100 percent Sealed ARCH SPECS TEMPLE CONVERT 204 VOL 1.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25722B0028
About this file
This federal contract opportunity is for project number 674-18-103 to convert patient rooms to private rooms in Building 204 at the Olin E. Teague Veterans' Medical Center in Temple, Texas. The contractor shall provide all labor, materials, equipment and supervision necessary to complete interior demolition and construction of new mechanical, electrical, plumbing, fire protection and nurse call systems. Key requirements include private rooms; demolition of walls, ceilings, floors and finishes; and new systems as shown on the plans and specifications. The project is set aside 100 percent for Service-Disabled Veteran-Owned Small Businesses. Offerors must be verified as SDVOSBs by the Department of Veterans Affairs Center for Verification and Evaluation by the time of proposal submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25722B0028 0003.docx | DOCX document | |
| Project Walk Through Sign In Sheet.pdf | ||
| Bid Schedule B - project 674-18-103 Add Alternate.pdf | ||
| 36C25722B0028 0002.docx | DOCX document | |
| 36C25722B0028 0001.docx | DOCX document | |
| TEMPLE_CONVERT_BLDG204_PATIENT_RMS_TECH-PLANS Model 08-20-2020.pdf | ||
| 2020-1_3.pdf | ||
| 2020-1_1.pdf | ||
| 100 percent Sealed ARCH SPECS TEMPLE CONVERT 204 VOL 2.pdf | ||
| 2020-1_2.pdf | ||
| 122220_1.pdf | ||
| 36C25722B0028_1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs
Convert Building 204 Patient Rooms to Private Rooms Olin E. Teague Veterans’ Medical Center Temple, TX Project 674-18-103
Construction Bid Documents Project Specifications – Volume 1 of 2 09 October, 2020
Prime Contractor: Health Facilities Solutions, 8718 Botts Lane, San Antonio, TX 78217
SCHEMATIC
10/13/2020
13-OCT-20
Prime Contractor: Health Facilities Solutions, 8718 Botts Lane, San Antonio, TX 78217
Olin E. Teague Veterans’ Medical Center 1901 Veterans Memorial Drive
Temple, TX. 76504
CONVERT BLDG. 204 PATIENT ROOMS TO PRIVATE ROOMS
PROJECT # 674-18-103
CONVERT BUILDING 204 PATIENT ROOMS TO PRIVATE ROOMS
PROJECT #674-18-103
OLIN E. TEAGUE VETERANS’ MEDICAL CENTER
CONSTRUCTION BID DOCUMENTS 09-12-19
01 00 00
GENERAL REQUIREMENTS
Section 01 00 00
1.1 GENERAL INTENTION AND INITIAL ITEMS OF CONCERN
1.2 STATEMENT OF BID ITEM(S)
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.4 CONSTRUCTION SECURITY
1.5 OPERATIONS AND STORAGE AREAS
1.6 DISPOSAL AND RETENTION
1.7 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS
1.8 RESTORATION
1.9 AS-BUILT DRAWINGS
OLIN E. TEAGUE VETERANS’ MEDICAL CENTER
CONSTRUCTION BID DOCUMENTS 02-12-19
01 00 00 - 1
GENERAL REQUIREMENTS
1.1 GENERAL REQUIREMENTS
A. The contractor shall provide all labor, material, equipment and supervision for the completion of project number 674-18-103, Convert
Building 204 Patient Rooms to Private Rooms, as required by the contract documents.
B. Visits to the site by bidders may be made only by appointment with the CO (Contracting Officer). There will be one site visit for the project, and attendance is highly encouraged.
C. All employees of the general contractor and the subcontractors shall comply with VA security management.
1. All employees are to obtain construction employee identification badges before the employee starts. The badge is to be displayed so the construction employee full name and the responsible Medical
Center service are seen.
2. All employees are restricted from unauthorized access.
D. Prior to commencing work, the General Contractor shall provide proof that a OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the General
Contractor or subcontractors are present and working.
E. Training & Tuberculosis Screening:
1. All employees of general contractor and subcontractors shall have the 10-hour OSHA certified construction safety course and/or 30-hour
Construction Safety training and relevant competency training, as determined by the COR or CSO in coordination with the Multi-
Disciplinary Team.
a. Submit training records of all such employees in compliances with section 1.30 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES with trade’s submittal package before the start of the work.
2. When asked, all employees of the general contractor and subcontractors shall provide documentation of “no active
Tuberculosis” that is dated within 90 calendar days of the employees’ assignment to the project.
F. Preconstruction Conference:
1. Contractor representatives who have a responsibility or significant role in implementation of the accident prevention program, as required by 29 CFR 1926.20(b)(1) and section 01 35 26
SAFETY REQUIREMENTS, on the project shall attend the preconstruction conference to gain a mutual understanding of its implementation. This includes the project superintendent, subcontractor superintendents, and any other assigned safety and health professionals.
OLIN E. TEAGUE VETERANS’ MEDICAL CENTER
01 00 00 - 2
2. Discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the contractor and the contracting officer's representative as to which phases will require an analysis. In addition, establish a schedule for the preparation, submittal, review, and acceptance of AHAs to preclude project delays.
