This document is an amendment to a solicitation for renovations to an outpatient clinic. The amendment extends the bid opening date to January 10, 2024 at 1:00 PM CST and provides responses to contractor questions. The renovation work includes demolition, new partitions, finishes, electrical and mechanical systems. The solicitation is issued by the Department of Veterans Affairs for work at the Central Texas Veterans Health Care System campus in Temple, Texas. Bids are due on the extended date of January 10, 2024.

View the file

Other files

File Type Posted
MP101-1 and MP101-2 (VABS OPC).pdf PDF
36C25723B0053 0013.docx DOCX document
519-19-700_VABS_Outpatient Exam Rooms_Issue for Bid Drawings - Plumbing.pdf PDF
519-19-700_VABS_Outpatient Exam Rooms_Issue for Bid Drawings - Mechanical.pdf PDF
519-19-700_VABS_Outpatient Exam Rooms_Issue for Bid Drawings - Electrical.pdf PDF
36C25723B0053 0012.docx DOCX document
519-19-700_VABS_Outpatient Exam Rooms_Issue for Bid Drawings - Arch redueced.pdf PDF
519-19-700_VABS_Outpatient Exam Rooms_Issue for Bid Drawings - Fire Protection.pdf PDF
36C25723B0053 0011.docx DOCX document
519-19-700_VABS_Outpatient Exam Rooms_Issue for Bid Specifications 1-8-24.pdf PDF
519-19-700 Drawings reduced size.pdf PDF
36C25723B0053 0010.docx DOCX document
36C25723B0053 0009.docx DOCX document
H4-02-A.pdf PDF
H3-04 B.pdf PDF
H2-05 B.pdf PDF
H3-02 A.pdf PDF
H3-06-B.pdf PDF
H2-03 B.pdf PDF
H3-06-A.pdf PDF
H2-04 A.pdf PDF
H3-07-B.pdf PDF
H4-01-B.pdf PDF
H3-03 A.pdf PDF
H2-04 B.pdf PDF
H3-05 B.pdf PDF
H2-02 B.pdf PDF
H3-05 A.pdf PDF
H3-01.pdf PDF
H4-03-B.pdf PDF
H2-05 A.pdf PDF
H4-01-A.pdf PDF
H2-03 A.pdf PDF
H3-03 B.pdf PDF
H4-02-B.pdf PDF
H2-02 A.pdf PDF
H3-07-A.pdf PDF
H2-01 B.pdf PDF
H2-01 A.pdf PDF
H3-04 A.pdf PDF
H3-01 A.pdf PDF
H4-03-A.pdf PDF
H3-02 B.pdf PDF
36C25723B0053 0007.docx DOCX document
36C25723B0053 0006.docx DOCX document
36C25723B0053 0005.docx DOCX document
519-19-700 Drawings pg 21-40.pdf PDF
519-19-700_VABS_Outpatient Exam Rooms_Issue for Bid Desgin Analysis.pdf PDF
519-19-700 Drawings pg 1-20.pdf PDF
519-19-700 Drawings pg 51-58.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 519-19-700 Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple TX 76504 Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171 Temple TX 76504 To all Offerors/Bidders

36C25723B0053 12-20-2023

X X X

The purpose of this Amendment is post RFI's and supporting documents along with extending the Bid Opening date Bids are due 10 January 2024 at 1:00 PM CST. Virtual Bid opening is 10 January 2024 @ 3:00PM CST No Other Changes

Rhonda Richardson Contracting Officer Bidder RFIs - VABS OPC

RFI

Number

RFI

AE

Response Are we to dispose/abate of any asbestos, lead, mold, or other hazardous material as part of this project?

If so, provide appropriate hazardous material site survey report.

The VA will provide a report

What will the

ICRA level be for this project?

Category D High Ris k so it would be level 4 Are there any required/proprietary subcontractors the general contractor is to hire associated with this project?

The only proprietary systems we have is Johnson Controls for HVAC and Seimens for fire alarm.

Will all work associated with this project able to be performed during regular working hours?

Most work will be able to be performed during normal business hours.

