Revised SOW 36C25625Q0671.pdf

PDF 148 KB Posted

Attached to
J041--Chiller Preventative and Corrective Maintenance Services Federal contract opportunity
Solicitation number
36C25625Q0671
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This Performance Work Statement (PWS) details chemical treatment and maintenance services for the Southeast Louisiana Veterans Health Care System in New Orleans. The contract covers comprehensive services for multiple boiler and cooling system components, including 4 Cleaver Brooks Fire Tube Boilers, 6 Trane Chillers, 12 Cooling Towers, and supporting water treatment equipment. Key requirements include weekly preventative maintenance, chemical testing, emergency repair services, on-site training, and environmental testing for Legionella.

The contract is a firm, fixed-price best value procurement set aside for Service-Disabled Veteran-Owned Small Businesses. The base performance period is May 12, 2025 through May 11, 2026, with three potential 12-month option periods. Contractor personnel must have minimum qualifications including 5 years for project managers and 10 years for operations managers and technicians, with specific experience in water treatment and equipment maintenance. The contract includes a $60,000 annual parts rider and requires monthly invoicing after successful service completion, with specific requirements for reporting, personnel qualifications, and system documentation.

View the file

Other files for this federal contract opportunity

Other files attached to J041--Chiller Preventative and Corrective Maintenance Services, newest first.
File Type Posted
Award Notice 36C25625P1028.pdf PDF
Revised Price Cost Schedule 36C25625Q0671.pdf PDF
36C25625Q0671 0003.docx DOCX document
M2010-1241 Marley M-5.pdf PDF
36C25625Q0671 0002.docx DOCX document
36C25625Q0671 Questions and Answers Updated.pdf PDF
22 67 19.16 - CEP Reverse Osmosis Water Purification System - Complete OM 02.pdf PDF
36C25625Q0671 0001.docx DOCX document
22 67 19.16 - CEP Reverse Osmosis Water Purification System - Complete OM.pdf PDF
36C25625Q0671 Questions and Answers.pdf PDF
Site Visit Information.pdf PDF
36C25625Q0671.pdf PDF
36C25625Q0671.docx DOCX document
VA Directive 2017-02-06.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Chemical Treatment for Boiler and Chiller Plant

Southeast Louisiana Veterans Health Care System New Orleans, LA

01/07/2024

Objective: The overall purpose is to provide chemical treatment, service, complete preventative maintenance (hereafter called PM Service), routine repair service, emergency repair service and on-the-job training for Government owned equipment for the Southeast Louisiana Veterans Health Care System (SLVHCS), New Orleans, LA. PM service is defined/described on page 2 of this Performance Work Statement.

Requirements: Chemical Testing, Preventive Maintenance and Training shall be in accordance with VA Directive 1810 Dated January 4, 2023 for boiler water testing, to include all manufacturer’s requirements, industry standards and statutory requirements. Please refer to Attachment A (VA Directive 1810 Dated January 4, 2023) which accompanies this Performance Work Statement.

Government Owned Equipment: Chemical treatment, service, PM Service, routine repair service, emergency repair service, and on-the-job training shall be done for the equipment listed in the table below and located at 2400 Canal Street, New Orleans, LA.

Item Qty Description

1 4 Cleaver Brooks Fire Tube Boilers

2 6 Trane Chillers

3 1 Chill Water Close Loop System

4 8 Heating Water Loop System

5 12 Cooling Towers

6 1 Reverse Osmosis Unit

7 1 Water Softener Unit

8 1 Carbon Filter Unit

TABLE 1 – Government Owned Equipment

Period of Performance: The expected base period of performance is May 12, 2025 through May 11, 2026 with three (3) Twelve (12) Month Option Periods that may or may not be exercised based on the needs of and at the discretion of the government. The actual performance period shall be established at the time of contract award.

Hours of Operation: Services shall be performed during the VA normal business hours, 8:00 a.m. through 4:30 p.m., Monday through Friday, excluding Federal holidays. Any work that needs to take place outside of the scope of normal business hours shall be approved by the

Contracting Officer’s Representative (COR) prior to the commencement of work. Federal holidays are available at the Federal Holiday OPM Site.

