This solicitation is for tuckpointing services at Building 1 of the Main Hospital at the Veterans Health Administration Veterans Integrated Service Network 16. The Department of Veterans Affairs is seeking offers to tuckpoint the exterior walls of the building. Offerors should provide their fixed unit pricing for the tuckpointing work along with the number of labor hours estimated and a completion date no later than October 31, 2022. The government intends to make award to the responsible offeror submitting the lowest priced, technically acceptable offer.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
TUCKPOINT
SHREVEPORT, LOUISIANA
COR
09/03/2021Revisions: Date:
ARCHIE LANHAM
A/E:
O'Brien Engineering Inc.
2340 E. Trinity Mills Rd. Ste 220 Carrollton, TX 75006 972-233-2288 obrieneng.com FULLY SPRINKLERED
667-19-101
MHW JLM
DATE: 03 SEPTEMBER 2021
CP502
PAVING & SITE DETAILS
S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
SS
x
E x
C x
W x
G x
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
TUCKPOINT
SHREVEPORT, LOUISIANA
COR
09/03/2021Revisions: Date:
ARCHIE LANHAM
A/E:
O'Brien Engineering Inc.
2340 E. Trinity Mills Rd. Ste 220 Carrollton, TX 75006 972-233-2288 obrieneng.com FULLY SPRINKLERED
667-19-101
MHW JLM
DATE: 03 SEPTEMBER 2021
CS103
AREA A PROPOSED
IMPROVEMENTS PLAN
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
SS
x
E x
C x
W x
G x
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
TUCKPOINT
SHREVEPORT, LOUISIANA
COR
09/03/2021Revisions: Date:
ARCHIE LANHAM
A/E:
O'Brien Engineering Inc.
2340 E. Trinity Mills Rd. Ste 220 Carrollton, TX 75006 972-233-2288 obrieneng.com FULLY SPRINKLERED
667-19-101
MHW JLM
DATE: 03 SEPTEMBER 2021
CS104
AREA A PROPOSED
G
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
W x
W x
W x
W x
W x
E x
C x
W x
G x
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
TUCKPOINT
SHREVEPORT, LOUISIANA
COR
09/03/2021Revisions: Date:
ARCHIE LANHAM
A/E:
O'Brien Engineering Inc.
2340 E. Trinity Mills Rd. Ste 220 Carrollton, TX 75006 972-233-2288 obrieneng.com FULLY SPRINKLERED
667-19-101
MHW JLM
DATE: 03 SEPTEMBER 2021
CS203
AREA B PROPOSED
G x
G x
G x
G x
G x
G x
G x
E x
C x
W x
G x
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
TUCKPOINT
SHREVEPORT, LOUISIANA
COR
09/03/2021Revisions: Date:
ARCHIE LANHAM
A/E:
O'Brien Engineering Inc.
2340 E. Trinity Mills Rd. Ste 220 Carrollton, TX 75006 972-233-2288 obrieneng.com FULLY SPRINKLERED
667-19-101
MHW JLM
DATE: 03 SEPTEMBER 2021
CS204
AREA B PROPOSED
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
TUCKPOINT
SHREVEPORT, LOUISIANA
COR
09/03/2021Revisions: Date:
ARCHIE LANHAM
A/E:
O'Brien Engineering Inc.
2340 E. Trinity Mills Rd. Ste 220 Carrollton, TX 75006 972-233-2288 obrieneng.com FULLY SPRINKLERED
667-19-101
MHW JLM
DATE: 03 SEPTEMBER 2021
CS303
AREA C PROPOSED
C
C x
C x
C x
C x
C x
C x
C x
C x
C x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
SS
x
E x
C x
W x
G x
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
TUCKPOINT
SHREVEPORT, LOUISIANA
COR
09/03/2021Revisions: Date:
ARCHIE LANHAM
A/E:
O'Brien Engineering Inc.
2340 E. Trinity Mills Rd. Ste 220 Carrollton, TX 75006 972-233-2288 obrieneng.com FULLY SPRINKLERED
667-19-101
MHW JLM
DATE: 03 SEPTEMBER 2021
CS403
AREA D PROPOSED
x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
SS
x
E x
C x
W x
G x
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
TUCKPOINT
SHREVEPORT, LOUISIANA
COR
09/03/2021Revisions: Date:
ARCHIE LANHAM
A/E:
O'Brien Engineering Inc.
2340 E. Trinity Mills Rd. Ste 220 Carrollton, TX 75006 972-233-2288 obrieneng.com FULLY SPRINKLERED
667-19-101
MHW JLM
DATE: 03 SEPTEMBER 2021
CS453
AREA E PROPOSED
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
TUCKPOINT
SHREVEPORT, LOUISIANA
COR
09/03/2021Revisions: Date:
ARCHIE LANHAM
A/E:
O'Brien Engineering Inc.
2340 E. Trinity Mills Rd. Ste 220 Carrollton, TX 75006 972-233-2288 obrieneng.com FULLY SPRINKLERED
667-19-101
MHW JLM
DATE: 03 SEPTEMBER 2021
CU501
STORM SEWER & UTILITY
DETAILS
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
TUCKPOINT
SHREVEPORT, LOUISIANA
COR
09/03/2021Revisions: Date:
ARCHIE LANHAM
A/E:
O'Brien Engineering Inc.
2340 E. Trinity Mills Rd. Ste 220 Carrollton, TX 75006 972-233-2288 obrieneng.com FULLY SPRINKLERED
667-19-101
MHW JLM
DATE: 03 SEPTEMBER 2021
CU502
STORM SEWER & UTILITY
DETAILS
GR001
KEYED EXTERIOR PHOTO SHEET
NOTES
TDM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
TUCKPOINT
SHREVEPORT, LOUISIANA
COR
ZAY/CMYRevisions: Date:
ARCHIE LANHAM
A/E:
O'Brien Engineering Inc.
2340 E. Trinity Mills Rd. Ste 220 Carrollton, TX 75006 972-233-2288 obrieneng.com
DATE: 03 SEPTEMBER 2021
FULLY SPRINKLERED
667-19-101 Architecture Yeates Mancil Architects, LLC 929 South Peters Street New Orleans, LA 70130 504-522-7218 www.yeatesarchitects.com
9/3/2021
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
VA VETERAN'S ADMINISTRATION
NIC NOT IN CONTRACT
ABBREVIATIONS
A. THE INTENT OF THESE NOTES IS TO PROVIDE A GENERAL
DOCUMENTATION OF BOTH TYPICAL AND SPECIFIC
EXISTING EXTERIOR CONDITIONS AND SCOPE OF WORK
AT THE EXISTING BUILDING. THE PHOTOS AND ITEMS
NOTED DO NOT CAPTURE OR DOCUMENT ALL EXISTING
INSTANCES OR LOCATIONS OF THE EXISTING
CONDITIONS TO BE CORRECTED AS PART OF THE
PROJECT SCOPE OF WORK.
B. ALL BRICK CLEANING MUST INCLUDE THE REMOVAL OF
ANY MASTIC/ADHESIVE, CAULK, ETC. FROM THE FACE OF
THE BRICK AND MORTAR.
