This document appears to be a life safety plan for a building in a federal contract opportunity. The key details are:

The document is a life safety plan for Building 08, Level 5.5 Mezzanine of the SLVHCS Replacement Medical Center project in New Orleans, Louisiana. It provides detailed information on the construction type, occupancy, exit capacity, occupant load, and maximum travel distance for this level of the building. The plan includes a legend for various life safety symbols and notes regarding the applicable building codes and fire safety requirements. The related federal contract opportunity, Solicitation Number 36C25624R0010, is for the expansion of a distributed antenna system for the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 16. The opportunity is a solicitation, but no additional details on the scope, schedule, pricing, or set-asides are provided in the materials submitted.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DZ--Project #629-18-114 Expand Distributed Antenna System (DB), newest first.
File Type Posted
INTERSTITIAL LEVEL 4i AREA F1.1_recover-Model.pdf PDF
INTERSTITIAL LEVEL 3i AREA E2-Model.pdf PDF
INTERSTITIAL LEVEL 3i AREA F1.1-Model.pdf PDF
INTERSTITIAL LEVEL 3i AREA D2.1-Model.pdf PDF
INTERSTITIAL LEVEL 3i AREA E1-Model.pdf PDF
INTERSTITIAL LEVEL 4i AREA G1.1-Model.pdf PDF
INTERSTITIAL LEVEL 3i AREA G2-Model.pdf PDF
INTERSTITIAL LEVEL 2i AREA G2.1-Model.pdf PDF
INTERSTITIAL LEVEL 2i AREA F1-Model.pdf PDF
LARGE SECOND FLOOR.pdf PDF
LARGE FOURTH FLOOR.pdf PDF
LARGE EIGHTH FLOOR.pdf PDF
01.BC.pdf PDF
06.M.pdf PDF
FIRST FLOOR.pdf PDF
03.HJ.pdf PDF
THIRD FLOOR-LIFE SAFETY.pdf PDF
01-BC INPATIENT - LVL.1-01.BC.1.pdf PDF
RESEARCH-FIFTH FLOOR -LIFE SAFETY.pdf PDF
FOURTH FLOOR.pdf PDF
05.L.pdf PDF
01-BC INPATIENT - LVL.5-01.5.pdf PDF
05.SUM.pdf PDF
04-K STAFF PARKING - LVL.7-04.K.7 L.S..pdf PDF
LEVEL 3.5-LIFE SAFETY.pdf PDF
01-BC INPATIENT - LVL.6-01.BC.6.pdf PDF
36C25624R0010 A0001 REVISED-6TH LEVEL -PATIENT GARAGE.pdf PDF
36C25624R0010 A0001 REVISED-5TH LEVEL -STAFF GARAGE.pdf PDF
36C25624R0010 A0001 REVISED-4TH LEVEL -STAFF GARAGE.pdf PDF
36C25624R0010 A0001 REVISED-3RD LEVEL -STAFF GARAGE.pdf PDF
36C25624R0010 A0001 REVISED-1ST LEVEL -PATIENT GARAGE.pdf PDF
36C25624R0010 A0001 NOR-CC-02AR.pdf PDF
36C25624R0010 A0001 NOR-09-01AR.pdf PDF
36C25624R0010 A0001 NOR-08-04AR.pdf PDF
36C25624R0010 A0001 NOR-08-02AR.pdf PDF
36C25624R0010 A0001 NOR-07-04AR.pdf PDF
36C25624R0010 A0001 FISHER HOUSE -SECOND FLOOR-Model.pdf PDF
36C25624R0010 A0001 NOR-06-04AR.pdf PDF
36C25624R0010 A0001 NOR-03-08AR.pdf PDF
36C25624R0010 A0001 NOR-03-07AR.pdf PDF
36C25624R0010 A0001 NOR-03-05AR.pdf PDF
36C25624R0010 A0001 NOR-03-02AR.pdf PDF
36C25624R0010 A0001 NOR-02-04AR.pdf PDF
36C25624R0010 A0001 NOR-01-05AR.pdf PDF
Att 15 - DAS - Wire Mesh Partitions.docx DOCX document
Att 10 - DAS - Reference Standards.docx DOCX document
Att 8 - DAS - HEFP SEP Design Alert 12 - Design Submission Guidance for Telecommunications.pdf PDF
36C25624R0010 EXHIBIT D.docx DOCX document
Att 13 - DAS - Scope of Existing.docx DOCX document
Att 12 - DAS - Schedules.docx DOCX document
Show all 50

Z1DZ--Project #629-18-114 Expand Distributed Antenna System (DB) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

102'

F

OPEN TO BELOW

UNOCCUPIED SPACE

DN

UP

ELEV

MACH

ROOM

5P202

MECH

MEZZ

5P201

FEC-W

UP

UNOCCUPIED

6P-CO50

5.5P200

3981 S.F

6P100

552 S.F

5.5P202

465 S.F

P

E

E

CM CM CM

CM CM MM

s s

CM

DETAIL

* TYPICAL PER

ELEVATOR

1 2

TO

SECURITY

FOR

DOOR

RELEASE

STAIR

5.5STP1

S S S S S

S S S S S

S S S

F

SMOKE PARTITION

GLASS/SPRINKLER 2-HOUR ASSEMBLY (DOUBLE LINE)

