About this file

This document provides details for a federal construction contract opportunity to convert patient rooms to private rooms at a Veterans Affairs medical center. The project involves replacing existing fire protection systems on the fourth floor to meet NFPA 13 standards for hazard categories 1 and 3. The contractor must be verified as a Service-Disabled Veteran-Owned Small Business by the VA Center for Verification and Evaluation. The solicitation number is 36C25722B0028 and was issued by the VA Veterans Health Administration Veterans Integrated Service Network 17. The work must be designed by a licensed professional engineer, with shop drawings requiring approval before fabrication.

View the file

Other files

File Type Posted
36C25722B0028 0003.docx DOCX document
Project Walk Through Sign In Sheet.pdf PDF
Bid Schedule B - project 674-18-103 Add Alternate.pdf PDF
36C25722B0028 0002.docx DOCX document
36C25722B0028 0001.docx DOCX document
TEMPLE_CONVERT_BLDG204_PATIENT_RMS_TECH-PLANS Model 08-20-2020.pdf PDF
2020-1_1.pdf PDF
100 percent Sealed ARCH SPECS TEMPLE CONVERT 204 VOL 2.pdf PDF
100 percent Sealed ARCH SPECS TEMPLE CONVERT 204 VOL 1.pdf PDF
2020-1_2.pdf PDF
122220_1.pdf PDF
36C25722B0028_1.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLUMBING SYMBOLS AND ABBREVIATIONS

(NOT ALL ITEMS INDICATED APPLY TO THIS PROJECT)

ABBREVIATIONS PLUMBING FIXTURE SYMBOLS PLUMBING FITTING SYMBOLSPLUMBING SYSTEM SYMBOLS MISCELLANEOUS SYMBOLS

3"CW

P2.1

GENERAL PLUMBING NOTES

1. PRIOR TO DEMOLITION/CONSTRUCTION; CONTRACTOR SHALL

FAMILIARIZE THEMSELVES WITH THE SITE AND ALL AVAILABLE

AS-BUILT DRAWINGS RELATING TO THE PREVIOUS

CONSTRUCTION OF ANY AND ALL EXISTING PLUMBING

SYSTEMS.

2. THE CONTRACTOR IS EXPECTED, AS A REQUIREMENT OF

THEIR QUALIFICATIONS, TO UTILIZE THEIR KNOWLEDGE AND

EXPERIENCE TO ANTICIPATE AND TO INCLUDE IN THE COST OF

THE WORK ANY INCIDENTALS, WHICH MAY BE REQUIRED, BUT

NOT SPECIFICALLY EXPRESSED HEREIN, IN ORDER TO

PROVIDE COMPLETE AND FULLY FUNCTIONAL PLUMBING

SYSTEMS FOR THE PROJECT AREAS.

3. SANITARY SEWER PIPING 2" AND SMALLER TO BE INSTALLED

AT A 2% SLOPE AND SANITARY SEWER PIPING 3" AND LARGER

TO BE INSTALLED AT A 1% SLOPE.

4. PROVIDE ALUMINUM JACKETING OVER ALL INSULATED PIPING

IN AREAS OF EXPOSED CEILING. ARCHITECT TO DETERMINE IF

PIPING AND JACKETING TO BE PAINTED OR REMAIN

UNFINISHED. REFER TO ARCHITECTURAL PLANS FOR COLORS

AND DETAILS.

5. CONTRACTOR SHALL COORDINATE EQUIPMENT CONNECTIONS

WITH SUPPLIER AND INSTALLATION DRAWINGS. INSTALL

EQUIPMENT AND MAKE FINAL CONNECTIONS, FURNISHING

CUTOFF VALVES, P-TRAPS, PRVS AND PIPING AS REQUIRED.

6. COORDINATE WATER, WASTE, VENT AND OTHER PIPING WITH

ALL OTHER TRADES TO AVOID SPACING AND ROUTING

PROBLEMS.

7. FIXTURES, EQUIPMENT, CONNECTIONS AND PIPING SHALL BE

FURNISHED AND INSTALLED TO MEET OR EXCEED STATE AND

LOCAL CODES AND REQUIREMENTS.

8. FURNISH AND INSTALL SHOCK ARRESTORS IN WATER LINES AT

COLD WATER CONNECTIONS TO FLUSH VALVES AND QUICK

CLOSING VALVES AND AT EACH HOT AND COLD WATER

CONNECTION TO FIXTURES.

9. PENETRATIONS THROUGH WALLS SHALL BE SLEEVED, SEALED

AND FIRESAFED TO MAINTAIN THE INTEGRITY OF THE WALL UL

FIRE RESISTANCE RATING.

10. DRAWINGS ARE SCHEMATIC IN NATURE AND SHALL NOT BE

SCALED. CONTRACTOR IS RESPONSIBLE FOR COORDINATING

EXACT ROUTING OF ALL SERVICES WITH BUILDING

CONDITIONS AND WITH ALL OTHER TRADES.

11. SUPPORTS, ANCHOR BOLTS AND HANGERS FOR ALL FIXTURES

AND EQUIPMENT SPECIFIED SHALL CONFORM TO THE

SPECIFICATIONS. MISCELLANEOUS STEEL BRACING SUPPORTS

AND REINFORCING STEEL NEEDED TO SUPPORT EQUIPMENT

AND PIPING SYSTEMS SPECIFIED SHALL BE FURNISHED AND

INSTALLED AS PART OF THE WORK.

12. MAINTAIN ACCESSIBILITY OF ALL EQUIPMENT AND VALVES.

PROVIDE ACCESS PANELS AS REQUIRED. COORDINATE

PLACEMENT WITH THE ARCHITECT PRIOR TO INSTALLATION.

13. CONTRACTOR SHALL COORDINATE WITH THE ARCHITECT

PRIOR TO CUTTING ANY OPENING IN THE STRUCTURE.

COORDINATE SLEEVING OF BEAMS AND CORING OF

STRUCTURE WITH STRUCTURAL DRAWINGS AND DETAILS

PRIOR TO INSTALLATION.

14. REFER TO STRUCTURAL DOCUMENTS FOR SAW CUTTING AND

PATCHING OF EXISTING STRUCTURAL CONCRETE SLAB. FIELD

VERIFY LOCATION OF EXISITNG FLOOR BEAMS/JOIST TO AVOID

CORING OR SAW CUTTING OF EXISTING FLOOR STRUCTURAL

ELEMENTS.

15. CONTRACTOR TO COORDINATE THE INSTALLATION OF THE

PLUMBING SYSTEMS WITH ALL OTHER TRADES.

16. CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING OVER

FLOORING, FURNITURE AND EQUIPMENT AS REQUIRED WHEN

PERFORMING WORK IN AN EXISTING OCCUPIED AREA/SPACE.

CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED TO

WALL FINISHES, FLOOR FINISHES, FURNITURE AND

EQUIPMENT. REPAIR DAMAGES OR REPLACE TO OWNER'S

SATISFACTION AT NO COST TO THE OWNER. CONTRACTOR

SHALL PROVIDE DUST BARRIERS WHERE REQUIRED TO

PROHIBIT THE MIGRATION OF AIRBORNE CONSTRUCTION DUST

INTO ADJACENT OCCUPIED AREAS.

17. DOWNTIME TO EXISTING WASTE, DOMESTIC WATER, AND MED

GAS PIPING SYSTEMS SHALL BE KEPT TO AN ABSOLUTE

MINIMUM. SCHEDULE AND COORDINATE WITH THE OWNER.

18. MAINTAIN EGRESS PATHWAYS, DO NOT BLOCK OR PARTIALLY

OBSTRUCT WITH CONSTRUCTION MATERIALS, TOOLS,

MACHINERY, AND INSTALLATION ACTIVITIES.

19. CUT, REPAIR, AND FINISH WALLS TO MATCH EXISTING WHERE

NEW PIPING IS INSTALLED, CONCEALED IN WALLS.

20. PROVIDE ISOLATION VALVES AT ALL HW AND CW BRANCH

PIPING.

21. ALL ISOLATION VALVES SHALL BE PROVIDED WITH A LOCKING

ACCESS PANEL WHEN VALVES ARE LOCATED IN WALL.

PROVIDE UNOBSTRUCTED ACCESS TO VALVES WHEN IN THE

CEILING BY ACCESS PANEL OR LABELED CEILING TILE.

22. WORK SHALL BE IN ACCORDANCE WITH:

-- 2018 INTERNATIONAL PLUMBING CODE WITH LOCAL CITY

AMENDMENTS

-- 2018 NFPA 99 - HEALTH CARE FACILITIES CODE

-- 2018 NFPA 13 - INSTALLATION OF SPRINKLER SYSTEMS

-- DEPARTMENT OF STATE HEALTH SERVICES - TITLE 25

TEXAS ADMINISTRATIVE CODE, CHAPTER 13 3 - HOSPITAL

LICENSING RULES

-- 2012 TEXAS ACCESSIBILITY STANDARDS (TAS)

23. PROVIDE WALL CLEANOUTS IN WASTE PIPING ABOVE EACH

WATER CLOSET.

24. DEAD-END PIPING (RISERS WITH NO FLOW, BRANCHES WITH

NO FIXTURE) SHALL NOT BE INSTALLED.

25. BACKFLOW PREVENTERS (VACUUM BREAKERS) SHALL BE

INSTALLED ON HOSE BIBBS, HAND-HELD TYPE SHOWERS,

FUME HOODS, LABORATORY EQUIPMENT, LABORATORY SINKS,

JANITOR SINKS, BED-PAN-FLUSHING ATTACHMENTS AND ON

ALL OTHER FIXTURES TO WHICH HOSES OR TUBING CAN BE

ATTACHED.

26. ALL CW AND HW PIPING STUB-OUTS TO SERVICE SINKS SHALL

BE SECURED WITH COPPER STUB-OUT BRACKETS OR

DROP-EAR ELBOWS, MALE SOLDERED ADAPTERS, AND 18x3x8

COMPRESSION ANGLE STOPS WITH KEY.

