Y1DZ--674-18-103 Convert Patient Rooms to Private Rooms Bldg. 204
Solicitation number
36C25722B0028
Issued by

About this file

This solicitation is for a construction project to convert patient rooms to private rooms at the South Texas VA Health Care System building 204. The contractor shall furnish all labor, materials, equipment, and incidentals to complete the work per plans and specifications provided by the Government architect-engineer. The project includes demolishing existing partitions and construction of new private patient rooms, replacing flooring, casework, and other finishes. Bids are due by 2:00PM CST on September 8, 2022. The NAICS code is 238210 with a small business size standard of $16.5M. The project value is between $1M-$2M and is 100% set aside for Service-Disabled Veteran-Owned Small Businesses. The point of contact is Lynn Pettit. Apparent successful offerors must be verified by the VA's Center for Verification and Evaluation.

View the file

Other files

File Type Posted
36C25722B0028 0003.docx DOCX document
Project Walk Through Sign In Sheet.pdf PDF
Bid Schedule B - project 674-18-103 Add Alternate.pdf PDF
36C25722B0028 0001.docx DOCX document
TEMPLE_CONVERT_BLDG204_PATIENT_RMS_TECH-PLANS Model 08-20-2020.pdf PDF
2020-1_3.pdf PDF
2020-1_1.pdf PDF
100 percent Sealed ARCH SPECS TEMPLE CONVERT 204 VOL 2.pdf PDF
100 percent Sealed ARCH SPECS TEMPLE CONVERT 204 VOL 1.pdf PDF
2020-1_2.pdf PDF
122220_1.pdf PDF
36C25722B0028_1.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 674-18-103 Department of Veterans Affairs Network Contracting Office 17 2002 Scott Blvd.

Temple TX 76504 Department of Veterans Affairs Network Contracting Office 17 2002 Scott Blvd.

Temple TX 76504 To all Offerors/Bidders

36C25722B0028 08-23-2022

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 2:00PM CST, September 8, 2022 Response to RFIs submitted for 36C25722B0028

Lynn Pettit Contracting Officer

CONTINUATION PAGE

36C25722B0028 Amendment 0002 RFI Q/A, revised bid schedule, site visit sign-in sheet and extended closing date.

RFIs for 36C25722B0028 – Project no. 674-18-103 Convert Patient Rooms to Private Rooms

1.Section 010000 Scope of Work describe the Alternate as an ADD whereas the Bid Schedule calls it a deduct.

A: Add Alternates shall be used, not deducts. See revised bid schedule.

2. Section 010000 para 1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR States that BEFORE AWARD OF CONTRACT, the contractor should have existing conditions drawings, and this general requirement to make bid.”

Please provide the “Existing Conditions Drawings” A: Please see demo sheets included in the construction documents.

3. Gen Note H on AS-131.1 calls for EJ covers at existing Expansion joints. Where are the existing joints shown so we can figure types, sizes and quantities?

A: See Sheet AS-104, existing expansion joints are located in Grid Lines 17, J, and L.

4. The Equipment list (such as shown on AS-403) does not identify which items are Contractor Furnished and which are Government Furnished. Please clarify. We assume items for which there are no specifications are Government furnished.

A: All Group I Equipment is contractor furnished contractor installed. All Group II Equipment is owner furnished owner installed.

5. Are the Headwalls (typical patient room as shown on 1/AS411) Government furnished as there are no specifications provided?

A: Headwall assemblies are to be based on Hill Rom as Basis of Design.

6. Are the Foldable Workstations (typical patient room as shown on 1/AS411) Government furnished as there are no specifications provided?

A: These units are to be owner furnished owner installed.

7. Finish information is not provided for HR-1 on the Wall Protection Legend AS-630.

A: INPRO 1200 Vinyl, 61/4” H, Color Natural Maple

8. A Pneumatic Tube Station System is shown on 3/AS404 but no specification or details are provided. Is this system provided under separate contract? If not please provide more information (specifications, plans,) A: Tube system is existing and the station is to be relocated and reconnected as shown.

