36C25620R0073-021.docx
DOCX document Posted
- Attached to
- C1PB-- CFM - Install Secondary Master Med Gas Panel Federal contract opportunity
- Solicitation number
- 36C25620R0073
About this file
36C25620R0073 Install Master Gas Panel #2- RFP to DB 2 Phase Spec 00 11 21.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25620R0073-0001000.docx | DOCX document | |
| 36C25620R0073-004.docx | DOCX document | |
| 36C25620R0073-010.pdf | ||
| 36C25620R0073-015.pdf | ||
| 36C25620R0073-017.pdf | ||
| 36C25620R0073-002.doc | DOC document | |
| 36C25620R0073-014.pdf | ||
| 36C25620R0073-008.docx | DOCX document | |
| 36C25620R0073-012.pdf | ||
| 36C25620R0073-020.pdf | ||
| 36C25620R0073-013.pdf | ||
| 36C25620R0073-018.pdf | ||
| 36C25620R0073-016.pdf | ||
| 36C25620R0073-001.docx | DOCX document | |
| 36C25620R0073-011.pdf | ||
| 36C25620R0073-009.xlsx | XLSX spreadsheet | |
| 36C25620R0073-019.docx | DOCX document | |
| 36C25620R0073-007.doc | DOC document | |
| 36C25620R0073-003.docx | DOCX document | |
| 36C25620R0073-006.docx | DOCX document | |
| 36C25620R0073-005.docx | DOCX document | |
| 36C25620R0073-022.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Install Secondary Master Gas Panel #2 Project 629-18-117 New Orleans, LA
SECTION 00 11 21
REQUEST FOR PROPOSAL TO DESIGN BUILD
INSTALL MASTER GAS PANEL #2
(Project No. 629-18-117)
SOUTHEAST LOUISIANA VTETERANS HEALTHCARE SYSTEM
NEW ORLEANS, LA
| A. | PART I - General |
| A1. | Scope of Contract |
A. This Request for Proposal (RFP) is issued as Two-Phase Design-Build procurement (Reference FAR 36.3). Proposals will be evaluated in Phase I to determine which offerors will submit proposals for Phase II. A maximum number of four (4) offerors will proceed to Phase II unless the contracting officer determines that a number greater than four (4) is in the Government’s interest and is consistent with the purposes and objectives of this two-phase design build project. Phase II RFP will be issued only to those successful offerors determined to be most highly qualified from Phase I. One contract will be awarded using competitive negotiation.
B. Provide all labor, materials, tools and equipment, and design-build services necessary for design and construction of a project described here in other specific tasks as further defined by this request for proposal (RFP).
A. Project Number: 629-18-117 B. Project Title: Install Master Medical Gas Panel #2
| C. Project Location: Southeast Louisiana Veterans Healthcare System | |
| D. Scope of Work: Attached to Solicitation | |
| E. General Drawing Submission Requirements: Shop Drawing Submission Requirements are available on the internet at the following address: http://www.cfm.va.gov/. As-built drawings for the Medical Center are available. (note: these drawings are not completely accurate. A-E shall verify existing conditions.) All drawings will be prepared with the VA Standard Title Block and Border. All drawings shall be provided in the 2017 version of AutoCAD and in PDF format. Each individual file on a DVD shall be named by numbers corresponding to the construction documents (i.e. the specs shall be named 00 11 22, 33 44 55, etc. and the drawings shall be E1, E2, etc.) and the final AutoCAD/ specifications files shall be exactly as submitted in the final submission. | |
| F. Incorporated References: The following Department of Veterans Affairs, Office of Construction and Facilities Management, information is incorporated within the Scope of Work by reference and can be found on the VA web site at http://www.cfm.va.gov/ Master Specifications; Design Guides; Design Manuals; Standard Details; Design Alerts; and Quality Alerts. | |
| A2. | Definitions |
| A. | Design-Build (D-B) as defined by the Department of Veterans Affairs (VA) is the procurement by the Government, under one contract, with one firm or Joint Venture (JV) for both design and construction services for a specific project. |
| 1. | Contracting Officer (C0): A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the contracting officer acting within the limits of their authority as delegated by the contracting officer. “Administrative contracting officer (ACO)” refers to a contracting officer who is administering contracts. “Termination contracting officer (TCO)” refers to a contracting officer who is settling terminated contracts. A single contracting officer may be responsible for duties in any or all of these areas. |
| 2. | Contracting Officer’s Representative (COR): The Contracting Officer's written designation of a representative responsible for administering contracts under the immediate direction of the Contracting Officer. For the purposes of this contract the term “COR” will be used herein. |
3. Project Manager: The Contracting Officer's representative (COR) responsible for administering contracts under the immediate direction of the Contracting Officer. This person is the Contracting Officer's authorized representative at the construction site. The Project Manager / COR is responsible for protecting the Government's interest in the execution of the construction contract work. His duties include surveillance of all construction work to assure compliance with the contract documents, interpretation of the contract documents, approval of changed work, approval of all submittals, samples, shop drawings, etc. The Resident Engineer may issue change orders to the Contractor within the limitations set forth in his delegation of authority from the Contracting Officer.