It is our understanding that the Solicitation is a Sealed Bid (IFB) design-bid-build project with the

Government's AE being responsible for the design portion (providing a full and complete set of

Specifications and Plans) and the successful offeror being responsible for bidding and building the project based on the Specifications and Plans provided by the Government's AE.

Put another way, the successful offeror will not be required to perform any design-build services as part of th e contract - correct?

It's AE's understanding that unsealed set was put out there for initial bidder inquiries, so maybe that's what the confusion is here.

AE has provided sealed documents, so should be clear that this is a normal

DBB

contract.

This requir ement is Construction only Reference sheet E901:

Panelboard H1ER is shown as a second section of a two-section panelboard.

Is panelboard H1EL already equipped with feed through lugs to accommodate the second section or should be figure replacing H1EL with a two-section panelboard?

H1ER

AND

H1EL

are existing panelboards to remain.

Field verify feed through lug construction RE: Sheet EL101, E601: Connect new light circuits to panel H1ER, six (6) circuits 3.2kVA.

Per keynote field verify space/spare availability.

Reference sheet EP102, detail 1:

Panelboard LS1E is shown as new but there isn't a panel schedule, and it is not shown on the riser diagram.

Is this simply a re-located panelboard?

If a completely new panelboard is required, please provide a panel schedule and riser diagram.

All panels are existing. LS1E Demo has been removed by others. LS1E

(NEW) has been relocated by others and is existing.

I'm assuming panelboard LS1E is on the life safety branch.

If it is re-located or replaced with new, it will have to meet coordination requirements of NEC 517.31 (G).

Has there been a recent, up to date coordination study performed on the electrical service?

If so, can we get access to that study?

LS1E

is existing.

It is not being relocated.

In the event that the current life safety branch does not meet the NEC coordination requirements, how will repairs to the existing electrical service be handled?

We just had a project done a year ago to upda te the electrical service in that area so there should not be any repairs needed. In the case of any repairs needed our electricians should be able to complete in house.

Where will the staging area be located, in location to the project area?

Refer General Note D on AD101. (IF CONTRACTOR NEEDS A MOBILE

OFFICE OR STAGING AREA FOR STORING CONSTRUCITON

MATERIALS, COORDINATE W/COR FOR THE EXACT LOCATION.)

Who is the fire alarm system contractor for the

VA?

Absolute Fire Protection What type of Fire

Alarm system is currently in place?

Seimens There are no drawings specifying nurse call or any type of telecom/data cabling, is the contractor safe to assume there is no type of work through the project?

Nurse

Call is provided by others.

RE: Sheet EP101: Outlet shown in coordinated locations. Provide raceway rough-in stubbed above ceiling. RE: Design Analysis Section 8.3 Interior

Electrical Low Voltage Systems.

Is the contractor to supply and install grab bars, medical equipment, clocks, soap dispensers, sharps containers, exam tables, telephones, monitors, etc?

Refer FF&E list and General Note A on AS131 (EQUIPMENT AND

FURNITURE ARE FURNISHED AND INSTALLED BY THE OWNER.) Grab Bar in toilet will be furnished and installed by Contractor.

General Note A on drawing AS 131 states, equipment and furniture are furnished and installed by the owner.

Assuming the VA is the owner?

Also, what is considered equipment and furniture?

As the note is not attached to details within the drawings.

VA

is the owner. Refer

FF&E

layout and list on

AS

131.

Will modular containment systems be allowed for ICRA barriers rather than sheetrock partitions?

As long as it meets the ICRA requirements The demolition drawings are not descriptive.

Is the contractor to demo all walls, finishes, and items left inside the hatched areas to concrete and begin building back with all new material?

Yes. Refer General Note C to prepare for the new renovation as described in drawings and spec

s. (EVERYTHING WITHIN THE HATCHED AREA IS TO

BE

DEMOLISHED).

Is there any terrazzo flooring within the construction area?

No Who is responsible for moving employees and their furniture from phase to Phase and vice versa?

The VA will move employees and furniture Please provide wall type and their construction detail for new walls in Rooms 1182 (Nurse Manager), (storage), 1192/1191 (Exam-1).

