589-334, CO EXPAND PHARMACY AND LOBBY
Solicitation number
36C25518R0539
Issued by

About this file

36C25518R0539 0002 DRAWINGS-MECHANICAL -EXPAND PHARMACY - VOL 8 - 28 pages.pdf

View the file

Other files

File Type Posted
36C25518C0223-000.docx DOCX document
36C25518R0539-0005000.docx DOCX document
36C25518R0539-0004001.pdf PDF
36C25518R0539-0004000.docx DOCX document
36C25518R0539-0003001.pdf PDF
36C25518R0539-0003000.docx DOCX document
36C25518R0539-0002000.docx DOCX document
36C25518R0539-0002001.docx DOCX document
36C25518R0539-0001011.pdf PDF
36C25518R0539-0001003.pdf PDF
36C25518R0539-0001008.pdf PDF
36C25518R0539-0001009.pdf PDF
36C25518R0539-0001001.pdf PDF
36C25518R0539-0001005.pdf PDF
36C25518R0539-0001004.pdf PDF
36C25518R0539-0001014.pdf PDF
36C25518R0539-0001013.pdf PDF
36C25518R0539-0001002.pdf PDF
36C25518R0539-0001010.pdf PDF
36C25518R0539-0001015.pdf PDF
36C25518R0539-0001012.pdf PDF
36C25518R0539-0001007.pdf PDF
36C25518R0539-0001006.pdf PDF
36C25518R0539-0001016.pdf PDF
36C25518R0539-0001000.docx DOCX document
36C25518R0539-008.pdf PDF
36C25518R0539-005.pdf PDF
36C25518R0539-001.docx DOCX document
36C25518R0539-003.pdf PDF
36C25518R0539-007.pdf PDF
36C25518R0539-006.pdf PDF
36C25518R0539-004.pdf PDF
36C25518R0539-002.pdf PDF
36C25518R0539-000.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

OA OUTSIDE AIR

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

M METER, SI UNIT

M/s METERS PER SECOND

(OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN

(STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

L LITER

L/h LITERS PER HOUR (OR LITERS/HOUR)

L/m LITERS PER MINUTE (OR

LITERS/MINUTE)

L/s LITERS PER SECOND (OR

LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN

(CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

J INTENTIALLY LEFT BLANK

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

IRH INTRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

ABBREVIATIONS

E EXISTING

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE

DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT

EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN

(STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY

(STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING)

PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

ABBREVIATIONS

T & PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER

MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLER RECTIFIER

SCV STEAM CONDENSATE VENT

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND

DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT

EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING

VALVE

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT

EXCHANGER

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD REFRIGERANT AIR DRYER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER

(SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE)

STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH –

GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR

CONDITIONER

ABBREVIATIONS

YR YEAR

W WATTS

WAG WASTE ANETHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL

OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE)

RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

ABBREVIATIONS

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

DB DECIBELS

Db DRY-BULB TEMPERATURE

DD-1 DESIGN DEVELOPMENT

(SUBMISSION1)

DD-2 DESIGN DEVELOPMENT

(SUBMISSION2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

CD-2 CONSTRUCTION DOCUMENTS

(SUBMISSION2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXODE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL

DAMPER,MODULATING

ACD-TP AUTOMATIC CONTROL

DAMPER,TWO POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

C CENTIGRADE (CELCIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE

DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS

(SUBMISSION1)

GENERAL NOTES

1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE HARD

SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION

OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET

INSIDE DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,

CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE

FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL

SPECIFICATIONS.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES

INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS,

COILS, ETC.

5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS

TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.

6. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON

FLOOR PLANS ARE NECK SIZES.

7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING

COILS SHALL BE MADE TO PROVIDE COUNTER FLOW

BETWEEN WATER AND AIR.

8. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS

FOR EXACT LOCATIONS OF CEILING DIFFUSERS,

REGISTERS, AND GRILLES.

9. SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES

LISTED ARE GAGE PRESSURE UNLESS OTHERWISE

NOTED.

10.SIZES OF ALL HWS & HWR RUNOUTS TO TERMINAL UNITS

CAN BE FOUND ON THE EQUIPMENT SCHEDULES.

11.THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL

COORDINATION AND LAYOUT DRAWINGS PER

SPECIFICATIONS SECTION 230511, 1.4 (G). COORDINATION

SHOULD BE COMPLETED WITH ALL TRADES INCLUDED.

CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION

DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER AND

COR.

12.TAB CONTRACTOR SHALL BALANCE EXISTING GRILLES

USING AIRFLOWS DETERMINED IN TAB PRE-BALANCE

REPORT (SEE DEMO DRAWINGS).

SEISMIC BRACING NOTES

SOME MECHANICAL AND PLUMBING COMPONENTS OF THIS

BUILDING REQUIRE SEISMIC BRACING. IT IS THE

RESPONSIBILITY OF THIS CONTRACTOR AND THE GC TO

ENGAGE A SEISMIC DESIGN ENGINEER TO DETERMINE AND

DESIGN THE REQUIRED BRACING FOR EACH SYSTEM.

SYSTEMS REQUIRING BRACING INCLUDE, BUT ARE NOT

LIMITED TO, THE FOLLOWING:

1. ALL LIFE-SAFETY COMPONENTS INCLUDING FIRE

PROTECTION SYSTEMS.

2. COMPONENTS WEIGHING MORE THAN 400 POUNDS.

3. COMPONENTS WITH A CENTER OF MASS GREATER

THAN 4 FEET ABOVE FLOOR LEVEL AND WEIGHING

MORE THAN 20 POUNDS. (E.G. TERMINAL UNITS).

4. DISTRIBUTION SYSTEMS WEIGHING MORE THAN 5

POUNDS PER FOOT. (E.G. 12x12, 22 GAUGE, SHEET

STEEL DUCTWORK AND CHILLED, HEATING,

DOMESTIC HOT, AND DOMESTIC COLD WATER PIPING

LARGER THAN 1 1/2".

FLEXIBLE CONNECTIONS ARE REQUIRED BETWEEN ALL

COMPONENTS AND ASSOCIATED DUCTWORK, PIPING, AND

CONDUITS.

THE FOLLOWING COMPONENTS ARE NOT REQUIRED TO BE

BRACED:

1. PLUMBING FIXTURES

THE CONTRACTOR SHALL PROVIDE ALL COMPONENT

SUBMITTALS WITH COMPONENT WEIGHTS TO SEISMIC

DESIGN ENGINEER FOR USE IN BRACING DESIGN.

BRACING SHALL BE DESIGNED TO MEET ASCE7 AND NFPA

13 BRACING REQUIREMENTS. REFER TO ASCE7 CHAPTER

13 FOR MORE INFORMATION ON SYSTEMS REQUIRED TO BE

BRACED.

TEST AND BALANCE NOTES

THE TEST AND BALANCE SCOPE OF WORK IS AS FOLLOWS:

1. OBTAIN PRE-BALANCE READINGS AS INDICATED ON DEMO

DRAWINGS. PROVIDE EXHAUST AND SUPPLY READINGS.

2. ALL HYDRONIC SYSTEMS SERVING 1-AHU1 INCLUDING:

A. HEATING WATER PIPING SERVING THE

HEATING COIL.

B. LOW PRESSURE STEAM PIPING SERVING THE

HUMIDIFIER.

C. CHILLED WATER PIPING SERVING THE COOLING

COIL.