27. VICTAULIC PIPING SYSTEMS FOR WATER PIPING IS NOT

ALLOWED.

28. T-DRILL METHODS FOR BRANCH PIPING ON WATER LINES IS

NOT ALLOWED.

29. DOMESTIC WATER PIPING SHALL BE TYPE L COPPER.

30. SANITARY WASTE AND VENT PIPING SHALL BE HUBLESS CAST

IRON.

31. TORM DRAIN PIPING SHALL BE HUBLESS CAST IRON.

32. ROUTING OF PLUMBING (WASTE AND WATER) PIPING OVER

LABS, ELECTRICAL ROOMS, OR CRITICAL/LIFE SAFETY

EQUIPMENT SHALL BE AVOIDED. WHEN PIPING IS NECESSARY

IN THESE AREAS, PROVIDE LEAKAGE PROTECTION SUCH AS

DRAIN PANS.

GENERAL MED GAS NOTES

1. WORK SHALL BE IN ACCORDANCE WITH:

- 2018 NFPA 99 - HEALTH CARE FACILITIES CODE

- DEPARTMENT OF STATE HEALTH SERVICES - TITLE 25 TEXAS

ADMINISTRATIVE CODE, CHAPTER 13 3 - HOSPITAL LICENSING

RULES

- COMPRESSED GAS ASSOCIATION (CGA) PUBLICATION M1

2. INSTALLERS OF MED GAS PIPING SHALL BE ASSE 6010

CERTIFIED. TESTING PERSONNEL SHALL BE ASSE 6020

CERTIFIED. INSPECTORS AND VERIFIERS SHALL BE ASSE 6030

CERTIFIED.

3. PROVIDE IN-LINE SHUT-FF VALVE ON EACH BRANCH LINE

SUPPLIED FROM EXISTING PIPING RISER MAIN.

4. COMBINE WASTE ANESTHESIA GAS DISPOSAL (WAGD) PIPING

WITH THE MEDICAL VACUUM SYSTEM PIPING ABOVE CEILINGS

AND DOWNSTREAM OF ZONE VALVE IN ACCORDANCE WITH

NFPA 99. COMBINED WGAD AND MEDICAL VACUUM SYSTEM IS

NOT ALLOWED.

5. MEDICAL GAS STATION OUTLETS AND VACUUM STATION

INLETS SHALL BE COMPATIBLE WITH THE EXISTING WITHOUT

THE USE OF SECONDARY ADAPTERS, EQUAL TO BEACON

MADAES.

6. ALL NITROGEN STATION OUTLETS SHALL BE DISS-TYPE, AND

SHALL BE LOCATED INSIDE A NITROGEN CONROL PANEL (NCP)

WITHIN THE ROOM BEING SERVED.

7. THE MINIMUM PIPE SIZE FOR VACUUM PIPINGS SHALL BE 3/4

INCH. 1/2 INCH DROPS TO INDIVIDUAL INLETS IS PERMISSIBLE.

8. COORDINATE TIME FOR SHUTDOWN OF ANY EXISTING MEDICAL

GAS SYSTEM.

9. ALL MEDICAL GAS AND OXYGEN PIPING SHALL CLEANED FOR

OXYGEN SERVICE.

10. PRIOR TO CONNECTING THE NEW MED GAS PIPING SYSTEM TO

THE EXISTING, THE NEW PIPING SHALL BE CHECKED FOR

PARTICULATE OR OTHER FORMS OF CONTAMINATION. NEW

PIPING SHALL BE CLEANED, TESTED AND PURGED IN

ACCORDANCE WITH NFPA 99. A SPOT CHECK OF THE EXISTING

PIPING SHOULD ALSO BE MADE TO DETERMINE THE LEVEL OF

CLEANLINESS PRESENT.

11. UTILIZE SHAPE MEMORY ALLOY COUPLINGS WHEN MAKING

CONNECTIONS TO THE EXISTING MEDICAL GAS PIPING

SYSTEMS.

12. NO 'HOT TAPS' OR SIMILAR TYPES OF VALVES WILL BE

ALLOWED IN THE MEDICAL GAS PIPING SYSTEMS.

13. AFTER THE TIE-IN IS MADE BETWEEN NEW AND EXISTING

MEDICAL GAS PIPING, THE MED GAS SHALL SLOWLY BE BLED

BACK INTO THE PIPING SYSTEM, TESTED FOR PIPE LEAKS WITH

SOAPY WATER, AND THE REPAIR OF ANY LEAKS.

33. ALL COPPER LINES INSIDE OF WALLS SHALL BE SOLDERED OR

BRAZED, PRO-PRESS JOINTS ARE NOT ALLOWED IN WALLS.

34. DOUBLE T-WYE COMBINATION WASTE FITTINGS ARE NOT

ALLOWED. USE COMBINATION WYE AND 1/8 BEND.

35. UTILIZE BALL VALVES FOR ISOLATION SHUT-OFF OF WATER

PIPING.

36. PROVIDE TRAP PRIMER IN ALL FLOOR DRAINS AND SHOWER

DRAINS.

37. MAINTAIN WASTE, VENT AND WATER SERVICES TO EXISTING

PLUMBING FIXTURES TO REMAIN WITHIN THE BLOOD BANK

AREA AND OTHER AREAS OUTSIDE OF THE HVE SPACE.

38. ALL HANDS FREE SENSOR OPERATED FAUCETS (INCLUDING

SCRUB SINKS) AND FLUSH VALVES SHALL BE HARDWIRED

ELECTRICALLY POWERED.

39. EXISTING PLUMBING FIXTURES WITHIN THE BLOOD BANK AREA

ARE TO REMAIN AND ARE REMAIN ACTIVE DURING

CONSTRUCTION. COORDINATE NEW WORK TO AVOID

DOWNTIME OF WATER AND WASTE DISRUPTION TO THESE

EXISTING FIXTURES DURING CONSTRUCTION.

40. FOR PIPING INSTALLATION ABOVE THE CEILING OF THE

GROUND FLOOR BELOW THE HVE SPACE, COORDINATE AND

SCHEDULE WITH OWNER FOR WORK IN THESE AREAS. WORK

SHALL BE PHASED TO MINIMIZE IMPACT TO DAILY OPERATIONS

AND ACTIVITIES ON THE OCCUPIED GROUND FLOOR.

CONTRACTOR SHALL INVESTIGATE ABOVE CEILING OF

GROUND FLOOR TO DETERMINE EXACT ROUTING OF NEW

PIPING TO AVOID CONFLICTS WITH EXISTING DUCTWORK,

PIPING CONDUIT, EQUIPMENT, ETC. CONTRACTOR SHALL

PROVIDE A CONTINGENCY FOR THIS COORDINATION WORK.

NEW PIPE ROUTING SHALL AVOID PASSING ABOVE CRITICAL

AREAS AND WHERE GYP BOARD CEILINGS OCCUR.

PROVIDE CONTINGENCY FOR MED GAS PIPING SYSTEMS SINCE MED

GAS OUTLET LOCATIONS/QUANTITIES HAVE NOT YET BEEN

COORDINATED AND FINALIZED WITH THE OWNER.

GENERAL DEMOLITION NOTES

1. PRIOR TO DEMOLITION; CONTRACTOR SHALL FAMILIARIZE

THEMSELVES WITH THE SITE AND ALL AVAILABLE AS-BUILT

DRAWINGS RELATING TO THE PREVIOUS CONSTRUCTION

OF ANY AND ALL EXISTING PLUMBING SYSTEMS.

2. PENETRATIONS THROUGH WALLS SHALL BE SLEEVED,

SEALED AND FIRESAFED TO MAINTAIN THE INTEGRITY OF

THE WALL UL FIRE RESISTANCE RATING.

3. CONTRACTOR SHALL COORDINATE WITH THE STRUCTURAL

ENGINEER PRIOR TO CUTTING ANY OPENING IN THE

STRUCTURE.

4. REFER TO STRUCTURAL DOCUMENTS FOR SAW CUTTING

AND PATCHING OF EXISTING STRUCTURAL CONCRETE

SLAB. FIELD VERIFY LOCATION OF EXISTING FLOOR

BEAMS/JOIST TO AVOID CORING OR SAW CUTTING OF

EXISTING FLOOR STRUCTURAL ELEMENTS.

6. DOWNTIME TO EXISTING WASTE AND DOMESTIC COLD

WATER PIPING SYSTEMS SHALL BE KEPT TO AN ABSOLUTE

MINIMUM. SCHEDULE AND COORDINATE WITH THE OWNER.

7. MAINTAIN EGRESS PATHWAYS, DO NOT BLOCK OR

PARTIALLY OBSTRUCT WITH CONSTRUCTION MATERIALS,

TOOLS, MACHINERY, AND INSTALLATION ACTIVITIES.

8. EXISTING STORM DRAIN SYSTEM TO REMAIN FULLY

FUNCTIONAL.

9. ALL EXISTING ABANDONED PLUMBING

SYSTEMS/EQUIPMENT SHALL BE REMOVED UNLESS

OTHERWISE NOTED.

10. ALL DOMESTIC WATER SYSTEMS ASSOCIATED WITH

REMOVED EQUIPMENT SHALL BE CAPPED AND VALVED IN

CEILING SPACE.