Scope:

1. Contractor shall provide full chemical treatment and service to include complete preventative maintenance (PM Service), routine repair service, emergency repair service and on-the-job training for the equipment in Table 1.

2. Contractor shall provide all needed equipment, parts, labor, and current software updates (as necessary) to perform service on all equipment in this Performance Work Statement to include personnel, supervision, materials, supplies, training, and all other associated costs required to perform such services.

3. Contractor shall provide all necessary reagent test kits and calibration solutions in order to perform all necessary treatment, service, preventive maintenance, and on-the-job training for all equipment.

4. Contractor shall provide all necessary salt for the water softener located in the boiler room.

Base on the current usage the water softener is using about 3 pallets (each consisting of 64 bags, 40lbs each) of salt pellet per month.

5. The Contractor shall provide all staffing and transportation necessary for the delivery and administration of the necessary chemicals for the treatment of the systems noted. The contractor is responsible for bringing the needed chemicals to specific site locations and transferring chemicals to and from the site. The contractor will also be responsible for handling all chemical transfers into all the tanks. Point of feed locations for each system are easily accessible and are not located in remote or hard to access locations to include sensitive areas (i.e. patient care or public areas). Contractors will not have to travel through sensitive areas or interact with patients to reach point of feed locations.

6. The Contractor shall adhere to all regulations as established by the Department of Transportation concerning the transport of chemicals. The Contractor shall also be responsible for all proper disposal of all chemicals as disposal requires. The Contractor shall provide bill of lading for each chemical delivery completed to the VA. VA employees will not sign for chemical deliveries. Therefore, the Contractor must provide someone on site to receive all deliveries.

Chemical inventories shall be completed as part of weekly tasks and chemical administration.

Preventive Maintenance (PM Service) – Definition/Description

1. PM Service shall be accomplished weekly and all scheduling shall be coordinated with Contracting Officer Representative (COR). PM service does not involve maintaining the equipment itself. The scope of PM service includes the following:

• Chemical maintenance of the equipment i.e. the point of entry (barrels, chemical tanks) and the subsequent locations of chemicals into the system.

• Water treatment testing on all equipment performed on a weekly basis. The contractor shall collect water samples for testing, inspect, calibrate, and service the water treatment system equipment, as required and in accordance with VA Directive 1810 Dated February 6, 2017, manufacturer, industry, and statutory requirements. The purpose of http://www.opm.gov/policy-data-oversight/snow-dismissal-procedures/federal-holidays/%23url=2015 this testing is to prevent premature equipment failures and to extend equipment life.

Services may be performed separate from or in conjunction with other services.

2. PM Service shall consist of a weekly PM site visit by the contractor for all equipment items in this Statement of Work. PM service shall be scheduled with the COR during the VA normal business hours, 8:00 a.m. through 4:30 p.m., Monday through Friday, excluding Federal holidays. Federal holidays are available at the Federal Holiday OPM Site. Any work that needs to take place outside of the scope of normal business hours shall be approved by the Contracting Officer’s Representative (COR) prior to the commencement of work.

This weekly PM site visit shall include PM service for the equipment in Table 1.

When doing weekly PM service contractor shall utilize a PM checklist. This PM checklist shall clearly state the Contractor personnel for all PM visits. This PM checklist shall be prepared during each PM visit and be submitted to the Contracting Officer's Representative (COR) within 7 days after each PM visit.