C. ALL EXTERIOR COMPONENT INSTALLATIONS SHALL MEET
OR EXCEED THE REQUIREMENTS OF THE INTERNATIONAL
BUILDING CODE, 2018 EDITION, FOR WIND LOADS OF 120
MPH FOR A WIND EXPOSURE IN ZONE C.
D. CONTRACTOR SHALL BE REQUIRED TO PROVIDE
MULTIPLE "MOCK UPS" OF ALL MASONRY AND MORTAR
REPAIR AND REPLACEMENT WORK FOR REVIEW AND
APPROVAL TO ENSURE PROPER CUSTOM COLOR
MATCHING IN ACCORDANCE WITH THE SPECIFICATIONS.
IMPORTANT PHOTO SHEET NOTE(S)ARCHITECTURAL SYMBOLS
# KEYED NOTE CALLOUT
(KEYED NOTES APPLY TO SHEETS GR101 - GR110)#
(NOT ALL KEYED NOTES MAY APPLY TO EACH SHEET)KEYED PHOTOSHEET NOTES
EXISTING BRICK VENEER AND MORTAR STAINED AND
DISCOLORED FROM MOISTURE, ORGANIC GROWTH AND
RAIN WATER RUNOFF FROM BUILDING PROJECTIONS,
COMPONENTS, PENETRATIONS, OPENINGS,
LOUVERS/GRILLES, ETC. ALL EXISTING MASONRY
COMPONENTS INCLUDING BUT NOT LIMITED TO BRICK,
STONE, MORTAR JOINTS, ETC. AT ALL EXTERIOR WALLS,
PARAPETS ETC., SHALL BE THOROUGHLY CLEANED PER
THE SPECIFICATIONS WITH FUNGICIDE CLEANER. ALL
AREAS OF THE BUILDING INCLUDING ALL NEW ADDITIONS
TO THE ORIGINAL 1948 PORTIONS OF THE BUILDING SHALL
REQUIRE CLEANING AND APPLICATION OF FUNGICIDE AS
PART OF THE PROJECT SCOPE OF WORK. ALL EXISTING
STAINS AND ACCUMULATED CAULKING, MASTIC, ADHESIVE,
ETC. SHALL BE CLEANED AND REMOVED FROM FACE OF
BRICK AND MORTAR IN ENTIRETY. SEE KEYED NOTE 52.
ALL EXISTING PREVIOUSLY PAINTED METAL BUILDING
COMPONENTS INCLUDING BUT NOT LIMITED TO
LOUVERS/GRILLES, METAL CONDUITS, PIPING, STEEL
LADDERS, HOLLOW METAL DOORS AND FRAMES, ETC.
SHALL BE SANDED, WIRE BRUSHED, CLEANED, PREPARED
AND RE-PAINTED PER THE SPECIFICATIONS. ALL EXISTING
NON PAINTED CONDUITS, PIPING, BRACKETS, ETC., SHALL
ALSO BE PREPARED AND PAINTED AS PART OF THE
PROJECT SCOPE OF WORK. REFER TO THE
SPECIFICATIONS FOR SPECIFIC PAINT PRODUCTS, NUMBER
OF COATS AND COLOR SELECTION. EXISTING UNPAINTED
GALVANIZED COMPONENTS SHALL REMAIN UNPAINTED.
CONTRACTOR SHALL REMOVE AND REPLACE ALL
EXTERIOR CAULKING AND ANY DAMAGED BACKER RODS,
OR OTHER ACCESSORIES AROUND THE PERIMETER OF ALL
OF THE EXISTING WINDOW OPENINGS, LOUVERS/GRILLES,
MECHANICAL EQUIPMENT, DUCT WORK PENETRATIONS
AND EXTERIOR HOLLOW METAL DOOR FRAMES OF THE
ORIGINAL 1948 BUILDING. REFER TO THE SPECIFICATIONS.
EXISTING METAL LOUVER WITH SIGNIFICANT DAMAGE TO
BE REPLACED TO MATCH ORIGINAL DESIGN, MATERIAL AND
FINISH COLOR, INSTALL INSECT SCREEN. VERIFY ALL
DIMENSIONS IN THE FILED. REFER TO THE SPECIFICATIONS.
EXISTING STAINED AND DISCOLORED LIMESTONE WINDOW
SILLS, LIMESTONE BELT COURSES, AND ALL OTHER
LIMESTONE DECORATIVE BUILDING COMPONENTS SHALL
BE THOROUGHLY CLEANED WITH SPECIFIED FUNGICIDE
CLEANER AS PER THE SPECIFICATIONS. ALL AREAS OF THE
BUILDING INCLUDING ALL NEW ADDITIONS TO THE
ORIGINAL 1948 PORTIONS OF THE BUILDING SHALL
REQUIRE CLEANING AND APPLICATION OF FUNGICIDE AS
PART OF THE PROJECT SCOPE OF WORK. CONTRACTOR
SHALL APPLY RAIN REPELLENT PRODUCT TO ALL EXISTING
LIMESTONE COMPONENTS AS PART OF THE SCOPE OF
WORK, REFER TO THE SPECIFICATIONS.
ALL EXISTING LIMESTONE PARAPET COPING CAPS SHALL
BE REMOVED AND REPLACED WITH NEW PREFINISHED
CUSTOM PROFILE METAL COPING WITH CUSTOM COLOR
SELECTION TO MATCH EXISTING LIMESTONE. REFER TO
THE ARCHITECTURAL DETAILS AND THE SPECIFICATIONS.
CONTRACTOR SHALL PROTECT ALL EXPOSED PARAPET
WALLS FROM WATER INTRUSION DURING THIS ALTERATION
AND THROUGHOUT THE CONSTRUCTION
PHASE.CONTRACTOR SHALL PROVIDE EXPANSION JOINT IN
NEW METAL COPING SYSTEM TO CORRESPOND WITH THE
FINAL LOCATION OF THE NEW CUT BUILDING EXPANSION
JOINTS IN THE EXISTING MASONRY PARAPET WALLS
BELOW.
AREAS OF DAMAGED EXISTING FACE BRICK AND SPECIFIC
BRICK UNITS DAMAGED BY CURRENT AND PREVIOUS
ATTACHMENT/PENETRATION OF VARIOUS CONDUITS,
BOXES, ELECTRICAL COMPONENTS, PIPING, AND WIRING.
ALL UNUSED ANCHORS, BRACKETS, NAILS, ETC. SHALL BE
REMOVED AND ALL HOLES, CRACKS, SPALLED AND
DAMAGE BRICKS SHALL BE REPAIRED, FILLED, "REFACED"
AND STAINED (MINERAL COATING) TO MATCH EXISTING
BRICK UNITS IN TEXTURE, COLOR, SIZE AND APPEARANCE.
CONTRACTOR SHALL RE-POINT ANY DAMAGED MORTAR AT
THESE AREAS IN ENTIRETY TO MATCH EXISTING COLOR.
THE CONTRACTOR SHALL REFER TO THE MAINTENANCE OF
MASONRY SPECIFICATIONS FOR RESTORATION, REFACING
AND STAINING SPECIFICATIONS AND GUIDELINES.