| 4. | Design-Build Contract: This term, as used herein, refers to the Contract(s) to perform the design and construction of the project. |
| 5. | Contractor: This term, as used herein, refers to the contractor under this contract or the D-B team. The contractor or D-B team is solely responsible for the management (planning, supervision, and contract coordination), design, and (professional) services and installation (including all labor, equipment, materials, tools, and inspections) to meet the requirements of this contract. |
| 6. | Architect-Engineer (A-E): This term, as used herein, refers to the A-E firm(s) that is a part of the D-B team, also referred to as D-B A-E. |
B. Source Selection Procedures
1. Source Selection Overview: In accordance with FAR 15.3, the objective of source selection is to select the proposal that represents the best value. A contracting officer is designated as the source selection authority (SSA), unless the agency head appoints another individual. The SSA establishes an evaluation team that includes appropriate contracting, legal, and technical expertise to ensure a comprehensive evaluation of offers. The award decision is based on evaluation factors and significant sub-factors that are tailored to the acquisition. The factors represent the key areas of importance and emphasis to be considered in the source selection decision; and support meaningful comparison and discrimination between and among competing proposals.
2. Evaluation: The proposal evaluation is an assessment of the proposal and the offeror’s ability to perform the prospective contract successfully. The technical, price, and source selection boards will evaluate competitive proposals and then assess their qualities solely on the factors and subfactors specified in the solicitation. Evaluations shall be conducted using a combination of adjectival ratings and numerical weights. The relative strengths, deficiencies, significant weaknesses, and risks supporting proposal evaluation shall be documented in the contract file.
3. Past Performance: Past performance information is one indicator of an offeror’s ability to perform the contract successfully. The currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered. This comparative assessment of past performance information is separate from the responsibility determination required under FAR Subpart 9.1.
4. Tradeoff Source Selection: If tradeoffs are performed, the source selection records shall include an assessment of each offeror’s ability to accomplish the technical requirements; and a summary, matrix, or quantitative ranking, along with appropriate supporting narrative, of each technical proposal using the evaluation factors.
5. SSA’s Final Decision: The SSA’s decision shall be based on a comparative assessment of proposals against all source selection criteria in the solicitation. While the SSA may use reports and analyses prepared by others, the source selection decision shall represent the SSA’s independent judgment. The source selection decision shall be documented, and the documentation shall include the rationale for any business judgments and tradeoffs made or relied on by the SSA, including benefits associated with additional costs. Although the rationale for the selection decision must be documented, that documentation need not quantify the tradeoffs that led to the decision.
6. Source Selection for this Procurement:
| a. Phase I of this procurement will result in a narrowing of offerors to a maximum of four (4) firms (unless the contracting officer determines that a number greater than four (4) is in the Government’s interest and is consistent with the purposes and objectives of this two-phase design build project) based on the following technical evaluation factors listed in descending order of importance: | |
| Phase I: |
(1) Technical Approach
(2) Technical Qualifications
| (2a.) Key Design Personnel & Experience |
| (2b.) Key Construction Personnel & Experience |
| (2c.) Capability to Perform |
(3) Past Performance
b. The Phase I successful offerors will receive a Phase II Request for Proposal (RFP). The Phase II RFP will be issued via amendment to the solicitation and issued to the four (4) most highly qualified offerors. The Phase I factors are not to be resubmitted in Phase II; however, the cumulative rating from the Phase I factors carries through to Phase II and is as equal in importance to Phase II, Factor 4 for proposal evaluation. Phase II evaluation technical factors (Factors 4 – 7) are listed below in descending order of importance. The Phase I and Phase II technical evaluation factors, when combined, are approximately equal to price.
Phase II:
(4) Technical Solution
(5) Design Concept
(6) Draft Project Schedule and Narrative
(7) Price
c. The Government reserves the right to reject any or all proposals at any time prior to award; to negotiate with any or all offerors; to award the contract to other than the offeror submitting the lowest total price; and to award to the offeror submitting the highest technically rated or the lowest total price proposal; and to award to the offeror submitting the proposal determined to be the most advantageous best value to the Government. Offerors are advised an award may be made in Phase II without discussion or any contact concerning the proposals received. Offerors should not assume that they would be contacted or afforded an opportunity to qualify, discuss, or revise their proposals. However, the Government reserves the right to clarify certain aspects of proposals or conduct discussions providing an opportunity for the offeror to revise its proposal.
| A3. | Pre-Proposal Site Visit |
| A pre-proposal site visit will be conducted in Phase II. The most highly qualified firms selected to proceed to Phase II will be invited to attend the pre-proposal site visit. The Contracting Officer will establish the date and time and notify the Phase II offerors in writing. See Federal Acquisition Regulation (FAR) Clause 52.236-27 of this solicitation. | |
| Location: | Southeast Louisiana Veterans Healthcare System- |
2400 Canal Street, Central Energy Plant Bldg., New Orleans, LA 70119;
| All Offerors, consultants, subcontractors, manufacturers and suppliers are invited to attend. The following agenda is furnished for this meeting: | |
| 1. | Open meeting & Introductions; |
| 2. | Review of project and Design-Build method for construction contracting; |
| 3. | Specifications; Network analysis system and project phasing; |
| 4. | General requirements, Solicitation Documents and Offer Submission Procedure; |
| 5. | Review of "Buy American Act"; |
| 6. | Questions and answers; |
| 7. | Close; and |
| 8. | Site walk through – attendance is optional. |
*Please note that attendance for the pre-proposal conference and / or the site walkthrough is voluntary.
