589-334, CO EXPAND PHARMACY AND LOBBY
Solicitation number
36C25518R0539
Issued by

About this file

36C25518R0539 0001 Drawings Expand Pharmacy-Vol 1.pdf

View the file

Other files

File Type Posted
36C25518C0223-000.docx DOCX document
36C25518R0539-0005000.docx DOCX document
36C25518R0539-0004001.pdf PDF
36C25518R0539-0004000.docx DOCX document
36C25518R0539-0003001.pdf PDF
36C25518R0539-0003000.docx DOCX document
36C25518R0539-0002002.pdf PDF
36C25518R0539-0002000.docx DOCX document
36C25518R0539-0002001.docx DOCX document
36C25518R0539-0001011.pdf PDF
36C25518R0539-0001003.pdf PDF
36C25518R0539-0001008.pdf PDF
36C25518R0539-0001009.pdf PDF
36C25518R0539-0001005.pdf PDF
36C25518R0539-0001004.pdf PDF
36C25518R0539-0001014.pdf PDF
36C25518R0539-0001013.pdf PDF
36C25518R0539-0001002.pdf PDF
36C25518R0539-0001010.pdf PDF
36C25518R0539-0001015.pdf PDF
36C25518R0539-0001012.pdf PDF
36C25518R0539-0001007.pdf PDF
36C25518R0539-0001006.pdf PDF
36C25518R0539-0001016.pdf PDF
36C25518R0539-0001000.docx DOCX document
36C25518R0539-008.pdf PDF
36C25518R0539-005.pdf PDF
36C25518R0539-001.docx DOCX document
36C25518R0539-003.pdf PDF
36C25518R0539-007.pdf PDF
36C25518R0539-006.pdf PDF
36C25518R0539-004.pdf PDF
36C25518R0539-002.pdf PDF
36C25518R0539-000.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

PROJ(D)

PLBG

PLYWD

PREFIN

RAD(R)

RESIL

REINF

REQ'D

SECT

SHWR

SPECS

REFRIG

galvanizedGALVBMRK benchmark concrete mansonry unit ceilingCLG

CLR

CMU

COL

CLO

clear/clearance column closet

CAB

CJ

CC

CB

BW

CL

BOC

BRZ

BRK

BO

BRG

BUR

BTM

BS

built-up roof center to center chalkboard bottom of wall center line control joint/ construction joint cabinet back of curb both sides bottom of bronze brick bearing bottom foundation floor drain fire extinguisher fire extinguisher cabinet

FE

FEC

FDN

FD

east each equipment exposed each way existing electrical exterior insulation finish system elevation/elevator expansion joint existing grade electrical contractor exterior ethylene propylene diene terpolymer

ELEV

EQUIP

EW

EPDM

EXP

EXIST

EXT

E

EA

EC

EG

EIFS

EJ

ELEC

insulation interior inside diameter

INSUL

IN(")

INT

ID

inch grab bar general contractor gypsum glass/glazing hollow metal high pressure decorative laminate horizontal hardware hardwood hose bib hot water heating, ventilating & air conditioning

HDWR

HM

HORZ

HT

HPDL

HVAC

HW

height

GB

GL

GRD

GYP

GC

HDWD

HB

grade

PART

PLAS

OVHD

partition plaster overhead

SRT

SS

SQ

miscellaneous masonry opening not in contract not applicable outside diameter numberNO(#)

NTS

OC

OA

NOM

OFF

OPNG

OD

on center overall nominal not to scale office opening

MISC

N

MO

MULL

MTL

NIC

NA

north mullion metal

SHT

SF

SB

SND

SIM

S

RM

ROW

RO

SAT

SAN

architect/ architectural

AB anchor bolt

APPROX

BLDG

BD

ARCH

BM

BLK

ADJ

AFF

AC

ACCU

ALUM

ANOD

ALT

approximate block/blocking at board beam building air cooled condensing unit above finish floor adjustable alternate anodized acoustical aluminum

A/C air conditioning plus or minus constructionCONST course ceramic tile continuous carpet corridor diameter door down ditto dimension double drinking fountain detail drawing downspout

DIA

DR

DS

DN

DO

DIM

DTL

DWG

CRS

CT

CONT

CORR

CPT

DBL

DF

conference concrete

CONF

CONC

finishFIN fluorescent flow line folding field verify furnace footing fire retardant foot scraper fiberglass reinforced plastic

FV

FT(')

FURR

FURN

FTG

G

GA

foot furring gas gauge

FRP

FLR

FLDG

FL

FRT

FS

FLUOR

floor finish grade finish floor

FG

FF

joistJST low volume change masonryMAS

MANUF

MATL

MAX

MECH

MEMB

MH

MIN

MIRR

manufacturer material mechanical membrane maximum minimum manhole mirror

LDR

LF

LAV

LAM

LVC

LOCN

lineal feet ladder lavatory laminate location

REF

R

RAG

RD

PT

PR

QT

PTD

JT

JAN janitor joint

PL

under cabinet lightrequired physical therapy respiratory therapy surgical intensive care unit studded rubber tile stainless steel square specifications

YD

suspended acoustical tile similar sanitary napkin dispenser section shower sheet square feet splash block resilient south sanitary right of way rough opening room

WD

WNDW

WH

WNSCT

WC

WT

WWF

WP

VCT

VWC

VEST

VERT

W

W/

W/O yard waterproofing, waterproof welded wire fabric water heater water closet window wood wainscot weight vinyl composition tile vinyl wall covering vertical vestibule west with with out

RT

SICU

central sterile long term care intensive care unit occupational therapy magnetic resonance imaging post anesthetic care unit medical intensive care unit labor-delivery-recovery-post partum operating room

FOR MEDICAL

emergency room computed tomography

FACILITIES ONLY

STORplumbing project/(projected) refer/reference roof drain radius return air grille reinforcing refrigerator riser pressure treated painted quarry tile plywood prefinished pair

TLT

TV

TW

TOC

TPH

TO

TYP

UCL

T&B

T

SUSP

STRUCT

TEL

TB

T&G plate/plastic/ property line STL

STD

storage toilet paper holder top of curb toilet television top of typical top of wall tongue & groove top & bottom structure/structural tread telephone tackboard suspended

ICU

OR

LDRP

MRI

MICU

LTC

PT

PACU

OT

CS

CT

ER

steel standard

DRAWING SYMBOLS

95.00

98.5

98.6

B

NEW ELEVATION

EXISTING CONTOUR

NEW CONTOUR

TEST BORING (SITE PLANS ONLY)

EXISTING ELEVATION

PROPERTY LINE

/1 A101

/1 A101

MATCHLINE

SHT. REFERENCE

ELEVATION DATUM

(SECTIONS, ELEVATIONS ONLY)

BUILDING SECTION

WALL SECTION

DETAIL DRAWING

A3.1

BUILDING ELEVATION

A6.1 INTERIOR ELEVATION

A100

WINDOW ID TAG

DOOR NUMBER

ROOM

NAME

ROOM NAME & NUMBER

PARTITION SYMBOL

1 REVISION TAG

COLUMN LINE GRID

ME100E EQUIPMENT NUMBER

? SITE PLAN NOTES

DEMOLITION PLAN NOTES

VICINITY MAP

NO SCALE

PRECAST CONCRETE

WALL PANEL TAG

XXX

A101

A-4 ALTERNATE TAG

PT-XX PAINT COLOR TAG

# PLAN NOTES

PROJECT LOCATION

X

X.X

X

X.X

CAST STONE

STEEL

PLYWOOD

FINISH WOOD

CONT WD FRAMING

WOOD BLOCKING

MATERIAL SYMBOLS

LVC FILL

GRANULAR FILL

CONCRETE MASONRY

FACE BRICK

CONCRETE

EARTH

EXISTING

CONSTRUCTION

ASPHALT

GLASS

RIGID OR TAPERED

INSULATION, EIFS

BATT INSULATION

GYPSUM BOARD

BID ITEMS

REFERENCE SECTION 01 00 00 GENERAL REQUIREMENTS ITEM 1.3 STATEMENT OF BID ITEMS.

STATEMENT OF BID ITEM(S)

THIS SINGLE SOLICITATION CONSISTS OF TWO PROJECTS WITH THE INTENT TO AWARD TO ONE CONTRACTOR DUE TO THE PHASING REQUIREMENTS OF THESE PROJECTS. BID ITEM #1, GROUPED AS BID ITEM #1A AND BID ITEM #1B, CONSISTS OF BOTH PROJECTS IN THEIR ENTIRETY. BID ITEM #2 CONSISTS OF ONE PROJECT (EXPAND PHARMACY AND LOBBY) IN ITS ENTIRETY; THE RENOVATE MAIN LOBBY HAS BEEN REMOVED FROM BID ITEM #2. BID ITEM #2A CONSISTS OF THE DEDUCT #1 OF THE EXPAND PHARMACY AND LOBBY PROJECT. BID ITEM #2B CONSISTS OF THE DEDUCT #2 OF THE EXPAND PHARMACY AND LOBBY PROJECT. THE BID PROPOSALS SHOULD BE PACKAGED IN A MANNER THAT WOULD ALLOW THE COMPARISON OF EACH BID ITEM (PROJECT) TO THE INDEPENDENT GOVERNMENT COST ESTIMATE (IGCE). EACH BID ITEM IN BID ITEM

1 REPRESENTS A SEPARATE PROJECT WITH A UNIQUE OBLIGATION NUMBER. AS SUCH, THE CONTRACTOR SHALL BE REQUIRED TO ADMINISTER EACH CONTRACT INDIVIDUALLY REGARDING PAYMENT AND PERFORMANCE BONDS, PAYMENT REQUESTS, PROGRESS SCHEDULES, SUBMITTALS, DAILY LOGS, ETC.

A. BID ITEM #1: RENOVATE MAIN LOBBY and EXPAND PHARMACY AND LOBBY:

BID ITEM #1A: RENOVATE MAIN LOBBY: includes all scope communicated in the drawings and specifications which includes the complete renovation of the main lobby. The scope of work involves selective interior demolition.