ELBOW UP

CAP ON END OF PIPE

ELBOW DOWN

DIRECTION OF FLOW

TEE OUTLET UP

TEE OUTLET DOWN

(V) SANITARY VENT

(SS) SANITARY SEWER WASTE

(SD) STORM DRAIN

(OSD) OVERFLOW STORM DRAIN

(CW) COLD WATER

(HW) HOT WATER 140° F

(HWR) HOT WATER RETURN

(MA) MEDICAL AIR

(MO) MEDICAL OXYGEN

(N) MEDICAL NITROGEN

(N2O) MEDICAL NITROUS OXIDE

(WAGD) MEDICAL WAGD

(MV) MEDICAL VACUUM

(TP) TRAP PRIMER

UNION

STRAINER WITH

GATE VALVE OR

BALL VALVE

BALANCING VALVE WITH

BLOW-DOWN VALVE

BALANCING/STOP VALVE

DIFFERENTIAL PRESSURE TAPS

CHECK VALVE

MANUAL AIR VENT

AUTOMATIC AIR VENT

BACKFLOW PREVENTOR

(ETR) EXISTING SYSTEMS TO REMAIN

*LINE TYPE MAY VARY BY SYSTEM

*UNLESS OTHERWISE NOTED

PLUMBING KEYED NOTE TAG

POINT OF NEW CONNECTION TO

REVISION TAG

PIPE SIZE AND TYPE

DETAIL NUMBER AND SHEET NUMBER

EXISTING PIPE

WHERE DETAIL OR ENLARGEMENT IS SHOWN

FLOOR SINK

FLOOR DRAIN

WALL MOUNTED WATERCLOSET

WALL MOUNTED LAVATORY

COUNTER MOUNTED LAVATORY

URINAL

COUNTER MOUNTED SINK

WALL MOUNTED HAND SINK

DRINKING FOUNTAIN, BI-LEVEL

FLOOR MOUNTED MOP SINK

ICE MAKER SUPPLY BOX

HOSE BIBB

1. NOT ALL FIXTURES WILL BE SERVED BY COLD AND HOT WATER

NOTES

2. ADA FIXTURES WILL BE NOTED AS SUCH ON FIXTURE SCHEDULE

RECIRCULATING PUMP

FLOOR CLEANOUT

LINE CLEANOUT/ WALL CLEANOUT

APPROX.

ASSE

C.P.

DESIG.

DWGS.

ETR

GPM

NFPA

NIC

NTS

RD

SS

AMERICAN SOCIETY OF SANITARY ENGINEERS

CHROME PLATED

DESIGNATION

DRAWINGS

EXISTING TO REMAIN

GALLONS PER MINUTE

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NOT TO SCALE

ROOF DRAIN

SANITARY SEWER

APPROXIMATELY

CW COLD WATER

HW HOT WATER

HWR HOT WATER RETURN

SD STORM DRAIN

CONN. CONNECTION

°F DEGREES FAHRENHEIT

FIN. FINISHED

GPF GALLONS PER FLUSH

HBC HOSE BIBB CONNECTION

HD HUB DRAIN

MAX MAXIMUM

MTD MOUNTED

MV MEDICAL VACUUM

IPS IRON PIPE SIZE

MA MEDICAL AIR

MED MEDICAL

MIN MINIMUM

N2O NITROUS OXIDE

NO. NUMBER

O.D. OUTSIDE DIAMETER

OD OVERFLOW DRAIN

OXY

PSI

OXYGEN

POUNDS PER SQUARE INCH

PRESS PRESSURE

V.B.

TYP

VACUUM BREAKER

TYPICAL

TP TRAP PRIMER

TEMP TEMPERATURE

TMV

VAC

THERMOSTATIC MIXING VALVE

VACUUM

V VENT

LAVATORY

CSS- CLINICAL SERVICE SINK

L-

MOP SINKMS-

SINKS-

SHOWERSH-

WATER CLOSETWC-

ZONE VALVE BOXZVB-

URINALUR-

ICE MAKER BOX (WATER VALVE)IMB-

COFFEE MAKER BOX (WATER VALVE)CMB-

ELECTRIC WATER COOLEREWC-

(DEMO) EXISTING SYSTEMS

TO BE DEMOLISHED

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:0

:1

P M

P0.0

PLUMBING SYMBOLS AND

ABBREVIATIONS

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 MTK GGR

674-18-103

PROPOSED PHASING PLAN:

• DEMOLITION AND NEW WORK SHALL BE PHASED TO

MINIMIZE HVAC, ELECTRICAL, AND PLUMBING OUTAGES

AND MINIMIZE THE REQUIREMENT FOR TEMPORARY

UTILITES. ALL OUTTAGES SHALL BE COORDINATED WITH

THE OWNERS SCHEDULE 4 WEEKS PRIOR TO CREATING

THE OUTTAGE.

• NEW SYSTEMS SHALL TIE INTO EXISTING SYSTEMS

WHERE PRACTICAL AND SHOWN ON THE PLANS. NEW

PIPING TIE IN POINTS SHALL BE HOT TAPPED TO MAINTAIN

OPERATION TO THE REMAINDER OF THE BUILDING.

DUCTWORK THAT SERVES EXISTING TO REMAIN SPACES

SHALL BE RE-ROUTED PRIOR TO SYSTEM CHANGEOVER.

• IT IS THE SOLE RESPONSIBILITY OF THE GENERAL

CONTRACTOR AND SUBCONTRACTOR TO PROVIDE A

FEASIBLE PHASING PLAN MAINTAIN BUILDING

OPERATIONS DURING CONSTUCTION. PRESENT SAID

PHASING PLAN TO OWNER AND DESIGN TEAM PRIOR TO

COMMENCING CONSTRUCTION. NO EXISTING TO REMAIN

PORTION OF THE BUILDING SHALL BE WITHOUT AIR

CONDITIONING FOR ANY PERIOD OF TIME UNLESS

COORDINATED WITH OWNER.

Revisions: Date:

WY U R P N M H G FJ.5L E D C BK J

PD1.2A

PD1.2B

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:1

:0

P M

PD1.1

LEVEL 4 OVERALL PLUMBING

DEMOLITION PLAN

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 MTK GGR

674-18-103

1/16" = 1'-0"1

REFERENCE PLAN - LEVEL 04 - PLUMBING DEMOLITION

N

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:0

:5

P M

PD1.2A

LEVEL 4 PLUMBING DEMOLITION

PLAN - NORTH

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 MTK GGR

674-18-103

1/8" = 1'-0"1

LEVEL 04 - PLUMBING DEMOLITION - NORTH

KEY NOTES:

(SOME KEY NOTES MAY

NOT APPLY TO THIS SHEET)

1 EXISTING LAVATORY/SINK TO BE

REMOVED. ASSOCIATED PIPING

TO REMAIN FOR NEW

CONNECTION.

EXISTING URINAL TO BE

REMOVED. ASSOCIATED PIPING

TO REMAIN FOR NEW

CONNECTION.

EXISTING WATER CLOSET TO BE

REMOVED. ASSOCIATED PIPING

TO REMAIN FOR NEW

CONNECTION.

EXISTING DRINKING FOUNTAIN TO

BE REMOVED. ASSOCIATED

PIPING TO REMAIN FOR NEW

CONNECTION.

EXISTING FLOOR DRAIN TO BE

REMOVED. ASSOCIATED PIPING

TO REMAIN FOR NEW

CONNECTION.

EXISTING LAVATORY/SINK TO BE

REMOVED. ALL ASSOCIATED

PIPING TO BE REMOVED BACK TO

MAINS EITHER UNDERFLOOR OR

ABOVE CEILING.

EXISTING URINAL TO BE

REMOVED. ALL ASSOCIATED

PIPING TO REMOVED BACK TO

MAINS EITHER UNDERFLOOR OR

ABOVE CEILING.

EXISTING WATER CLOSET TO BE

REMOVED. ALL ASSOCIATED

PIPING TO REMOVED BACK TO

MAINS EITHER UNDERFLOOR OR

ABOVE CEILING.

EXISTING DRINKING FOUNTAIN TO

BE REMOVED. ALL ASSOCIATED

PIPING TO REMOVED BACK TO

MAINS EITHER UNDERFLOOR OR

ABOVE CEILING.

EXISTING FLOOR DRAIN TO BE

REMOVED. ALL ASSOCIATED

PIPING TO REMOVED BACK TO

MAINS EITHER UNDERFLOOR OR

ABOVE CEILING.

ALL PLUMBING FIXTURES TO BE

REMOVED. ALL WASTE/VENT

PIPING TO BE REMOVED BACK TO

RISER TAP.

ALL WATER PIPING TO BE

REMOVED BACK TO ISOLATION

VALVE/PRESSURE REDUCING

VALVE.

REQUIRES WORK IN 3RD FLOOR

CEILING SPACE. COORDINATE

AND SCHEDULE DOWNTIME WITH

BUILDING OWNER.

REMOVE MEDICAL GAS

EQUIPMENT.

REMOVE MEDICAL GAS PIPING.

N

Revisions: Date:

GENERAL NOTE

REMOVE ALL EXISTING FIXTURES (BOLDED) AND

ASSOCIATED PIPING BACK TO MAIN RISERS.

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:0

:5

P M

PD1.2B

LEVEL 4 PLUMBING DEMOLITION

PLAN - SOUTH

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 MTK GGR

674-18-103

1/8" = 1'-0"1

LEVEL 04 - PLUMBING DEMOLITION - SOUTH

KEY NOTES:

(SOME KEY NOTES MAY

NOT APPLY TO THIS SHEET)

1 EXISTING LAVATORY/SINK TO BE

REMOVED. ASSOCIATED PIPING

TO REMAIN FOR NEW

CONNECTION.

EXISTING URINAL TO BE

REMOVED. ASSOCIATED PIPING

TO REMAIN FOR NEW

CONNECTION.

EXISTING WATER CLOSET TO BE

REMOVED. ASSOCIATED PIPING

TO REMAIN FOR NEW

CONNECTION.

EXISTING DRINKING FOUNTAIN TO

BE REMOVED. ASSOCIATED

PIPING TO REMAIN FOR NEW

CONNECTION.

EXISTING FLOOR DRAIN TO BE

REMOVED. ASSOCIATED PIPING

TO REMAIN FOR NEW

CONNECTION.

EXISTING LAVATORY/SINK TO BE

REMOVED. ALL ASSOCIATED

PIPING TO BE REMOVED BACK TO

MAINS EITHER UNDERFLOOR OR

ABOVE CEILING.

EXISTING URINAL TO BE

REMOVED. ALL ASSOCIATED

PIPING TO REMOVED BACK TO

MAINS EITHER UNDERFLOOR OR

ABOVE CEILING.