The weekly PM site visit shall include:

1. Chemical Treatment

2. System Testing Check and Adjustments

a. On site visit, shall be conducted on a weekly basis which shall include an equipment operational review and visual inspections.

b. System checks and adjustments to the make-up and recirculation system shall be made as required.

c. Instrumentation shall be re-calibrated during each visit and changes shall be recorded.

d. System adjustments such as controller and chemical pumps set points shall be made accordingly.

e. Contractor will update or provide a Cooling Tower Monitoring and Data Collection: The following operational conditions must be monitored, documented and alarmed by a building control system or equal. All alarms must be documented, and operational conditions must be documented at least hourly and upon significant change in state.

a) Biocide levels in the system.

b) Water chemistry including pH and conductivity.

c) Corrosion inhibitor levels.

f. Contractor will conduct the following Cooling Tower Maintenance, Inspection and Documentation.

a) Inspect and adjust chemical metering pumps monthly.

b) Inspect and clean sample lines monthly.

c) Inspect and calibrate continuous water chemistry analysis equipment monthly.

d) Inspection of the sump fill and drift eliminators and cleaning if required monthly.

e) Inspect and clean chemical injection quills quarterly.

f) Inspect and clean secondary chemical containment semi-annually.

g) Cleaning of the sump and fill: the system must be disinfected semi-annually, cleaned and re-disinfected.

h) Inspection of the fill and drift eliminators for damage and biofilm semi-annually.

i) Inspection and PM of the sump level control and valves monthly.

j) Inspection, cleaning and adjustment of the flow control valves semi-annually

k) Inspect and calibrate instrumentation annually.

g. Test Cooling Tower makeup water quality for water chemistry, with adjustments to the chemistry based on results.

http://www.opm.gov/policy-data-oversight/snow-dismissal-procedures/federal-holidays/%23url=2015

a) Test system water quality to confirm desired chemistry and dose rates monthly.

b) Measure corrosion byproducts to ensure corrosion inhibitors are effective monthly.

3. On-Site Water Testing

a. Water testing shall be done on a weekly basis and performed on all equipment.

b. Water testing shall consist of the following tests (at a minimum) but is not limited to the following: Total hardness (ppm CaCO3), Chlorides , Conductivity, pH, Alkalinity, Phosphates, TDS, etc. It is the responsibility of the Contractor to identity and to perform the required chemical treatments for the equipment in this Performance Work Statement. Contractor shall follow all manufacturer’s guidelines with respect to the necessary chemical treatments that are needed for this equipment. As this Performance Work Statement does not establish guidelines or restrictions for discharge (pH, Molybdenum, Chlorine, Phosphate, etc.) contractors shall follow local, state, and federal guidelines concerning this matter.

c. For Cooling Towers Systems Environmental Sampling Protocol and Interpretation of Results for Legionella and Heterotrophic Plate Counts (HPC) NOTE: Both HPC and Legionella testing are required. This appendix pertains to requirements for HPC testing. For requirements pertaining to Legionella testing, see VHA Directive 1061.

1. Sampling Requirements:

2. Analyte: Total Bacteria (HPC)

3. Method: Dip Slides

Note 1: Laboratories that process water samples for microbiological testing must:

(a) Be accredited by a recognized regional, national or international accrediting body as follows:

1. In accordance with a laboratory accreditation standard (e.g., ISO/IEC 17025:

2017, General Requirements for the Competence of Testing and Calibration Laboratories). Examples of such accrediting bodies include the National Environmental Laboratory Accreditation Program (NELAP); the American Association for Laboratory Accreditation (A2LA); and the Environmental Microbiology Laboratory Accreditation Program (EMLAP).

2. Include Legionella testing method(s) that will be used on facility water samples in the laboratory’s scope of accreditation, as documented on the laboratory’s accreditation certificate.

(b) Demonstrate proficiency by the Centers for Disease Control and Prevention (CDC) Environmental Legionella Isolation Techniques Evaluation (ELITE) program or the Public Health England (PHE) Legionella External Quality Assessment (EQA) scheme at performing the culture of Legionella from environmental samples. Information about the CDC ELITE program and a listing of laboratories that are ELITE members can be found at https://wwwn.cdc.gov/elite/public/elitehome.aspx. If PCR will be used in addition to culture, then the laboratory also must demonstrate proficiency at PCR detection of Legionella from environmental samples by the CDC-recognized lab conducting proficiency testing (currently the Wisconsin State Laboratory of Hygiene (WSLH)) or by the PHE EQA Legionella molecular scheme. NOTE: The method(s) used by the laboratory on the samples that the VA medical facility uses to determine Legionella positivity is to be the same method(s) used by the laboratory for proficiency testing.

