ABBREVIATIONS
PROJ(D)
PLBG
PLYWD
PREFIN
RAD(R)
RESIL
REINF
REQ'D
SECT
SHWR
SPECS
REFRIG
galvanizedGALVBMRK benchmark concrete mansonry unit ceilingCLG
CLR
CMU
COL
CLO
clear/clearance column closet
CAB
CJ
CC
CB
BW
CL
BOC
BRZ
BRK
BO
BRG
BUR
BTM
BS
built-up roof center to center chalkboard bottom of wall center line control joint/ construction joint cabinet back of curb both sides bottom of bronze brick bearing bottom foundation floor drain fire extinguisher fire extinguisher cabinet
FE
FEC
FDN
FD
east each equipment exposed each way existing electrical exterior insulation finish system elevation/elevator expansion joint existing grade electrical contractor exterior ethylene propylene diene terpolymer
ELEV
EQUIP
EW
EPDM
EXP
EXIST
EXT
E
EA
EC
EG
EIFS
EJ
ELEC
insulation interior inside diameter
INSUL
IN(")
INT
ID
inch grab bar general contractor gypsum glass/glazing hollow metal high pressure decorative laminate horizontal hardware hardwood hose bib hot water heating, ventilating & air conditioning
HDWR
HM
HORZ
HT
HPDL
HVAC
HW
height
GB
GL
GRD
GYP
GC
HDWD
HB
grade
PART
PLAS
OVHD
partition plaster overhead
SRT
SS
SQ
miscellaneous masonry opening not in contract not applicable outside diameter numberNO(#)
NTS
OC
OA
NOM
OFF
OPNG
OD
on center overall nominal not to scale office opening
MISC
N
MO
MULL
MTL
NIC
NA
north mullion metal
SHT
SF
SB
SND
SIM
S
RM
ROW
RO
SAT
SAN
architect/ architectural
AB anchor bolt
APPROX
BLDG
BD
ARCH
BM
BLK
ADJ
AFF
AC
ACCU
ALUM
ANOD
ALT
approximate block/blocking at board beam building air cooled condensing unit above finish floor adjustable alternate anodized acoustical aluminum
A/C air conditioning plus or minus constructionCONST course ceramic tile continuous carpet corridor diameter door down ditto dimension double drinking fountain detail drawing downspout
DIA
DR
DS
DN
DO
DIM
DTL
DWG
CRS
CT
CONT
CORR
CPT
DBL
DF
conference concrete
CONF
CONC
finishFIN fluorescent flow line folding field verify furnace footing fire retardant foot scraper fiberglass reinforced plastic
FV
FT(')
FURR
FURN
FTG
G
GA
foot furring gas gauge
FRP
FLR
FLDG
FL
FRT
FS
FLUOR
floor finish grade finish floor
FG
FF
joistJST low volume change masonryMAS
MANUF
MATL
MAX
MECH
MEMB
MH
MIN
MIRR
manufacturer material mechanical membrane maximum minimum manhole mirror
LDR
LF
LAV
LAM
LVC
LOCN
lineal feet ladder lavatory laminate location
REF
R
RAG
RD
PT
PR
QT
PTD
JT
JAN janitor joint
PL
under cabinet lightrequired physical therapy respiratory therapy surgical intensive care unit studded rubber tile stainless steel square specifications
YD
suspended acoustical tile similar sanitary napkin dispenser section shower sheet square feet splash block resilient south sanitary right of way rough opening room
WD
WNDW
WH
WNSCT
WC
WT
WWF
WP
VCT
VWC
VEST
VERT
W
W/
W/O yard waterproofing, waterproof welded wire fabric water heater water closet window wood wainscot weight vinyl composition tile vinyl wall covering vertical vestibule west with with out
RT
SICU
central sterile long term care intensive care unit occupational therapy magnetic resonance imaging post anesthetic care unit medical intensive care unit labor-delivery-recovery-post partum operating room
FOR MEDICAL
emergency room computed tomography
FACILITIES ONLY
STORplumbing project/(projected) refer/reference roof drain radius return air grille reinforcing refrigerator riser pressure treated painted quarry tile plywood prefinished pair
TLT
TV
TW
TOC
TPH
TO
TYP
UCL
T&B
T
SUSP
STRUCT
TEL
TB
T&G plate/plastic/ property line STL
STD
storage toilet paper holder top of curb toilet television top of typical top of wall tongue & groove top & bottom structure/structural tread telephone tackboard suspended
ICU
OR
LDRP
MRI
MICU
LTC
PT
PACU
OT
CS
CT
ER
steel standard
DRAWING SYMBOLS
95.00
TOC
98.5
TOC
98.5 E
B
NEW ELEVATION
EXISTING ELEVATION
EXISTING CONTOUR
NEW CONTOUR
TEST BORING (SITE PLANS ONLY)
EXISTING ELEVATION
EXISTING ELEVATION
PROPERTY LINE
/1 A101
/1 A101
MATCHLINE
SHT. REFERENCE
ELEVATION DATUM
(SECTIONS, ELEVATIONS ONLY)
BUILDING SECTION
WALL SECTION
DETAIL DRAWING
A3.1
BUILDING ELEVATION
A6.1 INTERIOR ELEVATION
A100
WINDOW ID TAG
DOOR NUMBER
ROOM
NAME
ROOM NAME & NUMBER
PARTITION SYMBOL
1 REVISION TAG
COLUMN LINE GRID
ME100E EQUIPMENT NUMBER
? SITE PLAN NOTES
DEMOLITION PLAN NOTES
PRECAST CONCRETE
WALL PANEL TAG
XXX
A101
A-4 ALTERNATE TAG
PT-XX PAINT COLOR TAG
# PLAN NOTES
X
X.X
X
X.X
CUT STONE
STEEL
PLYWOOD
FINISH WOOD
CONT WD FRAMING
WOOD BLOCKING
MATERIAL SYMBOLS
LVC FILL
GRANULAR FILL
CONCRETE MASONRY
FACE BRICK
CONCRETE
EARTH
EXISTING
CONSTRUCTION
ASPHALT
GLASS
RIGID OR TAPERED
INSULATION, EIFS
BATT INSULATION
GYPSUM BOARD
BID ITEMS
REFERENCE SECTION 01 00 00 GENERAL REQUIREMENTS ITEM 1.3 STATEMENT OF BID ITEMS.
