Water Tank Inspection Report Summary
This is a Water Tank Inspection Report prepared by TankSpek, LLC for the Veterans Healthcare System of the Ozarks at the VA Medical Center in Fayetteville, Arkansas. The inspection was conducted on May 22, 2026, on a 100,000-gallon elevated water tower with an approximate height of 140 feet. The facility is a multi-column, elevated, double ellipsoidal welded steel tank constructed with an unknown date and erection contractor. The inspection evaluated the tank's condition across multiple categories including structural integrity, sanitary conditions, safety compliance, and coating systems.
Overall condition assessments rate the tank as follows: structural condition is GOOD, sanitary condition is FAIR, interior coating is FAIR, exterior coating is POOR, and safety condition is FAIR. Key findings indicate visible sediment accumulation requiring cleaning, moderate exterior corrosion from UV degradation, interior coating staining from unsealed roof joints, and several safety deficiencies including inadequate fall arrest cable tension, undersized balcony passthrough opening (16 inches versus required 24 inches), and damaged electrical components. Critical safety concerns include RF exposure from cellular equipment exceeding OSHA occupational limits, requiring equipment deenergization during worker presence, and security vulnerabilities including damaged perimeter fencing and an accessible onsite ladder enabling unauthorized access. Recommended corrective actions include scheduled tank draining and cleaning, exterior coating application, interior coating improvements at year four, safety climb device adjustments, roof vent screening replacement, and aviation beacon bulb replacement with FAA-compliant incandescent bulbs. The report notes that cost estimates are not provided and that a supplemental report on cathodic protection system maintenance will be submitted separately.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Medical Center
Fayetteville, AR
WATER TANK
INSPECTION
REPORT
Prepared for
Veterans Healthcare
System of the Ozarks
1100 North College Avenue
Fayetteville, AR
Prepared by
TankSpek, LLC | PO Box 805 | Berryville, AR 72616
(800) 624-1023 www.tankspek.com
VA Medical Center 100MG Storage Tank 2026 INSPECTION
Inspection report | Copyright 2025 by TankSpek, LLC
Table of Contents
1.0 PROJECT INFORMATION
2.0 CITATIONS, STANDARDS AND REFERENCES
3.0 SUMMARY OF FINDINGS
4.0 SANITARY OBSERVATIONS
5.0 SAFETY EVALUATION
6.0 STRUCTURAL OBSERVATION
7.0 SITE & SECURITY
8.0. INTERIOR COATINGS EVALUATION
9.0 EXTERIOR COATINGS EVALUATION
10.0 SUPPORTING PHOTOS
11.0 PROJECTIONS AND COST ESTIMATIONS
VA Medical Center 100MG Storage Tank 2026 INSPECTION
1.0 PROJECT INFORMATION
PWS ID 1221 Non-transient / Non-community
Project Location 1100 North College Avenue Fayetteville, AR
Name / Designation 100,000 gallon elevated water tower (EWT)
Site Contact/ Representative
Purpose of Inspection Condition Assessment
Inspection Type In-service evaluation
Date of Inspection May 22, 2026
Inspected by Alek N. Gray
Report Prepared by James Brookshire 417-439-6011 jbrookshire@tankspek.com
Report Date May 31, 2025
Tank Description Multi-column, elevated Double Ellipsoidal
Construction Style Welded steel
Construction Date Information Unavailable
Erection Contractor Information Unavailable
Construction Drawings Information Unavailable
Date of Last Inspection November 2024 - ADH Sanitary Survey
Age of Exterior Coating Information Unavailable
Age of Interior Coating Information Unavailable
Last Interior Service Information Unavailable
Tank Height / ft BCL: ~110.0 TCL: ~135.0 Overall: ~140.0 {estimates}
Diameter / ft-in Tank Shell: ~32.0 Riser: ~30.0in Inlet: Unknown
WET INTERIOR COATING EXTERIOR COATING
Coating System Epoxy Epoxy/Urethane1
Thickness Readings Taken No2 Yes2
Adhesion Testing No No
Coating Samples Taken No No
1. Top-coating appears to be Aliphatic Acrylic Polyurethane.
2. Limited to accessible surfaces immediately within reach
VA Medical Center 100MG Storage Tank 2026 INSPECTION
2.0 CITATIONS, STANDARDS AND REFERENCES
All internal equipment used for this inspection is dedicated to the purpose of Potable Water Inspections and suitable for disinfection.