9 There are two different symbols for “patient Lift Track Assembly” shown on Bariatric Rooms (AS-403 is typical). Are these two different types of lifts?

A: The darker symbol is the Patient Privacy Curtain Track.

10. There are no specifications or details for the Patient Lift Systems in the Bariatric Patient Rooms. Please provide details and specifications.

A: The Basis of Design for the Patient Lift System is Hill Rom LikoGuard L for the Bariatric lift and Hill Rom Likorall 242 for standard lift.

11. Is the existing pneumatic tube system maintained by a separate contract? And who is that point of contact?

A: Tube system is existing and the station is to be relocated and reconnected as shown.

12. Hardware Sets not shown for Doors 4K42B,4K43B,4K44B and 4K45B A: Hardware sets for these Patient Toilet Doors are similar to all other Patient Toilet Doors, HW-1

13. AS402 (typical) shows a dark dashed line as “Patient Lift Track Assembly” at Patient room doorways. Is this intended to be a curtain track instead?

A: The darker symbol is the Patient Privacy Curtain Track.

14. Wall types not shown on floor plans A: See Sheets AS-111, 111.1, and 111.2 for typical wall types. See Sheet AS-520 for Partition Types. Note all corridor walls are Type 1A - 1 HR rated.

15. What signage is required? Type and locations?

A: See Sheet GI-006, Detail 3; Basis of Design is 2/90 Sign Systems, Klik; all signage must be coordinated with the existing medical center signage. All signage must be approved by COR.

16. What type wall guard/handrail is required? HR-1 is not specified on AS-630.

A: The Basis of Design is INPRO 1200, Vinyl, Natural Maple, 6 ¼” H.

17. Confirm door protection not required on these PLAM doors. Note 15/A104 “coordinate with abatement”. No spec or survey provided so abatement must be Not In Contract. Confirm.

A: Door protection is not required on PLAM doors.

1. Please provide Asbestos survey for coordination by GC with abatement contractor (not in contract) A: There is no asbestos abatement work in this progress. The building was constructed in the mid 1990s.

1. Note H/AS-104 Why the note? There is no elevator work in contract. Please confirm A: There is no elevator work

1. Who has existing roof warranty?

A: There is no roof work in this project.

1. Note I/ AS 111.1 Patching at abatement demo cannot be quantified without knowing abatement contractor’s scope of work and abatement plan.

A: There is no abatement work on this contract.

1. Detail 1/AS310 where does this Detail apply as there is not Columnline B? (NOTE to MCS- I think it only applies at Room 4J22) A: See Sheet AS-111, Rooms 4K46 and 4J22, Column line B on East and Column 27 on North

1. AS111.1 is typical. Wall types not shown on Floor plans.

A: See Sheets AS-111, 111.1, and 111.2 for typical wall types. See Sheet AS-520 for Partition Types. Note all corridor walls are Type 1A - 1 HR rated.

1. AS-620 where do Details 3 and 4 apply for grouted frames?

A: Door frames are not grouted

1. Note 13/PD1.2B does this note refer to Med Gas Zone valves and panels?

A: Yes, keyed note #13 does refer to ZVB #14. It appears keyed note #13 is not located on the floor plan, but ZVB #13 is located Corridor C4-11.

1. No headwall demo shown on plans. Are there existing headwalls and who removes them?

A: See Sheets AD-104, 104.1, and 104.2; General Notes and Sheet Key Notes

1. Note MG 06/P2.1. Please provide specification or model for zone valve panel to match existing used in hospital A: Existing zone valves are manufactured by Amico Corporation

1. MG08/P2.4 “match existing system”- please provide specification or model A: Med Gas Alarm System is M# ALERT1 S# 990617

1. No model or spec provided on headwalls-are headwalls Govt furnished/Govt Installed?

A: Headwall assemblies are to be based on Dirtt Modular Wall System as Basis of Design. This is to be government provided and installed.