CONTRACTOR SHALL PROVIDE "MOCK UP" OF COLOR
MATCHING COATING FOR REVIEW AND APPROVAL OF THE
A/E AND OWNER AS PART OF THE PROJECT SCOPE OF
WORK.
EXISTING CONCRETE CANOPY OBSERVED TO BE STAINED
AND EXHIBITING SIGNS OF MOISTURE DAMAGE FROM RAIN
WATER RUNOFF. ALL EXPOSED CONCRETE AREAS OF
CANOPY SHALL BE CLEANED AND PAINTED PER THE
SPECIFICATIONS. EXISTING METAL CANOPY COMPONENTS
SHALL BE CLEANED AND DAMAGED/BENT PORTIONS OF
THE METAL FASCIA COMPONENTS SHALL BE REPAIRED AT
THIS AREA TO MATCH EXISTING.
EXISTING METAL "EYEBROW" FLASHING ABOVE WINDOW
OPENINGS. CONTRACTOR SHALL CLEAN DISCOLORED OR
STAINED FLASHING AND REMOVE EXISTING CAULKING
AND/OR MORTAR JOINT ABOVE METAL "EYEBROW"
FLASHING AND REINSTALL NEW HYDRATED LIME MORTAR.
REFER TO THE SPECS. MORTAR COLOR TO MATCH
EXISTING MORTAR COLOR. REFER TO THE ARCHITECT'S
ENLARGED SECTION/DETAIL OF THIS METAL "EYEBROW"
FLASHING OVER THE EXISTING WINDOWS. CONTRACTOR
SHALL BE RESPONSIBLE FOR REPLACING ANY DAMAGED
OR MISSING PORTIONS OF THE EXISTING METAL
"EYEBROW" FLASHINGS TO MATCH EXISTING IN DESIGN,
DIMENSIONS, GAUGE OF METAL, PROFILE, ETC.
THE FIRST THREE BRICK COURSES AND ASSOCIATED
MORTAR JOINTS ABOVE THE EXISTING BRICK RELIEVING
ANGLE AND METAL "EYEBROW" FLASHING ARE HEAVILY
STAINED AND DISCOLORED AND SHALL BE CLEANED PER
THE TYPICAL BRICK CLEANING SCOPE IN THE
SPECIFICATIONS. THE CONTRACTOR SHALL ALSO
COMPLETELY RAKE THE EXISTING MORTAR OUT OF THE
FIRST THREE HORIZONTAL MORTAR JOINTS AND FIRST
TWO VERTICAL MORTAR JOINTS DIRECTLY ABOVE
RELIEVING ANGLES AT THE EYEBROW FLASHING AROUND
THE ENTIRE PERIMETER OF THE ORIGINAL BUILDING AT
EACH LEVEL. CONTRACTOR SHALL EXPOSE THE EDGE OF
THE EXISTING STEEL LINTEL ANGLE AND REMOVE ALL
EXISTING RUST/SCALE FROM THE EXPOSED STEEL. THE
EXPOSED EDGE OF THE ANGLE SHALL BE TREATED WITH A
MIGRATING ANTI-RUST TREATMENT AND COATED WITH A
RUST-INHIBITIVE PRIMER. NEW REPLACEMENT "SPECIAL
JOINT" HYDRATED LIME MORTAR SHALL BE INSTALLED IN
THESE JOINTS. REFER TO THE ENLARGED ELEVATION,
ARCHITECTURAL DETAILS, AND THE SPECIFICATIONS.
EXISTING PREVIOUSLY PAINTED METAL HANDRAILS AND
GUARDRAILS SHALL BE CLEANED, SANDED, PREPARED AND
RE-PAINTED. REFER TO THE SPECIFICATIONS.
DAMAGED BRICK AT THE GROUND FLOOR CORNERS AT
VARIOUS HIGH TRAFFIC ENTRY AREAS. CONTRACTOR
SHALL PATCH ALL DAMAGED BRICK AND MORTAR JOINTS IN
THESE LOCATIONS AND INSTALL NEW STAINLESS STEEL
CORNER GUARDS AT THE LOCATIONS INDICATED ON THE
EXTERIOR ELEVATIONS, IN ACCORDANCE WITH THE
DETAILS AND SPECIFICATIONS. REFER TO THE GUIDELINES
ON REPLACEMENT BRICKS.
LOOSE, DAMAGED, MISSING OR “BULGING” HORIZONTAL
MORTAR JOINTS AT TYPICAL SOLID MASONRY SECTION OF
EXTERIOR WALLS. THE CONTRACTOR SHALL REPLACE THE
MORTAR OR CAULK IN THESE JOINTS PER THE
SPECIFICATIONS. REFER TO KEYED NOTE NO. 10 FOR
DIRECTION FOR REPLACEMENT OF MASONRY JOINTS AT
STEEL RELIEVING ANGLES AND ABOVE METAL "EYEBROW"
FLASHING.
DAMAGE TO FACE BRICK AND ADJACENT MORTAR JOINTS
OBSERVED WHERE PREVIOUS IMPROPER REPAIR WORK
OR RE-POINTING WORK HAD TAKEN PLACE. DAMAGED
BRICKS SHALL BE REPAIRED, FILLED, “REFACED” AND
STAINED (MINERAL COATING) TO MATCH EXISTING BRICK
UNITS IN TEXTURE, COLOR, SIZE AND APPEARANCE.
CONTRACTOR SHALL REMOVE DAMAGED MORTAR JOINTS
AND RE-POINT ANY DAMAGE MORTAR JOINTS AT THESE
AREAS IN ENTIRETY TO MATCH EXISTING COLOR. REFER
TO THE GUIDELINES AND TECHNICAL SPECIFICATIONS FOR
"REFACING" DAMAGED BRICKS AND RE-POINTING MORTAR
JOINTS. CONTRACTOR SHALL PROVIDE "MOCK-UP" OF
COLOR MATCHING COATING AND MORTAR FOR REVIEW
AND APPROVAL OF THE A/E AND OWNER AS PART OF THE
PROJECT SCOPE OF WORK.
MISSING/DAMAGED MORTAR OR INCORRECTLY
COLORED/DAMAGED MORTAR AT PREVIOUS REPAIR AREA.
CONTRACTOR SHALL COMPLETELY REMOVE INCORRECTLY
COLORED MORTAR AND REINSTALL NEW CUSTOM
"STANDARD JOINT" RESTORATION MORTAR PER THE
SPECIFICATIONS AND REPLACEMENT MORTAR GUIDELINES.
CONTRACTOR SHALL PROVIDE "MOCK UP" OF COLOR
MATCHING MORTAR FOR REVIEW AND APPROVAL OF THE
A/E AND OWNER AS PART OF THE PROJECT SCOPE OF
WORK.
EXISTING BUILDING EXPANSION JOINT ASSEMBLY AND
EXPANSION JOINT COVER TO BE REMOVED IN ENTIRETY.
