This document is an Infection Control Risk Assessment (ICRA) permit for work to be conducted at a Veterans Affairs medical facility. The permit details the project to install an electric generator at the Polytrauma Transitional Rehabilitation Program, including the type of activity as large-scale and longer duration; patient risk area as a high risk location; required class of precautions as Class III; potential impacts to surrounding areas and mitigation controls. It lists the project requestor, location, timeline, and approving parties. Specifications, verification methods and additional controls are outlined on the permit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25722B0032 0005.docx | DOCX document | |
| 36C25722B0032 0004.docx | DOCX document | |
| PTRP Irrigation Drawings.pdf | ||
| Clarification Response RFIs 2 16 and 22.pdf | ||
| ICRA-2.0-ICRA.Permit.pdf | ||
| 36C25722B0032 0003.docx | DOCX document | |
| PTRP Irrigation Drawing.pdf | ||
| 36C25722B0032 0002.docx | DOCX document | |
| S04 Sign in Sheet PreBid Site Visit Conference AUG 16 2022.pdf | ||
| 36C25722B0032 0001.docx | DOCX document | |
| 671-18-118 Install Generator at PTRP-Bid Drawings.pdf | ||
| 671-18-118 Install Generator at PTRP-Bid Specifications.pdf | ||
| 36C25722B0032_1.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
©2022. American Society for Health Care Engineering of the American Hospital Association
ICRA 2.0 Infection Control Risk Assessment and Permit
Project Name:
ICRA Number: Requested by
Location of Work Activity Project Start Date Estimated Duration Completion Date
Foreman/Supervisor Phone Contractor Performing Work Phone
Approving Authority Phone Please note that the above signature is approval of the work activity as described and assessed documented here.
Should the scope of work change or the discovery of additional toxic or biological substances.
STOP WORK and seek additional approval and guidance before proceeding.
1. Type of Activity Explain this reasoning for this assessment Type A: Non-invasive Type B: Small-scale, short duration Type C: Large-scale, longer duration Type D: Major demolition, construction
2. Patient Risk Area Describe key patient risks Low: Non-patient care areas Medium: Patient care support areas High: Patient care areas Highest: Invasive, sterile or highly compromised care
3. Class of Precautions Type A TYPE B TYPE C TYPE D
Low I II II III Medium I II III IV
High I III IV V Highest III IV V V
4. Surrounding Area
Unit Below: Above: Lateral: Behind: In Front:
Risk group Contact
Phone Controls Noise
Vibration Dust Ventilation Pressurization
Noise Vibration Dust Ventilation Pressurization
Noise Vibration Dust Ventilation Pressurization
Noise Vibration Dust Ventilation Pressurization
Noise Vibration Dust Ventilation Pressurization
Systems impacted:
Data Mechanical Med Gas Hot/Cold Water Other
Data Mechanical Med Gas Hot/Cold Water Other
Data Mechanical Med Gas Hot/Cold Water Other
Data Mechanical Med Gas Hot/Cold Water Other
Data Mechanical Med Gas Hot/Cold Water Other
Were there discoveries in surrounding areas that would serve as cause to increase the class of precautions and necessitate additional controls? If so, please summarize.
©2022. American Society for Health Care Engineering of the American Hospital Association
5. Detailed Plan of ICRA Controls for this Work Final Class of Precautions being applied I II III IV V
Controls required for this project Specifications/ Materials Verification method and frequency
Exceptions/Additions to this permit Date and Initials are noted by attached memoranda
Initials Date
Permit Request By Date
Permit Authorized By Date
Approval Signature
©2022 The American Society for Health Care Engineering of the American Hospital Association Disclaimer: This document is provided by ASHE as a service to its members. The information provided may not apply to a reader’s specific situation and is not a substitute for application of the reader’s own independent judgment or the advice of a competent professional. ASHE does not make any guaranty or warranty as to the accuracy or completeness of any information contained in this document. ASHE and the authors disclaim liability for personal injury, property damage, or other damages of any kind, whether special, indirect, consequential, or compensatory, that may result directly or indirectly from use of or reliance on this document.