EXISTING WATER CLOSET TO BE

REMOVED. ALL ASSOCIATED

PIPING TO REMOVED BACK TO

MAINS EITHER UNDERFLOOR OR

ABOVE CEILING.

EXISTING DRINKING FOUNTAIN TO

BE REMOVED. ALL ASSOCIATED

PIPING TO REMOVED BACK TO

MAINS EITHER UNDERFLOOR OR

ABOVE CEILING.

EXISTING FLOOR DRAIN TO BE

REMOVED. ALL ASSOCIATED

PIPING TO REMOVED BACK TO

MAINS EITHER UNDERFLOOR OR

ABOVE CEILING.

ALL PLUMBING FIXTURES TO BE

REMOVED. ALL WASTE/VENT

PIPING TO BE REMOVED BACK TO

RISER TAP.

ALL WATER PIPING TO BE

REMOVED BACK TO ISOLATION

VALVE/PRESSURE REDUCING

VALVE.

REQUIRES WORK IN 3RD FLOOR

CEILING SPACE. COORDINATE

AND SCHEDULE DOWNTIME WITH

BUILDING OWNER.

REMOVE MEDICAL GAS

EQUIPMENT.

REMOVE MEDICAL GAS PIPING.

N

Revisions: Date:

GENERAL NOTE

REMOVE ALL EXISTING FIXTURES (BOLDED) AND

ASSOCIATED PIPING BACK TO MAIN RISERS.

WY U R P N M H G FJ.5L E D C BK J

P1.2

P1.3

NOT IN CONTRACT

STAIRS

PATIENT TOILET

4J22B

PATIENT ROOM

4J22

PATIENT ROOM

4J23

PATIENT ROOM

4J24

PATIENT ROOM

4J21

CORRIDOR

4J60

PATIENT ROOM

4J20

PATIENT ROOM

4J25

PATIENT ROOM

4J26

PATIENT ROOM

(ISOLATION)

4J30

PATIENT ROOM

(ISOLATION)

4J31

PATIENT ROOM

(ISOLATION)

4J32

PATIENT ROOM

(ISOLATION)

4J33

CORRIDOR

4J60

PATIENT ROOM

4J08

STORAGE ROOM

4J07

PATIENT ROOM

4J09

CONFERENCE

ROOM

4J10

MEDICATION

PREP.

4J15

NOURISHMENT

4J16

STAFF SUPPORT

ROOM

4J13

REPORT ROOM

4J11

TL. COM. ROOM

4J12

STORAGE ROOM

4K04

CORRIDOR

4J61

PATIENT ROOM

(ISOLATION)

4K35

PATIENT ROOM

(ISOLATION)

4K36

PATIENT ROOM

(ISOLATION)

4K37

PATIENT ROOM

4K42PATIENT ROOM

4K02

PATIENT ROOM

4K03

CORRIDOR

4K59

CONFERENCE

ROOM

4K01

CORRIDOR

4K59

CORRIDOR

4K59

NURSE STATION

4K57

TEAM WORK/

CLASS ROOM

4K53

MEDICATION

PREP.

4K55

NOURISHMENT

4K56

CLEAN LIN.

4K58

CORRIDOR

4K59

TL. COM. ROOM

4K52

PATIENT ROOM

4K48

PATIENT ROOM

4K47

PATIENT ROOM

4K46

STAIRS

PATIENT TOILET

4K46B

STAFF SUPPORT

ROOM

4K51

PATIENT ROOM

4K42

CLEAN UTILITY

4K39

EQUIPMENT

4K40

SOILED UTILITY

4K41

PATIENT ROOM

4K43

PATIENT ROOM

4K44 PATIENT ROOM

4K45

CLEAN LIN.

4J18

NURSE STATION

4J17

EQUIPMENT

4J28

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:0

:1

P M

P1.1

LEVEL 4 OVERALL PLUMBING NEW

WORK PLAN

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 MTK GGR

674-18-103

1/16" = 1'-0"1

REFERENCE PLAN - LEVEL 04 - PLUMBING

WY U R P N M H G FJ.5L E DK J

P2.1

P2.2

STAIRS

STORAGE ROOM

4K04

PATIENT ROOM

(ISOLATION)

4J31

PATIENT ROOM

(ISOLATION)

4J32

PATIENT ROOM

(ISOLATION)

4K36

PATIENT ROOM

(ISOLATION)

4K35

ANTE ROOM

4K35A

CONFERENCE

4J19

NOURISHMENT

4J16

REPORT ROOM

4J11

STAFF SUPPORT

ROOM

4J13

EQUIPMENT

4J28

SOILED UTILITY

4J27

PATIENT ROOM

4J21

PATIENT ROOM

4J20

PATIENT TOILET

4J09B

PATIENT TOILET

4J08B

PATIENT ROOM

4J08

PATIENT TOILET

4J20B

PATIENT TOILET

4J21B

PATIENT ROOM

4J22

PATIENT TOILET

4J25B

PATIENT ROOM

4J25

PATIENT TOILET

4J26B

CONFERENCE

ROOM

4J10

PATIENT ROOM

4J09

ANTE ROOM

4J32A

ANTE ROOM

4J31A

MEDICATION

PREP.

4J15

NURSE ALCOVE

4K45E

PATIENT TOILET

4J22B

NURSE ALCOVE

4J23C

CLEAN LIN.

4J18

ANTE ROOM

4K36A

PATIENT ROOM

4J24

PATIENT ROOM

4J23

PATIENT TOILET

4J24B

PATIENT TOILET

4J23B

PATIENT ROOM

4J26

PATIENT ROOM

(ISOLATION)

4J30

ELECTRICAL

4K06

STORAGE ROOM

4J07

H.A.C.

4K05

CORRIDOR

4J61

MECHANICAL

4K34

PATIENT ROOM

(ISOLATION)

4J33

ANTE ROOM

4J33A

TL. COM. ROOM

4J12

CLEAN UTILITY

4J29

ANTE ROOM

4J30A

NURSE ALCOVE

4J23E

NURSE ALCOVE

4J23D

NURSE STATION

4J17 CORRIDOR

4J60

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:0

:1

P M

P1.2

LEVEL 4 PLUMBING NEW WORK PLAN

- NORTH

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 MTK GGR

674-18-103

1/8" = 1'-0"1

ENLARGED PLAN - LEVEL 04 - PLUMBING - NORTH

N M H G FJ.5L E D C BK J

P2.3

P2.4

STAIRS

NOURISHMENT

4K56

EQUIPMENT

4K40

STORAGE ROOM

4K04

PATIENT ROOM

(ISOLATION)

4K37

PATIENT ROOM

(ISOLATION)

4K36

PATIENT ROOM

(ISOLATION)

4K35

ANTE ROOM

4K35A

WORK ROOM

4K50

STAFF SUPPORT

ROOM

4K51

TOILET

4K51B

MEDICATION

PREP.

4K55

PATIENT ROOM

4J08

PATIENT ROOM

4K03

PATIENT ROOM

4K02

PATIENT ROOM

4K47

PATIENT ROOM

4K46

PATIENT ROOM

4K44

PATIENT ROOM

4K43

PATIENT TOILET

4K64

CONFERENCE

ROOM

4K01

PATIENT TOILET

4K42B

PATIENT ROOM

4K42

SOILED UTILITY

4K41

STORAGE

4K49

PATIENT ROOM

4K48

CLEAN LIN.

4K58

TEAM WORK/

CLASS ROOM

4K53

WHL. CHR. STOR.

4K54

NURSE STATION

4K57

PATIENT ROOM

4K45

PATIENT TOILET

4K46B

ANTE ROOM

4K37A

ANTE ROOM

4K36A

CLEAN UTILITY

4K39

ANTE ROOM

4K38A

PATIENT TOILET

4K44B

NURSE ALCOVE

4K45C

PATIENT TOILET

4K45B

TL. COM. ROOM

4K52

ELECTRICAL

4K06

CORRIDOR

4K59

STORAGE ROOM

4J07

H.A.C.

4K05

CORRIDOR

4J61

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:0

:1

P M

P1.3

LEVEL 4 PLUMBING NEW WORK PLAN

- SOUTH

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 MTK GGR

674-18-103

1/8" = 1'-0"1

ENLARGED PLAN - LEVEL 04 - PLUMBING - SOUTH

BLDG. 204

3G 14

C3-13

PHYSICIAN

UTILITY

MED. PREP

3G 15

CHEMO

3G 16

CHEMO TREAT

CLEAN

(MULTI-

3G 173G 18

TLT.

HEMATOLOGY

3G 19

3G 23

EXAM

3G 24

3G 27

3G 28

ONE BEDONE BEDONE BED ONE BEDONE BED

C3-12 C3-11

X-RAY

3G 06

ELEV.

3G 12

SERVICE

3G 09

MECHANICAL

3K 35

3G 04

S. LINEN

NURSESURGERY

3K 37

MANAGER

3K 36

STAFF

3K 34TLT.

ROOM ROOM

ONE BED

ROOM ROOM

ROOM ROOM

BATH

3K 32A

BATH

3K 23A

TWO BED

TWO BED

TWO BED

RESIDENT

TWO BED

TWO BED

3K 15

3G 05

TRASH

LOUNGE

VISITOR'S

P-7

P-8ELEC.

3G 13

COMM.

PUBLIC

ELEV.

3G 00

3G 35

WAITING

3G 20

3G 21

CLINIC

CLERK

3G 03

3G 10 3G 11

RETHERM

CORR.

MEN

3G 02

P-9

EMS

WOMEN

3G 08

WOMEN

3G 01

CORR.

C3-1

3G 34

MICROSCOPE

3G 33

RESIDENT

EXAM

EXAM

3G 22

3G 25

EXAM

3G126

C3-2

CORR.

3G 32

3G 31

PROG. SUPP.

CLINICAL

EXAM

EXAM

3G 29

3G 30

3K 01

3K 40

COMM.

3K 39

HAC

MEN

3G 07

INSTRUCT

3K 02

NURSE

3K 38

HOUSE STAFF

CLASS ROOM

C3-9

CORR.