BID ITEM #1B: EXPAND PHARMACY AND LOBBY: includes all scope communicated in the drawings and specifications which includes the complete renovation of the first floor transcription office, travel, telehealth imaging, pharmacy, cashier and surrounding areas, and second floor existing bronze clinic and new pharmacy and eye clinic additions. The scope of work involves hazardous materials abatement and selective interior demolition.

B.BID ITEM #2: EXPAND PHARMACY AND LOBBY: includes all scope communicated in the drawings and specifications which includes the complete renovation of the first floor transcription office, travel, telehealth imaging, pharmacy, cashier and surrounding areas, and second floor existing bronze clinic and new pharmacy and eye clinic additions. The scope of work involves hazardous materials abatement and selective interior demolition.

C.BID ITEM #2A: EXPAND PHARMACY AND LOBBY – BID DEDUCT #1: all work in Bid Item #2 with the following exceptions:

a. In lieu of three new exam rooms, F265-F267, provide a storage room. Refer to the drawings and specifications for additional information.

D. BID ITEM #2B: EXPAND PHARMACY AND LOBBY – BID DEDUCT #2: all work in Bid Item #2A with the following exceptions:

a.In lieu of the new pharmacy addition complete with consult rooms, swamp, office, pharmacy work and vault, provide only one new storage room and electrical room with a corridor accessing the north exit door. The new construction shall include the thickened slab for a future vault. All civil work related to this area shall remain in the scope of work.

