSED TO WEATHER BE IT
TEMPERATURE, HUMIDITY, PRECIPITATION, WIND, OR SOLAR RADIATION.
3. SUBMITTALS:
a. CONTRACTOR SHALL MAKE ALL NECESSARY FIELD MEASUREMENTS AND
INVESTIGATIONS TO ASSURE THAT THE EQUIPMENT AND ASSEMBLIES WILL MEET
CONTRACT REQUIREMENTS, AND ALL EQUIPMENT THAT REQUIRES REGULAR
MAINTENANCE, CALIBRATION, ETC ARE ACCESSABLE FROM THE FLOOR OR PERMANENT
WORK PLATFORM. IT IS THE CONTRACTOR’S RESPONSIBILITY TO ENSURE ALL
SUBMITTALS MEET THE VA SPECIFICATIONS AND REQUIREMENTS AND IT IS ASSUMED
THAT ALL SUBMITTALS DO MEET THE SPECIFICATIONS UNLESS THE CONTRACTOR HAS
REQUESTED A VARIANCE IN WRITING AND APPROVED PRIOR TO THE SUBMITTAL. IF AT
ANY TIME DURING THE PROJECT IT IS FOUND THAT ANY ITEM DOES NOT MEET
SPECIFICATIONS AND THERE WAS NO VARIANCE APPROVAL THE CONTRACTOR SHALL
CLIENT PROJECT REPRESENTATIVERECT AT NO ADDITIONAL COST OR TIME EVEN IF A
SUBMITTAL WAS APPROVED.
b. COORDINATION/SHOP DRAWINGS:
• SUBMIT COMPLETE CONSOLIDATED AND COORDINATED SHOP DRAWINGS FOR ALL
NEW SYSTEMS, AND FOR EXISTING SYSTEMS THAT ARE IN THE SAME AREAS.
• DO NOT INSTALL EQUIPMENT FOUNDATIONS, EQUIPMENT OR PIPING UNTIL
COORDINATION/SHOP DRAWINGS HAVE BEEN APPROVED.
c. IN ADDITION, FOR HVAC SYSTEMS, PROVIDE DETAILS OF THE FOLLOWING:
• MECHANICAL EQUIPMENT ROOMS.
• INTERSTITIAL SPACE.
• HANGERS, INSERTS, SUPPORTS, AND BRACING.
• PIPE SLEEVES.
• DUCT OR EQUIPMENT PENETRATIONS OF FLOORS, WALLS, CEILINGS, OR ROOFS.
4. QUALITY ASSURANCE
a. MECHANICAL, ELECTRICAL AND ASSOCIATED SYSTEMS SHALL BE SAFE, RELIABLE, EFFICIENT, DURABLE, EASILY AND SAFELY OPERABLE AND MAINTAINABLE, EASILY AND
SAFELY ACCESSIBLE, AND IN COMPLIANCE WITH APPLICABLE CODES AS SPECIFIED. THE
SYSTEMS SHALL BE COMPRISED OF HIGH QUALITY INSTITUTIONAL-CLASS AND
INDUSTRIAL-CLASS PRODUCTS OF MANUFACTURERS THAT ARE EXPERIENCED
SPECIALISTS IN THE REQUIRED PRODUCT LINES. ALL CONSTRUCTION FIRMS AND
PERSONNEL SHALL BE EXPERIENCED AND QUALIFIED SPECIALISTS IN INDUSTRIAL AND
INSTITUTIONAL HVAC.
b. REFER TO ALL OTHER SECTIONS FOR QUALITY ASSURANCE REQUIREMENTS FOR
SYSTEMS AND EQUIPMENT SPECIFIED THEREIN.
c. ALL ITEMS FURNISHED SHALL BE FREE FROM DEFECTS THAT WOULD ADVERSELY
AFFECT THE PERFORMANCE, MAINTAINABILITY AND APPEARANCE OF INDIVIDUAL
COMPONENTS AND OVERALL ASSEMBLY.
d. THE PRODUCTS AND EXECUTION OF WORK SPECIFIED IN DIVISION 23 SHALL CONFORM
TO THE REFERENCED CODES AND STANDARDS AS REQUIRED BY THE SPECIFICATIONS.
LOCAL CODES AND AMENDMENTS SHALL BE ENFORCED, ALONG WITH REQUIREMENTS
OF LOCAL UTILITY COMPANIES. THE MOST STRINGENT REQUIREMENTS OF THESE
SPECIFICATIONS, LOCAL CODES, OR UTILITY COMPANY REQUIREMENTS SHALL ALWAYS
APPLY. ANY CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF CLIENT PROJECT
REPRESENTATIVE.
e. MANUFACTURER'S RECOMMENDATIONS: WHERE INSTALLATION PROCEDURES OR ANY
PART THEREOF ARE REQUIRED TO BE IN ACCORDANCE WITH THE RECOMMENDATIONS
OF THE MANUFACTURER OF THE MATERIAL BEING INSTALLED, PRINTED COPIES OF
THESE RECOMMENDATIONS SHALL BE FURNISHED TO THE CLIENT PROJECT
REPRESENTATIVE WITH SUBMITTALS. INSTALLATION OF THE ITEM WILL NOT BE
ALLOWED TO PROCEED UNTIL THE RECOMMENDATIONS ARE RECEIVED. FAILURE TO
FURNISH THESE RECOMMENDATIONS CAN BE CAUSE FOR REJECTION OF THE MATERIAL
AND REMOVAL BY THE CONTRACTOR AND NO ADDITIONAL COST OR TIME.
f. REFER TO ALL OTHER SECTIONS FOR QUALITY ASSURANCE REQUIREMENTS FOR
SYSTEMS AND EQUIPMENT SPECIFIED THEREIN.
5. EXECUTION (INSTALLATION, CONSTRUCTION) QUALITY:
a. APPLY AND INSTALL ALL ITEMS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN
INSTRUCTIONS. REFER CONFLICTS BETWEEN THE MANUFACTURER'S INSTRUCTIONS
AND THE CONTRACT DOCUMENTS TO THE CLIENT PROJECT REPRESENTATIVE FOR
RESOLUTION. PROVIDE WRITTEN HARD COPIES AND COMPUTER FILES ON CD OR DVD
OF MANUFACTURER’S INSTALLATION INSTRUCTIONS TO THE CLIENT PROJECT
REPRESENTATIVE WITH SUBMITTALS PRIOR TO COMMENCING INSTALLATION OF ANY
ITEM. INSTALLATION OF THE ITEM WILL NOT BE ALLOWED TO PROCEED UNTIL THE
RECOMMENDATIONS ARE RECEIVED AND APPROVED. FAILURE TO FURNISH THESE
RECOMMENDATIONS IS A CAUSE FOR REJECTION OF THE MATERIAL.
b. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY
PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS,
WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT
ARE NOT LIMITED TO, ALL TYPES OF VALVES, FILTERS AND STRAINERS, TRANSMITTERS,
CONTROL DEVICES. PRIOR TO COMMENCING INSTALLATION WORK, REFER CONFLICTS
BETWEEN THIS REQUIREMENT AND CONTRACT DOCUMENTS TO CLIENT PROJECT
REPRESENTATIVE FOR RESOLUTION. FAILURE OF THE CONTRACTOR TO RESOLVE OR
POINT OUT ANY ISSUES WILL RESULT IN THE CONTRACTOR CLIENT PROJECT
REPRESENTATIVERECTING AT NO ADDITIONAL COST OR TIME.
c. COMPLETE COORDINATION/SHOP DRAWINGS SHALL BE REQUIRED IN ACCORDANCE
WITH ARTICLE, SUBMITTALS. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM
UNTIL THE COORDINATION/SHOP DRAWINGS HAVE BEEN APPROVED.
d. WORKMANSHIP/CRAFTSMANSHIP WILL BE OF THE HIGHEST QUALITY AND STANDARDS.
THE CLIENT RESERVES THE RIGHT TO REJECT ANY WORK BASED ON POOR QUALITY OF
WORKMANSHIP THIS WORK SHALL BE REMOVED AND DONE AGAIN AT NO ADDITIONAL
COST OR TIME.