Refer

General

Note

G on

AS112

(all partitions are type a3 unless noted otherwise.)

Refer AS410 for construction details for partition walls.

Please confirm that all furniture/office equipment/medical equipment are furnished and installed by the

Gov't.

Refer FF&E list and General Note A on AS131 (EQUIPMENT AND

FURNITURE ARE FURNISHED AND INSTALLED BY THE OWNER.) Grab

Bar in toilet will be furnished and installed by Contractor.

Please confirm that this project does not include any contractor provided design/engineering services.
This project is a design-bid-build project. A complete design package has been provided. Requirements for the contractor are identified in the sealed plans/specs.
23
Is night work allowed?
Yes
24
Please extend bid date by two weeks in order to get better trade contractor participation
Bid Submission will be extended
Reference sheet E901: Panelboard H1ER is shown as a second section of a two-section panelboard. Is panelboard H1EL already equipped with feed through lugs to accommodate the second section or should be figure replacing H1EL with a two-section panelboard?
H1ER AND H1EL are existing panelboards to remain. Field verify feed through lug construction RE: Sheet EL101, E601: Connect new light circuits to panel H1ER, six (6) circuits 3.2kVA.

Per keynote 1 field verify space/spare availability.

Reference sheet EP102, detail 1: Panelboard LS1E is shown as new but there isn't a panel schedule and it is not shown on the riser diagram. Is this simply a re-located panelboard? If a completely new panelboard is required, please provide a panel schedule and riser diagram.

DUPLICATE RFI TO RFI #7 ... reference previous response.

I'm assuming panelboard LS1E is on the life safety branch. If it is re-located or replaced with new, it will have to meet coordination requirements of NEC 517.31 (G). Has there been a recent, up to date coordination study performed on the electrical service? If so, can we get access to that study?

DUPLICATE RFI TO RFI #8 ... reference previous response.

28
In the event that the current life safety branch does not meet the NEC coordination requirements, how will repairs to the existing electrical service be handled?
DUPLICATE RFI TO RFI #9 ... reference previous response.
29
Please confirm The Design Analysis attached to the solicitation is not part of the resulting contract and bidders are to bid per plans and specifications.
Correct ... Design Analysis is NOT a contract document and not part of the bid package.
30
Reference partition types plan details on AS410. Please provide the dimension between Finish Floor (FF) to underside of deck above (not provided).
Field verification required by Contractor.
31
Some items are identified as AED on floor plans AS111 and AS112. Please identify requirements (if any) for “AED.”
AED will be furnished and installed by owner.
32
Plans do not identify construction of the existing walls. If any of the existing walls are masonry, plaster or concrete, please identify these wall locations by amendment
Field verification required by Contractor.

Please confirm the only phase 1 construction required for partial room 1178 TLT which straddles the phase I/II lines is demolition and the temporary wall and the reconstruction of this room will be accomplished in phase 2.

Add necessary temporary walls to area to protect the Phase 1 area.

34
Because Phase 1 Exam room 6 has the sink portion of the room in phase 2, it will not be a fully functional exam room at the completion of phase 1.
No, it will not.
35
Plans are missing typically provided column line references in both directions. Can plans be revised to include column line references?
Column locations were not able to be verified during design. Contractor should field verify all column locations as needed during construction.

Demolition plan AD101 doesn’t identify any demolition at the exterior wall and the new floor plans do not identify any new wall at some/most exterior walls. If any demolition or new work such as gypsum board furring is required at the exterior walls, please indicate specifically what is required (demo and new work) at these locations by amendment. Snapshot of room 1180 is provided as an example.

Demo existing gypsum board on interior side and put new 5/8? gypsum board back after the required new conduit works. Keep the existing insulation in the wall.