APPROVAL SIGNATURES

MEDICAL CENTER DIRECTOR

ASSISTANT DIRECTOR

ASSOCIATE DIRECTOR

CHIEF OF STAFF

DIRECTOR OF PATIENT SERVICES

CHIEF OF SURGERY

CHIEF OF PHARMACY

INFECTION CONTROL PRACTITIONER

CHIEF OF FACILITIES MANAGEMENT

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

OFFEROR: EXPAND PHARMACY AND LOBBY 589-334

TITLE SHEET

COLUMBIA, MO

AR JU04/03/2018

GI101

EXPAND PHARMACY AND LOBBY

VA PROJECT NO. 589-334

HARRY S. TRUMAN MEMORIAL

VETERANS' HOSPITAL

COLUMBIA, MO

100% CONSTRUCTION DOCUMENTS

SHEET INDEX

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-505 MECHANICAL DETAILS

M511 MECHANICAL CONTROL DIAGRAMS

M512 MECHANICAL CONTROL DIAGRAMS

M513 MECHANICAL CONTROL DIAGRAMS

M601 MECHANICAL SCHEDULES

M602 MECHANICAL SCHEDULES

M-701 HVAC AIRFLOW BALANCE PLANS

M-702 ROOM AIR BALANCE SCHEDULE

ELECTRICAL

E-001 ELECTRICAL LEAD SHEET

ED111 ELECTRICAL FIRST FLOOR DEMO PLAN

ED121 ELECTRICAL SECOND FLOOR DEMO PLAN

EL111 ELECTRICAL FIRST FLOOR LIGHTING PLAN

EL111.2 ELECTRICAL FIRST FLOOR LIGHTING PLAN -

BID DEDUCT #2

EL121 ELECTRICAL SECOND FLOOR LIGHTING PLAN -

AREA A

EL121.1 ELECTRICAL SECOND FLOOR LIGHTING PLAN -

AREA A - BID DEDUCT #1

EL122 ELECTRICAL SECOND FLOOR LIGHTING PLAN -

AREA B

EL501 ELECTRICAL LIGHTING DETAILS

EL601 ELECTRICAL LIGHTING FIXTURE SCHEDULE

EP101 ELECTRICAL BASEMENT FLOOR POWER PLAN

EP111 ELECTRICAL FIRST FLOOR POWER PLAN

EP111.2 ELECTRICAL FIRST FLOOR POWER PLAN - BID

DEDUCT #2

EP121 ELECTRICAL SECOND FLOOR POWER PLAN -

AREA A

EP121.1 ELECTRICAL SECOND FLOOR POWER PLAN -

AREA A - BID DEDUCT #1

EP122 ELECTRICAL SECOND FLOOR POWER PLAN -

AREA B

EP131 ELECTRICAL ROOF POWER PLAN

EP501 ELECTRICAL POWER DETAILS

EP601 ELECTRICAL ONE-LINE DIAGRAM AND

SCHEDULES

EP602 ELECTRICAL SCHEDULES

EY111 ELECTRICAL FIRST FLOOR SYSTEMS PLAN

EY111.2 ELECTRICAL FIRST FLOOR SYSTEMS PLAN -

BID DEDUCT #2

EY121 ELECTRICAL SECOND FLOOR SYSTEMS PLAN

EY121.1 ELECTRICAL SECOND FLOOR SYSTEMS PLAN -

BID DEDUCT #1

EY501 ELECTRICAL SYSTEMS DETAILS

SHEET INDEX

S-701 MASONRY DETAILS

S-801 STAIR DETAILS

FIRE PROTECTION

FP101 FIRE PROTECTION PLAN FIRST FLOOR

FP101.2 FIRE PROTECTION PLAN - FIRST FLOOR - BID

DEDUCT #2

FP102 FIRE PROTECTION PLAN SECOND FLOOR

FP102.1 FIRE PROTECTION PLAN - SECOND FLOOR - BID

DEDUCT #1

PLUMBING

PP001 PLUMBING COVER SHEET

PD100 BASEMENT PLUMBING DEMOLITION PLAN

PD100.2 BASEMENT PLUMBING DEMOLITION PLAN - BID

DEDUCT #2

PD101 FIRST FLOOR PLUMBING DEMOLITION PLAN

PD101.2 FIRST FLOOR PLUMBING DEMOLITION PLAN -

BID DEDUCT #2

PD102 SECOND FLOOR PLUMBING DEMOLITION PLAN

PL100 BASEMENT PLUMBING PLAN

PL101 FIRST FLOOR PLUMBING PLAN

PL101.1 FIRST FLOOR PLUMBING - BID DEDUCT #1

PL101.2 FIRST FLOOR PLUMBING - BID DEDUCT #2

PL102 SECOND FLOOR PLUMBING PLAN

PL102.1 SECOND FLOOR PLUMBING - BID DEDUCT #1

PL401 PLUMBING DETAILS

PL501 PLUMBING SCHEDULES

MECHANICAL

MM001 MECHANICAL COVER SHEET

MM002 MECHANICAL COVER SHEET

MD101 FIRST FLOOR HVAC DEMOLITION PLAN

MD101.2 FIRST FLOOR HVAC DEMOLITION PLAN - BID

DEDUCT #2

MD102 SECOND FLOOR HVAC DEMOLITION PLAN

MD111 FIRST FLOOR HYDRONICS DEMOLITION PLAN

MD111.2 FIRST FLOOR HYDRONICS DEMOLITION PLAN -

BID DEDUCT #2

MD112 SECOND FLOOR HYDRONICS FLOOR PLAN

MH101 FIRST FLOOR HVAC PLAN

MH101.2 FIRST FLOOR HVAC PLAN - BID DEDUCT #2

MH102 SECOND FLOOR HVAC PLAN

MH102.1 SECOND FLOOR HVAC PLAN - BID DEDUCT #1

MH103 ROOF HVAC PLAN

MH301 MECHANICAL SECTIONS

MP101 FIRST FLOOR HYDRONICS PLAN

MP101.2 FIRST FLOOR HYDRONICS PLAN - BID DEDUCT

#2

MP102 SECOND FLOOR HYDRONICS PLAN

MP201 SNOW MELT PLANS

M-501 MECHANICAL DETAILS

SHEET INDEX

AS702.1 SECOND FLOOR - REFLECTED CEILING PLAN -

BID DEDUCT #1

AS703 CEILING DETAILS

ARCHITECTURAL INTERIORS

AI101 FIRST FLOOR - FINISH PLAN

AI101.2 FIRST FLOOR - FINISH PLAN - BID DEDUCT #2

AI102 SECOND FLOOR - FINISH PLAN

AI102.1 SECOND FLOOR - FINISH PLAN - BID DEDUCT #1

AI201 FIRST FLOOR - EQUIPMENT PLAN

AI201.2 FIRST FLOOR - EQUIPMENT PLAN - BID DEDUCT

#2

AI202 SECOND FLOOR - EQUIPMENT PLAN

AI202.1 SECOND FLOOR - EQUIPMENT PLAN - BID

DEDUCT #1

AI203 FIRST FLOOR - ENLARGED EQUIPMENT PLAN

AI203.2 FIRST FLOOR - ENLARGED EQUIPMENT PLAN -

BID DEDUCT #2

AI204 SECOND FLOOR - ENLARGED EQUIPMENT

PLAN

AI204.1 SECOND FLOOR - ENLARGED EQUIPMENT

PLAN - BID DEDUCT #1

AI301 FIRST FLOOR - WALL PROTECTION PLAN

AI301.2 FIRST FLOOR - WALL PROTECTION PLAN- BID

DEDUCT #2

AI302 SECOND FLOOR - WALL PROTECTION PLAN

AI302.1 SECOND FLOOR - WALL PROTECTION PLAN -

BID DEDUCT #1

AI401 INTERIOR ELEVATIONS

AI402 INTERIOR ELEVATIONS

AI501 MILLWORK SECTION DETAILS

AI601 FIRST FLOOR - SIGNAGE PLAN

AI601.2 FIRST FLOOR - SIGNAGE PLAN - BID DEDUCT #2

AI602 SECOND FLOOR - SIGNAGE PLAN

AI602.1 SECOND FLOOR - SIGNAGE PLAN - BID DEDUCT

#1

STRUCTURAL

S-001 GENERAL NOTES

S-002 GENERAL NOTES

S-003 IBC INSPECTION TABLES

S-101 FOUNDATION PLAN

S-101.2 FOUNDATION PLAN - BID ITEM #2

S-102 SECOND FLOOR FRAMING PLAN

S-102.1 SECOND FLOOR FRAMING PLAN - BID ITEM #1

S-103 ROOF FRAMING PLAN

S-501 TYPICAL FOUNDATION DETAILS

S-502 FOUNDATION DETAILS

S-503 TYPICAL FRAMING DETAILS

S-504 FRAMING DETAILS

S-505 FRAMING DETAILS

S-601 COLUMN AND GRADE BEAM SCHEDULES

S-602 AUGER CAST PILES DETAILS

SHEET INDEX

GENERAL

GI101 TITLE SHEET

GI102 ACCESSIBILITY

GI103 FIRST FLOOR LIFE SAFETY PLAN

GI103.2 FIRST FLOOR LIFE SAFETY PLAN - BID DEDUCT

#2

GI104 SECOND FLOOR LIFE SAFETY PLAN

GI104.1 SECOND FLOOR LIFE SAFETY PLAN - BID

DEDUCT #1

GI105 FIRST FLOOR PHASING PLAN

GI106 SECOND FLOOR PHASING PLAN

CIVIL

VF101 SITE SURVEY

CD101 DEMOLITION PLAN

CS101 SITE PLAN & GENERAL NOTES

CS102 PAVING & GRADING PLAN

CS501 PAVING AND RAMP DETAILS

CS502 SITE DETAILS

ARCHITECTURAL

AD101 FIRST FLOOR PLAN - DEMOLITION

AD102 SECOND FLOOR PLAN - DEMOLITION

AD103 FIRST FLOOR - REFLECTED CEILING PLAN -

DEMOLITION

AD104 SECOND FLOOR - REFLECTED CEILING PLAN -

DEMOLITION

AS101 FIRST FLOOR - FLOOR PLAN

AS101.2 FIRST FLOOR - FLOOR PLAN - BID DEDUCT #2

AS102 SECOND FLOOR - FLOOR PLAN

AS102.1 SECOND FLOOR - FLOOR PLAN - BID DEDUCT

#1

AS103 FIRST FLOOR - DIMENSIONS PLAN

AS103.2 FIRST FLOOR - DIMENSIONS PLAN - BID

DEDUCT #2

AS104 SECOND FLOOR - DIMENSIONS PLAN

AS104.1 SECOND FLOOR - DIMENSIONS PLAN - BID

DEDUCT #1

AS105 PLAN DETAILS

AS201 ROOF PLAN

AS301 EXTERIOR ELEVATIONS

AS401 BUILDING SECTIONS

AS501 WALL SECTIONS

AS502 WALL SECTIONS

AS503 WALL SECTION DETAILS

AS504 WALL SECTION DETAILS

AS601 DOOR & WINDOW INFORMATION

AS701 FIRST FLOOR - REFLECTED CEILING PLAN

AS701.2 FIRST FLOOR - REFLECTED CEILING PLAN - BID

DEDUCT #2

AS702 SECOND FLOOR - REFLECTED CEILING PLAN

CL

CL

3'-0" 4'-0" 3'-0"

3'-6" 3'-6"

6"

M

IN

HANDRAILS

H.C. LAVATORYH.C. URINAL

H.C. FLOOR MTD. TOILET

FRONT APPROACHSIDE APPROACH

LAV FLOOR SPACE

ACCESSIBLE

SINGLE TOILET

WHEELCHAIR MANEUVERING

MANEUVERING CLEARANCES AT DOORS

DRINKING FOUNTAINS

BATHROOM FIXTURES & ACCESSORIES

LATCH SIDE APPROACH LATCH SIDE APPROACH HINGE SIDE APPROACH

HINGE SIDE APPROACH FRONT APPROACH FRONT APPROACH

GENERAL REACH DIMENSIONS

LAVATORY DIMENSIONS

MOUNTING HEIGHT DIMENSIONS

90 TURNS 180 TURN

1 1/2 " CLEAR

16"-18" Lavatory

60" min

1.25"-2" DIA.

IF CIRCULAR

NO SCALE

Pull Side

Push Side

Push Side

Push Side Pull Side m in

24"min.

X

Y

X m in

Y m in

Y

54" min.

m in

X

24" min.

X

Y m in

NOTE: y=48" minimum if door has both a latch and closer.

17" MIN.

19" MAX.

48" MIN.

M

IN

NOT TO EXCEED

FOUNTAIN DEPTH

30" MIN.

M

IN

36" min m a x

7-9"

Sanitary napkin disposal

Toilet paper dispenser

24"-42"6" max

12" max m in m in

1'-7" min

8" min6" max

Clearance profile

Insulate drain & supply lines m a x

Mirror

Paper towel dispenser

Soap dispenser 3 m in

19" max

48" min

17" min

"12" min

16"-18"

54" min

42" min

TO BUBBLER

M

IN

M

A X

HIGH

FOUNTAIN

LOW

FOUNTAIN

17-19"

6" MAX

8" MIN

M

IN

M

A X

M

IN

L O

W F

O U

N T

A

IN

NO SCALE

NO SCALE

m a x

14"min

"m a x

TO FLUSH CONTROL

NOTE: y = 54" minimum if door has closer

NOTE: y=48" min if door has closer NOTE: x = 36" min if y = 60", x = 42" min if y = 54"

18" minimum 24" preferred

NOTE: x = 12" if door has both a closer and latch.

TELEPHONE

CLOCK

LIGHT SWITCH

"6

M

A X

M

A X

M

A X

(TO HIGHEST

OPERABLE PART)

17" MIN

M

IN

M

IN

M

A X

M

A X

M

IN

6" MAX

17" MIN

M

IN

M

A X

M

A X

M

IN

6" MAX

8" MIN

OCCUPANCY SIGN

LATCH SIDE PREFERRED

THERMOSTAT

OR OTHER

CONTROL

48"

M

IN

Z

48"

Y

X 30" 24"

M

A X

30"

10" MAX

21" MAX

M

IN

M

A X

36" MIN

M

IN

M

A X

NOTE: X SHALL BE < 25";

Z SHALL BE > X, WHEN X < 20",

THEN Y SHALL BE 48" MAX

WHEN X IS 20"-25",

THEN Y SHALL BE 44" MAX.

INSULATE

EXPOSED PIPES

NO SCALE

NO SCALE

NO SCALE

-1 m in

GRAB BARS

1 1/2 " CLEAR1.25"-2" DIA.

IF CIRCULAR

IF NON-CIRCULAR

PERIMETER MUST

BE 4"-6.25" AND

DIAMETER MUST

NOT EXCEED 2.25"

IF NON-CIRCULAR

PERIMETER MUST

BE 4"-6.25" AND

DIAMETER MUST

NOT EXCEED 2.25"

.5 m in m in

18" min. grab bar per

ANSI A117.1-2009 39"-41"

/4

/2

BEVELED FLOORING TRANSITIONS

/4 m a x

/2 m a x

BEVELED FLOORING TRANSITIONS

TURNING CLEAR

5'-0" 2'-6"

TOP AND SIDES

MUST BE

UNOBSTRUCTED. UP

TO 20% OF BOTTOM

MAY BE

OBSTRUCTED FOR

SUPPORTS.

M

IN

M

A X

NO SCALE

NO SCALE NO SCALE

MOUNTING HEIGHTS

MEDICAL GAS

ZONE VALVE

NURSE CALL -

PATIENT TOILET

CORD

ROBE HOOK

CALL STATION/

FLUSH-MOUNTED

STATION

RETURN AIR

REGISTER

SWITCH

CLOCK

MEDICAL EQUIPMENT

NO SCALE

SHARPS

CONTAINER

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

JUAR

Columbia, Missouri

EXPAND PHARMACY AND LOBBY

GI102

ACCESSIBILITY

589-334

04/03/2018

F E

F E

C

F E

C

F E

C

FEC

FEC

FEC

FEC

486/5

40.6"

44"

486/5

27.6"

105.5"

3 3 3

PHARMACY

WORK

STORAGE

WAITING

C O

N S

U L

T

C O

N S

U L

T

C O

N S

U L

T

SWAMP

OFFICE

MED ADMIN

CORRIDOR

AGENT

CASHIER

TRAVEL

PINPOINT

TRAVEL

VAULT

SMOKE COMP. 1-1

11,596 SF

SMOKE COMP. 1-2

17,285 SF

STAIR #11 EXITS

THIS LEVEL

ELEC

BLDG 1 - 1ST FLOOR = 42,999 SF

OCCUPANCY TYPE - AMBULATORY HEALTH CARE

TYPE II (222) CONSTRUCTION

LOBBY

T D

HBA

ROI LEGAL

HBA

HBA

HBA

PRE-REG

KIOSK

PERSONAL

EFFECTS

SUPPLY

ADMISSIONS

LEAD

ADMISSIONS

SUPERVISOR

WORK

HALL

MEN TLT

FAMILY TLT

WOMEN

TLT

INFO. DESK

WEST

CONCOURSE

WOMEN

MEN

W.C. STOR.

VALET

HOME

TELEHEALTH

N.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

PHARMACY

EXAM

SPEC.

DIETITIAN

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

PROCS.

N. STN.

M.P.R. /

CONF.

CLASS

EXAM

EXAM

WAITING

EYE

SCREENING

S T

A

IR

S T

A

IR

E L E

V

E L E

V

E L E

V

LEGEND

BUILDING & LIFE SAFETY REQUIREMENTS

DESCRIPTION

WALL

RATING

NEW

PARTITION KEY

NFPA 2015

(NEW HC)

NFPA 2015

(EXIST. HC)

OPENINGS DAMPERS

RATING RFRNC. TYPE RFRNC.

