This document provides details for a federal construction contract opportunity to convert patient rooms to private rooms at a Veterans Affairs medical center. The project involves replacing existing fire protection systems on the fourth floor to meet NFPA 13 standards for hazard categories 1 and 3. The contractor must be verified as a Service-Disabled Veteran-Owned Small Business by the VA Center for Verification and Evaluation. The solicitation number is 36C25722B0028 and was issued by the VA Veterans Health Administration Veterans Integrated Service Network 17. The work must be designed by a licensed professional engineer, with shop drawings requiring approval before fabrication.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25722B0028 0003.docx | DOCX document | |
| Project Walk Through Sign In Sheet.pdf | ||
| Bid Schedule B - project 674-18-103 Add Alternate.pdf | ||
| 36C25722B0028 0002.docx | DOCX document | |
| 36C25722B0028 0001.docx | DOCX document | |
| TEMPLE_CONVERT_BLDG204_PATIENT_RMS_TECH-PLANS Model 08-20-2020.pdf | ||
| 2020-1_1.pdf | ||
| 100 percent Sealed ARCH SPECS TEMPLE CONVERT 204 VOL 2.pdf | ||
| 100 percent Sealed ARCH SPECS TEMPLE CONVERT 204 VOL 1.pdf | ||
| 2020-1_2.pdf | ||
| 122220_1.pdf | ||
| 36C25722B0028_1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING SYMBOLS AND ABBREVIATIONS
(NOT ALL ITEMS INDICATED APPLY TO THIS PROJECT)
ABBREVIATIONS PLUMBING FIXTURE SYMBOLS PLUMBING FITTING SYMBOLSPLUMBING SYSTEM SYMBOLS MISCELLANEOUS SYMBOLS
3"CW
P2.1
GENERAL PLUMBING NOTES
1. PRIOR TO DEMOLITION/CONSTRUCTION; CONTRACTOR SHALL
FAMILIARIZE THEMSELVES WITH THE SITE AND ALL AVAILABLE
AS-BUILT DRAWINGS RELATING TO THE PREVIOUS
CONSTRUCTION OF ANY AND ALL EXISTING PLUMBING
SYSTEMS.
2. THE CONTRACTOR IS EXPECTED, AS A REQUIREMENT OF
THEIR QUALIFICATIONS, TO UTILIZE THEIR KNOWLEDGE AND
EXPERIENCE TO ANTICIPATE AND TO INCLUDE IN THE COST OF
THE WORK ANY INCIDENTALS, WHICH MAY BE REQUIRED, BUT
NOT SPECIFICALLY EXPRESSED HEREIN, IN ORDER TO
PROVIDE COMPLETE AND FULLY FUNCTIONAL PLUMBING
SYSTEMS FOR THE PROJECT AREAS.
3. SANITARY SEWER PIPING 2" AND SMALLER TO BE INSTALLED
AT A 2% SLOPE AND SANITARY SEWER PIPING 3" AND LARGER
TO BE INSTALLED AT A 1% SLOPE.
4. PROVIDE ALUMINUM JACKETING OVER ALL INSULATED PIPING
IN AREAS OF EXPOSED CEILING. ARCHITECT TO DETERMINE IF
PIPING AND JACKETING TO BE PAINTED OR REMAIN
UNFINISHED. REFER TO ARCHITECTURAL PLANS FOR COLORS
AND DETAILS.
5. CONTRACTOR SHALL COORDINATE EQUIPMENT CONNECTIONS
WITH SUPPLIER AND INSTALLATION DRAWINGS. INSTALL
EQUIPMENT AND MAKE FINAL CONNECTIONS, FURNISHING
CUTOFF VALVES, P-TRAPS, PRVS AND PIPING AS REQUIRED.
6. COORDINATE WATER, WASTE, VENT AND OTHER PIPING WITH
ALL OTHER TRADES TO AVOID SPACING AND ROUTING
PROBLEMS.
7. FIXTURES, EQUIPMENT, CONNECTIONS AND PIPING SHALL BE
FURNISHED AND INSTALLED TO MEET OR EXCEED STATE AND
LOCAL CODES AND REQUIREMENTS.
8. FURNISH AND INSTALL SHOCK ARRESTORS IN WATER LINES AT
COLD WATER CONNECTIONS TO FLUSH VALVES AND QUICK
CLOSING VALVES AND AT EACH HOT AND COLD WATER
CONNECTION TO FIXTURES.
9. PENETRATIONS THROUGH WALLS SHALL BE SLEEVED, SEALED
AND FIRESAFED TO MAINTAIN THE INTEGRITY OF THE WALL UL
FIRE RESISTANCE RATING.
10. DRAWINGS ARE SCHEMATIC IN NATURE AND SHALL NOT BE
SCALED. CONTRACTOR IS RESPONSIBLE FOR COORDINATING
EXACT ROUTING OF ALL SERVICES WITH BUILDING
CONDITIONS AND WITH ALL OTHER TRADES.
11. SUPPORTS, ANCHOR BOLTS AND HANGERS FOR ALL FIXTURES
AND EQUIPMENT SPECIFIED SHALL CONFORM TO THE
SPECIFICATIONS. MISCELLANEOUS STEEL BRACING SUPPORTS
AND REINFORCING STEEL NEEDED TO SUPPORT EQUIPMENT
AND PIPING SYSTEMS SPECIFIED SHALL BE FURNISHED AND
INSTALLED AS PART OF THE WORK.
12. MAINTAIN ACCESSIBILITY OF ALL EQUIPMENT AND VALVES.
PROVIDE ACCESS PANELS AS REQUIRED. COORDINATE
PLACEMENT WITH THE ARCHITECT PRIOR TO INSTALLATION.
13. CONTRACTOR SHALL COORDINATE WITH THE ARCHITECT
PRIOR TO CUTTING ANY OPENING IN THE STRUCTURE.
COORDINATE SLEEVING OF BEAMS AND CORING OF
STRUCTURE WITH STRUCTURAL DRAWINGS AND DETAILS
PRIOR TO INSTALLATION.
14. REFER TO STRUCTURAL DOCUMENTS FOR SAW CUTTING AND
PATCHING OF EXISTING STRUCTURAL CONCRETE SLAB. FIELD
VERIFY LOCATION OF EXISITNG FLOOR BEAMS/JOIST TO AVOID
CORING OR SAW CUTTING OF EXISTING FLOOR STRUCTURAL
ELEMENTS.
15. CONTRACTOR TO COORDINATE THE INSTALLATION OF THE
PLUMBING SYSTEMS WITH ALL OTHER TRADES.
16. CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING OVER
FLOORING, FURNITURE AND EQUIPMENT AS REQUIRED WHEN
PERFORMING WORK IN AN EXISTING OCCUPIED AREA/SPACE.
CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED TO
WALL FINISHES, FLOOR FINISHES, FURNITURE AND
EQUIPMENT. REPAIR DAMAGES OR REPLACE TO OWNER'S
SATISFACTION AT NO COST TO THE OWNER. CONTRACTOR
SHALL PROVIDE DUST BARRIERS WHERE REQUIRED TO
PROHIBIT THE MIGRATION OF AIRBORNE CONSTRUCTION DUST
INTO ADJACENT OCCUPIED AREAS.
17. DOWNTIME TO EXISTING WASTE, DOMESTIC WATER, AND MED
GAS PIPING SYSTEMS SHALL BE KEPT TO AN ABSOLUTE
MINIMUM. SCHEDULE AND COORDINATE WITH THE OWNER.
18. MAINTAIN EGRESS PATHWAYS, DO NOT BLOCK OR PARTIALLY
OBSTRUCT WITH CONSTRUCTION MATERIALS, TOOLS,
MACHINERY, AND INSTALLATION ACTIVITIES.
19. CUT, REPAIR, AND FINISH WALLS TO MATCH EXISTING WHERE
NEW PIPING IS INSTALLED, CONCEALED IN WALLS.
20. PROVIDE ISOLATION VALVES AT ALL HW AND CW BRANCH
PIPING.
21. ALL ISOLATION VALVES SHALL BE PROVIDED WITH A LOCKING
ACCESS PANEL WHEN VALVES ARE LOCATED IN WALL.
PROVIDE UNOBSTRUCTED ACCESS TO VALVES WHEN IN THE
CEILING BY ACCESS PANEL OR LABELED CEILING TILE.
22. WORK SHALL BE IN ACCORDANCE WITH:
-- 2018 INTERNATIONAL PLUMBING CODE WITH LOCAL CITY
AMENDMENTS
-- 2018 NFPA 99 - HEALTH CARE FACILITIES CODE
-- 2018 NFPA 13 - INSTALLATION OF SPRINKLER SYSTEMS
-- DEPARTMENT OF STATE HEALTH SERVICES - TITLE 25
TEXAS ADMINISTRATIVE CODE, CHAPTER 13 3 - HOSPITAL
LICENSING RULES
-- 2012 TEXAS ACCESSIBILITY STANDARDS (TAS)
23. PROVIDE WALL CLEANOUTS IN WASTE PIPING ABOVE EACH
WATER CLOSET.
24. DEAD-END PIPING (RISERS WITH NO FLOW, BRANCHES WITH
NO FIXTURE) SHALL NOT BE INSTALLED.
25. BACKFLOW PREVENTERS (VACUUM BREAKERS) SHALL BE
INSTALLED ON HOSE BIBBS, HAND-HELD TYPE SHOWERS,
FUME HOODS, LABORATORY EQUIPMENT, LABORATORY SINKS,
JANITOR SINKS, BED-PAN-FLUSHING ATTACHMENTS AND ON
ALL OTHER FIXTURES TO WHICH HOSES OR TUBING CAN BE
ATTACHED.
26. ALL CW AND HW PIPING STUB-OUTS TO SERVICE SINKS SHALL
BE SECURED WITH COPPER STUB-OUT BRACKETS OR
DROP-EAR ELBOWS, MALE SOLDERED ADAPTERS, AND 18x3x8
COMPRESSION ANGLE STOPS WITH KEY.