THE PROJECT SCOPE OF WORK SHALL INCLUDE THE
COMPLETED REMOVAL AND REPLACEMENT OF EXISTING
EXPANSION JOINT ASSEMBLY/MATERIAL TO MATCH
EXISTING, INCLUDING INSTALLATION OF NEW PRE-FINISH
METAL COVER. CONTRACTOR SHALL VERIFY EXISTING
CONDITIONS. REFER TO THE DETAILS AND
SPECIFICATIONS.
DECORATIVE (HISTORIC) BRONZE HANDRAILS AND
GUARDRAILS ARE DIRTY AND TARNISHED. PRIOR TO FINAL
ACCEPTANCE, THE CONTRACTOR SHALL CLEAN AND
RE-POLISH THE BRONZE HANDRAILS WITHOUT CAUSING
ANY DAMAGE TO THE HANDRAILS/GUARDRAILS OR ANY
OTHER SURROUNDING BUILDING COMPONENTS.
ALL EXISTING EXPOSED STEEL LINTELS ABOVE EXTERIOR
OPENINGS OBSERVED TO EXHIBIT PEELING PAINT (IF
PAINTED AT ALL) AND SURFACE CORROSION. THE
CONTRACTOR SHALL CLEAN AND REMOVE EXISTING PAINT,
SURFACE RUST AND SCALE, APPLY ANTI-RUST TREATMENT
AND RUST INHIBITIVE PRIMER. CONTRACTOR SHALL
PREPARE AND PAINT THE EXPOSED PORTIONS OF ALL
EXPOSED STEEL LINTELS.
AT THE LIMESTONE SILLS AND LIMESTONE SILL "BAND" AT
THE PERIMETER OF THE BUILDING, THE CONTRACTOR
SHALL COMPLETELY RAKE OUT ALL OF THE VERTICAL
MORTAR JOINTS AT THE LIMESTONE SILLS AND
CONTINUOUS LIMESTONE BANDS AND REPLACE THESE
MORTAR JOINTS WITH NEW MORTAR PER THE
SPECIFICATIONS. EXISTING JOINTS SHALL BE
CONSTRUCTED AS "EXPANSION JOINTS" WITH REMOVAL OF
EXISTING MORTAR AND THE INSTALLATION OF FLEXIBLE
SEALANT AT EXISTING VERTICAL JOINTS AT 10'-0" O.C.(OR
TO NEAREST ADJACENT JOINT OF 10'-0" O.C) INTERVALS.
AT ALL OF THE EXISTING METAL LOUVERED BRICK VENTS
AT 8TH FLOOR INTERSTITIAL SPACE, CONTRACTOR SHALL
REMOVE AND REPLACE ALL EXISTING CAULKING AROUND
THE TOP AND SIDE PERIMETER OF THE VENT. INSTALL NEW
BACKER ROD AS NEEDED TO ENSURE THE PERIMETER OF
THESE VENTS ARE PROPERLY SEALED.
VERTICAL AND DIAGONAL CRACKS WITH DAMAGED BRICK
AND MORTAR JOINTS AT THE CORNER AREAS OF THE
BUILDING FACADE SHALL HAVE ALL EXISTING MORTAR OR
SEALANT REMOVED IN ENTIRETY AND THE EXISTING
MORTAR JOINTS AND BRICK/MASONRY CRACKS REPLACED
WITH NEW CUSTOM COLOR "SOFT JOINTS" ONE-PART
POLYURETHANE, ELASTOMERIC SEALANT/ADHESIVE
JOINTS. REFER TO THE SPECIFICATIONS. NEW "SOFT
JOINTS" TO BE COLOR MATCHED TO MORTAR JOINTS AND
BRICK UNITS DEPENDING ON SPECIFIC LOCATION.
CONTRACTOR SHALL PROVIDE "MOCK UP" OF COLOR
MATCHING FOR REVIEW AND APPROVAL OF THE A/E AND
OWNER AS PART OF THE PROJECT SCOPE OF WORK.
EXISTING STAINED EIFS PLASTER CLADDING WITH SMALL
CHIPS AND DAMAGE TO WALL SURFACE SHALL BE
THOROUGHLY CLEANED AND DAMAGED AREAS SHALL BE
PATCHED TO MATCH EXISTING. ENTIRE EIFS WALL AREA
SHALL BE PREPARED AND REPAINTED IN ENTIRETY.
LOCALIZED AREAS OF "SPALLED" BRICK AND ALL
INDIVIDUAL "SPALLED" BRICK UNITS SHALL BE
REPAIRED, FILLED, “REFACED” AND STAINED (MINERAL
COATING) TO MATCH EXISTING BRICK UNITS IN TEXTURE,
COLOR, SIZE AND APPEARANCE. CONTRACTOR SHALL
RE-POINT ANY DAMAGED MORTAR AT THESE AREAS IN
ENTIRETY TO MATCH EXISTING COLOR. CONTRACTOR
SHALL PROVIDE "MOCK UP" OF COLOR MATCHING COATING
FOR REVIEW AND APPROVAL OF THE A/E AND OWNER AS
PART OF THE PROJECT SCOPE OF WORK.
AREAS OF HEAVY ACCUMULATIONS OF BIRD DROPPINGS
ON THE LIMESTONE SILLS, BRICK FAÇADE AND CANOPY
STRUCTURES SHALL BE THOROUGHLY CLEANED AND
REMOVED IN ACCORDANCE WITH THE SPECIFICATIONS.
EXISTING WEEP HOLES AT SOME AREAS OF THE VARIOUS
NEWER VA ADDITIONS, AT THE GROUND FLOOR AREAS AND
ABOVE WINDOW OPENINGS, RELIEVING ANGLES, ETC.,
SHALL REMAIN, BE PROTECTED AND SHALL NOT BE
ALTERED OR REMOVED/REPLACED. CONTRACTOR SHALL
ENSURE THAT ALL EXISTING WEEPS ARE FREE AND CLEAR
OF DEBRIS AS PART OF THE SCOPE OF WORK.
ALL LOOSE AND “BULGING” FACE BRICKS AT THE BUILDING
FACADE THAT ARE NOT DAMAGED SHALL BE RE-POINTED
AND SECURED FLUSH WITH THE FACE OF THE
SURROUNDING BRICK. ALL DAMAGED LOOSE
OR “BULGING” FACE BRICKS SHALL BE REPLACED WITH
NEW REPLACEMENT BRICK (AND MORTAR) TO MATCH
EXISTING BRICK UNITS IN TEXTURE, COLOR, SIZE AND
APPEARANCE FLUSH WITH THE FACE OF THE
SURROUNDING BRICK.
ALL EXISTING WINDOWS, GLAZING AND GLAZED OPENINGS
SHALL BE PROPERLY COVERED AND PROTECTED DURING
THE MASONRY CLEANING PROCESS AND WATER
REPELLENT INSTALLATION. APPLY LIQUID MASKING AGENT
TO GLASS AND SELF-ADHERING MEMBRANE TO METAL AND
OTHER WINDOW SURFACES. ALL EXISTING WINDOWS
SHALL BE THOROUGHLY CLEANED AND ALL STAINS,
ORGANIC GROWTH AND DISCOLORATION REMOVED. PRIOR
TO FINAL ACCEPTANCE, ALL EXISTING METAL WINDOW
FRAMES, GLAZING AND TRIM SHALL BE PROFESSIONALLY
CLEANED AGAIN AT THE CONCLUSION OF THE
CONSTRUCTION PHASE.
