This solicitation and statement of work are for annual boiler safety testing and repair services for the Veterans Health Administration Veterans Integrated Service Network 16. The contractor must inspect, test, and repair high and low pressure boiler safety devices at the Veterans Health Care System of the Ozarks facility in Fayetteville, Arkansas. Services include inspecting and testing boiler safety interlocks and devices, burner performance, instrumentation and controls. The contractor must also submit inspection reports, repair quotes, and complete any approved repairs. Qualified on-site technicians with boiler experience are required. Inspections must be completed within fifteen days and start within fifteen days of award in the base year and annually in March of option years. The solicitation number is 36C25624Q0417.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Annual Boiler Inspection, Safety Device Testing and Calibration of Boiler Plant Burners, Controls, Instruments and Data Management.
Veterans Health Care System of the Ozarks (VHSO) Fayetteville, Arkansas
I. SCOPE OF WORK:
A. Contractor must furnish all management, supervision, labor, material, equipment, tools, supplies, consumables, parts, and related services, in accordance with the SOW to inspect, test, document, and at Contracting Officers Representative (COR) discretion, may repair high pressure and low pressure boiler safety devices located on the VHSO Veterans Affairs (VA) station, 1100 N. College Avenue, Fayetteville, AR 72703.
B. VHSO will have the boilers that are to be serviced, prepared for the technicians upon their scheduled arrival. This includes having the boilers clean of soot and loose scale: fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation; boiler steam flow, stack temperature and flue gas oxygen instruments operating.
C. The inspections, testing and calibrations shall comply with:
1. The recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual, current edition.
2. The written recommendations of the equipment manufacturers.
3. The requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazards Code including applicable appendices.
D. The contractor shall provide all tools and labor necessary to perform inspection, tuning, testing, calibrating, and adjustments of burners and boilers and boiler plant controls as specified below:
1. The base year boiler safety inspections shall be started within fifteen (15) calendar days of contract award and annually during the month of March every option year thereafter.
a) All inspections, testing, and calibrations are to be completed within fifteen calendar days and shall follow the procedures and meet the requirements found in the latest editions of the VHA Boiler Safety Device Test Manual and VHA Directive 1810, Boiler and Boiler Plant Operations including the following:
(1) Review boiler plant log sheets and alarm trouble reports.
(2) Review records that show combustion performance (flue gas oxygen and carbon monoxide).
(3) Perform overall visual inspection of systems. Verify that systems comply with referenced codes and VHSO requirements stated in this contract.
(4) Test and record the operation and ser points of all burner/boiler safety interlock devices. Refer to list below. Verify that the set points and operating points are within approximately 20% of normal operating parameters. Adjust as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation.
(5) Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output.
(6) Compare the combustion performance data with VAMC requirements (see below) and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data.
(7) Verify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, code approval. Calibrate all instruments that are not within manufacturer’s specifications for accuracy.
b) All of interlocks and safety devices to be inspected and tested on each boiler/burner/equipment, are contained in the VHA Boiler Plant Safety Devices Testing Manual, 3rd Edition, along with testing procedures.
c) Required burner performance (natural gas and fuel oil):
(1) Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification).
(2) Achieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates.
(3) Maximum carbon monoxide: 200 parts per million (ppm)
(4) Maximum NOx: _____ (Refer to original burner specification).
(5) Flue gas oxygen: 2.5 – 4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single-point positioning systems).
(6) Flue gas oxygen (low excess air burners): 1.0 – 2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single point positioning systems).
(7) No visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations.
(8) Flames shall be stable with no pulsations, shall be retained near burner, no blowoff or flashbacks, no constant flame impingement on refractory or waterwalls.
d) List of instrumentation and controls to be inspected and calibrated:
(1) Steam flow transmitters (all).
(2) Steam flow recorders/computer readout.
(3) Flue gas oxygen sampling, analyzing and recorder/computer readout.
(4) Boiler and economizer stack temperature transmitters and recorder/computer readout.
(5) Master steam pressure and combustion controllers.
(6) Boiler outlet draft controllers.