3. Deficiencies in the submitted APP will be brought to the attention of the contractor within 14 calendar days of submittal, and the contractor shall revise the plan to correct deficiencies and re-submit it for acceptance. Do not begin work until there is an accepted APP.
1.2 STATEMENT OF BID ITEM(S)
A. Base Bid: Contractor to provide all labor, material, equipment and supervision necessary for completion of Project as described in
Contract Documents. Work includes but is not limited to interior demolition of walls, ceilings, floor materials and finishes, along with new mechanical, electrical, plumbing, fire protection and nurse call systems as shown and specified.
B. Bid Item #1: ADD Alternate #1. Domestic hot water recirculation line within 6” of domestic hot water outlet and associated appendages to each fixture using domestic hot water.
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. BEFORE AWARD OF CONTRACT, the contractor should have existing conditions drawings, and this general requirement to make bid.
1.4 CONSTRUCTION SECURITY
A. Security Plans and Procedures:
1. General Contractor’s employees shall not enter the project site without their appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. For working during the non-business hours, the General Contractor shall give three (3) calendar day notice to the Contracting Officer and the Contracting Officers Representative so that security arrangements can be provided. This notice is separate from any notices required for utility shutdown described later in the General
Requirements.
3. No photography of VA premises is allowed without permission of the Contracting Officer or Contracting Officer Representative.
a. Photos must not contain images of patients and/or patient’s information.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
OLIN E. TEAGUE VETERANS’ MEDICAL CENTER
01 00 00 - 3
5. For information protection the contractor will not have access to VA desktop computers nor will they have access to online resources belonging to the government while conducting this project.
6. The contractor will not have access to Patient Health Information (PHI) nor will they have the capability of accessing patient information during the services provided to the VA per the Medical
Center’s Privacy Officer.
7. All construction employees must present two (2) valid forms of Government issued identification when applying for a construction employee identification badge.
B. Key Control:
1. The General Contractor shall secure construction area(s) by means of standards lock(s) with key(s) or combination lock(s). VA Engineering shall be provided with key(s) or lock combinations(s) for access to construction areas.
C. Document Control:
1. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
2. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
3. Notify the Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
D. Motor Vehicle Restrictions
1. For this project the contractor will be provided with onsite parking and onsite material storage / lay-down area. Reference drawings.
E. Safety Permits:
1. The General Contractor and subcontractor employees will be required to use a “Hot Work” Permit when performing welding, cutting, blazing, heat treating, pipe thawing, power-driven fasteners, hot riveting and similar activities that produce sparks, flames heat or flammable gases.
a. This requires the contractor to notify the safety office when hot work is performed. The permit includes certification of pre and post inspection of the work area for combustible materials.
b. A fire watch will be needed during hot work activities.
2. The General Contractor and subcontractor employees will be required to complete a “LockOut/TagOut Inspection Checklist” prior to work on any utilities.
a. The checklist will be required before any utilities are de-energized.
1. The contractor will be required to submit documentation pertaining to their Authorized Employees with LOTO training performing LOTO, documentation of their LOTO procedures, and documentation of an audit for their LOTO procedures in the
OLIN E. TEAGUE VETERANS’ MEDICAL CENTER
01 00 00 - 4 last year. Submit in accordance with Section 1.22 SHOP
DRAWINGS, PRODUCT DATA, AND SAMPLES.
3. When electrical utilities cannot be de-energized to perform work, an
“Energized Electrical Work Permit” will be required.
a. The General Contractor and/or the subcontractors shall be required to have an electrically qualified person(s) to complete the permit and to attend a pre work coordination meetings.
1.5 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) in the foot print of the defined work area. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
(FAR 52.236-10)
C. Delivery Drivers and employee are subject to rules of Medical Center applicable to their conduct.
D. Execute work so as to interfere as little as possible with normal functioning of the Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
E. Utilities Services: Maintain existing utility services for Medical
Center at all times. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems
(including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
OLIN E. TEAGUE VETERANS’ MEDICAL CENTER
01 00 00 - 5
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the
Medical Center Safety service office prior knowledge and written approval. (see permits)
2. Contractor shall submit a request to interrupt any such services to
COR, in writing, 72 hours in advance of proposed interruption.
Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by safety office may occur at times other than the standard business hours.
4. Major interruptions where utilities cannot be shutdown of any system must be requested, in writing, at least 7 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
F. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are not to be abandoned but are to be removed, remove entirely up to the source, panel, trunk line, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
1.6 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be kept by the
Government. Items that remain property of the Government shall be protected in such a manner as to prevent damage which would be detrimental to re-installation and/or reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to
OLIN E. TEAGUE VETERANS’ MEDICAL CENTER
01 00 00 - 6 be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.7 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
A. Contractor to repair any damage caused by contractor or subcontractors to laydown yard surfaces.
1.8 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are indicated on drawings and which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"
(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR
52.236-2).
1.9 AS-BUILT DRAWINGS
A. The contractor shall maintain one (1) set of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR's review, as often as requested.
C. Contractor shall deliver one approved completed sets of as-built drawings to the COR within 15 calendar days after the acceptance of the project by the COR.