DAMAGED OR MISSING MORTAR/CAULK JOINTS OBSERVED
ABOVE EXISTING METAL "EYEBROW" FLASHING, SHALL BE
REPLACED WITH NEW "SPECIAL JOINT" HYDRATED LIME
MORTAR AT THESE JOINTS. REFER TO KEYED NOTE NO. 10,
THE ENLARGED ELEVATION, ARCHITECTURAL DETAILS, AND
THE SPECIFICATIONS.
ALL DAMAGED, CRACKED OR CRUMBLING BRICK SHALL BE
REPAIRED, FILLED, “REFACED” AND STAINED TO MATCH
EXISTING BRICK UNITS IN TEXTURE, COLOR, SIZE AND
APPEARANCE. CONTRACTOR SHALL RE-POINT ANY
DAMAGED MORTAR AT THESE AREAS IN ENTIRETY TO
MATCH EXISTING COLOR.
ALL DAMAGED OR MISSING MORTAR JOINTS IN THE
DECORATIVE POLISHED GRANITE LOCATED AT THE MAIN
ENTRY AREA, SHALL BE REPLACED WITH NEW
RESTORATION MORTAR TO MATCH EXISTING MATERIAL
AND COLOR, REFER TO THE SPECIFICATIONS.
THE OPEN VOID AT THE BASE OF THE BRICK VENEER AT
THE CONCRETE SLAB OF THE MAIN ENTRY AREA SHALL BE
FILLED AND THE DAMAGED BRICK AND MORTAR AT THIS
AREA SHALL BE REPLACED WITH NEW REPLACEMENT
BRICK (AND MORTAR) TO MATCH EXISTING BRICK UNITS IN
TEXTURE, COLOR, SIZE AND APPEARANCE. CONCRETE
SLAB SHALL BE PATCHED AT THIS AREA. REFER TO CIVIL
DOCUMENTS FOR OTHER RELATED WORK AT THIS AREA.
AREAS WERE OBSERVED WHERE LATER BUILDING
ADDITION BRICKWORK DID NOT MATCH THE ORIGINAL 1948
BUILDING BRICK COLOR BLEND. THIS NEW BRICKWORK
ABUTS OR IS TOOTHED INTO THE ORIGINAL BRICK AND
CREATES A COLOR CONTRAST. APPLICATION OF THE
SPECIFIED MINERAL COATING AT THESE AREAS WILL BE
REQUIRED AS PART OF THE PROJECT SCOPE OF WORK TO
BLEND IN THE DIFFERING BRICK FACE
COLORS.CONTRACTOR SHALL PROVIDE "MOCK UP" OF
COLOR MATCHING FOR REVIEW AND APPROVAL OF THE A/E
AND OWNER AS PART OF THE PROJECT SCOPE OF WORK.
PLYWOOD COVERING SHALL BE REMOVED AND THE
OPENING IN THE EXTERIOR WALL SHALL BE PATCHED AND
REPAIRED TO MATCH EXISTING. NEW REPLACEMENT
BRICK (AND MORTAR) SHALL BE INSTALLED AND “TOOTHED
IN” TO MATCH EXISTING SURROUNDING FACE BRICK IN
TEXTURE, COLOR, SIZE AND APPEARANCE.
AREAS OF PREVIOUS REPAIR/REPLACEMENT OF EXISTING
BRICK OBSERVED TO HAVE INCORPORATED
NON-MATCHING, INCORRECTLY COLORED BRICK AND
MORTAR. EXISTING NON-MATCHING BRICK AT THIS AREA
SHALL BE STAINED (MINERAL COATING) TO MATCH
EXISTING BRICK UNITS IN COLOR AND APPEARANCE.
CONTRACTOR SHALL REMOVE DAMAGED MORTAR JOINTS
AND RE-POINT ANY DAMAGED MORTAR JOINTS AT THESE
AREAS IN ENTIRETY TO MATCH EXISTING COLOR. REFER
TO THE GUIDELINES AND TECHNICAL SPECIFICATIONS FOR
RE-POINTING "STANDARD" MORTAR JOINTS. CONTRACTOR
SHALL PROVIDE "MOCK UP" OF COLOR MATCHING COATING
AND MORTAR FOR REVIEW AND APPROVAL OF THE A/E AND
OWNER AS PART OF THE PROJECT SCOPE OF WORK.
EXISTING ORIGINAL COPPER DOWNSPOUTS (CONDUCTOR)
TO BE CLEANED AND STABILIZED IN PLACE. CONTRACTOR
SHALL REATTACH ALL LOOSE OR UNATTACHED COPPER
BRACKETS (CONDUCTOR BANDS) AT THESE DOWNSPOUTS
TO THE MASONRY WALL WITH MASONRY NAILS OR LEAD
EXPANSION SHIELDS. IF COPPER BRACKETS (CONDUCTOR
BANDS) ARE MISSING, THE CONTRACTOR SHALL PROVIDE
AND INSTALL NEW COPPER BRACKETS (CONDUCTOR
BANDS) TO MATCH EXISTING.
EXISTING STEEL BRACKET ATTACHED TO THE FACE BRICK
AT THE COOLING TOWER. THE STAINING/DAMAGE TO THE
SURROUNDING BRICK AT THIS AREA SHALL BE CLEANED
AND THE DAMAGED BRICK PATCHED, REPAIRED AND THE
EXISTING MORTAR JOINTS RE-POINTED. EXISTING STEEL
BRACKET SHALL BE CLEANED, WIRE BRUSHED, PREPARED
AND REPAINTED.
CONTRACTOR SHALL INSTALL NEW PRE-FINISHED
GUTTERS AND DOWNSPOUTS AT THIS SHED ROOF
LOCATION. NEW DOWNSPOUTS SHALL BE CONNECTED TO
NEW CAST IRON DOWNSPOUT BOOTS (PAINTED) AND
SHALL BE TIED INTO NEW SUB-SURFACE DRAINAGE AT THIS
AREA. REFER TO THE EXTERIOR ELEVATIONS, DETAILS,
SPECIFICATIONS AND CIVIL DOCUMENTS.
SECTION OF MISSING OR BENT/DAMAGED METAL
"EYEBROW" FLASHING SHALL BE REPLACED TO MATCH
EXISTING. REFER TO THE ARCHITECT'S ENLARGED
SECTION/DETAIL OF THIS METAL "EYEBROW" FLASHING
OVER THE EXISTING WINDOWS. CONTRACTOR SHALL BE
RESPONSIBLE FOR REPLACING ANY DAMAGED OR MISSING
PORTIONS OF THE EXISTING METAL "EYEBROW" FLASHING
TO MATCH EXISTING IN DESIGN, DIMENSIONS, GAUGE OF
METAL, PROFILE, ETC. CONTRACTOR SHALL PROVIDE FULL
SIZE SHOP DRAWINGS OF REPLACEMENT "EYEBROW"
FLASHING FOR REVIEW BY THE ARCHITECT AND OWNER.