(7) Boiler water level controllers.
(8) Feedwater deaerator and condensate storage tank water level controllers including overflow.
(9) All pressure and temperature sensors and transmitters.
(10) All signal processing and readout devices.
2. The contractor shall provide a brief daily written report to the COR prior to checking out for the day. The report shall describe work performed that day and any deficiencies identified. The report maybe in email format.
a) The technician shall document any deficiencies identified during the inspections requiring repair and provide a separate itemized quote for each piece of equipment to perform those repairs. The itemized quote shall list in detail:
(1) All parts and materials required to complete all repairs, to include price, quantity, and lead time.
(2) Itemized labor hours and labor rate.
b) A draft report shall be submitted via email to the COR within 30 days from the start of boiler safety inspections and shall fully describe all tests performed, all findings, and all recommendations. The report shall have two sections, the first section will be in a table form with four (4) columns:
(1) The first column labeled “FUNCTION” did the device pass or fail.
(2) The second column labeled “Device” list the device number and description in accordance with the VHA Boiler Plant Safety Devices Testing Manual, latest edition.
(3) The third labeled “Deficiencies-Recommendations.”
(4) The fourth column labeled “corrective actions” list any corrective actions taken during the inspection.
c) The next section shall be in paragraph/bulleted form and list each device individual in accordance to the VHA Boiler Plant Safety Devices Testing Manual, latest edition. Plus, the section must reference the correct Master Specification and Standard Detail for that device. See sample below.
5.1. Condensate Storage Tank High Water Alarm
Purpose: High water level may be an indication of condensate transfer pump failure that could lead to low water condition in the feedwater deaerator and in the boilers. There may be a failure of make-up water controls.
Recommended set point: 4 inches below overflow level and 2/3 of tank height.
Potential hazards due to failure of high-water alarm: Feedwater deaerator running dry and, consequently, boiler feed pumps running dry will cause.
overheating and damage to pumps and potential for plant shut down. Failure of make-up water controls (in open position) could lead to significant cost from waste of water and condensate from the tank overflow if this occurs over a long time period.
Recommended type of device: Conductivity probe type switch. Float type switches have high failure rate in this application where they are exposed to flash steam that causes seals to harden and prevent float movement.
VA Master Specification section: 23 50 11 (old 15625).
www.va.gov/facmgt/standard/ VA Standard Detail: SD232111-05.pdf www.va.gov/facmgt/standard/ Failure rate of float types: 48% (BEI study of VA boiler plants).
Make and Model: Mercoid Float Did it function properly: No Category & Action Time Limit: Upon Failure or Within 5 Years Comments: Float type switches are not allowed for high water alarms. The VA recommended switch type is a conductivity probe type switch. Install the VA recommended switch and set to alarm at 2/3 of the tank height. There are valves that can isolate this alarm. These valves must be made lockable only in the operating position.
d) The draft report shall be submitted to the COR in Word format and include the following as attachments:
(1) On site technicians training documents and certifications.
(2) A list of all test instruments used during the certification and their current certification/calibration documents for each instrument.
(3) Hard copies of data sheets and flue gas analyzer “strip” printouts.
(4) One quote for each piece of equipment itemizing repairs referenced in III(A)(1)(b).
e) The draft report shall be reviewed by the COR and VHSO administration. Any required editing shall be completed by the contractor and submitted to the COR within 15 calendar days.
3. All safety-related deficiencies shall be immediately reported to the COR, Boiler Plant Supervisor and/or Chief Engineer during the inspection visit.
4. Boiler repairs identified and quoted by the contractor shall be performed by contract modification if approved by the COR and the Contracting Officer (CO). All repairs are to be started within thirty (30) days of contract modification. All repairs and a report documenting the repairs shall be completed within 30 days for COR review. Any edits required by the COR to all reports must be completed within thirty (30) days of COR notification.
5. VHSO Boiler Equipment:
a) Cleaver Brooks CB Package Boilers located in building 10.
(1) Boiler 1:
(a) Model number – CB-200-250-150.
(b) Serial number – OL103245.
(2) Boiler 2:
(a) Model number – CB-200-250-150.