27. VICTAULIC PIPING SYSTEMS FOR WATER PIPING IS NOT
ALLOWED.
28. T-DRILL METHODS FOR BRANCH PIPING ON WATER LINES IS
NOT ALLOWED.
29. DOMESTIC WATER PIPING SHALL BE TYPE L COPPER.
30. SANITARY WASTE AND VENT PIPING SHALL BE HUBLESS CAST
IRON.
31. TORM DRAIN PIPING SHALL BE HUBLESS CAST IRON.
32. ROUTING OF PLUMBING (WASTE AND WATER) PIPING OVER
LABS, ELECTRICAL ROOMS, OR CRITICAL/LIFE SAFETY
EQUIPMENT SHALL BE AVOIDED. WHEN PIPING IS NECESSARY
IN THESE AREAS, PROVIDE LEAKAGE PROTECTION SUCH AS
DRAIN PANS.
GENERAL MED GAS NOTES
1. WORK SHALL BE IN ACCORDANCE WITH:
- 2018 NFPA 99 - HEALTH CARE FACILITIES CODE
- DEPARTMENT OF STATE HEALTH SERVICES - TITLE 25 TEXAS
ADMINISTRATIVE CODE, CHAPTER 13 3 - HOSPITAL LICENSING
RULES
- COMPRESSED GAS ASSOCIATION (CGA) PUBLICATION M1
2. INSTALLERS OF MED GAS PIPING SHALL BE ASSE 6010
CERTIFIED. TESTING PERSONNEL SHALL BE ASSE 6020
CERTIFIED. INSPECTORS AND VERIFIERS SHALL BE ASSE 6030
CERTIFIED.
3. PROVIDE IN-LINE SHUT-FF VALVE ON EACH BRANCH LINE
SUPPLIED FROM EXISTING PIPING RISER MAIN.
4. COMBINE WASTE ANESTHESIA GAS DISPOSAL (WAGD) PIPING
WITH THE MEDICAL VACUUM SYSTEM PIPING ABOVE CEILINGS
AND DOWNSTREAM OF ZONE VALVE IN ACCORDANCE WITH
NFPA 99. COMBINED WGAD AND MEDICAL VACUUM SYSTEM IS
NOT ALLOWED.
5. MEDICAL GAS STATION OUTLETS AND VACUUM STATION
INLETS SHALL BE COMPATIBLE WITH THE EXISTING WITHOUT
THE USE OF SECONDARY ADAPTERS, EQUAL TO BEACON
MADAES.
6. ALL NITROGEN STATION OUTLETS SHALL BE DISS-TYPE, AND
SHALL BE LOCATED INSIDE A NITROGEN CONROL PANEL (NCP)
WITHIN THE ROOM BEING SERVED.
7. THE MINIMUM PIPE SIZE FOR VACUUM PIPINGS SHALL BE 3/4
INCH. 1/2 INCH DROPS TO INDIVIDUAL INLETS IS PERMISSIBLE.
8. COORDINATE TIME FOR SHUTDOWN OF ANY EXISTING MEDICAL
GAS SYSTEM.
9. ALL MEDICAL GAS AND OXYGEN PIPING SHALL CLEANED FOR
OXYGEN SERVICE.
10. PRIOR TO CONNECTING THE NEW MED GAS PIPING SYSTEM TO
THE EXISTING, THE NEW PIPING SHALL BE CHECKED FOR
PARTICULATE OR OTHER FORMS OF CONTAMINATION. NEW
PIPING SHALL BE CLEANED, TESTED AND PURGED IN
ACCORDANCE WITH NFPA 99. A SPOT CHECK OF THE EXISTING
PIPING SHOULD ALSO BE MADE TO DETERMINE THE LEVEL OF
CLEANLINESS PRESENT.
11. UTILIZE SHAPE MEMORY ALLOY COUPLINGS WHEN MAKING
CONNECTIONS TO THE EXISTING MEDICAL GAS PIPING
SYSTEMS.
12. NO 'HOT TAPS' OR SIMILAR TYPES OF VALVES WILL BE
ALLOWED IN THE MEDICAL GAS PIPING SYSTEMS.
13. AFTER THE TIE-IN IS MADE BETWEEN NEW AND EXISTING
MEDICAL GAS PIPING, THE MED GAS SHALL SLOWLY BE BLED
BACK INTO THE PIPING SYSTEM, TESTED FOR PIPE LEAKS WITH
SOAPY WATER, AND THE REPAIR OF ANY LEAKS.
33. ALL COPPER LINES INSIDE OF WALLS SHALL BE SOLDERED OR
BRAZED, PRO-PRESS JOINTS ARE NOT ALLOWED IN WALLS.
34. DOUBLE T-WYE COMBINATION WASTE FITTINGS ARE NOT
ALLOWED. USE COMBINATION WYE AND 1/8 BEND.
35. UTILIZE BALL VALVES FOR ISOLATION SHUT-OFF OF WATER
PIPING.
36. PROVIDE TRAP PRIMER IN ALL FLOOR DRAINS AND SHOWER
DRAINS.
37. MAINTAIN WASTE, VENT AND WATER SERVICES TO EXISTING
PLUMBING FIXTURES TO REMAIN WITHIN THE BLOOD BANK
AREA AND OTHER AREAS OUTSIDE OF THE HVE SPACE.
38. ALL HANDS FREE SENSOR OPERATED FAUCETS (INCLUDING
SCRUB SINKS) AND FLUSH VALVES SHALL BE HARDWIRED
ELECTRICALLY POWERED.
39. EXISTING PLUMBING FIXTURES WITHIN THE BLOOD BANK AREA
ARE TO REMAIN AND ARE REMAIN ACTIVE DURING
CONSTRUCTION. COORDINATE NEW WORK TO AVOID
DOWNTIME OF WATER AND WASTE DISRUPTION TO THESE
EXISTING FIXTURES DURING CONSTRUCTION.
40. FOR PIPING INSTALLATION ABOVE THE CEILING OF THE
GROUND FLOOR BELOW THE HVE SPACE, COORDINATE AND
SCHEDULE WITH OWNER FOR WORK IN THESE AREAS. WORK
SHALL BE PHASED TO MINIMIZE IMPACT TO DAILY OPERATIONS
AND ACTIVITIES ON THE OCCUPIED GROUND FLOOR.
CONTRACTOR SHALL INVESTIGATE ABOVE CEILING OF
GROUND FLOOR TO DETERMINE EXACT ROUTING OF NEW
PIPING TO AVOID CONFLICTS WITH EXISTING DUCTWORK,
PIPING CONDUIT, EQUIPMENT, ETC. CONTRACTOR SHALL
PROVIDE A CONTINGENCY FOR THIS COORDINATION WORK.
NEW PIPE ROUTING SHALL AVOID PASSING ABOVE CRITICAL
AREAS AND WHERE GYP BOARD CEILINGS OCCUR.
PROVIDE CONTINGENCY FOR MED GAS PIPING SYSTEMS SINCE MED
GAS OUTLET LOCATIONS/QUANTITIES HAVE NOT YET BEEN
COORDINATED AND FINALIZED WITH THE OWNER.
GENERAL DEMOLITION NOTES
1. PRIOR TO DEMOLITION; CONTRACTOR SHALL FAMILIARIZE
THEMSELVES WITH THE SITE AND ALL AVAILABLE AS-BUILT
DRAWINGS RELATING TO THE PREVIOUS CONSTRUCTION
OF ANY AND ALL EXISTING PLUMBING SYSTEMS.
2. PENETRATIONS THROUGH WALLS SHALL BE SLEEVED,
SEALED AND FIRESAFED TO MAINTAIN THE INTEGRITY OF
THE WALL UL FIRE RESISTANCE RATING.
3. CONTRACTOR SHALL COORDINATE WITH THE STRUCTURAL
ENGINEER PRIOR TO CUTTING ANY OPENING IN THE
STRUCTURE.
4. REFER TO STRUCTURAL DOCUMENTS FOR SAW CUTTING
AND PATCHING OF EXISTING STRUCTURAL CONCRETE
SLAB. FIELD VERIFY LOCATION OF EXISTING FLOOR
BEAMS/JOIST TO AVOID CORING OR SAW CUTTING OF
EXISTING FLOOR STRUCTURAL ELEMENTS.
6. DOWNTIME TO EXISTING WASTE AND DOMESTIC COLD
WATER PIPING SYSTEMS SHALL BE KEPT TO AN ABSOLUTE
MINIMUM. SCHEDULE AND COORDINATE WITH THE OWNER.
7. MAINTAIN EGRESS PATHWAYS, DO NOT BLOCK OR
PARTIALLY OBSTRUCT WITH CONSTRUCTION MATERIALS,
TOOLS, MACHINERY, AND INSTALLATION ACTIVITIES.
8. EXISTING STORM DRAIN SYSTEM TO REMAIN FULLY
FUNCTIONAL.
9. ALL EXISTING ABANDONED PLUMBING
SYSTEMS/EQUIPMENT SHALL BE REMOVED UNLESS
OTHERWISE NOTED.
10. ALL DOMESTIC WATER SYSTEMS ASSOCIATED WITH
REMOVED EQUIPMENT SHALL BE CAPPED AND VALVED IN
CEILING SPACE.