CONTRACTOR SHALL CAREFULLY REMOVE AND REINSTALL
EXISTING BRICKS TO MATCH EXISTING AT THIS AREA IN
ORDER TO COMPLETE THE INSTALLATION OF THE
REPLACEMENT METAL "EYEBROW" FLASHING.
THE CONCRETE PORTIONS OF THIS CANOPY SHALL BE
THOROUGHLY CLEANED AND THE LOOSE/BROKEN
CONCRETE REMOVED. SURFACE RUST AND SCALE SHALL
BE REMOVED FROM THE EXPOSED PORTIONS OF METAL
REINFORCEMENT AT THE DAMAGED AREAS AND THE
EXPOSED PORTIONS OF THE REINFORCING STEEL SHALL
RECEIVE AN ANTI-RUST TREATMENT AND BE COATED WITH
A RUST INHIBITIVE PRIMER. THE DAMAGED CONCRETE
AREAS PATCHED WITH NON SHRINK GROUT AND ALL
EXPOSED CONCRETE COMPONENTS SHALL BE PAINTED
PER THE SPECIFICATIONS. THE EXPOSED METAL TRIM AT
THIS CANOPY LOCATION WILL BE THOROUGHLY CLEANED
AND THE EXISTING METAL FLASHING REPAIRED AT THIS
AREA AS NECESSARY AS PART OF THE SCOPE OF WORK.
REPAIR/REPLACEMENT OF THE ROOFING SYSTEM ON THIS
CANOPY IS NOT PART OF THE PROJECT SCOPE OF WORK.
HOWEVER, THE SCOPE OF WORK WILL INCLUDE THE
REMOVAL OF ANY EXISTING DEBRIS FROM THE CANOPY
ROOF AREA AS WELL AS THE CLEARING OF ALL EXISTING
CANOPY ROOF DRAINS TO ENSURE PROPER DRAINAGE.
EXISTING CEMENT PLASTER WALLS AT COOLING TOWER.
ANY DAMAGED, LOOSE OR MISSING PLASTER AT THE
COOLING TOWER AREA WALLS SHALL BE
PATCHED/REPAIRED TO MATCH EXISTING IN THICKNESS.
ALL CEMENT PLASTER AREAS AT THE COOLING TOWER
SHALL BE RE-COATED IN ENTIRETY AND PAINTED WITH
ELASTOMERIC PAINT PER THE SPECIFICATIONS. ALL
EXISTING PENETRATIONS THROUGH THE EXTERIOR WALLS
FOR EXISTING EQUIPMENT, PIPING, CONDUITS, ETC. AT
THIS AREA, SHALL BE FILLED, CLOSED AND RE-CAULKED.
EXISTING BRICK AT THE COOLING TOWER AREA WAS
OBSERVED TO HAVE PAINT/COATING STAINS WHICH
APPEAR TO BE THE RESULT OF RECENT ROOF WORK AT
THESE AREAS. THESE STAINS SHALL BE CLEANED AND
REMOVED FROM THE FACE BRICK AND MORTAR, REFER TO
KEYED NOTE NO.1.
EXISTING BRICK AT THE COOLING TOWER AREA WAS
OBSERVED TO HAVE EXCESS ACCUMULATIONS OF
SEALANT FROM THE ROOF SYSTEM AND ASSOCIATED
FLASHING. THIS EXCESS SEALANT SHALL BE CLEANED AND
REMOVED FROM THE FACE BRICK AND MORTAR.
A BLACK MASTIC LIKE SEALANT MATERIAL WAS OBSERVED
ON THE FACE OF THE BRICK AND MORTAR NEAR THE BASE
COURSE OF THE EXTERIOR WALL AT VARIOUS AREAS. THIS
BLACK MASTIC/SEALANT MATERIAL SHALL BE CLEANED
AND REMOVED FROM THE FACE BRICK AND MORTAR AT
ALL AREAS WHERE THIS OCCURS AT THE GROUND FLOOR.
BRACKETS AND BRAIDED COPPER CABLE FOR THE
EXISTING LIGHTNING PROTECTION SYSTEM ATTACHED
DIRECTLY TO THE BRICK MASONRY WALLS AND LIMESTONE
PARAPET CAPS. THE EXISTING LIGHTNING PROTECTION
SYSTEM SHALL BE DISCONNECTED AND REPLACED WITH A
NEW SYSTEM FOLLOWING THE INSTALLATION OF NEW
METAL COPING CAPS AND COMPLETION OF THE MASONRY
SCOPE OF WORK. REFER TO THE SECTIONS/DETAILS OF
THE NEW METAL COPING AT THE PARAPET CAPS. REFER
TO THE CONSTRUCTION DOCUMENTS AND THE
SPECIFICATIONS FOR THE FULL SCOPE OF WORK FOR THE
NEW LIGHTNING PROTECTION SYSTEM TO BE INSTALLED
AS PART OF THIS PROJECT. IF PERMITTED BY CODE,
EXISTING LIGHTNING PROTECTION AIR TERMINALS MAY BE
REUSED, IN CONJUNCTION WITH THE NEW AIR TERMINALS.
CONTRACTOR SHALL ENSURE THE NEW LIGHTNING
PROTECTION SYSTEM, COMPONENTS AND PORTIONS OF
EXISTING SYSTEM TO BE RE-USED, ARE IN COMPLIANCE
WITH UL 96, UL 96A AND NFPA 780.
EXISTING LEAD JOINT AT LIMESTONE PARAPET CAP.
EXISTING LIMESTONE PARAPET CAP TO BE REMOVED AND
TURNED OVER TO THE VA. LIMESTONE PARAPET CAP
SHALL BE REPLACED WITH NEW PREFINISHED METAL
COPING. REFER TO THE ARCHITECTURAL DETAILS AND THE
SPECIFICATIONS. REFER TO KEYED NOTE NO. 6.
EXCESS LEAVES AND DEBRIS SHALL BE REMOVED FROM
THE CANOPY ROOF AT NORTHEAST ADDITION, NORTH
CANOPY ROOF AND ALL OTHER CANOPY ROOFS. THE
CONTRACTOR SHALL CLEAN ALL EXISTING CANOPY ROOF
DRAINS TO ENSURE PROPER DRAINAGE.
EXISTING COPPER FLASHING. COPPER FLASHINGS AT
BASE OF WALL SHALL REMAIN AND NOT BE DAMAGED. THE
SCOPE OF THIS PROJECT DOES NOT INCLUDE REPAIRS OR
ALTERATIONS TO EXISTING ROOFS OR ROOF FLASHINGS
AND INSPECTION OF THE EXISTING ROOFING SYSTEM HAS
NOT BEEN CONDUCTED BY THE DESIGN TEAM.
CONTRACTOR TO TAKE CARE TO PROTECT ALL EXISTING
ROOF AREAS AND ROOF SYSTEMS DURING THIS PROJECT.
EXISTING DAMAGED BRICK SCREEN WALL AND
ASSOCIATED SLAB/FOUNDATIONS AT MECHANICAL AREA
TO BE DEMOLISHED AND RECONSTRUCTED. REFER TO
STRUCTURAL DRAWINGS, DETAILS AND SPECIFICATIONS.