(b) Serial number – OL103246.
(3) Boiler 3:
(a) Model number – CB-200-250-150.
(b) Serial number – OL103247.
b) Cleaver Brooks Spraymaster Deaerator Tank located in building 10.
(1) Model number – SM30-450.
(2) Serial number – DG9380.
c) Lochinvar Knight Commercial boilers located in Building 44:
(1) B-1:
(a) Model number - KBN501.
(b) Serial number - F14H10306331.
(2) B-2:
(a) Model number – KBN501.
(b) Serial number – F14H10276629.
d) Aerco EXT Commercial boilers located in building 31.
(1) BHW-1:
(a) Model number – MLX EXT 1123.
(b) Serial number – 14H00058 / 2014.
(2) BHW-2:
(a) Model number – MLX EXT 1123.
(b) Serial number – 14H00427 / 2014.
II. GENERAL:
A. Contractor must have the following requirements completed and submitted to the COR within 10 days of contract award:
1. Provide the COR with a qualified point of contact name, phone number and email. The designated individual must have full authority to act for the contractor on all contractual matters relating to the daily performance of the contract; and, to receive, accept and sign for any notices, inspection reports and all other correspondence on behalf of the Contractor from the COR/Contracting Officer. This individual must serve as the central point of contact for the Government and must ensure all work is performed in accordance with the contract and must maintain the work specification requirements, scheduling, inspections and safety standards. This individual must be always available when contract work is in progress, if needed and can respond to the site, when needed, to monitor work progress and for any other emergency, as required. The Contractor or designated qualified personnel must return calls to the COR within 1 hour of being contacted.
2. The contractor shall submit a proposed schedule for work to be performed thirty (30) calendar days in advance for COR consideration. The contractor shall start the first inspection (base year) within 15 calendar days of contract award.
a) The contractors on site employees shall sign in and out with the COR or their designated representative upon entering and leaving the VHSO station.
b) The contractors’ employees shall have their ID badge always displayed in clear view on their outermost clothing while on station.
c) Work shall not be performed during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures.
d) All work will be monitored by the COR or their designated representative.
B. Work Site Access: Access to VHSO boilers shall be coordinated with the COR. All work shall not interfere with VHSO operations. VHSO facility must continue to operate during the contract Period of Performance. including but not limited to, steam, mechanical and electrical systems.
III. QUALIFICATIONS OF CONTRACTOR
A. Contractor’s and/or subcontractor on site technicians shall have completed at least a one-year trade school and have five years successful experience in operation, inspection, maintenance, and repair of high- and low-pressure boilers. On site technicians’ qualifications, experience and training records shall be included in the contractor’s proposal for technical evaluation by the COR.
1. Technicians shall demonstrate familiarity with and ready access to the current versions of the following references:
a) NFPA 85, Boiler and Combustion Systems Hazards Code.
b) VHA Boiler Plant Safety Device Testing Manual, current edition.
c) VHA Directive 1810 Boiler and Boiler Plant Operations, current edition.
2. Apprentices / Trainees shall never work alone and shall remain under constant supervision and within eyesight of the qualified technician while performing work.
3. Technicians shall be equipped with portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations, all calibrated within one month of the site visits. At facilities with programmable digital controls, the technicians must be capable of programming the controls and have the appropriate hardware and software for this.
IV. CONTRACTOR ACCESS AND ACTIVITIES:
A. Safety: Contractor’s highest priority must be safety. Contractor work must be in accordance with Federal, State, Local OSHA codes, regulations, latest edition of NEC, latest edition of NFPA 70E, and 01 35 26 Safety Requirements specification. Contractor must furnish and use required safety items, including but not limited to, safety signage, cones, barricades, and must furnish and wear required Personal Protective Equipment (PPE).
B. Key Access: Contractor site superintendent may check out a key to access mechanical and electrical rooms as project requires. Contractor site superintendent must check out and return a key at Engineering (Building 37) daily and the key must not leave VHSO property. Contractor site superintendent must notify the COR when a key is lost. Contractor must reimburse the Government a $3,500.00 fee for each lost or unreturned key(s).
