S05 RFIs 502-23-392 Replace Roof on Emerg. Adment 0004.docx

DOCX document 19 KB Posted

Attached to
Z1DZ--502-23-392 Replace Roof on Emergency Generator Building 39
Solicitation number
36C25626R0020
Issued by

About this file

This file is a Questions and Answers document for a federal construction solicitation. It contains responses to inquiries (Questions 20-26) submitted by prospective contractors regarding the roof replacement project for Emergency Generator Building 39 at the Pineville, Louisiana VA facility under solicitation number 36C25626R0020, Contract 502-23-392.

The Q&A addresses contractor concerns regarding project specifications and responsibilities. Key clarifications include: no subcontracting limitations are imposed; insulation specifications and sizing requirements must be obtained from the project specifications and drawings; replacement of a corroded electrical panel is only required if called for in the design documents; and the contractor is responsible for providing any new roof curb installation if required by the design. The responses consistently direct contractors to consult the specifications and drawings for detailed technical requirements, indicating that the solicitation documents contain comprehensive design and material specifications that govern the scope of work.

View the file

Other files

File Type Posted
36C25626R0020 0004.docx DOCX document
Wage Determination LA20250051 01-15-2026.pdf PDF
36C25626R0020 0003.docx DOCX document
36C25626R0020 0002.docx DOCX document
S05 RFIs 502-23-392 Replace Roof on Emerg. Generator Bldg. 39.docx DOCX document
S04 Site Visit 03-02-2026 Sign in sheet-Final.pdf PDF
36C25626R0020 0001.docx DOCX document
EXHIBIT C.docx DOCX document
P09 502-23-392 Drawings.pdf PDF
EXHIBIT D.docx DOCX document
EXHIBIT B.docx DOCX document
EXHIBIT E.docx DOCX document
EXHIBIT A.docx DOCX document
36C25626R0020.docx DOCX document
P09 502-23-392 Pineville Generator Roof - Specifications updated 01-02-26.pdf PDF
P09 SOW Replace Roof of emergency generator on Bldg 39- Final.docx DOCX document
P07 Wage Determination LA20250051 01-15-2026.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25626R0020 – CON 502-23-392 Replace Roof on Emergency Generator Building 39, Pineville, LA

Q20: What are the limitations of subcontracting? It isn't specified in the solicitation docs.

A20: None that I know of

Q21: What size insulation is required?

A21: Consult specifications

Q22: Is insulation tapered or non-tapered?

A22: Consult specifications/drawings

Q23: There was an electrical panel to the right of the door that had signs of rusting.

A23: Only if the drawings/specs call for it

Q24: Does this panel need to be replaced?

A24: Only if the design calls for it

Q25: If so, what is the size and breaker count of the panel?

A25: See above.

Q26: There is not clear information about this but will the new curb that is being installed on the roof be provided by the contractor or the VA facility?

A26: If a new curb is needed per the design, this will be provided by the contractor.