ELBOW UP
CAP ON END OF PIPE
ELBOW DOWN
DIRECTION OF FLOW
TEE OUTLET UP
TEE OUTLET DOWN
(V) SANITARY VENT
(SS) SANITARY SEWER WASTE
(SD) STORM DRAIN
(OSD) OVERFLOW STORM DRAIN
(CW) COLD WATER
(HW) HOT WATER 140° F
(HWR) HOT WATER RETURN
(MA) MEDICAL AIR
(MO) MEDICAL OXYGEN
(N) MEDICAL NITROGEN
(N2O) MEDICAL NITROUS OXIDE
(WAGD) MEDICAL WAGD
(MV) MEDICAL VACUUM
(TP) TRAP PRIMER
UNION
STRAINER WITH
GATE VALVE OR
BALL VALVE
BALANCING VALVE WITH
BLOW-DOWN VALVE
BALANCING/STOP VALVE
DIFFERENTIAL PRESSURE TAPS
CHECK VALVE
MANUAL AIR VENT
AUTOMATIC AIR VENT
BACKFLOW PREVENTOR
(ETR) EXISTING SYSTEMS TO REMAIN
*LINE TYPE MAY VARY BY SYSTEM
*UNLESS OTHERWISE NOTED
PLUMBING KEYED NOTE TAG
POINT OF NEW CONNECTION TO
REVISION TAG
PIPE SIZE AND TYPE
DETAIL NUMBER AND SHEET NUMBER
EXISTING PIPE
WHERE DETAIL OR ENLARGEMENT IS SHOWN
FLOOR SINK
FLOOR DRAIN
WALL MOUNTED WATERCLOSET
WALL MOUNTED LAVATORY
COUNTER MOUNTED LAVATORY
URINAL
COUNTER MOUNTED SINK
WALL MOUNTED HAND SINK
DRINKING FOUNTAIN, BI-LEVEL
FLOOR MOUNTED MOP SINK
ICE MAKER SUPPLY BOX
HOSE BIBB
1. NOT ALL FIXTURES WILL BE SERVED BY COLD AND HOT WATER
NOTES
2. ADA FIXTURES WILL BE NOTED AS SUCH ON FIXTURE SCHEDULE
RECIRCULATING PUMP
FLOOR CLEANOUT
LINE CLEANOUT/ WALL CLEANOUT
APPROX.
ASSE
C.P.
DESIG.
DWGS.
ETR
GPM
NFPA
NIC
NTS
RD
SS
AMERICAN SOCIETY OF SANITARY ENGINEERS
CHROME PLATED
DESIGNATION
DRAWINGS
EXISTING TO REMAIN
GALLONS PER MINUTE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NOT TO SCALE
ROOF DRAIN
SANITARY SEWER
APPROXIMATELY
CW COLD WATER
HW HOT WATER
HWR HOT WATER RETURN
SD STORM DRAIN
CONN. CONNECTION
°F DEGREES FAHRENHEIT
FIN. FINISHED
GPF GALLONS PER FLUSH
HBC HOSE BIBB CONNECTION
HD HUB DRAIN
MAX MAXIMUM
MTD MOUNTED
MV MEDICAL VACUUM
IPS IRON PIPE SIZE
MA MEDICAL AIR
MED MEDICAL
MIN MINIMUM
N2O NITROUS OXIDE
NO. NUMBER
O.D. OUTSIDE DIAMETER
OD OVERFLOW DRAIN
OXY
PSI
OXYGEN
POUNDS PER SQUARE INCH
PRESS PRESSURE
V.B.
TYP
VACUUM BREAKER
TYPICAL
TP TRAP PRIMER
TEMP TEMPERATURE
TMV
VAC
THERMOSTATIC MIXING VALVE
VACUUM
V VENT
LAVATORY
CSS- CLINICAL SERVICE SINK
L-
MOP SINKMS-
SINKS-
SHOWERSH-
WATER CLOSETWC-
ZONE VALVE BOXZVB-
URINALUR-
ICE MAKER BOX (WATER VALVE)IMB-
COFFEE MAKER BOX (WATER VALVE)CMB-
ELECTRIC WATER COOLEREWC-
(DEMO) EXISTING SYSTEMS
TO BE DEMOLISHED
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:0
:1
P M
P0.0
PLUMBING SYMBOLS AND
ABBREVIATIONS
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 MTK GGR
674-18-103
PROPOSED PHASING PLAN:
• DEMOLITION AND NEW WORK SHALL BE PHASED TO
MINIMIZE HVAC, ELECTRICAL, AND PLUMBING OUTAGES
AND MINIMIZE THE REQUIREMENT FOR TEMPORARY
UTILITES. ALL OUTTAGES SHALL BE COORDINATED WITH
THE OWNERS SCHEDULE 4 WEEKS PRIOR TO CREATING
THE OUTTAGE.
• NEW SYSTEMS SHALL TIE INTO EXISTING SYSTEMS
WHERE PRACTICAL AND SHOWN ON THE PLANS. NEW
PIPING TIE IN POINTS SHALL BE HOT TAPPED TO MAINTAIN
OPERATION TO THE REMAINDER OF THE BUILDING.
DUCTWORK THAT SERVES EXISTING TO REMAIN SPACES
SHALL BE RE-ROUTED PRIOR TO SYSTEM CHANGEOVER.
• IT IS THE SOLE RESPONSIBILITY OF THE GENERAL
CONTRACTOR AND SUBCONTRACTOR TO PROVIDE A
FEASIBLE PHASING PLAN MAINTAIN BUILDING
OPERATIONS DURING CONSTUCTION. PRESENT SAID
PHASING PLAN TO OWNER AND DESIGN TEAM PRIOR TO
COMMENCING CONSTRUCTION. NO EXISTING TO REMAIN
PORTION OF THE BUILDING SHALL BE WITHOUT AIR
CONDITIONING FOR ANY PERIOD OF TIME UNLESS
COORDINATED WITH OWNER.
Revisions: Date:
WY U R P N M H G FJ.5L E D C BK J
PD1.2A
PD1.2B
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:1
:0
P M
PD1.1
LEVEL 4 OVERALL PLUMBING
DEMOLITION PLAN
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 MTK GGR
674-18-103
1/16" = 1'-0"1
REFERENCE PLAN - LEVEL 04 - PLUMBING DEMOLITION
N
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:0
:5
P M
PD1.2A
LEVEL 4 PLUMBING DEMOLITION
PLAN - NORTH
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 MTK GGR
674-18-103
1/8" = 1'-0"1
LEVEL 04 - PLUMBING DEMOLITION - NORTH
KEY NOTES:
(SOME KEY NOTES MAY
NOT APPLY TO THIS SHEET)
1 EXISTING LAVATORY/SINK TO BE
REMOVED. ASSOCIATED PIPING
TO REMAIN FOR NEW
CONNECTION.
EXISTING URINAL TO BE
REMOVED. ASSOCIATED PIPING
TO REMAIN FOR NEW
CONNECTION.
EXISTING WATER CLOSET TO BE
REMOVED. ASSOCIATED PIPING
TO REMAIN FOR NEW
CONNECTION.
EXISTING DRINKING FOUNTAIN TO
BE REMOVED. ASSOCIATED
PIPING TO REMAIN FOR NEW
CONNECTION.
EXISTING FLOOR DRAIN TO BE
REMOVED. ASSOCIATED PIPING
TO REMAIN FOR NEW
CONNECTION.
EXISTING LAVATORY/SINK TO BE
REMOVED. ALL ASSOCIATED
PIPING TO BE REMOVED BACK TO
MAINS EITHER UNDERFLOOR OR
ABOVE CEILING.
EXISTING URINAL TO BE
REMOVED. ALL ASSOCIATED
PIPING TO REMOVED BACK TO
MAINS EITHER UNDERFLOOR OR
ABOVE CEILING.
EXISTING WATER CLOSET TO BE
REMOVED. ALL ASSOCIATED
PIPING TO REMOVED BACK TO
MAINS EITHER UNDERFLOOR OR
ABOVE CEILING.
EXISTING DRINKING FOUNTAIN TO
BE REMOVED. ALL ASSOCIATED
PIPING TO REMOVED BACK TO
MAINS EITHER UNDERFLOOR OR
ABOVE CEILING.
EXISTING FLOOR DRAIN TO BE
REMOVED. ALL ASSOCIATED
PIPING TO REMOVED BACK TO
MAINS EITHER UNDERFLOOR OR
ABOVE CEILING.
ALL PLUMBING FIXTURES TO BE
REMOVED. ALL WASTE/VENT
PIPING TO BE REMOVED BACK TO
RISER TAP.
ALL WATER PIPING TO BE
REMOVED BACK TO ISOLATION
VALVE/PRESSURE REDUCING
VALVE.
REQUIRES WORK IN 3RD FLOOR
CEILING SPACE. COORDINATE
AND SCHEDULE DOWNTIME WITH
BUILDING OWNER.
REMOVE MEDICAL GAS
EQUIPMENT.
REMOVE MEDICAL GAS PIPING.
N
Revisions: Date:
GENERAL NOTE
REMOVE ALL EXISTING FIXTURES (BOLDED) AND
ASSOCIATED PIPING BACK TO MAIN RISERS.
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:0
:5
P M
PD1.2B
LEVEL 4 PLUMBING DEMOLITION
PLAN - SOUTH
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 MTK GGR
674-18-103
1/8" = 1'-0"1
LEVEL 04 - PLUMBING DEMOLITION - SOUTH
KEY NOTES:
(SOME KEY NOTES MAY
NOT APPLY TO THIS SHEET)
1 EXISTING LAVATORY/SINK TO BE
REMOVED. ASSOCIATED PIPING
TO REMAIN FOR NEW
CONNECTION.
EXISTING URINAL TO BE
REMOVED. ASSOCIATED PIPING
TO REMAIN FOR NEW
CONNECTION.
EXISTING WATER CLOSET TO BE
REMOVED. ASSOCIATED PIPING
TO REMAIN FOR NEW
CONNECTION.
EXISTING DRINKING FOUNTAIN TO
BE REMOVED. ASSOCIATED
PIPING TO REMAIN FOR NEW
CONNECTION.
EXISTING FLOOR DRAIN TO BE
REMOVED. ASSOCIATED PIPING
TO REMAIN FOR NEW
CONNECTION.
EXISTING LAVATORY/SINK TO BE
REMOVED. ALL ASSOCIATED
PIPING TO BE REMOVED BACK TO
MAINS EITHER UNDERFLOOR OR
ABOVE CEILING.
EXISTING URINAL TO BE
REMOVED. ALL ASSOCIATED
PIPING TO REMOVED BACK TO
MAINS EITHER UNDERFLOOR OR
ABOVE CEILING.
