36C25618R0764-0001001.docx
DOCX document 15 KB Posted
- Solicitation number
- 36C25618R0764
About this file
36C25618R0764 0001 Question Responses.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25618C0183-000.docx | DOCX document | |
| 36C25618R0764-0002000.docx | DOCX document | |
| 36C25618R0764-0001000.docx | DOCX document | |
| 36C25618R0764-0001002.pdf | ||
| 36C25618R0764-002.pdf | ||
| 36C25618R0764-004.pdf | ||
| 36C25618R0764-003.pdf | ||
| 36C25618R0764-005.pdf | ||
| 36C25618R0764-000.docx | DOCX document | |
| 36C25618R0764-001.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Spec Section:
01 00 00 General Requirements Subsection 1.5.B.1 says that badges are required for all workers. Does this pertain to Hammond? Who will produce the badges if required?
A: Yes, Clinic Security.
Subsection 1.5.B.3 says no photos- Will subcontractor photos be authorized during construction for their experience portfolio?
A: Contractors will have to coordinate with the COR. The COR will forward the request to security to take the photos. Approval from security must be obtained in advance.
Subsection 1.30 says that Photographic Documentation is required by a service providing 3 years of experience? Does this requirement pertain to this project?
A: No. Disregard this section.
Subsection 1.31 requires Final Elevation photos on CD and Framed? Does this requirement have same experience requirements as section 1.30?
A: No. Disregard this section.
Subsection 1.5.F says no parking provided- Is this in reference to overnight parking or daily parking?
A: Pertains to both
Subsection 1.6.F- How will the noises from demolition of siding effect the medical clinic? Will there be identified times that no construction can occur?
A: Demolition will be minimal. Construction activities are anticipated being performed during normal working hours unless noted otherwise by the COR.
Subsection 1.12 requires a professional land survey or professional engineer survey for areas specified within. Is a survey required before and after to verify drainage?
A: A qualified surveyor has to perform the field surveying/layout. Does not have to be licensed.
Subsection 1.16 requires a temporary field office for government- furnished- Is this applicable to this project? Will the contractor be required to provide a field office for the government, fully furnished as called out in the spec?
A: No field office will be required. Disregard this section.
01.35.26 Safety Requirements
Subsection 1.7 doesn't specify if the SSHO can hold other positions? Can SSHO have additional duties?
A: CURRENT SOW states that only a 30hour OSHA certified person is required. SSHO has more requirements than just 30 hour OSHA certification.
SSHO can hold other duties. An alternate should also be identified if the SSHO performs other duties.
Subsection 1.9.B specifies that an CSHT or CSP must conduct a monthly verification of the project site. This requirement is not typically seen on a project of this size, how do we proceed with this requirement?
A: Yes. Does not require the person on site full-time.
Subsection 1.13 requires a tuberculosis screening for all contractor employees. Is this requirement for all outdoor employees as well as limited work on electrical inside?
A: Yes.
07.46.60 Fiber Cement Siding
09.91.00 is referenced several times but no spec is attached. Color Plus siding is being used so the assumption is there is no other painting requirements without a spec.
A: The pre-finished option is the preferred option with touch up painting as required.
Will the detached classroom building be included with the project?
A: No, only the clinic building is included with this project.