| Project Name: |
| Requested by: |
| Location of Work Activity: |
| Project Start Date: |
| Estimated Duration: |
| Completion Date: |
| ForemanSupervisor: |
| Phone: |
| Contractor Performing Work: |
| Phone_2: |
| Approving Authority: |
| Phone_3: |
| Explain this reasoning for this assessmentRow1: |
| Describe key patient risksRow1: |
| BelowRisk group: |
| AboveRisk group: |
| LateralRisk group: |
| BehindRisk group: |
| In FrontRisk group: |
| BelowContact: |
| AboveContact: |
| LateralContact: |
| BehindContact: |
| In FrontContact: |
| BelowPhone: |
| AbovePhone: |
| LateralPhone: |
| BehindPhone: |
| In FrontPhone: |
| Noise: Off |
| Vibration: Off |
| Dust: Off |
| Ventilation: Off |
| Pressurization: Off |
| Noise_2: Off |
| Vibration_2: Off |
| Dust_2: Off |
| Ventilation_2: Off |
| Pressurization_2: Off |
| Noise_3: Off |
| Vibration_3: Off |
| Dust_3: Off |
| Ventilation_3: Off |
| Pressurization_3: Off |
| Noise_4: Off |
| Vibration_4: Off |
| Dust_4: Off |
| Ventilation_4: Off |
| Pressurization_4: Off |
| Noise_5: Off |
| Vibration_5: Off |
| Dust_5: Off |
| Ventilation_5: Off |
| Pressurization_5: Off |
| Data: Off |
| Mechanical: Off |
| Med Gas: Off |
| Water Systems: Off |
| Other: Off |
| Data_2: Off |
| Mechanical_2: Off |
| Med Gas_2: Off |
| Water Systems_2: Off |
| Other_2: Off |
| Data_3: Off |
| Mechanical_3: Off |
| Med Gas_3: Off |
| Water Systems_3: Off |
| Other_3: Off |
| Data_4: Off |
| Mechanical_4: Off |
| Med Gas_4: Off |
| Water Systems_4: Off |
| Other_4: Off |
| Data_5: Off |
| Mechanical_5: Off |
| Med Gas_5: Off |
| Water Systems_5: Off |
| Other_5: Off |
| Were there discoveries in surrounding areas that would serve as cause to increase the class of precautions and necessitate additional controls If so please summarize: |
| Controls required for this projectRow1: |
| Specifications MaterialsRow1: |
| Verification method and frequencyRow1: |
| Controls required for this projectRow2: |
| Specifications MaterialsRow2: |
| Verification method and frequencyRow2: |
| Controls required for this projectRow3: |
| Specifications MaterialsRow3: |
| Verification method and frequencyRow3: |
| Controls required for this projectRow4: |
| Specifications MaterialsRow4: |
| Verification method and frequencyRow4: |
| Controls required for this projectRow5: |
| Specifications MaterialsRow5: |
| Verification method and frequencyRow5: |
| Controls required for this projectRow6: |
| Specifications MaterialsRow6: |
| Verification method and frequencyRow6: |
| Controls required for this projectRow7: |
| Specifications MaterialsRow7: |
| Verification method and frequencyRow7: |
| Controls required for this projectRow8: |
| Specifications MaterialsRow8: |
| Verification method and frequencyRow8: |
| Controls required for this projectRow9: |
| Specifications MaterialsRow9: |
| Verification method and frequencyRow9: |
| Controls required for this projectRow10: |
| Specifications MaterialsRow10: |
| Verification method and frequencyRow10: |
| Controls required for this projectRow11: |
| Specifications MaterialsRow11: |
| Verification method and frequencyRow11: |
| Controls required for this projectRow12: |
| Specifications MaterialsRow12: |
| Verification method and frequencyRow12: |
| Controls required for this projectRow13: |
| Specifications MaterialsRow13: |
| Verification method and frequencyRow13: |
| Controls required for this projectRow14: |
| Specifications MaterialsRow14: |
| Verification method and frequencyRow14: |
| Controls required for this projectRow15: |
| Specifications MaterialsRow15: |
| Verification method and frequencyRow15: |
| Controls required for this projectRow16: |
| Specifications MaterialsRow16: |
| Verification method and frequencyRow16: |
| Controls required for this projectRow17: |
| Specifications MaterialsRow17: |
| Verification method and frequencyRow17: |
| Controls required for this projectRow18: |
| Specifications MaterialsRow18: |
| Verification method and frequencyRow18: |
| Controls required for this projectRow19: |
| Specifications MaterialsRow19: |
| Verification method and frequencyRow19: |
| Initials: |
| Date: |
| Permit Request By: |
| Date_2: |
| Permit Authorized By: |
| Date_3: |
| Approval Signature: |
| Final Class of Precautions: [Class I] |
| Unit Above: |
| Unit Below: |
| Unit Lateral: |
| Unit Behind: |
| Unit In Front: |
| Patient Risk: Off |
| Activity: Off |
| ICRA Number: |
| Class: Off |
File details come from the government source that posted it. Updated .