1. Has abatement already been performed under another contract?

A: There is no abatement work on this contract.

1. There are no specs, that we could find, for the ceiling hoists? What is the weight capacity? Do they want an integrated scale?

A: The darker symbol is the Patient Privacy Curtain Track.

1. According to the VA Safe Patient Handling and Mobility Design Criteria handbook (August 1, 2021), and following the direction of VISNs across the country, traverse (room-covering systems, with or without tracks into the bathroom) are the preferred design, with a minimum weight capacity of 550 lbs. (section 2.8.2.3 VA EQUIPMENT DESCRIPTION – OVERHEAD RAIL SYSTEM). Is there a specific reason this facility requires a straight rail system, "which are of limited assistance in performing many high-risk patient handling tasks" (VA Safe Patient Handling and Mobility Design Criteria handbook section 2.8.2-1)?

A: Provide the Patient Lift system per Contract Documents. Please see demo sheets included in the construction documents.

1. If the design is changed to make it into an XY system, will we get updated drawings from the architect regarding this change, or are we to make that change ourselves?

A: The darker symbol is the Patient Privacy Curtain Track.

1. The solicitation states to send the quotes to you – are we supposed to be doing that as well, or do we send them to the GC who will then forward on to you?

A: Follow the instructions in the solicitation.

1. Where will the lay down and dumpster are be located?

A: In the field directly south of building 204

1. Where will contractor parking be located?

A: Contractor is to park in any of the designated open parking spaces on campus. Parking in the grass is not authorized.

1. Can the trash chute to dumpster be utilized by the contractor?

A: No

1. Is there an existing access control system in the facility? If so, what is it?

A: Yes. It is the C-Cure system.

1. Note 10/A104 calls to Demo existing abandoned MEP but bidders are unable to quantify without existing MEP plan showing abandoned systems to demo. Please provide the existing plan showing systems to demo.

A: Please see the mechanical demo sheets that are included in the construction documents for this project.

1. General Note 13/AD-104.2 (typ) calls for removal of “plaster ceilings above 4th floor ceiling”. Is this a typical condition throughout or only a portion of the work area?

A: Not a typical condition.

1. General Note 18/AD104.2 (typ) calls for demolition of steam radiators per the MEP plans but MEP plans do not show this work. Locations or quantities. Without more information, bidders cannot quantify the scope of work. Please provide the info.

A: Please see the mechanical demo sheets that are included in the construction documents for this project.

1. Are we to dispose/abate of any asbestos, lead, mold or other hazardous material as part of this project? If so, provide appropriate hazardous material site survey report.

A: No asbestos is part of this project

1. What will the ICRA level be for this project?

A: 5

1. Are there any required/proprietary subcontractors the general contractor is to hire associated with this project?

A: No. However, the contractor is required to match the existing building systems (HVAC).

1. Will all work associated with this project able to be performed during regular working hours?

A: No. The hospital will still be in full operation. Noise, vibration, and other disruptive activities need to be done after hours or on weekends.

1. It is our understanding that the Solicitation is a negotiated Bid (RFP) design-bid-build project with the Government's AE being responsible for the design portion (providing a full and complete set of Specifications and Plans) and the successful offeror being responsible for bidding and building the project based on the Specifications and Plans provided by the Government's AE. Put another way, the successful offeror will not be required to perform any design-build services as part of the contract - correct?

A: Correct. The only 'design' required is the sprinkler contractor's final system layout per standard industry practice.

1. Refer to Sheets 12 and 13 of 63 of the solicitation. We require clarity on the intent for Deduct Alternate #1. For the Base Bid are we to provide a price for all work associated with the specifications and drawings including the work required to install the items associate with the hot water recirculation line and then show under Deduct Alternate #1 how much we would “decrease” our total Base Bid if we did not do the work associated with the hot water recirculation line?

A: Add alternates shall be used. Not deduct alternates.

