ICRA JACC Mechanical Upgrade Contract ONLY.pdf
PDF 60 KB Posted
- Solicitation number
- 36C25624R0052
About this file
This document outlines an Infection Control Construction Permit for Project 520-22-169 to upgrade mechanical systems at three Department of Veterans Affairs locations. The project involves medium risk construction activities at the Joint Ambulatory Care Clinic in Pensacola, Florida, Eglin Air Force Base VA Clinic in Eglin AFB, Florida, and Magnolia Clinic in Panama City Beach, Florida. The permit details infection control requirements and classifications for the work. It requires active dust prevention, containment of waste, and HVAC isolation during construction. The related pre-solicitation notice provides an opportunity for contractors to upgrade mechanical systems at the three specified VA locations. The anticipated solicitation number is listed along with a brief project description and location addresses. The contracting agency is identified as the Department of Veterans Affairs Veterans Health Administration VISN 16.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Full Drawing Set Final.pdf | ||
| 36C25624R0052 EXHIBIT B.docx | DOCX document | |
| WD Okaloosa County FL20240217.pdf | ||
| P03 Brand Name JA 520-22-169 (CO Signed) - Copy_Redacted.pdf | ||
| 36C25624R0052 EXHIBIT E.docx | DOCX document | |
| Attachment_A_Basis of Design Submittals rev1.pdf | ||
| 36C25624R0052 EXHIBIT F.docx | DOCX document | |
| 36C25624R0052 EXHIBIT A.docx | DOCX document | |
| 36C25624R0052 Solicitation.pdf | ||
| Attachment_B_Decon Site Prep.pdf | ||
| 36C25624R0052 EXHIBIT D.docx | DOCX document | |
| WD Bay County FL20240005.pdf | ||
| P09 (REVISED) 520-22-169 SOW Upgrade Mech Systems JACC Eglin PCY rev4.docx | DOCX document | |
| WD Escambia County FL20240203.pdf | ||
| 36C25624R0052 EXHIBIT C.docx | DOCX document | |
| Specs rev6.pdf | ||
| 36C25624R0052 Pre-solicitation.docx | DOCX document | |
| P09 (REVISED) 520-22-169 SOW Upgrade Mechanical Systems JACC Eglin PCY rev4.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Adapted with permission V Kennedy, B Barnard, St Luke Episcopal Hospital, Houston TX, Forms modified and provided courtesy of Judene Bartley, ECSI Inc Beverly Hills MI 2002 Reviewed 2005
Infection Control Construction Permit-CONTRACT ONLY Project Title: Upgrade Mechanical System Permit No: 520-22-169
Location of Construction: JACC- Eglin- PCY Project Start Date: TBD
Project Coordinator/COTR: Logan Bazo Estimated Duration: TBD
Contractor Performing Work: TBD Permit Expiration Date: TBD
Supervisor: Telephone: 850-912-2150
YES NO CONSTRUCTION ACTIVITY YES NO INFECTION CONTROL RISK GROUP
TYPE A: Inspection, non-invasive activity GROUP 1: Low Risk
X TYPE B: Small scale, short duration, moderate to high levels
X GROUP 2: Medium Risk
TYPE C: Activity generates moderate to high levels of dust, requires greater 1 work shift for completion
GROUP 3: Medium/High Risk
TYPE D: Major duration and construction activities
Requiring consecutive work shifts
GROUP 4: Highest Risk
CLASS I 1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace any ceiling tile displaced for visual inspection.
3. Minor Demolition for Remodeling
CLASS II
3/8/2022
TSC
1. Provides active means to prevent air-borne dust from dispersing into atmosphere
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Wipe surfaces with disinfectant.
6. Contain construction waste before transport in tightly covered containers.
7. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
8. Place dust mat at entrance and exit of work area.
9. Remove or isolate HVAC system in areas where work is being performed.
CLASS III
1. Obtain infection control permit before construction begins.
2. Isolate HVAC system in area where work is being done to prevent contamination of the duct system.
3. Complete all critical barriers or implement control cube method before construction begins.
6. Vacuum work with HEPA filtered vacuums.
7. Wet mop with disinfectant
8. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
9. Contain construction waste before transport in
Date 4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
5. Do not remove barriers from work area until complete project is thoroughly cleaned by Facilities Management Service.
tightly covered containers.
10. Cover transport receptacles or carts. Tape covering.
11. Remove or isolate HVAC system in areas where work is being performed/
Initial
CLASS IV
1. Obtain infection control permit before construction begins.
2. Isolate HVAC system in area where work is being done to prevent contamination of duct system.
3. Complete all critical barriers or implement control cube method before construction begins.
4. Maintain negative air pressure within work site utilizing
HEPA equipped air filtration units.
5. Seal holes, pipes, conduits, and punctures appropriately.
6. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
7. All personnel entering work site are required to wear shoe covers
8. Do not remove barriers from work area until completed project is thoroughly cleaned by the Environmental
Service Dept.
9. Vacuum work area with HEPA filtered vacuums.
10. Wet mop with disinfectant.
11. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
12. Contain construction waste before transport in tightly covered containers.
13. Cover transport receptacles or carts. Tape covering.
14. Remove or isolate HVAC system in areas where work is being performed.
Date
Initial
Construction taking place in negative pressure rooms where TB patients are housed or work with exhaust to these rooms? ___Yes _X__No
If yes, the contractor must provide written certification that all employees assigned to the work site have a negative TB screening within 90 days prior to assignment to work area.
Additional Requirements:
Infection Control: Tanya Chandler COTR:
Safety:
File details come from the government source that posted it. Updated .