EXCESS SEALANT WHERE THE PARAPET AND LIMESTONE
PARAPET CAP INTERSECTED THE ADJACENT BRICK WALL.
CONTRACTOR SHALL REMOVE ALL EXISTING CAULKING AT
THIS JUNCTURE AND INSTALL NEW BACKER ROD AND
SEALANT AT THESE JUNCTURES.
EXISTING DAMAGED BUILDING EXPANSION JOINT/CAULK
JOINT TO BE REMOVED IN ENTIRETY INCLUDING MATERIAL
PRESENT ON ADJACENT BRICK AND MORTAR AND SHALL
BE REPLACED WITH NEW CUSTOM COLOR "SOFT JOINT"
ONE-PART POLYURETHANE, ELASTOMERIC
SEALANT/ADHESIVE JOINTS THE FULL HEIGHT OF THE
JOINTS. REFER TO THE SPECIFICATIONS. NEW "SOFT"
JOINTS AT THESE LOCATIONS TO BE COLOR MATCHED TO
THE ADJACENT MORTAR JOINTS NEARBY. CONTRACTOR
SHALL PROVIDE "MOCK UP" OF COLOR MATCHING FOR
REVIEW AND APPROVAL OF THE A/E AND OWNER AS PART
OF THE PROJECT SCOPE OF WORK.
DAMAGED EXISTING METAL LOUVERS IN SCREEN WALL AT
FORMER COOLING TOWER. ALL EXISTING METAL LOUVERS
IN THIS AREA ARE TO REMOVED AND REPLACED WITH NEW
METAL LOUVERS TO MATCH EXISTING AND EXISTING
MATERIAL. REFER TO EXISTING CONDITIONS AND THE
SPECIFICATIONS.
CONTRACTOR SHALL APPLY TWO (2) COATS OF
BREATHABLE SILOXANE PRE-DILUTED RAIN REPELLANT
PRODUCT OVER ENTIRETY OF ALL EXTERIOR FACE BRICK
(INCLUDING ALL MASONRY SURFACES OF THE PARAPETS)
AND LIMESTONE COMPONENTS OF THE ORIGINAL 1948
PORTIONS OF THE BUILDING IN ACCORDANCE WITH THE
SPECIFICATIONS AND MANUFACTURER'S REQUIREMENTS.
CONTRACTOR SHALL BE RESPONSIBLE FOR FULL
PROTECTION OF ALL EXISTING WINDOW GLAZING, FRAMES
AND ASSOCIATED COMPONENTS IN ACCORDANCE WITH
THE RAIN REPELLANT MANUFACTURER'S REQUIREMENTS
TO ENSURE ALL EXISTING BUILDING PAINTED/PRE-FINISHED
COMPONENTS, AND WINDOWS ARE NOT DAMAGED DURING
APPLICATION OF THIS PRODUCT.
ALL EXISTING EXTERIOR WALL MOUNTED EQUIPMENT,
SPEAKERS, LIGHT FIXTURES AND SECURITY CAMERAS,
ETC. SHALL BE COVERED AND PROTECTED DURING ALL
CLEANING REPAIR AND CONSTRUCTION WORK, WHETHER
INDICATED ON THE DRAWINGS OR NOT. ANY EQUIPMENT
DAMAGED DURING CONSTRUCTION, SHALL BE REPLACED
BY THE CONTRACTOR AT NO COST TO THE OWNER.
EXISTING COPPER COPING AT PARAPET AREA TO REMAIN
AND BE PROTECTED. DAMAGED AREAS OF EXISTING
EXPOSED COPPER COPING/FLASHING TO BE REPAIRED TO
MATCH EXISTING.
ALL EXISTING LIMESTONE PARAPET COPING CAPS AT THE
CENTER CORE ROOF AREAS WHERE EXISTING COPPER
COPING/FLASHING EXISTS BELOW THE LIMESTONE COPING,
SHALL BE REMOVED AND REPLACED WITH NEW
PREFINISHED CUSTOM PROFILE METAL COPING WITH
CUSTOM COLOR SELECTION TO MATCH EXISTING
LIMESTONE. THE EXISTING COPPER COMPONENTS BELOW
THE LIMESTONE SHALL REMAIN AND BE PROTECTED AND
THE EXISTING ROOFING SYSTEM INCLUDING ASSOCIATED
FLASHING AT THESES AREAS SHALL REMAIN AND BE
PROTECTED. REFER TO THE ARCHITECTURAL DETAILS AND
THE SPECIFICATIONS. CONTRACTOR SHALL PROTECT ALL
EXPOSED PARAPET WALLS FROM WATER INTRUSION
DURING THIS ALTERATION AND THROUGHOUT THE
CONSTRUCTION PHASE.
EXISTING BUILDING EXPANSION JOINT ASSEMBLY TO
REMAIN AND BE PROTECTED DURING CONSTRUCTION.
CONTRACTOR SHALL PROTECT EXISTING EXPANSION
JOINT EXPOSED COMPONENTS DURING ALL MASONRY
CLEANING REPAIR/REPLACEMENT AND COATING WORK.
ANY DAMAGE TO THESE EXISTING EXPANSION JOINT
ASSEMBLIES DURING CONSTRUCTION SHALL REQUIRE
REPLACEMENT OF THESE JOINT ASSEMBLIES IN ENTIRETY
BY THE CONTRACTOR.
CONTRACTOR SHALL THOROUGHLY CLEAN UNDERSIDE OF
CANTILEVERED CONCRETE AWNINGS AND THE METAL
FASCIA IN ENTIRETY.
ALL EXISTING AREAS OF MORTAR ACCUMULATION ON THE
EXISTING FACE BRICK SHALL BE CLEANED AND REMOVED
IN ENTIRETY.
CONTRACTOR SHALL REMOVE EXISTING MASONRY
LOUVER OPENING SILL AND INSTALL NEW PRE-FINISHED
LOUVER SILL TO MATCH NEW PRE-FINISHED LOUVER.
REFER TO THE LOUVER OPENING DETAILS.
EXISTING JOINT MATERIAL AT THE INTERIOR CORNERS AND
CONNECTIONS OF THE ELEVATOR TOWER CONNECTION TO
THE ORIGINAL 1948 CENTER CORE PORTION OF THE
BUILDING SHALL HAVE ALL EXISTING JOINT MATERIAL,
MORTAR OR SEALANT REMOVED IN ENTIRETY, THE FULL
HEIGHT OF THE JOINT ON ALL SIDES OF THE ELEVATOR
TOWER, WHETHER INDICATED ON THE DRAWINGS OR NOT.