A5. Permit Requirements A. The D-B Contractor is responsible for obtaining all permits and approvals necessary to complete the project, prior to starting Construction.
A6. Selection Criteria (This section will be removed after award.)
A. In accordance with FAR part 15 The Government intends to award a contract resulting from this solicitation to the responsible Offeror on a best value basis after evaluation in accordance with the factors in the Two-Phase Design-Build solicitation. A responsible determination will be made in accordance with FAR 9.1, Responsible Prospective Contractors.
B. Evaluations: All Phase I and Phase II proposals shall be subject to evaluation by a team of Government personnel. In Phase I of the Two-Phase Design-Build process, Offerors will submit a Phase I proposal in accordance with the three (3) evaluation factors listed in C3. Upon receipt of the Phase I proposals, the VA team will evaluate and determine the highest qualified Offerors based on their Phase I proposal submissions. The Phase I proposals will only be evaluated on the three (3) evaluation factors listed. The Offerors not selected to provide Phase II proposals will be notified that they are no longer being considered for this project. The Phase II proposals will consist of both technical and price factors, which are listed in D4. The Government intends to award without discussions; however, the Government reserves the right to conduct discussions if determined necessary based on the initial evaluation of the Phase II proposals.
| B. | PART II - RESPONSIBILITIES |
| B1. | VA Team |
A. The VA team consist of the following members: Contracting Officer, Project Manager/COR, Radiology Staff, Maintenance and Operations Staff, Infection Control Staff, Safety staff and any other VA staff impacted by this project.
B2. Use of Advisors A. Contractors are advised that VA contractor personnel may assist the Government during the Government’s evaluation of Proposals. The persons shall be authorized access to only those portions of the proposal and discussions that are necessary to enable them to provide technical advice on specialized matters or on specific problems. These individuals will be required to protect the confidentiality of any specifically identified trade secrets and/or privileged or confidential commercial or financial information obtained because of their participation in this evaluation. They shall be expressly prohibited from scoring, ranking or recommending the selection of a vendor.
| B3. | Design-Build Team: |
| A. | The D-B team includes all J/V partners, consultants, and sub-contractors to the one firm. The D-B team shall provide Architectural and Engineering disciplines for the preparation of construction documents, and construction contractor capabilities for construction of the project. D-B Team prime contractor or controlling partner shall be a Service-Disabled Veteran-Owned Small business. |
| B. | If the D-B Team and A-E contractor are a J/V (not one and the same firm), engineering and other technical consultants shall be subcontractors of the J/V Architect - not the Design-Build construction contractor or sub-contractors. If the D-B Team A-E and contractor are one and the same firm (not a J/V) those consultants shall be subcontractors of the D-B firm, not the construction subcontractors. |
| C. | The RFP documents are intended to define existing conditions, certain required items, and design parameters to be included in the project. It is the contractor's responsibility to visit the site or ascertain the conditions at each site. In addition, the Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, the existing conditions, certain required items, and design parameters to be included in the project. It is the D-B Team’s responsibility to complete the documents and construction in a manner consistent with the intent of the RFP documents within the required period of performance. |
| C. | PART III - PROPOSAL REQUIREMENTS (This section will be removed after award.) |
| C1. | General |
PHASE I
| A. | Phase I proposals shall be based on the solicitation documents issued for RFP Solicitation. Phase I proposals will be in the format stipulated elsewhere in Section C2. Phase I Proposal Format. |
| B. | Phase I proposals shall be received on or before the date listed in Block 13a of the SF 1442. There will be no public opening of the proposals. |
| C. | Submit Phase I proposals via email to: |
| 1. | Leslie Robinson; leslie.robinson@va.gov |
| 2. | Emails are limited to five (5) MB. |
3. Phase I proposals will only be accepted via email.
| C2. | PHASE I Proposal Format |
| A. | The Offeror shall submit the Phase I proposal in one (1) PDF document. The proposal shall be labeled with the Offeror’s organization, business address and VA solicitation number. The Offeror shall not include any price or price related material in the Phase I proposal. |
B. The Offeror shall submit the Phase I proposal in electronic format only. Include page numbers and the company name in the header or footer of each page.
C. The Offer, including title page, detailed table of contents, preface, for the Phase I proposal shall not exceed a total of 25 (twenty-five) pages in Microsoft Arial size 12 font. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal.