All inspection equipment entering the facility is disinfected before entry as dened in the AWWA C652 standard.
This storage tank was evaluated for compliance, conformance and overall condition with the latest revisions of the applicable following agencies, standards or criteria.
• Company operating procedures and safety protocols
• Arkansas Department of Health (ADH)
− Rules and Regulations Pertaining to Public Water Systems − Checklist and Guidance for Water Storage Tank Inspections − Policy for Maintaining Water Quality
• OSHA Occupational Safety and Health Standards, Part 1910
• OSHA Safety and Health Regulations for Construction, Part 1926
• General guidelines of AWWA Manual M42- Steel Water Storage Tanks
• AWWA D101 -Inspecting & Repairing Water Storage Tanks
• SSPC-PA 2-2022 Coating System Application, Maintenance, & Inspection
• AWWA D102 -Painting and Repainting Steel Tanks
• AWWA D100- Welded steel storage tanks
• US DOT- FAA Advisory on Obstruction Marking & Lighting
• AWWA D104—Automatically Controlled, Impressed-Current Cathodic Protection
• NFPA 22 – Standard for Water Tanks for Private Fire Protection
• 10 States Standards when applicable
• General industry recognized standards and practices
VA Medical Center 100MG Storage Tank 2026 INSPECTION
4 Inspection report | Copyright 2025 by TankSpek, LLC
3.0 SUMMARY OF FINDINGS
Overview of ndings and observations. Detailed information, exceptions, and recommendations are provided at the conclusion of each item’s information section.
INTERIOR COATING
Overall Condition: FAIR
Recommendation: Maintain planned coating improvement schedule
EXTERIOR COATING
Overall Condition: POOR
Recommendation: Consider coating the exterior.
SANITARY CONDITION:
Overall Assessment: FAIR
Recommendation: Proceed with scheduled routine maintenance
SAFETY CONDITION
Overall Assessment: FAIR
Recommendation: a.) Proceed with scheduled routine maintenance b.) Impose/Enforce restrictions on telecommunications
STRUCTURAL CONDITION:
Overall Assessment: GOOD
Recommendation: Continue with a periodic maintenance schedule
VA Medical Center 100MG Storage Tank 2026 INSPECTION
4.0 SANITARY OBSERVATIONS
ITEM FINDING REMARKS
WATER LEVEL Tank level was at approx. 75% capacity during time of inspection. No action
WATER QUALITY
Visible solids were observed on water surface. Objects in tank. No visible indication of biolm on wall surfaces. Clean and sanitize interior surface.
Corrective Action Base Bid 0006
{Scheduled Tank Draining & Clean}
SEDIMENT LEVEL
A uniform sediment layer was observed in tank bowl. Estimation of total volume is not considered excessive (moderate) but should be scheduled for cleaning and removal.
Corrective Action Base Bid 0006
{Scheduled Tank Draining & Clean}
WATER CLARITY
Presence of some solids was noted; water clarity was adequate to complete inspection. Residual or turbidity testing was not performed by inspectors.
No action
RETENTION
Total usage / turnover rate was unavailable at time of inspection. No internal mixing or circulation system.
No action
ROOF SURFACE
Inspection plates were adjusted during inspection. Damaged inspection plates are allowing surface water to enter. No visible pinholing or damage from corrosion. Replace any damaged plates as needed.