EXISTING WATER CLOSET TO BE
REMOVED. ALL ASSOCIATED
PIPING TO REMOVED BACK TO
MAINS EITHER UNDERFLOOR OR
ABOVE CEILING.
EXISTING DRINKING FOUNTAIN TO
BE REMOVED. ALL ASSOCIATED
PIPING TO REMOVED BACK TO
MAINS EITHER UNDERFLOOR OR
ABOVE CEILING.
EXISTING FLOOR DRAIN TO BE
REMOVED. ALL ASSOCIATED
PIPING TO REMOVED BACK TO
MAINS EITHER UNDERFLOOR OR
ABOVE CEILING.
ALL PLUMBING FIXTURES TO BE
REMOVED. ALL WASTE/VENT
PIPING TO BE REMOVED BACK TO
RISER TAP.
ALL WATER PIPING TO BE
REMOVED BACK TO ISOLATION
VALVE/PRESSURE REDUCING
VALVE.
REQUIRES WORK IN 3RD FLOOR
CEILING SPACE. COORDINATE
AND SCHEDULE DOWNTIME WITH
BUILDING OWNER.
REMOVE MEDICAL GAS
EQUIPMENT.
REMOVE MEDICAL GAS PIPING.
N
Revisions: Date:
GENERAL NOTE
REMOVE ALL EXISTING FIXTURES (BOLDED) AND
ASSOCIATED PIPING BACK TO MAIN RISERS.
WY U R P N M H G FJ.5L E D C BK J
P1.2
P1.3
NOT IN CONTRACT
STAIRS
PATIENT TOILET
4J22B
PATIENT ROOM
4J22
PATIENT ROOM
4J23
PATIENT ROOM
4J24
PATIENT ROOM
4J21
CORRIDOR
4J60
PATIENT ROOM
4J20
PATIENT ROOM
4J25
PATIENT ROOM
4J26
PATIENT ROOM
(ISOLATION)
4J30
PATIENT ROOM
(ISOLATION)
4J31
PATIENT ROOM
(ISOLATION)
4J32
PATIENT ROOM
(ISOLATION)
4J33
CORRIDOR
4J60
PATIENT ROOM
4J08
STORAGE ROOM
4J07
PATIENT ROOM
4J09
CONFERENCE
ROOM
4J10
MEDICATION
PREP.
4J15
NOURISHMENT
4J16
STAFF SUPPORT
ROOM
4J13
REPORT ROOM
4J11
TL. COM. ROOM
4J12
STORAGE ROOM
4K04
CORRIDOR
4J61
PATIENT ROOM
(ISOLATION)
4K35
PATIENT ROOM
(ISOLATION)
4K36
PATIENT ROOM
(ISOLATION)
4K37
PATIENT ROOM
4K42PATIENT ROOM
4K02
PATIENT ROOM
4K03
CORRIDOR
4K59
CONFERENCE
ROOM
4K01
CORRIDOR
4K59
CORRIDOR
4K59
NURSE STATION
4K57
TEAM WORK/
CLASS ROOM
4K53
MEDICATION
PREP.
4K55
NOURISHMENT
4K56
CLEAN LIN.
4K58
CORRIDOR
4K59
TL. COM. ROOM
4K52
PATIENT ROOM
4K48
PATIENT ROOM
4K47
PATIENT ROOM
4K46
STAIRS
PATIENT TOILET
4K46B
STAFF SUPPORT
ROOM
4K51
PATIENT ROOM
4K42
CLEAN UTILITY
4K39
EQUIPMENT
4K40
SOILED UTILITY
4K41
PATIENT ROOM
4K43
PATIENT ROOM
4K44 PATIENT ROOM
4K45
CLEAN LIN.
4J18
NURSE STATION
4J17
EQUIPMENT
4J28
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:0
:1
P M
P1.1
LEVEL 4 OVERALL PLUMBING NEW
WORK PLAN
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 MTK GGR
674-18-103
1/16" = 1'-0"1
REFERENCE PLAN - LEVEL 04 - PLUMBING
WY U R P N M H G FJ.5L E DK J
P2.1
P2.2
STAIRS
STORAGE ROOM
4K04
PATIENT ROOM
(ISOLATION)
4J31
PATIENT ROOM
(ISOLATION)
4J32
PATIENT ROOM
(ISOLATION)
4K36
PATIENT ROOM
(ISOLATION)
4K35
ANTE ROOM
4K35A
CONFERENCE
4J19
NOURISHMENT
4J16
REPORT ROOM
4J11
STAFF SUPPORT
ROOM
4J13
EQUIPMENT
4J28
SOILED UTILITY
4J27
PATIENT ROOM
4J21
PATIENT ROOM
4J20
PATIENT TOILET
4J09B
PATIENT TOILET
4J08B
PATIENT ROOM
4J08
PATIENT TOILET
4J20B
PATIENT TOILET
4J21B
PATIENT ROOM
4J22
PATIENT TOILET
4J25B
PATIENT ROOM
4J25
PATIENT TOILET
4J26B
CONFERENCE
ROOM
4J10
PATIENT ROOM
4J09
ANTE ROOM
4J32A
ANTE ROOM
4J31A
MEDICATION
PREP.
4J15
NURSE ALCOVE
4K45E
PATIENT TOILET
4J22B
NURSE ALCOVE
4J23C
CLEAN LIN.
4J18
ANTE ROOM
4K36A
PATIENT ROOM
4J24
PATIENT ROOM
4J23
PATIENT TOILET
4J24B
PATIENT TOILET
4J23B
PATIENT ROOM
4J26
PATIENT ROOM
(ISOLATION)
4J30
ELECTRICAL
4K06
STORAGE ROOM
4J07
H.A.C.
4K05
CORRIDOR
4J61
MECHANICAL
4K34
PATIENT ROOM
(ISOLATION)
4J33
ANTE ROOM
4J33A
TL. COM. ROOM
4J12
CLEAN UTILITY
4J29
ANTE ROOM
4J30A
NURSE ALCOVE
4J23E
NURSE ALCOVE
4J23D
NURSE STATION
4J17 CORRIDOR
4J60
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:0
:1
P M
P1.2
LEVEL 4 PLUMBING NEW WORK PLAN
- NORTH
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 MTK GGR
674-18-103
1/8" = 1'-0"1
ENLARGED PLAN - LEVEL 04 - PLUMBING - NORTH
N M H G FJ.5L E D C BK J
P2.3
P2.4
STAIRS
NOURISHMENT
4K56
EQUIPMENT
4K40
STORAGE ROOM
4K04
PATIENT ROOM
(ISOLATION)
4K37
PATIENT ROOM
(ISOLATION)
4K36
PATIENT ROOM
(ISOLATION)
4K35
ANTE ROOM
4K35A
WORK ROOM
4K50
STAFF SUPPORT
ROOM
4K51
TOILET
4K51B
MEDICATION
PREP.
4K55
PATIENT ROOM
4J08
PATIENT ROOM
4K03
PATIENT ROOM
4K02
PATIENT ROOM
4K47
PATIENT ROOM
4K46
PATIENT ROOM
4K44
PATIENT ROOM
4K43
PATIENT TOILET
4K64
CONFERENCE
ROOM
4K01
PATIENT TOILET
4K42B
PATIENT ROOM
4K42
SOILED UTILITY
4K41
STORAGE
4K49
PATIENT ROOM
4K48
CLEAN LIN.
4K58
TEAM WORK/
CLASS ROOM
4K53
WHL. CHR. STOR.
4K54
NURSE STATION
4K57
PATIENT ROOM
4K45
PATIENT TOILET
4K46B
ANTE ROOM
4K37A
ANTE ROOM
4K36A
CLEAN UTILITY
4K39
ANTE ROOM
4K38A
PATIENT TOILET
4K44B
NURSE ALCOVE
4K45C
PATIENT TOILET
4K45B
TL. COM. ROOM
4K52
ELECTRICAL
4K06
CORRIDOR
4K59
STORAGE ROOM
4J07
H.A.C.
4K05
CORRIDOR
4J61
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:0
:1
P M
P1.3
LEVEL 4 PLUMBING NEW WORK PLAN
- SOUTH
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 MTK GGR
674-18-103
1/8" = 1'-0"1
ENLARGED PLAN - LEVEL 04 - PLUMBING - SOUTH
BLDG. 204
3G 14
C3-13
PHYSICIAN
UTILITY
MED. PREP
3G 15
CHEMO
3G 16
CHEMO TREAT
CLEAN
(MULTI-
3G 173G 18
TLT.
HEMATOLOGY
3G 19
3G 23
EXAM
3G 24
3G 27
3G 28
ONE BEDONE BEDONE BED ONE BEDONE BED
C3-12 C3-11
X-RAY
3G 06
ELEV.
3G 12
SERVICE
3G 09
MECHANICAL
3K 35
3G 04
S. LINEN
NURSESURGERY
3K 37
MANAGER
3K 36
STAFF
3K 34TLT.
ROOM ROOM
ONE BED
ROOM ROOM
ROOM ROOM
BATH
3K 32A
BATH
3K 23A
TWO BED
TWO BED
TWO BED
RESIDENT
TWO BED
TWO BED
3K 15
3G 05
TRASH
LOUNGE
VISITOR'S
P-7
P-8ELEC.
3G 13
COMM.
PUBLIC
ELEV.
3G 00
3G 35
WAITING
3G 20
3G 21
CLINIC
CLERK
3G 03
3G 10 3G 11
RETHERM
CORR.
MEN
3G 02
P-9
EMS
WOMEN
3G 08
WOMEN
3G 01
CORR.
C3-1
3G 34
MICROSCOPE
3G 33
RESIDENT
EXAM
EXAM
3G 22
3G 25
EXAM
3G126
C3-2
CORR.
3G 32
3G 31
PROG. SUPP.
CLINICAL
EXAM
EXAM
3G 29
3G 30
3K 01
3K 40
COMM.