3. HEATING WATER PIPING SERVING ALL NEW TERMINAL UNITS.

4. ALL COMPONENTS OF THE AIR SYSTEM SERVED BY 1-AHU1

INCLUDING:

A. TERMINAL UNITS.

B. SUPPLY AIR BRANCH DUCTWORK TO DIFFUSERS.

C. RETURN AIR BRANCH DUCTWORK FROM GRILLES.

5. NEW TERMINAL UNITS (AND BRANCH DUCTWORK)

CONNECTED TO EXISING MEDIUM PRESSURE DUCTWORK

SERVED BY (E)AHU-1, 2 AND 3.

6. ALL COMPONENTS OF ALL EXHAUST SYSTEMS INCLUDING:

A. NEW EXHAUST MAINS CONNECTED TO EXISTING

MAINS.

B. NEW EXHAUST BRANCHES AND ASSOCIATED GRILLES.

7. ALL NEW CIRCUIT SETTERS IN DOMESTIC HOT WATER

LOOP. REFER TO PLUMBING SHEETS FOR QUANTITY AND

LOCATION.

NOTE: THIS LIST IS NOT INTENDED TO BE ALL INCLUSIVE. REFER

TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

OFFEROR:

EXPAND PHARMACY AND LOBBY 589-334

MECHANICAL COVER SHEET

COLUMBIA, MO

BOH FLB04/03/2018

MM001

MECHANICAL SHEET INDEX

MM001 MECHANICAL COVER SHEET

MM002 MECHANICAL COVER SHEET

MD101 FIRST FLOOR HVAC DEMOLITION PLAN

MD102 SECOND FLOOR HVAC DEMOLITION PLAN

MD111 FIRST FLOOR HYDRONICS DEMOLITION PLAN

MD112 SECOND FLOOR HYDRONICS DEMOLITION PLAN

MH101 FIRST FLOOR HVAC PLAN

MH101.2 FIRST FLOOR HVAC PLAN - BID DEDUCT #2

MH102 SECOND FLOOR HVAC PLAN

MH102.1 SECOND FLOOR HVAC PLAN - BID DEDUCT #1

MH103 ROOF HVAC PLAN

MH301 MECHANICAL SECTIONS

MP101 FIRST FLOOR HYDRONICS PLAN

MP101.2 FIRST FLOOR HYDRONICS PLAN - BID DEDUCT #2

MP102 SECOND FLOOR HYDRONICS PLAN

MP201 SNOW MELT PLAN

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-505 MECHANICAL DETAILS

M-511 MECHANICAL CONTROL DIAGRAMS

M-512 MECHANICAL CONTROL DIAGRAMS

M-513 MECHANICAL CONTROL DIAGRAMS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-701 HVAC AIRFLOW BALANCE PLANS

M-702 ROOM AIR BALANCE SCHEDULE

04/04/2018

OVERFLOW

RH

SCH

SH

TH

PS

RC

WB

CSH

SS

LC

M

PIPING SYMBOLS

VACUUM CONDENSATE RETURN

CONDENSATE TRANSFER PUMP SUCTION

CONDENSATE TRANSFER PUMP DISCHARGE

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

VR

CTPS

CTPD

FWPS

FWPD

FEEDWATER SAMPLE (FROM DEAERATOR)

BOILER WATER SAMPLE

CONTINUOUS BLOWDOWN

CF

FWS

BWS

CBD

BO

CHEMICAL FEED

BOILER BLOWOFF

TUBE CLEANER WATER SUPPLYTC

A

OFL

COMPRESSED AIR

COLD WATER (CITY WATER)

LIQUEFIED PETROLEUM GAS IGNITER FUEL

NATURAL GAS IGNITER FUEL

NATURAL GAS MAIN FUEL

HW

SW

CW

FOR

FOS

LPG(I)

G(I)

G

HOT WATER

SOFTENED WATER

FUEL OIL RETURN

FUEL OIL SUPPLY

RISER CLAMP (TYPE 42)*

FLOOR-SUPPORTED PIPE STAND

CLEVIS-TYPE HANGER

VARIABLE SPRING-TYPE HANGER (TYPE 51)*

ROLLER-TYPE HANGER

TO TRAPEZE EXCEPT WHERE RH ARE INDICATED)

TRAPEZE HANGER (PROVIDE U-BOLT PIPE ATTACHMENT

SPRING CUSHION-TYPE HANGER (TYPE 48 OR 49)*

STANDARD PRACTICE SP-58

SLIDING SUPPORTS (TYPE 35)*

CONSTANT SUPPORT HANGER (TYPE 54, 55, 56)*

WALL BRACKET (TYPE 31, 32, 33)*

* TYPE NUMBERS REFER TO MANUFACTURER'S STANDARDIZATION SOCIETY

DRAWING SYMBOLS

26-SF 3

26-TU-I-I

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

SUPPLY FAN NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (SUPPLY FAN)

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

DRAWING NUMBER WHERE DRAWN

BUILDING NO. WHERE EQUIPMENT IS LOCATED

AIR TERMINAL SYMBOLS

FAN POWERED VARIABLE VOLUME

TERMINAL UNIT WITH HEATING COIL.

MB

DOUBLE DUCT MIXING BOX.

TERMINAL UNIT WITH REHEAT COIL

PIPING SYMBOLS

HIGH PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

HOT WATER HEATING SUPPLY

CONDENSATE PUMP DISCHARGE

LOW PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG AND BELOW)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

VENT LINE

SOLAR WATER RETURN

SOLAR WATER SUPPLY

GLYCOL-WATER HEATING RETURN

GLYCOL-WATER HEATING SUPPLY

REFRIGERANT SUCTION

REFRIGERANT HOT GAS

REFRIGERANT LIQUID

CHILLED WATER SUPPLY

CHILLED WATER RETURN

DRAIN LINE

MAKE-UP WATER

CONDENSER WATER RETURN (TO TOWER)

CHILLED GLYCOL-WATER RETURN

CHILLED GLYCOL-WATER SUPPLY

CONDENSER WATER SUPPLY (FROM TOWER)

HOT WATER HEATING RETURN

HPS

HPR

MPS

MPR

LPS

LPR

PC

HWS

HWR

GHS

GHR

V

SWS

SWR

CWR

CHR

GCR

RL

RS

RHG

CWS

CHS

GCS

MW

D

GLYCOL-WATER RUN AROUND SUPPLY

GLYCOL-WATER RUN AROUND RETURNGRR

GRS

X EXISTING PIPE TO BE REMOVED

GENERAL PIPING SYMBOLS

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

PRESSURE GAGE

THERMOMETER

FLOW ELEMENT

FLOAT & THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

PIPING ACCESSORIES SEE DETAIL

INVERTED BUCKET TRAP SET INCLUDING

FE

PIPE UP

PIPE DOWN

REFRIGERANT SIGHT GLASS

TEST PLUG (PRESSURE/TEMPERATURE)

AUTOMATIC AIR VENT

AV

MANUAL AIR VENT

MV

THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

QUICK-COUPLE HOSE CONNECTOR

VALVE SYMBOLS

BALL VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC BALANCING CONTROL VALVE

PRESSURE SAFETY VALVE

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

FLEXIBLE CONNECTION

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

PRESSURE REDUCING VALVE (PRV)

HOSE CONNECTOR

WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE

WATER LEVEL CONTROLLER

FLOW METER

DUCTWORK SYMBOLS

LIMIT OF DEMOLITION

(WALL TYPE)

(WALL TYPE)

DN

DN

UP

UP

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

ROUND AND SQUARE 4-WAY CEILING DIFFUSERS

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

EXHAUST OR RETURN REGISTER OR TOP GRILLE

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT

D

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

R

DNUP RETURN DUCT (UP & DOWN)

SQUARE 3-WAY CEILING DIFFUSERS

SQUARE 2-WAY CEILING DIFFUSERS

LINEAR SLOT DIFFUSER

SQUARE 1-WAY CEILING DIFFUSERS

DUCTWORK SYMBOLS

BACK DRAFT DAMPER

BDD

SECTION.)

FC

10x8

FLEXIBLE CONNECTION, EQUIPMENT,

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

EXISTING DUCT TO REMAIN

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL

FIRE DAMPER

FD

VD

DUCT WITH SOUND LINING

FLEXIBLE DUCTWORK (INSULATED)

MANUAL VOLUME DAMPER

EXISTING DUCT TO BE REMOVED

VIBRATION, OR SEISMIC

DUCTWORK SYMBOLS

DUCT MOUNTED COIL

DUCT MOUNTED COIL (HOT WATER OR STEAM COIL)

SUPPLY

RETURN45°

RETURN, NO SPLITTER (45° TAP)

STANDARD BRANCH SUPPLY OR

MANUAL SPLITTER DAMPER

45°

N

2 1

POINT OF CHANGE IN DUCT CONSTRUCTION BY

STATIC PRESSURE CLASS. THE NUMBER ASSIGNS

PRESSURE CLASS (IN. OF WATER) WHICH WILL

ACCOMMODATE MAXIMUM OPERATING PRESSURE

COMBINATION FIRE/SMOKE DAMPER

1/24 IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES

THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR

ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT

INDICATES NEGATIVE PRESSURE.

STAINLESS STEEL DUCT

(ELECTRIC)

F/S DPR

AUTOMATIC CONTROL DAMPER MODULATING

AUTOMATIC CONTROL DAMPER TWO POSITION

TERMINAL UNIT SYMBOLS

2'x4' RADIANT CEILING PANEL

2'x2' RADIANT CEILING PANEL

AIR CURTAIN

A

PTAC

A TWU

THRU WALL AIR CONDITIONING UNIT.

UNIT. LETTER INDICATES UNIT SIZE.

WINDOW TYPE AIR CONDITIONING

LETTER INDICATES UNIT SIZE.

UNIT HEATER (VERTICAL)

UNIT HEATER (HORIZONTAL)

CONVECTOR OR RADIATOR (RECESSED)

LETTER INDICATES UNIT SIZE.

FLOOR MOUNTED VERTICAL CABINET FAN COIL UNIT.

FLOOR MOUNTED VERTICAL RECESSED FAN COIL UNIT.

LETTER INDICATES UNIT SIZE.

CONVECTOR OR RADIATOR (WALL HUNG)

A

FCU

FCU

A

INDICATES UNIT SIZE.

FLOOR MOUNTED HEAT PUMP. LETTER

PTACA

(E)10x8

FIRE PROTECTION RISER LOCATION

H4

H7

A

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

OFFEROR:

EXPAND PHARMACY AND LOBBY 589-334

MECHANICAL COVER SHEET

COLUMBIA, MO

BOH FLB04/03/2018

MM002

ACA

B

ACA

C

ACA

D

ACA

D.7

ACA

D.8

ACA

E

ACA

E.1

ACA

F

ACA

G

ACA

H

ACA

ACA

11.5

ACA

ACA

10.6

ACA

ACA

ACA

D.8

D.1

(E)-150

(E)-275

(E X

)1 x

(E)-275(E)-275(E)-275

(EX)12x10

(E X

)1 x

(EX)14x10

(E)-130

(E)-130

(E X)1

0x

(E)-130

(E)-130

(E)-130

(E X

)8 "ø

(E X

)8 "ø

(E X

)1 x

(E)-255

(E)-255

(E)-255

(E X

)1 x

(E)-130

(EX)12x12

(E X

)8 "ø

(EX)8"ø

(EX)10"ø

(EX)12x12

(E X

)1 x

(E)-130

(E)-130

(E X

)1 x

(E)-115

(E)-115 (E)-115

(E)-115

(E X

)1 x

(E X

)2 x

(E)-200

(E)-135

(E X

)1 x

(E)-135

(E)-135

(E)-200 (E)-200

(E X

)1 x

EXISTING PROJECT

AREAS

GENERAL NOTES

1. TAB CONTRACTOR TO PROVIDE TAB PRE-BALANCE REPORT

FOR ALL EXISTING VAV BOXES, AIR HANDLER UNITS,

EXHAUST FANS OR OTHER AIR MOVING SYSTEM(S)

AFFECTED IN REMODEL AREA. PRE-BALANCE REPORT TO

INCLUDE AIRFLOW FROM ALL TERMINAL UNITS, SUPPLY

DIFFUSERS, RETURN GRILLES AND EXHAUST GRILLES.

2. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE HARD

SUSPENDED CEILING.

3. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF

FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE

DIMENSIONS.

4. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,

CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE

FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL

SPECIFICATIONS.

5. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES

INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS,

ETC.

6. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO

EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.

7. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON FLOOR

PLANS ARE NECK SIZES.

8. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING

COILS SHALL BE MADE TO PROVIDE COUNTER FLOW

BETWEEN WATER AND AIR.

9. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS

FOR EXACT LOCATIONS OF CEILING DIFFUSERS,

REGISTERS, AND GRILLES.

10.SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES

LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.

11.SIZES OF ALL HWS & HWR RUNOUTS TO TERMINAL UNITS

CAN BE FOUND ON THE EQUIPMENT SCHEDULES.

12.THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL

COORDINATION AND LAYOUT DRAWINGS PER

SPECIFICATIONS SECTION 230511, 1.4 (G). COORDINATION

SHOULD BE COMPLETED WITH ALL TRADES INCLUDED.

CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION

DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER AND

COR.

DEMOLITION PLAN NOTES

1. REMOVE EXISTING DIFFUSERS/GRILLES.

2. REMOVE EXISTING DUCTWORK.

3. REMOVE EXISTING TERMINAL UNITS.

4. REMOVE EXISTING FIRE ALARM CONTROL PANEL.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

OFFEROR:

EXPAND PHARMACY AND LOBBY 589-334

FIRST FLOOR HVAC DEMOLITION PLAN

COLUMBIA, MO

BOH FLB04/03/2018

MD101

1/8" = 1'-0"

HVAC DEMOLITION PLAN - FIRST FLOOR

4' 8' 16'

1/8" = 1'-0"

0'

N

1" = 80'-0"

KEY PLAN - EXISTINGN

(EX)14x10 (EX)14x10

(EX)16x10

(EX)12x10

(E X

)1 x

(EX)16x6

(EX)16x12

(E X

)1 x

(E)-270

(E)-240

(E)-200

(E)-240

(E)-200

(E)-250

(E)-250

(EX)12x12

(EX)8"ø

(E X

)1 "ø

(E)-270

(E)-380 (E)-310

(E)-380 (E)-310 (E)-310

(E)-310

(E)-310

(E)-310

(E X

)2 x

(EX)16x16

(E X

)1 x

(E X

)1 x

(E X

)4 x

(E X)4

0x

(E X

)1 x

(EX)20x16

(E X

)1 x

(EX)8x12

(EX)12x14

(E X

)6 "ø

(E X

)6 "ø

(E X

)6 "ø

(E X

)6 "ø

(E X

)8 "ø

(E X

)8 x

(EX)16x14

(E X

)3 x

(E X

)3 x

(E X

)1 x

(E X

)8 "ø

(EX)8"ø

(E X

)8 "ø

(E X

)1 x

(EX)12x6

(EX)14x8

(E X

)1 x

ACA

B

ACA

C

ACA

D

ACA

D.7

ACA

D.8

ACA

E

ACA

E.1

ACA

F

ACA

G

ACA

H

ACA

ACA

11.5

ACA

ACA

10.6

ACA

ACA

ACA

ACA

D.8

D.1

C.3

B.8

(EX)6x6

(E X

)6 x

(EX)6x6

(E X

)6 x

(E X

)6 x 6 (E

X )8 x

(E)-250

(E)-150 (E)-150

(E)-200

(E)-380

(E)-250

(E)-250

(E)-200

(E)-150

(E)-150

(E)-200

(E)-200

(E)-150

(E)-150

(E)-150

(E)-200

(E)-150

(E)-150

(E)-300

(E)-125

(E)-125

(E)-250

(E)-250

(E)-250

T1.9

200 CFM

5 5 5

T

GENERAL NOTES

1. TAB CONTRACTOR TO PROVIDE TAB PRE-BALANCE REPORT

FOR ALL EXISTING VAV BOXES, AIR HANDLER UNITS,

EXHAUST FANS OR OTHER AIR MOVING SYSTEM(S)

AFFECTED IN REMODEL AREA. PRE-BALANCE REPORT TO

INCLUDE AIRFLOW FROM ALL TERMINAL UNITS, SUPPLY

DIFFUSERS, RETURN GRILLES AND EXHAUST GRILLES.

2. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE HARD

SUSPENDED CEILING.

3. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF

FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE

DIMENSIONS.

4. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,

CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE

FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL

SPECIFICATIONS.

5. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES

INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS,

ETC.

6. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO

EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.

7. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON FLOOR

PLANS ARE NECK SIZES.

8. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING

COILS SHALL BE MADE TO PROVIDE COUNTER FLOW

BETWEEN WATER AND AIR.

9. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS

FOR EXACT LOCATIONS OF CEILING DIFFUSERS,

REGISTERS, AND GRILLES.

10.SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES

LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.

11.SIZES OF ALL HWS & HWR RUNOUTS TO TERMINAL UNITS

CAN BE FOUND ON THE EQUIPMENT SCHEDULES.

12.THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL

COORDINATION AND LAYOUT DRAWINGS PER

SPECIFICATIONS SECTION 230511, 1.4 (G). COORDINATION

SHOULD BE COMPLETED WITH ALL TRADES INCLUDED.

CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION

DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER AND

COR.

EXISTING PROJECT

AREAS

DEMOLITION PLAN NOTES

1. REMOVE EXISTING DIFFUSERS/GRILLES.

2. REMOVE EXISTING DUCTWORK.

3. REMOVE EXISTING TERMINAL UNITS.

4. (NOT USED)

5. RELOCATE EXISTING DIFFUSER/GRILLE TO MATCH

ARCHITECTURAL RCP. EXTEND DUCTWORK AS REQUIRED.

A MAXIMUM LENGTH OF 5' (EXISTING AND NEW OF FLEX

DUCTWORK MAYBE USED FOR SUPPLY.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

OFFEROR:

EXPAND PHARMACY AND LOBBY 589-334

SECOND FLOOR HVAC DEMOLITION PLAN

COLUMBIA, MO

BOH FLB04/03/2018

MD102

1/8" = 1'-0"

HVAC DEMOLITION PLAN - SECOND FLOOR

4' 8' 16'

1/8" = 1'-0"

0'

N

1" = 80'-0"

E 1

H

G

Ea

E

D

ACA

B

ACA

C

ACA

D

ACA

D.7

ACA

D.8

ACA

E

ACA

E.1

ACA

F

ACA

G

ACA

H

D.8

D.1

(EX)1" HWS

(EX)1" HWR

(EX)3/4" HWR

(EX)3/4" HWS

(EX)3/4" HWS

(EX)3/4" HWR

(EX)3/4" HWR

(EX)3/4" HWS

(EX)2" HWR

(EX)2" HWS

(EX)3/4" HWS

(EX)3/4" HWR

(EX)1" HWS

(EX)1" HWR

(EX)2" HWR

(EX)2" HWS

(EX)1 1/2" HWR

(EX)1 1/2" HWS

(EX)3/4" HWS

(EX)3/4" HWR

(EX)1" HWR

(EX)1" HWS

(EX)3/4" HWS

(EX)3/4" HWR

(EX)3/4" HWR

(EX)3/4" HWS

(EX)2" HWS

(EX)2" HWR

T

T

T

3H

T

T

EXISTING PROJECT

AREAS

GENERAL NOTES

1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES

SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE

THE HARD SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION

OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET

INSIDE DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,

CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE

FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL

SPECIFICATIONS.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES

INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS,

COILS, ETC.

5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS

TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.

6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON

FLOOR PLANS ARE NECK SIZES.

7. WATER PIPE CONNECTIONS TO AIR HEATING AND

COOLING COILS SHALL BE MADE TO PROVIDE COUNTER

FLOW BETWEEN WATER AND AIR.

8. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON

DRAWINGS ARE TO BE INSTALLED WITH BOTTOM

ELEVATION OF REGISTER AT 7" [175mm] ABOVE FINISHED

FLOOR.

9. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS

FOR EXACT LOCATIONS OF CEILING DIFFUSERS,

REGISTERS, AND GRILLES.

10.SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES

LISTED ARE GAGE PRESSURE UNLESS OTHERWISE

NOTED.

11.SIZES OF ALL HWS & HWR RUNOUTS TO TERMINAL UNITS

CAN BE FOUND ON THE EQUIPMENT SCHEDULES.

12.THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING

FULL COORDINATION AND LAYOUT DRAWINGS PER

SPECIFICATIONS SECTION 220511, 1.4 (I). COORDINATION

SHOULD BE COMPLETED WITH ALL TRADES INCLUDED.

CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION

DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER AND

COR.

13.THERE IS ASBESTOS ON THIS PROJECT. REFER TO

DEMOLITION SPECIFICATIONS FOR PROPER REMOVAL

PROCEDURES.

DEMOLITION PLAN NOTES

1. REMOVE EXISTING THERMOSTAT, CONTROL WIRING AND

BRANCH HWS & HWR PIPING ASSOCIATED WITH TERMINAL

UNIT TO BE REMOVED IN REMODEL AREA.

2. REMOVE EXISTING HUMIDITY CONTROLLER & ASSOCIATED

CONTROL WIRING.

3. EXISTING HOT WATER UNIT HEATER TO BE REMOVED.

DEMO PIPING TO ABOVE CEILING VALVE AND CAP. REMOVE

ASSOCIATED THERMOSTAT AND CONTROL WIRING.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

OFFEROR:

EXPAND PHARMACY AND LOBBY 589-334

FIRST FLOOR HYDRONICS DEMOLITION

PLAN

COLUMBIA, MO

BOH FLB04/03/2018

MD111

1/8" = 1'-0"

HYDRONICS DEMOLITION PLAN - FIRST FLOOR

N

4' 8' 16'

1/8" = 1'-0"

0'

1" = 80'-0"

B

ACA

C

ACA

D

ACA

D.7

ACA

D.8

ACA

E

ACA

E.1

ACA

F

ACA

G

ACA

H

D.8

D.1

(EX)1" HWR

(EX)1" HWS

(EX)1 1/4" HWS

(EX)1 1/4" HWR

(EX)3/4" HWR

(EX)3/4" HWS

(EX)1" HWS

(EX)1" HWR

(EX)2" HWS

(EX)2" HWS

(EX)2" HWR

(EX)3/4" HWS

(EX)3/4" HWR

(EX)2" HWS

(EX)2" HWR

(EX)2" HWS

(EX)2" HWR

(EX)3/4" HWS

(EX)3/4" HWR

(EX)2" HWS

(EX)2" HWR

(EX)2" HWS

(EX)2" HWR

(EX)3/4" HWS

(EX)3/4" HWR

(EX)1 1/2" HWR

(EX)1 1/2" HWS

(EX)1" HWR

(EX)1" HWS

(EX)3/4" HWR

(EX)3/4" HWS

(EX)3/4" HWS

(EX)3/4" HWR

(EX)1 1/4" HWS

(EX)1 1/4" HWR

(EX)3/4" HWS

(EX)3/4" HWR

(EX)3/4" HWS

(EX)3/4" HWR

(EX)5"HWR/S RISER

(EX)2" HWR

T

T

T

T

T

T

T

T

T

T

EXISTING PROJECT

AREAS

GENERAL NOTES

1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES

SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE

THE HARD SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION

OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET

INSIDE DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,

CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE

FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL

SPECIFICATIONS.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES

INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS,

COILS, ETC.

5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS

TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.

6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON

FLOOR PLANS ARE NECK SIZES.

7. WATER PIPE CONNECTIONS TO AIR HEATING AND

COOLING COILS SHALL BE MADE TO PROVIDE COUNTER

FLOW BETWEEN WATER AND AIR.

8. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON

DRAWINGS ARE TO BE INSTALLED WITH BOTTOM

ELEVATION OF REGISTER AT 7" [175mm] ABOVE FINISHED

FLOOR.

9. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS

FOR EXACT LOCATIONS OF CEILING DIFFUSERS,

REGISTERS, AND GRILLES.

10.SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES

LISTED ARE GAGE PRESSURE UNLESS OTHERWISE

NOTED.

11.SIZES OF ALL HWS & HWR RUNOUTS TO TERMINAL UNITS

CAN BE FOUND ON THE EQUIPMENT SCHEDULES.

12.THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING

FULL COORDINATION AND LAYOUT DRAWINGS PER

SPECIFICATIONS SECTION 220511, 1.4 (I). COORDINATION

SHOULD BE COMPLETED WITH ALL TRADES INCLUDED.

CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION

DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER AND

COR.

13.THERE IS ASBESTOS ON THIS PROJECT. REFER TO

DEMOLITION SPECIFICATIONS FOR PROPER REMOVAL

PROCEDURES.

DEMOLITION PLAN NOTES

1. DISCONNECT EXISTING 3/4" HWS/HWR PIPING FROM

TERMINAL BOX BEING REMOVED. EXISTING PIPING TO

REMAIN FOR CONNECTION TO NEW BOX.

2. REMOVE EXISTING THERMOSTAT AND CONTROL WIRING

ASSOCIATED WITH TERMINAL UNIT TO BE REMOVED IN

REMODEL AREA.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

OFFEROR:

EXPAND PHARMACY AND LOBBY 589-334

SECOND FLOOR HYDRONICS DEMOLITION

PLAN

COLUMBIA, MO

BOH FLB04/03/2018

MD112

1/8" = 1'-0"

HYDRONICS DEMOLITION PLAN - SECOND FLOOR

4' 8' 16'

1/8" = 1'-0"

0'

N

1" = 80'-0"

KEY PLAN - EXISTING

N

DN

(EX)12x8

(E X

)1 x 8 (EX)8"ø (EX)8"ø

(EX)12x12

(E X

)6 x

(E X

)1 x

(EX)6"ø

(E X

)1 x

(EX)10"ø

(EX)16x12 (EX)10"ø

(E X

)8 "ø

(EX)14"ø

(E X

)5 x

(E X

)3 x

(EX)36x12

(E X

)2 x

(E X

)1 x

(E X

)1 x

(E X

)1 x

(EX)12x12

(EX)12"ø

(E X

)1 x

(EX)6x6

(EX)6x6

(EX)6x6

(E X

)1 x

(EX)12x12 (EX)8"ø

(E X

)1 x 0 (E

X )8

"ø (E

X )8

"ø

(EX)6"ø

(EX)6"ø

(EX)10"ø

(EX)12x10

(E X)1

0x

(E X

)8 "ø

(E X

)8 "ø

(EX)12x12

(EX)8"ø

(EX)10"ø

(E X

)1 x

(E X

)1 x

(EX)22x10

(E X

)1 x 0(E

X )8

"ø (E

X )8

"ø

(E X

)1 x

(E X

)1 x

(EX)10"ø

(EX)8"ø

(EX)6"ø (E X

)8 "ø

(E X

)8 "ø

(EX)8"ø

(EX)10x12

(EX)10x12

(EX)28x14

(E X

)1 x

(EX)8"ø

(E X

)8 "ø

(EX)8"ø (EX)8"ø

(EX)12x8

(EX)12x12 (EX)12x8

(EX)8"ø

(EX)12x12

(E X

)6 x

(E X

)1 x

(EX)6"ø

(E X

)1 x

(EX)10"ø

(EX)16x12 (EX)10"ø

(E X

)8 "ø

(EX)14"ø

(E X

)5 x

(E X

)3 x

(EX)36x12

(E X

)2 x

(E X

)1 x

(E X

)1 x

(E X

)1 x

(EX)12x12

(EX)12"ø

(E X

)1 x

(EX)12x8

(EX)12x12

(E X

)1 x

(EX)6x6

(EX)6x6

(EX)6x6

(E X

)1 x

(EX)12x12 (EX)8"ø

(E X

)1 x 0 (E

X )8

"ø (E

X )8

"ø

(EX)6"ø

(E X

)1 x

(E X

)1 "ø

(EX)12x10

(E X

)1 x

(E X

)1 x

(EX)14x10

(EX)16"ø

(E X

)1 "ø

(E X

)8 "ø

(E X)1

0x

(E X

)8 "ø

(E X

)8 "ø

(E X

)8 "ø

(EX)12x12

(EX)8"ø (EX)6"ø

(EX)8"ø

(E X

)1 x

(EX)22x10

(E X

)1 x 0(E

X )8

"ø (E

X )8

"ø

(E X

)1 x

(EX)12x12

(E X

)1 x

(EX)10"ø

(EX)8"ø

(EX)6"ø

(EX)6"ø

(E X

)8 "ø

(EX)8"ø

(EX)10x12

(EX)10x12

(EX)28x14

(E X

)1 x

(EX)8"ø

(E X

)8 "ø

(EX)8"ø (EX)8"ø

ACA

B

ACA

C

ACA

D

ACA

D.7

ACA

D.8

ACA

E

ACA

E.1

ACA

F

ACA

G

ACA

H

ACA

ACA

11.5

ACA

ACA

10.6

ACA

ACA

D.8

D.1

STORAGE

F179

WAITING

F174

CONSULT 1

F174A

CONSULT 2

F174B

CONSULT 3

F174C

AGENT CASHIER

E142

SWAMP

F176

STAIR #11

F173

F.M.S. ENG.

F170

PINPOINT TRAVEL

E144

VAULT

F178

OFFICE

F175

OFFICE

F164

OFFICE

F162

OFFICE

F161

OFFICE

F160

OFFICE

F159

MED ADMIN

E141

LOBBY

C1E3

CORR

F1F21

MAIL

F177B

PHARMACY WORK

F177

DISPENSING

F177A

VALET

C1E34

INFO. DESK

C1E35

VESTIBULE

C1E32

ENTRY

C1E31

W.C. STOR

E101

LOBBY

C1E3

32x24 RA UP

"ø

"ø x

12"ø x x

32x24

24x20 x x

12"ø 12"ø1

"ø

8"ø

"ø x

"ø

10"ø

12"ø

12"ø 12"ø

12"ø

12"ø

12"ø

12"ø

"ø

8"ø

"ø

SD-15

SD-13

SD-12

SD-12

SD-12

SD-13

SD-12

SD-12

RR-52

14"ø

RR-52

RR-54

SD-13

RR-51 350

RR-53

1-T1.11

125 CFM

1-T1.12

650 CFM

1-T1.13

375 CFM

1-T1.14

250 CFM

1-T1.15

400 CFM

1-T1.16

2700 CFM

1-T1.17

750 CFM

1-T1.18

400 CFM

MH301

MH301

MH301

MH301

24x20 x x

14"ø

26x22

RR-54 750

RR-54

x

10"ø

SD-16

SD-13

RR-51

28x24 24x18

8"ø

24x24 SA UP

RG-63

SD-62

(TYP. OF 4)

(TYP. OF 2)

CORRIDOR

F1F23

TRAVEL

E140

(TYP. OF 5)

(TYP. OF 6)

1-UH-1

1-FD-1

1-FD-2

1-FCU-1

12x12

"ø

10"ø

SD-12

1-T2.18

200 CFM

PROVIDE

TRANSFER

AIR DUCT

RR-51

RR-51

SD-12

SD-12

SD-12

1-T2.16

375 CFM 1

"ø

8"ø

8"ø

"ø

RR-51

RR-53

1-T2.17

450 CFM

SD-12

SD-12

SA-12

S

1-FD-3

1-FD-4

"ø

GENERAL NOTES

1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE HARD

SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION

OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET

INSIDE DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,

CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE

FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL

SPECIFICATIONS.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES

INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS,

COILS, ETC.

5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS

TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.

6. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON

FLOOR PLANS ARE NECK SIZES.

7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING

COILS SHALL BE MADE TO PROVIDE COUNTER FLOW

BETWEEN WATER AND AIR.

8. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS

FOR EXACT LOCATIONS OF CEILING DIFFUSERS,

REGISTERS, AND GRILLES.

9. SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES

LISTED ARE GAGE PRESSURE UNLESS OTHERWISE

NOTED.

10.SIZES OF ALL HWS & HWR RUNOUTS TO TERMINAL UNITS

CAN BE FOUND ON THE EQUIPMENT SCHEDULES.

11.THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL

COORDINATION AND LAYOUT DRAWINGS PER

SPECIFICATIONS SECTION 230511, 1.4 (G). COORDINATION

SHOULD BE COMPLETED WITH ALL TRADES INCLUDED.

CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION

DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER AND

COR.

12.TAB CONTRACTOR SHALL BALANCE EXISTING GRILLES

USING AIRFLOWS DETERMINED IN TAB PRE-BALANCE

REPORT (SEE DEMO DRAWINGS).

ADDITION

REMODEL

AREAS

PLAN NOTES

1. RE-BALANCE EXISITING VAV TERMINAL UNITS TO AIRFLOW

MEASURED IN TAB PRE-BALANCE REPORT (SEE DEMO

DRAWINGS, GENERAL NOTE #1).

2. DUCTWORK PASSING THROUGH AGENT CASHIER SHALL BE

PROTECTED WITH SECURITY BARS. PROVIDE 1/2 INCH (12.7

MM) DIAMETER STEEL WELDED BARS VERTICALLY AND

HORIZONTALLY SIX INCHES (150 MM) ON CENTER.

3. INSTALL HORIZONTAL FIRE DAMPER IN DUCT AT 2ND FLOOR.

PER SPECS, PROVIDE ACCESS PANEL IN DUCT FOR DAMPER

MAINTENANCE.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

OFFEROR:

EXPAND PHARMACY AND LOBBY 589-334

FIRST FLOOR HVAC PLAN

COLUMBIA, MO

BOH FLB04/03/2018

MH101

1/8" = 1'-0"

HVAC PLAN - FIRST FLOOR

N

4' 8' 16'

1/8" = 1'-0"

0'

N 1" = 80'-0"

KEY PLAN LEVEL 1

C

ACA

D

ACA

D.7

ACA

D.8

ACA

E

ACA

E.1

ACA

F

ACA

G

ACA

H

ACA

ACA

11.5

ACA

ACA

10.6

ACA

ACA

ACA

D.1

MH301

(EX)12x8

(E X

)1 x

(EX)8"ø (EX)8"ø

(EX)12x12

(E X

)6 x

(E X

)1 x

(EX)6"ø

(E X

)1 x

(EX)10"ø

(EX)16x12 (EX)10"ø

(E X

)8 "ø

(EX)14"ø

(E X

)3 x

(EX)36x12

(E X

)2 x

(E X

)1 x

(E X

)1 x

(E X

)1 x

(EX)12x12

(EX)12"ø

(E X

)1 x

(EX)6x6

(EX)6x6

(EX)6x6

(EX)12x12 (EX)8"ø

(E X

)8 "ø

(E X

)8 "ø

(EX)6"ø

(EX)6"ø

(E X

)1 "ø

(EX)10"ø

(EX)12x10

(EX)16"ø

(E X

)8 "ø

(E X)1

0x

(E X

)8 "ø

(E X

)8 "ø

(E X

)8 "ø

(EX)12x12

(EX)8"ø

(EX)6"ø

(EX)8"ø

(EX)10"ø

(E X

)1 x

(E X

)1 x

(EX)22x10

(E X

)1 x 0(E

X )8

"ø (E

X )8

"ø

(E X

)1 x

(E X

)1 x

(EX)10"ø

(EX)8"ø

(EX)6"ø (E X

)8 "ø

(E X

)8 "ø

(EX)8"ø

(EX)10x12

(EX)10x12

(EX)28x14

(EX)8"ø

(E X

)8 "ø

(EX)8"ø (EX)8"ø

(EX)12x8

(E X

)1 x

(EX)12x12 (EX)12x8

(EX)8"ø (EX)8"ø

(EX)12x12

(E X

)6 x

(E X

)1 x

(EX)6"ø

(E X

)1 x

(EX)10"ø

(EX)16x12 (EX)10"ø

(E X

)8 "ø

(EX)14"ø

(E X

)3 x

(EX)36x12

(E X

)2 x

(E X

)1 x

(E X

)1 x

(E X

)1 x

(EX)12x12

(EX)12"ø

(E X

)1 x

(EX)12x8

(E X

)1 x

(EX)6x6

(EX)6x6

(EX)6x6

(EX)12x12 (EX)8"ø

(E X

)8 "ø

(E X

)8 "ø

(EX)6"ø

(EX)6"ø

(E X

)1 x

(E X

)1 "ø

(EX)10"ø

(EX)12x10

(E X

)1 x 4(E

X )1 x

(EX)16"ø

(E X

)1 "ø

(E X )8

"ø

(E X)1

0x

(E X

)8 "ø

(E X

)8 "ø

(E X

)8 "ø

(EX)12x12

(EX)8"ø

(EX)6"ø

(EX)8"ø

(EX)10"ø

(E X

)1 x

(E X

)1 x

(EX)22x10

(E X

)1 x 0(E

X )8

"ø (E

X )8

"ø

(E X

)1 x

(E X

)1 x

(EX)10"ø

(EX)8"ø

(EX)6"ø

(EX)6"ø (E X

)8 "ø

(E X

)8 "ø

(EX)8"ø

(EX)10x12

(EX)10x12

(EX)28x14

(EX)8"ø

(E X

)8 "ø

(EX)8"ø (EX)8"ø

LOBBY

C1E3

CORR

F1F21

VALET

C1E34

INFO. DESK

C1E35

VESTIBULE

C1E32

ENTRY

C1E31

W.C. STOR

E101

LOBBY

C1E3

ENTR. VEST.

E1100

32x24 RA UP

24x24 SA UP x

32x24

24x20

SD-12

RR-52

SD-13

1-T1.15

400 CFM

1-T1.16

2700 CFM

24x20 x x

26x22

28x24 24x18 20x18

1-T1.19

2300 CFM

SD-63

(TYP. OF 10)

(TYP. OF 7)

(TYP. OF 2)

(TYP. OF 10)

12x12 16x14 18x16 16x14

12x12

22x18 14x14

RG-64

SD-63

18x14

12"ø

SD-62

1-UH-1

PROVIDE

TRANSFER AIR DUCT

1-T2.18

200 CFM

1-T2.17

450 CFM100

SA-12

RR-51

RR-51

RR-51

SD-12

10"ø

SD-12

SD-12

RR-51

"ø

8"ø

AGENT CASHIER

E142

CORRIDOR

F1F23

TRAVEL

E140

"ø

GENERAL NOTES

1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE HARD

SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION

OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET

INSIDE DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,

CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE

FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL

SPECIFICATIONS.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES

INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS,

COILS, ETC.

5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS

TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.

6. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON

FLOOR PLANS ARE NECK SIZES.

7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING

COILS SHALL BE MADE TO PROVIDE COUNTER FLOW

BETWEEN WATER AND AIR.

8. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS

FOR EXACT LOCATIONS OF CEILING DIFFUSERS,

REGISTERS, AND GRILLES.

9. SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES

LISTED ARE GAGE PRESSURE UNLESS OTHERWISE

NOTED.

10.SIZES OF ALL HWS & HWR RUNOUTS TO TERMINAL UNITS

CAN BE FOUND ON THE EQUIPMENT SCHEDULES.

11.THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL

COORDINATION AND LAYOUT DRAWINGS PER

SPECIFICATIONS SECTION 230511, 1.4 (G). COORDINATION

SHOULD BE COMPLETED WITH ALL TRADES INCLUDED.

CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION

DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER AND

COR.

12.TAB CONTRACTOR SHALL BALANCE EXISTING GRILLES

USING AIRFLOWS DETERMINED IN TAB PRE-BALANCE

REPORT (SEE DEMO DRAWINGS).

ADDITION

REMODEL

AREAS

PLAN NOTES

1. RE-BALANCE EXISITING VAV TERMINAL UNITS TO AIRFLOW

MEASURED IN TAB PRE-BALANCE REPORT (SEE DEMO

DRAWINGS, GENERAL NOTE #1).

2. DUCTWORK PASSING THROUGH AGENT CASHIER SHALL BE

PROTECTED WITH SECURITY BARS. PROVIDE 1/2 INCH (12.7

MM) DIAMETER STEEL WELDED BARS VERTICALLY AND

HORIZONTALLY SIX INCHES (150 MM) ON CENTER.

3. INSTALL HORIZONTAL FIRE DAMPER IN DUCT AT 2ND FLOOR.

PER SPECS, PROVIDE ACCESS PANEL IN DUCT FOR DAMPER

MAINTENANCE.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

OFFEROR:

EXPAND PHARMACY AND LOBBY 589-334

FIRST FLOOR HVAC PLAN - BID DEDUCT #2

COLUMBIA, MO

BOH FLB04/03/2018

MH101.2

1/8" = 1'-0"

FIRST FLOOR HVAC PLAN - BID DEDUCT #2

4' 8' 16'

1/8" = 1'-0"

0'

N 1" = 80'-0"

EXAM 17

F265

EXAM 16

F266

EXAM 15

F267

CORR

C2F23

CORR

C2F22

WAITING

F263

NURSE

F264

WAITING

F268

EXAM 14

F269

EXAM 18

F262

EXAM 13

F270

EXAM 19

F261

EXAM 20

F260

EXAM 12

F271

EXAM 11

F272

EXAM 21

F259

EXAM 10

F273

EXAM 22

F258

WAITING DILATION

F257

WAITING / DILATION

E209

DIRTY

E253

ELEC

F252

SWAMP

E215

LASER

E255

TLT

F253

EXAM 1

E226

EXAM 2

E225

EXAM 3

E223

EXAM 4

E222

EXAM 5

E221

EXAM 6

E219

EXAM 7

E218

EXAM 8

E217

FUNDUS

E216

VISUAL FIELDS

E211

VISUAL FIELDS

E212

REFRAC

E212A

PROCEDURE

E213

EXAM 9

E220

JAN

E205

EQUIP

E205A

N.S.

E211AWORK RM.