BUILDING SEPARATION:

FIRE WALL (TYPE II)

2 HR NOT

APPLICABLE

90 MIN FIRE

90 MIN

NOT

APPLICABLE

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

2 HR 90 MIN NFPA 8.2.3.2.3.1

(1)

FIRE

90 MIN

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

NFPA 6.1.14

NFPA 8.2.3.1.2

HORIZONTAL EXIT (& REFUGE AREA)

FIRE BARRIER

2 HR 90 MIN NFPA 8.2.3.2.3.1

(1)

FIRE

90 MIN

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

NFPA 6.1.14

NFPA 8.2.3.1.2

VERT. OPG. (EXIT ENCLSR/SHAFT)

FIRE BARRIER

(2 HR = 4 OR MORE STORIES)

(1 HR = LESS THAN 4 STORIES)

NFPA 19.3.1.1

NFPA 8.6.5

NFPA 18.3.1

NFPA 8.2.5.4

NFPA 8.3.4 NOT

ALLOWED

HR

2 HR

60 MIN

90 MIN

HAZ./INCIDENTAL USE

FIRE BARRIER

1 HR 45 MIN

NFPA 8.3.4

NFPA

19.3.2.1

NFPA 8.7.1.1

FIRE

90 MIN

NFPA 18.3.2.1

NFPA 8.7.1.1

HAZ./INCIDENTAL USE

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

NR

SELF OR AUTO

CLOSING

NFPA 8.7.1.2 SEE

NOTE B

NFPA 8.4.1.2

SUBDIVIDING SPACES

SMOKE BARRIER (1-2 OCCUPANCY)

20 MINNFPA 18.3.7.1

NFPA 18.3.7.3

SMOKE

90 MIN

SEE NOTE [A]

NFPA 8.3.5.1

NFPA 19.3.7.1

1/2

HR

1 HR

SUITE SEPARATION

SMOKE PARTITION

NR NFPA 19.2.5 SEE

NOTE [B]

NR

SELF OR AUTO

CLOSING

NFPA 18.2.5

EXIT ACCESS CORRIDORS (1-2)

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

NRNFPA 18.3.6.2 SEE

NOTE [D]

NFPA 19.3.6.2

EXIT ACCESS CORRIDORS (I-1 OR I-2)

FIRE PARTITION (EXIST CONDITION)

(NON-SPRINKLERED)

20 MIN FIRE (I-1)

SMOKE (I-2)

NFPA 19.3.6.2.11/2 HR NFPA

18.3.6.2.1

10/1

2"

34"

REQ'D. EXIT WIDTH

NO. OF OCC. EXITING

ACTUAL EXIT

WIDTH

NO. OF OCC./

NO. OF EXITS

NO. OCC. EXITING

(SMALLER ROOMS)

MAXIMUM OCCUPANCY

AREA

OCC. LOAD

FACTOR

1:50

FIRE EXTINGUISHER AND CABINET

FIRE ALARM CONTROL PANEL

FIRE SYSTEM ANNUNCIATOR ALARM

ANNUNCIATOR PANEL

FEC

FACP

FSA

FAA

100'

(50)

STARTING

LOCATION

EXITING #

TRAVEL

DISTANCE

TRAVEL PATH

[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS

WHERE HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)

[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS (NFPA

8.2.4.4.3)

[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED

ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)

NOTES

SYMBOLS

R.O.I.R.O.I.

TLT.

SOILED

UTIL.

COMP.

ALCOVE

CORR.

CORR.

CORR.

M.A.S.

OFFICE

ENVIRO.

MGT.

EXAM/

OFFICE

EXAM/

OFFICE

OFFICE

OFFICE

EXAM/

OFFICE

EXAM/

OFFICE

EXAM/

OFFICE

BLDG. MGT.

LKR./

LNGE./ TLT. TLT.

ST. LNGE.

TLT.

TLT.

CORR.CORR.

CORR.

CORR.

CORR.

BLDG. MGT.

LKR./

LNGE./ TLT.

ELEVATOR

LOBBY

F.M.S. ENG.

INFO. MGT.

SVC

F.M.S. ENG.

F.M.S. ENG.

EQ. STG.

DETAILS

CLERK

ENTR.

VEST.

PHARM.

CARE SVC.

EXAM

EXAM

CORR.

LOBBY

EXAM

ELEC./

TELE./

MECH.

ELEC./

TELE./

MECH.

EXAM

CLEAN

UTIL.

MEDICAL

SUPPORT

ASST.

PHYSICIAN'S

WK. RM.

CL.

CL.

CL.

WAITING

CORR.

CORR.

CORR

CORR.

CORR.

CHECK-IN

OFFICE

OFFICE

OFFICE

DIAGNOSTIC

LAB

OFFICE

MSR

AUDIOLOGY

WAITING

VENDING

TUBE

STATION

TUBE

STATION ELEV #12

OFFICE

EXAM

2 2 2

2 2

FEC

FEC

ADDITION

REMODEL

AREAS

CODE INFORMATION

PROJECT INFORMATION:

1. CONSTRUCTION PURPOSE: RENOVATION

2. REASON FOR SUBMITTAL: RENOVATION

3. I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE THE

SUBMITTED PLANS FOR THE ABOVE-REFERENCED

PROJECT

COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING.

NOTE: WHERE THE NFPA & ICC CODES ARE NOT

IDENTICAL, THE DESIGN COMPLIES W/ NFPA AS PER VA

REQUIREMENTS:

2015 INTERNATIONAL BUILDING CODE (IBC)

2015 INTERNATIONAL MECHANICAL CODE (IMC)

2015 INTERNATIONAL PLUMBING CODE (IPC)

2014 NATIONAL ELECTRICAL CODE (NFPA-70)

2015 LIFE SAFETY CODE (NFPA-101)

ABA ACCESSIBILITY STANDARDS

4. LOCATION OF ANY ANTICIPATED FUTURE ADDITIONS:

NONE

5. OWNER:

HARRY S. TRUMAN MEMORIAL VETERANS HOSPITAL

800 HOSPITAL DR

COLUMBIA, MO 65201

PH (573) 814-6000

6. DATE DEVELOPED: SEE DATE ON TITLE BLOCK

7. DESIGN TEAM:

ARCHITECT:

HEALTH FACILITIES GROUP, LLC

142 N. MOSLEY ST., SUITE 300

WICHITA, KS 67202 316-262-2500

CONTACT: MARK CRANE

DESIGN CONSULTANTS:

PROFESSIONAL ENGINEERING CONSULTANTS

303 S. TOPEKA

WICHITA, KS 67202 316-262-2691

CONTACT:

JOSH GOLKA (CIVIL)

Josh.Golka@pec1.com

BRIAN HENRY (MECHANICAL & PROJECT MANAGER)

brian.henry@pec1.com

BRETT WALBRIDGE (ELECTRICAL)

Brett.Walbridge@pec1.com

CRISTY HELMICK (STRUCTURAL)

Cristy.Helmick@pec1.com

8. ARCHITECTS SEAL: SEE STAMP AT BOTTOM

9. FIRE SERVICE: COLUMBIA, MISSOURI FIRE DEPARTMENT

10. INSPECTION: VISN SAFETY OFFICER

11. OCCUPANCY TYPE: MULTILPLE SEPARATED

OCCUPANCIES

OCCUPANCY FOR THIS PROJECT: AMBULATORY HEALTH

CARE

12. CONSTRUCTION TYPE: TYPE II (222) PER NFPA

13. STRUCTURAL CODE REQUIREMENTS

A. ALLOWABLE FLOOR AREA: UNCHANGED

B. ALLOWABLE HEIGHT: UNCHANGED

NO HEIGHT MODIFICATIONS REQUIRED

C. FIRE-RESISTANCE RATING FOR BUILDING ELEMENTS: TYPE II (222)

1. BEARING WALLS:

A. EXTERIOR: 2HR

B. INTERIOR: 2HR

2. NONBEARING WALLS:

A. EXTERIOR: 0HR, 1HR, SEE NFPA 5000

TABLE 7.3.2.1

B. INTERIOR: 0HR

3. COLUMNS: 2HR

4. BEAMS, GIRDERS,

TRUSSES, & ARCHES: 2HR

5. FLOOR/CEILING ASSEMBLIES: 2HR

6. ROOF/ CEILING ASSEMBLIES: 1HR

OTHER REQUIREMENTS:

1. NFPA 101 18.3.2.1:

1 HR OCCUPANCY SEPARATION REQUIRED AT STORAGE ROOMS

OVER 100 SF

(NEW HEALTH CARE OCCUPANCY)

14. ACTIVE FIRE SAFETY SYSTEMS

* NOTE:

ALL AREAS OF THIS PROJECT WILL BE FULLY SPRINKLERED.

SPRINKLER SYSTEM SHALL COMPLY WITH NFPA

13 IN ALL AREAS

(a) SMOKE DETECTORS THROUGHOUT

(b) GENERATOR POWERED EMERGENCY LIGHTING

(c) GERERATOR POWERED EXIT LIGHTING

(d) PORTABLE EXTINGUISHERS

(e) AUTOMATIC AIR-HANDLING SHUT-DOWN

(f) FIRE ALARM SYSTEM

15. WATER SUPPLY: CITY OF COLUMBIA

16. SEWAGE TREATMENT: CITY OF COLUMBIA

17. HANDICAP PROVISIONS:

ACCESSIBLE ROUTE, TOILETS, LAVATORIES, SIGNAGE AND

ELSEWHERE AS REQUIRED BY ABAAS AND VA

ACCESSIBILITY

3/32" = 1'-0" A

FIRST FLOOR - LIFE SAFETY

0' 4'

3/32" = 1'

8' 16'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

JUAR

Columbia, Missouri

EXPAND PHARMACY AND LOBBY

GI103

FIRST FLOOR LIFE SAFETY PLAN

589-334

04/03/2018

N 1" = 80'-0"

KEY PLAN FIRST FLOOR

N

F E

C

F E

C

F E

C

FEC

FEC

486/5

40.6"

44"

486/5

27.6"

105.5"

SMOKE COMP. 1-1

11,596 SF

SMOKE COMP. 1-2

17,285 SF

STAIR #11 EXITS

THIS LEVEL

BLDG 1 - 1ST FLOOR = 42,999 SF

OCCUPANCY TYPE - AMBULATORY HEALTH CARE

TYPE II (222) CONSTRUCTION

LOBBY

T D

HBA

ROI LEGAL

HBA

HBA

HBA

PRE-REG

KIOSK

PERSONAL

EFFECTS

SUPPLY

ADMISSIONS

LEAD

ADMISSIONS

SUPERVISOR

WORK

HALL

MEN TLT

FAMILY TLT

WOMEN

TLT

INFO. DESK

WEST

CONCOURSE

WOMEN

MEN

W.C. STOR.

VALET

HOME

TELEHEALTH

N.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

PHARMACY

EXAM

SPEC.

DIETITIAN

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

PROCS.

N. STN.

M.P.R. /

CONF.

CLASS

EXAM

EXAM

WAITING

EYE

SCREENING

S T

A

IR

S T

A

IR

E L E

V

E L E

V

E L E

V

STORAGE

PHARMACY

ELEC

CORRIDOR

R.O.I.R.O.I.

TLT.

SOILED

UTIL.

COMP.

ALCOVE

CORR.