D. A page is defined as each face of an 8.5 X 11-inch sheet of paper containing information. All information (except for document numbers, page numbers, etc.) shall be provided in an image area of 7 X 9 inches. The background color of each page of the submission shall be white or ivory stock only. Excess pages will not be evaluated. Text lines will be single-spaced. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye. Fonts other than Arial are permissible in the presentation of graphic material only.
C3. PHASE I Proposal Evaluation Factors Offerors will be required to submit their Phase I proposal in response to the solicitation in accordance with the evaluation criteria set forth in the solicitation for Phase I. The SSEB will evaluate the Phase I proposals utilizing the criteria provided in the solicitation. After completion of the Phase I evaluations, the Contracting Officer shall select no more than four (4) of the most highly qualified offerors providing the best value. The Contracting Officer reserves the right to select more than four (4) offerors to proceed to Phase II evaluations if they deem it necessary.
1. Factor 1, Technical Approach:
Provide a brief narrative (page limitation: three (3) pages, not including cover page or table of contents) on the offeror’s proposed technical approach for this design-build project as defined in the solicitation submittal requirements. The assessment of the offeror’s method to manage the project shall be used as a means of evaluating the offeror’s ability to successfully meet the requirements of the solicitation. If the page limits are exceeded, the pages exceeding the limit will not be read or considered. The following shall be included in the narrative:
· Design Approach: Describe the techniques, processes and methods to be used specific to the subject project.
· Construction Approach: Describe the techniques and methods for this construction project to include coordination with the design packages, projected timelines and phases, and coordination of work.
· Quality Control: Describe quality control processes during design and construction phases that will lead to an effective and successful project that completes on-time within budget.
2. Factor 2, Technical Qualifications:
a. Key Design Personnel & Experience: The Offeror shall provide a resume (page limitation, two (2) pages per requested resume) for each of the following A-E personnel:
a. Lead Architect
b. Lead Structural Engineer
c. Lead Mechanical Engineer
d. Lead Electrical Engineer
e. Licensed Radiation Physicist for Shielding Calculations NOTE: These are intended to be the Architect and Engineers that will actually affix their seal to the appropriate construction drawings.
b. Key Construction Personnel & Experience: The Offeror shall also provide a resume (page limitation, two (2) pages per requested resume) for each of the following key construction or contract personnel:
a. Project Manager
b. Project Engineer
c. Site Superintendent
d. Lead personnel for any known major subcontractors.
NOTE: For each resume, include company name; name of individual; listing relevant experience; qualifications such as specialized training, education experience, etc. For any subcontractors identified, provide a resume of the lead person who will be directly involved in the work subcontracted for that company, identify any key personnel that will be assigned to the contract resulting from this solicitation, and the relevant experience of both the company and any key personnel that were identified. Please delineate the approximate percentage of work the prime contractor will perform and the approximate percentage of work the subcontractors (collectively) will perform. The VA will use the information provided to evaluate, among other things, specialized experience and technical competence.
c. Capability to Perform: The Offeror shall provide a letter from their Surety demonstrating the Offeror’s total bonding capacity and current available bonding capacity. Total bonding capacity and current available bonding must be outlined in a letter dated no earlier than the solicitation release date.
3. Factor 3, Past Performance: Provide a minimum of one (1) and a maximum of five (5) projects completed within the last five (5) years similar in size, complexity and scope to this project. Projects must demonstrate an offeror’s experience as a prime contractor managing multiple subcontractors to include A-E firms if applicable. If the contractor does not possess Design-Build (D-B) experience, provide a minimum of one (1) and a maximum of five (5) projects completed by the A-E firm similar in size, complexity, and scope to this project in addition to the one (1) to five (5) projects submitted for the prime contractor. For purposes of this evaluation, a relevant project is further defined as “design and/or construction completed in a clinical, hospital or other medical related use space similar in size and scope to this project.” Project(s) shall have a minimum value of $100,000 and be 100% completed for Design-Bid-Build (D-B-B) or D-B. Projects shall have a minimum value of $100,000 and be 100% completed for designs completed by the A-E firm in support of D-B or D-B-B. For multiple award and indefinite delivery/indefinite quantity type contracts, the whole contract shall not be submitted as a project; rather Offerors shall submit the work performed under a single task order as a project. If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit experience for all Joint Venture partners may be rated lower. The Offeror’s submission should include at a minimum:
· Project Title
· Project Location (Physical Address)
· Contract Type (Example: Design-Build, Design-Bid-Build, Design)
· Project Owner’s Name & Current Contact Information
· Brief Description of the Scope of Work (highlight relevant factors)
· Identify Project Prime Contractor, Design Firm and Major Subcontractors
· Project Start & Completion Date
· Project Original Contract Award Amount & Final Award Amount NOTE: Limit 1 project per page
· Separately provide any completed Past Performance Evaluations, if available, for any of the projects on subsequent sheets.
C4. PHASE I Evaluation of Offers The Phase I evaluations will be conducted in accordance with the Two-Phase Design-Build Evaluation process and the methodologies provided below:
A. Factor 1, Technical Approach: Will be evaluated based on the Offeror’s proposed technical approach for this design-build project as defined in the solicitation submittal requirements. The assessment of the Offeror’s method to manage the project shall be used as a means of evaluating the Offeror’s ability to successfully meet the requirements of the solicitation.