Please confirm new power and data communication conduit are allowed to be exposed wall mounted conduit/boxes at existing to remain exterior walls. (REFERENCE TO RFI #36)
Demo existing gypsum board on interior side and put new 5/8? gypsum board back after the required new conduit works. Keep the existing insulation in the wall.
So that the existing to remain exterior wall is not damaged, confirm any existing inwall conduit is to be reused or abandoned in place (REFERENCE RFIs #36 & #37)
Demo existing gypsum board on interior side and put new 5/8? gypsum board back after the required new conduit works. Keep the existing insulation in the wall.
39
Please provide as-built drawings by amendment
Attched
40
What finish is required on the aluminum window frames, reference clerestory window details on AS600.
The finish of the aluminum window frame is Clear Anodized
41
We assume clerestory windows will receive ¼” clear glass per Section 08 80 00 paragraph 2.1 unless clarified otherwise.
2 of 1/4" annealed glazing with air insulation to reduce sound transmission. Will update the specification.
42
Please provide plan details for the windows located over the J3 pony walls at registration to include window frame type and what supports the window on the pony wall.
Partition walls to match existing.
RFI Number
RFI
AE Response

Reference Detail 13/AS401 which indicates to match glass pattern of the existing window to be demolished. Specifications provide for ¼” clear glass, reference Section 08 80 00 paragraph 2.1. If there is a discrepancy between existing pattern and the specifications, please confirm either is acceptable at contractor’s choice. If not, please provide a specification for the glass required at detail 13/AS401.

The partition fritted glass wall to match existing. Provide samples to COR for approval.

General note 4 on FP101 states “Building Construction is Type I-A. No sprinkler protection is required.” General notes 5 & 6 on FP101 indicate areas to be designed for light hazard (not shaded) and ordinary hazard (shaded areas). Is no sprinkler protection required per General Note 4 or is sprinkler protection required per general notes 5 & 6?
Sprinkler protection is required throughout the area of work. New sprinklers shall be supplied by existing fire sprinkler system modified to new floor plan and required densities.
45
Wall between corridor C118A and Pharmacist 1173 is identified as a B8 wall type. Please provide definition for a B8 wall type.
B8 wall is 8" stud + 2 5/8" gypsum board on both sides.
46
What is the height of J3 Knee Wall partitions, reference detail J6/AS410?
The height of the J3 partition wall is 3'-9"
47
Reference detail J6/AS410. What are the Partition Caps made of?
Will provide details for the partition wall.
48
How many steel plate / angle assemblies shown on AS410 are required (spacing, etc)? (SEE ATTACHED JPG.)
Will provide details for the partition wall.
49
Please identify steel fastener type and size required for the steel plate (to concrete?). (REFERENCE TO RFI #48.)
Will provide details for the partition wall.
50
Is contractor responsible for in wall blocking for VA furnished and installed equipment?
Provide space for AED and FEC
51
We understand that detail 6/AS131 Equipment Plan -TLT is a typical detail for toilet rooms 1178, 1179, 1180A. Clarify otherwise if this is not a correct understanding.
AS131/6 is typical equipment plan for all toilets
52
Reference AS421. Are all countertops on this project to be solid surface?
Yes.
53
Confirm WC-Wall Covering basis of design is intended to be Arc-Com and not Arc-Con, reference Finish Schedule on AS400.
Typo. ARC-COM is right name.
54
Plans show vinyl wall covering in the corridors to 30” A.F.F. with paint above to the ceiling.
Refer AS401/9 - AS401/12. Wall covering will be 36" A.F.F.
55
What should the transition material be between the VWC and the paint? Please provide a detail.
Will provide details for the transition.
56
The room finish schedule indicates to match existing base and wall finish at the Waiting Room. What are the existing materials we are to match?
Contractor verify the existing materials and provide samples to COR for approval.
57
Please clarify what the differences are between window types A and B, reference plan sheet AS600.
A and B are identical but mirrored.
58
Please provide a description for keynote 4 plan sheet PD102.
Duplicate RFI to #82. Please reference that response.

General note 4 on new Fire Alarm Floor Plan FA101 indicates “Provide and install required duct smoke detection, remote LEDS/Test Stations, and fire smoke dampers/smoke dampers smoke detection.” We understand the required devices are shown on the new Fire Alarm Floor Plan. Please note FA101 does not show any smoke detectors, LEDS/TEST Stations, fire smoke dampers/smoke dampers smoke detection. If any of these are required, please identify on the fire alarm plan.

A duct smoke detector is required at each new combination Fire/Smoke Damper - See mechanical drawings MH101-1 and MH101-2 for damper locations.