CORR.

CORR.

M.A.S.

OFFICE

ENVIRO.

MGT.

EXAM/

OFFICE

EXAM/

OFFICE

OFFICE

OFFICE

EXAM/

OFFICE

EXAM/

OFFICE

EXAM/

OFFICE

BLDG. MGT.

LKR./

LNGE./ TLT.

TLT.

ST. LNGE.

TLT.

TLT.

CORR.CORR.

CORR.

CORR.

CORR.

BLDG. MGT.

LKR./

LNGE./ TLT.

ELEVATOR

LOBBY

F.M.S. ENG.

INFO. MGT.

SVC

F.M.S. ENG.

F.M.S. ENG.

EQ. STG.

DETAILS

CLERK

ENTR.

VEST.

PHARM.

CARE SVC.

EXAM

EXAM

CORR.

LOBBY

EXAM

ELEC./

TELE./

MECH.

ELEC./

TELE./

MECH.

EXAM

CLEAN

UTIL.

MEDICAL

SUPPORT

ASST.

PHYSICIAN'S

WK. RM.

CL.

CL.

CL.

WAITING

CORR.

CORR.

CORR

CORR.

CORR.

CHECK-IN

OFFICE

OFFICE

OFFICE

DIAGNOSTIC

LAB

OFFICE

MSR

AUDIOLOGY

WAITING

VENDING

TUBE

STATION

TUBE

STATION ELEV #12

OFFICE

EXAM

2 2 2

2 2

FEC

FEC

ADDITION

REMODEL

AREAS

LEGEND

BUILDING & LIFE SAFETY REQUIREMENTS

DESCRIPTION

WALL

RATING

NEW

PARTITION KEY

NFPA 2015

(NEW HC)

NFPA 2015

(EXIST. HC)

OPENINGS DAMPERS

RATING RFRNC. TYPE RFRNC.

BUILDING SEPARATION:

FIRE WALL (TYPE II)

2 HR NOT

APPLICABLE

90 MIN FIRE

90 MIN

NOT

APPLICABLE

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

2 HR 90 MIN NFPA 8.2.3.2.3.1

(1)

FIRE

90 MIN

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

NFPA 6.1.14

NFPA 8.2.3.1.2

HORIZONTAL EXIT (& REFUGE AREA)

FIRE BARRIER

2 HR 90 MIN NFPA 8.2.3.2.3.1

(1)

FIRE

90 MIN

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

NFPA 6.1.14

NFPA 8.2.3.1.2

VERT. OPG. (EXIT ENCLSR/SHAFT)

FIRE BARRIER

(2 HR = 4 OR MORE STORIES)

(1 HR = LESS THAN 4 STORIES)

NFPA 19.3.1.1

NFPA 8.6.5

NFPA 18.3.1

NFPA 8.2.5.4

NFPA 8.3.4 NOT

ALLOWED

HR

2 HR

60 MIN

90 MIN

HAZ./INCIDENTAL USE

FIRE BARRIER

1 HR 45 MIN

NFPA 8.3.4

NFPA

19.3.2.1

NFPA 8.7.1.1

FIRE

90 MIN

NFPA 18.3.2.1

NFPA 8.7.1.1

HAZ./INCIDENTAL USE

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

NR

SELF OR AUTO

CLOSING

NFPA 8.7.1.2 SEE

NOTE B

NFPA 8.4.1.2

SUBDIVIDING SPACES

SMOKE BARRIER (1-2 OCCUPANCY)

20 MINNFPA 18.3.7.1

NFPA 18.3.7.3

SMOKE

90 MIN

SEE NOTE [A]

NFPA 8.3.5.1

NFPA 19.3.7.1

1/2

HR

1 HR

SUITE SEPARATION

SMOKE PARTITION

NR NFPA 19.2.5 SEE

NOTE [B]

NR

SELF OR AUTO

CLOSING

NFPA 18.2.5

EXIT ACCESS CORRIDORS (1-2)

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

NRNFPA 18.3.6.2 SEE

NOTE [D]

NFPA 19.3.6.2

EXIT ACCESS CORRIDORS (I-1 OR I-2)

FIRE PARTITION (EXIST CONDITION)

(NON-SPRINKLERED)

20 MIN FIRE (I-1)

SMOKE (I-2)

NFPA 19.3.6.2.11/2 HR NFPA

18.3.6.2.1

10/1

2"

34"

REQ'D. EXIT WIDTH

NO. OF OCC. EXITING

ACTUAL EXIT

WIDTH

NO. OF OCC./

NO. OF EXITS

NO. OCC. EXITING

(SMALLER ROOMS)

MAXIMUM OCCUPANCY

AREA

OCC. LOAD

FACTOR

1:50

FIRE EXTINGUISHER AND CABINET

FIRE ALARM CONTROL PANEL

FIRE SYSTEM ANNUNCIATOR ALARM

ANNUNCIATOR PANEL

FEC

FACP

FSA

FAA

100'

(50)

STARTING

LOCATION

EXITING #

TRAVEL

DISTANCE

TRAVEL PATH

[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS

WHERE HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)

[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS (NFPA

8.2.4.4.3)

[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED

ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)

NOTES

SYMBOLS

CODE INFORMATION

PROJECT INFORMATION:

1. CONSTRUCTION PURPOSE: RENOVATION

2. REASON FOR SUBMITTAL: RENOVATION

3. I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE THE

SUBMITTED PLANS FOR THE ABOVE-REFERENCED

PROJECT

COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING.

NOTE: WHERE THE NFPA & ICC CODES ARE NOT

IDENTICAL, THE DESIGN COMPLIES W/ NFPA AS PER VA

REQUIREMENTS:

2015 INTERNATIONAL BUILDING CODE (IBC)

2015 INTERNATIONAL MECHANICAL CODE (IMC)

2015 INTERNATIONAL PLUMBING CODE (IPC)

2014 NATIONAL ELECTRICAL CODE (NFPA-70)

2015 LIFE SAFETY CODE (NFPA-101)

ABA ACCESSIBILITY STANDARDS

4. LOCATION OF ANY ANTICIPATED FUTURE ADDITIONS:

NONE

5. OWNER:

HARRY S. TRUMAN MEMORIAL VETERANS HOSPITAL

800 HOSPITAL DR

COLUMBIA, MO 65201

PH (573) 814-6000

6. DATE DEVELOPED: SEE DATE ON TITLE BLOCK

7. DESIGN TEAM:

ARCHITECT:

HEALTH FACILITIES GROUP, LLC

142 N. MOSLEY ST., SUITE 300

WICHITA, KS 67202 316-262-2500

CONTACT: MARK CRANE

DESIGN CONSULTANTS:

PROFESSIONAL ENGINEERING CONSULTANTS

303 S. TOPEKA

WICHITA, KS 67202 316-262-2691

CONTACT:

JOSH GOLKA (CIVIL)

Josh.Golka@pec1.com

BRIAN HENRY (MECHANICAL & PROJECT MANAGER)

brian.henry@pec1.com

BRETT WALBRIDGE (ELECTRICAL)

Brett.Walbridge@pec1.com

CRISTY HELMICK (STRUCTURAL)

Cristy.Helmick@pec1.com

8. ARCHITECTS SEAL: SEE STAMP AT BOTTOM

9. FIRE SERVICE: COLUMBIA, MISSOURI FIRE DEPARTMENT

10. INSPECTION: VISN SAFETY OFFICER

11. OCCUPANCY TYPE: MULTILPLE SEPARATED

OCCUPANCIES

OCCUPANCY FOR THIS PROJECT: AMBULATORY HEALTH

CARE

12. CONSTRUCTION TYPE: TYPE II (222) PER NFPA

13. STRUCTURAL CODE REQUIREMENTS

A. ALLOWABLE FLOOR AREA: UNCHANGED

B. ALLOWABLE HEIGHT: UNCHANGED

NO HEIGHT MODIFICATIONS REQUIRED

C. FIRE-RESISTANCE RATING FOR BUILDING ELEMENTS: TYPE II (222)

1. BEARING WALLS:

A. EXTERIOR: 2HR

B. INTERIOR: 2HR

2. NONBEARING WALLS:

A. EXTERIOR: 0HR, 1HR, SEE NFPA 5000

TABLE 7.3.2.1

B. INTERIOR: 0HR

3. COLUMNS: 2HR

4. BEAMS, GIRDERS,

TRUSSES, & ARCHES: 2HR

5. FLOOR/CEILING ASSEMBLIES: 2HR

6. ROOF/ CEILING ASSEMBLIES: 1HR

OTHER REQUIREMENTS:

1. NFPA 101 18.3.2.1:

1 HR OCCUPANCY SEPARATION REQUIRED AT STORAGE ROOMS

OVER 100 SF

(NEW HEALTH CARE OCCUPANCY)

14. ACTIVE FIRE SAFETY SYSTEMS

* NOTE:

ALL AREAS OF THIS PROJECT WILL BE FULLY SPRINKLERED.

SPRINKLER SYSTEM SHALL COMPLY WITH NFPA

13 IN ALL AREAS

(a) SMOKE DETECTORS THROUGHOUT

(b) GENERATOR POWERED EMERGENCY LIGHTING

(c) GERERATOR POWERED EXIT LIGHTING

(d) PORTABLE EXTINGUISHERS

(e) AUTOMATIC AIR-HANDLING SHUT-DOWN

(f) FIRE ALARM SYSTEM

15. WATER SUPPLY: CITY OF COLUMBIA

16. SEWAGE TREATMENT: CITY OF COLUMBIA

17. HANDICAP PROVISIONS:

ACCESSIBLE ROUTE, TOILETS, LAVATORIES, SIGNAGE AND

ELSEWHERE AS REQUIRED BY ABAAS AND VA

ACCESSIBILITY

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

JUAR

Columbia, Missouri

EXPAND PHARMACY AND LOBBY

GI103.2

FIRST FLOOR LIFE SAFETY PLAN - BID

DEDUCT #2

589-334

04/03/2018

0' 4'

3/32" = 1'

8' 16'

NN

3/32" = 1'-0"

A

FIRST FLOOR - LIFE SAFETY - BID

DEDUCT #2

1" = 80'-0"

C

F E

C

F E

C

F E

C

FEC

FE

FEC

LEGEND

BUILDING & LIFE SAFETY REQUIREMENTS

DESCRIPTION

WALL

RATING

NEW

PARTITION KEY

NFPA 2015

(NEW HC)

NFPA 2015

(EXIST. HC)

OPENINGS DAMPERS

RATING RFRNC. TYPE RFRNC.