Corrective Action Base Bid 0004
{Scheduled Temporary Roof Patch}
ROOF VENT
12 inch roof vent installed onto a 24 inch NFPA fan ange at roof apex is adequately protected with 24 mesh, stainless screening. No visible contamination or internal corrosion.
No action
ROOF VENT
16 inch secondary roof vent with fail-safe features is installed adjacent to original roof vent. Oversized screening does not meet ADH requirements. Screening assemblies will require removal and adjustment to fully seal. Replace screening with 24 mesh and adjust as needed.
Corrective Action Base Bid 0005
{Scheduled Replace Vent Screen}
ROOF HATCH- Primary
24 inch roof entry hatch meets ADH design standards. Hatch cover was noted closed and secured at time of inspection (bolted in place) and secured on completion. Hatch opening is not gasketed or sealed weather tight. Install weather seal
Corrective Action Base Bid 0006
{Scheduled Tank Draining & Clean}
VA Medical Center 100MG Storage Tank 2026 INSPECTION
OVERALL SANITARY CONDITION FAIR, with exceptions as noted
No evidence of any contamination was found during inspection. Deciencies or sanitary items indicated for any Corrective Action or Maintenance are documented and ready for scheduled service.
4.0 Sanitary Observations (Cont.)
OVERFLOW PIPING
8 inch overow piping is extended to grade and adequately screened with 24 mesh. Discharge is accessible from ground level, terminating into a separate drainage pipe with adequate air break.
No action
SAMPLING PORT An adequate sampling tap / port is present and functional. No action
DRAINING /
ISOLATING
Adequate or functional drainage method /valving in place. No action
LEVEL INDICATOR
Existing mechanical oat system is immobilized and non-functional.
Repair is not recommended. Removal of internal components and sealing openings is recommended at the next scheduled interior coating procedure.
Maintenance needed Option 3008 Option 3009
{Year 3- Misc. Repairs Not to Exceed / Interior Coatings}
VA Medical Center 100MG Storage Tank 2026 INSPECTION
5.0 SAFETY OBSERVATIONS
TOWER ACCESS LADDER
Ladder was found in good condition with no visible damage or defects and is currently safe for use with maintenance needed.
Fall arrest cable system was observed in place with no visible damage. Cable & guides are not adequately tensioned and scheduled for maintenance.
Corrective Action Base Bid 0003
{Scheduled -Adjust safety climb device}
BALCONY ENTRY
16 inch width of the balcony passthrough opening from the access ladder does not meet the OSHA minimum of 24 inch.
Minor modications are recommended to enlarge ladder opening and install a self-closing gate.
Maintenance Needed Base Bid 0008
{Scheduled Misc. Repairs Not to Exceed}
ROOF ACCESS
LADDER
Ladder was found in good condition with no visible damage or defects and is currently safe for use with maintenance needed.
Ladder siderail is sectioned (not continuous) with a minimal gap.
A cover plate should be welded in place to fully join ladder sections, providing a continuous side rail.
Fall arrest cable system was observed in place with no visible damage. Cable & guides are not adequately tensioned and scheduled for maintenance.
Corrective Action Base Bid 0003 Base Bid 0008
{Adjust safety climb device/ Misc. Repairs not to Exceed)
RAILINGS- Balcony
Railing observed in good condition with no visible damage.
Railing meets OSHA standards for top rail height of 42 in. Midrail and toeboard are in place. See additional balcony information below in TELECOM ITEMS
See telecom notes
INTERIOR ACCESS
LADDER
Ladder is mechanically connected to tank bottom to meet NFPA 22 requirements. Ladder was found in fair condition with moderate corrosion noted on upper three rungs. No other visible damage or defects and is currently safe for limited use with maintenance needed. Stainless fall arrest cable system was observed in place with no visible damage. Cable & guides are not adequately tensioned and scheduled for maintenance.