B. Factor 2, Technical Qualifications: Will be evaluated on the Offeror’s key personnel experience and capability to perform. Key personnel experience will be evaluated by the resumes provided by the Offeror. Capability to perform will be evaluated based on whether the Offeror has adequate total bonding capacity and available bonding capacity to accommodate the design and construction of the project.
C. Factor 3, Past Performance: Will be evaluated on recent and relevant experience as well as the quality rendered of the projects provided. If D-B experience is not applicable, the construction contractor and the A-E firm will be evaluated on relevant and recent projects to the applicable portion of the project, construction or design respectively. Past performance will be evaluated on the quality of the Offeror’s past performance with respect to the projects provided. When evaluating quality aspects that may be considered are timeliness of contract completion, adherence to contract schedules and timely submission of data deliverables, the contractor’s ability to comply with the terms and conditions of the contract, the overall quality of the work performed on the contract, the Offeror’s managerial performance, and if the reference would enter into a contract with the contractor again. Contractors without relevant past performance or for whom past performance information is not available, will be rated neither favorably nor unfavorably on past performance. In accordance with Procurement Policy Memorandum 2013-03, past performance evaluations may also be conducted using information obtained from CPS or PPIRS and any other sources deemed appropriate by the CO. Other sources may include, but are not limited to, inquiries of owner representatives, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
PHASE II
| D1. | General |
| A. | Phase II proposals shall be based on solicitation documents issued for RFP Solicitation and the instructions provided by the Contracting Officer in the Phase II Notice of Offerors. Phase II proposals will be issued to the most highly qualified offerors from Phase I evaluations. Proposals shall be in the format stipulated in Section D2. Phase II Proposal Format. |
| B. | Proposals shall be received on or before the date specified in the Phase II Notice of Offerors. |
| C. | Submit Phase II proposals via email to: |
| 1. | CONTRACTING OFFICER at leslie.roibnosn@va.gov |
| 2. | Emails are limited to five (5) MB. |
3. Phase II proposals will only be accepted via email.
D. Submit the original Bid Bond by mail to:
1. US Postal Service, USP/FEDEX Deliveries:
Department of Veterans Affairs Southeast Louisiana Veterans Healthcare System Attn: Leslie Robinson 1515 Poydras St. Ste. 1100 New Orleans, LA 70112
2. Commercial Delivery Services / Hand Carry (Monday- Friday, 8:00 AM to 4:30 PM (EDT)) Department of Veterans Affairs Southeast Louisiana Veterans Healthcare System Attn: Leslie Robinson 1515 Poydras St. Ste. 1100 New Orleans, LA 70112
3. Failure to furnish the required bid guarantee in the proper form and amount, by the time specified in Block 13 of the SF 1442, may result in rejection of the Phase II proposal. SEE FAR Provision 52.228-1, Bid Guarantee, of this solicitation.
| d2. | PHASE II Proposal Format |
| A. | Technical, Schedule, Design Concept and Price sections of the Offerors Phase II proposals will be evaluated independently; therefore, the Offeror shall submit the Phase II proposal in four (4) Volumes (Volume I: Technical Solution, Volume II: Design Concept, Volume III: Draft Project Schedule, and Volume IV: Price). In order to evaluate Volume, I: Technical Solution, Volume II: Design Concept, and Volume III: Draft Project Schedule strictly on the merit of the material submitted, the contractor shall include NO price information in Volume I, II, or III. The offeror shall separately bind Volumes I, II, III, and IV. All four (4) volumes must be labeled with the Offeror's organization, business address, and VA Solicitation Number. |
B. The Offeror shall submit Volumes I, II, III, and IV in electronic format only. No hard copies will be accepted. Include page numbers and the company name in the header or footer of each page.
C. The Offer, including title page, detailed table of contents, and preface, for Volume I - Technical Solution shall not exceed a total of five (5) pages for detailed narrative, not including cover pages or table of contents. Submission format shall be in Microsoft Arial size 10 font or larger. Volume II – Design Concept shall not exceed a total of two (2) pages. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal. Volume III – Draft Project Schedule & Narrative shall not exceed three (3) pages (2 for schedule and 1 for narrative) and shall be formatted in a time scaled bar graph format. Volume IV – Price, the SF 1442, Representations and Certifications and acknowledged amendments shall all be part of Volume IV and will not count against the page limitations. The J/V documentation, if applicable, will not be counted in the page limit.
D. A page is defined as each face of an 8.5 X 11-inch sheet of paper containing information. All information (except for document numbers, page numbers, etc.) shall be provided in an image area of 7 X 9 inches. The background color of each page of the submission shall be white or ivory stock only. Excess pages will not be evaluated. Text lines will be single-spaced. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye. Fonts other than Arial are permissible in the presentation of graphic material only.