4. Service Reporting (which includes the following):

a. On site follow up with key observations shall be delivered to operators.

b. Summary report shall be completed and submitted within 7 calendar days.

c. Reports shall include test results, records of adjustments and any system operation recommendations.

d. Contractor shall maintain report archives.

e. Review of operator log for completion, accuracy and errors.

f. For Cooling Towers monthly, Quarterly and annually PM’s Contractor will create a document/spreadsheet to document at a minimum Equipment name, state of equipment, finding (pass or failed), corrective action taken, etc. Contractor will have one month after post award to deliver a sample document for final approved. Contractor will provide a report with chemical levels, findings, and corrective action taken.

General Requirements:

1. The Contractor shall inform the COR and provide any original equipment manufacturer (OEM) updates that are necessary to perform the required services. OEM updates shall be accomplished during PM visits or emergency repair service calls. The Contractor shall also inform the COR of any optional updates provided by the OEM. The government reserves the right to consider and implement these optional updates if deemed necessary.

2. The Contractor shall be accessible by phone and shall provide a point of contact name and telephone number in the event that emergency services must be performed on the equipment.

Accessibility for emergency requests consists of a telephone number where a designated contact person can be reached or a message left for emergency repair requests, 24 hours per day, seven days per week (notification time, as stated in this contract, shall be considered to have been given at the time a message is left, or a call received).

3. Call Back: Call outs will be at the discretion of the Government. Call backs will only occur in the event of an emergency when the government requires your assistance. However, if contacted, the Contractor shall respond to all emergency repair service requests within 2 hours by telephone, from the time of the initial telephone call received by the COR or their approved designee. If the problem cannot be resolved by telephone the Contractor shall make an on-site visit in person within 4 hours after receipt of the verbal request to do so. The Contractor shall bring the proper tools, equipment, and parts as appropriate for the problem described. Should parts not be available immediately, the Contractor shall notify the COR or designee, and obtain these unavailable parts in the most expeditious manner available.

Temporary measures shall be implemented by the Contractor in the event the issue cannot be addressed immediately.

4. Upon arrival at the medical center, the Contractor shall check in with Contracting Officer Representative or their approved designee. Contractor shall wear their Identification Badge visibly upon their person, between the height of the waist and shoulders. The Contractor shall return to the Contracting Officer Representative or their approved designee to check out at the completion of the service. Failure to wear the required badge may result in removal from the medical center. Parking at the medical facility is not guaranteed. The Contractor may have to seek parking outside of the government facility (at contractor expense if free parking is not available).

5. Service calls shall be deemed to be ROUTINE by the Government. Routine service calls will be scheduled by the COR, making every effort to arrange this repair service at a time convenient to both the Contractor and the VA.

6. Routine or PM visits shall not be canceled once scheduled (without the prior coordination and approval from the COR).

7. Should the Contractor determine that the damage or needed repair has been caused through the fault or negligence of the VA, the Contractor shall receive the COR or designee concurrence before proceeding. The Contractor shall notify the COR who will notify the Contracting Officer in writing of the repair accomplished outside the scope of the contract and will request a separate purchase order to cover those repair costs.

8. All parts, controllers, pump and fitting or other items required to perform normal, routine services (to include labor) that are $3,500.00 or less are included in this contract. (Routine maintenance is from the chemical tanks to the point of injection into the systems). This $3,500.00 cap is for every 12-month period while the contract is in effect (to include extensions to the contract through the exercise of option years) beginning on the performance period start date of the contract. Parts, labor, and other accessories costing more than $3,500.00 will require approval of the Contracting Officer’s Representative (COR). Any parts replaced under this contract shall be new or equivalent to OEM specifications and are to be warranted against defects in material and workmanship during the term of this contract or 90 days, whichever is longer. Parts replaced shall become the sole property of the Government.