THE EXISTING VERTICAL JOINTS AT THE INTERIOR
CORNERS AND CONNECTIONS OF THE ELEVATOR TOWER
CONNECTION TO THE CENTER CORE OF THE BUILDING
SHALL BE REPLACED WITH NEW CUSTOM COLOR "SOFT
JOINT" ONE-PART POLYURETHANE, ELASTOMERIC
SEALANT/ADHESIVE JOINTS THE FULL HEIGHT OF THE
JOINTS. REFER TO THE SPECIFICATIONS. NEW "SOFT"
JOINTS AT THESE LOCATIONS TO BE COLOR MATCHED TO
THE ADJACENT MORTAR JOINTS NEARBY. CONTRACTOR
SHALL PROVIDE "MOCK UP" OF COLOR MATCHING FOR
REVIEW AND APPROVAL OF THE A/E AND OWNER AS PART
OF THE PROJECT SCOPE OF WORK.
EXISTING JOINT MATERIAL SHALL BE REMOVED IN
ENTIRETY INCLUDING ALL EXISTING JOINT MATERIAL,
MORTAR OR SEALANT. THIS JOINT AREA OF THE EXISTING
PARAPET SHALL BE FILLED IN/RECONSTRUCTED WITH NEW
BRICK AN MORTAR TO MATCH EXISTING AND SHALL BE
TOOTHED IN WITH EXISTING BRICK.
EXISTING STAINLESS STEEL FLASHING AT SOUTH SIDE OF
ELEVATOR TOWER SHALL REMAIN AND BE PROTECTED.
EXISTING LIMESTONE COPING UNDER STAINLESS STEEL
FLASH SHALL REMAIN AT THIS LOCATION ONLY. NEW
PRE-FINISHED METAL COPING SYSTEM SHALL TIE INTO
EXISTING STAINLESS STEEL FLASHING AND EXISTING
LIMESTONE FLASHING AT THIS LOCATION IN ACCORDANCE
WITH THE MANUFACTURER'S REQUIREMENTS AND DETAILS.
CONTRACTOR SHALL ENSURE THAT THIS CONNECTION IS
WETHER-TIGHT AND ALL JOINTS OF THE EXISTING
STAINLESS STEEL FLASHING SHALL BE RE-SEALED. REFER
TO KEYED NOTE NO. 50.
EXISTING METAL RAILINGS AT THE PARAPET AREAS SHALL
BE TEMPORARILY REMOVED, CLEANED, PREPARED AND
RE-PAINTED AND SHALL BE REINSTALLED AS PART OF THE
INSTALLATION WORK ASSOCIATED WITH THE NEW
REPLACEMENT PRE-FINISHED METAL COPING SYSTEM.
COORDINATE REINSTALLATION AND FASTENING WITH NEW
PRE-FINISHED METAL COPING SYSTEM.
CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING THE INSTALLATION OF THE NEW
PRE-FINISHED METAL COPING SYSTEM WITH ALL EXISTING
PIPING, CONDUIT, DUCT WORK, ACCESS LADDERS, ETC.
CURRENTLY ROUTED OVER AND ATTACHED TO THE
BUILDING PARAPETS WHETHER INDICATED ON THE
DRAWINGS/PHOTO SHEETS OR NOT. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO WORK AROUND
THESE EXISTING BUILDING COMPONENTS INCLUDING THE
TEMPORARY REMOVAL AND REINSTALLATION OF THESE
COMPONENTS AS NEEDED TO COMPLETE THE
INSTALLATION OF THE NEW METAL COPING SYSTEM.
EXISTING BUILDING COMPONENTS IN THE VICINITY OF THE
PARAPETS SHALL BE PROTECTED FROM DAMAGE.
4517 37
GR101
TDM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
TUCKPOINT
SHREVEPORT, LOUISIANA
COR
ZAY/CMYRevisions: Date:
ARCHIE LANHAM
A/E:
O'Brien Engineering Inc.
2340 E. Trinity Mills Rd. Ste 220 Carrollton, TX 75006 972-233-2288 obrieneng.com
DATE: 03 SEPTEMBER 2021
FULLY SPRINKLERED
667-19-101 Architecture Yeates Mancil Architects, LLC 929 South Peters Street New Orleans, LA 70130 504-522-7218 www.yeatesarchitects.com
9/3/2021
3 11
(TYP.)
(TYP.)
(TYP.)
(TYP.)
PHOTO 16 PHOTO 17 PHOTO 18 PHOTO 19
PHOTO 11 PHOTO 12 PHOTO 13 PHOTO 14
PHOTO 7 PHOTO 8 PHOTO 9 PHOTO 10
PHOTO 1 PHOTO 2
PHOTO 6
(TYP.)
(TYP.)
EXTERIOR PHOTO SHEETS
PHOTO 3 PHOTO 4 PHOTO 5
A
East Elevation
Center Core
B
North Elevation
Center Core
C
West Elevation
Center Core
D
South Elevation
Center Core
E
East Elevation
East Wing
3 3
(TYP.
ALL
EXISTING
BRICK &
LIMESTONE)
(TYP. ALL
EXISTING BRICK
& LIMESTONE)
PHOTO 15
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
E
East Elevation
East Wing
PHOTO 20
F
South Elevation
Center Core
(TYP.)
(TYP.)
IMPORTANT NOTES:
1. LEGEND - REFER TO SHEET GR001 FOR THE KEYED PHOTO
SHEET KEYED NOTES THAT APPLY TO THE PHOTOGRAPHS
ON THIS SHEET.
2. THE INTENT OF THIS PHOTO SHEET IS TO PROVIDE A
GENERAL DOCUMENTATION OF BOTH TYPICAL AND SPECIFIC
EXISTING EXTERIOR CONDITIONS AND SCOPE OF WORK AT
THE EXISTING BUILDING. THE PHOTOS AND ITEMS NOTED DO
NOT CAPTURE OR DOCUMENT ALL EXISTING INSTANCES OR
LOCATIONS OF THE EXISTING CONDITIONS TO BE
CORRECTED AS PART OF THE PROJECT SCOPE OF WORK.
THE PHOTO SHEETS ALSO DETAIL SPECIFIC SCOPE OF WORK
AREAS AND CONDITIONS THAT ARE NOT EASILY INDICATED IN
THE EXTERIOR ELEVATION SHEETS.
3. REFER TO THE EXTERIOR ELEVATION SHEETS FOR EXACT
LOCATIONS AT THE BUILDING FACADE WHERE THESE
PHOTOGRAPHED AREAS ARE LOCATED.
4. IMPORTANT REQUIREMENT: ALL PHOTOS ON ALL PHOTO
SHEETS MUST BE PRINTED IN COLOR (NOT BLACK AND
WHITE OR GRAY TONES) FOR THE MAXIMUM CLARITY. THIS
COLOR PHOTO REQUIREMENT APPLIES TO ALL PHOTO
SHEETS ON BOTH FULL SIZE DRAWING SHEETS AND HALF
SIZE DRAWING SHEETS.
| CS-103 - AREA A PROPOSED IMPORVEMENTS PLAN |
| CS-104 - AREA A PROPOSED IMPROVEMENTS PLAN |
| CS-203 - AREA B PROPOSED IMPROVEMENTS PLAN |
| CS-204 - AREA B PROPOSED IMPROVEMENTS PLAN |
| CS-303 - AREA C PROPOSED IMPORVEMENTS PLAN |
| CS-403 - AREA D PROPOSED IMPORVEMENTS PLAN |
| CP-502 - PAVING & SITE DETAILS |