Corrective Action Base Bid 0003
{Scheduled -Adjust safety climb device}
INTERIOR RISER LADDER
Ladder is inaccessible for inspection and noted as ‘in place’ only with fall protection cable system bracket visible. Condition of ladder and fall arrest system is unknown. A full condition assessment is needed at the next scheduled interior cleaning.
Corrective Action Base Bid 0006
{Scheduled Tank Draining & Clean}
INTERIOR RISER
RAILING
No perimeter railing or guard in tank bottom at riser opening.
Consider installing a safety component at next major renovation.
Maintenance needed Option 3008 Option 3009
{Year 3- Misc. Repairs Not to Exceed / Interior Coatings}
VA Medical Center 100MG Storage Tank 2026 INSPECTION
5.0 Safety Observations (Cont.)
AUXILIARY ROOF
ENTRY
No secondary access hatch. 24” NFPA vent flange will suffice as an additional opening when needed but is not practical.
No action
EXTERIOR ROOF
RAILING
No handrails or perimeter guard rail in place. Rigging/ painters ring in place at roof perimeter was observed in good condition with no visible damage. Roof has adequate points for safe tie-off.
No action
SHELL MANWAY-
BALCONY
No auxiliary entry / egress at balcony level. Consider installation at next major renovation in lieu of any additional roof hatch.
Maintenance needed Option 3008 Option 3009
{Year 3- Misc. Repairs Not to Exceed / Interior Coatings}
GROUND LEVEL ENTRY
18” pressure-style opening at base of 30” riser. No visible leaks.
Note: 24” is considered minimum safe opening for rescue.
No action
PLACARDS /SIGNAGE
No warning signage for EM or RF exposure as required by OSHA Confined Space placard in place at Riser Manway Entry.
Maintenance needed
TELECOM ITEMS
Components installed onto balcony railing create added lateral wind loads and stresses. Additional supports should be added to prevent damage to balcony railing and floor. Alternatively, components should be installed at roof level to a dedicated corral. Balcony floor is a structural component and is at risk of damage or cracking from repeated or continuous movement generated by telecom items attached to railing.
Maintenance needed All costs should be absorbed by Telecom Installer(s)
RF EXPOSURE
Electromagnetic (EM) and Radio Frequency (RF) readings taken during inspection show the existing cellular components emit frequencies exceeding occupational exposure limits for personnel as defined by OSHA. Future work for any extended period will require these components to be deenergized in accordance with OSHA Lock Out/ Tag Out Procedures during the presence of workers.
Corrective Action for Worker Safety to be implemented and enforced
OBSTRUCTIONS
Impediments and safety obstructions were observed and noted.
Telecom connectors and wiring connected to siderail of roof ladder. Various trip hazards noted -poorly secured wiring/coax.
Maintenance needed All costs should be absorbed by Telecom Installer(s)
VA Medical Center 100MG Storage Tank 2026 INSPECTION
OVERALL SAFETY CONDITION : FAIR with exceptions as noted
Some deciencies indicated for any Corrective Action or Maintenance are documented and ready for scheduled service. Other items can be progressively corrected as needed under a Not to Exceed option of a proposed maintenance plan.
Testing showed that RF levels near the cellular equipment exceed occupational safe distance requirements. Equipment will need to be isolated if workers are near this equipment for longer than a few moments. Safety conditions relating to telecommunication installation and improvement should be corrected by the telecom equipment owner (e.g., provider, contractor, company, etc.). ALL costs should be on the equipment owner. Future work should be restricted or limited access should be enforced, along with a detailed work plan for any additions, changes or modications. Oversight and follow-up inspection by a neutral third party will ensure proper installation and procedures are followed.
5.0 Safety Observations (Cont.)
ELECTRICAL
COMPONENTS
Sections of rigid and flex conduit were observed damaged or exposed. Exposed wiring and open junction boxes were observed. 120V service was tested and found active to the tank roof level. Age of GFCI breaker is unknown and should be upgraded as a precaution. Repairs are recommended for safety of personnel.
