These are bid documents consisting of electrical distribution diagrams for an expansion and upgrade project to Building 42 for laboratory use located in Marion, Illinois. The documents include a Building 42 Distribution Diagram (Drawing E602) and a Primary Single Line Diagram (Drawing E604), prepared by Heapy Engineering for the Office of Facilities Management.
The Building 42 Distribution Diagram details the electrical distribution system redesign, including multiple distribution panels, transformers, and circuit breakers. Key components include: a 1500 KVA primary transformer (12,470V to 480Y/277V), a 300 KVA secondary transformer (12,470V to 208V), a 625 KVA building generator (800A), and numerous distribution panels serving life safety, critical, and equipment branches. The work involves removing and replacing a 200A three-phase breaker with a 600A three-phase GFP breaker, installing new 480V and 208V circuit breakers, running electrical feeders with specific wire gauges and conduit sizes, and providing new equipment transformers including 30 KVA and 112.5 KVA units for lab addition loads. Construction sequencing requires panel de-energization for no more than four hours during cutover to new panel 42-DP1-2-1. The Primary Single Line Diagram shows 15 KV feeder routes serving multiple buildings (38, 42, 43, 49, 81, 82, 83, 8, 14, and 15) through existing and new underground concrete-encased duct banks and junction boxes. Work includes removal and replacement of 15 KV feeders, installation of new concrete-encased duct banks and manhole, splicing operations using dead break junctions, and feeder re-routing. The project requires coordination with campus power systems to maintain operations during extended outages and involves Basler relay protection systems throughout the distribution network.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bld 7 1.pdf | ||
| EHRM One line 2114 - RECORD DWGS 1.pdf | ||
| one line 2019 1.pdf | ||
| 36C25526R0186 0001.pdf | ||
| Previous Results 1.pdf | ||
| Drawing - Final - 657A5-21-105 VEG 21.08 Upgrade Campus Electrical Grid 1.pdf | ||
| Sign in Sheet.pdf | ||
| Equipment Inventory Schedule WITH EE NUMBERS 1.xlsx | XLSX spreadsheet | |
| OR Bld 2 1.pdf | ||
| 36C25526R0186.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EN EN EN EN EN
G
G F
P GFP GFP GFP GFP GFP GFP GFPGFP
SWBD
METERING
G F
P
SWBD
METERING
GFP GFP GFP GFP GFP GFPGFP
DISTRIBUTION PANEL "USUB-A"
"CATH-1A"
(ABANDON)
"CATH-1"
(ABANDON)
X-RAY
SCAN
"42-1" "42-3" "42-7" "42-5" "RC120 X-RAY"
DISTRIBUTION PANEL "42-DP1" DISTRIBUTION PANEL "USUB-B/42-DP-2"
"42-8" "42-A" "42-6" "42-6A" "42-4" "42-4A" "42-2"
"42-2A""42-8B"
"42-EC-3"
DISTRIBUTION PANEL "42-EMDP-EC-1"
"42-EL-3"
DISTRIBUTION PANEL "42-EMDP-EL-1"
"42-EQ-1" "42-EQ-3" "42-EQ-9"
DISTRIBUTION PANEL "42-EMDP-EQ-1"
"42-EQ-5" "42-EQ-7"
"42-EL-1" "42-EL-5" "42-EL-7"
"42-EMCP-EL-1"
"42-EC-1" "42-EC-5" "42-EC-7"
"42-EC-2"
DIST. PANEL "42-EMDP-EC-2"
"42-EC-4" "42-EC-4A" "42-EC-6"
"42-EC-6A"
"42-EC-8"
"42-EC-8A"
42-ATS-EQ 42-ATS-EL 42-ATS-CATH-1A
(ABANDON)
42-ATS-CATH-1
(ABANDON)
42-ATS-EC
480Y/277V-3PH-4W
600A 200A 250A 250A 225AT 250A 800A
200A 200A 200A 200A 200A 250A 200A150A 200A 200A 200A 200A 150A
100A 100A 100A 100A 200A100A 100A 50A 100A 100A
125A
200A
600A
480Y/277V-3PH-4W
208Y/120V-3PH-4W
480Y/277V-3PH-4W 480Y/277V-3PH-4W
225A
100A 100A
400A
EXIST.