9. Contractor shall provide a service report (which includes both the Contract Number and the Purchase Order Number) each time the Contractor accomplishes routine or emergency repairs.

Contractor shall use an approved PM checklist for accomplished PM Service reports for all required PMs.

10. Contractor shall submit to the COR a service log. Contractor shall maintain a service log for each piece of equipment listed in this Performance Work Statement that is to be maintained/serviced. Upon arriving at the equipment site, Contractor personnel shall log in their name and the time of arrival. Prior to departure from the site for the day, Contractor personnel will log out by entering the time of departure and ensuring that all required information is written in the log.

11. Government shall not furnish any supplies, consumables, refinishing (painting) the equipment or furnishing materials, or electrical repairs external to the equipment.

12. Parts Rider/Emergency Hours A recurring annual parts rider of $60,000.00 shall be included in this contract. All single part purchases required to maintain these systems shall be covered under and up to the amount noted in this rider. The contractor shall provide an itemized quote for all parts associated with this rider and is not permitted to proceed with any purchase under this rider without written approval from the COR. Additionally, the contractor shall respond to a call for on-site repair and be at the job site within two (2) hours during regular working hours, Monday – Friday 8:00am – 4:00pm. In very urgent cases, an immediate repair can be requested after 4:00pm and on Saturdays and Sundays, and Federal holidays. After repair, the contractor shall submit a detailed work report to include all required materials and is to be at no charge to the facility. If the malfunction is reported to the contractor no later than 4:00pm, the failure shall be immediately on the same day.

Training:

1. The Contractor shall provide on the job training every six months for all operators (not to exceed 15 students) for all equipment in this Statement of Work. Onsite Training will be conducted in a classroom setting and out in the field by actual trainers. Virtual training is not allowable or acceptable to include the use of a virtual instructor or prerecorded instructor.

Approximately eighty percent (80%) of the training will be in a “field style” environment (i.e. in the boiler plant etc.). The other twenty percent (20%) will be in the classroom. Training will be provided on all devices, their function, operation, location and purpose. All training shall occur at 2400 Canal Street, New Orleans, LA 70119. The Contractor shall be responsible for providing all classroom materials necessary in order to successfully render the training the following:

teaching materials, samples, projectors, laptops, presentations, sign in sheets, etc. Total training time shall be a minimum of two (2), eight (8) hour days. Prior to the scheduling and commencement of training the proposed training plan (syllabus, planned course of instruction, proposed classes etc.) shall be approved by the COR.

Personnel Staffing Requirements:

The government cannot anticipate an exact number of staff that are needed to successfully complete the tasks/requirements in this Performance Work Statement. However, for the performance period of the contract (to include the option year periods if exercised) the contractor shall provide the minimum staffing levels that are listed below. While it is the responsibility of the contractor to provide an adequate level of qualified staff to meet (or exceed) mission requirements contractors shall provide the minimum staff that are listed below during the performance period of the contract.

• At least 1 Project Manager (PM). See Note 1 and Note 2

• At least 1 Operations Manager (OM) See Note 1 and Note 2

• At least 1 Technician

*Note 1: The Project Manager can also be the Operations Manager (and serve a dual role) if the Project Manager is actively engaged in and is performing/completing operations related tasks and deliverables to include meeting the definition of an Operations Manager as defined herein.

In turn, the Operations Manager (OM) can also be the Project Manager (and serve a dual role) if he/she is managing/overseeing the project.

*Note 2: Project Managers and Operations Managers must have the minimum number of years of experience as annotated in the Contractor Staff/Personnel Qualifications section of this Performance Work Statement. A Project Manager cannot serve as an Operations Manager if he/she lacks the minimum years of experience required for this role.

For this specific requirement, the roles/responsibilities of the Project Manager, Operations Manager, and Technician are defined/described below.