6. DELIVERY, STORAGE AND HANDLING
a. PROTECTION OF EQUIPMENT:
• EQUIPMENT AND MATERIAL PLACED ON THE JOB SITE SHALL REMAIN IN THE
CUSTODY OF THE CONTRACTOR UNTIL PHASED ACCEPTANCE, WHETHER OR NOT
THE CONTRACTOR HAS BEEN REIMBURSED FOR THE EQUIPMENT AND MATERIAL.
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PROTECTION OF SUCH
EQUIPMENT AND MATERIAL AGAINST ANY DAMAGE OR THEFT.
• LARGE EQUIPMENT SUCH AS BOILERS, CHILLERS, COOLING TOWERS, FANS, AND AIR
HANDLING UNITS IF SHIPPED ON OPEN TRAILER TRUCKS SHALL BE COVERED WITH
SHRINK ON PLASTICS OR WATER PROOF TARPAULINS THAT PROVIDE PROTECTION
FROM EXPOSURE TO RAIN, ROAD SALTS AND OTHER TRANSIT HAZARDS.
PROTECTION SHALL BE KEPT IN PLACE UNTIL EQUIPMENT IS MOVED INTO A
BUILDING OR INSTALLED AS DESIGNED.
• REPAIR DAMAGED EQUIPMENT IN FIRST CLASS, NEW OPERATING CONDITION AND
APPEARANCE; OR REPLACE SAME AS DETERMINED AND DIRECTED BY THE CLIENT
PROJECT REPRESENTATIVE. SUCH REPAIR OR REPLACEMENT SHALL BE AT NO
ADDITIONAL COST OR TIME.
• PROTECT INTERIORS OF NEW EQUIPMENT AND PIPING SYSTEMS AGAINST ENTRY OF
FOREIGN MATTER. CLEAN BOTH INSIDE AND OUTSIDE BEFORE PAINTING OR
PLACING EQUIPMENT IN OPERATION.
• EXISTING EQUIPMENT AND PIPING BEING WORKED ON BY THE CONTRACTOR SHALL
BE UNDER THE CUSTODY AND RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE
PROTECTED AS REQUIRED FOR NEW WORK.
• PROTECT PLASTIC PIPING AND TANKS FROM ULTRAVIOLET LIGHT (SUNLIGHT).
b. CLEANLINESS OF PIPING AND EQUIPMENT SYSTEMS:
• EXERCISE CARE IN STORAGE AND HANDLING OF EQUIPMENT AND PIPING MATERIAL
TO BE INCLIENT PROJECT REPRESENTATIVEPORATED IN THE WORK. REMOVE
DEBRIS ARISING FROM CUTTING, THREADING AND WELDING OF PIPING.
• PIPING SYSTEMS SHALL BE FLUSHED, BLOWN OR PIGGED AS NECESSARY TO
DELIVER CLEAN SYSTEMS.
7. ASBUILT – RECLIENT PROJECT REPRESENTATIVED DOCUMENTS
a. THE INSTALLING CONTRACTOR SHALL MAINTAIN AS-BUILT DRAWINGS OF EACH
COMPLETED PHASE FOR VERIFICATION; AND SHALL PROVIDE THE COMPLETE SET AT
THE TIME OF FINAL SYSTEMS CERTIFICATION TESTING.
b. THE AS-BUILT DRAWINGS SHALL INDICATE THE LOCATION AND TYPE OF ALL
LOCKOUT/TAGOUT POINTS FOR ALL ENERGY SOURCES FOR ALL EQUIPMENT AND
PUMPS TO INCLUDE BREAKER LOCATION AND NUMBERS, VALVE TAG NUMBERS, ETC.
COORDINATE LOCKOUT/TAGOUT PROCEDURES AND PRACTICES WITH LOCAL VA
REQUIREMENTS.
8. GENERAL CONDITIONS: BUILDING WORKING ENVIRONMENT: MAINTAIN THE
ARCHITECTURAL AND STRUCTURAL INTEGRITY OF THE BUILDING AND THE WORKING
ENVIRONMENT AT ALL TIMES. MAINTAIN THE INTERIOR OF BUILDING AT 18 DEGREES C (65
DEGREES F) MINIMUM. LIMIT THE OPENING OF DOORS, WINDOWS OR OTHER ACCESS
OPENINGS TO BRIEF PERIODS AS NECESSARY FOR RIGGING PURPOSES. STORM WATER OR
GROUND WATER LEAKAGE IS PROHIBITED. PROVIDE DAILY CLEAN-UP OF CONSTRUCTION
AND DEMOLITION DEBRIS ON ALL FLOOR SURFACES AND ON ALL EQUIPMENT BEING
OPERATED BY VA. MAINTAIN ALL EGRESS ROUTES AND SAFETY SYSTEMS/DEVICES.
B. PRODUCTS
1. FACTORY ASSEMBLED PRODUCTS
a. PERFORMANCE AND WARRANTY OF ALL COMPONENTS THAT MAKE UP AN ASSEMBLED
UNIT SHALL BE THE RESPONSIBILITY OF THE MANUFACTURER OF THE COMPLETED
ASSEMBLY.
2. V-BELT DRIVES: RE: SPECIFICATIONS
3. SYNCHRONOUS BELT DRIVES: RE: SPECIFICATIONS
4. ELECTRICAL MOTORS: RE: SPECIFICATIONS
5. VARIABLE SPEED MOTOR CONTROLLERS: RE: SPECIFICATIONS
6. THE COMBINATION OF CONTROLLER AND MOTOR SHALL BE PROVIDED BY THE
MANUFACTURER OF THE DRIVEN EQUIPMENT, SUCH AS PUMPS AND FANS, AND SHALL BE
RATED FOR 100 PERCENT OUTPUT PERFORMANCE. MULTIPLE UNITS OF THE SAME CLASS
OF EQUIPMENT, I.E. AIR HANDLERS, FANS, PUMPS, SHALL BE PRODUCT OF A SINGLE
MANUFACTURER.
7. FIRESTOPPING: ARCH SPEC SECTION FIRESTOPPING SPECIFIES AN EFFECTIVE BARRIER
AGAINST THE SPREAD OF FIRE, SMOKE AND GASES WHERE PENETRATIONS OCCUR FOR
PIPING AND DUCTWORK. REFER TO SECTION HVAC AND BOILER PLANT INSULATION, FOR
FIRESTOP PIPE AND DUCT INSULATION.
5. HVAC AND BOILER PLANT INSULATION
A. GENERAL
1. DESCRIPTION: FIELD APPLIED INSULATION FOR THERMAL EFFICIENCY AND CONDENSATION
CONTROL FOR HVAC PIPING, DUCTWORK AND EQUIPMENT.
B. PRODUCTS: RE: SPECIFICATIONS FOR INSULATION MATERIALS, INSULATION FACINGS AND
JACKETS, INSULATION ACCESSORY MATERIALS.
C. EXECUTION
1. GENERAL REQUIREMENTS
a. INSULATION MATERIALS SHALL BE INSTALLED IN A FIRST CLASS MANNER WITH SMOOTH
AND EVEN SURFACES, WITH JACKETS AND FACINGS DRAWN TIGHT AND SMOOTHLY
CEMENTED DOWN AT ALL LAPS. INSULATION SHALL BE CONTINUOUS THROUGH ALL
SLEEVES AND OPENINGS, EXCEPT AT FIRE DAMPERS AND DUCT HEATERS (NFPA 90A).
VAPOR RETARDERS SHALL BE CONTINUOUS AND UNINTERRUPTED THROUGHOUT
SYSTEMS WITH OPERATING TEMPERATURE 16 DEGREES C (60 DEGREES F) AND BELOW.
LAP AND SEAL VAPOR RETARDER OVER ENDS AND EXPOSED EDGES OF INSULATION.