BUILDING SEPARATION:

FIRE WALL (TYPE II)

2 HR NOT

APPLICABLE

90 MIN FIRE

90 MIN

NOT

APPLICABLE

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

2 HR 90 MIN NFPA 8.2.3.2.3.1

(1)

FIRE

90 MIN

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

NFPA 6.1.14

NFPA 8.2.3.1.2

HORIZONTAL EXIT (& REFUGE AREA)

FIRE BARRIER

2 HR 90 MIN NFPA 8.2.3.2.3.1

(1)

FIRE

90 MIN

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

NFPA 6.1.14

NFPA 8.2.3.1.2

VERT. OPG. (EXIT ENCLSR/SHAFT)

FIRE BARRIER

(2 HR = 4 OR MORE STORIES)

(1 HR = LESS THAN 4 STORIES)

NFPA 19.3.1.1

NFPA 8.6.5

NFPA 18.3.1

NFPA 8.2.5.4

NFPA 8.3.4 NOT

ALLOWED

HR

2 HR

60 MIN

90 MIN

HAZ./INCIDENTAL USE

FIRE BARRIER

1 HR 45 MIN

NFPA 8.3.4

NFPA

19.3.2.1

NFPA 8.7.1.1

FIRE

90 MIN

NFPA 18.3.2.1

NFPA 8.7.1.1

HAZ./INCIDENTAL USE

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

NR

SELF OR AUTO

CLOSING

NFPA 8.7.1.2 SEE

NOTE B

NFPA 8.4.1.2

SUBDIVIDING SPACES

SMOKE BARRIER (1-2 OCCUPANCY)

20 MINNFPA 18.3.7.1

NFPA 18.3.7.3

SMOKE

90 MIN

SEE NOTE [A]

NFPA 8.3.5.1

NFPA 19.3.7.1

1/2

HR

1 HR

SUITE SEPARATION

SMOKE PARTITION

NR NFPA 19.2.5 SEE

NOTE [B]

NR

SELF OR AUTO

CLOSING

NFPA 18.2.5

EXIT ACCESS CORRIDORS (1-2)

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

NRNFPA 18.3.6.2 SEE

NOTE [D]

NFPA 19.3.6.2

EXIT ACCESS CORRIDORS (I-1 OR I-2)

FIRE PARTITION (EXIST CONDITION)

(NON-SPRINKLERED)

20 MIN FIRE (I-1)

SMOKE (I-2)

NFPA 19.3.6.2.11/2 HR NFPA

18.3.6.2.1

10/1

2"

34"

REQ'D. EXIT WIDTH

NO. OF OCC. EXITING

ACTUAL EXIT

WIDTH

NO. OF OCC./

NO. OF EXITS

NO. OCC. EXITING

(SMALLER ROOMS)

MAXIMUM OCCUPANCY

AREA

OCC. LOAD

FACTOR

1:50

FIRE EXTINGUISHER AND CABINET

FIRE ALARM CONTROL PANEL

FIRE SYSTEM ANNUNCIATOR ALARM

ANNUNCIATOR PANEL

FEC

FACP

FSA

FAA

100'

(50)

STARTING

LOCATION

EXITING #

TRAVEL

DISTANCE

TRAVEL PATH

[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS

WHERE HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)

[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS (NFPA

8.2.4.4.3)

[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED

ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)

NOTES

SYMBOLS

WAITING

WAITING /

DILATION

ADMIT

EXAM 9

HALL

EXAM 1

EXAM 2

EXAM 3

EXAM 4

PROCEDURE

PRE-

CATARACT

VISUAL

FIELDS

VISUAL

FIELDS

EXAM 6

EXAM 7

EXAM 8

EXAM 5

FUNDUS

IMAGING

WAITING

DILATION

SWAMP

TLT

ADMIN

OFFICE

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM 15

EXAM 16

EXAM 17

WAITING

NURSE

WAITING

EXAM 18

EXAM 14

EXAM 13

EXAM 19

EXAM 20

EXAM 12

EXAM 11

EXAM 21

EXAM 22

EXAM 10

LASER

CLEAN

DIRTY

REFRAC

REFRAC

CORR

CORR

EQUIP

JAN

SMOKE COMP. 2-1

14,720 SF

SMOKE COMP. 2-2

10,354 SF

ELEC

CORR

CORR

458/2

40"

40.5"

BLDG 1 - 2ND FLOOR = 41,580SF

OCCUPANCY TYPE - AMBULATORY HEALTH CARE

TYPE II (222) CONSTRUCTION

FEC

OFFICE

PHYSICIAN

OFFICE PFT

EXAM 6

CHEMO.

CORR.

CONSULT/VIEW

RM.

3EXAM

TLT

EXAM

TLT

VASCULAR

LAB

CORR.

CORR.

CAST

PROCEDURE

& EXAM 1

MICROSCOPE

ROOM

EXAM 5

WAITING

AREA

RECPT.

CORR.

N. STN.

OFFICE

ST. TLT.

EXAM

EXAM

CORR.

PHYS.

OFFICE

EXAM

EXAM

EXAM

CLEAN

DISPATCH

SOILED

UTIL.

EXAM

TLT

CORR.

Room

EXAM

EXAM

CHEMO.

OFFICE

HOOD

ROOM

TELE/DATA ELEC.

OFFICE

OFFICE

WAITING

TLT TLT

CORR

CORR

CORR

ST. TLT

P.T./O.T./STG./WK.

S T

A

IR

S T

A

IR

E L E

V

E L E

V

E L E

V

FEC

F E

C

ADDITION

REMODEL

AREA

CODE INFORMATION

PROJECT INFORMATION:

1. CONSTRUCTION PURPOSE: RENOVATION

2. REASON FOR SUBMITTAL: RENOVATION

3. I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE THE

SUBMITTED PLANS FOR THE ABOVE-REFERENCED

PROJECT

COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING.

NOTE: WHERE THE NFPA & ICC CODES ARE NOT

IDENTICAL, THE DESIGN COMPLIES W/ NFPA AS PER VA

REQUIREMENTS:

2015 INTERNATIONAL BUILDING CODE (IBC)

2015 INTERNATIONAL MECHANICAL CODE (IMC)

2015 INTERNATIONAL PLUMBING CODE (IPC)

2014 NATIONAL ELECTRICAL CODE (NFPA-70)

2015 LIFE SAFETY CODE (NFPA-101)

ABA ACCESSIBILITY STANDARDS

4. LOCATION OF ANY ANTICIPATED FUTURE ADDITIONS:

NONE

5. OWNER:

HARRY S. TRUMAN MEMORIAL VETERANS HOSPITAL

800 HOSPITAL DR

COLUMBIA, MO 65201

PH (573) 814-6000

6. DATE DEVELOPED: SEE DATE ON TITLE BLOCK

7. DESIGN TEAM:

ARCHITECT:

HEALTH FACILITIES GROUP, LLC

142 N. MOSLEY ST., SUITE 300

WICHITA, KS 67202 316-262-2500

CONTACT: MARK CRANE

DESIGN CONSULTANTS:

PROFESSIONAL ENGINEERING CONSULTANTS

303 S. TOPEKA

WICHITA, KS 67202 316-262-2691

CONTACT:

JOSH GOLKA (CIVIL)

Josh.Golka@pec1.com

BRIAN HENRY (MECHANICAL & PROJECT MANAGER)

brian.henry@pec1.com

BRETT WALBRIDGE (ELECTRICAL)

Brett.Walbridge@pec1.com

CRISTY HELMICK (STRUCTURAL)

Cristy.Helmick@pec1.com

8. ARCHITECTS SEAL: SEE STAMP AT BOTTOM

9. FIRE SERVICE: COLUMBIA, MISSOURI FIRE DEPARTMENT

10. INSPECTION: VISN SAFETY OFFICER

11. OCCUPANCY TYPE: MULTILPLE SEPARATED

OCCUPANCIES

OCCUPANCY FOR THIS PROJECT: AMBULATORY HEALTH

CARE

12. CONSTRUCTION TYPE: TYPE II (222) PER NFPA

13. STRUCTURAL CODE REQUIREMENTS

A. ALLOWABLE FLOOR AREA: UNCHANGED

B. ALLOWABLE HEIGHT: UNCHANGED

NO HEIGHT MODIFICATIONS REQUIRED

C. FIRE-RESISTANCE RATING FOR BUILDING ELEMENTS: TYPE II (222)

1. BEARING WALLS:

A. EXTERIOR: 2HR

B. INTERIOR: 2HR

2. NONBEARING WALLS:

A. EXTERIOR: 0HR, 1HR, SEE NFPA 5000

TABLE 7.3.2.1

B. INTERIOR: 0HR

3. COLUMNS: 2HR

4. BEAMS, GIRDERS,

TRUSSES, & ARCHES: 2HR

5. FLOOR/CEILING ASSEMBLIES: 2HR

6. ROOF/ CEILING ASSEMBLIES: 1HR

OTHER REQUIREMENTS:

1. NFPA 101 18.3.2.1:

1 HR OCCUPANCY SEPARATION REQUIRED AT STORAGE ROOMS

OVER 100 SF

(NEW HEALTH CARE OCCUPANCY)

14. ACTIVE FIRE SAFETY SYSTEMS

* NOTE:

ALL AREAS OF THIS PROJECT WILL BE FULLY SPRINKLERED.