C. Utilities: Contractor must not leave unattended out-of-service any utility, fire protection, life safety system, or security system without written permission of the COR. If a utility, fire protection, life safety system or security system is not functional at the end of a work period without written permission of the COR, then the Contractor must restore the system(s) to working order prior to leaving the job site or must furnish an around-the-clock watch subject to COR written approval until the system is functional. If the Contractor fails to do so, the Contractor must reimburse the Government a fee equal to the amount of costs incurred by the Government to furnish around-the-clock watch and/or repair the system(s).
D. Fire Alarm: Contractor must coordinate and schedule fire alarm interruption activity with COR. Contractor must submit to the COR for consideration and written approval a minimum of seven (7) business days prior to activity. Contractor must have COR written approval to proceed three business days prior to activity. Contractor must submit written fire watch plan to CO and COR for consideration no later than (NLT) ten (10) calendar days after NTP. Contractor must be responsible for fire watch in the areas where fire/smoke detection coverage is removed or disabled. Contractor must be responsible to coordinate fire or smoke detection with the COR for the removal and restoration of fire protection coverage. After regular business hours or designated hours, supervision of the fire alarm panel is required at the Contractor’s expense. The Contractor must be responsible for completion and submission of a written Fire Alarm Bypass Request. The Contractors’ written request must be submitted for COR approval and if approved by COR, then the COR must furnish a written approval to proceed three (3) business days in advance of any proposed work activity. If the fire alarm system requires any deactivation, then it must be reactivated the same day before the Contractor leaves the job site to ensure that the fire alarm system is functional. If the fire alarm system is not functional, then the Contractor must restore the fire alarm system to working order prior to leaving the site or must furnish an around-the-clock fire watch until the fire alarm system is functional. The Contractor must be liable for any costs incurred by the Government to furnish the fire watch and/or to repair the fire alarm system.
E. Hot Work: Contractor must perform and safeguard hot work operations in accordance with OSHA 1910 Subpart Q, NFPA 241, and NFPA 51B. Contractor must coordinate and schedule with COR Hot Work Operations. Hot work operation is defined as operations including, but not limited to, open flame, producing heat and/or sparks, burning, welding, processes such as arc welding, oxy-fuel gas welding, open-flame soldering, brazing, thermal spraying, cutting, oxygen cutting, arc cutting, chipping, grinding, heat treating, sand blasting, torch-applied roofing, chemical welding, thawing pipe, and light horizontal welding, or an operation that is capable of initiating fires or explosions. Contractor must obtain Hot Work Permit from COR prior to activity.
F. Energized Circuit Work: Contractor must perform, maintain, and safeguard the integrity of the VHSO electrical systems and must follow procedures around energized equipment in accordance with NFPA 70E standards including proper PPE. Contractor must coordinate and schedule energized circuit work with COR. Contractor must submit to the COR a written request for consideration and written approval a minimum of seven (7) business days prior to activity. VHSO electrician or electrical engineer must monitor work. Contractor must use safety equipment to include but not be limited to, 12 calorie arc flash suits with hoods and 5KV gloves. No exits will be blocked. Personnel without proper PPE must be prohibited within the working area around live electrical panels with the cover removed. Contractor must have COR written approval to proceed three (3) business days prior to activity.
G. Utility interruption: Contractor must coordinate and schedule with COR. Contractor must submit to the COR a written request for consideration and written approval a minimum of seven (7) business days prior to activity. Work must be planned in advance to give as much time as possible to schedule a utility interruption. There may be times when a utility interruption request is denied because of insufficient lead-time or interference with ongoing VHSO activities and must be rescheduled at no additional cost to the Government. Contractor must have COR written approval to proceed three (3) business days prior to activity.
H. Photography: Contractor must coordinate and schedule with COR. Contractor must be escorted by VHSO personnel to take job site related photos. Contractor must not photograph any patients, personnel, visitors, and others on VHSO property.
I. IT Security: **The Certification and Accreditation (C&A) does not apply, a Security Accreditation Package is not required**
(End of Statement of Work)