3K 39
HAC
MEN
3G 07
INSTRUCT
3K 02
NURSE
3K 38
HOUSE STAFF
CLASS ROOM
C3-9
CORR.
3K 03
DAY ROOM
BALC.
STORAGE
3K101A
3K 06A
BATH
CORR.
3K 00
COMM. CTR.
3K 33
C.UTILITY
3K 19
C3-8
CORR.
NOUR.
3K 04
MED.
3K 05
C.LINEN
S. UTIL.
3K 22
3K 21
WC STO.
3K 20
EQUIP./
3K 06
3K 07
3K 08
3K 09
ROOM
ANTE
3K 06B
3K 07A
BATH
BATH 3K 18
RM.
3K 17A
3K 17
RM.
3K 08A
BATH
BATH
RM.
3K 15A 3K 16
SLEEP
GEN. B.
3K 10
3K 09A
BATH
3K 13
3K 09B
ANTE
ROOM
C3-7
CORR.
RM.
3K 13A
BATH 3K 14
RM.
STR #9
3K 273K 263K 253K 243K 23
3K 29
TWO BED
3K 32 3K131
3K 30A
BATH
3K 30
C3-10CORR.
TWO BED
RM.
TWO BED
RM.
TWO BED
3K 24A
BATH
RM.
3K 29A
BATH
3K 28
BATH
3K 28A
TWO BED
BATH
3K 26A
RM. RM.
3G 19C
3G 19B
3S-9
TREAT
SOIL.
C3-13A
CORR.
CORR.
PURP.)
P-10
ROOM
ONE BED
3J 06
3J 05
ROOM
3J 04
ROOM
3J 03
ROOM
ONE BED
3J 02
ROOM
3J 01
ROOM
ONE BED
CORR.
C3-14
ONE BED
ONE BED
ONE BED
3J 36
3J 35
3J 38
NURSE
MANAGER
3J 37
LOUNGE
3J 39
TLT.
3J 40
3J 03A
ONE BED
3J 24
3J 18
CORR.
C3-5
TWO BED
MED.
3J 31
ROOM
CLASS
CARE
PRIMARY
3J 30
3J 33
HAC
COMM.
3J 34
PURPOSE
3J 32
MULTI-
3J 31A
CHEMO.
PREP.
3J 29
DAY ROOM
BATH
3J 26A
ROOM
3J 26
ISOLATION ONE BED
ROOM
3J 25
ROOM
NOUR.
3J 28
C. UTIL.
3J 12
COMM. CTR.
3J 00
C3-3
CORR.
C3-4
CORR.
C.LINEN
3J 01A
BATH
BATH
S.UTILITY
3J 15
3J 11A
3J 13
BATH
3J 09A
BATH
3J 14
BATH
3J 25A
BATH
3J 16A
C3-5A
3J 26B
3J 27
ROOM
ANTE
EQUIP./
WC STO.
TWO BED
ROOM
ROOM
3J 16
TWO BED
TWO BED
3J 11
ROOM
3J 10
3J 17
ROOM
TWO BED
ROOM
3J 23A
BATHISOLATION
ROOM
3J 23
TLT.
3J 22A
TWO BED
BATH
3J 24A
3J 23B
ANTE
ROOM
3J 18A
BATH
3J 22
STORAGE
3J 20A
BATH
TWO BED
3J 19
TWO BED
ROOM
3J 20
ROOM
3J 21
ROOM
CORR.
C3-6
MECH
3K 12
3J 05A
BATH 3J 07A
BATH
3J 06A
BATH
STR #10
3S-10
TWO BED
TWO BED
ROOM
3J 09
ROOM
3J 08
ROOM
3J 07
TWO BED
(2) STAFF
PHARMACIST
ASST.
(SURGICAL)
(SLEEP LAB)
ONE BED
RM.
RM.
S-8
S-9
S-10
S-11
ONE BED
RM.
ONE BED
RM.
ONE BED
RM.
STO.
LOUNGE
STR #8
3S-8
3K11
ELEC
CALL
ROOM
WY U R P N M H G FJ.5L E D C BK J
P1.5
P1.6
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:0
:1
P M
P1.4
LEVEL 3 OVERALL PLUMBING NEW
WORK PLAN - CEILING SPACE
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 MTK GGR
674-18-103
1/16" = 1'-0"1
REFERENCE PLAN - LEVEL 03 - CEILING SPACE - PLUMBING
RESIDENT
TWO BED
TWO BED
3K 15
3K 09 SLEEP
GEN. B.
3K 10
3K 09A
BATH
3K 13
3K 09B
ANTE
ROOM
C3-7
CORR.
RM.
3K 13A
BATH 3K 14
RM.
ROOM
ONE BED
3J 06
3J 05
ROOM
3J 04
ROOM
3J 03
ROOM
ONE BED
3J 02
ROOM
3J 01
ROOM
ONE BED
CORR.
C3-14
ONE BED
ONE BED
ONE BED
3J 36
3J 35
3J 38
NURSE
MANAGER
3J 37
LOUNGE
3J 39
TLT.
3J 40
3J 03A
ONE BED
3J 24
3J 18
CORR.
C3-5
TWO BED
MED.
3J 31
ROOM
CLASS
CARE
PRIMARY
3J 30
3J 33
HAC
COMM.
3J 34
PURPOSE
3J 32
MULTI-
3J 31A
CHEMO.
PREP.
3J 29
DAY ROOM
BATH
3J 26A
ROOM
3J 26
ISOLATION ONE BED
ROOM
3J 25
ROOM
NOUR.
3J 28
C. UTIL.
3J 12
COMM. CTR.
3J 00
C3-3
CORR.
C3-4
CORR.
C.LINEN
3J 01A
BATH
BATH
S.UTILITY
3J 15
3J 11A
3J 13
BATH
3J 09A
BATH
3J 14
BATH
3J 25A
BATH
3J 16A
C3-5A
3J 26B
3J 27
ROOM
ANTE
EQUIP./
WC STO.
TWO BED
ROOM
ROOM
3J 16
TWO BED
TWO BED
3J 11
ROOM
3J 10
3J 17
ROOM
TWO BED
ROOM
3J 23A
BATHISOLATION
ROOM
3J 23
TLT.
3J 22A
TWO BED
BATH
3J 24A
3J 23B
ANTE
ROOM
3J 18A
BATH
3J 22
STORAGE
3J 20A
BATH
TWO BED
3J 19
TWO BED
ROOM
3J 20
ROOM
3J 21
ROOM
CORR.
C3-6
MECH
3K 12
3J 05A
BATH 3J 07A
BATH
3J 06A
BATH
STR #10
3S-10
TWO BED
TWO BED
ROOM
3J 09
ROOM
3J 08
ROOM
3J 07
TWO BED
(2) STAFF RM.ONE BED
RM.
3K11
ELEC
WY U R P N M H G FJ.5L E DK J
4"SAN
2"V
3"ST
1"HW
4"SAN
4"SAN
3"SAN
M01
2"V
4"SAN
1"HW
2"CW
3"ST
M02
M03 4"SAN
M02 M02
M03M03M03M03
3"ST
1"HW
2"V
2"CW
M02M02
M01 M03M03M03M01M01M01
2"CW
1"HW
4"SAN
2"V
2"CW
1"HW
4"SAN
2"V
M01M01M01M01
M03M03M03M03 M02M02M02
M02
2"CW
2"V
4"SAN
1"HW
4"SAN
2"V
1"HW
2"CW
S01
4"SAN
2"SAN
M01M01M01
M01
M03M03
M03
M03
M01
M02M02M02M02
2"V
4"SAN
1"HW
2 1/2"CW
2"CW
1"HW
4"SAN
3"V
4"SAN
1"HW
2"CW
M02
2"SAN
2"SAN
2"SAN
2"SAN
2"V
4"SAN
2"CW
1"HW
2"V
4"SAN
1"HW
2"CW
2"V
4"SAN
1"HW
2"CW
2"SAN
2"V
4"SAN
1"HW
2"CW
2"CW
1"HW
4"SAN
2"V
2"SAN
2"SAN
2"V
4"SAN 1"HW
2"CW
2"SAN
2"SAN
2"SAN
1 1/2"HW
2"CW
4"SAN
2"V
4"SAN
M01 M01
S01S01S01S01S01S01
S01
S01S01S01
M01
M01
1 1/2"V
2"SAN
S01S01S01S01S01S01
M02
S01S01S01
M01
S01
S01
2"CW
1 1/2"HW
2"V S01S01
2"CW
4"SAN
2"V
4"SAN
M01
S01
4"SAN
2"V
2"CW
3/4"HW
2"V
4"SAN
3/4"HW
2"CW
3"V
4"SAN
1"HW
2"CW
2"V
S01S01S01S01
S01S01S01
S01S01
M08
EXISTING MED GAS
RISERS
(2" MV, 1-1/2" MA, 2" O)
FROM 2ND FLOOR
SERVICE BELOW.
OFFSET ABOVE 3RD
FLOOR CEILING.
OFFSET MED GAS
RISERS
(2" MV, 1-1/2" MA, 2" O)
UP TO 4TH FLOOR.
FIELD COORDINATE
WITH NEW WALL
LOCATION ABOVE.
2"SAN
4"SAN
S10
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:0
:2
P M
P1.5
LEVEL 3 PLUMBING NEW WORK PLAN
- CEILING SPACE - NORTH
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 MTK GGR
674-18-103
1/8" = 1'-0"1
ENLARGED PLAN - LEVEL 03 - CEILING SPACE - PLUMBING - NORTH
Revisions: Date:
NOTE TO CONTRACTOR: (APPLIES TO ALL SHEETS)
OUTTAGES SHALL BE COORDINATED WITH THE
OWNER PRIOR TO BEGINNING CONSTRUCTION.
THE CONTRACTOR SHALL COORDINATE THE
REQUIRED REMOVAL AND REPLACEMENT OF THE
EXISTING CEILING SYSTEM TO COMPLETE WORK
WITH ARCHITECTURAL TRADES. RE-ROUTING OF
EXISTING SYSTEMS TO BE FIELD COORDINATED
WITH EXISTING SYSTEMS.
