36C25518R0539-0005000.docx

DOCX document 18 KB Posted

Attached to
589-334, CO EXPAND PHARMACY AND LOBBY
Solicitation number
36C25518R0539
Issued by

About this file

36C25518R0539 0005 36C25518R0539 0005.docx

View the file

Other files

File Type Posted
36C25518C0223-000.docx DOCX document
36C25518R0539-0004001.pdf PDF
36C25518R0539-0004000.docx DOCX document
36C25518R0539-0003001.pdf PDF
36C25518R0539-0003000.docx DOCX document
36C25518R0539-0002002.pdf PDF
36C25518R0539-0002000.docx DOCX document
36C25518R0539-0002001.docx DOCX document
36C25518R0539-0001011.pdf PDF
36C25518R0539-0001003.pdf PDF
36C25518R0539-0001008.pdf PDF
36C25518R0539-0001009.pdf PDF
36C25518R0539-0001001.pdf PDF
36C25518R0539-0001005.pdf PDF
36C25518R0539-0001004.pdf PDF
36C25518R0539-0001014.pdf PDF
36C25518R0539-0001013.pdf PDF
36C25518R0539-0001002.pdf PDF
36C25518R0539-0001010.pdf PDF
36C25518R0539-0001015.pdf PDF
36C25518R0539-0001012.pdf PDF
36C25518R0539-0001007.pdf PDF
36C25518R0539-0001006.pdf PDF
36C25518R0539-0001016.pdf PDF
36C25518R0539-0001000.docx DOCX document
36C25518R0539-008.pdf PDF
36C25518R0539-005.pdf PDF
36C25518R0539-001.docx DOCX document
36C25518R0539-003.pdf PDF
36C25518R0539-007.pdf PDF
36C25518R0539-006.pdf PDF
36C25518R0539-004.pdf PDF
36C25518R0539-002.pdf PDF
36C25518R0539-000.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 09-04-2018 589-334 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 To all Offerors/Bidders

36C25518R0539 08-07-2018

X X X September 7, 2018 by 2:00 PM CDT Expand Pharmacy/Lobby, project No 589-334 A. This amendment answers additional questions icluded on page 2.

B. All other terms and conditions remain unchanged.

CONTINUATION PAGE

Questions and Answers

1. On sheet PL101, General Note 5, it states that, “All work shall be done at night and/or weekends, or as directed by the COR.” It does this throughout the Plumbing drawings, so I believe that I should be bidding this job as overtime only. However, this note does not show up anywhere in the Mechanical drawings that depict work to be taking place in the same areas as the Plumbing scope. Is it the intent that only the Plumbing scope be performed on overtime, or is there some scope that we would be allowed to perform during regular working hours?

A – We prefer for water outages to occur after hours/weekends to limit impact to patient care. However, there will be some instances where the outage may occur during business hours. Work shown on Pharmacy – MD101 shall occur after hours, all other mechanical work could occur during business hours.

1. On sheet MP201, detail 1, there is a note on the right side of the page that says to patch the existing snow melt system after demo is completed. In order to bid this in a way that can be compared, do you want this treated as an allowance or is there a way to define this scope further? If we are to patch the snow melt field, is this limited to just the concrete/paving, or are there to be below grade joints allowed in those snow melt zones piping that may be affected?

A - Any damage or required removal of the existing snow melt system shall be repaired/replaced as needed for full functionality.

1. Specification 221300 defines that Cast Iron pipe should be used for basically all applications (I presume this also includes storm pipe); however, the spec also then includes some options on using Schedule 40 PVC pipe and none of the restrictions appear to limit the use of PVC below grade. Are we allowed to use schedule 40 PVC below grade, or are we to follow section 2.1, A, 1, a. that says cast iron shall be used for pipe in contact with earth?

A – Develop price estimates based on information provided in the specifications.

1. The bid form currently reads that item 1B and item 2 are to be the same value; however, when I read through the Division 1, statement of bid items, I could see there being an interpretation of Bid Item #2 to actually be the combined value of Bid Items 1A and 1B. Which interpretation are we to follow?

A – Bid Item #1B and #2 are identical (the entire base bid of the Pharmacy project). Bid Item #2 is solely the base bid of the Pharmacy project [the Renovate Main Lobby drawings and specifications are not included].