SPRINKLER SYSTEM SHALL COMPLY WITH NFPA

13 IN ALL AREAS

(a) SMOKE DETECTORS THROUGHOUT

(b) GENERATOR POWERED EMERGENCY LIGHTING

(c) GERERATOR POWERED EXIT LIGHTING

(d) PORTABLE EXTINGUISHERS

(e) AUTOMATIC AIR-HANDLING SHUT-DOWN

(f) FIRE ALARM SYSTEM

15. WATER SUPPLY: CITY OF COLUMBIA

16. SEWAGE TREATMENT: CITY OF COLUMBIA

17. HANDICAP PROVISIONS:

ACCESSIBLE ROUTE, TOILETS, LAVATORIES, SIGNAGE AND

ELSEWHERE AS REQUIRED BY ABAAS AND VA

ACCESSIBILITY

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

JUAR

Columbia, Missouri

EXPAND PHARMACY AND LOBBY

GI104

SECOND FLOOR LIFE SAFETY PLAN

589-334

04/03/2018

3/32" = 1'-0" A

SECOND FLOOR - LIFE SAFETY

0' 4'

3/32" = 1'

8' 16'

KEY PLAN SECOND FLOOR NN

C

F E

C

F E

C

F E

C

FEC

FE

FEC

WAITING

WAITING /

DILATION

ADMIT

EXAM 9

HALL

EXAM 1

EXAM 2

EXAM 3

EXAM 4

PROCEDURE

PRE-

CATARACT

VISUAL

FIELDS

VISUAL

FIELDS

EXAM 6

EXAM 7

EXAM 8

EXAM 5

FUNDUS

IMAGING

WAITING

DILATION

SWAMP

TLT

ADMIN

OFFICE

EXAM

EXAM

EXAM

EXAM

EXAM

WAITING

NURSE

WAITING

EXAM 18

EXAM 14

EXAM 13

EXAM 19

EXAM 20

EXAM 12

EXAM 11

EXAM 21

EXAM 22

EXAM 10

LASER

CLEAN

DIRTY

REFRAC

REFRAC

CORR

CORR

EQUIP

JAN

SMOKE COMP. 2-1

14,720 SF

SMOKE COMP. 2-2

10,354 SF

ELEC

CORR

CORR

458/2

40"

40.5"

BLDG 1 - 2ND FLOOR = 41,580SF

OCCUPANCY TYPE - AMBULATORY HEALTH CARE

TYPE II (222) CONSTRUCTION

FEC

OFFICE

PHYSICIAN

OFFICE PFT

EXAM 6

CHEMO.

CORR.

CONSULT/VIEW

RM.

3EXAM

TLT

EXAM

TLT

VASCULAR

LAB

CORR.

CORR.

CAST

PROCEDURE

& EXAM 1

MICROSCOPE

ROOM

EXAM 5

WAITING

AREA

RECPT.

CORR.

N. STN.

OFFICE

ST. TLT.

EXAM

EXAM

CORR.

PHYS.

OFFICE

EXAM

EXAM

EXAM

CLEAN

DISPATCH

SOILED

UTIL.

EXAM

TLT

CORR.

Room

EXAM

EXAM

CHEMO.

OFFICE

HOOD

ROOM

TELE/DATA ELEC.

OFFICE

OFFICE

WAITING

TLT TLT

CORR

CORR

CORR

ST. TLT

P.T./O.T./STG./WK.

S T

A

IR

S T

A

IR

E L E

V

E L E

V

E L E

V

STORAGE

FEC

F E

C

LEGEND

BUILDING & LIFE SAFETY REQUIREMENTS

DESCRIPTION

WALL

RATING

NEW

PARTITION KEY

NFPA 2015

(NEW HC)

NFPA 2015

(EXIST. HC)

OPENINGS DAMPERS

RATING RFRNC. TYPE RFRNC.

BUILDING SEPARATION:

FIRE WALL (TYPE II)

2 HR NOT

APPLICABLE

90 MIN FIRE

90 MIN

NOT

APPLICABLE

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

2 HR 90 MIN NFPA 8.2.3.2.3.1

(1)

FIRE

90 MIN

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

NFPA 6.1.14

NFPA 8.2.3.1.2

HORIZONTAL EXIT (& REFUGE AREA)

FIRE BARRIER

2 HR 90 MIN NFPA 8.2.3.2.3.1

(1)

FIRE

90 MIN

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

NFPA 6.1.14

NFPA 8.2.3.1.2

VERT. OPG. (EXIT ENCLSR/SHAFT)

FIRE BARRIER

(2 HR = 4 OR MORE STORIES)

(1 HR = LESS THAN 4 STORIES)

NFPA 19.3.1.1

NFPA 8.6.5

NFPA 18.3.1

NFPA 8.2.5.4

NFPA 8.3.4 NOT

ALLOWED

HR

2 HR

60 MIN

90 MIN

HAZ./INCIDENTAL USE

FIRE BARRIER

1 HR 45 MIN

NFPA 8.3.4

NFPA

19.3.2.1

NFPA 8.7.1.1

FIRE

90 MIN

NFPA 18.3.2.1

NFPA 8.7.1.1

HAZ./INCIDENTAL USE

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

NR

SELF OR AUTO

CLOSING

NFPA 8.7.1.2 SEE

NOTE B

NFPA 8.4.1.2

SUBDIVIDING SPACES

SMOKE BARRIER (1-2 OCCUPANCY)

20 MINNFPA 18.3.7.1

NFPA 18.3.7.3

SMOKE

90 MIN

SEE NOTE [A]

NFPA 8.3.5.1

NFPA 19.3.7.1

1/2

HR

1 HR

SUITE SEPARATION

SMOKE PARTITION

NR NFPA 19.2.5 SEE

NOTE [B]

NR

SELF OR AUTO

CLOSING

NFPA 18.2.5

EXIT ACCESS CORRIDORS (1-2)

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

NRNFPA 18.3.6.2 SEE

NOTE [D]

NFPA 19.3.6.2

EXIT ACCESS CORRIDORS (I-1 OR I-2)

FIRE PARTITION (EXIST CONDITION)

(NON-SPRINKLERED)

20 MIN FIRE (I-1)

SMOKE (I-2)

NFPA 19.3.6.2.11/2 HR NFPA

18.3.6.2.1

10/1

2"

34"

REQ'D. EXIT WIDTH

NO. OF OCC. EXITING

ACTUAL EXIT

WIDTH

NO. OF OCC./

NO. OF EXITS

NO. OCC. EXITING

(SMALLER ROOMS)

MAXIMUM OCCUPANCY

AREA

OCC. LOAD

FACTOR

1:50

FIRE EXTINGUISHER AND CABINET

FIRE ALARM CONTROL PANEL

FIRE SYSTEM ANNUNCIATOR ALARM

ANNUNCIATOR PANEL

FEC

FACP

FSA

FAA

100'

(50)

STARTING

LOCATION

EXITING #

TRAVEL

DISTANCE

TRAVEL PATH

[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS

WHERE HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)

[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS (NFPA

8.2.4.4.3)

[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED

ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)

NOTES

SYMBOLS

ADDITION

REMODEL

AREA

CODE INFORMATION

PROJECT INFORMATION:

1. CONSTRUCTION PURPOSE: RENOVATION

2. REASON FOR SUBMITTAL: RENOVATION

3. I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE THE

SUBMITTED PLANS FOR THE ABOVE-REFERENCED

PROJECT

COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING.

NOTE: WHERE THE NFPA & ICC CODES ARE NOT

IDENTICAL, THE DESIGN COMPLIES W/ NFPA AS PER VA

REQUIREMENTS:

2015 INTERNATIONAL BUILDING CODE (IBC)

2015 INTERNATIONAL MECHANICAL CODE (IMC)

2015 INTERNATIONAL PLUMBING CODE (IPC)

2014 NATIONAL ELECTRICAL CODE (NFPA-70)

2015 LIFE SAFETY CODE (NFPA-101)

ABA ACCESSIBILITY STANDARDS

4. LOCATION OF ANY ANTICIPATED FUTURE ADDITIONS:

NONE

5. OWNER:

HARRY S. TRUMAN MEMORIAL VETERANS HOSPITAL

800 HOSPITAL DR

COLUMBIA, MO 65201

PH (573) 814-6000

6. DATE DEVELOPED: SEE DATE ON TITLE BLOCK

7. DESIGN TEAM:

ARCHITECT:

HEALTH FACILITIES GROUP, LLC

142 N. MOSLEY ST., SUITE 300

WICHITA, KS 67202 316-262-2500

CONTACT: MARK CRANE

DESIGN CONSULTANTS:

PROFESSIONAL ENGINEERING CONSULTANTS

303 S. TOPEKA

WICHITA, KS 67202 316-262-2691

CONTACT:

JOSH GOLKA (CIVIL)

Josh.Golka@pec1.com

BRIAN HENRY (MECHANICAL & PROJECT MANAGER)

brian.henry@pec1.com

BRETT WALBRIDGE (ELECTRICAL)

Brett.Walbridge@pec1.com

CRISTY HELMICK (STRUCTURAL)

Cristy.Helmick@pec1.com

8. ARCHITECTS SEAL: SEE STAMP AT BOTTOM

9. FIRE SERVICE: COLUMBIA, MISSOURI FIRE DEPARTMENT

10. INSPECTION: VISN SAFETY OFFICER

11. OCCUPANCY TYPE: MULTILPLE SEPARATED

OCCUPANCIES

OCCUPANCY FOR THIS PROJECT: AMBULATORY HEALTH

CARE

12. CONSTRUCTION TYPE: TYPE II (222) PER NFPA

13. STRUCTURAL CODE REQUIREMENTS

A. ALLOWABLE FLOOR AREA: UNCHANGED

B. ALLOWABLE HEIGHT: UNCHANGED

NO HEIGHT MODIFICATIONS REQUIRED

C. FIRE-RESISTANCE RATING FOR BUILDING ELEMENTS: TYPE II (222)

1. BEARING WALLS:

A. EXTERIOR: 2HR

B. INTERIOR: 2HR

2. NONBEARING WALLS:

A. EXTERIOR: 0HR, 1HR, SEE NFPA 5000

TABLE 7.3.2.1

B. INTERIOR: 0HR

3. COLUMNS: 2HR

4. BEAMS, GIRDERS,

TRUSSES, & ARCHES: 2HR

5. FLOOR/CEILING ASSEMBLIES: 2HR

6. ROOF/ CEILING ASSEMBLIES: 1HR

OTHER REQUIREMENTS:

1. NFPA 101 18.3.2.1:

1 HR OCCUPANCY SEPARATION REQUIRED AT STORAGE ROOMS

OVER 100 SF

(NEW HEALTH CARE OCCUPANCY)

14. ACTIVE FIRE SAFETY SYSTEMS

* NOTE:

ALL AREAS OF THIS PROJECT WILL BE FULLY SPRINKLERED.

