36C25620R0073-013.pdf

PDF Posted

Attached to
C1PB-- CFM - Install Secondary Master Med Gas Panel Federal contract opportunity
Solicitation number
36C25620R0073
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

36C25620R0073 Dwg. #360-1PG703 C-BLDG 1 MEDICAL GAS RISER DIAGRAM FOURTH.pdf

View the file

Other files for this federal contract opportunity

Other files attached to C1PB-- CFM - Install Secondary Master Med Gas Panel, newest first.
File Type Posted
36C25620R0073-0001000.docx DOCX document
36C25620R0073-004.docx DOCX document
36C25620R0073-010.pdf PDF
36C25620R0073-015.pdf PDF
36C25620R0073-017.pdf PDF
36C25620R0073-002.doc DOC document
36C25620R0073-014.pdf PDF
36C25620R0073-008.docx DOCX document
36C25620R0073-021.docx DOCX document
36C25620R0073-012.pdf PDF
36C25620R0073-020.pdf PDF
36C25620R0073-018.pdf PDF
36C25620R0073-016.pdf PDF
36C25620R0073-001.docx DOCX document
36C25620R0073-011.pdf PDF
36C25620R0073-009.xlsx XLSX spreadsheet
36C25620R0073-019.docx DOCX document
36C25620R0073-007.doc DOC document
36C25620R0073-003.docx DOCX document
36C25620R0073-006.docx DOCX document
36C25620R0073-005.docx DOCX document
36C25620R0073-022.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3" O

3" MA

4" MV

3/4" O

3/4" MA

1" MV

1" M V 3/4" M

A 3/4" O

1" MV

3/4" MA

1/2" O

3" MV UP

2" MA UP

3" O UP

3" MV DN

2" MA UP DN

3" O UP DN

3"OX UP

3"MA UP

4"MV UP

3"OX

3"MA

4"MV

REFER TO CONCOURSE

DRAWING 2PG201

FOR CONTINUATION

1"MV RISE

3/4"MA RISE

3/4"O RISE

3/4"O DROP

3/4"MA DROP

1"MV DROP

PRESSURE & VACUUM

SWITCHES

4C�C01

ZVB�4�C1�3

AAP�4�C1�3

4C128

MGO�16

4C134

MGO�16

FLEXIBLE CONNECTIONS

3" MV 3" O

2" MA

1"CA DROP TO TRASH & LAUNDRY

CHUTES. PROVIDE A 1/2" SHUTOFF/BALL VALVE

AT THE BOTTOM OF THE DROP. PRIOR TO THE

START OF WORK THE PLUMBING SUBCONTRACTOR

SHALL COORDINATE THE EXACT LOCATION OF THE

COMPRESSED AIR CONNECTION WITH THE TRASH AND

LAUNDRY CHUTE ENGINEERS AND THE CONSTRUCTION

MANAGER.

Q

D2 D1

E2 E1

F2 F1

G2 G1

A2

A4

A5

A1

A6

B1

C1 C2

B2

H

J1 J2

L

K

M1 M2 M3

N1 N2

A7

D3

E3

F3

R1

R4

R2 R3

A3

08 P

PLAN

NORTH

DATE

LOCATION

CHECKED DRAWN

PROJECT TITLE PROJECT NUMBER

DOCUMENT SET PACKAGE

DRAWING NUMBERAPPROVED: PROJECT DIRECTOR

DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:

REVISIONS: DATE

B

A

D

C

E

VA FORM 08-6231

O N

E

EI

G H

T

IN

C H

O

N E

FO

O

T O

N E

Q U

AR

TE

R

IN

C H

O

N E

FO

O

T O

N E

H A L

F

IN

C H

O

N E

FO

O

T

TH

R

EE

Q U

AR

TE

R S

IN

C

H

O N

E

FO

O T

TH

R

EE

IN

C H

ES

O N

E

FO

O T

O N

E

IN

C H

F

O R

TY

F

E E T

(1

0'

6"

6"

0'

0'

123456

F

B

A

D

C

E

F

O N

E

SI

X T

EE

N

TH

IN

C

H

O N

E

FO

O T

O N

E

AN

D O

N E

H

AL

F

IN

C H

ES

O N

E

FO

O T

6"

BUILDING NUMBER

NEW ORLEANS, LOUISIANA

1PG703-C

BLDG 1 MEDICAL GAS RISER DIAGRAM FOURTH

FLOOR AREA C1

RVD CADDFebruary 29, 2012

01629-HS2-401SLVHCS REPLACEMENT MEDICAL

CENTER PROJECT

SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL

KORDA/NEMETH ENGINEERING / STRUCTURAL

BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE

ARCHITECTURAL ENGINEERING/ PLUMBING

SCALES ASSOCIATES / FIRE PROTECTION

DESMAN ASSOCIATES / PARKING

CODE CONSULTANTS, INC. / CODE CONSULTANT

THE SEXTANT GROUP / AV & ACOUSTICAL

HAMMER DESIGN ASSOCIATES / FOOD SERVICE

PYBURN & ODOM / ABATEMENT

TATA & HOWARD / TANK CONSULTANT

I.S.C. GROUP, INC./ IRRIGATION

DAN EUSER WATER ARCHITECTURE, INC./ WATER FEATURE

Department of

Veterans Affairs

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

WP_08

CONSTRUCTION DOCUMENTS 1

FULLY SPRINKLERED

N.T.S.

MEDICAL GAS � 4TH FLOOR AREA C1/C2

BUILDING #1 FLOOR ELEVATIONS:

UPPER ROOF(SEVENTH FLOOR): 214'-0"

ROOF(SIXTH FLOOR): 195'-0"

FIFTH FLOOR: 176'-0"

FOURTH FLOOR: 157'-0"

THIRD FLOOR: 138'-0"

SECOND FLOOR: 119'-0"

FIRST FLOOR: 100'-0"

GENERAL NOTES

MG

MG

MG

File details come from the government source that posted it. Updated .