Maintenance Needed Schedule with any option year {Misc. Repairs Not to
Exceed}
FALLING OBJECTS
Loose items, hardware, spare telecom parts, etc. should be removed to protect passers-by from potentially falling objects.
Primary roof vent cover should have a permanent tether installed to prevent accidental drops during maintenance or complete removal in the event of wind/storm damage.
Maintenance Needed Schedule with any option year {Misc. Repairs Not to
Exceed}
ABANDONDED or
OUT-OF SERVICE
ITEMS
Components no longer in use, abandoned, or damaged should be removed periodically as part of routine maintenance.
Insistence that any Telecom accessories, including wiring/coax, loose hardware on balcony, etc., be removed as a condition of any new component being installed. Waste telecom cables discarded at the tank base should immediately be removed from the site by technicians on completion of their service.
Maintenance Needed Schedule with any option year {Misc. Repairs Not to
Exceed}
VA Medical Center 100MG Storage Tank 2026 INSPECTION
6.0 STRUCTURAL OBSERVATIONS
OVERALL STRUCTURAL CONDITION : GOOD with exceptions as noted
No observable structural deciencies were found during visual inspection. Additional information is needed on interior riser piping and inlet/outlet piping to be obtained during a scheduled Interior Tank Clean & Drain. A supplemental report of the existing cathodic protection system, maintenance and components will be submitted.
SITE DRAINAGE
Adequate site drainage; no evidence of ponding, standing water, or soil erosion near foundation piers.
No action
FOUNDATION PIERS
Concrete foundation pads observed in good condition. No spalling or visible damage. Tops of concrete footings are 6 inches or greater above nished grade.
No action
ANCHORORAGE
Anchor bolts were found sufficiently tightened. No visible damage or excess corrosion was observed on anchors or connectors.
No action
DIAGONAL BRACING
Tower wind rods were observed to be sufficiently tensioned with no visible damage.
No action
ROOF VENTING
Secondary vent has failsafe / vacuum release. No low spots on roof surface; No visible damage from vacuum pressure.
No action
OVERFLOW PIPING
8” overow piping. Inlet piping was not accessible at inspection and size unknown. Inlet pipe size will be needed to determine if overow is sufficient for maximum discharge.
Additional info needed {Scheduled during Tank
Drain & Clean}
VORTEX BREAKER
Presence of a vortex breaker on the outlet pipe as required by NFPA 22 is unknown. Inlet/Outlet piping was not accessible at inspection.
Additional info needed {Scheduled during Tank
Drain & Clean}
GIRDERS/STIFFENERS No observable damage. No action
GROUNDING Ground cable observed connected in place. No action
WATER TIGHTNESS No evidence of leaks, past or present. No action
CATHODIC PROTECTION Supplemental maintenance summary provided See additional summary
VA Medical Center 100MG Storage Tank 2026 INSPECTION
7.0 SITE & SECURITY
OVERALL SITE SECURITY & VULNERABILITY: GOOD with improvements needed
Address any immediate security vulnerabilities as allowable. Remove/ repair / correct ground level items within the scope of facility or groundskeeping maintenance. Maintain existing schedule of repair for items at upper levels.
SITE ACCESS Controlled or limited access; not secure No action
PERIMETER
FENCING
Perimeter fencing is unsecure, damaged or not fully in place. Access gate is locked.
See below
TOWER ACCESS
A locking cover is in place at base of access ladder. Access ladder height-from-ground is ~12ft.
A sufficient length aluminum extension ladder is available inside the fenced perimeter to provide access to unauthorized personnel. Repairing of fencing and removal of ladder should be completed as a priority.
Immediate Corrective Action to eliminate a known vulnerability
ROOF HATCH
ENTRY
Roof entry hatch is bolted in place- Install a padlock as needed for additional security.