ANCHORS, SUPPORTS AND OTHER METAL PROJECTIONS THROUGH INSULATION ON
COLD SURFACES SHALL BE INSULATED AND VAPOR SEALED FOR A MINIMUM LENGTH OF
150 MM (6 INCHES).
b. INSTALL VAPOR STOPS AT ALL INSULATION TERMINATIONS ON EITHER SIDE OF VALVES, PUMPS AND EQUIPMENT AND PARTICULARLY IN STRAIGHT LENGTHS OF PIPE
INSULATION.
c. CONSTRUCT INSULATION ON PARTS OF EQUIPMENT SUCH AS CHILLED WATER PUMPS
AND HEADS OF CHILLERS, CONVERTORS AND HEAT EXCHANGERS THAT MUST BE
OPENED PERIODICALLY FOR MAINTENANCE OR REPAIR, SO INSULATION CAN BE
REMOVED AND REPLACED WITHOUT DAMAGE. INSTALL INSULATION WITH BOLTED 1 MM
THICK (20 GAGE) GALVANIZED STEEL OR ALUMINUM COVERS AS COMPLETE UNITS, OR
IN SECTIONS, WITH ALL NECESSARY SUPPORTS, AND SPLIT TO COINCIDE WITH
FLANGE/SPLIT OF THE EQUIPMENT.
d. INSULATION ON HOT PIPING AND EQUIPMENT SHALL BE TERMINATED SQUARE AT ITEMS
NOT TO BE INSULATED, ACCESS OPENINGS AND NAMEPLATES. COVER ALL EXPOSED
RAW INSULATION WITH WHITE SEALER OR JACKET MATERIAL.
e. PROTECT ALL INSULATIONS OUTSIDE OF BUILDINGS WITH ALUMINUM JACKET USING
LOCK JOINT OR OTHER APPROVED SYSTEM FOR A CONTINUOUS WEATHER TIGHT
SYSTEM. ACCESS DOORS AND OTHER ITEMS REQUIRING MAINTENANCE OR ACCESS
SHALL BE REMOVABLE AND SEALABLE.
6. DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC
A. GENERAL
1. DESCRIPTION
a. GENERAL CONTRACTOR SHALL PROVIDE DIRECT-DIGITAL CONTROL SYSTEM(S) AS
INDICATED ON THE PROJECT DOCUMENTS, POINT LIST, INTEROPERABILITY TABLES,
DRAWINGS AND AS DESCRIBED IN THESE SPECIFICATIONS. INCLUDE A COMPLETE AND
WORKING DIRECT-DIGITAL CONTROL SYSTEM. INCLUDE ALL ENGINEERING,
PROGRAMMING, CONFIGURATION/SETUP HARDWARE AND SOFTWARE, CONTROLS AND
INSTALLATION MATERIALS, INSTALLATION LABOR, COMMISSIONING AND START-UP,
TRAINING, FINAL PROJECT DOCUMENTATION AND WARRANTY. RE: SPECIFICATIONS.
b. THE DIRECT-DIGITAL CONTROL SYSTEM(S) SHALL CONSIST OF HIGH-SPEED, PEER-TO-
PEER NETWORK OF DDC CONTROLLERS, A CONTROL SYSTEM SERVER, ALL
CONFIGURATION AND SETUP SOFTWARE AND HARDWARE DEVICES, AND AN
ENGINEERING CONTROL CENTER. PROVIDE A REMOTE USER USING A STANDARD HTML 5
WEB BROWSER AND/OR JCI BUILDING CONTROLLERS TO ACCESS THE CONTROL
SYSTEM GRAPHICS AND CHANGE ADJUSTABLE SETPOINTS WITH THE PROPER
PASSWORD.
c. ALL NEW BUILDING CONTROLLERS SHALL BE NATIVE BACNET. ALL NEW BACNET
WORKSTATIONS, CONTROLLERS, DEVICES AND COMPONENTS SHALL BE LISTED BY
BACNET TESTING LABORATORIES. ALL NEW BACNET WORKSTATIONS, CONTROLLERS,
DEVICES AND COMPONENTS SHALL BE ACCESSIBLE USING A HTML5 WEB BROWSER
INTERFACE. BROWSERS SHALL NOT REQUIRE THE USE OF AN EXTENSION OR ADD ON
SOFTWARE IN ORDER TO ACCESS AFOREMENTIONED WORKSTATIONS, CONTROLLERS,
DEVICES, AND COMPONENTS.
d. THE CONTROL SYSTEMS SHALL BE DESIGNED SUCH THAT EACH MECHANICAL SYSTEM
SHALL OPERATE UNDER STAND-ALONE MODE. THE A/E SHALL DESIGNATE WHAT EACH
“MECHANICAL SYSTEMS” IS COMPOSED OF. THE CONTRACTOR ADMINISTERED BY THIS
SECTION OF THE TECHNICAL SPECIFICATIONS SHALL PROVIDE CONTROLLERS FOR
EACH MECHANICAL SYSTEM. IN THE EVENT OF A NETWORK COMMUNICATION FAILURE,
OR THE LOSS OF ANY OTHER CONTROLLER, THE CONTROL SYSTEM SHALL CONTINUE
TO OPERATE INDEPENDENTLY. FAILURE OF THE ECC SHALL HAVE NO EFFECT ON THE
FIELD CONTROLLERS, INCLUDING THOSE INVOLVED WITH GLOBAL STRATEGIES.
2. SUBMITTALS
a. MANUFACTURER’S LITERATURE AND DATA FOR ALL COMPONENTS INCLUDING BUT NOT
LIMITED TO THE FOLLOWING:
• SEQUENCE OF OPERATIONS FOR EACH SYSTEM AND THE ASSOCIATED CONTROL
DIAGRAMS. EQUIPMENT AND CONTROL LABELS SHALL CLIENT PROJECT
REPRESENTATIVERESPOND TO THOSE SHOWN ON THE DRAWINGS.
• SCHEMATIC WIRING DIAGRAMS FOR ALL CONTROL, COMMUNICATION AND POWER
WIRING. PROVIDE A SCHEMATIC DRAWING OF THE CENTRAL SYSTEM INSTALLATION.
LABEL ALL CABLES AND PORTS WITH COMPUTER MANUFACTURERS’ MODEL
NUMBERS AND FUNCTIONS. SHOW ALL INTERFACE WIRING TO THE CONTROL
SYSTEM.
• RISER DIAGRAMS OF WIRING BETWEEN CENTRAL CONTROL UNIT(CCU)AND ALL
CONTROL PANELS.
B. PRODUCTS:
1. RE: Specifications for controls system architecture components, communication protocol, control center components, operator's terminal components, software (by manufacturer and by third parties), input and output devices including DDC controllers, panels, peripherals, modems, repeaters, etc., auxiliary control devices such as sensors, actuators, and control dampers (electric or electronic actuators, temperature pressure, flow and humidity sensors and transmitters, motor starters), control relays, control cables, airflow measuring stations and associated components, etc.
7. HYDRONIC PIPING
A. GENERAL
1. DESCRIPTION: WATER PIPING TO CONNECT HVAC EQUIPMENT, INCLUDING THE
FOLLOWING: CHILLED WATER, CONDENSER WATER, HEATING HOT WATER AND DRAIN
PIPING; EXTENSION OF DOMESTIC WATER MAKE-UP PIPING FOR HVAC SYSTEMS; GLYCOL-
WATER PIPING.
B. PRODUCT
1. RE: SPECIFICATION FOR PIPE AND EQUIPMENT SUPPORTS, VARIABLE SPRING AND
CONSTANT SUPPORT HANGERS, PIPE AND TUBING, PIPE FITTINGS, INCLUDING
MISCELLANEOUS ADAPTERS AND SPECIAL FITTINGS, FLANGES, GASKETS AND BOLTING,
COUPLINGS AND FITTINGS, VALVES OF ALL TYPES, STRAINERS, FLEXIBLE CONNECTORS
FOR WATER SERVICE, PIPE ALIGNMENT GUIDES, EXPANSION JOINTS, EXPANSION
COMPENSATORS, ALL SPECIFIED HYDRONIC SYSTEM COMPONENTS, WATER FLOW
MEASURING DEVICES, GAUGES, THERMOMETERS AND TEST WELLS, ASME PRESSURE
VESSELS (HEAT EXCHANGERS (WATER TO WATER), AIR SEPARATORS, EXPANSION TANKS,
BUFFER TANKS), ETC.
C. EXECUTION
1. GENERAL
a. THE DRAWINGS SHOW THE GENERAL ARRANGEMENT OF PIPE AND EQUIPMENT BUT DO
NOT SHOW ALL REQUIRED FITTINGS AND OFFSETS THAT MAY BE NECESSARY TO
CONNECT PIPES TO EQUIPMENT, FAN-COILS, COILS, RADIATORS, ETC., AND TO
COORDINATE WITH OTHER TRADES. PROVIDE ALL NECESSARY FITTINGS, OFFSETS AND
PIPE RUNS BASED ON FIELD MEASUREMENTS AND AT NO ADDITIONAL COST OR TIME.