3K 03

DAY ROOM

BALC.

STORAGE

3K101A

3K 06A

BATH

CORR.

3K 00

COMM. CTR.

3K 33

C.UTILITY

3K 19

C3-8

CORR.

NOUR.

3K 04

MED.

3K 05

C.LINEN

S. UTIL.

3K 22

3K 21

WC STO.

3K 20

EQUIP./

3K 06

3K 07

3K 08

3K 09

ROOM

ANTE

3K 06B

3K 07A

BATH

BATH 3K 18

RM.

3K 17A

3K 17

RM.

3K 08A

BATH

BATH

RM.

3K 15A 3K 16

SLEEP

GEN. B.

3K 10

3K 09A

BATH

3K 13

3K 09B

ANTE

ROOM

C3-7

CORR.

RM.

3K 13A

BATH 3K 14

RM.

STR #9

3K 273K 263K 253K 243K 23

3K 29

TWO BED

3K 32 3K131

3K 30A

BATH

3K 30

C3-10CORR.

TWO BED

RM.

TWO BED

RM.

TWO BED

3K 24A

BATH

RM.

3K 29A

BATH

3K 28

BATH

3K 28A

TWO BED

BATH

3K 26A

RM. RM.

3G 19C

3G 19B

3S-9

TREAT

SOIL.

C3-13A

CORR.

CORR.

PURP.)

P-10

ROOM

ONE BED

3J 06

3J 05

ROOM

3J 04

ROOM

3J 03

ROOM

ONE BED

3J 02

ROOM

3J 01

ROOM

ONE BED

CORR.

C3-14

ONE BED

ONE BED

ONE BED

3J 36

3J 35

3J 38

NURSE

MANAGER

3J 37

LOUNGE

3J 39

TLT.

3J 40

3J 03A

ONE BED

3J 24

3J 18

CORR.

C3-5

TWO BED

MED.

3J 31

ROOM

CLASS

CARE

PRIMARY

3J 30

3J 33

HAC

COMM.

3J 34

PURPOSE

3J 32

MULTI-

3J 31A

CHEMO.

PREP.

3J 29

DAY ROOM

BATH

3J 26A

ROOM

3J 26

ISOLATION ONE BED

ROOM

3J 25

ROOM

NOUR.

3J 28

C. UTIL.

3J 12

COMM. CTR.

3J 00

C3-3

CORR.

C3-4

CORR.

C.LINEN

3J 01A

BATH

BATH

S.UTILITY

3J 15

3J 11A

3J 13

BATH

3J 09A

BATH

3J 14

BATH

3J 25A

BATH

3J 16A

C3-5A

3J 26B

3J 27

ROOM

ANTE

EQUIP./

WC STO.

TWO BED

ROOM

ROOM

3J 16

TWO BED

TWO BED

3J 11

ROOM

3J 10

3J 17

ROOM

TWO BED

ROOM

3J 23A

BATHISOLATION

ROOM

3J 23

TLT.

3J 22A

TWO BED

BATH

3J 24A

3J 23B

ANTE

ROOM

3J 18A

BATH

3J 22

STORAGE

3J 20A

BATH

TWO BED

3J 19

TWO BED

ROOM

3J 20

ROOM

3J 21

ROOM

CORR.

C3-6

MECH

3K 12

3J 05A

BATH 3J 07A

BATH

3J 06A

BATH

STR #10

3S-10

TWO BED

TWO BED

ROOM

3J 09

ROOM

3J 08

ROOM

3J 07

TWO BED

(2) STAFF

PHARMACIST

ASST.

(SURGICAL)

(SLEEP LAB)

ONE BED

RM.

RM.

S-8

S-9

S-10

S-11

ONE BED

RM.

ONE BED

RM.

ONE BED

RM.

STO.

LOUNGE

STR #8

3S-8

3K11

ELEC

CALL

ROOM

WY U R P N M H G FJ.5L E D C BK J

P1.5

P1.6

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:0

:1

P M

P1.4

LEVEL 3 OVERALL PLUMBING NEW

WORK PLAN - CEILING SPACE

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 MTK GGR

674-18-103

1/16" = 1'-0"1

REFERENCE PLAN - LEVEL 03 - CEILING SPACE - PLUMBING

RESIDENT

TWO BED

TWO BED

3K 15

3K 09 SLEEP

GEN. B.

3K 10

3K 09A

BATH

3K 13

3K 09B

ANTE

ROOM

C3-7

CORR.

RM.

3K 13A

BATH 3K 14

RM.

ROOM

ONE BED

3J 06

3J 05

ROOM

3J 04

ROOM

3J 03

ROOM

ONE BED

3J 02

ROOM

3J 01

ROOM

ONE BED

CORR.

C3-14

ONE BED

ONE BED

ONE BED

3J 36

3J 35

3J 38

NURSE

MANAGER

3J 37

LOUNGE

3J 39

TLT.

3J 40

3J 03A

ONE BED

3J 24

3J 18

CORR.

C3-5

TWO BED

MED.

3J 31

ROOM

CLASS

CARE

PRIMARY

3J 30

3J 33

HAC

COMM.

3J 34

PURPOSE

3J 32

MULTI-

3J 31A

CHEMO.

PREP.

3J 29

DAY ROOM

BATH

3J 26A

ROOM

3J 26

ISOLATION ONE BED

ROOM

3J 25

ROOM

NOUR.

3J 28

C. UTIL.

3J 12

COMM. CTR.

3J 00

C3-3

CORR.

C3-4

CORR.

C.LINEN

3J 01A

BATH

BATH

S.UTILITY

3J 15

3J 11A

3J 13

BATH

3J 09A

BATH

3J 14

BATH

3J 25A

BATH

3J 16A

C3-5A

3J 26B

3J 27

ROOM

ANTE

EQUIP./

WC STO.

TWO BED

ROOM

ROOM

3J 16

TWO BED

TWO BED

3J 11

ROOM

3J 10

3J 17

ROOM

TWO BED

ROOM

3J 23A

BATHISOLATION

ROOM

3J 23

TLT.

3J 22A

TWO BED

BATH

3J 24A

3J 23B

ANTE

ROOM

3J 18A

BATH

3J 22

STORAGE

3J 20A

BATH

TWO BED

3J 19

TWO BED

ROOM

3J 20

ROOM

3J 21

ROOM

CORR.

C3-6

MECH

3K 12

3J 05A

BATH 3J 07A

BATH

3J 06A

BATH

STR #10

3S-10

TWO BED

TWO BED

ROOM

3J 09

ROOM

3J 08

ROOM

3J 07

TWO BED

(2) STAFF RM.ONE BED

RM.

3K11

ELEC

WY U R P N M H G FJ.5L E DK J

4"SAN

2"V

3"ST

1"HW

4"SAN

4"SAN

3"SAN

M01

2"V

4"SAN

1"HW

2"CW

3"ST

M02

M03 4"SAN

M02 M02

M03M03M03M03

3"ST

1"HW

2"V

2"CW

M02M02

M01 M03M03M03M01M01M01

2"CW

1"HW

4"SAN

2"V

2"CW

1"HW

4"SAN

2"V

M01M01M01M01

M03M03M03M03 M02M02M02

M02

2"CW

2"V

4"SAN

1"HW

4"SAN

2"V

1"HW

2"CW

S01

4"SAN

2"SAN

M01M01M01

M01

M03M03

M03

M03

M01

M02M02M02M02

2"V

4"SAN

1"HW

2 1/2"CW

2"CW

1"HW

4"SAN

3"V

4"SAN

1"HW

2"CW

M02

2"SAN

2"SAN

2"SAN

2"SAN

2"V

4"SAN

2"CW

1"HW

2"V

4"SAN

1"HW

2"CW

2"V

4"SAN

1"HW

2"CW

2"SAN

2"V

4"SAN

1"HW

2"CW

2"CW

1"HW

4"SAN

2"V

2"SAN

2"SAN

2"V

4"SAN 1"HW

2"CW

2"SAN

2"SAN

2"SAN

1 1/2"HW

2"CW

4"SAN

2"V

4"SAN

M01 M01

S01S01S01S01S01S01

S01

S01S01S01

M01

M01

1 1/2"V

2"SAN

S01S01S01S01S01S01

M02

S01S01S01

M01

S01

S01

2"CW

1 1/2"HW

2"V S01S01

2"CW

4"SAN

2"V

4"SAN

M01

S01

4"SAN

2"V

2"CW

3/4"HW

2"V

4"SAN

3/4"HW

2"CW

3"V

4"SAN

1"HW

2"CW

2"V

S01S01S01S01

S01S01S01

S01S01

M08

EXISTING MED GAS

RISERS

(2" MV, 1-1/2" MA, 2" O)

FROM 2ND FLOOR

SERVICE BELOW.

OFFSET ABOVE 3RD

FLOOR CEILING.

OFFSET MED GAS

RISERS

(2" MV, 1-1/2" MA, 2" O)

UP TO 4TH FLOOR.

FIELD COORDINATE

WITH NEW WALL

LOCATION ABOVE.

2"SAN

4"SAN

S10

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:0

:2

P M

P1.5

LEVEL 3 PLUMBING NEW WORK PLAN

- CEILING SPACE - NORTH

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 MTK GGR

674-18-103

1/8" = 1'-0"1

ENLARGED PLAN - LEVEL 03 - CEILING SPACE - PLUMBING - NORTH

Revisions: Date:

NOTE TO CONTRACTOR: (APPLIES TO ALL SHEETS)

OUTTAGES SHALL BE COORDINATED WITH THE

OWNER PRIOR TO BEGINNING CONSTRUCTION.

THE CONTRACTOR SHALL COORDINATE THE

REQUIRED REMOVAL AND REPLACEMENT OF THE

EXISTING CEILING SYSTEM TO COMPLETE WORK

WITH ARCHITECTURAL TRADES. RE-ROUTING OF

EXISTING SYSTEMS TO BE FIELD COORDINATED

WITH EXISTING SYSTEMS.