GLASS/SPRINKLER 1-HOUR ASSEMBLY (SINGLE LINE)

1-HOUR RATED WALL

2-HOUR RATED WALL

3-HOUR RATED WALL

4-HOUR RATED WALL

1-HOUR SMOKE BARRIER

2-HOUR SMOKE BARRIER

MAXIMUM PERMITTED TRAVEL DISTANCE

FIRE EXTINGUISHER

STANDPIPE HOSE OUTLET

EXIT FLOW AND CAPACITY0

SYMBOL KEY

NOTE 1: DETAILED OCCUPANT LOAD AND EXIT CAPACITY CALCULATIONS

ARE PROVIDED IN THE FIRE PROTECTION AND LIFE SAFETY

ANALYSIS.

NOTE 2: FURTHER DESCRIPTION REGARDING THE BUILDING

CLASSIFICATIONS, CONSTRUCTION TYPES AND FIRE

RESISTANCE RATED/SMOKE BARRIER WALLS IS INCLUDED IN

THE NARRATIVE AND THE FIRE PROTECTION AND LIFE SAFETY

ANALYSIS.

NOTE 3: NFPA 45 LAB CLASSIFICATION

2A = D

2B = D

3A = D

3B = D

4A = D

CAMPUS KEY PLAN

C

INCIDENTAL USE: CONFERENCE ROOM - OCC.

LOAD FOR ROOM CALCULATED AS 15 SF PER

OCCUPANT, LESS THAN 50 OCCUPANTS.

ALL LIFESAFETY SYMBOLS DO NOT APPEAR ON LIFESAFETY PLANS

CONSTRUCTION TYPE

ELEMENT IBC = 1B NFPA 220

STRUCT FRAME 2 HR 2

BEARING WALL 2 HR 2

2 HR 2

NON-BEARING EXT WALL TABLE 602 0

NON BEARING INT WALL 0 0

FLOOR CONST 2 2

ROOF CONSTR 1 1

TABLE 601

SEE PAGE 87 OF IBC FOR DETAIL.

Revision 12-26-18

B

STB

S.C.

1B.1

BUSINESS

P

S

B

Q

D2 D1

E2 E1

F2 F1

G2 G1

A2

A4

A5

A1

A6

B1

C1 C2

B2

H

J1 J2

L

K

M1 M2

M3

P

N1 N2

A7

D3

E3

F3

R1

R4

R2

R3

A3

PLAN

NORTH

DATE

LOCATION

CHECKED DRAWN

PROJECT TITLE PROJECT NUMBER

DOCUMENT SET PACKAGE

DRAWING NUMBERAPPROVED: PROJECT DIRECTOR

DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:

REVISIONS: DATE

VA FORM 08-6231

O N

E

EI

G H

T

IN

C H

O

N E

FO

O

T O

N E

Q U

AR

TE

R

IN

C H

O

N E

FO

O

T O

N E

H

AL

F

IN

C H

O

N E

FO

O

T

TH

R

EE

Q U

AR

TE

R S

IN

C

H

O N

E

FO

O T

TH

R

EE

IN

C H

ES

O N

E

FO

O T

O N

E

IN

C H

F

O R

TY

F

EE

T

(1

0'

6"

6"

0'

0'

123456

B

A

D

C

E

F

O N

E

SI

XT

EE

N

TH

IN

C

H

O N

E

FO

O T

O N

E

AN

D O

N E

H

AL

F

IN

C H

ES

O N

E

FO

O T

6"

BUILDING NUMBER

BLDG 08 LIFE SAFETY PLANS

ML MLJuly 16, 2012

08100342.00SLVHCS REPLACEMENT MEDICAL

CENTER PROJECT

NEW ORLEANS, LOUISIANA

SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL

KORDA/NEMETH ENGINEERING / STRUCTURAL

BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE

ARCHITECTURAL ENGINEERING / PLUMBING

SCALES ASSOCIATES / FIRE PROTECTION

DESMAN ASSOCIATES / PARKING

CODE CONSULTANTS, INC. / CODE CONSULTANT

THE SEXTANT GROUP / AV & ACOUSTICAL

HAMMER DESIGN ASSOCIATES / FOOD SERVICE

PYBURN & ODOM / ABATEMENT

TATA & HOWARD / TANK CONSULTANT

Department of Veterans Affairs

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

WP_09B

CONSTRUCTION DOCUMENTS 1

FULLY SPRINKLERED

I.S.C. GROUP, INC. / IRRIGATION

DAN EUSER WATER ARCHITECTURE, INC. / WATER FEATURE

"=1'-0"

5.5

BLDG 08 LEVEL 5.5 MEZZ LIFE SAFETY PLAN

OCCUPANCY

CONSTRUCTION TYPE

EXIT CAPACITY

OCCUPANT LOAD

MAX.TRAVEL DIST.

PERMITTED

S

II (222)

400' - 0"

RESEARCH #08

THIS LEVEL IS MECHANICAL

PENTHOUSE

ONE INCH = FORTY FEET (1" = 40')

0' 15' 30' 0' 40' 80'

GRAPHIC SCALE

OVERSIZED DOOR KICK PLATES

12-26-18

File details come from the government source that posted it. Updated .