NIC
NIC
NIC
GENERAL NOTES:
KEY NOTES:
(SOME KEY NOTES MAY
NOT APPLY TO THIS SHEET)
M01 EXISTING RISER(S) OFFSET IN
THIRD FLOOR CEILING SPACE.
FIELD COORDINATE WITH ALL
EXISTING UTILITIES. OFFSET PIPING
AS REQUIRED. (TYP.) PROVIDE
ISOLATION VALVES IN NON GRAVITY
FLOW SYSTEMS.
M02 EXTEND LINE IN CEILING SPACE TO
NEW RISER LOCATION THRU
FOURTH FLOOR. FIELD
COORDINATE EXACT ROUTING
WITH EXISTING SYSTEMS. (TYP.)
M03 NEW RISER THRU 4TH FLOOR.
(TYP.)
M08 EXISTING RISER(S) TO REMAIN.
S01 NEW SANITARY RISER TO FOURTH
FLOOR FIXTURES. (TYP.)
S10 SANITARY RISING TO FLOOR DRAIN.
ONE BEDONE BEDONE BED ONE BEDONE BED
C3-11
X-RAY
3G 06 3K 35
3G 04
S. LINEN
NURSESURGERY
3K 37
MANAGER
3K 36
STAFF
3K 34TLT.
ROOM ROOM
ONE BED
ROOM ROOM
ROOM ROOM
BATH
3K 32A
BATH
3K 23A
TWO BED
TWO BED
TWO BED
RESIDENT
TWO BED
TWO BED
3K 15
3G 05
TRASH
3K 01
3K 40
COMM.
3K 39
HAC
MEN
3G 07
INSTRUCT
3K 02
NURSE
3K 38
HOUSE STAFF
CLASS ROOM
C3-9
CORR.
3K 03
DAY ROOM
BALC.
STORAGE
3K101A
3K 06A
BATH
CORR.
3K 00
COMM. CTR.
3K 33
C.UTILITY
3K 19
C3-8
CORR.
NOUR.
3K 04
MED.
3K 05
C.LINEN
S. UTIL.
3K 22
3K 21
WC STO.
3K 20
EQUIP./
3K 06
3K 07
3K 08
3K 09
ROOM
ANTE
3K 06B
3K 07A
BATH
BATH 3K 18
RM.
3K 17A
3K 17
RM.
3K 08A
BATH
BATH
RM.
3K 15A 3K 16
SLEEP
GEN. B.
3K 10
3K 09A
BATH
3K 13
3K 09B
ANTE
ROOM
C3-7
CORR.
RM.
3K 13A
BATH 3K 14
RM.
STR #9
3K 273K 263K 253K 243K 23
3K 29
TWO BED
3K 32 3K131
3K 30A
BATH
3K 30
C3-10CORR.
TWO BED
RM.
TWO BED
RM.
TWO BED
3K 24A
BATH
RM.
3K 29A
BATH
3K 28
BATH
3K 28A
TWO BED
BATH
3K 26A
RM. RM.
3S-9
3J 23A
BATHISOLATION
ROOM
3J 23
TLT.
3J 22A
BATH
3J 24A
ANTE
ROOM
3J 22
STORAGE
CORR.
C3-6
(SURGICAL)
(SLEEP LAB)
ONE BED
RM.
RM.ONE BED
RM.
ONE BED
RM.
ONE BED
RM.
LOUNGE
3K11
ELEC
CALL
ROOM
N M H G FJ.5L E D C BK J
3"SAN
2"CW
1"HW
2"V
4"SAN 1"HW
2"CW
2"SAN
2"SAN
2"V
4"SAN
2"CW
1"HW
2"SAN
2"SAN
2"V
4"SAN
1"HW
2"CW
S01
S01S01S01
M01
1 1/2"V
2"SAN
M01
S01S01S01
S01
M01
1"HW
4"SAN
2"V
2"CW
M03
S01
M03
S01
M02M02M02M02
2"CW
1"HW
2"V
4"SAN
2"V
4"SAN
2"SAN
M03
M01
M02M02M02M02
M01
2"V
4"SAN
2"CW
2"CW
1"HW
M03
M01
M02M02M02M02
M08
M01
2"CW
1"HW
4"SAN
2"V
M02M02M02M02
S01
M03
S01S01S01
2"CW
1"HW
4"SAN
2"V
M01
M02M02M02M02
S01S01S01
M03
2"V
4"SAN
2"CW
1"HW
M03
S01
S01
M01
M02M02M02M02
M09
3"SAN
2"SAN
S01
S01
S01S01S01
2"SAN
2"SAN
2"SAN
OFFSET MED GAS
RISER UP TO ABOVE
4TH FLOOR CEILING
(1-1/2" MV, 1-1/4" MA,
1-1/2" O)
EXISTING MED GAS
RISERS TO REMAIN,
OFFSET ABOVE 3RD
FLOOR CEILING
(1-1/2" MV, 1-1/4" MA,
1-1/2" O)
1-1/2" MV
1-1/2" O1-1/4" MA
M01
S10
V01
2"SAN
2"SAN
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:0
:2
P M
P1.6
LEVEL 3 PLUMBING NEW WORK PLAN
- CEILING SPACE - SOUTH
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 MTK GGR
674-18-103
1/8" = 1'-0"1
ENLARGED PLAN - LEVEL 03 - CEILING SPACE - PLUMBING - SOUTH
Revisions: Date:
GENERAL NOTES:
KEY NOTES:
(SOME KEY NOTES MAY
NOT APPLY TO THIS SHEET)
M01 EXISTING RISER(S) OFFSET IN
THIRD FLOOR CEILING SPACE.
FIELD COORDINATE WITH ALL
EXISTING UTILITIES. OFFSET PIPING
AS REQUIRED. (TYP.) PROVIDE
ISOLATION VALVES IN NON GRAVITY
FLOW SYSTEMS.
M02 EXTEND LINE IN CEILING SPACE TO
NEW RISER LOCATION THRU
FOURTH FLOOR. FIELD
COORDINATE EXACT ROUTING
WITH EXISTING SYSTEMS. (TYP.)
M03 NEW RISER THRU 4TH FLOOR.
(TYP.)
M08 EXISTING RISER(S) TO REMAIN.
M09 EXTEND NEW SUPPLY LINES OFF
ETR RISERS.
S01 NEW SANITARY RISER TO FOURTH
FLOOR FIXTURES. (TYP.)
S10 SANITARY RISING TO FLOOR DRAIN.
V01 VENT PIPING RISING IN WALL TO
ABOVE CEILING.
W U R
P-414
P-414
P-414
P-528
P-528
P-528
P-528
P-528
P-528
MGO-2222
MGO-2222
MGO-2222
MGO-2222
MGO-2222
MGO-2222
MGO-2222
ZVB-1.1
P-414
P-414
P-414
P-414
P-103A
P-103A
P-103A
P-103A
P-103A
P-103A
P-516
P-103A
/4
M
V
/2
O
/2
M
A
/4
M
V /4
M
V
/2
M
A
/2
O
3/4" MV
3/4" MA
3/4" 0
M04M04M04M04
M06 M07M07M07M07
M06M06
M06
2"CW
1"HW
4"SAN
2"V
2"CW
1"HW
4"SAN
2"V
M04
M06
M05M05M05M05
M06M06M06
M06
4"SAN
4"SAN
2"V
3"ST
2"V
1"HW
2"CW
M07M07M07M07M07
2"V
4"SAN
1"HW
2"CW
3"ST
M07M07M07M07
2"CW
2"V
4"SAN
1"HW
M05M05M05M05
2"CW
1"HW
2"V
4"SAN
S024"SAN
S02 2"SAN
M06M06M06M06
M07M07M07M07
M07M07M07M07
M07M07M07
M07M07M07M07
M04M04M04M04
M04M04M04M04
2"CW
1"HW
4"SAN
3"V
2"V
2"CW
1"HW
4"SAN
2"CW
1"HW
4"SAN
2"V
2"CW
1"HW
2"V
4"SAN
1"HW
2"CW
4"SAN
2"V
M06M06M06M06
M06M06M06M06
M06M06M06M06
M06M06M06M06
/4
O
/4
M
A
/4
M
V
P-704
S05 S04
WCO
RP-1
FD-Z
2"V
4"SAN
1"HW
1 1/2"V
3/4"HW
1 1/4"CW
2"CW
4"SAN
1 1/2"V
3/4"HW
3/4"CW
3/4"HWC
3/4"HWC
3/4"CW
1 1/2"V
3/4"HW
3/4"HWC
3/4"HWC
3/4"HWC
MG01
3/4" MV
1/2" O
1/2" MA
S06
FD-ZS07
S06
S06
S06
FD-ZS07
MG01M12
3/4"HWC
3/4"HWC
FD-Z
2"CW
1"HW
4"SAN
2"V
3/4"CW 1 1/2"V
3/4"HW
3/4"HW
S07
S06
MG01
3/4"HWC
3/4"HWC
M13
S06
FD-Z
FD-Z
S07
S07
MG01
M13
MG06
3/4"HW
3/4"CW
1 1/2"V
3"V
2"V
3/4"HWC
MG05MG05
PATIENT ROOM
4J23
PATIENT ROOM
4J22
PATIENT ROOM
4J21
STAIRS
PATIENT TOILET
4J22B
PATIENT ROOM
4J25
PATIENT ROOM
4J20
PATIENT ROOM
4J26
CONFERENCE
4J19 SOILED UTILITY
4J27
EQUIPMENT
4J28
WCO
M16
P-704
P-704
FD-Z
P-704
P-704
P-704
P-704
/2
M
A
/4
M
V
/2
O
/2
O
/4
M
V
/2
M
A
3/4" 0
3/4" MA
3/4" MV
/4
M
V
/2
O
/2
M
A
FD-C
P-505
P-516
TP-1
MG01
MG02
MG03
MG04
MG03
MG04
MG03
MG04
MG04MG01
MG03
MG03
MG04
MG04
MG02
M17
P-708
S09
SA-1
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:0
:3
P M
P2.1
LEVEL 4 PLUMBING ENLARGEMENTS
- NORTH A
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 MTK GGR
674-18-103
1/4" = 1'-0"1
ENLARGED PLAN - LEVEL 04 - PLUMBING - NORTH A
GENERAL NOTES:
KEY NOTES:
(SOME KEY NOTES MAY
NOT APPLY TO THIS SHEET)
M04 NEW RISER IN CHASE. RISER
OFFSET IN FOURTH FLOOR CEILING
SPACE.