- - E N D - - -
OLIN E. TEAGUE VETERANS’ MEDICAL CENTER
CONSTRUCTION DOCUMENTS 100% 09-01-18
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GI-000 COVER SHEET
GI-001 INDEX OF SHEETS
GI-002 GENERAL NOTES
GI-003 ARCHITECTURAL ABBREVIATIONS
GI-004 ACCESSIBILITY STANDARDS
GI-005 ACCESSIBILITY STANDARDS
GI-006 ACCESSIBILITY STANDARDS
AI-100 FOURTH FLOOR - LIFE SAFETY PLAN
AD-104 4TH FLOOR - DEMOLITION PLAN
AD-104.1 4TH FLOOR - DEMOLITION PLAN - SOUTH
AD-104.2 4TH FLOOR - DEMOLITION PLAN - NORTH
AS-104 4TH FLOOR - FLOOR PLAN
AS-104.1 4TH FLOOR - FLOOR PLAN SOUTH
AS-104.2 4TH FLOOR - FLOOR PLAN NORTH
AS-105 ROOF PLAN NORTH
AS-111 4TH FLOOR - DIMENSION PLAN
AS-121 4TH FLOOR - FLOOR FINISH PLAN
AS-131 4TH FLOOR - REFLECTED CEILING PLAN
AS-301 BUILDING SECTIONS
AS-302 BUILDING SECTIONS
AS-310 WALL SECTIONS
AS-401 ENLARGED FLOOR PLANS
AS-402 ENLARGED FLOOR PLANS
AS-403 ENLARGED FLOOR PLANS
AS-410 INTERIOR ELEVATIONS
AS-411 INTERIOR ELEVATIONS
AS-506 CASEWORK DETAILS
AS-507 CEILING DETAILS
AS-508 FLOOR FINISH DETAILS
AS-520 WALL TYPES
OLIN E. TEAGUE VETERANS’ MEDICAL CENTER
CONSTRUCTION DOCUMENTS 100% 09-01-18
00 01 15 - 2
AS-536 ARCHITECTURAL DETAILS
AS-610 DOOR SCHEDULE / DOOR TYPES
AS-620 DOOR DETAILS
AS-630 ROOM FINISH/MATERIAL FINISH SCHEDULES
FP1.2A FOURTH FLOOR FIRE PROTECTION NEW WORK PLAN –
NORTH
FP1.2B FOURTH FLOOR FIRE PROTECTION NEW WORK PLAN -
SOUTH
P0.0 PLUMBING SYMBOLS AND ABBREVIATIONS
PD1.1 LEVEL 4 OVERALL PLUMBING DEMOLITION PLAN
PD1.2A LEVEL 4 PLUMBING DEMOLITION PLAN - NORTH
PD1.2B LEVEL 4 PLUMBING DEMOLITION PLAN - SOUTH
P1.1 LEVEL 4 OVERALL PLUMBING NEW WORK PLAN
P1.2 LEVEL 4 PLUMBING NEW WORK PLAN - NORTH
P1.3 LEVEL 4 PLUMBING NEW WORK PLAN - SOUTH
P1.4 LEVEL 3 OVERALL PLUMBING NEW WORK PLAN -
CEILING SPACE
P1.5 LEVEL 3 PLUMBING NEW WORK PLAN - CEILING SPACE
- NORTH
P1.6 LEVEL 3 PLUMBING NEW WORK PLAN - CEILING SPACE
– SOUTH
P2.1 LEVEL 4 PLUMBING ENLARGEMENTS - NORTH A
P2.1A LEVEL 4 PLUMBING ISOMETRIC - NORTH A
P2.1B LEVEL 4 MED GAS ISOMETRIC - NORTH A
P2.2 LEVEL 4 PLUMBING ENLARGEMENTS - NORTH B
P2.2A LEVEL 4 PLUMBING ISOMETRIC - NORTH B
P2.2B LEVEL 4 MED GAS ISOMETRIC - NORTH B
P2.3 LEVEL 4 PLUMBING ENLARGEMENTS - SOUTH A
P2.3A LEVEL 4 PLUMBING ISOMETRIC - SOUTH A
P2.3B LEVEL 4 MED GAS ISOMETRIC -SOUTH A
P2.4 LEVEL 4 PLUMBING ENLARGEMENTS - SOUTH B
P2.4A LEVEL 4 PLUMBING ISOMETRIC - SOUTH B
P2.4B LEVEL 4 MED GAS ISOMETRIC -SOUTH B
P3.1 PLUMBING SCHEDULES
P4.1 PLUMBING DETAILS
P4.2 PLUMBING DETAILS
OLIN E. TEAGUE VETERANS’ MEDICAL CENTER
CONSTRUCTION DOCUMENTS 100% 09-01-18
00 01 15 - 3
M0.0 MECHANICAL SYMBOLS & ABBREVIATIONS
MD1.1 FOURTH FLOOR MECHANICAL DEMOLITION PLAN - NORTH
MD1.2 FOURTH FLOOR MECHANICAL DEMOLITION PLAN - SOUTH
MD1.3 ENLARGED MECHANICAL ROOM DEMOLITION PLAN
MD2.1 FOURTH FLOOR MECHANICAL PIPING DEMOLITION PLAN
- NORTH
MD2.2 FOURTH FLOOR MECHANICAL PIPING DEMOLITION PLAN
– SOUTH
M1.1 FOURTH FLOOR MECHANICAL FLOOR PLAN - NORTH
M1.2 FOURTH FLOOR MECHANICAL FLOOR PLAN - SOUTH