STATEMENT OF BID ITEM(S)
THIS SINGLE SOLICITATION CONSISTS OF TWO PROJECTS WITH THE INTENT TO AWARD TO ONE CONTRACTOR DUE TO THE PHASING REQUIREMENTS OF THESE PROJECTS. BID ITEM #1, GROUPED AS BID ITEM #1A AND BID ITEM #1B, CONSISTS OF BOTH PROJECTS IN THEIR ENTIRETY. BID ITEM #2 CONSISTS OF ONE PROJECT (EXPAND PHARMACY AND LOBBY) IN ITS ENTIRETY; THE RENOVATE MAIN LOBBY HAS BEEN REMOVED FROM BID ITEM #2. BID ITEM #2A CONSISTS OF THE DEDUCT #1 OF THE EXPAND PHARMACY AND LOBBY PROJECT. BID ITEM #2B CONSISTS OF THE DEDUCT #2 OF THE EXPAND PHARMACY AND LOBBY PROJECT. THE BID PROPOSALS SHOULD BE PACKAGED IN A MANNER THAT WOULD ALLOW THE COMPARISON OF EACH BID ITEM (PROJECT) TO THE INDEPENDENT
GOVERNMENT COST ESTIMATE (IGCE). EACH BID ITEM IN BID ITEM 1 REPRESENTS A SEPARATE PROJECT WITH A UNIQUE OBLIGATION NUMBER. AS SUCH, THE CONTRACTOR SHALL BE REQUIRED TO ADMINISTER EACH CONTRACT INDIVIDUALLY REGARDING PAYMENT AND PERFORMANCE BONDS, PAYMENT REQUESTS, PROGRESS SCHEDULES, SUBMITTALS, DAILY LOGS, ETC.
A. BID ITEM #1: RENOVATE MAIN LOBBY and EXPAND PHARMACY AND LOBBY:
BID ITEM #1A: RENOVATE MAIN LOBBY: includes all scope communicated in the drawings and specifications which includes the complete renovation of the main lobby. The scope of work involves selective interior demolition.
BID ITEM #1B: EXPAND PHARMACY AND LOBBY: includes all scope communicated in the drawings and specifications which includes the complete renovation of the first floor transcription office, travel, telehealth imaging, pharmacy, cashier and surrounding areas, and second floor existing bronze clinic and new pharmacy and eye clinic additions. The scope of work involves hazardous materials abatement and selective interior demolition.
B.BID ITEM #2: EXPAND PHARMACY AND LOBBY: includes all scope communicated in the drawings and specifications which includes the complete renovation of the first floor transcription office, travel, telehealth imaging, pharmacy, cashier and surrounding areas, and second floor existing bronze clinic and new pharmacy and eye clinic additions. The scope of work involves hazardous materials abatement and selective interior demolition.
C.BID ITEM #2A: EXPAND PHARMACY AND LOBBY – BID DEDUCT #1: all work in Bid Item #2 with the following exceptions:
a. In lieu of three new exam rooms, F265-F267, provide a storage room. Refer to the drawings and specifications for additional information.
D. BID ITEM #2B: EXPAND PHARMACY AND LOBBY – BID DEDUCT #2: all work in Bid Item #2A with the following exceptions:
a.In lieu of the new pharmacy addition complete with consult rooms, swamp, office, pharmacy work and vault, provide only one new storage room and electrical room with a corridor accessing the north exit door. The new construction shall include the thickened slab for a future vault. All civil work related to this area shall remain in the scope of work.
APPROVAL SIGNATURES
MEDICAL CENTER DIRECTOR
ASSOCIATE DIRECTOR
ASSISTANT DIRECTOR
CHIEF OF STAFF
ASSOCIATE DIRECTOR OF PATIENT SERVICES
CHIEF OF FACILITIES MANAGEMENT
CHIEF OF HEALTH ADMINISTRATION SERVICE
INFECTION CONTROL PRACTITIONER
SAFETY OFFICER
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
JUAR
Columbia, Missouri
GI101
TITLE SHEET
RENOVATE MAIN LOBBY
HARRY S. TRUMAN MEMORIAL VETERANS' HOSPITAL
RENOVATE MAIN LOBBY
COLUMBIA, MO
100% CONSTRUCTION DOCUMENTS
589-334
589-334
04/03/2018
SHEET INDEX
GENERAL
GI101 TITLE SHEET
GI102 ACCESSIBILITY
GI103 FIRST FLOOR LIFE SAFETY PLAN
GI104 FIRST FLOOR PHASING PLAN - PH 1
GI105 FIRST FLOOR PHASING PLAN - PH 2
ARCHITECTURAL
AD101 FIRST FLOOR PLAN - DEMOLITION
AD102 FIRST FLOOR REFLECTED CEILING PLAN - DEMOLITION
AS101 FIRST FLOOR PLAN
AS102 FIRST FLOOR PLAN - DIMENSIONS
AS701 FIRST FLOOR REFLECTED CEILING PLAN
AS702 FIRST FLOOR CEILING PAINT REFERENCE
ARCHITECTURAL INTERIORS
AI101 FIRST FLOOR FINISH PLAN
AI201 FIRST FLOOR EQUIPMENT PLAN
AI301 FIRST FLOOR WALL PROTECTION & SIGNAGE PLAN
AI401 INTERIOR ELEVATIONS
AI501 MILLWORK SECTION DETAILS
PLUMBING
FP101 FIRE PROTECTION PLAN FIRST FLOOR
PP001 PLUMBING COVER SHEET
PD101 BASEMENT AND FIRST FLOOR PLUMBING DEMOLITION PLANS
PL101 BASEMENT AND FIRST FLOOR PLUMBING PLANS
PL301 PLUMBING RISER DIAGRAMS
PL501 PLUMBING SCHEDULES
MECHANICAL
MM001 MECHNICAL COVER SHEET
MM002 MECHANICAL COVER SHEET
MD101 HVAC DEMOLITION PLAN - FIRST FLOOR
MH101 HVAC FLOOR PLANS
M-501 MECHNICAL DETAILS
M-502 MECHNICAL DETAILS
M-511 MECHANICAL CONTROL DIAGRAMS
M-601 MECHANICAL SHEDULES
ELECTRICAL
E-001 ELECTRICAL LEAD SHEET
ED101 ELECTRICAL FIRST FLOOR DEMO PLAN
EL101 ELECTRICAL FIRST FLOOR LIGHTING PLAN
EL501 ELECTRICAL LIGHTING DETAILS
EP101 ELECTRICAL FIRST FLOOR POWER PLAN
EP501 ELECTRICAL POWER DETAILS
EY101 ELECTRICAL FIRST FLOOR SYSTEMS PLAN
EY501 ELECTRICAL SYSTEMS DETAILS
CL
CL
3'-0" 4'-0" 3'-0"
3'-6" 3'-6"
6"
M
IN
HANDRAILS
H.C. LAVATORYH.C. URINAL
H.C. FLOOR MTD. TOILET
LAV FLOOR SPACE
ACCESSIBLE
SINGLE TOILET
WHEELCHAIR MANEUVERING
MANEUVERING CLEARANCES AT DOORS
BATHROOM FIXTURES & ACCESSORIES
LATCH SIDE APPROACH LATCH SIDE APPROACH HINGE SIDE APPROACH
HINGE SIDE APPROACH FRONT APPROACH FRONT APPROACH
GENERAL REACH DIMENSIONS
LAVATORY DIMENSIONS
MOUNTING HEIGHT DIMENSIONS
90 TURNS 180 TURN
1 1/2 " CLEAR
16"-18" Lavatory
60" min
1.25"-2" DIA.
IF CIRCULAR
NO SCALE
Pull Side
Push Side
Push Side
Push Side Pull Side m in
24"min.
X
Y
X m in
Y m in
Y
54" min.
m in
X
24" min.
X
Y m in
NOTE: y=48" minimum if door has both a latch and closer.
36" min m a x
7-9"
Sanitary napkin disposal
Toilet paper dispenser
24"-42"6" max
12" max m in m in
1'-7" min
8" min6" max
Clearance profile
Insulate drain & supply lines m a x
Mirror
Paper towel dispenser
Soap dispenser 3 m in
19" max
48" min
17" min
"12" min
16"-18"
54" min
42" min
NO SCALE
m a x
14"min
"m a x
TO FLUSH CONTROL
NOTE: y = 54" minimum if door has closer
NOTE: y=48" min if door has closer NOTE: x = 36" min if y = 60", x = 42" min if y = 54"
18" minimum 24" preferred
NOTE: x = 12" if door has both a closer and latch.
TELEPHONE
CLOCK
LIGHT SWITCH
"6
M
A X
M
A X
M
A X
(TO HIGHEST
OPERABLE PART)
17" MIN
M
IN
M
IN
M
A X
M
A X
M
IN
6" MAX
17" MIN
M
IN
M
A X
M
A X
M
IN
6" MAX
8" MIN
OCCUPANCY SIGN
LATCH SIDE PREFERRED
THERMOSTAT
OR OTHER
CONTROL
48"
M
IN
Z
48"
Y
X 30" 24"
M
A X
30"
10" MAX
21" MAX
M
IN
M
A X
36" MIN
M
IN
M
A X
NOTE: X SHALL BE < 25";
Z SHALL BE > X, WHEN X < 20",
THEN Y SHALL BE 48" MAX
WHEN X IS 20"-25",
THEN Y SHALL BE 44" MAX.
INSULATE
EXPOSED PIPES
NO SCALE
NO SCALE
NO SCALE
-1 m in
GRAB BARS
1 1/2 " CLEAR1.25"-2" DIA.
IF CIRCULAR
IF NON-CIRCULAR
PERIMETER MUST
BE 4"-6.25" AND
DIAMETER MUST
NOT EXCEED 2.25"
IF NON-CIRCULAR
PERIMETER MUST
BE 4"-6.25" AND
DIAMETER MUST
NOT EXCEED 2.25"
.5 m in m in
18" min. grab bar per
ANSI A117.1-2009 39"-41"
/4
/2
BEVELED FLOORING TRANSITIONS
/4 m a x
/2 m a x
BEVELED FLOORING TRANSITIONS
TURNING CLEAR
5'-0" 2'-6"
TOP AND SIDES
MUST BE
UNOBSTRUCTED. UP
TO 20% OF BOTTOM
MAY BE
OBSTRUCTED FOR
SUPPORTS.
M
IN
M
A X
NO SCALE
NO SCALE NO SCALE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
JUAR
Columbia, Missouri
GI102
ACCESSIBILITY
RENOVATE MAIN LOBBY 589-334
04/03/2018
FECFEC
FEC
F E
C
FEC
FEC
FEC
FEC
F E
C
F E
C
F E
C
448/5
34"
34.5"
97+36
448/5
23.4"
105.5"
3 3 3 3
PRE-REGHBAHBAHBAROI LEGAL
WORK
ADMISSIONS
SUPERVISOR
ADMISSIONS
LEAD
SUPPLY
KIOSK
HBA
HALL
2WAITING
PERSONAL
EFFECTS
PAT. REP.
MEN TLT
ELEVATOR
LOBBY
TRANSCRIPTION
OFF.
ST. LNGE./
LKR/ CONF.
SOILED
UTIL.
H. NURSE /
NOD
E.N.T.
EXAM
ISO.
EXAM
EXAM
CORR.
TRIAGE
RECEP.
TRIAGE
CORR.
PT.
TLT/SHR.
TREAT. 4
N. STN./
PHYS. WK.
B.H. EXAM
2 CLEAN
CHART
NOURISH.
VERT RM. 3
VERT RM. 2
VERT RM. 1
EYE
SCREENING
OFFICE
INFO. MGT.
SVC
F.M.S. ENG. R.O.I
R.O.I
CORR.
ELEVATOR
LOBBY
F.M.S. ENG.
EQ. STG.
VEST.
ADMIN.
OFFICE
OFFICE
LKR.
ST. LNGE.
CORR.
DETAILS
CLERK
FAMILY TLT
WOMEN
TLT
CL.CL. CL.
PHARM.
CARE SVC.
2CHECK-IN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
HOME
TELEHEALTH
N.
ENVIRO.
MGT.
OFFICE
OFFICE
EXAM /
OFFICE
EXAM /
OFFICE
EXAM /
OFFICE
EXAM /
OFFICE
EXAM /
OFFICE
ST. LNGE.
TLT. TLT.
CORR.
CORR.CORR. CORR.
EXAM
SPEC.
PHARMACY
OFFICE
BLDG. MGT.
LKR./
LNGE./ TLT.
BLDG. MGT.
LKR./
LNGE./ TLT.
TLT.
WAITING
CORR.
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
DIETITIAN
PROCS.
EXAM
EXAM
EXAM
GYN. EXAM
TLT.
GYN. EXAM
TLT
CONSULT
RM.
CLEAN
UTIL.
M.P.R. /
CONF.
CLASS
SOILED
UTIL.
TLT.
CORR.
CORR.CORR.
EXAM RM. 5
EXAM
PSY.
EXAM
GYN.
2 TLT.
EXAM
EXAM
CONSULT
RM.
EXAM
EXAM
EXAM
EXAM
EXAM
OFFICE
OFFICE
ST. TLT
N. STN.
CORR.CORR.
CORR.
CORR.
M.A.S.
WAITING
CORR.
BLDG. MGT.
LKR./
LNGE./ TLT.
BLDG. MGT.
LKR./
LNGE./ TLT.
CONSULT
RM.
CONSULT
RM.
CONSULT
RM.
CONSULT
RM.
ST. TLT.
M.A.S.
N. STN.
448/5
15.6"
65"
EXAM
EXAM
EXAM
ENTR.
VEST.
OI&T
CLOSET
TLT
SOILED
UTIL.
CLEAN
UTIL.
PROVIDER
WK. RM.
PHARMACY
TRAVEL
TELEHEALTH
IMAGING
1 CASHIER
F.M.S. ENG.
SIGNAL
CASHIER
WINDOWS
STAIR #11
ELEV.
#10
ELEV.
#9
ELEV.
#11
SMOKE COMP 1-1
12, 190 SF
SMOKE COMP 1-2
13, 703 SF
SMOKE COMP 1-1
12, 190 SF
SMOKE COMP 1-3
5, 762 SF
TRASH
EXAM
ELEC./TELE./MECH.
F.M.S. ENG.
DECONTAMINATION
TREAT. 1
CORR.
TREAT. 2
RESUS /
BARIATRIC
TREAT. 3
STAIR #10
SMOKE COMP 1-3
5, 762 SF
SMOKE COMP 1-4
5, 705 SF
448/5
11.8"
57"
PAT.
INTERVIEW.
PAT. TLT.
RECEP. /
SCHED.
ST. WK/
PAT.
INTERVIEW
448/5
15.2"
34.5"
EXIT
TD = 109'-4"
STAIR #10 EXITS
THIS LEVEL
TD = 194'
TD = 155'-2"
EXIT
FIRE SHUTTERS
@ WINDOWS
EXIT
TD = 159'
INFO. DESK
WEST
CONCOURSE
VALET
W.C. STOR.
LEGEND
BUILDING & LIFE SAFETY REQUIREMENTS
DESCRIPTION
WALL
RATING
NEW
PARTITION KEY
NFPA 2015
(NEW HC)
NFPA 2015
(EXIST. HC)
OPENINGS DAMPERS
RATING RFRNC. TYPE RFRNC.
BUILDING SEPARATION:
FIRE WALL (TYPE I)
3 HRNOT
APPLICABLE
3 HR FIRE
3 HR
NOT
APPLICABLE
BUILDING SEPARATION:
FIRE WALL (TYPE II)
2 HR NOT
APPLICABLE
90 MIN FIRE
90 MIN
NOT
APPLICABLE
OCCUPANCY/AREA SEPARATION
FIRE BARRIER
2 HR 90 MIN NFPA 8.2.3.2.3.1
(1)
FIRE
90 MIN
NFPA 6.1.14
NFPA 8.2.3.1.2
NFPA 8.2.3.2.4.1
NFPA 6.1.14
NFPA 8.2.3.1.2
HORIZONTAL EXIT (& REFUGE AREA)
FIRE BARRIER
2 HR 90 MIN NFPA 8.2.3.2.3.1
(1)
FIRE
90 MIN
NFPA 6.1.14
NFPA 8.2.3.1.2
NFPA 8.2.3.2.4.1
NFPA 6.1.14
NFPA 8.2.3.1.2
VERT. OPG. (EXIT ENCLSR/SHAFT)
FIRE BARRIER
(2 HR = 4 OR MORE STORIES)
(1 HR = LESS THAN 4 STORIES)
NFPA 19.3.1.1
NFPA 8.6.5
NFPA 18.3.1
NFPA 8.2.5.4
NFPA 8.3.4 NOT
ALLOWED
1 HR
2 HR
60 MIN
90 MIN
1 HR
2 HR
EXIT PASSAGEWAY (HORIZ.)
FIRE BARRIER
NFPA 8.2.3.2.3.1 NFPA 18.2.2.7
NFPA 7.2.6
NOT
ALLOWED
NFPA 1005.3.4.1
NFPA 1021.5
NFPA 19.2.2.7
NFPA 7.2.6
60 MIN
90 MIN
HAZ./INCIDENTAL USE
SMOKE PARTITIONS (SPRINKLERED)
NR-
RESIST
SMK
NR
SELF OR AUTO
CLOSING
NFPA 8.4.1.2 SEE
NOTE B
NFPA 8.4.1.2
SUBDIVIDING SPACES
SMOKE BARRIER (1-2 OCCUPANCY)
20 MINNFPA 18.3.7.1
NFPA 18.3.7.3
SMOKE
90 MIN
SEE NOTE [A]
NFPA 8.3.5.1
NFPA 19.3.7.1
1/2
HR
1 HR
SUITE SEPARATION
SMOKE PARTITION
NR NFPA 19.2.5 SEE
NOTE [B]
NR
SELF OR AUTO
CLOSING
NFPA 18.2.5
EXIT ACCESS CORRIDORS (1-2)
SMOKE PARTITIONS (SPRINKLERED)
NR-
RESIST
SMK
NRNFPA 18.2.5 SEE
NOTE [D]
NFPA 19.3.6.2
EXIT ACCESS CORRIDORS (I-1 OR I-2)
FIRE PARTITION (EXIST CONDITION)
(NON-SPRINKLERED)
20 MIN FIRE (I-1)
SMOKE (I-2)
NFPA 19.3.6.21/2 HR NFPA 18.3.6.2
10/1
2"
34"
REQ'D. EXIT WIDTH
NO. OF OCC. EXITING
ACTUAL EXIT
WIDTH
NO. OF OCC./
NO. OF EXITS
NO. OCC. EXITING
(SMALLER ROOMS)
MAXIMUM OCCUPANCY
AREA
OCC. LOAD
FACTOR
1:50
FIRE EXTINGUISHER AND CABINET
FIRE ALARM CONTROL PANEL
FIRE SYSTEM ANNUNCIATOR ALARM
ANNUNCIATOR PANEL
FEC
FACP
FSA
FAA
100'
(50)
STARTING
LOCATION
EXITING #
TRAVEL
DISTANCE
TRAVEL PATH
[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS
WHERE HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)
[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS (NFPA
8.2.4.4.3)
[C] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED
ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)
NOTES
SYMBOLS
EXISTING TO
REMAIN
REMODEL
AREA
CODE INFORMATION
PROJECT INFORMATION:
1. CONSTRUCTION PURPOSE: RENOVATION
2. REASON FOR SUBMITTAL: RENOVATION
3. I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE THE
SUBMITTED PLANS FOR THE ABOVE-REFERENCED
PROJECT
COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING.
NOTE: WHERE THE NFPA & ICC CODES ARE NOT
IDENTICAL, THE DESIGN COMPLIES W/ NFPA AS PER VA
REQUIREMENTS:
2015 INTERNATIONAL BUILDING CODE (IBC)
2015 INTERNATIONAL MECHANICAL CODE (IMC)
2015 INTERNATIONAL PLUMBING CODE (IPC)
2014 NATIONAL ELECTRICAL CODE (NFPA-70)
2015 LIFE SAFETY CODE (NFPA-101)
ABA ACCESSIBILITY STANDARDS
4. LOCATION OF ANY ANTICIPATED FUTURE ADDITIONS:
NONE
5. OWNER:
HARRY S. TRUMAN MEMORIAL VETERANS HOSPITAL
800 HOSPITAL DR
COLUMBIA, MO 65201
PH (573) 814-6000
6. DATE DEVELOPED: SEE DATE ON TITLE BLOCK
7. DESIGN TEAM:
ARCHITECT:
M+HFG, LLC
142 N. MOSLEY ST., SUITE 300
WICHITA, KS 67202 316-262-2500
CONTACT: MARK CRANE
DESIGN CONSULTANTS:
PROFESSIONAL ENGINEERING CONSULTANTS
303 S. TOPEKA
WICHITA, KS 67202 316-262-2691
CONTACT:
BECKY HESSE (MECHANICAL)
becky.hesse@pec1.com
JOSH WILCOX (ELECTRICAL)
josh.wilcox@pec1.com
8. ARCHITECTS SEAL: SEE STAMP AT BOTTOM
9. FIRE SERVICE: COLUMBIA, MISSOURI FIRE DEPARTMENT
10. INSPECTION: VISN SAFETY OFFICER
11. OCCUPANCY TYPE: MULTILPLE SEPARATED
OCCUPANCIES
OCCUPANCY FOR THIS PROJECT: AMBULATORY HEALTH
CARE
12. CONSTRUCTION TYPE: TYPE II (222) PER NFPA
13. STRUCTURAL CODE REQUIREMENTS
A. ALLOWABLE FLOOR AREA: UNCHANGED
B. ALLOWABLE HEIGHT: UNCHANGED
NO HEIGHT MODIFICATIONS REQUIRED
C. FIRE-RESISTANCE RATING FOR BUILDING ELEMENTS: TYPE II (222)
1. BEARING WALLS:
A. EXTERIOR: 2HR
B. INTERIOR: 2HR
2. NONBEARING WALLS:
A. EXTERIOR: 0HR, 1HR, SEE NFPA 5000
TABLE 7.3.2.1
B. INTERIOR: 0HR
3. COLUMNS: 2HR
4. BEAMS, GIRDERS,
TRUSSES, & ARCHES: 2HR
5. FLOOR/CEILING ASSEMBLIES: 2HR
6. ROOF/ CEILING ASSEMBLIES: 1HR
OTHER REQUIREMENTS:
1. NFPA 101 18.3.2.1:
1 HR OCCUPANCY SEPARATION REQUIRED AT STORAGE ROOMS
OVER 100 SF
(NEW HEALTH CARE OCCUPANCY)
14. ACTIVE FIRE SAFETY SYSTEMS
* NOTE:
ALL AREAS OF THIS PROJECT WILL BE FULLY SPRINKLERED.