Note 3: The VA must assess and document the competency of contractors and the contractor’s personnel as part of the acquisition process prior to the start of any work on facility cooling tower water systems, including water treatment. Competencies must be re-assessed on an on-going basis, or whenever there is a change in contractors or the contractor’s personnel performing the work. At a minimum, the contractor’s competency should be assessed and documented on an annual basis. A copy of any assessment or documentation must be submitted and retained in the contract file by the Contracting Officers Representative.

Definition/Description:

Project Manager (PM): the person in overall charge of the planning and execution of a project.

(A project manager is typically a senior manager who is not involved in the daily operations of a project but ensures that the operations of a project are functioning effectively and that tasks/deliverables are being completed. A project manager is usually the supervisor of an operations manager. The project manager is ultimately responsible/accountable for the completion of operational tasks/deliverables for a project. (In some cases, the project manager is also the operations manager who (as the PM/OM) manages the entire spectrum of a project ensuring that everything gets done).

Operations Manager (OM): a person who manages the operations of a project. An operations manager is sometimes referred to as a “floor manager.” An operations manager is the “boots on the ground,” “personnel on the flight line,” and the “hands on deck” supervisor of the technicians that are performing the work. In most cases the operations manager is working right alongside the technicians who are performing/completing operational tasks/deliverables for a project.

Technician: staff/personnel who perform/complete the operational tasks/deliverable for a project. Technicians are the “worker bees” for a project and usually do not serve in a supervisory capacity. Technicians are the “boots on the ground,” “personnel on the flight line,” and the “hands on deck” who are doing the work for a project.

Contractor Staff/Personnel Qualifications:

1. (Prime) contractors and subcontractors shall possess the necessary capabilities, qualifications, and experience necessary to execute the specific tasks in this Performance Work Statement. No unqualified individuals shall perform maintenance and/or repair service for the equipment listed in this Performance Work Statement at any time during the performance period. Contractors and subcontractors shall have the minimum qualifications as listed below (i.e. core competencies) for the staff/personnel that are provided.

Project Manager (PM):

• Minimum of five (5) years’ experience on the equipment to be maintained (as specified in this Statement of Work) to include original equipment manufacturer and other related devices. If the Project Manager (PM) is also serving as the Operations Manager (OM) (dual role) then he/she shall have the additional experience required for an Operations Manager.

Operations Manager (OM) and Technician:

• Minimum of ten (10) years’ experience on the equipment to be maintained (as specified in this Statement of Work) to include original equipment manufacturer and other related devices).

• Minimum of seven (7) years’ experience performing water testing and chemical treatment on chiller and boiler systems.

The government cannot afford to take any risks during execution of services and therefore must ensure that only qualified personnel are performing these services. Therefore, personnel must have the minimum experience as annotated in this section. While the government cannot prevent unqualified personnel from helping other staff members, personnel not possessing the minimum qualifications are not allowed to be performing maintenance/repair on the equipment.

If the prime contractor is partnering with another subcontractor to provide services, the subcontractor will be required to possess the same qualifications as the prime contractor. Prime contractors are responsible for the actions/inactions of their subcontractor for this requirement.

2. Contractor shall provide personnel/technicians that have successfully completed service and training from the manufacturer or a manufacturer accredited school that resulted in the core competencies mentioned above.

3. All personnel who will be performing services on the required equipment shall demonstrate that they have the necessary capabilities, qualifications, and minimum required experience by providing the appropriate credentialing documents. Resumes shall be provided for each personnel/staff member that will be performing work and/or who will be managing personnel, the services being conducted, and/or the progress of this requirement in a direct or indirect capacity. The submittal of resumes is required for both prime contractor and subcontracting personnel/staff as a part of their technical proposal. Other documents may be provided by the contractor/subcontractor as needed (or if appropriate) if such documents adequately describe the qualifications, experience, skills, and technical capabilities of those personnel. To be relevant, the qualifications, experience, skills, and technical capabilities described/listed must be specific and must mirror the current requirement (Chemical Maintenance and Treatment of Boilers and Chillers that is described herein). To be valid, qualifications, experience, skills, and technical capabilities of personnel must be verifiable through a cross check of the credentialing documents that are required/submitted. The minimum required experience of contractor personnel who will be performing services on equipment shall be verified by the COR prior to the commencement of these services by these personnel. The contractor will notify the COR if there are substitutions or replacement of these personnel so that additional and/or follow up verifications can be done.