General note 3, FA101 “Connect all fire alarm system devices and sprinkler system devices to the existing fire alarm control panel.” Please identify the location of the existing fire alarm control panel (on a floor plan) so the raceway, wire and ceiling patch can be quantified and priced.

Attached. Room number is 83

Plan sheets MH101-1 and MH101-2 identify locations for the Fire Smoke Dampers (FSD). Detail MH502 Fire Damper note 5 refers to access panels to permit servicing the fusible link. Detail 2/MI701 Smoke Damper Control Diagram indicates Upon detection of smoke detector, the smoke damper shall close & send an alarm to the ECC. The Fire Alarm Sequence of Events on FA 100 indicates that when Smoke Detector goes off, shut down HVAC units and Supply fans, but it does not indicate to close the damper. In general, please clarify the scope of the fire alarm to include:

New Smoke Detections shall signal smoke dampers to close NOT activate shut down of mechanical units as indicated on FA100 Sequence of events. There should already be duct smoke detection existing to handle that operation.

Is Fire Smoke damper controlled by fusible link or by duct smoke detector?
RE: Sheet M701: See Combination Fire/Smoke Damper Control Diagram. Fire smoke damper to be controlled by duct Smoke Detector, Damper Actuator, two (2) temperature fire closure device, position indicator in sequence. Provide Combination Fire Smoke Damper: Damper, Actuator, Temp Switch, High Temp Switch, Duct Detector, Position Indicator.
Revise Fire Alarm Sequence of Operations to reflect what is desired (close fire smoke damper?)
RE: Sheet M701: See Combination Fire/Smoke Damper Control Diagram. Fire smoke damper to be controlled by duct Smoke Detector, Damper Actuator, two (2) temperature fire closure device, position indicator in sequence. Provide Combination Fire Smoke Damper: Damper, Actuator, Temp Switch, High Temp Switch, Duct Detector, Position Indicator.
Identify which HVAC units (and their locations) are to shut down upon smoke detection.
RE: The existing unit is located in the basement. Unit is to remain. Fire smoke damper / unit shutdown interlock is not required. Smoke Detector local to the unit will operate smoke damper in sequence and send alarm signal to fire alarm system.

General note S on EP103 and EP104 indicates to provide 120V Connection for Smoke Damper… but these sheets which are titled “Electrical Power for HVAC” do not show the locations. Also, electrical panel schedules on E601 do not identify any circuits dedicated to fire smoke dampers. Is the intent to use fusible link or 120V power & smoke detectors to operate the fire smoke dampers? If 120V power & smoke detectors, please identify circuits for the fire smoke dampers.

RE: Sheets EP103, EP104, E601. Provide new circuits H1G-10, 17 for new 120V circuits for FSD. RE: Coordinate with Mech for final locations.

Plan sheet EP101 note L states “Telecommunications cabling shall be installed by client’s vendor. Electrical contractor shall coordinate required junction boxes and raceway rough-ins with appropriate vendor.” We understand the project provides for the in-wall electrical rough-in and stub up and the VA’s separate vendor is providing and installing (outside of this contract) all data cabling, terminations, above ceiling raceways, and data outlets . If this is not a correct understanding, please clarify otherwise by amendment.

Electrical telco scope includes raceway rough-in at indicated locations. Raceway and structured cabling above ceiling including cable, terminations, etc. by others. Agreed.

The one-line diagram on E901 depicts items which seem out of scope for this project including demolition of electrical conduit/wire from building 15 generator room, emergency distribution switchboard, to Automatic Transfer Switches 1 and 2. Also shows demolition of grounding at the same switchboard. If these are required, please provide floor plans showing the routing of the conduit/wire to be demolished so the work can be quantified and priced.

RE: Comment Response 68: RE: Sheet E901. Sheet reissued with scope clarifications. Agreed.

69
Is the only work required by the one-line diagram on E901 limited to the new panels H1G and H1ER and all other work shown is not in contract?
RE: Comment Response 69: RE: Sheet E901. Yes. Sheet reissued with scope clarifications.
70
The plans do not identify the use of wall and door protection. If any of the items in Section 10 26 00 are required, please identify locations on revised floor plans by amendment.
Will provide update the plans with required wall and door protection.

