07-N CEP - LVL.3 & 3.5-07.N.3-3.5.pdf
PDF 395 KB Posted
- Solicitation number
- 36C25624R0010
About this file
This document appears to be a set of construction drawings for the Central Energy Plant (CEP) Levels 3 and 3.5 at the Southeast Louisiana Veterans Health Care System facility. The drawings provide a detailed floor plan layout, including mechanical rooms, electrical rooms, treatment plant, and other support spaces. The drawings are part of a life safety audit and assessment for the facility.
The related federal contract opportunity is for Project #629-18-114 to expand the Distributed Antenna System (DAS) at the facility. This is a solicitation issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 16. The solicitation number is 36C25624R0010, but the document provided does not contain details on requirements, response dates, award information, pricing terms, or set asides. This appears to be a separate facility infrastructure project not directly related to the DAS expansion contract opportunity.
View the file
Other files
Show 40 more
Latest 50 of 193 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Issue
DateProject:
Building/Wing.
Client Project No.
AutoCAD File Name
Title Drawn by: Checked by: Date:
Location Scale:
RAM AJA
For Review
Facility:
07-N CENTRAL ENERGY PLANT
SLVHCS LSC EVAL - 2017Life Safety Audit 2017 Southeast Louisiana Veterans Health Care System 2400 Canal Street New Orleans, LA 70119
(800) 935-8387 SLVHCS, LA
The Mihalik Group 1300 West Belmont Ave., Suite 500 Chicago, Illinois 60657
(773) 929-4276
PLAN
NORTH
REFERENCE PLAN
D
E
F
G
B1
C1
M1 M2
H
J1
J2
N1
N2
B2
C2
Q
K
L
P
A
M3
07- N CENTRAL ENERGY
PLANT (CEP)-LVL. 3 & 3.5
06-01-1706-01-17 Revision
07/23/2020
B
STB
S.C.
1B.1
BUSINESS
OVERSIZED DOOR KICK PLATES
12-26-18
5/22/19
3N115
SERVICE
BAY
REF
LIB
PLANS,
DRAFTING,
WORK
OFFICE
STOR/OFF
CHIEF
OF
SERV
OPS
ENG
ASST
CHIEF
PROJ
ENG
PROJ
ENG
PROJ
ENG
CONF
CLERK/REC
WAITING
3N109
TELECOM
LOUNGE
ELEC
SHN103
INTERIOR
DESIGNERS
KITCHEN
SECURITY
CHUTE
FAN
ROOM
FAN
ROOM
ELEVATOR
SHAFT
HK
TOILET
TOILET
STAIR
3STN3
SHAFT
3.5N145
3N1013N103
3N105
3N107
3N107A
3N109A
3N109B
3N109M
3N111
3N109L
3N109K
3N109I
3N109C
3N109D
3N109E
3N109F
3N109G
3N109H
3N109J
3N113
3N117
3N117A
3N114
STAIR
3STN2
3N109J3
3N109J1
3N109J2
3N109B3
3N109B2
3N109B.1
STN
STN
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F H
F H
F
H F
H
F H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H F
H
F H
F H
F H
F H
F
H F
H
F H
F
2HF2HF2HF2HF2HF2HF2HF
2HF2HF2HF2HF2HF
H
F H
F H
F
H
F H
F H
F H
F
2HF
H
F H
F H
F H
F
T
D
N
S.C.
7N.3
MECHANICAL
FACILITIES REFER TO
07 - N - LEVEL 3.5
REFER TO
07 - N - LEVEL 3.5
REFER TO
07 - N - LEVEL 3.5
CEP
CORR
3NC03A
CORR
3NC05A
CORR
3NC06
CORR
3NC04
CORR
3NC05
CORRIDOR
3NC02.A
CORR
3NC03
CUBICLE AREA
CUBICLE AREA
3NCO3.1 TO 3NC03.4
3NC05.1 TO 3NC05.4
CORR
LOBBY
3NC01
3NC02
CORR
3NC07
CORR
3NC08
UP
DN
UP
DN
DN
DN
2HF 2HF
H
F H
F
H F
H
F
2HF2HF2HF2HF2HF2HF2HF
H
F
H F
H
F
2HF 2HF 2HF 2HF 2HF
H
F
H F
H
F H
F
H
F H
F
H F
H
F
H
F H
F H
F
2HF
H
F H
F H
F
2HF
2HF
H
F H
F
H F
H
F
H F
H
F
H
F
H F
H
F H
F
H F
H
F
H F
H
F H
F H
F
H F
2HF 2HF
H
F
H
F
2HF
H
F H
F H
F
H F
H
F
H F
H
F H
F
2HF 2HF
2HF 2HF 2HF 2HF 2HF 2HF 2HF 2HF 2HF 2HF 2HF 2HF 2HF
2HF2HF
2HF
H
F H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F
H
F H
F H
F
ELEVATOR
SHAFT
CHILLERS/
PUMPS
3N124
ELECTRICAL
CHILLER
SWITCHGEAR
3N124A
EMERGENCY
ELECTRIC
3N126
CHILLERS/
PUMPS
3N124B
SHAFT
BOILER PLANT
CONTROL
3N122
SHAFT
TREATMENT
PLANT
HK
TOILET
TOILET
3N120
3N120C
3N120B
3N120A
TREATMENT
PLANT
3N120
STN
STN
SHAFT
3.5N145
T.D.=285-5"
N
S.C.
7N.3.5
MECHANICAL
FACILITIES
CEP
REFER TO
07 - N - LEVEL 3
REFER TO
07 - N - LEVEL 3
CHILLERSTREATMENT
PLANT
STAIR
3.5STN1
3NC09
CORR
CORR
3NC10
CORR
3NC11
CORR
3NC12
CORR
3NC12A
CORR
CORR
CORR
07.N.3-3.5LIFE SAFETY DRAWINGS
1/16"=1'-0"
SCALE: 1/16" = 1'-0"
0'
8' 16' 32'
PARTIAL LEVEL THREE - LIFE SAFETY PLAN
BUILDING 07 - N - CENTRAL ENERGY PLANT (CEP)
SCALE: 1/16" = 1'-0"
PARTIAL LEVEL THREE AND A HALF - LIFE SAFETY PLAN
3.5 BUILDING 07 - N CENTRAL ENERGY PLANT (CEP)
LIFE SAFETY SYMBOLS LEGEND
COMPARTMENT CALCULATIONS
1HF 1HF
PARTITION LEGEND
1HFS
2HF 2HF
2HFS
STP STP
CORRIDORS AND STAIRS NUMBER
CHANGED
File details come from the government source that posted it. Updated .