COORDINATE WITH OTHER TRADES FOR SPACE AVAILABLE AND RELATIVE LOCATION OF
HVAC EQUIPMENT AND ACCESSORIES TO BE CONNECTED ON CEILING GRID. PIPE
LOCATION ON THE DRAWINGS SHALL BE ALTERED BY CONTRACTOR WHERE
NECESSARY TO AVOID INTERFERENCES AND CLEARANCE DIFFICULTIES.
b. INSTALL PIPING GENERALLY PARALLEL TO WALLS AND COLUMN CENTER LINES, UNLESS
SHOWN OTHERWISE ON THE DRAWINGS. SPACE PIPING, INCLUDING INSULATION, TO
PROVIDE 25 MM (1 INCH) MINIMUM CLEARANCE BETWEEN ADJACENT PIPING OR OTHER
SURFACE. UNLESS SHOWN OTHERWISE, SLOPE DRAIN PIPING DOWN IN THE DIRECTION
OF FLOW NOT LESS THAN 25 MM (1 INCH) IN 12 M (40 FEET). PROVIDE ECCENTRIC
REDUCERS TO KEEP BOTTOM OF SLOPED PIPING FLAT.
c. PROVIDE MANUAL OR AUTOMATIC AIR VENT AT ALL PIPING SYSTEM HIGH POINTS AND
DRAIN VALVES AT ALL LOW POINTS. INSTALL PIPING TO FLOOR DRAINS FROM ALL
AUTOMATIC AIR VENTS.
d. CONNECT PIPING TO EQUIPMENT AS SHOWN ON THE DRAWINGS. INSTALL COMPONENTS
FURNISHED BY OTHERS SUCH AS:
• WATER TREATMENT POT FEEDERS AND CONDENSER WATER TREATMENT SYSTEMS.
• FLOW ELEMENTS (ORIFICE UNIONS), CONTROL VALVE BODIES, FLOW SWITCHES,
PRESSURE TAPS WITH VALVE, AND WELLS FOR SENSORS.
e. FIRESTOPPING: FILL OPENINGS AROUND UNINSULATED PIPING PENETRATING FLOORS
OR FIRE WALLS, WITH FIRESTOP MATERIAL. FOR FIRESTOPPING INSULATED PIPING
REFER TO SECTION HVAC AND BOILER PLANT INSULATION.
2. FLUSHING AND CLEANING PIPING SYSTEMS
a. INITIAL FLUSHING: REMOVE LOOSE DIRT, MILL SCALE, METAL CHIPS, WELD BEADS, RUST, AND LIKE DELETERIOUS SUBSTANCES WITHOUT DAMAGE TO ANY SYSTEM
COMPONENT. PROVIDE TEMPORARY PIPING OR HOSE TO BYPASS COILS, CONTROL
VALVES, EXCHANGERS AND OTHER FACTORY CLEANED EQUIPMENT UNLESS
ACCEPTABLE MEANS OF PROTECTION ARE PROVIDED AND SUBSEQUENT INSPECTION
OF HIDE-OUT AREAS TAKES PLACE. ISOLATE OR PROTECT CLEAN SYSTEM
COMPONENTS, INCLUDING PUMPS AND PRESSURE VESSELS, AND REMOVE ANY
COMPONENT WHICH MAY BE DAMAGED. OPEN ALL VALVES, DRAINS, VENTS AND
STRAINERS AT ALL SYSTEM LEVELS. REMOVE PLUGS, CAPS, SPOOL PIECES, AND
COMPONENTS TO FACILITATE EARLY DEBRIS DISCHARGE FROM SYSTEM. SECTIONALIZE
SYSTEM TO OBTAIN DEBRIS CARRYING VELOCITY OF 1.8 M/S (5.9 F/S), IF POSSIBLE.
CONNECT DEAD-END SUPPLY AND RETURN HEADERS AS NECESSARY. FLUSH BOTTOMS
OF RISERS. INSTALL TEMPORARY STRAINERS WHERE NECESSARY TO PROTECT DOWN-
STREAM EQUIPMENT. SUPPLY AND REMOVE FLUSHING WATER AND DRAINAGE BY
VARIOUS TYPE HOSE, TEMPORARY AND PERMANENT PIPING AND CONTRACTOR'S
BOOSTER PUMPS. FLUSH UNTIL CLEAN AS APPROVED.
b. FINAL FLUSHING: RETURN SYSTEMS TO CONDITIONS REQUIRED BY INITIAL FLUSHING
AFTER ALL CLEANING SOLUTION HAS BEEN DISPLACED BY CLEAN MAKE-UP. FLUSH ALL
DEAD ENDS AND ISOLATED CLEAN EQUIPMENT. GENTLY OPERATE ALL VALVES TO
DISLODGE ANY DEBRIS IN VALVE BODY BY THROTTLING VELOCITY. FLUSH FOR NOT
LESS THAN ONE HOUR.
3. STARTUP AND TESTING: PERFORM TESTS AS RECOMMENDED BY PRODUCT
MANUFACTURER AND LISTED STANDARDS AND UNDER ACTUAL OR SIMULATED OPERATING
CONDITIONS AND PROVE FULL COMPLIANCE WITH DESIGN AND SPECIFIED REQUIREMENTS.
TESTS OF THE VARIOUS ITEMS OF EQUIPMENT SHALL BE PERFORMED SIMULTANEOUSLY
WITH THE SYSTEM OF WHICH EACH ITEM IS AN INTEGRAL PART.
2. GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT
A. GENERAL: FURNISHING, INSTALLATION AND CONNECTION OF MOTORS FOR HVAC AND STEAM
GENERATION EQUIPMENT.
B. PRODUCTS
1. DESCRIPTION: ALL MATERIAL AND EQUIPMENT FURNISHED AND INSTALLATION METHODS
SHALL CONFORM TO THE REQUIREMENTS OF SECTION MOTOR CONTROLLERS; AND
SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES. PROVIDE ALL
ELECTRICAL WIRING, CONDUIT, AND DEVICES NECESSARY FOR THE PROPER CONNECTION,
PROTECTION AND OPERATION OF THE SYSTEMS. PROVIDE PREMIUM EFFICIENCY TYPE
MOTORS. UNLESS OTHERWISE SPECIFIED FOR A PARTICULAR APPLICATION, USE ELECTRIC
MOTORS WITH THE FOLLOWING REQUIREMENTS.
C. EXECUTION
1. INSTALLATION
a. INSTALL MOTORS IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS, THE
NEC, NEMA, AS SHOWN ON THE DRAWINGS AND/OR AS REQUIRED BY OTHER SECTIONS
OF THESE SPECIFICATIONS.
3. NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT
A. GENERAL: APPLICATION OF NOISE CONTROL MEASURES, AND VIBRATION CONTROL
TECHNIQUES TO BOILER PLANT ROTATING EQUIPMENT AND PARTS INCLUDING CHILLERS,
COOLING TOWERS, BOILERS, PUMPS, FANS, COMPRESSORS, MOTORS AND STEAM TURBINES.
B. PRODUCTS
1. GENERAL REQUIREMENTS:
a. TYPE OF ISOLATOR, BASE, AND MINIMUM STATIC DEFLECTION SHALL BE AS REQUIRED
FOR EACH SPECIFIC EQUIPMENT APPLICATION AS RECOMMENDED BY ISOLATOR OR
EQUIPMENT MANUFACTURER BUT SUBJECT TO MINIMUM REQUIREMENTS INDICATED
HEREIN AND IN THE SCHEDULE ON THE DRAWINGS.
C. EXECUTION
a. INSTALLATION: INSPECTION AND ADJUSTMENTS: CHECK FOR VIBRATION AND NOISE
TRANSMISSION THROUGH CONNECTIONS, PIPING, DUCTWORK, FOUNDATIONS, AND WALLS.