TX-42032 42-T-EC
150 KVA
200A
480Y/277V-3PH-4W 208Y/120V-3PH-4W
BLDG 42 GEN
625 KVA
800A
600A 200A 100A 225A 225A
PANEL "42-EMPD-1"
480Y/277V-3PH-4W
100A 100A
SPARE SPARE
200A 200A 200A 200A 200A 200A
100A
SPARE
100A MB
"42-EL-4"
-E
L-
-E
L-
-E
L-
30 KVA
200A 200A 200A 200A 200A 200A 150A 150A 150A
ELEV. XRAY
BC131
CT
C-138
SPARE SPARE
"42-EC-10A""42-EC-10"
LAB ADDITION
(CRITICAL BRANCH)
AHU1
LAB ADDITION
EQUIPMENT BRANCH
AHU2EQ-11-A
30KVA
"42 -EQ-11"
DISTRIBUTION PANEL "42-EMDP-EQ-2"
208Y/120V-3PH-4W
112.5 KVA
145 KVAD (175 AMPS) PER METER
+ 55 KVAD NEW (LAB)
+ 89 KVAD (CU-1)
= 289 KVAD (347 AMPS) NEW
(LAB ADDITION
EM LTG)
36 KVAD (44 AMPS) PER METER
225A
50 KVAD (60 AMPS) PER METER
+ 67 KVAD NEW
= 117 KVAD (140 AMPS)
42-9
(LAB ADDITION
277V LTG)
SPARESPARESPARE
789 KVAD (949 AMPS DEMAND) PER METER
2000A
1500 KVA
12,470 V
480V 5.72%
100 E
96 KVAD (268 AMPS DEMAND) PER METER
+ 57 KVAD NEW
= 153 KVAD (425 AMPS)
1000A
300 KVA
12,470 V
208V 5.72%
100 E
100 E 100 E MINERAL OIL
FILLED XFMR
"42-10"
200A 200A 200A
DISTRIBUTION PANEL "42-DP-2-1"
"42-10A"
LAB ADDITION
(NORMAL RECEPTACLES)
MINERAL OIL
FILLED XFMR
600A F
E E
D E
R
F E
E D
E R
225A
200A 200A 200A 200A 200A 200A
"42-EQ-2" "42-EQ-4" "42-EQ-6" "42-EQ-6"
SPARE SPARE
100A
SPARE
LIFE SAFETY BRANCH CRITICAL BRANCH
CRITICAL BRANCH
EQUIPMENT BRANCH
EQUIPMENT BRANCH
T-EQ-11-A
100A M.B.
200A
SPARE
"42-10B"
"42-EC-10B" "42-EC-10C"
"42-10C"
2 2
100A
SPARE
125A
CU-1
(LAB ADD'N
ROOF)
Drawing Title Project T itle
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
42-AdditionApproved: Associate Director
Approved: Chief of Staff
Approved: Chief Engineer
Approved: Infection Control
Approved: Safety Officer
Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1
BBBB
AAAA
CCCC
DDDD
EEEE
FFFF
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1111 2222 3333 4444 5555 6666 88887777 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
99997777 8888666655554444333322221111
1 Memorial Dr. STE 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
220 N College Ave Indianapolis, IN 46202
Tel Fax
317.464.9090 317.464.9393
Office of Facilities
ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032
Tel Fax
317.580.0402 317.582.0766
Structural
Asaturian Eaton & Assoc.
1440 O ld West Main Carbondale, IL 62901
Tel Fax
618.529.3414 618.529.3423
Civil
John A Jurgiel & Assoc.
123 N. Main Street St. Charles, MO 63301
Tel Fax
636.757.3060 636.757.3064
Industrial Hygenist
Holcomb Foundation 393 Wood Road Carbondale, IL 62901
Tel Fax
618.529.5262 618.457.8991
Geotechnical
Heapy Project No.: 2017-05045 Firm License No. 01528
5/28/2020 9:31:56 AM
/2
/2
:3 :5
A
M
BLDG 42 - DISTRIBUTION
DIAGRAM
Expand & Upgrade Building 42 for Laboratory
E602
657-502
MARION, ILLINOIS
11/08/2019
BID DOCUMENTS
MSG CLM
1. REMOVE 200A /3P BREAKER AND REPLACE W ITH 600A/3P GFP BREAKER (SET TRIP
AT 600A).
2. UTILIZE SPARE BREAKER FOR NEW PANEL FEEDER.
3. REFER TO PRIMARY SINGLE LINE DIAGRAM FOR REMOVALS / NEW W ORK.
4. RUN 4-#2, #8 GRD. IN 1.25"C.
5. PROVIDE NEW 480V-100A/3P CIRCUIT BREAKER IN EXISTING PANEL.
6. RUN 4-#3/0, #6 GRD. IN 2"C.
7. RUN 3-#4, #10 GRD. IN 1"C.
8. RUN 4-#2, #8 G.E.C. IN 1.25"C.
9. RUN TW O SETS OF (4-350 KCMIL, #1 GRD. IN 3"C.).
10. REMOVE FEEDER DURING CUTOVER TO NEW 42-DP1-2-1. PANEL SHALL BE
DEENERGIZED NO MORE THAN 4 HOURS.
11. PROVIDE NEW 480V-125A/3P CIRCUIT BREAKER IN EXISTING PANEL. RUN 3-#1/0, #6
GRD., IN 1.5"C. UNDER DEDUCT ALTERNATE, DELETE THIS W ORK.
NOTES
EN EN EN EN EN
DIST. PANEL "B8P"
"B8P1" "B8P2" "B8P3"
100A 100A 100A
400A
208Y/120V-3PH-4W
BLDG 8 "OUTDOOR SWGR"
1200AF
250AT
2500AF
1200AT
480Y/277V-3PH-4W
B-8-T
150KVA
Z=2.35%
TX-0800
150 KVA
480Y/277V
002 PRIMARY GEAR B
2-2 FDR1 RELAY
BASLER
BE1-50/51B
2-2 FDR1 G RELAY
BASLER
BE1-50/51B
2-3 FDR2 RELAY
BASLER
BE1-50/51B
2-3 FDR2 G RELAY
BASLER
BE1-50/51B
2-4 FDR3 RELAY
BASLER
BE1-50/51B
2-4 FDR3 G RELAY
BASLER
BE1-50/51B
2-2 FDR1 RELAY
BASLER
BE1-50/51B
2-2 FDR1 G RELAY
BASLER
BE1-50/51B
GE 225 KVA
12.47 KV, DELTA
208Y/120V
600AS
600AF
BLDG 15 BLDG 14
EMH #4
MH #9
R.T.F. 225 KVA
12.47 KV, DELTA
Z=4.2%
600AS
600AF
BLDG 43
CLC
MH #4BB
MH #4A
BLDG 42
MH #3AA MH #4AA
EMH #2 EMH #3EMH #1
MH #4B
112.5 KVA
12.47 KV, DELTA
208Y/120V
600AS
600AF
PANEL
"B13"
MDP
EMH #2AA
BLDG 38
MH #6BB
EMH #6B
PULL BOX
1500 /
2000 KVA
12.47 KV,
480Y/277V
1500 /
2000 KVA
12.47 KV,
480Y/277V
MH #10
1500 KVA,
DELTA
480Y/277V
BLDG 49
CHILLER
PANEL
CS-3
100E
BLDG 38
UNIT SUB
MH #1AA
UNIT SUB
B
UNIT SUB
A
100E
BLDG 38
UNIT SUB
PM1 PM2
FEEDER #3
25E
EMH #5 EMH #6
MH #5AA MH #6AA
SPLICE (TYP.)
FEEDER #2
FEEDER #3
FEEDER #3
FEEDER #2
FEEDER #3
FEEDER #23-1/C #2/0 AW G EPR 15KV(EA.)