1. Is all work (other than utility shutdowns) to be performed during normal duty hours Monday to Friday?

A: No. The hospital will still be in full operation. Noise, vibration, and other disruptive activities need to be done after hours or on weekends.

1. The Technology and Security drawings were not provided during the solicitation. Provide copies of those drawings.

A: See Amendment 0001

1. Are the drawings that were provided scalable for measurement purposes? If not, provide scalable drawings.

A: drawings are scalable if printed to the correct size.

1. For the new millwork where drawers are being installed, are all drawers to be lockable? If so, provide details on the type of locks required.

A: Drawers are to be lockable. Combination/keypad/pin number locking mechanism

1. For the new millwork where drawers are being installed, if only some drawers are required to be lockable, specify which drawers must be lockable and which are not. Also, provide details on the type of locks required.

A: Drawers are to be lockable. Combination/keypad/pin number locking mechanism

1. Refer to Sheet GI-002, General Note 2. There are multiple places in the drawings that require the contractor to “salvage” existing materials, or turn over to the Government existing materials, or protect and save existing materials. However, no specifics are given on what any of these items are. Will it be acceptable for the successful offeror to do a detailed site walk with the COR after award contract to determine what does and does not remain and what does and does not get demoed out and disposed of?

A: Yes

1. Refer to Sheet GI-002, General Note 6. Confirm that the successful offeror will be required to replace all signage within the construction area (including elevator related signage).

A: Confirmed

1. If the successful offeror is required to replace all signage within the construction area (including elevator related signage), provide a VA design guide or equivalent document that specifies what the requirements for new signage will be.

A: Room signage will be provided and installed by the VA.

1. Refer to Sheet AD-104. General Note 3. For bidding purposes, provide an estimated volume of setting bed for ceramic tile that must be removed – 100 square feet x 3 inches, 1000 square feet by 2 inches, etc. It is very expensive, time intensive, and “dirty” to remove setting bed for ceramic tile. We need an estimated volume for bidding purposes.

A: Drawers are to be lockable. Combination/keypad/pin number locking mechanism

1. In those places where setting bed is removed, we assume that Ardex will be used to level the floor. Is this correct? If not, specify what product should be used.

A: if not specified in the contract documents, this will be “means and methods”

1. Refer to Sheet AD-104. General Note 18. How many existing mechanical in-wall radiators are there that will remain in place and provide a drawing that shows their locations.

A: 0, please omit this note

1. Sheets AD-104.1 and AD-104.2 show multiple places where shower depressions are being filled in. Provide a detail that shows how the depressions are to be filled in to include how the drain hole is to be filled in.

A: if not specified in the contract documents, this will be “means and methods”

1. Refer to Sheet AD-104.1 Sheet Keynote 4. which states to “provide a 1 hr fire rated premanufactured temporary barrier wall.” This requirement to provide a 1 hr fire rated premanufactured temporary barrier wall appears in multiple other places in the documents. Provide detail on the type of “premanufactured temporary barrier wall” required. We have never heard of a “premanufactured” temporary barrier wall.

A: something similar to this High-Quality and Sustainable Temporary Barrier Walls and Panels (starcsystems.com) The VA is not requesting this exact brand.

1. Refer to Sheet AD-104.2 Sheet Keynote 10 which says “Existing Window to Remain.” Is this the only existing window to remain and all other exterior facing windows are to be replaced? If any exterior facing windows are being replaced, specify which windows they are and the type of new window(s) required.

A: Unless otherwise noted, no windows are to be removed or replaced.

1. Do all exterior facing windows receive a new sill? If so, specify which windows receive a new sill and details on the type of sill required.

A: Please follow construction documents

1. Refer to Sheets AS-121, AS-121.1, and AS-121.2. Are the “white” places on the drawings (such as under the nurse’s stations) to receive no floor covering of any kind? There are multiple other “white” places on the drawings A: New flooring is to be installed throughout the project

1. Refer to Sheets AS-121, AS-121.1, and AS-121.2 and General Note N. on each drawing. The note says that flooring depressions are shown as dashed lines. We can find no dashed lines. Clarify.