E. Offeror shall include all required Representations and Certifications; and acknowledge receiving amendments by filling out section 19 of the SF 1442 and returning a signed copy of the amendment(s) with the proposal.
| F. | Offeror shall include their Safety or Environmental Violations and Experience Modification Rating Information as part of Volume IV. It will not be evaluated as part of Volume IV Price but will be used as part of the Responsibility Determination. It will also not count against the page limitations for Volume IV. | |
| 1. | All Offerors shall submit information pertaining to their past Safety and Environmental record. The information must contain a certification that the Offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, an Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations. | |
| 2. | All Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an Offeror’s EMR is above 1.0, Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below. | |
| 3. | Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau. | |
| 4. | If the NCCI cannot issue an EMR because the Offeror lacks insurance history, Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that is has assigned Offeror a Unity Rating of 1.0. | |
| 5. | The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility. *The above information is not required for subcontractors. | |
| D3. | PHASE II – Proposal Evaluation Factors |
A. Factors 1 – 3 (Volumes I – III)
1. Factor 1, Volume 1, Technical Solution:
Based on the solicitation documents, site visit, and the Offeror’s Phase I Technical Approach, provide a detailed narrative (page limitation: five (5) pages for detailed narrative, not including cover pages or table of contents) describing the Offeror’s technical solution to the project to achieve design and construction design objectives as described in the solicitation. If the page limits are exceeded, the pages in excess of the limit will not be read or considered.
The Offeror’s narratives shall include, at minimum, the following technical areas:
· Install Master Gas Panel #2 - Site Requirements
· Install Master Gas Panel #2 - Design & Construction requirements (to include associated support areas/space)
· Shielding Design & Installation
· Hospital Construction Knowledge relative to Infection Control & Life Safety NOTE: The Offeror shall address areas of concerns, any items they determine relevant and how they will minimize risk in conjunction with the identified areas of concern. The narrative shall indicate that the Design-Build team understands the site complexities and address how their approach offers constructability advantages in an operational hospital setting.
2. Factor 2, Volume 2, Design Concept: The Offeror shall submit a preliminary (concept) design schematic (floor plan) to demonstrate their understanding of the project scope and their plan to accomplish the project (page limitation: two (2) pages for schematic layout suggestions). The design schematic shall be based on the information provided in the solicitation. The intent of the design concept is to show a clear understanding of the contract requirements, as well as to allow a creative latitude of the Offerors design team. Acceptable methods of demonstrating design concept include digital design software, architectural sketches/drawings, and/or artistic renderings. Include at a minimum an architectural floor plan to demonstrate level of innovation and ability to provide all required areas in the allotted square footage. Indicate each room name and square footage.
3. Volume III, Factor 3, Draft Project Schedule & Narrative: The Offeror shall demonstrate their understanding of the requirements and associated timeline by submitting a draft project schedule for design and construction that adheres to the project Period of Performance, Project Schedule Specification and Statement of Work. Each Offerors schedule must address the following:
· Design Phase, indicating each required design submission & important design milestones
· Construction Phase, identifying the task for each discipline and definable feature of work require to complete the project.
· Indicate when construction and design services can be concurrent
· NOTE 1: Draft project Schedule is limited to 2 pages. The project will start at the issuance of the Notice to Proceed (NTP). For the purposes of the “Draft Project Schedule”, use an NTP date of April 1, 2020. (Note that there is no guarantee the Notice to Proceed will be issued on this date and is only for facilitating the Draft Project Schedule Submission.)
· NOTE 2: Project Schedule Narrative: Include a Project Schedule Narrative along with the Draft Project Schedule indicating how impacts will be managed/mitigated. Some examples include: working in and around a functioning hospital, scheduling of disruptive type work (noise, dust generating, asbestos abatement, demolishing, etc. Narrative is limited to 1 page.
B. Factor 4, Price Proposal Requirements (Volume IV) A. Carefully follow “Instructions, Conditions, and Notices to Offerors”. Standard form (SF) 1442 Solicitation, Offer and Award (Construction, Alteration, or Repair) and the pricing schedule located on page 12 when submitting price offers. Submit a bid guarantee as stipulated in the solicitation”.
B. The prices shall be Firm Fixed Price. The Offeror shall take care not to include remarks that take exception to the Government’s SOW/Specifications or pricing requirements or otherwise preclude the Government from evaluating the offer or render the offer as non-responsive or unacceptable.
C. If the Offeror communicates in its proposal any qualifications, exceptions, exclusions, or conditions to the proposed prices not provided for in the Offerors proposal documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.
D. In addition to the pricing schedule, Offerors shall submit a complete Breakdown of the Division Pricing for CLIN 0001.
D4. Evaluation of Offers Factors 1 – 3 (Volumes 1 – 3) The Phase II evaluations will be conducted in accordance with Two-Phase Design-Build Evaluation process and the methodologies provided below. All evaluation factors other than price, when combined are approximately equal to price. The factors are listed in descending order of importance.