NIC

NIC

NIC

GENERAL NOTES:

KEY NOTES:

(SOME KEY NOTES MAY

NOT APPLY TO THIS SHEET)

M01 EXISTING RISER(S) OFFSET IN

THIRD FLOOR CEILING SPACE.

FIELD COORDINATE WITH ALL

EXISTING UTILITIES. OFFSET PIPING

AS REQUIRED. (TYP.) PROVIDE

ISOLATION VALVES IN NON GRAVITY

FLOW SYSTEMS.

M02 EXTEND LINE IN CEILING SPACE TO

NEW RISER LOCATION THRU

FOURTH FLOOR. FIELD

COORDINATE EXACT ROUTING

WITH EXISTING SYSTEMS. (TYP.)

M03 NEW RISER THRU 4TH FLOOR.

(TYP.)

M08 EXISTING RISER(S) TO REMAIN.

S01 NEW SANITARY RISER TO FOURTH

FLOOR FIXTURES. (TYP.)

S10 SANITARY RISING TO FLOOR DRAIN.

ONE BEDONE BEDONE BED ONE BEDONE BED

C3-11

X-RAY

3G 06 3K 35

3G 04

S. LINEN

NURSESURGERY

3K 37

MANAGER

3K 36

STAFF

3K 34TLT.

ROOM ROOM

ONE BED

ROOM ROOM

ROOM ROOM

BATH

3K 32A

BATH

3K 23A

TWO BED

TWO BED

TWO BED

RESIDENT

TWO BED

TWO BED

3K 15

3G 05

TRASH

3K 01

3K 40

COMM.

3K 39

HAC

MEN

3G 07

INSTRUCT

3K 02

NURSE

3K 38

HOUSE STAFF

CLASS ROOM

C3-9

CORR.

3K 03

DAY ROOM

BALC.

STORAGE

3K101A

3K 06A

BATH

CORR.

3K 00

COMM. CTR.

3K 33

C.UTILITY

3K 19

C3-8

CORR.

NOUR.

3K 04

MED.

3K 05

C.LINEN

S. UTIL.

3K 22

3K 21

WC STO.

3K 20

EQUIP./

3K 06

3K 07

3K 08

3K 09

ROOM

ANTE

3K 06B

3K 07A

BATH

BATH 3K 18

RM.

3K 17A

3K 17

RM.

3K 08A

BATH

BATH

RM.

3K 15A 3K 16

SLEEP

GEN. B.

3K 10

3K 09A

BATH

3K 13

3K 09B

ANTE

ROOM

C3-7

CORR.

RM.

3K 13A

BATH 3K 14

RM.

STR #9

3K 273K 263K 253K 243K 23

3K 29

TWO BED

3K 32 3K131

3K 30A

BATH

3K 30

C3-10CORR.

TWO BED

RM.

TWO BED

RM.

TWO BED

3K 24A

BATH

RM.

3K 29A

BATH

3K 28

BATH

3K 28A

TWO BED

BATH

3K 26A

RM. RM.

3S-9

3J 23A

BATHISOLATION

ROOM

3J 23

TLT.

3J 22A

BATH

3J 24A

ANTE

ROOM

3J 22

STORAGE

CORR.

C3-6

(SURGICAL)

(SLEEP LAB)

ONE BED

RM.

RM.ONE BED

RM.

ONE BED

RM.

ONE BED

RM.

LOUNGE

3K11

ELEC

CALL

ROOM

N M H G FJ.5L E D C BK J

3"SAN

2"CW

1"HW

2"V

4"SAN 1"HW

2"CW

2"SAN

2"SAN

2"V

4"SAN

2"CW

1"HW

2"SAN

2"SAN

2"V

4"SAN

1"HW

2"CW

S01

S01S01S01

M01

1 1/2"V

2"SAN

M01

S01S01S01

S01

M01

1"HW

4"SAN

2"V

2"CW

M03

S01

M03

S01

M02M02M02M02

2"CW

1"HW

2"V

4"SAN

2"V

4"SAN

2"SAN

M03

M01

M02M02M02M02

M01

2"V

4"SAN

2"CW

2"CW

1"HW

M03

M01

M02M02M02M02

M08

M01

2"CW

1"HW

4"SAN

2"V

M02M02M02M02

S01

M03

S01S01S01

2"CW

1"HW

4"SAN

2"V

M01

M02M02M02M02

S01S01S01

M03

2"V

4"SAN

2"CW

1"HW

M03

S01

S01

M01

M02M02M02M02

M09

3"SAN

2"SAN

S01

S01

S01S01S01

2"SAN

2"SAN

2"SAN

OFFSET MED GAS

RISER UP TO ABOVE

4TH FLOOR CEILING

(1-1/2" MV, 1-1/4" MA,

1-1/2" O)

EXISTING MED GAS

RISERS TO REMAIN,

OFFSET ABOVE 3RD

FLOOR CEILING

(1-1/2" MV, 1-1/4" MA,

1-1/2" O)

1-1/2" MV

1-1/2" O1-1/4" MA

M01

S10

V01

2"SAN

2"SAN

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:0

:2

P M

P1.6

LEVEL 3 PLUMBING NEW WORK PLAN

- CEILING SPACE - SOUTH

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 MTK GGR

674-18-103

1/8" = 1'-0"1

ENLARGED PLAN - LEVEL 03 - CEILING SPACE - PLUMBING - SOUTH

Revisions: Date:

GENERAL NOTES:

KEY NOTES:

(SOME KEY NOTES MAY

NOT APPLY TO THIS SHEET)

M01 EXISTING RISER(S) OFFSET IN

THIRD FLOOR CEILING SPACE.

FIELD COORDINATE WITH ALL

EXISTING UTILITIES. OFFSET PIPING

AS REQUIRED. (TYP.) PROVIDE

ISOLATION VALVES IN NON GRAVITY

FLOW SYSTEMS.

M02 EXTEND LINE IN CEILING SPACE TO

NEW RISER LOCATION THRU

FOURTH FLOOR. FIELD

COORDINATE EXACT ROUTING

WITH EXISTING SYSTEMS. (TYP.)

M03 NEW RISER THRU 4TH FLOOR.

(TYP.)

M08 EXISTING RISER(S) TO REMAIN.

M09 EXTEND NEW SUPPLY LINES OFF

ETR RISERS.

S01 NEW SANITARY RISER TO FOURTH

FLOOR FIXTURES. (TYP.)

S10 SANITARY RISING TO FLOOR DRAIN.

V01 VENT PIPING RISING IN WALL TO

ABOVE CEILING.

W U R

P-414

P-414

P-414

P-528

P-528

P-528

P-528

P-528

P-528

MGO-2222

MGO-2222

MGO-2222

MGO-2222

MGO-2222

MGO-2222

MGO-2222

ZVB-1.1

P-414

P-414

P-414

P-414

P-103A

P-103A

P-103A

P-103A

P-103A

P-103A

P-516

P-103A

/4

M

V

/2

O

/2

M

A

/4

M

V /4

M

V

/2

M

A

/2

O

3/4" MV

3/4" MA

3/4" 0

M04M04M04M04

M06 M07M07M07M07

M06M06

M06

2"CW

1"HW

4"SAN

2"V

2"CW

1"HW

4"SAN

2"V

M04

M06

M05M05M05M05

M06M06M06

M06

4"SAN

4"SAN

2"V

3"ST

2"V

1"HW

2"CW

M07M07M07M07M07

2"V

4"SAN

1"HW

2"CW

3"ST

M07M07M07M07

2"CW

2"V

4"SAN

1"HW

M05M05M05M05

2"CW

1"HW

2"V

4"SAN

S024"SAN

S02 2"SAN

M06M06M06M06

M07M07M07M07

M07M07M07M07

M07M07M07

M07M07M07M07

M04M04M04M04

M04M04M04M04

2"CW

1"HW

4"SAN

3"V

2"V

2"CW

1"HW

4"SAN

2"CW

1"HW

4"SAN

2"V

2"CW

1"HW

2"V

4"SAN

1"HW

2"CW

4"SAN

2"V

M06M06M06M06

M06M06M06M06

M06M06M06M06

M06M06M06M06

/4

O

/4

M

A

/4

M

V

P-704

S05 S04

WCO

RP-1

FD-Z

2"V

4"SAN

1"HW

1 1/2"V

3/4"HW

1 1/4"CW

2"CW

4"SAN

1 1/2"V

3/4"HW

3/4"CW

3/4"HWC

3/4"HWC

3/4"CW

1 1/2"V

3/4"HW

3/4"HWC

3/4"HWC

3/4"HWC

MG01

3/4" MV

1/2" O

1/2" MA

S06

FD-ZS07

S06

S06

S06

FD-ZS07

MG01M12

3/4"HWC

3/4"HWC

FD-Z

2"CW

1"HW

4"SAN

2"V

3/4"CW 1 1/2"V

3/4"HW

3/4"HW

S07

S06

MG01

3/4"HWC

3/4"HWC

M13

S06

FD-Z

FD-Z

S07

S07

MG01

M13

MG06

3/4"HW

3/4"CW

1 1/2"V

3"V

2"V

3/4"HWC

MG05MG05

PATIENT ROOM

4J23

PATIENT ROOM

4J22

PATIENT ROOM

4J21

STAIRS

PATIENT TOILET

4J22B

PATIENT ROOM

4J25

PATIENT ROOM

4J20

PATIENT ROOM

4J26

CONFERENCE

4J19 SOILED UTILITY

4J27

EQUIPMENT

4J28

WCO

M16

P-704

P-704

FD-Z

P-704

P-704

P-704

P-704

/2

M

A

/4

M

V

/2

O

/2

O

/4

M

V

/2

M

A

3/4" 0

3/4" MA

3/4" MV

/4

M

V

/2

O

/2

M

A

FD-C

P-505

P-516

TP-1

MG01

MG02

MG03

MG04

MG03

MG04

MG03

MG04

MG04MG01

MG03

MG03

MG04

MG04

MG02

M17

P-708

S09

SA-1

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:0

:3

P M

P2.1

LEVEL 4 PLUMBING ENLARGEMENTS

- NORTH A

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 MTK GGR

674-18-103

1/4" = 1'-0"1

ENLARGED PLAN - LEVEL 04 - PLUMBING - NORTH A

GENERAL NOTES:

KEY NOTES:

(SOME KEY NOTES MAY

NOT APPLY TO THIS SHEET)

M04 NEW RISER IN CHASE. RISER

OFFSET IN FOURTH FLOOR CEILING

SPACE.