Maintenance recommended
ROOF VENTING
Primary roof vent cover is not tamper-proof. Cover could be easily removed. Secondary roof vent is exposed and readily accessible to vandalism. Install vandal-proof devices on venting as necessary.
Maintenance recommended
WARNING
BEACON
An FAA, L810, steady burning dual obstruction beacon is in place with globes intact. No visible damage with power supply at the unit. Full functionality will be tested at the scheduled bulb replacement.
Existing LED bulbs do not meet FAA requirement for NVG (infrared emitting). Replacement with approved incandescent bulbs with a minimum requirement of 120V, ~ 8000hr, krypton lled.
Corrective Action Base Bid 0007
{Scheduled Aviation Bulb Replacement}
LIGHTING Street lighting and basic perimeter lighting. No action
CAMERAS Unknown No action
VA Medical Center 100MG Storage Tank 2026 INSPECTION
8.0 INTERIOR COATING EVALUATION
OVERALL INTERIOR COATING CONDITION : FAIR
Recommendation: Proceed with scheduled interior coating improvements at year four of an ongoing maintenance plan. Specify sealing of the open roof joints with an NSF approved urethane (exible) joint sealant during the coating procedure to prolong coating life and prevent unsightly staining.
Fair Condition = Light-to- moderate coating damage; Localized or isolated areas of debonding; (Acceptable) weathering on aged coatings; (Acceptable) abrasions on aged coatings. Light-to-Moderate mold or debris staining. No excessive corrosion, No large areas of debonding. Acceptable adhesion of existing coatings; Often repairable with maintenance coatings; Typically, acceptable for overcoating.
SURFACE CONDITION Damaged Surface Area
Avg. Coating Thickness
ROOF PLATES
No visible coating damage or debonding. Moderate staining is present from surface corrosion along the unwelded/unsealed roof joints.
<1% 9.0 mils DFT
ROOF SUPPORT N/A N/A
ROOF KNUCKLE No visible corrosion or debonding observed. Minor staining 0%
SHELL PLATES Moderate staining. No visible debonding. Localized abrasions noted. <2%
BOWL KNUCKLE
Not fully visible due to sediment layer. No coating damage observed over visible areas.
BOWL BOTTOM
Not fully visible due to sediment layer. No coating damage observed over visible areas.
RISER PIPING Inaccessible ------
Thickness readings limited to surfaces within immediate reach
APPURTENANCES
ROOF VENT
Primary central roof vent shows no visible corrosion or coating damage.
Newly installed secondary roof vent shows nearly 100% coating failure on the internal surface.
100%
ROOF HATCH
Minor coating abrasions and corrosion on interior hatch frame and interior perimeter.
5%
ACCESS LADDER
Visible coating loss and corrosion on upper three rungs and upper connecting hardware. Minor abrasions overall.
10%
OVERFLOW WEIR Visible corrosion and possible metal loss on the overow intake weir box. 15%
VA Medical Center 100MG Storage Tank 2026 INSPECTION
9.0 EXTERIOR COATING EVALUATION
OVERALL EXTERIOR COATING CONDITION : POOR
Recommendation Consider coating the exterior. Existing coating is no longer adequately protecting the exterior surfaces. The existing coating is likely still in a condition that maintenance or overcoating will extend the lifespan another 7-12 years. A full exterior renovation is inevitable. Coating samples were not collected and tested for presence of lead or heavy metals during this inspection process. Sampling will be necessary to determine if containment & abatement procedures are necessary in the event of a full renovation.
Poor Condition = Large % of surface area damage, debonding or (Unacceptable) weathering on aged coatings. Heavy mold, mildew, or mineral staining. Poor adhesion of existing coatings; Often prolonged with maintenance coatings; Conditionally acceptable for overcoating.
EXTERIOR CONDITION Damaged Surface Area
Avg. Coating Thickness
ROOF PLATES
Coating shows moderate cracking/ checking and surface corrosion; Likely age-related UV degradation and weathering.