ADJUST, REPAIR, OR REPLACE ISOLATORS AS REQUIRED TO REDUCE VIBRATION AND
NOISE TRANSMISSIONS TO SPECIFIED LEVELS.
b. ADJUSTING: ADJUST VIBRATION ISOLATORS AFTER PIPING SYSTEMS ARE FILLED AND
EQUIPMENT IS AT OPERATING WEIGHT.
4. TESTING, ADJUSTING, AND BALANCING FOR HVAC
A. GENERAL
1. DESCRIPTION
2. RE: SPECIFICATIONS FOR TESTING, ADJUSTING, AND BALANCING (TAB) OF HEATING,
VENTILATING AND AIR CONDITIONING (HVAC) SYSTEM(S) REQUIREMENTS.
3. TAB INCLUDES THE FOLLOWING:
a. BALANCING AIR AND WATER DISTRIBUTION SYSTEMS; ADJUSTMENT OF TOTAL SYSTEM
TO PROVIDE DESIGN PERFORMANCE; AND TESTING PERFORMANCE OF EQUIPMENT
AND AUTOMATIC CONTROLS.
4. HYDRONIC SYSTEMS: INCLUDES CHILLED WATER, CONDENSER WATER, HEATING HOT
WATER AND GLYCOL-WATER SYSTEMS.
5. AIR SYSTEMS: INCLUDES ALL OUTSIDE AIR, SUPPLY AIR, RETURN AIR, EXHAUST AIR AND
RELIEF AIR SYSTEMS.
6. TAB PROCEDURES
a. TAB SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENT OF THE
STANDARD UNDER WHICH TAB AGENCY IS CERTIFIED BY EITHER AABC, TABB OR NEBB.
BALANCING SHALL BE DONE PROPORTIONALLY TO ALL APPLICABLE SYSTEMS.
b. GENERAL: DURING TAB ALL RELATED SYSTEM COMPONENTS SHALL BE IN FULL
OPERATION. FAN AND PUMP ROTATION, MOTOR LOADS AND EQUIPMENT VIBRATION
SHALL BE CHECKED AND CLIENT PROJECT REPRESENTATIVERECTED AS NECESSARY
BEFORE PROCEEDING WITH TAB. SET CONTROLS AND/OR BLOCK OFF PARTS OF
DISTRIBUTION SYSTEMS TO SIMULATE DESIGN OPERATION OF VARIABLE VOLUME AIR
OR WATER SYSTEMS FOR TEST AND BALANCE WORK.
B. PRODUCT
1. PROVIDE PLASTIC PLUGS TO SEAL HOLES DRILLED IN DUCTWORK FOR TEST PURPOSES.
2. SEE SECTION HVAC AND BOILER PLANT INSULATION PROVIDE FOR REPAIR OF INSULATION
REMOVED OR DAMAGED FOR TAB WORK.
C. EXECUTION
1. FOLLOWING APPROVAL OF TAB FINAL REPORT, THE SETTING OF ALL HVAC ADJUSTMENT
DEVICES INCLUDING VALVES, SPLITTERS AND DAMPERS SHALL BE PERMANENTLY MARKED
BY THE TAB SPECIALIST SO THAT ADJUSTMENT CAN BE RESTORED IF DISTURBED AT ANY
TIME. STYLE AND COLORS USED FOR MARKINGS SHALL BE COORDINATED PRIOR TO
MARKING.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP
O'Brien Engineering, Inc.
2340 E. Trinity Mills Rd. Ste 200
Carrollton, TX 75006
972-233-2288 www.obrieneng.com
OEI - LBL Joint Venture LLC
2340 E. Trinity Mills Rd. Ste 200
Carrollton, TX 75006
972-233-2288 www.obrieneng.com
O'Brien Engineering, Inc., Managing Partner
COR, Mr. JOSHUA JUNKIN
B
IM
/V
A B ig S p ri n g
O u tp a ti e n t
E x a m
R o o m s /0
.0
V
A B
S O u tp a ti e n t E x a m R o o m s M
E C
H
R
.r v t
/1
/2
:2
:5
P
M
M001
COVER SHEET - GENERAL NOTES OUTPATIENT CLINIC
Big Spring, TX
519-19-700
03/17/2023 LRL MM
100% ISSUE FOR BID
SHEET INDEX
NUMBER NAME
M001 COVER SHEET - GENERAL NOTES
M002 COVER SHEET - GENERAL NOTES, SYMBOLS & LEGENDS
M003 COVER SHEET - ABBREVIATIONS
MD101-1 FIRST FLOOR DEMOLITION PLAN HVAC, PHASE I
MD101-2 FIRST FLOOR DEMOLITION PLAN HVAC, PHASE II
MH101-1 FIRST FLOOR VENTILATION PLAN HVAC, PHASE I
MH101-2 FIRST FLOOR VENTILATION PLAN HVAC, PHASE II
MH501 MECHANICAL DETAILS
MH502 MECHANICAL DETAILS
MH601 MECHANICAL SCHEDULES
MI701 HVAC CONTROLS
MP101-1 FIRST FLOOR HVAC PIPING PLAN, PHASE I
MP101-2 FIRST FLOOR HVAC PIPING PLAN, PHASE II
SHEET LOG
SHEET REVISION
NUMBER NAME REV DATE DESCRIPTION
M001 COVER SHEET - GENERAL NOTES 1 03/17/2023 100% ISSUE FOR BID
M002 COVER SHEET - GENERAL NOTES, SYMBOLS & LEGENDS 1 03/17/2023 100% ISSUE FOR BID
M003 COVER SHEET - ABBREVIATIONS 1 03/17/2023 100% ISSUE FOR BID
MD101-1 FIRST FLOOR DEMOLITION PLAN HVAC, PHASE I 1 03/17/2023 100% ISSUE FOR BID
MD101-2 FIRST FLOOR DEMOLITION PLAN HVAC, PHASE II 1 03/17/2023 100% ISSUE FOR BID
MH101-1 FIRST FLOOR VENTILATION PLAN HVAC, PHASE I 1 03/17/2023 100% ISSUE FOR BID
MH101-2 FIRST FLOOR VENTILATION PLAN HVAC, PHASE II 1 03/17/2023 100% ISSUE FOR BID
MH501 MECHANICAL DETAILS 1 03/17/2023 100% ISSUE FOR BID
MH502 MECHANICAL DETAILS 1 03/17/2023 100% ISSUE FOR BID
MH601 MECHANICAL SCHEDULES 1 03/17/2023 100% ISSUE FOR BID
MI701 HVAC CONTROLS 1 03/17/2023 100% ISSUE FOR BID
MP101-1 FIRST FLOOR HVAC PIPING PLAN, PHASE I 1 03/17/2023 100% ISSUE FOR BID
MP101-2 FIRST FLOOR HVAC PIPING PLAN, PHASE II 1 03/17/2023 100% ISSUE FOR BID
WEST TEXAS VETERANS HEALTH CARE SYSTEM
OUTPATIENT CLINIC
519-19-700
BIG SPRING, TEXAS
Revisions: Date:
100% ISSUE FOR BID 03/17/2023
mmajdi C:\Users\libbya\Desktop\38894 Majdi TX-Eng\38894 Majdi TX-Eng FINAL Model (1)
11. AIR TERMINAL UNITS
A. GENERAL
1. DESCRIPTION: AIR TERMINAL UNITS, AIR FLOW CONTROL VALVES.
B. PRODUCTS
1. RE: SPECIFICATION FOR AIR TERMINAL UNITS (COOLING COILS, HEATING COILS, TERMINAL
UNIT BOXES), AIR FLOW CONTROL VALVES.
C. EXECUTION
1. WORK SHALL BE INSTALLED AS SHOWN AND ACCORDING TO THE MANUFACTURER’S
DIAGRAMS AND RECOMMENDATIONS.
2. HANDLE AND INSTALL UNITS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN
INSTRUCTIONS.
3. SUPPORT UNITS RIGIDLY SO THEY REMAIN STATIONARY AT ALL TIMES. CROSS-BRACING OR
OTHER MEANS OF STIFFENING SHALL BE PROVIDED AS NECESSARY. METHOD OF SUPPORT
SHALL BE SUCH THAT DISTORTION AND MALFUNCTION OF UNITS CANNOT OCCUR.