M05 NEW RISER IN WALL. RISER OFFSET

IN FOURTH FLOOR CEILING SPACE.

M06 EXTENDED LINES ROUTED IN

CEILING SPACE TO EXISTING RISER

LOCATION THRU FIFTH FLOOR.

FIELD COORDINATE EXACT

ROUTING WITH EXISTING SYSTEMS.

M07 RECONNECT NEW LINE INTO

BUILDINGS EXISTING RISER(S).

PERFORM ALL NECESSARY

PREP-WORK PRIOR TO SHUTDOWN

TO MINIMIZE DOWNTIME.

M12 INSTALL HOT WATER

RE-CIRCULATION PUMP ABOVE

CEILING AT THIS LOCATION. (ADD

ALTERNATE #1)

M13 INSTALL HOT WATER

RE-CIRCULATION LINE TO EACH

FIXTURE. HOT WATER LINE SHALL

DROP IN WALL AND TIE INTO HOT

WATER LINE WITHIN 6" OF OUTLET.

(ADD ALTERNATE #1) (TYP.) INSTALL

CIRCUIT SETTER EQUAL TO IMI

FLOW DESIGN MODEL#

ICSS075FF-1, BALANCE TO 0.5 GPM.

M16 HOT WATER RE-CIRCULATION LINE

TYING BACK INTO HOT WATER

RISER WITH IN-LINE CHECK VALVE.

(ADD ALTERNATE #1)

M17 ELECTRONIC TRAP PRIMER TO BE

INSTALLED WITH 3/4" CW AT THIS

LOCATION. COORDINATE POWER

REQUIREMENTS WITH DIV 26.

ROUTE TRAP PRIMER PIPING TO

ALL TRENCH AND FLOOR DRAIN

FIXTURES. COORDINATE

REQUIRED NUMBER OF PORTS ON

TRAP PRIMERS WITH DRAINS IN THE

VICINITY, FIXTURES REQUIRE DEEP

SEAL P-TRAP WITH TRAP PRIMER

CONNECTIONS.

MG01 MEDICAL GAS OUTLETS TO BE

INSTALLED AS PER

ARCHITECTURAL HEAD WALL

DETAIL. MATCH EXISTING OUTLET

TYPE USED BY THE HOSPITAL.

PROVIDE 1/2" OXYGEN, 1/2"

MEDICAL AIR, 3/4" MEDICAL

VACUUM DOWN TO MED GAS

OUTLETS. (TYP.)

MG02 EXTEND MEDICAL GAS PIPING AT

THIS LOCATION.

MG03 TAP EXISTING MED GAS MAINS AT

THIS LOCATION, 1/2" OXYGEN, 1/2"

MEDICAL AIR, 3/4" MEDICAL

VACUUM. PROVIDE ISOLATION

VALVES ABOVE CEILING SERVING

EACH PATIENT BED. PROVIDE

ACCESS PANEL WHER INSTALLED

IN HARD CEILING AREAS. (TYP.)

MG04 EXISTING MED GAS MAINS TO

REMAIN AND BE RE-USED WHERE

PRACTICAL. WHERE MED GAS

CONFLICTS WITH NEW UTILITIES

BEING INSTALLED, PROVIDE

PROVISIONS TO OFFSET EXISTING

MED GAS PIPING. (TYP.)

MG05 MED GASES TO DROP DOWN IN

WALL TO ZONE VALVE BOX, THEN

BACK ABOVE CEILING AT THIS

LOCATION.

MG06 ZONE VALVE BOX TO BE LOCATED

IN THIS AREA. INSTALL IN

ACCORDANCE WITH NFPA 99

REQUIREMENTS. MATCH EXISTING

PANEL TYPE USED BY THE

HOSPITAL. (TYP.)

S02 SANITARY RISING IN CHASE.

S04 WALL HUNG WATER CLOSET WITH

BACK-TO-BACK CARRIER.

S05 WALL HUNG WATER CLOSET WITH

HORIZONTAL CARRIER.

S06 INSTALL WALL CLEANOUT BELOW

LAVATORY. (TYP.)

P-414 P-528

P-414

FD-Z

FD-Z

P-704

P-704

P-103A

P-516

P-528

P-103A

P-704

FD-Z

FD-Z

P-528

P-528

P-708

RP-1

FD-C

P-505

P-414

P-414

P-414P-414

P-528

P-103A

P-414

P-103A

P-516

FD-Z

3/4"CW

3/4"HW

3/4"HWC

2"CW

1"HW

4"SAN

2"V

1 1/2"V

3/4"HWC

4"SAN

3"ST

2"CW

2"SAN

1"HW

3"ST

4"SAN

4"SAN

2"V

1"HW

2"CW

3/4"HWC

3/4"HWC

3/4"HWC

2"V

4"SAN

1"HW

2"CW

2"CW

1"HW

4"SAN

2"V

2"CW

2"SAN

2"SAN

2"SAN

2"SAN

3/4"HW

1 1/2"V

3/4"CW

3/4"HWC

2"CW

1"HW

4"SAN

P-704

FD-Z

3/4"HW

1 1/2"V

3/4"CW

1"CW

1 1/2"V

3/4"HW

3/4"CW

3/4"CW

3/4"HW

3/4"CW

3/4"HWC

4"SAN

2"CW

1"HW

2"V

1"HW 2"CW 3/4"HW

1 1/2"CW

1 1/2"V

4"SAN

1 1/4"CW

1"CW

1"CW

2"V

3/4"CW

3/4"HW

3/4"CW

3/4"HW 2"V

4"SAN

2"V

1"CW

3/4"CW

1 1/2"V

3/4"HW

4"SAN

3/4"CW

3/4"HW

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:0

:3

P M

P2.1A

LEVEL 4 PLUMBING ISOMETRIC -

NORTH A

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 Checker Author

674-18-103

ISOMETRIC - LEVEL 04 - PLUMBING - NORTH A

1/2" MV

1/2" MA

3/4" O

/2

M

V

/4

O

/2

M

A

/4

M

V

/2

M

A /2

O

/4

O

/2

M

A 1 /2

O

3/4" MV

1/2" O

1/2" MA

1/2" O

1/2" M A

3/4" O

ZVB-1.1

3/4" O

3/4" MA

3/4" MV

3/4" O

1/2" MA

/2

O

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:0

:3

P M

P2.1B

LEVEL 4 MEDICAL GAS ISOMETRIC -

NORTH A

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 Checker Author

674-18-103

ISOMETRIC - LEVEL 04 - MEDICAL GAS - NORTH A

W U R P N M HJ.5L K J

P-414

P-414

P-414

P-414

P-516

P-516

P-516

P-414

P-414

P-516

P-414

P-528P-528

MGO-2222

MGO-2222

MGO-2244

MGO-2222

MGO-2222 MGO-2222

MGO-2222

ZVB-1.1

AAP-2

ZVB-2.1

EXISTING MED GAS

RISERS

(1-1/4" MV, 1-1/4" MA,

1-1/2" O) TO SERVE

FLOORS ABOVE.

P-502

AAP-1

P-103A

PATIENT ROOM

(ISOLATION)

4J31

PATIENT ROOM

(ISOLATION)

4J32

NOURISHMENT

4J16

REPORT ROOM

4J11

STAFF SUPPORT

ROOM

4J13

PATIENT TOILET

4J09B

PATIENT ROOM

4J08

PATIENT TOILET

4J33B

CONFERENCE

ROOM

4J10

PATIENT ROOM

4J09

ANTE ROOM

4J32A

PATIENT TOILET

4J31B

ANTE ROOM

4J31A

MEDICATION

PREP.

4J15

CLEAN LIN.

4J18

PATIENT ROOM

(ISOLATION)

4J30

ELECTRICAL

4K06

STORAGE ROOM

4J07

H.A.C.

4K05

PATIENT ROOM

(ISOLATION)

4J33

ANTE ROOM

4J33A

CLEAN UTILITY

4J29

ANTE ROOM

4J30A

NURSE ALCOVE

4J23E

NURSE STATION

4J17

NURSE ALCOVE

4J23F

CORRIDOR

4J60

P-103A P-103A

P-103A

P-103A

MGO-2222

P-528

3/4" MV

3/4" MA

3/4" 0

3/4" O

3/4" MA

3/4" MV

4"SAN

4"SAN

3/4" MV

3/4" MA

3/4" O

3/4" MV

1/2" MA

1/2" O

3/4" MV

1/2" MA

1/2" O

3/4" MV

1/2" O

1/2" MA

3/4" O

1/2" MA

3/4" MV

P-103A P-103A

/2

M

A

/2

O

/4

M

V

/4

M

A

/4

O

/4

M

V

/4

O

/4

M

V

/4

M

V

M07M07M07

M04M04M04M04

2"CW

1"HW

4"SAN

2"V

M07M07M07M07

M05M05M05M05

M07M07M07M07

M04M04M04M04 M05M05M05M05

M07M07M07M07

M07M07M07M07

M05M05M05

M07M07 M07

V01

W01W01

V01

W01W01

M08M08M08M08

W01W01

2"V

4"SAN

1"HW

2 1/2"CW

2"V

4"SAN

1"HW

2"CW

1 1/2"HW

2"CW

2"V

M07M07M07M07

2"V

4"SAN

1"HW

2"CW

M06M06M06M06

/4

O

/4

M

A

/4

M

V

2"V

4"SAN

1"HW

2"CW

3/4"HW

3/4"CW

M04M04M04M04

M04M04M04M04

W01W01

V01

W01W01

W01W01

V01

W01W01

WCO

RP-1 MG01M12

3/4"HWC

3/4"HWC

FD-Z

2"CW

1"HW

4"SAN

2"V

3/4"CW 1 1/2"V

3/4"HW

3/4"HW

3/4"HWC

MG01

M13

MG06

MG05MG05

CONFERENCE

4J19 SOILED UTILITY

4J27

EQUIPMENT

4J28

2"CW

1"HW

4"SAN

2"V

M16

P-704

OFFSET MED GAS

RISERS

(2" MV, 1-1/2" MA, 2" O)

FROM SERVICE

BELOW.