Coating appears tightly adhered with no visible debonding.
75% 8.0 mils DFT
ROOF KNUCKLE
Coating shows moderate cracking/ checking and surface corrosion; Likely age-related UV degradation and weathering.
Coating appears tightly adhered with no visible debonding.
40% 8.0 mils DFT
SHELL PLATES
Localized, minor coating damage. Visible debris and staining. No visible debonding.
10% 9.0 mils DFT
BALCONY
Minor abrasions on upper surfaces (typical) with no visible debonding.
Localized corrosion noted on underside of balcony oor.
10% -----
BOWL PLATES No visible coating damage. No visible debonding. ---- -----
RISER PIPING
Coating shows moderate cracking/ checking and surface corrosion; Likely age-related UV degradation and weathering. Coating appears tightly adhered with no visible debonding.
65% -----
COLUMNS/
LEGS/ SUPPORTS
Moderate cracking/ checking and surface corrosion; Likely age-related UV degradation and weathering. Coating appears tightly adhered with exceptions as noted: Localized debonding of top coating noted on sections of legs/columns appear to damage caused by previously installed telecom bracketry and not being considered a failure of the coating.
20% ------
APPURTENANCES Localized, minor coating damage. No visible debonding -----
Thickness readings limited to surfaces within immediate reach
VA Medical Center 100MG Storage Tank 2026 INSPECTION
Roof Vent Corrosion
Weir Box Corrosion
INTERIOR ROOF SURFACES
Staining as a result of unsealed, unwelded roof joints
VA Medical Center 100MG Storage Tank 2026 INSPECTION
Meets NFPA standard
Uniform sediment layer Interior ladder corrosion
INTERIOR VIEWS, Typical
VA Medical Center 100MG Storage Tank 2026 INSPECTION
ROOF EXTERIOR
VA Medical Center 100MG Storage Tank 2026 INSPECTION
ROOF EXTERIOR
VA Medical Center 100MG Storage Tank 2026 INSPECTION
ROOF VENTING
Oversized screening Oversized screening
VA Medical Center 100MG Storage Tank 2026 INSPECTION
1. ROOF HATCH COVER & FRAME
2. TELECOM ITEMS ATTACHED TO LADDER RAIL
VA Medical Center 100MG Storage Tank 2026 INSPECTION
1. ROOF ACCESS LADDER & FALL ARREST
2. BALCONY TOP RAIL & TOE BOARD
VA Medical Center 100MG Storage Tank 2026 INSPECTION
BALCONY, Typical
OBSTRUCTIONS
VA Medical Center 100MG Storage Tank 2026 INSPECTION
BALCONY PASS THROUGH OPENING
ACCESS LADDER & FALL ARREEST
24” Min. OPENING NEEDED
VA Medical Center 100MG Storage Tank 2026 INSPECTION
EXTERIOR SURFACE CORROSION
VA Medical Center 100MG Storage Tank 2026 INSPECTION
EXTERIOR SURFACE CORROSION
VA Medical Center 100MG Storage Tank 2026 INSPECTION
EXTERIOR GROUND AND LADDER ACCESS
VANDAL DETERRENT
Onsite ladder for unauthorized access
Damaged perimeter fencing
VA Medical Center 100MG Storage Tank 2026 INSPECTION
OVERFLOW PIPING & DISCHARGE
VA Medical Center 100MG Storage Tank 2026 INSPECTION
PREVIOUSLY DROPPED OR FALLEN ITEMS
DISCARDED & ABANDONED TELECOM COAXIAL CABLES
Grounding cable in place
Falling Object Hazard
VA Medical Center 100MG Storage Tank 2026 INSPECTION
DAMAGED OR EXPOSED ELECTRICAL
VA Medical Center 100MG Storage Tank 2026 INSPECTION
Cost estimates are not provided as part of this report.
11.0 PROJECTIONS & COST ESTIMATIONS
File details come from the government source that posted it. Updated .