M1.3 ENLARGED MECHANICAL ROOM and ROOF NEW WORK
PLANS
M2.1 FOURTH FLOOR MECHANICAL PIPING FLOOR PLAN -
NORTH
M2.2 FOURTH FLOOR MECHANICAL PIPING FLOOR PLAN -
SOUTH
M3.1 MECHANICAL SCHEDULES
M3.2 MECHANICAL SCHEDULES
M4.1 MECHANICAL DETAILS
M4.2 MECHANICAL DETAILS
M5.1 MECHANICAL CONTROLS
ES-000 ELECTRICAL SYMBOLS & ABBREVIATIONS
ESD-101 4TH FLOOR - ELECTRICAL DEMOLITION - NORTH PLAN
ESD-102 4TH FLOOR - ELECTRICAL DEMOLITION - SOUTH PLAN
ES-101 4TH FLOOR - LIGHTING PLAN - NORTH PLAN
ES-102 4TH FLOOR - LIGHTING PLAN - SOUTH PLAN
ES-201 4TH FLOOR - POWER PLAN - NORTH PLAN
ES-202 4TH FLOOR - POWER PLAN - SOUTH PLAN
ES-203 4TH FLOOR - PARTIAL FLOOR PLANS
ES-204 4TH FLOOR - MECH./PLUMB. POWER PLAN - NORTH
PLAN
ES-205 4TH FLOOR - MECH./PLUMB. POWER PLAN - SOUTH
PLAN
ES-301 4TH FLOOR - SPECIAL SYSTEMS PLAN - NORTH PLAN
ES-302 4TH FLOOR - SPECIAL SYSTEMS PLAN - SOUTH PLAN
ES-303 4TH FLOOR - FIRE ALARM PLAN - NORTH PLAN
OLIN E. TEAGUE VETERANS’ MEDICAL CENTER
CONSTRUCTION DOCUMENTS 100% 09-01-18
00 01 15 - 4
ES-304 4TH FLOOR - FIRE ALARM PLAN - SOUTH PLAN
ES-401 RISER DIAGRAM - ESSENTIAL DISTRIBUTION
ES-402 RISER DIAGRAM - NORMAL DISTRIBUTION
ES-501 ELECTRICAL SCHEDULES
ES-502 ELECTRICAL SCHEDULES
ES-503 ELECTRICAL SCHEDULES
ES-504 ELECTRICAL SCHEDULES
ES-505 ELECTRICAL SCHEDULES
ES-601 ELECTRICAL DETAILS
ES-602 ELECTRICAL DETAILS
T001 TECHNOLOGY - COVER PAGE
T002 TECHNOLOGY- MATRIX
T100 TECHNOLOGY - 4TH FLOOR NORTH DEMOLITION PLAN
T101 TECHNOLOGY - 4TH FLOOR NORTH DEMOLITION
REFLECTED CEILING PLAN
T102 TECHNOLOGY - 4TH FLOOR SOUTH DEMOLITION PLAN
T103 TECHNOLOGY - 4TH FLOOR SOUTH DEMOLITION
REFLECTED CEILING PLAN
T200 TECHNOLOGY - 4TH FLOOR NORTH TECHNOLOGY PLAN
T201 TECHNOLOGY - 4TH FLOOR SOUTH TECHNOLOGY PLAN
T300 TECHNOLOGY - 4TH FLOOR NORTH PATHWAY LAYOUT
T301 TECHNOLOGY - 4TH FLOOR SOUTH PATHWAY LAYOUT
T400 TECHNOLOGY - TELECOM ROOM LAYOUT
T401 TECHNOLOGY - TELECOM ROOM - RACK ELEVATION
T500 TECHNOLOGY - 4TH FLOOR NORTH TECHNOLOGY
REFLECTED CEILING PLAN
T501 TECHNOLOGY - 4TH FLOOR SOUTH TECHNOLOGY
REFLECTED CEILING PLAN
T600 TECHNOLOGY - RISER DIAGRAM
T700 TECHNOLOGY - TYPICAL DETAILS
T701 TECHNOLOGY - TYPICAL DETAILS
T702 TECHNOLOGY - TYPICAL DETAILS
T703 TECHNOLOGY - TYPICAL DETAILS
TS100 TECHNOLOGY - 4th FLOOR NORTH SECURITY
DEMOLITION PLAN
TS101 TECHNOLOGY- 4th FLOOR SOUTH SECURITY
OLIN E. TEAGUE VETERANS’ MEDICAL CENTER
CONSTRUCTION DOCUMENTS 100% 09-01-18
00 01 15 - 5
DEMOLITION PLAN
TS200 TECHNOLOGY- 4TH FLOOR NORTH SECURITY PLAN
TS201 TECHNOLOGY- 4th FLOOR SOUTH SECURITY PLAN
TS700 TECHNOLOGY - SECURITY TYPICAL DETAILS
- - - END - - -
CONSTRUCTION DOCUMENTS 100% 09-01-18
01 33 23 - 1
SECTION 01 33 23
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
PART 1 – GENERAL
1.1 DESCRIPTION
A. This specification defines the general requirements and procedures for submittals. A submittal is information submitted for VA review to establish compliance with the contract documents.
B. Detailed submittal requirements are found in the technical sections of the contract specifications. The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective technical specifications at no additional cost to the government.
C. VA approval of a submittal does not relieve the Contractor of the responsibility for any error which may exist. The Contractor is responsible for fully complying with all contract requirements and the satisfactory construction of all work, including the need to check, confirm, and coordinate the work of all subcontractors for the project.
Non-compliant material incorporated in the work will be removed and replaced at the Contractor’s expense.
1.2 DEFINITIONS
A. Preconstruction Submittals: Submittals which are required prior to issuing contract notice to proceed or starting construction. For example, Certificates of insurance; Surety bonds; Site-specific safety plan; Construction progress schedule; Schedule of values; Submittal register; List of proposed subcontractors.
B. Shop Drawings: Drawings, diagrams, and schedules specifically prepared to illustrate some portion of the work. Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be integrated and coordinated.
C. Product Data: Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions, and brochures, which describe and illustrate size, physical appearance, and other characteristics of materials, systems, or equipment for some portion of the work. Samples
01 33 23 - 2 of warranty language when the contract requires extended product warranties.
D. Samples: Physical examples of materials, equipment, or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged. Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project. Field samples and mock-ups constructed to establish standards by which the ensuing work can be judged.
E. Design Data: Calculations, mix designs, analyses, or other data pertaining to a part of work.
F. Test Reports: Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work. Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
G. Certificates: Document required of Contractor, or of a manufacturer, supplier, installer, or subcontractor through Contractor. The purpose is to document procedures, acceptability of methods, or personnel qualifications for a portion of the work.
H. Manufacturer's Instructions: Pre-printed material describing installation of a product, system, or material, including special notices and MSDS concerning impedances, hazards, and safety precautions.
I. Manufacturer's Field Reports: Documentation of the testing and verification actions taken by manufacturer's representative at the job site on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must indicate whether the material, product, or system has passed or failed the test.
J. Operation and Maintenance Data: Manufacturer data that is required to operate, maintain, troubleshoot, and repair equipment, including manufacturer's help, parts list, and product line documentation. This data shall be incorporated in an operations and maintenance manual.
K. Closeout Submittals: Documentation necessary to properly close out a construction contract. For example, Record Drawings and as-built
01 33 23 - 3 drawings. Also, submittal requirements necessary to properly close out a phase of construction on a multi-phase contract.
1.3 SUBMITTAL REGISTER
A. The submittal register will list items of equipment and materials for which submittals are required by the specifications. This list may not be all inclusive and additional submittals may be required by the specifications. The Contractor is not relieved from supplying submittals required by the contract documents but which have been omitted from the submittal register.
B. The submittal register will serve as a scheduling document for submittals and will be used to control submittal actions throughout the contract period.
C. The VA will provide the initial submittal register in electronic format. Thereafter, the Contractor shall track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the
VA.
D. The Contractor shall update the submittal register as submittal actions occur and maintain the submittal register at the project site until final acceptance of all work by Contracting Officer.
E. The Contractor shall submit formal monthly updates to the submittal register in electronic format. Each monthly update shall document actual submission and approval dates for each submittal.
F. Submittal Register to be submitted 30 days after Notice to Proceed.
1.4 SUBMITTAL SCHEDULING
A. Submittals are to be scheduled, submitted, reviewed, and approved prior to the acquisition of the material or equipment.
B. Coordinate scheduling, sequencing, preparing, and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow time for potential resubmittal.
C. No delay costs or time extensions will be allowed for time lost in late submittals or resubmittals.
D. All submittals are required to be approved prior to the start of the specified work activity.
01 33 23 - 4
1.5 SUBMITTAL PREPARATION
A. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
B. Collect required data for each specific material, product, unit of work, or system into a single submittal. Prominently mark choices, options, and portions applicable to the submittal. Partial submittals will not be accepted for expedition of construction effort. Submittal will be returned without review if incomplete.
C. If available product data is incomplete, provide Contractor-prepared documentation to supplement product data and satisfy submittal requirements.
D. All irrelevant or unnecessary data shall be removed from the submittal to facilitate accuracy and timely processing. Submittals that contain the excessive amount of irrelevant or unnecessary data will be returned with review.
E. Provide a transmittal form for each submittal with the following information:
1. Project title, location and number.
2. Construction contract number.
3. Date of the drawings and revisions.
4. Name, address, and telephone number of subcontractor, supplier, manufacturer, and any other subcontractor associated with the submittal.
5. List paragraph number of the specification section and sheet number of the contract drawings by which the submittal is required.
6. When a resubmission, add alphabetic suffix on submittal description.
For example, submittal 18 would become 18A, to indicate resubmission.
7. Product identification and location in project.
F. The Contractor is responsible for reviewing and certifying that all submittals are in compliance with contract requirements before submitting for VA review. Proposed deviations from the contract requirements are to be clearly identified. All deviations submitted must include a side by side comparison of item being proposed against item specified. Failure to point out deviations will result in the VA
01 33 23 - 5 requiring removal and replacement of such work at the Contractor's expense.
G. Stamp, sign, and date each submittal transmittal form indicating action taken.
H. Stamp used by the Contractor on the submittal transmittal form to certify that the submittal meets contract requirements is to be similar to the following:
01 33 23 - 6
| CONTRACTOR |
| (Firm Name) |
| Approved |
| Approved with corrections as noted on submittal data and/or |
| attached sheets(s) |
| SIGNATURE: |
| TITLE: |
| DATE: |
1.6 SUBMITTAL FORMAT AND TRANSMISSION
A. Provide submittals in electronic format, with the exception of material samples. Use PDF as the electronic format, unless otherwise specified or directed by the Contracting Officer.
B. Compile the electronic submittal file as a single, complete document.
Name the electronic submittal file specifically according to its contents.
C. Electronic files must be of sufficient quality that all information is legible. Generate PDF files from original documents so that the text included in the PDF file is both searchable and can be copied. If
01 33 23 - 7 documents are scanned, Optical Character Resolution (OCR) routines are required.
D. E-mail electronic submittal documents smaller than 5MB in size to e-mail addresses as directed by the Contracting Officer.
E. Provide electronic documents over 5MB through an electronic FTP file sharing system. Confirm that the electronic FTP file sharing system can be accessed from the VA computer network. The Contractor is responsible for setting up, providing, and maintaining the electronic
FTP file sharing system for the construction contract period of performance.
F. Provide hard copies of submittals when requested by the Contracting
Officer. Up to 3 additional hard copies of any submittal may be requested at the discretion of the Contracting Officer, at no additional cost to the VA.
1.7 SAMPLES
A. Submit two sets of physical samples showing range of variation, for each required item.
B. Where samples are specified for selection of color, finish, pattern, or texture, submit the full set of available choices for the material or product specified.
C. When color, texture, or pattern is specified by naming a particular manufacturer and style, include one sample of that manufacturer and style, for comparison.
D. Before submitting samples, the Contractor is to ensure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.
E. The VA reserves the right to disapprove any material or equipment which previously has proven unsatisfactory in service.
F. Physical samples supplied maybe requested back for use in the project after reviewed and approved.
01 33 23 - 8
1.8 OPERATION AND MAINTENANCE DATA
A. Submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.
B. In the event the Contractor fails to deliver O&M Data within the time limits specified, the Contracting Officer may withhold from progress payments 50 percent of the price of the item with which such O&M Data are applicable.
1.9 TEST REPORTS
SRE may require specific test after work has been installed or completed which could require contractor to repair test area at no additional cost to contract.
1.10 VA REVIEW OF SUBMITTALS AND RFIS
A. The VA will review all submittals for compliance with the technical requirements of the contract documents. The Architect-Engineer for this project will assist the VA in reviewing all submittals and determining contractual compliance. Review will be only for conformance with the applicable codes, standards and contract requirements.
B. Period of review for submittals begins when the VA COR receives submittal from the Contractor.
C. Period of review for each resubmittal is the same as for initial submittal.
D. VA review period is 15 working days for submittals.
E. VA review period is 10 working days for RFIs.
F. The VA will return submittals to the Contractor with the following notations:
1. "Approved": authorizes the Contractor to proceed with the work covered.
2. "Approved as noted": authorizes the Contractor to proceed with the work covered provided the Contractor incorporates the noted comments and makes the noted corrections.
3. "Disapproved, revise and resubmit": indicates noncompliance with the contract requirements or that submittal is incomplete. Resubmit with appropriate changes and corrections. No work shall proceed for this item until resubmittal is approved.
01 33 23 - 9
4. "Not reviewed": indicates submittal does not have evidence of being reviewed and approved by Contractor or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals after taking appropriate action.
1.11 APPROVED SUBMITTALS
A. The VA approval of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing, and other information are satisfactory.
B. VA approval of a submittal does not relieve the Contractor of the responsibility for any error which may exist. The Contractor is responsible for fully complying with all contract requirements and the satisfactory construction of all work, including the need to check, confirm, and coordinate the work of all subcontractors for the project.
Non-compliant material incorporated in the work will be removed and replaced at the Contractor’s expense.
C. After submittals have been approved, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
D. Retain a copy of all approved submittals at project site, including approved samples.
1.12 WITHHOLDING OF PAYMENT
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
- - - E N D - - -
01 35 26 -1
SECTION 01 35 26
SAFETY REQUIREMENTS
TABLE OF CONTENTS
1.1 APPLICABLE PUBLICATIONS
1.2 DEFINITIONS
1.3 REGULATORY REQUIREMENTS
1.4 ACCIDENT PREVENTION PLAN (APP)
1.5 ACTIVITY HAZARD ANALYSES (AHAs)
1.6 PRECONSTRUCTION CONFERENCE
1.7 “SITE SAFETY AND HEALTH OFFICER” (SSHO) and “COMPETENT PERSON”
(CP)
1.8 TRAINING
1.9 INSPECTIONS
1.10 ACCIDENTS, OSHA 300 LOGS, AND MAN-HOURS
1.11 PERSONAL PROTECTIVE EQUIPMENT (PPE)
1.12 INFECTION CONTROL
1.13 TUBERCULOSIS SCREENING
1.14 FIRE SAFETY
1.15 ELECTRICAL
1.16 FALL PROTECTION
1.17 SCAFFOLDS AND OTHER WORK PLATFORMS
1.18 EXCAVATION AND TRENCHES
1.19 CRANES
1.20 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)
1.21 CONFINED SPACE ENTRY
1.22 WELDING AND CUTTING
01 35 26 -2
1.23 LADDERS
1.24 FLOOR & WALL OPENINGS
01 35 26 -3
SECTION 01 35 26
SAFETY REQUIREMENTS
1.1 APPLICABLE PUBLICATIONS:
A. Latest publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.
B. American Society of Safety Engineers (ASSE):
A10.1-2011...........Pre-Project & Pre-Task Safety and Health
Planning
A10.34-2012..........Protection of the Public on or Adjacent to
Construction Sites
A10.38-2013..........Basic Elements of an Employer’s Program to
Provide a Safe and Healthful Work Environment
American National Standard Construction and
Demolition Operations
C. American Society for Testing and Materials (ASTM):
E84-2013.............Surface Burning Characteristics of Building
Materials
D. The Facilities Guidelines Institute (FGI):
FGI Guidelines-2010Guidelines for Design and Construction of
Healthcare Facilities
E. National Fire Protection Association (NFPA):
10-2013..............Standard for Portable Fire Extinguishers
30-2012..............Flammable and Combustible Liquids Code
51B-2014.............Standard for Fire Prevention During Welding, Cutting and Other Hot Work
01 35 26 -4
70-2014..............National Electrical Code
70B-2013.............Recommended Practice for Electrical Equipment
Maintenance
70E-2015 ............Standard for Electrical Safety in the Workplace
99-2012..............Health Care Facilities Code
241-2013.............Standard for Safeguarding Construction, Alteration, and Demolition Operations
F. The Joint Commission (TJC)
TJC Manual ..........Comprehensive Accreditation and Certification
Manual
G. U.S. Nuclear Regulatory Commission
10 CFR 20 ...........Standards for Protection Against Radiation
H. U.S. Occupational Safety and Health Administration (OSHA):
29 CFR 1904 .........Reporting and Recording Injuries & Illnesses
29 CFR 1910 .........Safety and Health Regulations for General
Industry
29 CFR 1926 .........Safety and Health Regulations for Construction
Industry
CPL 2-0.124..........Multi-Employer Citation Policy
I. VHA Directive 2005-007
1.2 DEFINITIONS:
A. Critical Lift. A lift with the hoisted load exceeding 75% of the crane’s maximum capacity; lifts made out of the view of the operator
(blind picks); lifts involving two or more cranes; personnel being hoisted; and special hazards such as lifts over occupied facilities, loads lifted close to power-lines, and lifts in high winds or where
01 35 26 -5 other adverse environmental conditions exist; and any lift which the crane operator believes is critical.
B. OSHA “Competent Person” (CP). One who is capable of identifying existing and predictable hazards in the surroundings and working conditions which are unsanitary, hazardous or dangerous to employees, and who has the authorization to take prompt corrective measures to eliminate them (see 29
CFR 1926.32(f)).
C. "Qualified Person" means one who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, training and experience, has successfully demonstrated his ability to solve or resolve problems relating to the subject matter, the work, or the project.
D. High Visibility Accident. Any mishap which may generate publicity or high visibility.
E. Accident/Incident Criticality Categories:
No impact – near miss incidents that should be investigated but are not required to be reported to the VA;
Minor incident/impact – incidents that require first aid or result in minor equipment damage (less than $5000). These incidents must be investigated but are not required to be reported to the VA;
Moderate incident/impact – Any work-related injury or illness that results in:
1. Days away from work (any time lost after day of injury/illness onset);
2. Restricted work;
3. Transfer to another job;
4. Medical treatment beyond first aid;
5. Loss of consciousness;
01 35 26 -6
6. A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (5) above or,
7. any incident that leads to major equipment damage (greater than $5000).
These incidents must be investigated and are required to be reported to the VA;
Major incident/impact – Any mishap that leads to fatalities, hospitalizations, amputations, and losses of an eye as a result of contractors’ activities. Or any incident which leads to major property damage (greater than $20,000) and/or may generate publicity or high visibility. These incidents must be investigated and are required to be reported to the VA as soon as practical, but not later than 2 hours after the incident.
E. Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.
F.
1.3 REGULATORY REQUIREMENTS:
A. In addition to the detailed requirements included in the provisions of this contract, comply with 29 CFR 1926, comply with 29 CFR 1910 as incorporated by reference within 29 CFR 1926, comply with ASSE A10.34, and all applicable [federal, state, and local] laws, ordinances, criteria, rules and regulations [_____]. Submit matters of interpretation of standards for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most
01 35 26 -7 stringent requirements govern except with specific approval and acceptance by the Contracting Officer Representative
1.4 ACCIDENT PREVENTION PLAN (APP):
A. The APP (aka Construction Safety & Health Plan) shall interface with the Contractor's overall safety and health program. Include any portions of the Contractor's overall safety and health program referenced in the APP in the applicable APP element and ensure it is site-specific. The Government considers the Prime Contractor to be the
"controlling authority" for all worksite safety and health of each subcontractor(s). Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
B. The APP shall be prepared as follows:
1. Written in English by a qualified person who is employed by the
Prime Contractor articulating the specific work and hazards pertaining to the contract (model language can be found in ASSE
A10.33). Specifically articulating the safety requirements found within these VA contract safety specifications.
2. Address both the Prime Contractors and the subcontractors work operations.
3. State measures to be taken to control hazards associated with materials, services, or equipment provided by suppliers.
4. Address all the elements/sub-elements and in order as follows:
01 35 26 -8
a. SIGNATURE SHEET. Title, signature, and phone number of the following:
1) Plan preparer (Qualified Person such as corporate safety staff person or contracted Certified Safety Professional with construction safety experience);
2) Plan approver (company/corporate officers authorized to obligate the company);
3) Plan concurrence (e.g., Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional). Provide concurrence of other applicable corporate and project personnel (Contractor).
b. BACKGROUND INFORMATION. List the following:
1) Contractor;
2) Contract number;
3) Project name;
4) Brief project description, description of work to be performed, and location; phases of work anticipated (these will require an AHA).
c. STATEMENT OF SAFETY AND HEALTH POLICY. Provide a copy of current corporate/company Safety and Health Policy Statement, detailing commitment to providing a safe and healthful workplace for all employees. The Contractor’s written safety program goals, objectives, and accident experience goals for this contract should be provided.
d. RESPONSIBILITIES AND LINES OF AUTHORITIES. Provide the following:
1) A statement of the employer’s ultimate responsibility for the implementation of his SOH program;
01 35 26 -9
2) Identification and accountability of personnel responsible for safety at both corporate and project level. Contracts specifically requiring safety or industrial hygiene personnel shall include a copy of their resumes.
3) The names of Competent and/or Qualified Person(s) and proof of competency/qualification to meet specific OSHA
Competent/Qualified Person(s) requirements must be attached.;
4) Requirements that no work shall be performed unless a designated competent person is present on the job site;
5) Requirements for pre-task Activity Hazard Analysis (AHAs);
6) Lines of authority;
7) Policies and procedures regarding noncompliance with safety requirements (to include disciplinary actions for violation of safety requirements) should be identified;
e. SUBCONTRACTORS AND SUPPLIERS. If applicable, provide procedures for coordinating SOH activities with other employers on the job site:
1) Identification of subcontractors and suppliers (if known);
2) Safety responsibilities of subcontractors and suppliers.
f. TRAINING.
1) Site-specific SOH orientation training at the time of initial hire or assignment to the project for every employee before working on the project site is required.
2) Mandatory training and certifications that are applicable to this project (e.g., explosive actuated tools, crane operator, rigger, crane signal person, fall protection, electrical lockout/NFPA 70E, machine/equipment lockout, confined space, 01 35 26 -10 etc…) and any requirements for periodic retraining/recertification are required.
3) Procedures for ongoing safety and health training for supervisors and employees shall be established to address changes in site hazards/conditions.
4) OSHA 10-hour training is required for all workers on site and the OSHA 30-hour training is required for Trade Competent
Persons (CPs)
g. SAFETY AND HEALTH INSPECTIONS.
1) Specific assignment of responsibilities for a minimum daily job site safety and health inspection during periods of work activity: Who will conduct (e.g., “Site Safety and Health
CP”), proof of inspector’s training/qualifications, when inspections will be conducted, procedures for documentation, deficiency tracking system, and follow-up procedures.
2) Any external inspections/certifications that may be required
(e.g., contracted CSP or CSHT)
h. ACCIDENT/INCIDENT INVESTIGATION & REPORTING. The Contractor shall conduct mishap investigations of all Moderate and Major as well as all High Visibility Incidents. The APP shall include accident/incident investigation procedure and identify person(s) responsible to provide the following to the Contracting Officer
Representative:
1) Exposure data (man-hours worked);
2) Accident investigationreports;
3) Project site injury and illness logs.
i. PLANS (PROGRAMS, PROCEDURES) REQUIRED. Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable
01 35 26 -11 occupational, patient, and public safety risks in site-specific compliance and accident prevention plans. These Plans shall include but are not be limited to procedures for addressing the risks associates with the following:
1) Emergency response;
2) Contingency for severe weather;
3) Fire Prevention;
4) Medical Support;
5) Posting of emergency telephone numbers;
6) Prevention of alcohol and drug abuse;
7) Site sanitation(housekeeping, drinking water, toilets);
8) Night operations and lighting;
9) Hazard communication program;
10) Welding/Cutting “Hot” work;
11) Electrical Safe Work Practices (Electrical LOTO/NFPA 70E);
12) General Electrical Safety;
13) Hazardous energy control (Machine LOTO);
14) Site-Specific Fall Protection & Prevention;
15) Excavation/trenching;
16) Asbestos abatement;
17) Lead abatement;
18) Crane Critical lift;
19) Respiratory protection;
20) Health hazard control program;
01 35 26 -12
21) Radiation Safety Program;
22) Abrasive blasting;
23) Heat/Cold Stress Monitoring;
24) Crystalline Silica Monitoring (Assessment);
25) Demolition plan (to include engineering survey);
26) Formwork and shoring erection and removal;
27) PreCast Concrete;
28) Public (Mandatory compliance with ANSI/ASSE A10.34-2012).
C. Submit the APP to the Contracting Officer Representative or Government
Designated Authority for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 15 calendar days…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .