This is a pricing template and appendix requiring offerors to provide a detailed price breakdown for construction work organized by specification divisions. The document applies to solicitation 36C25526R0127 for Project 589-21-211, which involves renovating Building 26 at a Department of Veterans Affairs facility for Pharmacy, Phlebotomy, and Police Department use. The solicitation targets Commercial and Institutional Building Construction Contractors (NAICS code 236220) and includes a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside provision.
Offerors must separately identify personnel costs and material/equipment costs across 27 specification divisions, ranging from General Requirements through Waterway & Marine Construction. The template requires designation of which work is self-performed by SDVOSBs versus subcontracted. Non-SDVOSB firms cannot pay more than 85% of the government contract amount to non-certified SDVOSB subcontractors. Offerors must calculate the adjusted contract amount, maximum subcontracting allowance, total SDVOSB work amount, and subcontractor payments, then add home office overhead, profit/fee, and bond costs to reach the grand total. The document must be completed for each bid item and certified by an authorized representative.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 1- PRICE BREAKDOWN AND CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Solicitation: 36C25526R0127 Project: 589-21-211, Renovate Building 26 for Pharmacy, Phlebotomy, and Police Department Offerors for Commercial and Institutional Building Construction Contractors (NAICS code 236220) will not pay more than 85% ("Applicable %") of the amount paid by the government to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in VAAR 852.219-73.
Provide a breakdown of material and personnel costs, by specification division listed for the project. Home office overhead, profit/fee, and bond cost shall be added after a subtotal of personnel and material/equipment cost has been calculated. Clearly identify the personnel cost you will be self-performing, and the personnel cost of other similarly situated service-disabled veteran owned small business concerns. Below is the required format.
THIS DOCUMENT MUST BE COMPLETED FOR EACH BID ITEM.
Specification Section
SDVOSB
(Y or N)
Personnel Cost Material/ Equipment Costs
Total
Division 01 General Requirements
| $ |
| $ |
| $ |
Division 02 Demolition
| $ |
| $ |
| $ |
Division 03 Concrete
| $ |
| $ |
| $ |
Division 04 Masonry
| $ |
| $ |
| $ |
Division 05 Misc. Steel
| $ |
| $ |
| $ |
Division 06 Carpentry
| $ |
| $ |
| $ |
Division 07 Thermal and Moisture
| $ |
| $ |
| $ |
Division 08 Openings
| $ |
| $ |
| $ |
Division 09 Finishes
| $ |
| $ |
| $ |
Division 10 Specialties
| $ |
| $ |
| $ |
Division 11 Equipment
| $ |
| $ |
| $ |
Division 12 Furnishings
| $ |
| $ |
| $ |
Division 13 Special Construction
| $ |
| $ |
| $ |
Division 14 Conveying Systems
| $ |
| $ |
| $ |
Division 21 Fire Suppression
| $ |
| $ |
| $ |
Division 22 Plumbing
| $ |
| $ |
| $ |
Division 23 HVAC
| $ |
| $ |
| $ |
Division 25 Integrated Automation
| $ |
| $ |
| $ |
Division 26 Electrical
| $ |
| $ |
| $ |
Division 27 Communications
| $ |
| $ |
| $ |
Division 28 Electronic Safety and Security
| $ |
| $ |
| $ |
Division 31 Earthwork
| $ |
| $ |
| $ |
Division 32 Exterior Improvements
| $ |
| $ |
| $ |
Division 33 Utilities
| $ |
| $ |
| $ |
Division 34 Transportation
| $ |
| $ |
| $ |
Division 35 Waterway & Marine Construction
| $ |
| $ |
| $ |
Division 40 Process Integration
| $ |
| $ |
| $ |
Sub Totals:
| $ |
| $ |
| $ |
Sub Total (Personnel Costs and Material/Equipment Costs)
| Profit: |
| $ |
| Home Office Overhead: |
| $ |
| Bond: |
| $ |
| Grand Total |
| $ |
CALCULATION OF SELF PERFORMED WORK
1. Adjusted Contract Amount (Grand Total less Sub Total of All Material and Equipment Costs):
| 2. Maximum Subcontracting Amount (Not To Exceed Applicable % of Adjusted Contract Amount): (Line 1 x Applicable %) |
| $ |
3. Total Amount to be performed by SDVOSB's (Self and any Similarly Situated Entities Personnel Cost + Profit, Overhead, Bond)
4. Total Amount Paid Out to Subcontractors (Line 1-Line 3)
| 5. Percentage of Adjusted Contract Amount considered to be Self Performed (Line 3/Line 1 x 100): |
| $ |
6. Percentage of Adjusted Contract Amount Paid to Subcontractors- Not to Exceed Applicable % (Line 4/ Line 1)
I certify the above representations are true and correct to the best of my knowledge.
Signed:
Date
(Typed Name of Authorized Representative)
(Title of Authorized Representative)