M05 NEW RISER IN WALL. RISER OFFSET
IN FOURTH FLOOR CEILING SPACE.
M06 EXTENDED LINES ROUTED IN
CEILING SPACE TO EXISTING RISER
LOCATION THRU FIFTH FLOOR.
FIELD COORDINATE EXACT
ROUTING WITH EXISTING SYSTEMS.
M07 RECONNECT NEW LINE INTO
BUILDINGS EXISTING RISER(S).
PERFORM ALL NECESSARY
PREP-WORK PRIOR TO SHUTDOWN
TO MINIMIZE DOWNTIME.
M12 INSTALL HOT WATER
RE-CIRCULATION PUMP ABOVE
CEILING AT THIS LOCATION. (ADD
ALTERNATE #1)
M13 INSTALL HOT WATER
RE-CIRCULATION LINE TO EACH
FIXTURE. HOT WATER LINE SHALL
DROP IN WALL AND TIE INTO HOT
WATER LINE WITHIN 6" OF OUTLET.
(ADD ALTERNATE #1) (TYP.) INSTALL
CIRCUIT SETTER EQUAL TO IMI
FLOW DESIGN MODEL#
ICSS075FF-1, BALANCE TO 0.5 GPM.
M16 HOT WATER RE-CIRCULATION LINE
TYING BACK INTO HOT WATER
RISER WITH IN-LINE CHECK VALVE.
(ADD ALTERNATE #1)
M17 ELECTRONIC TRAP PRIMER TO BE
INSTALLED WITH 3/4" CW AT THIS
LOCATION. COORDINATE POWER
REQUIREMENTS WITH DIV 26.
ROUTE TRAP PRIMER PIPING TO
ALL TRENCH AND FLOOR DRAIN
FIXTURES. COORDINATE
REQUIRED NUMBER OF PORTS ON
TRAP PRIMERS WITH DRAINS IN THE
VICINITY, FIXTURES REQUIRE DEEP
SEAL P-TRAP WITH TRAP PRIMER
CONNECTIONS.
MG01 MEDICAL GAS OUTLETS TO BE
INSTALLED AS PER
ARCHITECTURAL HEAD WALL
DETAIL. MATCH EXISTING OUTLET
TYPE USED BY THE HOSPITAL.
PROVIDE 1/2" OXYGEN, 1/2"
MEDICAL AIR, 3/4" MEDICAL
VACUUM DOWN TO MED GAS
OUTLETS. (TYP.)
MG02 EXTEND MEDICAL GAS PIPING AT
THIS LOCATION.
MG03 TAP EXISTING MED GAS MAINS AT
THIS LOCATION, 1/2" OXYGEN, 1/2"
MEDICAL AIR, 3/4" MEDICAL
VACUUM. PROVIDE ISOLATION
VALVES ABOVE CEILING SERVING
EACH PATIENT BED. PROVIDE
ACCESS PANEL WHER INSTALLED
IN HARD CEILING AREAS. (TYP.)
MG04 EXISTING MED GAS MAINS TO
REMAIN AND BE RE-USED WHERE
PRACTICAL. WHERE MED GAS
CONFLICTS WITH NEW UTILITIES
BEING INSTALLED, PROVIDE
PROVISIONS TO OFFSET EXISTING
MED GAS PIPING. (TYP.)
MG05 MED GASES TO DROP DOWN IN
WALL TO ZONE VALVE BOX, THEN
BACK ABOVE CEILING AT THIS
LOCATION.
MG06 ZONE VALVE BOX TO BE LOCATED
IN THIS AREA. INSTALL IN
ACCORDANCE WITH NFPA 99
REQUIREMENTS. MATCH EXISTING
PANEL TYPE USED BY THE
HOSPITAL. (TYP.)
S02 SANITARY RISING IN CHASE.
S04 WALL HUNG WATER CLOSET WITH
BACK-TO-BACK CARRIER.
S05 WALL HUNG WATER CLOSET WITH
HORIZONTAL CARRIER.
S06 INSTALL WALL CLEANOUT BELOW
LAVATORY. (TYP.)
P-414 P-528
P-414
FD-Z
FD-Z
P-704
P-704
P-103A
P-516
P-528
P-103A
P-704
FD-Z
FD-Z
P-528
P-528
P-708
RP-1
FD-C
P-505
P-414
P-414
P-414P-414
P-528
P-103A
P-414
P-103A
P-516
FD-Z
3/4"CW
3/4"HW
3/4"HWC
2"CW
1"HW
4"SAN
2"V
1 1/2"V
3/4"HWC
4"SAN
3"ST
2"CW
2"SAN
1"HW
3"ST
4"SAN
4"SAN
2"V
1"HW
2"CW
3/4"HWC
3/4"HWC
3/4"HWC
2"V
4"SAN
1"HW
2"CW
2"CW
1"HW
4"SAN
2"V
2"CW
2"SAN
2"SAN
2"SAN
2"SAN
3/4"HW
1 1/2"V
3/4"CW
3/4"HWC
2"CW
1"HW
4"SAN
P-704
FD-Z
3/4"HW
1 1/2"V
3/4"CW
1"CW
1 1/2"V
3/4"HW
3/4"CW
3/4"CW
3/4"HW
3/4"CW
3/4"HWC
4"SAN
2"CW
1"HW
2"V
1"HW 2"CW 3/4"HW
1 1/2"CW
1 1/2"V
4"SAN
1 1/4"CW
1"CW
1"CW
2"V
3/4"CW
3/4"HW
3/4"CW
3/4"HW 2"V
4"SAN
2"V
1"CW
3/4"CW
1 1/2"V
3/4"HW
4"SAN
3/4"CW
3/4"HW
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:0
:3
P M
P2.1A
LEVEL 4 PLUMBING ISOMETRIC -
NORTH A
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 Checker Author
674-18-103
ISOMETRIC - LEVEL 04 - PLUMBING - NORTH A
1/2" MV
1/2" MA
3/4" O
/2
M
V
/4
O
/2
M
A
/4
M
V
/2
M
A /2
O
/4
O
/2
M
A 1 /2
O
3/4" MV
1/2" O
1/2" MA
1/2" O
1/2" M A
3/4" O
ZVB-1.1
3/4" O
3/4" MA
3/4" MV
3/4" O
1/2" MA
/2
O
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:0
:3
P M
P2.1B
LEVEL 4 MEDICAL GAS ISOMETRIC -
NORTH A
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 Checker Author
674-18-103
ISOMETRIC - LEVEL 04 - MEDICAL GAS - NORTH A
W U R P N M HJ.5L K J
P-414
P-414
P-414
P-414
P-516
P-516
P-516
P-414
P-414
P-516
P-414
P-528P-528
MGO-2222
MGO-2222
MGO-2244
MGO-2222
MGO-2222 MGO-2222
MGO-2222
ZVB-1.1
AAP-2
ZVB-2.1
EXISTING MED GAS
RISERS
(1-1/4" MV, 1-1/4" MA,
1-1/2" O) TO SERVE
FLOORS ABOVE.
P-502
AAP-1
P-103A
PATIENT ROOM
(ISOLATION)
4J31
PATIENT ROOM
(ISOLATION)
4J32
NOURISHMENT
4J16
REPORT ROOM
4J11
STAFF SUPPORT
ROOM
4J13
PATIENT TOILET
4J09B
PATIENT ROOM
4J08
PATIENT TOILET
4J33B
CONFERENCE
ROOM
4J10
PATIENT ROOM
4J09
ANTE ROOM
4J32A
PATIENT TOILET
4J31B
ANTE ROOM
4J31A
MEDICATION
PREP.
4J15
CLEAN LIN.
4J18
PATIENT ROOM
(ISOLATION)
4J30
ELECTRICAL
4K06
STORAGE ROOM
4J07
H.A.C.
4K05
PATIENT ROOM
(ISOLATION)
4J33
ANTE ROOM
4J33A
CLEAN UTILITY
4J29
ANTE ROOM
4J30A
NURSE ALCOVE
4J23E
NURSE STATION
4J17
NURSE ALCOVE
4J23F
CORRIDOR
4J60
P-103A P-103A
P-103A
P-103A
MGO-2222
P-528
3/4" MV
3/4" MA
3/4" 0
3/4" O
3/4" MA
3/4" MV
4"SAN
4"SAN
3/4" MV
3/4" MA
3/4" O
3/4" MV
1/2" MA
1/2" O
3/4" MV
1/2" MA
1/2" O
3/4" MV
1/2" O
1/2" MA
3/4" O
1/2" MA
3/4" MV
P-103A P-103A
/2
M
A
/2
O
/4
M
V
/4
M
A
/4
O
/4
M
V
/4
O
/4
M
V
/4
M
V
M07M07M07
M04M04M04M04
2"CW
1"HW
4"SAN
2"V
M07M07M07M07
M05M05M05M05
M07M07M07M07
M04M04M04M04 M05M05M05M05
M07M07M07M07
M07M07M07M07
M05M05M05
M07M07 M07
V01
W01W01
V01
W01W01
M08M08M08M08
W01W01
2"V
4"SAN
1"HW
2 1/2"CW
2"V
4"SAN
1"HW
2"CW
1 1/2"HW
2"CW
2"V
M07M07M07M07
2"V
4"SAN
1"HW
2"CW
M06M06M06M06
/4
O
/4
M
A
/4
M
V
2"V
4"SAN
1"HW
2"CW
3/4"HW
3/4"CW
M04M04M04M04
M04M04M04M04
W01W01
V01
W01W01
W01W01
V01
W01W01
WCO
RP-1 MG01M12
3/4"HWC
3/4"HWC
FD-Z
2"CW
1"HW
4"SAN
2"V
3/4"CW 1 1/2"V
3/4"HW
3/4"HW
3/4"HWC
MG01
M13
MG06
MG05MG05
CONFERENCE
4J19 SOILED UTILITY
4J27
EQUIPMENT
4J28
2"CW
1"HW
4"SAN
2"V
M16
P-704
OFFSET MED GAS
RISERS
(2" MV, 1-1/2" MA, 2" O)
FROM SERVICE
BELOW.