A. Factor 1, Technical Solution: The VA will evaluate and use as an aid to help determine that the Offeror understands the project and can perform all of the required elements. The technical solution will be evaluated for inclusion of the technical areas listed in the criteria. The VA will evaluate an Offeror’s specific detail in each of the technical areas regarding design and constructability of design. The Offeror’s narrative should provide enough detail to demonstrate that the scope and complexity of the project requirements are understood and will be successfully completed.
B. Factor 2, Design Concept: Will be evaluated and used as an aid to help determine that the Offeror understands all project requirements and is able to design a complete and usable space. The Offeror’s Design Concept will be evaluated on the incorporation of the space requirements, design guide criteria, level of innovation, and ability to provide all required areas in the allotted square footage.
C. Factor 3, Draft Project Schedule & Narrative: The VA will evaluate and use as an aid to help determine that the Offeror understands and can perform all of the required elements to complete the project in the time frame specified with limited impact, to the greatest extent possible, to the Medical Center. (The draft project schedule submitted with the offer should not be construed as the agreed upon schedule as per FAR 52.236-15, the contractor shall, within twenty-one (21) Calendar days after receiving the Notice to Proceed, submit an interim project schedule which will supersede the draft project schedule submitted in the Phase II proposal. The interim project schedule will be subject to VA approval and must show the project being accomplished within the time frame specified on the SF 1442 (Block 11).
Factor 4, Price (Volume IV): The Contracting Officer will evaluate Offers in accordance with the process identified in the Price Schedule. The total evaluated price will be determined by the Offeror’s price for all the CLINs listed. Note: The VA will look at the total evaluated price and non-price factors to determine the best value. “Best Value” means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirements.
| D5. | Final Proposal Revisions (FAR 52.215-1) |
| A. | If determined to be necessary, Phase II proposal revisions will be requested from the Phase II proposals received. The CO will identify those Offerors, whose Phase II proposals are within the competitive range, considering the selection criteria identified in this section. Negotiations may be conducted with those Offerors falling within the competitive range, after which Phase II proposal revisions will be requested. Sealed Phase II proposal revisions will be submitted as per Part III.D1.D, above, except as noted below and will be due at a time and place to be determined. |
| B. | Offerors submitting Phase II proposal revisions will not be requested to re-submit any documents which are unchanged from their initial Phase II proposals. They should provide necessary changes to individual paragraphs, as briefly as possible, together with a table of contents, which clarifies where within the initial Phase II proposal the additional information or changed documents would be placed. Phase II proposal revisions shall include a completed SF 1442 that acknowledges receiving all amendments, by number. A new bid bond shall be submitted only if the final Phase II proposal revisions Offeror’s price proposal is greater than its initial price proposal. |
| E. | PART IV - POST AWARD REQUIREMENTS |
| E1. | Construction Document Preparation: |
| A. | Design Review Submissions: |
| 1. | The Design-Build Team A-E (D-B A-E) shall prepare and submit complete construction documents for review and approval by the VA in accordance with the SOW, standard professional practice, the VA A/E Submission Instructions for Minor and NRM Construction Program, prevailing codes, and as outlined in this document. |
| 2. | The documents may be divided into multiple review submission packages. The VA will review as many as six (6) package submissions (examples: demolition, civil, architectural, structural, mechanical, electrical, plumbing etc.) to facilitate the start of construction. |
| 3. | All submission packages will be reviewed at 35%, 95% and 100% completion stages. Each submission package shall incorporate the final review comments from the previous review. If any package is not complete for the required stage a post review may be required, the cost of which will be borne by the DB Team. |
| 4. | See Scope of Work for each review submission package requirement. |
| The package will include an index of drawings (by sheet number and title) and specifications (by section number and title) submitted. The packages will be distributed to the VA Project Manager, the VA Medical Center, VA COR and others as determined to be appropriate by the VA Project Manager. |
B. Design Review Meetings:
| The Design-Build Contractor (and A/E if separate entities) shall attend meetings at the time and place requested by the Contracting Officer and COR. Minutes of the meetings shall be taken by the Design-Build Contractor and submitted to the Contracting Officer and COR. | |
| 1. | A review meeting to resolve design issues will be held for each design review package submitted. The meeting will include discussion of VA comments on functional relationships and technical peer review comments (by others). |
| 2. | Participants will include VA Staff and D-B team members as appropriate for the specific package to be reviewed. The DB team members will each allow for (1) full day for each discipline/package design review meeting. DB team management will be present at each review meeting. |
| 3. | The D-B team shall allow a minimum of 16 calendar days for each review cycle. A cycle includes: |
| a. | The VA’s receipt of the design review submission package. |
| b. | The review meeting. |
| c. | D-B teams’ receipt of comments from the VA, either electronically, by fax, or by hard copy delivery. |
| 4. | Coordination of the review meeting schedules will be the responsibility of the VA COR and the D-B Team Project Manager. See section I. Quality Assurance/Quality Control. |
| C. | Electronic Media: |
| 1. | Design review submission drawings and final Construction Document submission drawings will be executed in electronic format AutoCAD version 2016 |