A: Misplaced note. Please see depressed areas on demolition plan.

1. Additionally, we assume that we are to use Ardex to fill in the floor depressions (once we receive clarification on where the floor depressions are located). Is this correct?

A: if not specified in the contract documents, this will be “means and methods”

1. Refer to Sheet AS-310, Detail 1 which specifies to “provide new window treatment on interior pane . . . “ Is this just for this one window or all exterior windows?

A: All existing exterior windows.

1. Specify what the required new window treatment is per Sheet AS-310, Detail 1.

A: See Room Finish Schedule. Coordinate with VA prior to procurement and installation

1. Refer to Sheet AS-301, Detail 3. Are there any special requirements for the “New Bariatric Door?” If so, provide details on what the special requirements are.

A: See door schedule

1. Refer to Sheets AS-401 to AS- 404, Equipment Schedule. There are multiple items listed including sofas, mirrors, refrigerators, ice makers, etc. Is this equipment VA supplied and VA installed, or VA supplied and contractor installed, or contractor supplied and contractor installed?

A: Mirrors shall be Contractor provided and Contractor installed. All other items listed in this question are VA supplied and VA installed.

1. Refer to Sheets AS-401 to AS- 404, Equipment Schedule. If any of the items shown in the Equipment Schedule is contractor supplied, specify which items they are and provide information on required manufacturer, make, model number, quantity, color, etc. for pricing purposes.

A: All of these items are VA purchased. All items that require wall mounting will be mounted by the General Contractor

1. Refer to Sheets AS-410 to AS-414. There are many, multiple places that indicate the need for a “patient lift track.”

53. Will the successful offeror be required to provide these patient lift tracks? If so, provide information on required manufacturer, make, model number, quantity, size, color, finish, etc.

A: Contractor is to install a 600lb pound rated X-Y patient lift system in common patient rooms. Contractor is to install a 1000lb rated X-Y patient lift system in the bariatric patient rooms

53. Will the successful offeror be required to install these patient lift tracks?

A: Yes.

53. If the successful offeror is required to install these patient lift tracks, provide information on required framing, ceiling reinforcement, structural layout and other key items required to safely support the required patient lift tracks.

A: GC is to follow manufacturers/vendors instructions.

53. If the VA will install the patient lift tracks, and the successful offeror is putting in place the required framing, ceiling reinforcement, structural layout and other key items required to safely support the patient lift tracks, provide information needed to complete this task.

A: GC is to follow manufacturers/vendors instructions.

1. Refer to Sheets AS-415 and AS-416. Verify the locations of the required FECs (Fire Extinguisher Cabinets). In some places the annotation FEC and the dashed line representing the fire extinguisher cabinets line up perfectly. In other instances, they do not. When the two don’t line up, which governs the required location for the FECs.

A: Line work governs

1. If the drawings are scalable, ignore the next comment. No dimensions are given for any of the handrails and chair guards. Provide these dimensions.

A: Dimensions will be provided to awarded contractor. Final placement will be coordinated between the GC and the VA.

1. Is spray foam insulation required for any portion of the project? If yes, specify where and provide a specification on the foam required.

A: Please follow construction documents.

1. Refer to Sheet AS-610. For the doors listed as Existing, are we to sand and repaint the frames and doors?

A: Yes

1. Refer to Sheet AS-610. There are ten (10) doors listed as having a required 45 minute fire rating. The fire rating for all other doors is blank and we assume that those doors are not required to be fire rated. If we are incorrect on this assumption, provide an updated Door Schedule that shows the required fire rating for all new doors to be installed.

A: Assumption is correct.

1. Refer to Sheet AS-630, Room Finish Schedule. The window treatments for Rooms AJ22 and AK46 are listed as “Opaque.” We assume this means to paint the window black on both sides. If we are incorrect, clarify what is required.

A: Blinds with black painted drywall. However, this will be coordinated between the GC and the VA.

1. Refer to Sheet AS-630 Floor Finish Legend

60. For SV-1 provide the Manufacturer Number

60. For CT-3 provide the Manufacturer Number and the type and color of grout required

A: Will be coordinated between the VA and the awarded contractor

1. Refer to Sheet AS-640 Base Finish Legend. For RB-1 and CT-1 verify the material, manufacturer, and manufacturer number (if not already provided).

A: Will be coordinated between the VA and the awarded contractor

1. Refer to Sheet AS-640 Ceiling Finish Legend. Verify the manufacturer number, pattern, and type of grid system that must be used.

A: Please see RCP for pattern

1. Refer to Sheet AS-640 Wall Finish Legend. For PT-1 to PT-4, verify the type of finish to be applied flat, semi-glossy, glossy, etc.

A: Glossy

1. Refer to Sheet AS-640 Wall Finish Legend. For CT-1 and CT-2, verify the manufacturer number, tile size, and type and color of grout (if not already provided).

A: Carpet tile shall be linear planks or in 2' x 2' squares

1. Refer to Sheet AS-640, Wall Finish Legend. We cannot begin to price CG-1 and HR-1 with the information provided. Provide full and complete information on what is required.

A: Inpro 3100 series hand rail and 700 series wall guard are to be used as the basis of design

1. Refer to Sheet AS-640, Miscellaneous Finish Legend. Provide full and complete information on each of the items listed such as manufacturer number, pattern, etc. (if not already provided).

A: Will be coordinated between the VA and the awarded contractor

1. Refer to Sheet P0.0, General Plumbing Notes 39. Please clarify where the blood bank area is on the drawings.

A: No blood bank in this project

1. Refer to Sheet PD1.2A Key Note 4. Provide information on the new water fountain to be installed.

A: Drinking fountain on the 4th floor of building 204 is to be replace with a unit that has both a standard and ADA height drinking fountain unit. Unit is also to include a bottle filler.

1. Refer to Sheet P3.1 Plumbing Fixture Schedule. Provide the basis of design for each of the items listed in the Plumbing Fixture Schedule. What is currently shown is not adequate for pricing purposes.

A: No basis of design needed. Please provide all necessary materials, skills, trades, and labor to install plumbing fixtures, this includes electrical power where needed. Fixture P-528 shall be a undermounted sink.

1. Refer to Sheets T200, T201, T300, T301, T302, T500, and T501, Sheet Notes 6. and 7. Please specify via a simple list which rooms are small rooms and offices and which rooms are open spaces and large rooms. The sheet notes are not detailed enough as to which rooms are which, are too open to interpretation, and will inevitably lead to misunderstandings between the VA, the AE, and the successful offeror on which room and spaces are which.

A: Install CAT 6A cabling, ports, and patch panels where indicated in the construction documents. In addition, add a project standard IT drop to all nourishment rooms, med rooms, storage rooms, clean linen, clean utility, soil utility, and equipment rooms.

1. What kind of fire Alarm system is currently in the building? Simplex, Siemens, Honeywell?

A: Simplex

1. Is there any radio frequency boosters or fiber optic lines for your building radio communications in this area of the building?

A: Yes, they will need to be reinstalled in same location if possible.

1. There were no Card readers in your drawings, would there be any in that area?

A: Card readers to be installed on all Med rooms, nourishment rooms

1. Is there a preference on electrical devices ex., Hubble switches, Square D panelboards, etc.?

A: No

1. Is there an exiting smart lighting system in that area? If so, what is it?

A: No blood bank in this project

1. We found the lift tracks in the plans but there is no 11 73 00 specification for the lifts, which usually indicates they will be VA furnished. Can you please confirm if Lifts will be VA Furnished?

A: Provide the Patient Lift system per Contract Documents. Please see demo sheets included in the construction documents.

See attached document: Bid Schedule B - project 674-18-103 Add Alternate.

See attached document: Project Walk Through Sign In Sheet.