This document is an Infection Control Risk Assessment (ICRA) for a tuckpointing project at the Overton Brooks VA Medical Center. The ICRA identifies the construction project as Type B, involving small-scale, short-duration work that creates minimal dust on the exterior of the building. It determines the affected patient risk group is low. Using the Infection Control Risk Matrix, the ICRA circles Class II precautions based on the construction type and patient risk. The related federal contract opportunity is solicitation number 36C25622R0062 for tuckpointing work at Building 1 of the Overton Brooks VAMC, to be awarded by the Department of Veterans Affairs Veterans Health Administration VISN 16.

View the file

Other files

File Type Posted
Final RFI Register 667-19-101 05052022 v2.docx DOCX document
36C25622R0062 0003.docx DOCX document
36C25622R0062 SOW v2.docx DOCX document
Final RFI Register 667-19-101 05022022.docx DOCX document
36C25622R0062 0002.docx DOCX document
36C25622R0062 0001.docx DOCX document
Project 66719101 SV Sign in Sheet.pdf PDF
36C25622R0062 Part 1 DRWGS .pdf PDF
36C25622R0062 Part 4 DRWGS .pdf PDF
36C25622R0062 EXHIBIT A.docx DOCX document
36C25622R0062 Part 2 DRWGS .pdf PDF
36C25622R0062 Part 3 DRWGS .pdf PDF
36C25622R0062 SOW .docx DOCX document
36C25622R0062 COVID-19 Safety Protocols for Federal Contractors rev2 .docx DOCX document
36C25622R0062 EXHIBIT C.docx DOCX document
36C25622R0062 Part 6 DRWGS .pdf PDF
36C25622R0062 EXHIBIT E.docx DOCX document
36C25622R0062 CRA .pdf PDF
36C25622R0062 EXHIBIT B.docx DOCX document
36C25622R0062 EXHIBIT F.docx DOCX document
36C25622R0062 Part 8 DRWGS .pdf PDF
36C25622R0062 EXHIBIT D.docx DOCX document
36C25622R0062 Part 5 DRWGS .pdf PDF
36C25622R0062 RFP.docx DOCX document
36C25622R0062 Specifications.pdf PDF
36C25622R0062 Part 7 DRWGS .pdf PDF
36C25622R0062 WD LA20220031 Mod 2 02252022.docx DOCX document
36C25622R0062 ILSM .pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overton Brooks VAMC Infection Prevention & Control Construction Risk Assessment (ICRA)

*A preliminary ICRA is required for contracting purposes only; do not post during construction. The FINAL ICRA must be posted at the construction site.

Project: Tuckpointing Building 1 667-19-101 Preliminary Assessment* by: Vickie L. Moore Date: 9/16/2021 FINAL ICRA Determined and Processed by: Final Date: ___

STEP ONE: CIRCLE the Type of Construction Project based on scope and expected activity (Type A-D)

TYPE

A

Inspection and Non-Invasive Activities. Includes, but is not limited to:

removal of ceiling tiles for visual inspection only, e.g., limited to 1 tile per 50 square feet painting (but not sanding) wallcovering, electrical trim work, minor plumbing, activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.

TYPE

B

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

installation of telephone and computer cabling access to chase spaces cutting of walls or ceiling where dust migration can be controlled.

Project Specific: Conducted on the exterior of the building

TYPE

C

Work generates a moderate/high level of dust or requires demolition/removal of any fixed building components or assemblies Includes, but is not limited to:

sanding of walls for painting or wall covering removal of floorcoverings, ceiling tiles and casework; new wall construction minor duct work or electrical work above ceilings major cabling activities any activity which cannot be completed within a single work shift.

TYPE

D

Major demolition and construction projects Includes, but is not limited to:

activities which require consecutive work shifts requires heavy demolition, removal of a complete cabling system, or excavation new construction.

STEP TWO: CIRCLE the affected Patient Risk Groups. If more than one risk group will be affected, select the higher risk group.

Low Risk Medium Risk High Risk Highest Risk

Office areas Kitchen storage area Public access, hallways, elevator Lobby

Non-clinical vacated engineering space

Exterior of the building potentially adjacent to hospital exhaust & air intakes

Cardiology Echocardiography Endoscopy Nuclear Medicine Physical Therapy Radiology/MRI Respiratory

Therapy Kitchen – food preparation area

Step Down Unit Emergency Room Laboratories (specimen) Medical Units Outpatient Surgery Pharmacy Post Anesthesia Care Unit Surgical Units Minor Procedure Rooms Sterile Supply storage/distribution

Immunocompromised patient care areas

Cardiac Cath Lab Sterile Processing Service Preparation Area Decontamination Area

Intensive Care Unit Negative pressure isolation rooms Oncology Operating rooms

STEP THREE: Using the IC Matrix CIRCLE the Class of Precautions as determined by Construction Type and Patient Risk Construction Project Type

Patient Risk Group TYPE A TYPE B TYPE C TYPE D

IC

M at ri x LOW Risk Group I II II III/IV

MEDIUM Risk Group I II III IV

HIGH Risk Group I II III/IV IV

HIGHEST Risk Group II III/IV III/IV IV

Preliminary ICRA Approved Final ICRA Approved 9/16/2021

X Vickie L. Moore Vickie L. Moore MA, CIC, VHA-CM Infection Prevention Program Manager Signed by: VICKIE L. MOORE 193380

X Vickie L. Moore MA, CIC, VHA-CM Infection Prevention Program Manager

STEP ONE: CIRCLE the Type of Construction Project based on scope and expected activity (Type A-D)
STEP THREE: Using the IC Matrix CIRCLE the Class of Precautions as determined by Construction Type and Patient Risk
TYPE D
TYPE C
TYPE B
TYPE A