2" O 2" MV1-1/2" MA
/2
M
A
/4
M
V
/2
O
/2
O
/4
M
V
/2
M
A
3/4" 0
3/4" MA
3/4" MV
FD-C
P-505
P-516
P-529
4"SAN
2"V
3/4"HW
3/4"CW
TP-1
TP-1
MG03
MG04
MG03
MG04
MG04
MG02
M17
M17
MG04
MG04
MG04
MG04
MG04
MG04
MG01
MG02
MG03
MG01
MG02
MG04
MG05
MG06
MG04
MG03
MG01
MG03
MG01
MG07
P-708
P-704
FD-Z S07
WCO
FD-Z S07
P-704 P-704
FD-Z
SA-1
S07
P-704
FD-Z
SA-1
S07
P-812
FD-C
PATIENT TOILET
4J08B
CORRIDOR
4J60
PATIENT TOILET
4J30B
PATIENT TOILET
4J32B
S09
S09
3/4"CW
1 1/2"V
SA-1
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1 /2
:0
:3
P M
P2.2
LEVEL 4 PLUMBING ENLARGEMENTS
- NORTH B
CONVERT BUILDING 204
PATIENT ROOMS TO
PRIVATE ROOMS
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TX. 76504
10/13/2020 MTK GGR
674-18-103
1/4" = 1'-0"1
ENLARGED PLAN - LEVEL 04 - PLUMBING - NORTH B
Revisions: Date:
GENERAL NOTES:
KEY NOTES:
(SOME KEY NOTES MAY
NOT APPLY TO THIS SHEET)
M04 NEW RISER IN CHASE. RISER
OFFSET IN FOURTH FLOOR CEILING
SPACE.
M05 NEW RISER IN WALL. RISER OFFSET
IN FOURTH FLOOR CEILING SPACE.
M06 EXTENDED LINES ROUTED IN
CEILING SPACE TO EXISTING RISER
LOCATION THRU FIFTH FLOOR.
FIELD COORDINATE EXACT
ROUTING WITH EXISTING SYSTEMS.
M07 RECONNECT NEW LINE INTO
BUILDINGS EXISTING RISER(S).
PERFORM ALL NECESSARY
PREP-WORK PRIOR TO SHUTDOWN
TO MINIMIZE DOWNTIME.
M08 EXISTING RISER(S) TO REMAIN.
M12 INSTALL HOT WATER
RE-CIRCULATION PUMP ABOVE
CEILING AT THIS LOCATION. (ADD
ALTERNATE #1)
M13 INSTALL HOT WATER
RE-CIRCULATION LINE TO EACH
FIXTURE. HOT WATER LINE SHALL
DROP IN WALL AND TIE INTO HOT
WATER LINE WITHIN 6" OF OUTLET.
(ADD ALTERNATE #1) (TYP.) INSTALL
CIRCUIT SETTER EQUAL TO IMI
FLOW DESIGN MODEL#
ICSS075FF-1, BALANCE TO 0.5 GPM.
M16 HOT WATER RE-CIRCULATION LINE
TYING BACK INTO HOT WATER
RISER WITH IN-LINE CHECK VALVE.
(ADD ALTERNATE #1)
M17 ELECTRONIC TRAP PRIMER TO BE
INSTALLED WITH 3/4" CW AT THIS
LOCATION. COORDINATE POWER
REQUIREMENTS WITH DIV 26.
ROUTE TRAP PRIMER PIPING TO
ALL TRENCH AND FLOOR DRAIN
FIXTURES. COORDINATE
REQUIRED NUMBER OF PORTS ON
TRAP PRIMERS WITH DRAINS IN THE
VICINITY, FIXTURES REQUIRE DEEP
SEAL P-TRAP WITH TRAP PRIMER
CONNECTIONS.
MG01 MEDICAL GAS OUTLETS TO BE
INSTALLED AS PER
ARCHITECTURAL HEAD WALL
DETAIL. MATCH EXISTING OUTLET
TYPE USED BY THE HOSPITAL.
PROVIDE 1/2" OXYGEN, 1/2"
MEDICAL AIR, 3/4" MEDICAL
VACUUM DOWN TO MED GAS
OUTLETS. (TYP.)
MG02 EXTEND MEDICAL GAS PIPING AT
THIS LOCATION.
MG03 TAP EXISTING MED GAS MAINS AT
THIS LOCATION, 1/2" OXYGEN, 1/2"
MEDICAL AIR, 3/4" MEDICAL
VACUUM. PROVIDE ISOLATION
VALVES ABOVE CEILING SERVING
EACH PATIENT BED. PROVIDE
ACCESS PANEL WHER INSTALLED
IN HARD CEILING AREAS. (TYP.)
MG04 EXISTING MED GAS MAINS TO
REMAIN AND BE RE-USED WHERE
PRACTICAL. WHERE MED GAS
CONFLICTS WITH NEW UTILITIES
BEING INSTALLED, PROVIDE
PROVISIONS TO OFFSET EXISTING
MED GAS PIPING. (TYP.)
MG05 MED GASES TO DROP DOWN IN
WALL TO ZONE VALVE BOX, THEN
BACK ABOVE CEILING AT THIS
LOCATION.
MG06 ZONE VALVE BOX TO BE LOCATED
IN THIS AREA. INSTALL IN
ACCORDANCE WITH NFPA 99
REQUIREMENTS. MATCH EXISTING
PANEL TYPE USED BY THE
HOSPITAL. (TYP.)
MG07 EXISTING MEDICAL GAS RISERS TO
BE OFFSET ABOVE 3RD FLOOR
CEILING, UP IN WALL SPACE ON 4TH
FLOOR, THEN TIE BACK INTO
ORIGINAL RISER LOCATION
SERVING 5TH FLOOR AND ABOVE.
COORDINATE REQUIRED MEDICAL
GAS SHUTDOWN WITH HOSPITAL
STAFF AND GENERAL CONTRACTOR
PRIOR TO BEGINING
CONSTRUCTION.
S07 TRENCH DRAIN TYPE FD-Z TO BE
INSTALLED IN PATIENT SHOWER.
PROVIDE DEEP SEAL P-TRAP WITH
TRAP PRIMER CONNECTION.
COORDINATE FINAL LOCATION AND
SLOPING OF THE FLOOR WITH
STRUCTURAL ELEMENTS AND
ARCHITECTURAL TRADES. (TYP.)
V01 VENT PIPING RISING IN WALL TO
ABOVE CEILING.
W01 CW, HW SUPPLY DROPPING IN
WALL TO FIXTURE.
2"V
4"SAN
1"HW
2"CW
2"CW
2"V
1"HW
4"SAN
3/4"HWC
3/4"HWC
3/4"HWC
3/4"HWC
2 1/2"CW
1"HW
2"V
4"SAN
4"SAN
2"V
2"CW
1"HW
2"SAN
P-516 P-704
P-414
P-103AP-103A
2"SAN
2"SAN
1 1/2"V
3/4"HW
3/4"CW
P-516
3/4"CW
1 1/2"V
3/4"HW
2"SAN
P-704
2"SAN
2"V
FD-Z
2"V
4"SAN
3/4"HWC
P-502
2"V
3/4"HW
3/4"CW
3"SAN
2"V
2"CW
1"HW
4"SAN
P-414
FD-Z
FD-Z
P-704P-704
P-414
3/4"HWC
3/4"HW
1 1/2"V
3/4"CW
2"SAN
P-528
P-414
P-516
P-516
P-414
P-529
P-812
FD-C
P-505
P-516
P-414
RP-1P-708
FD-C
P-704 FD-Z
FD-Z
P-704
2"V
1"CW
1 1/2"V
3/4"HW
3/4"HWC
2"V
3/4"HW
1"CW
3/4"CW
1"CW
2"SAN
3/4"CW
3/4"HW
3/4"HWC
3/4"HWC
1 1/2"HW
2"CW
2"V
4"SAN
4"SAN
3/4"CW
1 1/2"V
3/4"HW
1 1/2"SAN
1 1/2"V
2"SAN
2"SAN
4"SAN
3/4"HW
4"SAN
3/4"CW
3/4"HWC
1 1/2"V
3/4"CW
1 1/4"CW
2"CW
2"CW
1"HW
2"V
4"SAN
3/4"HW
P-103AP-103A
P-528
2"CW
1"HW
1 1/2"V
2"V
2"V
2"SAN
4"SAN
3/4"CW
3/4"HW
4"SAN
2"CW
2"V
1"HW
3/4"HWC
3/4"HWC
1 1/2"V 2"V
4"SAN
4"SAN
4"SAN
P R
O J E
C T
7700 Torino St, Suite 101
San Antonio, TX 78229 Telephone: 210.614.1110
© 2020 Alderson & Associates, Inc.
F-1008
P.E. Reg. No.
Engineer:
for permit, bidding or construction.
Document incomplete: Not intended
INTERIM REVIEW ONLY
Dean Alderson
54441
Firm: Alderson & Associates, F-1008
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Central Texas Veterans Health
Care System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
CONSTRUCTION BID
DOCUMENTS
B
IM
/1
-1
T e m p le V
A C o n v e rt
P a ti e n t R o o m s B ld g
/1
T e m p le
V A
B
P
.r v t
/1…
This is the start of the file's text. The full file is on GovTribe.