2" O 2" MV1-1/2" MA

/2

M

A

/4

M

V

/2

O

/2

O

/4

M

V

/2

M

A

3/4" 0

3/4" MA

3/4" MV

FD-C

P-505

P-516

P-529

4"SAN

2"V

3/4"HW

3/4"CW

TP-1

TP-1

MG03

MG04

MG03

MG04

MG04

MG02

M17

M17

MG04

MG04

MG04

MG04

MG04

MG04

MG01

MG02

MG03

MG01

MG02

MG04

MG05

MG06

MG04

MG03

MG01

MG03

MG01

MG07

P-708

P-704

FD-Z S07

WCO

FD-Z S07

P-704 P-704

FD-Z

SA-1

S07

P-704

FD-Z

SA-1

S07

P-812

FD-C

PATIENT TOILET

4J08B

CORRIDOR

4J60

PATIENT TOILET

4J30B

PATIENT TOILET

4J32B

S09

S09

3/4"CW

1 1/2"V

SA-1

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1 /2

:0

:3

P M

P2.2

LEVEL 4 PLUMBING ENLARGEMENTS

- NORTH B

CONVERT BUILDING 204

PATIENT ROOMS TO

PRIVATE ROOMS

1901 VETERANS MEMORIAL DRIVE TEMPLE,

TX. 76504

10/13/2020 MTK GGR

674-18-103

1/4" = 1'-0"1

ENLARGED PLAN - LEVEL 04 - PLUMBING - NORTH B

Revisions: Date:

GENERAL NOTES:

KEY NOTES:

(SOME KEY NOTES MAY

NOT APPLY TO THIS SHEET)

M04 NEW RISER IN CHASE. RISER

OFFSET IN FOURTH FLOOR CEILING

SPACE.

M05 NEW RISER IN WALL. RISER OFFSET

IN FOURTH FLOOR CEILING SPACE.

M06 EXTENDED LINES ROUTED IN

CEILING SPACE TO EXISTING RISER

LOCATION THRU FIFTH FLOOR.

FIELD COORDINATE EXACT

ROUTING WITH EXISTING SYSTEMS.

M07 RECONNECT NEW LINE INTO

BUILDINGS EXISTING RISER(S).

PERFORM ALL NECESSARY

PREP-WORK PRIOR TO SHUTDOWN

TO MINIMIZE DOWNTIME.

M08 EXISTING RISER(S) TO REMAIN.

M12 INSTALL HOT WATER

RE-CIRCULATION PUMP ABOVE

CEILING AT THIS LOCATION. (ADD

ALTERNATE #1)

M13 INSTALL HOT WATER

RE-CIRCULATION LINE TO EACH

FIXTURE. HOT WATER LINE SHALL

DROP IN WALL AND TIE INTO HOT

WATER LINE WITHIN 6" OF OUTLET.

(ADD ALTERNATE #1) (TYP.) INSTALL

CIRCUIT SETTER EQUAL TO IMI

FLOW DESIGN MODEL#

ICSS075FF-1, BALANCE TO 0.5 GPM.

M16 HOT WATER RE-CIRCULATION LINE

TYING BACK INTO HOT WATER

RISER WITH IN-LINE CHECK VALVE.

(ADD ALTERNATE #1)

M17 ELECTRONIC TRAP PRIMER TO BE

INSTALLED WITH 3/4" CW AT THIS

LOCATION. COORDINATE POWER

REQUIREMENTS WITH DIV 26.

ROUTE TRAP PRIMER PIPING TO

ALL TRENCH AND FLOOR DRAIN

FIXTURES. COORDINATE

REQUIRED NUMBER OF PORTS ON

TRAP PRIMERS WITH DRAINS IN THE

VICINITY, FIXTURES REQUIRE DEEP

SEAL P-TRAP WITH TRAP PRIMER

CONNECTIONS.

MG01 MEDICAL GAS OUTLETS TO BE

INSTALLED AS PER

ARCHITECTURAL HEAD WALL

DETAIL. MATCH EXISTING OUTLET

TYPE USED BY THE HOSPITAL.

PROVIDE 1/2" OXYGEN, 1/2"

MEDICAL AIR, 3/4" MEDICAL

VACUUM DOWN TO MED GAS

OUTLETS. (TYP.)

MG02 EXTEND MEDICAL GAS PIPING AT

THIS LOCATION.

MG03 TAP EXISTING MED GAS MAINS AT

THIS LOCATION, 1/2" OXYGEN, 1/2"

MEDICAL AIR, 3/4" MEDICAL

VACUUM. PROVIDE ISOLATION

VALVES ABOVE CEILING SERVING

EACH PATIENT BED. PROVIDE

ACCESS PANEL WHER INSTALLED

IN HARD CEILING AREAS. (TYP.)

MG04 EXISTING MED GAS MAINS TO

REMAIN AND BE RE-USED WHERE

PRACTICAL. WHERE MED GAS

CONFLICTS WITH NEW UTILITIES

BEING INSTALLED, PROVIDE

PROVISIONS TO OFFSET EXISTING

MED GAS PIPING. (TYP.)

MG05 MED GASES TO DROP DOWN IN

WALL TO ZONE VALVE BOX, THEN

BACK ABOVE CEILING AT THIS

LOCATION.

MG06 ZONE VALVE BOX TO BE LOCATED

IN THIS AREA. INSTALL IN

ACCORDANCE WITH NFPA 99

REQUIREMENTS. MATCH EXISTING

PANEL TYPE USED BY THE

HOSPITAL. (TYP.)

MG07 EXISTING MEDICAL GAS RISERS TO

BE OFFSET ABOVE 3RD FLOOR

CEILING, UP IN WALL SPACE ON 4TH

FLOOR, THEN TIE BACK INTO

ORIGINAL RISER LOCATION

SERVING 5TH FLOOR AND ABOVE.

COORDINATE REQUIRED MEDICAL

GAS SHUTDOWN WITH HOSPITAL

STAFF AND GENERAL CONTRACTOR

PRIOR TO BEGINING

CONSTRUCTION.

S07 TRENCH DRAIN TYPE FD-Z TO BE

INSTALLED IN PATIENT SHOWER.

PROVIDE DEEP SEAL P-TRAP WITH

TRAP PRIMER CONNECTION.

COORDINATE FINAL LOCATION AND

SLOPING OF THE FLOOR WITH

STRUCTURAL ELEMENTS AND

ARCHITECTURAL TRADES. (TYP.)

V01 VENT PIPING RISING IN WALL TO

ABOVE CEILING.

W01 CW, HW SUPPLY DROPPING IN

WALL TO FIXTURE.

2"V

4"SAN

1"HW

2"CW

2"CW

2"V

1"HW

4"SAN

3/4"HWC

3/4"HWC

3/4"HWC

3/4"HWC

2 1/2"CW

1"HW

2"V

4"SAN

4"SAN

2"V

2"CW

1"HW

2"SAN

P-516 P-704

P-414

P-103AP-103A

2"SAN

2"SAN

1 1/2"V

3/4"HW

3/4"CW

P-516

3/4"CW

1 1/2"V

3/4"HW

2"SAN

P-704

2"SAN

2"V

FD-Z

2"V

4"SAN

3/4"HWC

P-502

2"V

3/4"HW

3/4"CW

3"SAN

2"V

2"CW

1"HW

4"SAN

P-414

FD-Z

FD-Z

P-704P-704

P-414

3/4"HWC

3/4"HW

1 1/2"V

3/4"CW

2"SAN

P-528

P-414

P-516

P-516

P-414

P-529

P-812

FD-C

P-505

P-516

P-414

RP-1P-708

FD-C

P-704 FD-Z

FD-Z

P-704

2"V

1"CW

1 1/2"V

3/4"HW

3/4"HWC

2"V

3/4"HW

1"CW

3/4"CW

1"CW

2"SAN

3/4"CW

3/4"HW

3/4"HWC

3/4"HWC

1 1/2"HW

2"CW

2"V

4"SAN

4"SAN

3/4"CW

1 1/2"V

3/4"HW

1 1/2"SAN

1 1/2"V

2"SAN

2"SAN

4"SAN

3/4"HW

4"SAN

3/4"CW

3/4"HWC

1 1/2"V

3/4"CW

1 1/4"CW

2"CW

2"CW

1"HW

2"V

4"SAN

3/4"HW

P-103AP-103A

P-528

2"CW

1"HW

1 1/2"V

2"V

2"V

2"SAN

4"SAN

3/4"CW

3/4"HW

4"SAN

2"CW

2"V

1"HW

3/4"HWC

3/4"HWC

1 1/2"V 2"V

4"SAN

4"SAN

4"SAN

P R

O J E

C T

7700 Torino St, Suite 101

San Antonio, TX 78229 Telephone: 210.614.1110

© 2020 Alderson & Associates, Inc.

F-1008

P.E. Reg. No.

Engineer:

for permit, bidding or construction.

Document incomplete: Not intended

INTERIM REVIEW ONLY

Dean Alderson

54441

Firm: Alderson & Associates, F-1008

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Central Texas Veterans Health

Care System

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENT STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

CONSTRUCTION BID

DOCUMENTS

B

IM

/1

-1

T e m p le V

A C o n v e rt

P a ti e n t R o o m s B ld g

/1

T e m p le

V A

B

P

.r v t

/1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .