36C25518R0539-0001006.pdf
PDF 1 MB Posted
- Attached to
- 589-334, CO EXPAND PHARMACY AND LOBBY
- Solicitation number
- 36C25518R0539
About this file
36C25518R0539 0001 Drawings Expand Pharmacy-Vol 6.pdf
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
FEC
FEC
FEC
F E
C
FEC
FEC
S
S S
S
S
S
S
S S
SS
S
S
S S
S
S
S
S
S S
S
TO (E)SPRINKLER ZONE #38
TO (E)SPRINKLER ZONE #40
(E)TEST RISER
(E)FIRE RISER
(E)O,S & Y VALVE
WITH SUPERVISORY
SWITH (TYP.)
(E)FLOW SWITCH (TYP.)
AREA TO BE CONNECTED
TO EXISTING SPRINKLER
ZONE IN SMOKE
COMPARTMENT 1-2. REF.
GI103. CONNECT NEW
AREA TO SPRINKLER ZONE
#38 SERVING LOBBY AND
EXISTING PHARMACY.
STORAGE
F179
WAITING
F174
CONSULT 1
F174A
CONSULT 2
F174B
CONSULT 3
F174C
TRAVEL
E140
AGENT CASHIER
E142
SWAMP
F176
CORRIDOR
F1F23CORRIDOR
F1F22
STAIR #11
F173
F.M.S. ENG.
F170
PINPOINT TRAVEL
E144
VAULT
F178
OFFICE
F175
OFFICE
F164
OFFICE
F162
OFFICE
F161
OFFICE
F160
OFFICE
F159
MED ADMIN
E141
LOBBY
C1E3
CORR
F1F21
F177B
PHARMACY WORK
F177
DISPENSING
F177A
VALET
C1E34
INFO. DESK
C1E35
VESTIBULE
C1E32
W.C. STOR
E101
LOBBY
C1E3
ENTR. VEST.
E1100
C
D
E
G
H
ACA
ACA
ACA
ACA
ACA
10.6
ACA
ACA
11.5
ACA
ACA
H
ACA
G
ACA
E
ACA
D
ACA
C
ACA
B
ACA
E.1
ACA
F
ACA
B.2
ACA
D.8
ACA
D.7
C
D
ACA
ACA
ACA
ACA
ACA
10.6
ACA
ACA
11.5
ACA
ACA
H
ACA
G
ACA
E
ACA
D
ACA
C
ACA
B
ACA
E.1
ACA
F
ACA
B.2
ACA
D.8
ACA
D.7
HBA
E102F
ROI LEGAL
E102E
HBA
E102D
HBA
E102C
HBA
E102C
PRE-REG
E102A
KIOSK
E101
GENERAL FIRE PROTECTION NOTES
1. EXISTING PIPING AND FIRE PROTECTION ZONES ARE SHOWN FOR
REFERENCE ONLY.
2. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR
THE FOLLOWING:
a. REMOVE DISTRIBUTION PIPING BACK TO MAIN. REDISTRIBUTE
AS REQUIRED TO ACCOMMODATE NEW FLOOR PLAN. (E)
BRANCE PIPING MAY BE USED IF SIZE MATCHES CALCULATION
REQUIREMENTS.
b. PROVIDE NEW HEADS AS REQUIRED TO ACCOMMODATE NEW
FLOOR PLAN. REMOVED HEADS SHALL NOT BE REINSTALLED.
ALL NEW HEADS ARE TO BE FM-APPROVED, QUICK RESPONSE
TYPE.
c. FIRE SPRINKLER HEADS SHALL BE LOCATED IN CENTER OF
TILE IN BOTH DIRECTIONS WHEN LOCATED IN LAY-IN CEILINGS.
FIRE SPRINKLER HEADS SHALL BE LOCATED IN SYMMETRICAL
PATTERNS IN ROOMS WITH HARD CEILINGS.
d. COORDINATE SPRINKLER HEAD LOCATIONS WITH ALL
CEILING COMPONENTS INCLUDING ELECTRICAL & MECHANICAL
COMPONENTS.
3. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR
THE SPRINKLER HEAD LAYOUTS, CALCULATIONS, AND SEALED
ENGINEERING DRAWINGS AS FOLLOWS:
a. DELEGATED DESIGN: DESIGN SPRINKLER SYSTEM (S), INCLUDING COMPREHENSIVE ENGINEERING ANALYSIS BY A
QUALIFIED PROFESSIONAL ENGINEER, USING PERFORMANCE
REQUIREMENTS AND DESIGN CRITERIA OF NFPA 13.
b. OBTAIN COPY OF FIRE-HYDRANT OR RISER FLOW TEST
RECORDS OR CONTACT LOCAL WATER AND/OR FIRE
DEPARTMENTS TO PERFORM A FIRE-HYDRANT FLOW TEST.
INCLUDE FLOW TEST RESULTS FOR EACH RISER WITH
HYDRAULIC CALCULATIONS. INCLUDE A 10% SAFETY FACTOR IN
HYDRAULIC CALCULATIONS.
c. SPRINKLER SYSTEM SHALL BE APPROVED BY AUTHORITIES
HAVING JURISDICTION.
d. SHOP DRAWINGS: FOR WET-PIPE SPRINKLER SYSTEMS.
INCLUDE PLANS, ELEVATIONS, SECTIONS, DETAILS, AND
ATTACHMENTS TO OTHER WORK.
e. DELEGATED DESIGN SUBMITTAL: FOR ALL SPRINKLER
SYSTEMS, INCLUDING ANALYSIS DATA SIGNED AND SEALED BY
THE QUALIFIED PROFESSIONAL ENGINEER RESPONSIBLE FOR
THEIR PREPARATION. ENGINEER SHALL BE LICENSED IN THE
STATE OF MISSOURI.
f. COORDINATION DRAWINGS: SPRINKLER SYSTEMS, DRAWN TO
SCALE, ON WHICH THE ELECTRICAL, PLUMBING, HVAC,
STRUCTURAL AND OTHER BUILDING SYSTEMS ARE SHOWN AND
COORDINATED WITH EACH OTHER, USING INPUT FROM
INSTALLERS OF THE ITEMS INVOLVED.
g. APPROVED SPRINKLER PIPING DRAWINGS: WORKING PLANS, PREPARED ACCORDING TO NFPA 13, THAT HAVE BEEN
APPROVED BY AUTHORITIES HAVING JURISDICTION, INCLUDING
HYDRAULIC CALCULATIONS.
4. EXISTING FIRE PROTECTION PIPING ARE BASED ON BEST
AVAILABLE EXISTING DRAWINGS AND ARE SHOWN FOR
INFORMATION ONLY. FP CONTRACTOR RESPONSIBLE FOR
VERIFYING EXISTING CONDITIONS BEFORE BEGINNING WORK.
5. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL
COORDINATION AND LAYOUT DRAWINGS PER FIRE PROTECTION
SPEC SECTION. COORDINATION SHOULD BE COMPLETED WITH ALL
TRADES INCLUDED. CONSTRUCTION SHALL NOT BEGIN UNTIL
COORDINATION DRAWINGS HAVE BEEN REVIEWED BY THE
ENGINEER AND COR.
HATCH KEY PLAN
ORDINARY HAZARD GROUP 2
LIGHT HAZARDNO
HATCH
ORDINARY HAZARD GROUP 1
ADDITION
REMODEL
AREAS
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
OFFEROR:
EXPAND PHARMACY AND LOBBY 589-334
FIRE PROTECTION PLAN - FIRST FLOOR
COLUMBIA, MO
BOH FLB04/03/2018
FP101
1/8" = 1'-0"
FIRE PROTECTION PLAN - FIRST FLOOR
N
4' 8' 16'
1/8" = 1'-0"
0'
FP SHEET INDEX
FP101 FIRE PROTECTION PLAN - FIRST FLOOR
FP101.2 FIRE PROTECTION PLAN - FIRST FLOOR - BID DEDUCT #2
FP102 FIRE PROTECTION PLAN - SECOND FLOOR
FP102.1 FIRE PROTECTION PLAN - SECOND FLOOR - BID DEDUCT #1
N 1" = 80'-0"
KEY PLAN LEVEL 1
DN
F E
C
FEC
FEC
S
S S
S
S
S
S
S S
SS
S
S
S S
S
S
S
S
S S
S
GENERAL FIRE PROTECTION NOTES
1. EXISTING PIPING AND FIRE PROTECTION ZONES ARE SHOWN FOR
REFERENCE ONLY.
2. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR
THE FOLLOWING:
a. REMOVE DISTRIBUTION PIPING BACK TO MAIN. REDISTRIBUTE
AS REQUIRED TO ACCOMMODATE NEW FLOOR PLAN. (E)
BRANCE PIPING MAY BE USED IF SIZE MATCHES CALCULATION
REQUIREMENTS.
b. PROVIDE NEW HEADS AS REQUIRED TO ACCOMMODATE NEW
FLOOR PLAN. REMOVED HEADS SHALL NOT BE REINSTALLED.
ALL NEW HEADS ARE TO BE FM-APPROVED, QUICK RESPONSE
TYPE.
c. FIRE SPRINKLER HEADS SHALL BE LOCATED IN CENTER OF
TILE IN BOTH DIRECTIONS WHEN LOCATED IN LAY-IN CEILINGS.
FIRE SPRINKLER HEADS SHALL BE LOCATED IN SYMMETRICAL
PATTERNS IN ROOMS WITH HARD CEILINGS.
d. COORDINATE SPRINKLER HEAD LOCATIONS WITH ALL
CEILING COMPONENTS INCLUDING ELECTRICAL & MECHANICAL
COMPONENTS.
3. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR
THE SPRINKLER HEAD LAYOUTS, CALCULATIONS, AND SEALED
ENGINEERING DRAWINGS AS FOLLOWS:
a. DELEGATED DESIGN: DESIGN SPRINKLER SYSTEM (S), INCLUDING COMPREHENSIVE ENGINEERING ANALYSIS BY A
QUALIFIED PROFESSIONAL ENGINEER, USING PERFORMANCE
REQUIREMENTS AND DESIGN CRITERIA OF NFPA 13.
b. OBTAIN COPY OF FIRE-HYDRANT OR RISER FLOW TEST
RECORDS OR CONTACT LOCAL WATER AND/OR FIRE
DEPARTMENTS TO PERFORM A FIRE-HYDRANT FLOW TEST.
INCLUDE FLOW TEST RESULTS FOR EACH RISER WITH
HYDRAULIC CALCULATIONS. INCLUDE A 10% SAFETY FACTOR IN
HYDRAULIC CALCULATIONS.
c. SPRINKLER SYSTEM SHALL BE APPROVED BY AUTHORITIES
HAVING JURISDICTION.
d. SHOP DRAWINGS: FOR WET-PIPE SPRINKLER SYSTEMS.
INCLUDE PLANS, ELEVATIONS, SECTIONS, DETAILS, AND
ATTACHMENTS TO OTHER WORK.
e. DELEGATED DESIGN SUBMITTAL: FOR ALL SPRINKLER
SYSTEMS, INCLUDING ANALYSIS DATA SIGNED AND SEALED BY
THE QUALIFIED PROFESSIONAL ENGINEER RESPONSIBLE FOR
THEIR PREPARATION. ENGINEER SHALL BE LICENSED IN THE
STATE OF MISSOURI.
f. COORDINATION DRAWINGS: SPRINKLER SYSTEMS, DRAWN TO
SCALE, ON WHICH THE ELECTRICAL, PLUMBING, HVAC,
STRUCTURAL AND OTHER BUILDING SYSTEMS ARE SHOWN AND
COORDINATED WITH EACH OTHER, USING INPUT FROM
INSTALLERS OF THE ITEMS INVOLVED.
g. APPROVED SPRINKLER PIPING DRAWINGS: WORKING PLANS, PREPARED ACCORDING TO NFPA 13, THAT HAVE BEEN
APPROVED BY AUTHORITIES HAVING JURISDICTION, INCLUDING
HYDRAULIC CALCULATIONS.
4. EXISTING FIRE PROTECTION PIPING ARE BASED ON BEST
AVAILABLE EXISTING DRAWINGS AND ARE SHOWN FOR
INFORMATION ONLY. FP CONTRACTOR RESPONSIBLE FOR
VERIFYING EXISTING CONDITIONS BEFORE BEGINNING WORK.
5. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL
COORDINATION AND LAYOUT DRAWINGS PER FIRE PROTECTION
SPEC SECTION. COORDINATION SHOULD BE COMPLETED WITH ALL
TRADES INCLUDED. CONSTRUCTION SHALL NOT BEGIN UNTIL
COORDINATION DRAWINGS HAVE BEEN REVIEWED BY THE
ENGINEER AND COR.
HATCH KEY PLAN
ORDINARY HAZARD GROUP 2
LIGHT HAZARDNO
HATCH
ORDINARY HAZARD GROUP 1
ADDITION
REMODEL
AREAS
TO (E)SPRINKLER ZONE #2
TO (E)SPRINKLER ZONE #4
(E)TEST RISER
(E)FIRE RISER
(E)O,S & Y VALVE
WITH SUPERVISORY
SWITH (TYP.)
(E)FLOW SWITCH (TYP.)
AREA TO BE CONNECTED
TO EXISTING SPRINKLER
ZONE IN SMOKE
COMPARTMENT 1-2. REF.
GI103. CONNECT NEW AREA
TO SPRINKLER ZONE #38
SERVING LOBBY AND
EXISTING PHARMACY.
OFFICE
F164
OFFICE
F162
OFFICE
F161
OFFICE
F160
OFFICE
F159
LOBBY
C1E3
CORR
F1F21
VALET
C1E34
INFO. DESK
C1E35
VESTIBULE
C1E32
W.C. STOR
E101
LOBBY
C1E3
ENTR. VEST.
E1100
HBA
E102F
ROI LEGAL
E102E
HBA
E102D
HBA
E102C
HBA
E102C
PRE-REG
E102A
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
OFFEROR:
EXPAND PHARMACY AND LOBBY 589-334
FIRE PROTECTION PLAN - FIRST FLOOR -
BID DEDUCT #2
COLUMBIA, MO
BOH FLB04/03/2018
FP101.2
1" = 80'-0"
KEY PLAN LEVEL 1
1/8" = 1'-0"
FIRE PROTECTION PLAN - FIRST FLOOR - BID DEDUCT #2
04/04/2018
F E
C
F E
C
FEC
S
S
S
S
S
S
S
S
S
S
(E)TO SPRINKLER ZONE #5
TO (E)ELEVATOR PENTHOUSE
TO (E)SPRINKLER ZONE #45
TO (E)SPRINKLER ZONE #43
(E)TEST RISER
(E)FIRE RISER
(E)O,S & Y VALVE
WITH SUPERVISORY
SWITH (TYP.)
(E)SPRINKLER ZONE #45
(E)FLOW SWITCH (TYP.)
AREA TO BE CONNECTED
TO EXISTING SPRINKLER
ZONE IN SMOKE
COMPARTMENT 2-1. REF.
GI104. CONNECT NEW
AREA TO SPRINKLER ZONE
#46 SERVING CLINIC TO THE
WEST.
WAITING / DILATION
E209
DIRTY
E253
ELEC
F252
SWAMP
E215LASER
E255
TLT
F253
EXAM 1
E226
EXAM 2
E225
EXAM 3
E223
EXAM 4
E222
EXAM 5
E221
EXAM 6
E219
EXAM 7
E218
EXAM 8
E217
FUNDUS
E216
VISUAL FIELDS
E211
VISUAL FIELDS
E212
REFRAC
E212A
PROCEDURE
E213
EXAM 9
E220
JAN
E205
EQUIP
E205A
N.S.
E211AWORK RM.
E224A
REFRAC
E210
IMAGING
F256
EXAM 10
F273
EXAM 22
F258
EXAM 21
F259
EXAM 11
F272
EXAM 12
F271
EXAM 13
F270
EXAM 14
F269
EXAM 18
F262
EXAM 19
F261
EXAM 20
F260
EXAM 15
F267
EXAM 16
F266
EXAM 17
F265
WAITING DILATION
F257
WAITING
E206
CORR
C2E3
CORR
C2E2
CORR
C2E1
CORR
C2F21
STAIR #11
F248
CORR
C2F22
CORR
C2F24
CORR
C2F23
WAITING
F263
NURSE
F264
WAITING
F268
PRE- CATARACT
E214
CLEAN
E254
ADMIN OFFICE
F255
ADMIT
E224
HALL
C2E4
EXAM
F247
EXAM
F244
EXAM
F243
EXAM
F241
EXAM
F240
CORR
C2F20
(E)SPRINKLER ZONE #46
(E)SPRINKLER ZONE #43
GENERAL FIRE PROTECTION NOTES
1. EXISTING PIPING AND FIRE PROTECTION ZONES ARE SHOWN FOR
REFERENCE ONLY.
2. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR
THE FOLLOWING:
a. REMOVE DISTRIBUTION PIPING BACK TO MAIN. REDISTRIBUTE
AS REQUIRED TO ACCOMMODATE NEW FLOOR PLAN. (E)
BRANCE PIPING MAY BE USED IF SIZE MATCHES CALCULATION
REQUIREMENTS.
b. PROVIDE NEW HEADS AS REQUIRED TO ACCOMMODATE NEW
FLOOR PLAN. REMOVED HEADS SHALL NOT BE REINSTALLED.
ALL NEW HEADS ARE TO BE FM-APPROVED, QUICK RESPONSE
TYPE.
c. FIRE SPRINKLER HEADS SHALL BE LOCATED IN CENTER OF
TILE IN BOTH DIRECTIONS WHEN LOCATED IN LAY-IN CEILINGS.
FIRE SPRINKLER HEADS SHALL BE LOCATED IN SYMMETRICAL
PATTERNS IN ROOMS WITH HARD CEILINGS.
d. COORDINATE SPRINKLER HEAD LOCATIONS WITH ALL
CEILING COMPONENTS INCLUDING ELECTRICAL & MECHANICAL
COMPONENTS.
3. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR
THE SPRINKLER HEAD LAYOUTS, CALCULATIONS, AND SEALED
ENGINEERING DRAWINGS AS FOLLOWS:
a. DELEGATED DESIGN: DESIGN SPRINKLER SYSTEM (S), INCLUDING COMPREHENSIVE ENGINEERING ANALYSIS BY A
QUALIFIED PROFESSIONAL ENGINEER, USING PERFORMANCE
REQUIREMENTS AND DESIGN CRITERIA OF NFPA 13.
b. OBTAIN COPY OF FIRE-HYDRANT OR RISER FLOW TEST
RECORDS OR CONTACT LOCAL WATER AND/OR FIRE
DEPARTMENTS TO PERFORM A FIRE-HYDRANT FLOW TEST.
INCLUDE FLOW TEST RESULTS FOR EACH RISER WITH
HYDRAULIC CALCULATIONS. INCLUDE A 10% SAFETY FACTOR IN
HYDRAULIC CALCULATIONS.
c. SPRINKLER SYSTEM SHALL BE APPROVED BY AUTHORITIES
HAVING JURISDICTION.
d. SHOP DRAWINGS: FOR WET-PIPE SPRINKLER SYSTEMS.
INCLUDE PLANS, ELEVATIONS, SECTIONS, DETAILS, AND
ATTACHMENTS TO OTHER WORK.
e. DELEGATED DESIGN SUBMITTAL: FOR ALL SPRINKLER
SYSTEMS, INCLUDING ANALYSIS DATA SIGNED AND SEALED BY
THE QUALIFIED PROFESSIONAL ENGINEER RESPONSIBLE FOR
THEIR PREPARATION. ENGINEER SHALL BE LICENSED IN THE
STATE OF MISSOURI.
f. COORDINATION DRAWINGS: SPRINKLER SYSTEMS, DRAWN TO
SCALE, ON WHICH THE ELECTRICAL, PLUMBING, HVAC,
STRUCTURAL AND OTHER BUILDING SYSTEMS ARE SHOWN AND
COORDINATED WITH EACH OTHER, USING INPUT FROM
INSTALLERS OF THE ITEMS INVOLVED.
g. APPROVED SPRINKLER PIPING DRAWINGS: WORKING PLANS, PREPARED ACCORDING TO NFPA 13, THAT HAVE BEEN
APPROVED BY AUTHORITIES HAVING JURISDICTION, INCLUDING
HYDRAULIC CALCULATIONS.
4. EXISTING FIRE PROTECTION PIPING ARE BASED ON BEST
AVAILABLE EXISTING DRAWINGS AND ARE SHOWN FOR
INFORMATION ONLY. FP CONTRACTOR RESPONSIBLE FOR
VERIFYING EXISTING CONDITIONS BEFORE BEGINNING WORK.
5. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL
COORDINATION AND LAYOUT DRAWINGS PER FIRE PROTECTION
SPEC SECTION. COORDINATION SHOULD BE COMPLETED WITH ALL
TRADES INCLUDED. CONSTRUCTION SHALL NOT BEGIN UNTIL
COORDINATION DRAWINGS HAVE BEEN REVIEWED BY THE
ENGINEER AND COR.
HATCH KEY PLAN
ORDINARY HAZARD GROUP 2
LIGHT HAZARDNO
HATCH
ORDINARY HAZARD GROUP 1
ADDITION
REMODEL
AREA
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
OFFEROR:
EXPAND PHARMACY AND LOBBY 589-334
FIRE PROTECTION PLAN - SECOND FLOOR
COLUMBIA, MO
BOH FLB04/03/2018
FP102
1/8" = 1'-0"
FIRE PROTECTION PLAN - SECOND FLOOR
N
4' 8' 16'
1/8" = 1'-0"
0'
N 1" = 80'-0"
KEY PLAN LEVEL 2
04/04/2018
F E
C
F E
C
FEC
S
S
S
S
S
S
S
S
S
S
GENERAL FIRE PROTECTION NOTES
1. EXISTING PIPING AND FIRE PROTECTION ZONES ARE SHOWN FOR
REFERENCE ONLY.
2. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR
THE FOLLOWING:
a. REMOVE DISTRIBUTION PIPING BACK TO MAIN. REDISTRIBUTE
AS REQUIRED TO ACCOMMODATE NEW FLOOR PLAN. (E)
BRANCE PIPING MAY BE USED IF SIZE MATCHES CALCULATION
REQUIREMENTS.
b. PROVIDE NEW HEADS AS REQUIRED TO ACCOMMODATE NEW
FLOOR PLAN. REMOVED HEADS SHALL NOT BE REINSTALLED.
ALL NEW HEADS ARE TO BE FM-APPROVED, QUICK RESPONSE
TYPE.
c. FIRE SPRINKLER HEADS SHALL BE LOCATED IN CENTER OF
TILE IN BOTH DIRECTIONS WHEN LOCATED IN LAY-IN CEILINGS.
FIRE SPRINKLER HEADS SHALL BE LOCATED IN SYMMETRICAL
PATTERNS IN ROOMS WITH HARD CEILINGS.
d. COORDINATE SPRINKLER HEAD LOCATIONS WITH ALL
CEILING COMPONENTS INCLUDING ELECTRICAL & MECHANICAL
COMPONENTS.
3. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR
THE SPRINKLER HEAD LAYOUTS, CALCULATIONS, AND SEALED
ENGINEERING DRAWINGS AS FOLLOWS:
a. DELEGATED DESIGN: DESIGN SPRINKLER SYSTEM (S), INCLUDING COMPREHENSIVE ENGINEERING ANALYSIS BY A
QUALIFIED PROFESSIONAL ENGINEER, USING PERFORMANCE
REQUIREMENTS AND DESIGN CRITERIA OF NFPA 13.
b. OBTAIN COPY OF FIRE-HYDRANT OR RISER FLOW TEST
RECORDS OR CONTACT LOCAL WATER AND/OR FIRE
DEPARTMENTS TO PERFORM A FIRE-HYDRANT FLOW TEST.
INCLUDE FLOW TEST RESULTS FOR EACH RISER WITH
HYDRAULIC CALCULATIONS. INCLUDE A 10% SAFETY FACTOR IN
HYDRAULIC CALCULATIONS.
c. SPRINKLER SYSTEM SHALL BE APPROVED BY AUTHORITIES
HAVING JURISDICTION.
d. SHOP DRAWINGS: FOR WET-PIPE SPRINKLER SYSTEMS.
INCLUDE PLANS, ELEVATIONS, SECTIONS, DETAILS, AND
ATTACHMENTS TO OTHER WORK.
e. DELEGATED DESIGN SUBMITTAL: FOR ALL SPRINKLER
SYSTEMS, INCLUDING ANALYSIS DATA SIGNED AND SEALED BY
THE QUALIFIED PROFESSIONAL ENGINEER RESPONSIBLE FOR
THEIR PREPARATION. ENGINEER SHALL BE LICENSED IN THE
STATE OF MISSOURI.
f. COORDINATION DRAWINGS: SPRINKLER SYSTEMS, DRAWN TO
SCALE, ON WHICH THE ELECTRICAL, PLUMBING, HVAC,
STRUCTURAL AND OTHER BUILDING SYSTEMS ARE SHOWN AND
COORDINATED WITH EACH OTHER, USING INPUT FROM
INSTALLERS OF THE ITEMS INVOLVED.
g. APPROVED SPRINKLER PIPING DRAWINGS: WORKING PLANS, PREPARED ACCORDING TO NFPA 13, THAT HAVE BEEN
APPROVED BY AUTHORITIES HAVING JURISDICTION, INCLUDING
HYDRAULIC CALCULATIONS.
4. EXISTING FIRE PROTECTION PIPING ARE BASED ON BEST
AVAILABLE EXISTING DRAWINGS AND ARE SHOWN FOR
INFORMATION ONLY. FP CONTRACTOR RESPONSIBLE FOR
VERIFYING EXISTING CONDITIONS BEFORE BEGINNING WORK.
5. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL
COORDINATION AND LAYOUT DRAWINGS PER FIRE PROTECTION
SPEC SECTION. COORDINATION SHOULD BE COMPLETED WITH ALL
TRADES INCLUDED. CONSTRUCTION SHALL NOT BEGIN UNTIL
COORDINATION DRAWINGS HAVE BEEN REVIEWED BY THE
ENGINEER AND COR.
HATCH KEY PLAN
ORDINARY HAZARD GROUP 2
LIGHT HAZARDNO
HATCH
ORDINARY HAZARD GROUP 1
ADDITION
REMODEL
AREA
(E)TO SPRINKLER ZONE #5
(E)TO ELEVATOR PENTHOUSE
(E)TO SPRINKLER ZONE #4
(E)TO SPRINKLER ZONE #2
(E)TEST RISER
(E)FIRE RISER
(E)O,S & Y VALVE
WITH SUPERVISORY
SWITH (TYP.)
(E)FLOW SWITCH (TYP.)
AREA TO BE CONNECTED
TO EXISTING SPRINKLER
ZONE IN SMOKE
COMPARTMENT 2-1. REF.
GI104. CONNECT NEW
AREA TO SPRINKLER ZONE
#46 SERVING CLINIC TO
THE WEST.
WAITING / DILATION
E209
DIRTY
E253
ELEC
F252
SWAMP
E215LASER
E255
TLT
F253
EXAM 1
E226
EXAM 2
E225
EXAM 3
E223
EXAM 4
E222
EXAM 5
E221
EXAM 6
E219
EXAM 7
E218
EXAM 8
E217
FUNDUS
E216
VISUAL FIELDS
E211
VISUAL FIELDS
E212
REFRAC
E212A
PROCEDURE
E213
EXAM 9
E220
JAN
E205
EQUIP
E205A
N.S.
E211AWORK RM.
E224A
REFRAC
E210
IMAGING
F256
EXAM 10
F273
EXAM 22
F258
EXAM 21
F259
EXAM 11
F272
EXAM 12
F271
EXAM 13
F270
EXAM 14
F269
EXAM 18
F262
EXAM 19
F261
EXAM 20
F260
WAITING DILATION
F257
WAITING
E206
CORR
C2E3
CORR
C2E2
CORR
C2E1
CORR
C2F21
STAIR #11
F248
CORR
C2F22
CORR
C2F24
CORR
C2F23
WAITING
F263
NURSE
F264
WAITING
F268
PRE- CATARACT
E214
CLEAN
E254
ADMIN OFFICE
F255
ADMIT
E224
HALL
C2E4
EXAM
F247
EXAM
F244
EXAM
F243
EXAM
F241
EXAM
F240
CORR
C2F20
(E)SPRINKLER ZONE #45
(E)SPRINKLER ZONE #46
(E)SPRINKLER ZONE #43
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
OFFEROR:
EXPAND PHARMACY AND LOBBY 589-334
FIRE PROTECTION PLAN - SECOND FLOOR -
BID DEDUCT #1
COLUMBIA, MO
BOH FLB04/03/2018
FP102.1
1" = 80'-0"
KEY PLAN LEVEL 2
1/8" = 1'-0"
FIRE PROTECTION PLAN - SECOND FLOOR - BID DEDUCT #1