The plans identify the toilet accessories as VA provided and installed. If any toilet accessory listed in Section 10 28 00 is required to be provided by the contractor, please identify specific items and locations by amendment.

All FF&E in AS131/06 will be furnished and installed by owner.

72
Section 01 00 00 paragraph 1.3 Statement of Bid Items refers to a different project and is not applicable. Please revise via amendment.
Will correct to reflect the correct project name. Specification requirements would not change.
Can the project superintendent take photographic documentation with his mobile phone camera and provide via email in lieu of a professional photographer and hard copies? Reference Section 01 00 00 paragraph 1.16.
Yes, photographic documentation via camera / email is acceptable so long as it is complete. Completeness of the documentation shall be as approved by the COR.
74
AS141 general note 1 mentions 3" sound attenuation blankets to be installed in the stud walls. These are not mentioned in specifications. Please provide requirements for this item.
Will provide Section 07 21 13 for Sound Attenuation Batt Insulation
75
Please specify size of ceramic tile for bathrooms.
2"x2" Mosaic Module
76
Per the plans we understand there to be no corner guards in this project. Is this correct?
Will provide update the plans with required corner guards.
We understand work underneath the floor to partially be in crawlspaces accessible via the building’s basement. Upon inspection, these crawlspaces are exposed earth of varying elevation. Does VA anticipate excavation for sanitary line to be necessary for this project?
In the areas where piping is installed in accessible crawlspaces, the contractor is responsible for means and methods relating to the pipe installations. Existing earth elevations in crawl spaces have not been defined.
78
Why does MH101-1 new HVAC show the existing floorplan to demo and not the new floorplan?
RE:Background floor plan is updated to reflect new floor plan.
79
Recently amended plans have many changes that aren't marked with clouding. Please cloud changes to plans as typical.
Do not understand comment. Drawings that were provided were initial Issue For Bid submittal. The Government had to break the drawings done in order to upload to SAM.Gov
80
Amended plans are provided in 8 ½” x 11” format and are thus not to scale. Please provide to scale drawings.
Documents provided to VA were not in 8.5 x 11. Unsure how bidder's set is that size.
81
Please provide make, model, and manufacturer of patterned glass partition in waiting room
AE doesn't specify a certain model and manufacturer. Provide COR samples match the existing fritted glass for approval.
82
PD101 and PD102 reference keyed note 4. This keyed note is not in the keyed note legend. Please provide keyed note 4’s description.
Keyed note 4 description is as follows: Remove existing piping branch or portion of existing piping branch indicated.
83
Sheet AS111: what is the door number for door leading corridor C118D?
All door numbers are labeled in AS111
84
What is the required species and finish of wood doors?
Refer Section 08-14-00 - White Oak with Rift Cut

See attached document: H2-01 A.

See attached document: H2-01 B.

See attached document: H4-03-A.

See attached document: H4-02-A.

See attached document: H4-01-A.

See attached document: H3-07-A.

See attached document: H3-06-A.

See attached document: H3-05 A.

See attached document: H3-04 A.

See attached document: H3-03 A.

See attached document: H3-02 A.

See attached document: H3-01.

See attached document: H2-05 A.

See attached document: H2-04 A.

See attached document: H2-03 A.

See attached document: H2-02 A.

See attached document: H4-03-B.

See attached document: H4-02-B.

See attached document: H4-01-B.

See attached document: H3-07-B.

See attached document: H3-06-B.

See attached document: H3-05 B.

See attached document: H3-04 B.

See attached document: H3-03 B.

See attached document: H3-02 B.

See attached document: H3-01 A.

See attached document: H2-05 B.

See attached document: H2-04 B.

See attached document: H2-03 B.

See attached document: H2-02 B.

AMENDMENT 36C25723B0053 0008

AMENDMENT TO ISSUE RFI RESPONSES ALONG WITH SUPPORTING DOCUMENTS.

PLEASE SEE SF30 FOR DETAILS

File details come from the government source that posted it. Updated .