12. AIR OUTLETS AND INLETS
A. GENERAL
1. DESCRIPTION: ROOF CURBS, AIR OUTLETS AND INLETS: DIFFUSERS, REGISTERS, GRILLES, AND ACCESSORIES, AIR INTAKE/EXHAUST HOODS.
B. PRODUCTS
1. RE: EQUPMENT SCHEDULES AND SPECIFICATIONS FOR AIR OUTLET AND INLETS.
2. CONTRACTOR SHALL REVIEW ALL CEILING DRAWINGS AND DETAILS AND PROVIDE ALL
CEILING MOUNTED DEVICES WITH APPROPRIATE DIMENSIONS AND TRIM FOR THE SPECIFIC
LOCATIONS.
C. EXECUTIVE
1. COMPLY WITH PROVISIONS OF SECTION COMMON WORK RESULTS FOR HVAC AND STEAM
GENERATION. COORDINATE WITH OTHER TRADES AND WORK.
GENERAL NOTES (CONT'D)
9. HVAC DUCTS AND CASINGS
A. GENERAL
1. DESCRIPTION: DUCTWORK AND ACCESSORIES FOR HVAC INCLUDING THE FOLLOWING:
SUPPLY AIR, RETURN AIR, OUTSIDE AIR, EXHAUST, MAKE-UP AIR, AND RELIEF SYSTEMS.
B. PRODUCTS
1. GENERAL: EXCEPT FOR SYSTEMS SPECIFIED OTHERWISE, CONSTRUCT DUCTS, CASINGS,
AND ACCESSORIES OF GALVANIZED SHEET STEEL, ASTM A653, COATING G90; OR,
ALUMINUM SHEET, ASTM B209, ALLOY 1100, 3003 OR 5052.
2. JOINT SEALING: REFER TO SMACNA HVAC DUCT CONSTRUCTION STANDARDS.
3. REGARDLESS OF THE PRESSURE CLASSIFICATIONS OUTLINED IN THE SMACNA STANDARDS,
FABRICATE AND SEAL THE DUCTWORK IN ACCORDANCE WITH THE FOLLOWING PRESSURE
CLASSIFICATIONS:
4. DUCT PRESSURE CLASSIFICATION:
a. 0 TO 50 MM (2 INCH)
b. 50 MM TO 75 MM (2 INCH TO 3 INCH)
c. 75 MM TO 100 MM (3 INCH TO 4 INCH)
5. SEAL CLASS: ALL DUCTWORK SHALL RECEIVE CLASS A SEAL
6. CASINGS AND PLENUMS: CONSTRUCT IN ACCORDANCE WITH SMACNA HVAC DUCT
CONSTRUCTION STANDARDS SECTION 6, INCLUDING CURBS, ACCESS DOORS, PIPE
PENETRATIONS, ELIMINATORS AND DRAIN PANS. ACCESS DOORS SHALL BE HOLLOW
METAL, INSULATED, WITH LATCHES AND DOOR PULLS, 500 MM (20 INCHES) WIDE BY 1200 -
1350 MM (48 - 54 INCHES) HIGH. PROVIDE VIEW PORT IN THE DOORS WHERE SHOWN.
PROVIDE DRAIN FOR OUTSIDE AIR LOUVER PLENUM. OUTSIDE AIR PLENUM SHALL HAVE
EXTERIOR INSULATION. DRAIN PIPING SHALL BE ROUTED TO THE NEAREST FLOOR DRAIN.
7. PROVIDE ACCESS DOORS, SIZED AND LOCATED FOR MAINTENANCE WORK, UPSTREAM, IN
THE FOLLOWING LOCATIONS:
8. EACH DUCT MOUNTED COIL AND HUMIDIFIER.
9. EACH FIRE DAMPER (FOR LINK SERVICE), SMOKE DAMPER AND AUTOMATIC CONTROL
DAMPER.
10. EACH DUCT MOUNTED SMOKE DETECTOR.
11. FIRE DAMPER: THE DAMPER FRAME MAY BE OF DESIGN AND LENGTH AS TO FUNCTION AS
THE MOUNTING SLEEVE, THUS ELIMINATING THE NEED FOR A SEPARATE SLEEVE, AS
ALLOWED BY UL 555. OTHERWISE PROVIDE SLEEVES AND MOUNTING ANGLES, MINIMUM 1.9
MM (14 GAGE), REQUIRED TO PROVIDE INSTALLATION EQUIVALENT TO THE DAMPER
MANUFACTURER'S UL TEST INSTALLATION.
12. SMOKE DAMPER OPERATION: AUTOMATIC OPEN/CLOSE. NO SMOKE DAMPER THAT
REQUIRES MANUAL RESET OR LINK REPLACEMENT AFTER ACTUATION IS ACCEPTABLE. SEE
DRAWINGS FOR REQUIRED CONTROL OPERATION.
13. COMBINATION FIRE AND SMOKE DAMPERS: MULTI-BLADE TYPE UNITS MEETING ALL
REQUIREMENTS OF BOTH FIRE DAMPERS AND SMOKE DAMPERS SHALL BE USED WHERE
SHOWN AND MAY BE USED AT THE CONTRACTOR'S OPTION WHERE APPLICABLE.
14. GENERAL: FACTORY FABRICATED, COMPLYING WITH NFPA 90A FOR CONNECTORS NOT
PASSING THROUGH FLOORS OF BUILDINGS. FLEXIBLE DUCTS SHALL NOT PENETRATE ANY
FIRE OR SMOKE BARRIER WHICH IS REQUIRED TO HAVE A FIRE RESISTANCE RATING OF
ONE HOUR OR MORE. FLEXIBLE DUCT LENGTH SHALL NOT EXCEED 1.5 M (5 FEET). PROVIDE
INSULATED ACOUSTICAL AIR DUCT CONNECTORS IN SUPPLY AIR DUCT SYSTEMS AND
ELSEWHERE AS SHOWN.
15. WHERE DUCT CONNECTIONS ARE MADE TO FANS, AIR TERMINAL UNITS, AND AIR HANDLING
UNITS, INSTALL A NON-COMBUSTIBLE FLEXIBLE CONNECTION OF 822 G (29 OUNCE)
NEOPRENE COATED FIBERGLASS FABRIC APPROXIMATELY 150 MM (6 INCHES) WIDE. FOR
CONNECTIONS EXPOSED TO SUN AND WEATHER PROVIDE HYPALON COATING IN LIEU OF
NEOPRENE. BURNING CHARACTERISTICS SHALL CONFORM TO NFPA 90A. SECURELY
FASTEN FLEXIBLE CONNECTIONS TO ROUND DUCTS WITH STAINLESS STEEL OR
ZINC-COATED IRON DRAW BANDS WITH WORM GEAR FASTENER. FOR RECTANGULAR
CONNECTIONS, CRIMP FABRIC TO SHEET METAL AND FASTEN SHEET METAL TO DUCTS BY
SCREWS 50 MM (2 INCHES) ON CENTER. FABRIC SHALL NOT BE STRESSED OTHER THAN BY
AIR PRESSURE. ALLOW AT LEAST 25 MM (ONE INCH) SLACK TO ENSURE THAT NO
VIBRATION IS TRANSMITTED.
C. EXECUTION
1. INSTALLATION
a. FABRICATE AND INSTALL DUCTWORK AND ACCESSORIES IN ACCORDANCE WITH
SMACNA STANDARDS.
b. DRAWINGS SHOW THE GENERAL LAYOUT OF DUCTWORK AND ACCESSORIES BUT DO
NOT SHOW ALL REQUIRED FITTINGS AND OFFSETS THAT MAY BE NECESSARY TO
CONNECT DUCTS TO EQUIPMENT, BOXES, DIFFUSERS, GRILLES, ETC., AND TO
COORDINATE WITH OTHER TRADES. FABRICATE DUCTWORK BASED ON FIELD
MEASUREMENTS. PROVIDE ALL NECESSARY FITTINGS AND OFFSETS AT NO ADDITIONAL
COST. COORDINATE WITH OTHER TRADES FOR SPACE AVAILABLE AND RELATIVE
LOCATION OF HVAC EQUIPMENT AND ACCESSORIES ON CEILING GRID. DUCT SIZES ON
THE DRAWINGS ARE INSIDE DIMENSIONS WHICH SHALL BE ALTERED BY CONTRACTOR
TO OTHER DIMENSIONS WITH THE SAME AIR HANDLING CHARACTERISTICS WHERE
NECESSARY TO AVOID INTERFERENCES AND CLEARANCE DIFFICULTIES.
c. PROVIDE DUCT TRANSITIONS, OFFSETS AND CONNECTIONS TO DAMPERS, COILS, AND
OTHER EQUIPMENT IN ACCORDANCE WITH SMACNA STANDARDS. PROVIDE
STREAMLINER, WHEN AN OBSTRUCTION CANNOT BE AVOIDED AND MUST BE TAKEN IN
BY A DUCT. REPAIR GALVANIZED AREAS WITH GALVANIZING REPAIR COMPOUND.
d. CONSTRUCT CASINGS, ELIMINATORS, AND PIPE PENETRATIONS IN ACCORDANCE WITH
SMACNA STANDARDS, CHAPTER 6. DESIGN CASING ACCESS DOORS TO SWING AGAINST
AIR PRESSURE SO THAT PRESSURE HELPS TO MAINTAIN A TIGHT SEAL.
e. INSTALL DUCT HANGERS AND SUPPORTS IN ACCORDANCE WITH SMACNA STANDARDS.
f. INSTALL FIRE DAMPERS, SMOKE DAMPERS AND COMBINATION FIRE/SMOKE DAMPERS IN
ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS TO CONFORM TO THE
INSTALLATION USED FOR THE RATING TEST. INSTALL FIRE DAMPERS, SMOKE DAMPERS
AND COMBINATION FIRE/SMOKE DAMPERS AT LOCATIONS INDICATED AND WHERE
DUCTS PENETRATE FIRE RATED AND/OR SMOKE RATED WALLS, SHAFTS AND WHERE
REQUIRED. INSTALL WITH REQUIRED PERIMETER MOUNTING ANGLES, SLEEVES,
BREAKAWAY DUCT CONNECTIONS, CLIENT PROJECT REPRESENTATIVEROSION
RESISTANT SPRINGS, BEARINGS, BUSHINGS AND HINGES PER UL AND NFPA.
DEMONSTRATE RE-SETTING OF FIRE DAMPERS AND OPERATION OF SMOKE DAMPERS.
g. SEAL OPENINGS AROUND DUCT PENETRATIONS OF FLOORS AND FIRE RATED
PARTITIONS WITH FIRE STOP MATERIAL AS REQUIRED BY NFPA 90A.
h. FLEXIBLE DUCT INSTALLATION: REFER TO SMACNA STANDARDS, CHAPTER 3. DUCTS
SHALL BE CONTINUOUS, SINGLE PIECES NOT OVER 1.5 M (5 FEET) LONG (NFPA 90A), AS
STRAIGHT AND SHORT AS FEASIBLE, ADEQUATELY SUPPORTED. CENTERLINE RADIUS
OF BENDS SHALL BE NOT LESS THAN TWO DUCT DIAMETERS. MAKE CONNECTIONS WITH
CLAMPS AS RECOMMENDED BY SMACNA. CLAMP PER SMACNA WITH ONE CLAMP ON THE
CLIENT PROJECT REPRESENTATIVEE DUCT AND ONE ON THE INSULATION JACKET.
FLEXIBLE DUCTS SHALL NOT PENETRATE FLOORS, OR ANY CHASE OR PARTITION
DESIGNATED AS A FIRE OR SMOKE BARRIER, INCLUDING CLIENT PROJECT
REPRESENTATIVERIDOR PARTITIONS FIRE RATED ONE HOUR OR TWO HOURS. SUPPORT
DUCTS SMACNA STANDARDS.
i. INSTALL ALL DAMPER CONTROL/ADJUSTMENT DEVICES ON STAND-OFFS TO ALLOW
COMPLETE COVERAGE OF INSULATION.
2. PROTECTION AND CLEANING: ADEQUATELY PROTECT EQUIPMENT AND MATERIALS
AGAINST PHYSICAL DAMAGE. PLACE EQUIPMENT IN FIRST CLASS OPERATING CONDITION
OR RETURN TO SOURCE OF SUPPLY FOR REPAIR OR REPLACEMENT, AS DETERMINED BY
APPROVER. PROTECT EQUIPMENT AND DUCTS DURING CONSTRUCTION AGAINST ENTRY OF
FOREIGN MATTER TO THE INSIDE AND CLEAN BOTH INSIDE AND OUTSIDE BEFORE
OPERATION AND PAINTING. WHEN NEW DUCTS ARE CONNECTED TO EXISTING DUCTWORK,
CLEAN BOTH NEW AND EXISTING DUCTWORK BY MOPPING AND VACUUM CLEANING INSIDE
AND OUTSIDE BEFORE OPERATION.
3. DUCTWORK LEAKAGE TESTING SHALL BE PERFORMED FOR THE ENTIRE AIR DISTRIBUTION
SYSTEM (INCLUDING ALL SUPPLY, RETURN, EXHAUST AND RELIEF DUCTWORK), SECTION BY
SECTION, INCLUDING FANS, COILS AND FILTER SECTIONS. BASED UPON SATISFACTORY
INITIAL DUCT LEAKAGE TEST RESULTS, THE SCOPE OF THE TESTING MAY BE REDUCED ON
DUCTWORK CONSTRUCTED TO THE 500 PA (2" WG) DUCT PRESSURE CLASSIFICATION. IN
NO CASE SHALL THE LEAKAGE TESTING OF DUCTWORK CONSTRUCTED ABOVE THE 500 PA
(2" WG) DUCT PRESSURE CLASSIFICATION OR DUCTWORK LOCATED IN SHAFTS OR OTHER
INACCESSIBLE AREAS BE ELIMINATED.
a. ALL DUCTWORK SHALL BE LEAK TESTED FIRST BEFORE ENCLOSED IN A SHAFT OR
COVERED IN OTHER INACCESSIBLE AREAS.
10. HVAC FANS
A. GENERAL
1. FANS FOR HEATING, VENTILATING AND AIR CONDITIONING.
B. PRODUCTS
1. RE: SPECIFICATIONS FOR FAN SECTIONS, MOTORS AND DRIVES, CENTRIFUGAL FANS,
MOTORS, DRIVES, ACCESSORIES AND COATINGS, IN-LINE CENTRIFUGAL FANS, TUBULAR
CENTRIFUGAL FANS, UP-BLAST KITCHEN HOOD EXHAUST FANS, INDUSTRIAL FANS, UTILITY
FANS AND VENT SETS, PREFABRICATED ROOF CURBS, POWER ROOF AND WALL
VENTILATORS, CENTRIFUGAL CEILING FANS, PROPELLER FANS, PACKAGED HOOD
MAKE-UP AIR UNITS, VANE AXIAL FANS, TUBE-AXIAL FANS, AIR CURTAIN UNITS, ROOF
CURBS, BELT GUARDS, ETC.
C. EXECUTION
1. INSTALLATION
a. WORK SHALL BE INSTALLED AS SHOWN AND ACCORDING TO THE MANUFACTURER’S
DIAGRAMS AND RECOMMENDATIONS.
b. HANDLE AND INSTALL UNITS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN
INSTRUCTIONS.
c. SUPPORT UNITS RIGIDLY SO THEY REMAIN STATIONARY AT ALL TIMES.
CROSS-BRACING OR OTHER MEANS OF STIFFENING SHALL BE PROVIDED AS
NECESSARY. METHOD OF SUPPORT SHALL BE SUCH THAT DISTORTION AND
MALFUNCTION OF UNITS CANNOT OCCUR.
d. LOCATE AIR TERMINAL UNITS TO PROVIDE A STRAIGHT SECTION OF INLET DUCT FOR
PROPER FUNCTIONING OF VOLUME CONTROLS. SEE STANDARD DETAIL.