4. Contractor’s shall familiarize themselves with Addendum A: Hazardous Material Identification and Material Safety Data as listed below for this requirement.

5. Contractor’s shall familiarize themselves with Addendum B: Personnel Protective Equipment

(PPE) guidelines as listed below for this requirement.

Deliverable

1. Contractor must have a current written operating plan for each system in place when operating the equipment. The plan(s) must include the following at a minimum:

a. System schematic with all equipment and instrumentation uniquely labeled (e.g. tag number), including chemical treatment systems and components. All equipment, valves and instruments must be physically labeled to match the schematic.

b. Detailed sequence of operation for all modes of operation, including the chemical treatment system. Sequence of operation must reference and be correlated with the system schematic. The sequence of operation must include the following either in tabular form or within the document:

1. Nominal operating point for all equipment.

2. Range of operation for all equipment, flow, pressure, temperature, and biocide levels.

3. Alarm points for all equipment and systems.

4. A complete equipment/instrumentation list with the following information:

a. Manufacturer, make, model and serial number

b. System served

c. Equipment rated and operating capacity, rated and operating flow, rated and operating pressure

d. Instrumentation rated and operating flow, temperature and/or pressure

f. Unique tag number referenced to the schematic

g. Installation date

h. Details on the equipment’s operational and performance data, including chemical treatment

i. Standard operating procedures (SOPs) for each piece of equipment and device including chemical treatment

j. Emergency procedures for equipment or system failure, along with alarm conditions.

k. Procedures for shutdown and startup of equipment and systems.

l. Methods for monitoring system(s) and equipment operation and parameters, where data is displayed and the frequency of data collection

(Contractor will have 1 month after post award to present this information to the COR).

Use of Subcontractors:

The government does not encourage or discourage the use of subcontractors by prime contractors (and affirms a neutral position on this matter for this requirement only). The government is only concerned with the successful completion of the tasks/deliverables/requirements that are described herein. However, prime contractors and subcontractors are expected to adhere to the guidelines and limitations regarding subcontracting as stipulated in the solicitation for this requirement. Subcontractors that are to be utilized for this requirement shall be identified by the prime contractor and subcontracting personnel must meet the minimum qualification standards as described herein.

Additional Information

All boilers are the same size.

The existing chemical boiler feed system will be used for the Cleaver Brooks Fire Tube Boilers (4).

The chiller tanks belong to the facility.

The system volume for the heating water loop is estimated to be 1500 gallons per building.

City water is the primary source for the twelve (12) Cooling Towers and six (6) Trane Chillers.

Rain water is the backup. The estimated percentages of city water or rain water that is needed cannot be determined because the amount of rainfall cannot be predicted.

Legionella testing is required-Four (4) tests per year, on 3 cooling towers (4 cell per tower), to be conducted once every quarter. In the event that legionella tests come back as positive the government has a local policy that will be followed. (Additional testing will be required if the cooling tower tests positive).

The cooling towers does involve tower cleanings, once (2) per year. Every 6 Months.

RO unit will have two (2) new membrane changes per year.

Carbon and Multimedia filter will have one (1) each change out per this contract This will be done in the Base Year.

General Information

Contract Type: A firm, fixed price best value contract is the contemplated for this requirement.

When solicited a contractor’s total offer price must cover/include all expected costs for this requirement described herein to include expected/anticipated expenses for call backs.

Contractors shall refer to the solicitation for this requirement for all matters related to pricing/cost.

Invoicing and Payments: Invoicing will be done monthly after successful completion and required certification of completion of services for that month. Contractors are encouraged to submit their invoices monthly after they have successfully completed all required services for that month to get reimbursed for the services rendered. Specific invoicing instructions will be provided to the successful awardee upon award of contract.