| 2. | The drawings included in the VA RFP will be available to the DB team in electronic format in AutoCAD or PDF for use in preparing the construction drawings. The Contractor’s DB Team shall independently verify all information provided. Where the VA does not have existing drawings, the Contractor’s DB Team will have to collect the data and create the drawing(s). |
| 3. | Design review submission specifications and other 8 1/2 by 11 formatted material and final Construction Document submission specifications and other 8 1/2 by 11 formatted material will be executed in electronic format Microsoft Office, Word and in PDF format. |
| 4. | The specifications included in the VA RFP shall be available to the DB team in electronic format in Microsoft Office, Word, for use in preparing the construction specifications (reference solicitation package and VA Technical Information Library (TIL)). The design builder shall independently verify all information in the files. |
| 5. | The construction record drawings shall be completed in AutoCAD version 2016. |
| 6. | Construction shop drawings are not required to be completed in AutoCAD version 2016. |
| D. | Professional Licensing: |
| 1. | The D-B A-E who prepares the construction documents shall be a professional architect or engineer licensed in the states that comprise VISN 16. |
| 2. | The professional seal indicating such license by the state shall appear on the final construction documents. The architect whose seal is shown will be known as the Architect of Record. The D-B A-E shall certify compliance with the VA RFP and all applicable codes. |
| E. | Approved Construction Documents: |
| 1. | The final construction document submission package will be submitted by the DB team for approval by the VA after completion of the 100% review cycle for the final package to be submitted by the DB team. The VA will have 16 days to take approval action. |
| 2. | The final construction documents submission package will include a full set of construction documents including all disciplines/packages as indicated in this document. The final construction documents submission package will include: |
| Two (2) hard copy size ANSI E1 and four (2) hard copy size ANSI C complete set of construction drawings. Two (1) hard copy sets of complete Specifications 2-hole punched, bond and printed on both sides of the paper. Additionally, the contractor shall provide drawings in PDF, DWG, and RVT, and Specifications in PDF and WORD format. All documents will be uploaded to the VA specified electronic document management system. | |
| 3. | The final construction documents submission package will incorporate all VA supplied comments from the earlier submission package reviews and will comply with the VA RFP. |
| 4. | If the final construction documents submission package is not complete, a post submittal may be required and the cost of which will be borne by the DB Team. |
| 5. | The approved final construction documents include such details that the project can be constructed and will be used for construction of the project. |
| 6. | See PART IV, D2 CONSTRUCTION PERIOD SUBMITTALS for Approved Construction Document distribution. |
F. Construction Drawing Preparation - Mandatory material and equipment schedules and details may be indicated either on the drawings or in the specifications, at the option of the D-B team. The construction drawings shall include a coordinated set of the following:
| 1. | Structural drawings including foundation plans, framing plans, schedules, and details, including general notes and all calculations as applicable. |
| 2. | Architectural drawings including floor plans, building elevations, building sections, wall sections, radiation safety, reflected ceiling plans, stair details, toilet and bath details, door schedules and details, window schedules and details, room finish schedules, auto transport and other details. |
| 3. | Fire protection drawings including floor and roof plans, riser diagrams, equipment schedules, and details, including general notes calculations and all related calculations. |
| 4. | Plumbing drawings including floor and roof plans, riser diagrams equipment schedules, plumbing fixture schedules, and details, including general notes, and all related calculations. |
| 5. | HVAC drawings including floor and roof plans, one-line flow diagrams, equipment schedules, and details, including general notes and all related calculations. Also provide sections for mechanical equipment rooms and sequence of operation for all HVAC equipment. |
| 6. | Electrical drawings and specifications including site demolition plans, site, floor and roof plans (power, lighting, controls, and other systems), one-line diagrams, panel schedules, equipment schedules, light fixture schedules calculations and details. |
| 7. | Asbestos abatement drawings including site demolition plans and floor plans indicating asbestos abatement method. |
| G. | Construction Specifications - Project specifications shall include specifications for all products, materials, equipment, methods, and systems shown on the construction drawings in accordance with standard professional practice and the SOW. DB Contractor/Team to reference the VA Technical Information Library for applicable Program Guides, Design Guidelines and Master Specifications. The specification submitted for review shall include: |
| 1. | The name of the manufacturer, the product name, model number, or other identification as appropriate to clearly identify the product that will be used in the construction of the project; |
| 2. | Other data as appropriate to clearly identify the product that will be used in the construction of the project i.e. shop drawings, product data, and samples as required by the VA RFP documents; and |
| 3. | The required stamp of the licensed architect or engineer of record will be considered as certification of compliance with the RFP requirements. |
H. Design Requirements - Compliance with codes and standards.
| 1. | Project design shall be in compliance with applicable standards and codes described in VA Program Guides and design materials included or referenced in the solicitation materials. |
| 2. | See Section E. Approved Construction documents, above, for required inclusion of design review comments. |
| 3. | In the design of new building and alteration work under this contract, the DB team shall consider all requirements (other than procedural requirements) of: |
| l. | Zoning laws: |
| 2. | Environmental and erosion control regulations; and |
This is the start of the file's text. The full file is on GovTribe.