S-60 HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
CR-60 HIGH PRESSURE STEAM CONDENSATE RETURN
S-30 MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
CR-30 MEDIUM PRESSURE STEAM CONDENSATE RETURN
S-15 LOW PRESSURE STEAM (15 PSIG AND BELOW)
CR-15 LOW PRESSURE STEAM CONDENSATE RETURN
PC CONDENSATE PUMP DISCHARGE
HWS HOT WATER HEATING SUPPLY
HWR HOT WATER HEATING RETURN
GHS GLYCOL WATER HEATING SUPPLY
GHR GLYCOL WATER HEATING RETURN
SWS SOLAR WATER SUPPLY
SWR SOLAR WATER RETURN
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RHG REFRIGERANT HOT GAS
CWS CONDENSER WATER SUPPLY (FROM TOWER)
CWR CONDENSER WATER RETURN (TO TOWER)
CHS CHILLED WATER SUPPLY
CHR CHILLED WATER RETURN
GCS CHILLED GLYCOL WATER SUPPLY
GCR CHILLED GLYCOL WATER RETURN
MW MAKE UP WATER
D DRAIN LINE
V VENT LINE
GRS GLYCOL WATER RUN AROUND SUPPLY
GRR GLYCOL WATER RUNAROUND RETURN
EXISTING PIPE TO BE REMOVEDX
FWPD FEED WATER PUMP DISCHARGE
FWPS FEED WATER PUMP SUCTION
VR VACUUM CONDENSATE RETURN
TC TUBE CLEANER WATER SUPPLY
BO BOILER BLOWOFF
CBD CONTINUOUS BLOWDOWN
BWS BOILER WATER SAMPLE
FWS FEEDWATER SAMPLE (FROM DEAERATOR)
CF CHEMICAL FEED
A COMPRESSED AIR
G NATURAL GAS MAIN FUEL
G(I) NATURAL GAS IGNITER FUEL
LPG(I) LIQUID PETROLEUM GAS IGNITER FUEL
FOS FUEL OIL SUPPLY
FOR FUEL OIL RETURN
CW COLD WATER (CITY WATER)
SW SOFTENED WATER
HW HOT WATER
RH
ROLLER TYPE HANGER
SH
VARIABLE SPRING TYPE HANGER (TYPE 51)*
SCH
SPRING CUSHION TYPE HANGER (TYPE 48 OR 49)*
CLEVIS TYPE HANGER
TH
TRAPEZE HANGER (PROVIDE U-BOLT PIPE ATTACHMENT TO
TRAPEZE EXCEPT WHERE RH IS INDICATED)
PS
FLOOR SUPPORTED PIPE STAND
RC
RISER CLAMP (TYPE 42)*
WB
WALL BRACKET (TYPE 31, 32, 33)*
CSH
CONSTANT SUPPORT HANGER (TYPE 54, 55, 56)*
SS
SLIDING SUPPORTS (TYPE 35)*
* TYPE NUMBERS REFERS TO MANUFACTURER'S STANDARDIZATION SOCIETY
STANDARD PRACTICE SP-58
DESCRIPTION:SYMBOL
PIPING SYSTEMSVA PIPING VALVE SYMBOLS
GATE VALVE, THREADED
GATE VALVE, THREADED
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
(WITH BALL VALVE & HOSE CONNECTION)
FLEXIBLE CONNECTION
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO-POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
MODULATING BUTTERFLY VALVE
AUTOMATIC BALANCING CONTROL VALVE
WATER BALANCE DEVICE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV), FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLER
FLOW METER
WYE STRAINER
QUICK-COUPLE HOSE CONNECTOR)
WYE STRAINER(WITH VALVED DRAIN &
GATE VALVE, FLANGED
GATE VALVE, FLANGED
CONTROLS SYMBOLS
ROOM THERMOSTAT/TRANSMITTER
WALL MOUNT
T
ROOM HUMIDISTAT (MOISTURE)/
TRANSMITTER - WALL MOUNT
TEMPERATURE TRANSMITTERTT
TEMPERATURE TRANSMITTER,
AVERAGING ELEMENT
TT
MOISTURE (HUMIDITY)
TRANSMITTER
MT
PRESSURE TRANSMITTERPT
STATIC PRESSURE SENSORSPS
FLOW TRANSMITTERFT
CURRENT TRANSMITTERIT
CONDUCTIVITY TRANSMITTERCT
SMOKE DETECTORSD
PRESSURE DIFFERENTIAL
TRANSMITTER
PDT
PRESSURE DIFFERENTIAL
SWITCH
PDS
HAND SWITCH
(HAND-OFF-AUTO SWITCH)
HS
VALVE OR DAMPER
POSITION CONTROLLER
ZC
LOCAL RECORDING TIME CLOCK
(RUNTIME)
KR
TEMPERATURE SWITCH, LOW
(FREEZESTAT)
TSL
M
TEMPERATURE SWITCH, HIGH
(FREEZESTAT)
TSH
LEVEL CONTROLLERLC
LEVEL TRANSMITTERLT
PRESSURE SWITCH HIGHPSH
PSL
ELECTRONIC TO PNEUMATIC
TRANSDUCER
EPT
CARBON DIOXIDE TRANSMITTERAT
CARBON MONOXIDE TRANSMITTER
OCCUPANCY SENSOR
LOCAL TEMPERATURE
CONTROL PANEL
LTCP
HVAC CONTROL PANELHVAC
VARIABLE SPEED
MOTOR CONTROLLER
VSMC
INTEGRATE CONTROL POINT ON
REMOTE GRAPHICS WORKSTATION
AT ENERGY CONTROL CENTER
ECC
TEMPERATURE CONTROLLER
SEE SEQUENCE OF OPERATION
TC
PRESSURE CONTROLLER
SEE SEQUENCE OF OPERATION
PC
SPEED CONTROLLER
SEE SEQUENCE OF OPERATION
SC
FLOW CONTROLLER
SEE SEQUENCE OF OPERATION
FC
FLOW SWITCH HIGHFSH
FLOW SWITCH LOWFSL
TIME CLOCK CONTROLLING
EQUIPMENT ON A SCHEDULE
KC
PRESSURE SWITCH LOW
CO2
AT
CO
AT
OC
DETAIL NUMBER
DRAWING SYMBOLS
DRAWING NUMBER WHERE DRAWN
SECTION LETTER
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
EQUIPMENT ABBREVIATION (PUMP)
PP105
PP105
P
PUMP NO. 3 IN BUILDING NO. 26
TYPICAL UNIT NUMBER
CALLOUT
(ENLARGED VIEW)
SECTION
EQUIPMENT TAG
EQUIPMENT TAG
SAN
RISER TAG
RISER SYSTEM
RISER NUMBER
2-26
BUILDING NO. WHERE EQUIPMENT IS LOCATED
SERVED BY AIR HANDLER UNIT NO. 1
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
P 2-26 2
DUCTWORK SYMBOLS
DN SUPPLY DUCTUP
DN EXHAUST DUCTUP
DN RETURN DUCTUP
ROUND AND SQUARE
4-WAY CEILING DIFFUSERS
SQUARE 3-WAY
CEILING DIFFUSERS
SQUARE 2-WAY
CEILING DIFFUSERS
SQUARE 1-WAY
CEILING DIFFUSERS
LINEAR SLOT DIFFUSER
SUPPLY TOP REGISTER
OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING
REGISTER OR GRILLE
EXHAUST OR RETURN REGISTER
OR TOP GRILLE (WALL TYPE)
VANED ELBOW & AIR SPLIT
TYPE DUCT TAKE-OFF
CONNECT NEW DUCT
TO EXISTING DUCT
INCLINED RISE,
IN DIRECTION OF AIR FLOW
EXHAUST OR RETURN BOTTOM
REGISTER OR GRILLE (WALL TYPE)
INCLINED DROP,
IN DIRECTION OF AIR FLOW
LIMIT OF DEMOLITION
R
D
VD
FD
BDD
10x8
FLEXIBLE CONNECTION,
EQUIPMENT, VIBRATION OR SEISMIC
VANED ELBOW
STANDARD RADIUS ELBOW
(LONG RADIUS)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE REMOVED
FLEXIBLE DUCTWORK (INSULATED)
DUCT WITH SOUND LINING
MANUAL VOLUME DAMPER
FIRE DAMPER
BACK DRAFT DAMPER
FC
LOUVER (SPECIFIED IN
ARCHITECTURAL SECTION)
NEW DUCT
(INSIDE DIMENSIONS: WIDTH x DEPTH)
VANED ELBOW
(SHORT RADIUS)
//FIRE//SMOKE//DAMPER
(VA DOES NOT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .