This file is a Questions and Answers (Q&A) document for RFI 502-23-392, a Department of Veterans Affairs solicitation (36C25626R0020) for replacing the roof on Emergency Generator Building 39 located in Pineville, Louisiana. The contract opportunity is being managed by the Veterans Health Administration Veterans Integrated Service Network 16.

The Q&A addresses 19 inquiries from prospective contractors regarding project staffing, documentation, specifications, and submission requirements. Key clarifications include: superintendent personnel may serve dual roles covering Safety and Site Health Officer (SSHO) and Quality Assurance/Quality Control (QA/QC) requirements simultaneously; specifications govern over other contract documents; the correct period of performance is 150 days (not 240 days as indicated in drawings); and the submission deadline is March 18, 2026 at 4:00 PM CST. Additional clarifications specify that temporary plastic wall panels are not acceptable (fencing required instead), the contractor is responsible for terminal cleanup, no commissioning agent is necessary, interior work means and methods are contractor-determined, and unscaled PDF drawings will not be updated. Regarding submission materials, resumes for key personnel will not count toward Factor 1 and Factor 2 page limits, while the Performance Relevancy Survey (Exhibit A) is the only required past performance submittal and will be included within page limitations; CPARS submissions, if provided, are subject to the same page restrictions. The applicable wage determination is LA20250051, effective January 15, 2026.

View the file

Other files

File Type Posted
S05 RFIs 502-23-392 Replace Roof on Emerg. Adment 0004.docx DOCX document
36C25626R0020 0004.docx DOCX document
Wage Determination LA20250051 01-15-2026.pdf PDF
36C25626R0020 0003.docx DOCX document
36C25626R0020 0002.docx DOCX document
S04 Site Visit 03-02-2026 Sign in sheet-Final.pdf PDF
36C25626R0020 0001.docx DOCX document
EXHIBIT C.docx DOCX document
P09 502-23-392 Drawings.pdf PDF
EXHIBIT D.docx DOCX document
EXHIBIT B.docx DOCX document
EXHIBIT E.docx DOCX document
EXHIBIT A.docx DOCX document
36C25626R0020.docx DOCX document
P09 502-23-392 Pineville Generator Roof - Specifications updated 01-02-26.pdf PDF
P09 SOW Replace Roof of emergency generator on Bldg 39- Final.docx DOCX document
P07 Wage Determination LA20250051 01-15-2026.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25626R0020 – CON 502-23-392 Replace Roof on Emergency Generator Building 39, Pineville, LA

Q1: Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO?

A1: Yes

Q2: If no to the question above, will the SSHO need to be full-time for this project?

A2: N/A

Q3: Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC?

A3: Yes

Q4: If no to the question above, will the QA/QC need to be full time for this project?

A4: N/A

Q5: Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC?

Q5:Yes

Q6: Please confirm the issued drawing set is the latest and complete set.

A6: The FORCE package was the latest

Q7: Please confirm the current design documents meet current VA TIL guidelines.

A7: Yes

Q8: Please provide the latest wage determination for this project’s county.

A8: Wage Determination LA20250051 01-15-2026, attachment

Q9: Is the use of temporary plastic wall panels (such as STARC panels) acceptable?

A9: No, the boundaries should be fencing.

Q10: Who is responsible for the terminal clean of the project area?

A10: The contractor

Q11: Who is responsible for contracting the commissioning agent?

A11: There will be no commissioning agent necessary for this project.

Q12: Please confirm order of precedence for the contract documents. Does SOW prevail over the specifications and construction drawings?

A12: Specifications always govern.

Q13: Can the dryout phase begin during the submittal process?

A13: That depends on coordination. If the work necessary for completion prior to the dryout phase does not have a submittal tied to it, then yes.

Q14: Can interior work be performed during the dryout process?

A14: Means and methods will not be determined by the VA.

Q15: In the solicitation the period of performance is listed as 150 days. In the drawings the phasing plan on sheet GC100 lists project days as 240 days. Please confirm correct period of performance.

A15: POP is 150 days

Q16: The provided drawings are not scaled properly, will updated PDF drawings be provided?

A16: No, this is what the architect of record provided

Q17: Can you please confirm the due date and time? SAM.gov is reporting a different due date than what is listed inside of the RFQ document.

A17: March 18, 2026 at 4:00PM CST

Q18: Factor 1 requests the experience and qualification details for all key subcontractors and proposed key personnel. This requirement will be fulfilled with the use of resumes. As there will be a large number of key personnel presented (between our internal team and subcontractor team members), will these resumes count towards the Factor 1 & 2 page limits?

A18: No. Resumes will not count toward the page limits.

Q19: Factor 2 requests past project performance information with the use of the Performance Relevancy Survey (Exhibit A) but does not specifically request past performance ratings reports of any kind. Please confirm you do not want completed Past Performance Questionnaires or available CPARS? If you would like past performance ratings reports provided in Factor 2, please confirm they will not count towards the Factor 1 & 2 page limits.

A19: For Factor Two, Exhibit A is the only required submittal and will be included within the page limitation. CPARS is not required, but any CPARS submitted will be subject to the same page limitation.