SPRINKLER SYSTEM SHALL COMPLY WITH NFPA

13 IN ALL AREAS

(a) SMOKE DETECTORS THROUGHOUT

(b) GENERATOR POWERED EMERGENCY LIGHTING

(c) GERERATOR POWERED EXIT LIGHTING

(d) PORTABLE EXTINGUISHERS

(e) AUTOMATIC AIR-HANDLING SHUT-DOWN

(f) FIRE ALARM SYSTEM

15. WATER SUPPLY: CITY OF COLUMBIA

16. SEWAGE TREATMENT: CITY OF COLUMBIA

17. HANDICAP PROVISIONS:

ACCESSIBLE ROUTE, TOILETS, LAVATORIES, SIGNAGE AND

ELSEWHERE AS REQUIRED BY ABAAS AND VA

ACCESSIBILITY

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

JUAR

Columbia, Missouri

EXPAND PHARMACY AND LOBBY

GI104.1

SECOND FLOOR LIFE SAFETY PLAN - BID

DEDUCT #1

589-334

04/03/2018

3/32" = 1'-0" A

SECOND FLOOR - LIFE SAFETY - BID

DEDUCT #1

0' 4'

3/32" = 1'

8' 16'

NN

KEY PLAN SECOND FLOOR

DN

STORAGE

F179

WAITING

F174

CONSULT

F174A

CONSULT

F174B

CONSULT

F174C

TRAVEL

E140

AGENT

CASHIER

E142

SWAMP

F176

CORRIDOR

F1F23

CORRIDOR

F1F22

STAIR #11

F173

F.M.S.

ENG.

F170

PINPOINT

TRAVEL

E144

VAULT

F178

OFFICE

F175

OFFICE

F164

OFFICE

F162

OFFICE

F161

OFFICE

F160

OFFICE

F159

MED

ADMIN

E141

CORR

C1A1

CORR

C1E6

LOBBY

C1E3

CORR

F1F21

MAIL

F177B

PHARMACY

WORK

F177

DISPENSING

F177A

NOT IN SCOPE OF

WORK

NOT IN SCOPE OF

WORK

NOT IN SCOPE OF WORK

PH2A

PH1

TEMPORARY

CONSTRUCTION WALL

PH2A

TEMPORARY

CONSTRUCTION

WALL DURING

PH2A

EXISTING WALL SERVES

AS A CONSTRUCTION

BARRIER

COORDINATE WORK WITH

COR - WORK SHALL BE

ACCOMPLISHED AFTER

HOURS, NIGHTS AND/ OR

WEEKENDS. SPACE MUST BE

MADE READY FOR

OCCUPANCY DURING

BUSINESS HOURS.

SITE WORK SHALL BE

COMPLETED IN PH1

PH2B

PH3

ELEC

F180

PROVIDE

TEMPORARY EXIT

SIGNAGE DURING

CONSTRUCTION

CONSTRUCTION ENTRY DURING PH1

CONSTRUCTION ENTRY PH2A

TEMPORARY

CONSTRUCTION WALL

PH2B

CONSTRUCTION

ENTRY DURING

PH2B

COORDINATE WORK WITH COR -

WORK SHALL BE ACCOMPLISHED

AFTER HOURS, NIGHTS AND/ OR

WEEKENDS. SPACE MUST BE

MADE READY FOR OCCUPANCY

DURING BUSINESS HOURS.

TEMPORARY

CONST. WALL

DURING PH2A

TEMPORARY

CONST. WALL

DURING PH2B

ADDITION

REMODEL

AREAS

PHASE 1

FLOOR 1 PHASING LEGEND

PHASE 2B

PHASE 3

AREAS REQUIRING SPECIAL

COORDINATION - WORK

SHALL BE ACCOMPLISHED

AFTER HOURS, NIGHTS, AND

WEEKENDS

NOTE:

TEMPORARY CONSTRUCTION WALLS SHALL BE 1HR

RATED. RUN WALLS TO DECK AND PROVIDE 45 MIN

DOORS AS REQ'D IN WALL.

PHASE 2A

PH2A: DURING PHASE 2A THE EXISTING TRAVEL

E140 AND TELEHEALTH IMAGING E143 WILL BE

CLOSED. THIS INCLUDES THE WEST 3 WINDOWS OF

TRAVEL. TEMPORARY WALLS WILL BE INSTALLED

DIRECTLY SOUTH OF THE NEW TRAVEL SOUTH

WALL AND TO THE EAST OF THE BLOCK WALL

ALONG GRID LINE ACA9 WHILE THE NEW WALLS

FOR TRAVEL E140 AND AGENT CASHIER E142 ARE

BEING CONSTRUCTED. A SMALL PORTION OF THE

CORRIDOR NORTH OF THE NEW AGENT CASHIER

WILL ALSO NEED A TEMPORARY WALL TO

COMPLETE THE CORRIDOR WORK. DURING PH2A

THE EXISTING CASHIER WINDOWS MUST REMAIN

OPEN AT ALL TIMES FOR BUSINESS.

PH2B: DURING PHASE 2B THE EXISTING CASHIER

E142, SIGNAL F172, AND A PORTION OF CORRIDOR

C1F22 WILL BE CLOSED. THIS INCLUDES THE 2

EXISTING WINDOWS OF THE EXISTING CASHIER

E142 AND THE NEW WINDOW IN THE NEW AGENT

CASHIER ROOM E142. TEMPORARY WALLS WILL BE

INSTALLED DIRECTLY SOUTH OF THE EXISTING

BLOCK WALL OF CASHIER E142 AND AT THE NORTH

PORTION OF THE CORRIDOR C1F22 WHILE

CONSTRUTION OCCURS IN THIS AREA. DURING PH2

THE NEW TRAVEL E140 WINDOW MUST REMAIN

OPEN AT ALL TIMES FOR BUSINESS.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

JUAR

Columbia, Missouri

EXPAND PHARMACY AND LOBBY

GI105

FIRST FLOOR PHASING PLAN

589-334

04/03/2018

1/8" = 1'-0" A

FIRST FLOOR PLAN - PHASINGN

4' 8' 16'

1/8" = 1'-0"

0'

1" = 80'-0"

WAITING /

DILATION

E209

DIRTY

E253

ELEC

F252

SWAMP

E215LASER

E255

TLT

F253

EXAM 1

E226

EXAM 2

E225

EXAM 3

E223

EXAM 4

E222

EXAM 5

E221 EXAM 6

E219

EXAM 7

E218 EXAM 8

E217

FUNDUS

E216

VISUAL

FIELDS

E211

VISUAL

FIELDS

E212

REFRAC

E212A

PROCEDURE

E213

EXAM 9

E220

JAN

E205

EQUIP

E205A

N.S.

E211A

WORK RM.

E224A

REFRAC

E210

IMAGING

F256

EXAM 10

F273

EXAM 22

F258

EXAM 21

F259

EXAM 11

F272

EXAM 12

F271

EXAM 13

F270

EXAM 14

F269

EXAM 18

F262

EXAM 19

F261

EXAM 20

F260

EXAM 15

F267

EXAM 16

F266

EXAM 17

F265

WAITING

DILATION

F257

WAITING

E206

CORR

C2E3

CORR

C2E2

CORR

C2E1

CORR

C2F21

STAIR #11

F248

CORR

C2F22

CORR

C2F24

CORR

C2F23

WAITING

F263

NURSE

F264

WAITING

F268

PRE-

CATARACT

E214

CLEAN

E254

ADMIN

OFFICE

F255

ADMIT

E224

HALL

C2E4

EXAM

F247

EXAM

F244

EXAM

F243

EXAM

F241

EXAM

F240

CORR

C2F20

NOT IN SCOPE OF

WORK

OPEN TO

BELOW

TEMPORARY

CONSTRUCTION WALL

DURING PH1

COORDINATE WORK WITH

COR - WORK SHALL BE

ACCOMPLISHED AFTER HOURS,

NIGHTS AND/OR WEEKENDS.

SPACE MUST BE MADE READY

FOR OCCUPANCY DURING

BUSINESS HOURS.

PH1B

PH2

PH1A

TEMPORARY

CONST. WALL

DURING PH1

PROVIDE

TEMPORARY EXIT

SIGNAGE DURING

CONSTRUCTION

CONSTRUCTION

ENTRY PH1

TEMP. CONST.

WALL PH1

TEMP. CONST.

WALL PH1

COORDINATE WORK WITH

COR - WORK SHALL BE

ACCOMPLISHED AFTER HOURS,

NIGHTS AND/OR WEEKENDS.

SPACE MUST BE MADE READY

FOR OCCUPANCY DURING

BUSINESS HOURS.

PROVIDE SIGNAGE

DURING

CONSTRUCTION OF

THE BRONZE CLINIC;

COORDINATE EXACT

LOCATION AND

WORDING WITH COR

PRIOR TO INSTALL

ADDITION

REMODEL

AREA

PHASE 1A

FLOOR 2 PHASING LEGEND

PHASE 2

PHASE 1B

AREAS REQUIRING SPECIAL

COORDINATION - WORK

SHALL BE ACCOMPLISHED

AFTER HOURS, NIGHTS, AND

WEEKENDS

NOTE:

TEMPORARY CONSTRUCTION WALLS SHALL BE 1HR

RATED. RUN WALLS TO DECK AND PROVIDE 45 MIN

DOORS AS REQ'D IN WALL.

AFTER PHASE 1A COMPLETION THE EYE CLINIC

MUST BE ABLE TO FUNCTION IN THIS SPACE WHILE

PHASE 1B IS UNDER CONSTRUCTION. PROVIDE ALL

THE NECESSARY TEMPORARY SIGNAGE TO

ACCOMMODATE THIS.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

JUAR

Columbia, Missouri

EXPAND PHARMACY AND LOBBY

GI106

SECOND FLOOR PHASING PLAN

589-334

04/03/2018

1/8" = 1'-0" A

SECOND FLOOR PLAN - PHASING

N

4' 8' 16'

1/8" = 1'-0"

0'

1" = 80'-0"

KEY PLAN SECOND FLOOR