SPRINKLER SYSTEM SHALL COMPLY WITH NFPA
13 IN ALL AREAS
(a) SMOKE DETECTORS THROUGHOUT
(b) GENERATOR POWERED EMERGENCY LIGHTING
(c) GERERATOR POWERED EXIT LIGHTING
(d) PORTABLE EXTINGUISHERS
(e) AUTOMATIC AIR-HANDLING SHUT-DOWN
(f) FIRE ALARM SYSTEM
15. WATER SUPPLY: CITY OF COLUMBIA
16. SEWAGE TREATMENT: CITY OF COLUMBIA
17. HANDICAP PROVISIONS:
ACCESSIBLE ROUTE, TOILETS, LAVATORIES, SIGNAGE AND
ELSEWHERE AS REQUIRED BY ABAAS AND VA
ACCESSIBILITY
N
3/32" = 1'-0" A
FIRST FLOOR LIFE SAFETY PLAN
0' 4'
3/32" = 1'
8' 16'
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
JUAR
Columbia, Missouri
GI103
FIRST FLOOR LIFE SAFETY PLAN
RENOVATE MAIN LOBBY 589-334
04/03/2018
N
1" = 80'-0"
KEY PLAN FIRST FLOOR
EXISTING TO
REMAIN
REMODEL
AREA
PHASE 1
PHASING LEGEND
PHASE 2
NIGHT & WEEKEND
WORK - COORDINATE
WITH COR; PROVIDE
CONSTRUCTION
BARRIER FOR AREA
OF WORK BEING
DONE
CONSTRUCTION
BOUNDARY - INSTAL 1
HR WALL TO DECK AS
REQ'D
DEMO BOUNDARY
LINE OF
CEILING
ABOVE
NOT IN
SCOPE OF
WORK
NOT IN
SCOPE OF
WORK
NIGHT & WEEKEND
WORK -
COORDINATE TIME
W/ COR
GI104
CONSTRUCTION ENTRY PHASE
MAINTAIN 4' - 0" MIN
FOR STAFF TO
ACCESS ALL ROOMS
DURING
CONSTRUCTION
4' - 1"
REF. SECTION 1/GI104 FOR
PORTIONS OF 1 HR. CONSTR.
BOUNDARY OPEN TO ABOVE
LINE OF
CEILING
ABOVE
CONSTRUCTION ENTRY PHASE
4'-0" CLEAR MIN.
REF. GI105 FOR
MILLWORK
PHASING IN
HBA E102B
UPPER LEVEL MUST BE ENCLOSED W/ 6 MIL MIN.
CLEAR PLASTIC SHEETING OR 1HR CONSTRUCTION
BARRIER TO DECK WHILE WORK IS OCCURING.
CONTRACTOR TO FOLLOW REQUIREMENTS FOR
INFECTION CONTROL AS STATED IN SPECS
1 HR
CONSTRUCTION
WALL
1 HR
CONSTRUCTION
WALL
WAITING
C2E11
WAITING
AREA
OEF/OIF
CASE
MGR.
E108A
PH1
PH1
R.O.I.
E146
TRANSCRIPTION
OFF.
E144
TELEHEALTH
IMAGING
E143
TRAVEL
E140
F.M.S.
ENG.
E138
CORR.
C1F22
ELEVATOR
LOBBY
F.M.S.
ENG.
E137
H. NURSE/
NOD
E.N.T.
EXAM
106PT. TLT.
ISO.
ST. TLT.
SOILED
UTIL.
EXAM
EXAM
RECP.
115TRIAGE
TRIAGE
VERT RM.
VERT RM.
VERT RM.
PT. TLT/
SHR.
EWC
118A
TREAT. 3
TREAT. 4
CORR.
B.H. EXAM
CLEAN
ALCOVE
126A
NOURISH..
109A
CHART
112A
CORR.
CORR.
N. STN./
PHYS. WK.
CORR.
JAN.
OFFICE
B137
LKR.
B144B
ST. TLT.
B143
ST. LNGE.
B144
MED.
ADMIN
E108
F. TLT.
E107
M. TLT.
E106
CORR.
CORR.
C1E14
CORR.
C1E7
CASHIER
WINDOWS
C1E2
MED.
ADMIN.
E102C
MED.
ADMIN.
E102D
MED.
ADMIN.
E102E
MED.
ADMIN.
E102A
MED.
ADMIN.
E102B
MED.
ADMIN.
E102
MED.
ADMIN.
E102G
MED.
ADMIN.
E102F
CORR.
C1E6
LOBBY
C1E3
WAITING
AREA
ALCOVE
113A
ALCOVE
120A
VEST.
MED.
ADMIN.
E102I
MED.
ADMIN.
E102H
PAT. TLT.
B130
PAT.
INTERVIEW
B133
OFFICE
B138
CL.
E105
CL.
E104
CL.
E103
OI&T
CLOSET
B144A
CORR.
C1A1
ADMIN.
B134
CORR
C1E8
CHECK-IN
A119
PAT. REP.
E108B
OFFICE
E147B
ST. LNGE./
LKR/
CONF.
EQ. STG.
144 INFO.
MGT. SVC
E139
EYE
SCREENING
E147A
R.O.I.
E145
CASHIER
E142
CORR.
ELEVATOR
LOBBY
C1E9
OEF/OIF
CASE
MGR.
E108A
DETAILS
CLERK
E108C
VEST.
PHARM.
CARE
SVC.
A119A
EXAM
A121
INFO
DESK.
C1E35
WHEELCHAIR
STORAGE
E102J
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
JUAR
Columbia, Missouri
GI104
FIRST FLOOR PHASING PLAN -
PH 1
RENOVATE MAIN LOBBY 589-334
04/03/2018
N 4' 8' 16'
1/8" = 1'-0"
0'
1" = 80'-0"
KEY PLAN FIRST FLOOR
N
1/8" = 1'-0" A
FIRST FLOOR PLAN - PHASE 1 DEMO
1/4" = 1'-0"
PHASING PLAN - SECTION
ROI
LEGAL
E102E
HBA
E102D
HBA
E102C
HBA
E102B
ADMISSIONS
LEAD
E102I
ADMISSIONS
SUPERVISOR
E102H
WORK
E102G
HALL
E102
LOBBY
C1E3
LINE OF
CEILING
ABOVE
CORR.
B116
ADMIN.
B134
OFFICE
B138
OFFICE
B137
JAN
LKR.
B144B
ST. LNGE.
B144
MEN TLT
E108
PAT. REP.
E108B
DETAILS
CLERK
E108C
FAMILY
TLT
E107
CL.
E103
CL.
E104
CL.
E105
TREAT. 4
PT.
TLT/SHR.
CORR.
CORR.
119 TRIAGE
RECEP.
CORR.
112 TRIAGE
SOILED
UTIL.
111CLEAN
VERT RM.
VERT RM.
VERT RM.
B.H. EXAM
B.H. TLT.
CHART
112A
ELEVATOR
LOBBY
ELEVATOR
LOBBY
C1E9
OFFICE
E147B
CORR.
C1E8
TRANSCRIPTION
OFF.
E144
R.O.I E145
VEST.
OI&T
CLOSET
B144A
NOURISH.
109A
CORR.
CORR.
C1E8
PHARM.
CARE
SVC.
A119A
CHECK-IN
A119
N. STN./
PHYS. WK.
EXAM
EXAM
ISO.
E.N.T.
EXAM
H. NURSE
/ NOD
ST. LNGE./
LKR/
CONF.
EYE
SCREENING
E147A
R.O.I E146
INFO.
MGT. SVC
E147C
F.M.S.
ENG.
E138
EQ. STG.
F.M.S.
ENG.
E137
CASHIER
WINDOWS
TRAVEL
TELEHEALTH
IMAGING
CASHIER
PAT.
INTERVIEW.
B133
PAT. TLT.
B130
TREAT. 3
HALL
CORR.
CORR.
CORR.
ST. TLT
B143
CORR.
ENTR.
VEST.
EXAM
INSTALL MILLWORK IN
THIS ROOM AT END OF
PH2. THIS ROOM WILL BE
USED FOR STAFF TO
ACCESS THEIR
WORKSPACE DURING PH2
CONSTRUCTION
MAINTAIN 4' - 0" MIN
FOR STAFF TO
ACCESS ALL ROOMS
DURING
CONSTRUCTION
REF. SECTION 1/GI105 FOR
PORTIONS OF 1 HR. CONSTR.
BOUNDARY OPEN TO ABOVE
GI105
INFO.
DESK
C1E35
LINE OF
CEILING
ABOVE
4'-0" CLEAR MIN.
WAITING
HALL
E102
CORR
C1A1
CORR
C1E6
LOBBY
C1E3
PH2
CONSTRUCTION
ENTRY PHASE 2
PH2
CONSTRUCTION
ENTRY PHASE 2
CONSTRUCT A HARD
CEILING OVER
CONSTRUCTION AREA THAT
IS OPEN TO ABOVE TO
MAINTAIN FULL 1HR
ENCLOSURE
EXISTING TO
REMAIN
REMODEL
AREA
PHASE 1
PHASING LEGEND
PHASE 2
NIGHT & WEEKEND
WORK - COORDINATE
WITH COR; PROVIDE
CONSTRUCTION
BARRIER FOR AREA
OF WORK BEING
DONE
CONSTRUCTION
BOUNDARY - INSTAL 1
HR WALL TO DECK AS
REQ'D
DEMO BOUNDARY
1 HR
CONSTRUCTION
WALL
1 HR
CONSTRUCTION
WALL
WAITING
MEN TLT
E108
WAITING
C2E11
UPPER LEVEL MUST BE ENCLOSED W/ 6 MIL MIN.
CLEAR PLASTIC SHEETING OR 1HR CONSTRUCTION
BARRIER TO DECK WHILE WORK IS OCCURING.
CONTRACTOR TO FOLLOW REQUIREMENTS FOR
INFECTION CONTROL AS STATED IN SPECS
CONSTRUCTION
ENTRY PHASE 2
MED.
ADMIN.
E102A
MED.
ADMIN.
E102B
MED.
ADMIN.
E102C
CORR.
C1E7
M. TLT.
E106
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
JUAR
Columbia, Missouri
GI105
FIRST FLOOR PHASING PLAN -
PH 2
RENOVATE MAIN LOBBY 589-334
04/03/2018
1/8" = 1'-0" A
FIRST FLOOR PLAN - PHASE 2 DEMO
N 4' 8' 16'
1/8" = 1'-0"
0'
N
1" = 80'-0"
KEY PLAN FIRST FLOOR
1/4" = 1'-0"
PHASING PLAN - SECTION