1200 AF
200 AT
1200 AF
200 AT
1200 AF
200 AT
1200 AF
200 AT
N.C.N.O.
FEEDER #1
FEEDER #2
FEEDER #1
FEEDER #3
FEEDER #2
FEEDER #1
FEEDER #3
FEEDER #1
NEW M.H. #4CC
LOAD INTERRUPTER
SW ITCH IN XFMR
LOAD INTERRUPTER
SW ITCH IN XFMR
1500 KVA 300 KVA
E604
9 4
BLDG 81 BLDG 82
TX-083
500 KVA
480Y/277V
BLDG 83
Drawing Title Project T itle
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
42-AdditionApproved: Associate Director
Approved: Chief of Staff
Approved: Chief Engineer
Approved: Infection Control
Approved: Safety Officer
Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1
BBBB
AAAA
CCCC
DDDD
EEEE
FFFF
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1111 2222 3333 4444 5555 6666 88887777 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
99997777 8888666655554444333322221111
1 Memorial Dr. STE 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
220 N College Ave Indianapolis, IN 46202
Tel Fax
317.464.9090 317.464.9393
Office of Facilities
ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032
Tel Fax
317.580.0402 317.582.0766
Structural
Asaturian Eaton & Assoc.
1440 O ld West Main Carbondale, IL 62901
Tel Fax
618.529.3414 618.529.3423
Civil
John A Jurgiel & Assoc.
123 N. Main Street St. Charles, MO 63301
Tel Fax
636.757.3060 636.757.3064
Industrial Hygenist
Holcomb Foundation 393 Wood Road Carbondale, IL 62901
Tel Fax
618.529.5262 618.457.8991
Geotechnical
Heapy Project No.: 2017-05045 Firm License No. 01528
5/28/2020 9:32:05 AM
/2
/2
:3 :0
A
M
PRIMARY SINGLE LINE
DIAGRAM
Expand & Upgrade Building 42 for Laboratory
E603
657-502
MARION, ILLINOIS
11/08/2019
BID DOCUMENTS
MSG CLM
NOTES
1. REMOVE 15KV, 3-1/C #2/0, #1 GRD (600V) AND EXISTING CONCRETE ENCASED DUCT BANK.
2. RUN 15KV, 3-1/C #2/0, #1 GRD (600V) IN NEW CONCRETE ENCASED DUCT BANK.
3. PROVIDE NEW CONCRETE MANHOLE. REFER TO DETAILS. NAME PER COR DIRECTION.
4. SPLICE NEW FEEDERS IN EXISTING MANHOLE UTILIZING DEAD BREAK JUNCTIONS.
5. DISCONNECT FEEDERS SERVING M.H. #4A & #4B TO PERMIT FEEDER RE-ROUTE. RE-
ENERGIZE IMMEDIATELY AFTER SO CAMPUS POW ER CAN REMAIN ON DURING RE-ROUTE
W ORK. REFER TO SEQUENCE OF CONSTRUCTION.
6. TO DE-ENERGIZE M.H. #4A, MAIN BREAKER TO CAMPUS MUST BE OPENED. REFER TO
SEQUENCE OF CONSTRUCTION NOTES.
7. PROVIDE NEW 4-W AY (ONE SPARE) 15KV JUNCTION BAR W ITH 200A DEAD BREAK
JUNCTIONS INTERCEPT AND SPLICE EXISTING FEEDER. PROVIDE NEW TERMINATIONS.
8. PROVIDE NEW 5-W AY (ONE SPARE) 15KV JUNCTION BAR W ITH 200A DEAD BREAK
JUNCTIONS INTERCEPT AND SPLICE EXISTING FEEDER. PROVIDE NEW TERMINATIONS.
9. REMOVE AND REPLACE FEEDER IN EXISTING CONDUIT. RUN 15 KV, 3-A/C #2/0, #1 GRD
(600V).
10. BUILDING / LOADS AFFECTED BY EXTENDED OUTAGE TO RE-ROUTE FEEDERS #1 & #3.
REFER TO SEQUENCE OF CONSTRUCTION NOTES.
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
| Sheets |
File details come from the government source that posted it. Updated .