E224A

REFRAC

E210

IMAGING

F256

WAITING

E206

CORR

C2E3

CORR

C2E2

CORR

C2E1

CORR

C2F21

STAIR #11

F248

CORR

C2F24

PRE- CATARACT

E214

CLEAN

E254

ADMIN OFFICE

F255

(EX)12x10 (EX)16x6

(E X

)9 "ø

(E X

)2 x

(EX)12x6

(EX)6x6

(EX)12x10

(EX)20x16(EX)32x16

(E X

)3 x

(E X

)3 x

(E X

)2 x

(E X

)6 "ø

(E X

)6 "ø

(E X

)1 "ø

(E X

)6 "ø

(EX)6"ø

(E X

)1 x

(E X

)6 x

(EX)14x14

(EX)8"ø

(EX)12x10

(EX)12x10

(E X

)8 "ø

(E X

)1 "ø

(E X

)2 x

(EX)14x8 (EX)14x8

(EX)10"ø

(E X

)1 "ø

(E X

)1 "ø

(E X

)1 x

(EX)8x8

(E X

)8 x

(E X

)6 x

(E X

)8 "ø

(EX)8"ø

(E X

)1 x

(E X

)1 x 6 (E

X )8

"ø

(E X

)8 "ø

(EX)20x16(EX)16x14

(E X

)8 "ø (EX)8"ø

(EX)10"ø

(EX)16x6

(EX)16x10

(EX)14x10 (EX)14x10

(E X

)1 x

(E X )6

"ø

(E X

)6 x

(E X

)1 "ø

(EX)10"ø (EX)10"ø

(EX)6"ø

(E)-240

(E)-240

(E)-270

(E)-250

(E)-250

(E)-200

(E)-380 (E)-380 (E)-310

(E)-310 (E)-310

(E)-310

(E)-310

(E)-310

(E X

)2 x

(EX)12x6

(EX)6x6

(EX)12x10

(EX)20x16(EX)32x16

(E X

)3 x

(E X

)4 x

(E X

)6 "ø

(E X

)6 "ø

(E X

)1 "ø

(E X

)6 "ø

(EX)6"ø

(E X

)1 x

(E X

)6 x

(EX)14x14

(EX)8"ø

(EX)12x10

(EX)12x10

(E X

)8 "ø

(EX)12x10

(E X

)1 "ø

(E X

)2 x

(EX)14x8 (EX)14x8

(EX)10"ø

(E X

)1 "ø

(E X

)1 "ø

(E X

)1 x

(EX)8x8

(EX)8"ø

(E X

)8 "ø

(E X

)1 x

(E X

)1 x 6 (E

X )8

"ø

(EX)20x16(EX)16x14

(EX)12x12 (EX)10"ø

(E X

)1 x

(E X )6

"ø

(E X

)6 x

(E X

)1 "ø

(EX)10"ø (EX)10"ø

(EX)6"ø

(E)-200

(E)-240

(E)-270

(E)-380

RELOCATE

(E) DIFFUSER

SD-12

SD-12

SD-12

SD-12

SD-12

ACA

B

ACA

B

ACA

C

ACA

C

ACA

D

ACA

D

ACA

D.7

ACA

D.8

ACA

E

ACA

E

ACA

E.1

ACA

F

ACA

F

ACA

G

ACA

G

ACA

H

ACA

H

ACA

ACA

11.5

ACA

10.6

ACA

ACA

32x20

40x22

20x16

24x24 SA DN 32x24 RA DN

"ø

12"ø x

"ø

SD-13

SD-13

SD-13

SD-12

RR-51

RR-51

RR-51

SD-12

SD-12

SD-12

"ø

10"ø

SD-12

SD-13

SD-14

RR-51

SD-12

20x16 x x

12"ø

10"ø x x

12"ø

12"ø

"ø

10"ø

8"ø

10"ø

"ø

"ø

8"ø

"ø 8"ø 8"ø

8"ø

10"ø

8"ø

12"ø

"ø

1-T1.01

100 CFM

1-T1.02

650 CFM

1-T1.04

350 CFM

1-T1.03

300 CFM

1-T1.05

800 CFM

1-T1.07

375 CFM

1-T1.06

500 CFM

1-T1.10

600 CFM

1-T1.08

400 CFM

1-SAS1

1-SAS2

1-SAR1

1-SAR2

EG-51

SD-11

EG-51

EG-51

1-T2.15

675 CFM

SD-12

SD-12

1-T2.01

400 CFM

1-T2.02

100 CFM

1-T2.04

150 CFM

1-T2.10

300 CFM

1-T2.11

930 CFM

1-T2.09

600 CFM

1-T2.08

600 CFM

1-T2.07

200 CFM

1-T2.13

710 CFM

1-T2.12

380 CFM

1-T2.06

375 CFM

1-T2.05

600 CFM

1-T2.03

200 CFM

1-T2.14

250 CFM

SD-12

SD-12

SD-12

SD-12

SD-12

SD-12

10"ø x

RELOCATE

(E) DIFFUSER

SD-12

SD-12

SD-12

SD-12

SD-13

SD-15

SD-12

32x24

14x14

MH301

MH301

MH301

MH301

MH301

34x20

14x14

8"ø

12"ø 10"ø 8"ø

14"ø12"ø

"ø x

20x14

RR-52

SD-12

10x10

UP TO

1-EF-1

"ø

RR-54

x

"ø x

RR-52

RR-53

12x10

RR-54

12"ø

14x12

RR-54

"ø x

MH301

RR-52200

RR-52

RR-54

RR-54

SD-15

RR-51

SD-15

RR-51

RR-53

RR-53

MH301

RR-53

RR-53

"ø

"ø

40x24

RR-51

SD-12

1-T1.09

500 CFM

(TYP. OF 2)

(TYP. OF 2)

S

S S

(EX)10"ø

"ø

"ø

"ø

"ø

GENERAL NOTES

1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE HARD

SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION

OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET

INSIDE DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,

CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE

FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL

SPECIFICATIONS.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES

INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS,

COILS, ETC.

5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS

TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.

6. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON

FLOOR PLANS ARE NECK SIZES.

7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING

COILS SHALL BE MADE TO PROVIDE COUNTER FLOW

BETWEEN WATER AND AIR.

8. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS

FOR EXACT LOCATIONS OF CEILING DIFFUSERS,

REGISTERS, AND GRILLES.

9. SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES

LISTED ARE GAGE PRESSURE UNLESS OTHERWISE

NOTED.

10.SIZES OF ALL HWS & HWR RUNOUTS TO TERMINAL UNITS

CAN BE FOUND ON THE EQUIPMENT SCHEDULES.

11.THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL

COORDINATION AND LAYOUT DRAWINGS PER

SPECIFICATIONS SECTION 230511, 1.4 (G). COORDINATION

SHOULD BE COMPLETED WITH ALL TRADES INCLUDED.

CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION

DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER AND

COR.

12.TAB CONTRACTOR SHALL BALANCE EXISTING GRILLES

USING AIRFLOWS DETERMINED IN TAB PRE-BALANCE

REPORT (SEE DEMO DRAWINGS).

ADDITION

REMODEL

AREA

PLAN NOTES

1. CLEAN AND RELOCATE EXISTING DIFFUSER. EXTEND

DUCTWORK AS REQUIRED TO LOCATE DIFFUSER AS

SHOWN ON ARCHITECTURAL RCP. COORDINATE WITH

OTHER TRADES.

2. TYP., ALL NEW EXAM ROOMS.

3. DUCT UP TO 1-AHU-1. SEE 1/M-505 FOR DUCT/AHU

ACOUSTICAL REQUIREMENTS.

4. STEAM HUMIDIFIER, SEE SHEET MP102.

5. ALL DUCTWORK 10'-0" DOWNSTREAM OF STEAM

HUMIDIFIER TO BE ALUMINUM CONSTRUCTION. SLOPE

DUCT BACK TO HUMIDIFIER.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

OFFEROR:

EXPAND PHARMACY AND LOBBY 589-334

SECOND FLOOR HVAC PLAN

COLUMBIA, MO

BOH FLB04/03/2018

MH102

1/8" = 1'-0"

HVAC PLAN - SECOND FLOOR

4' 8' 16'

1/8" = 1'-0"

0'

N

N 1" = 80'-0"

KEY PLAN LEVEL 2

GENERAL NOTES

1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE HARD

SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION

OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET

INSIDE DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,

CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE

FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL

SPECIFICATIONS.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES

INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS,

COILS, ETC.

5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS

TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.

6. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON

FLOOR PLANS ARE NECK SIZES.

7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING

COILS SHALL BE MADE TO PROVIDE COUNTER FLOW

BETWEEN WATER AND AIR.

8. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS

FOR EXACT LOCATIONS OF CEILING DIFFUSERS,

REGISTERS, AND GRILLES.

9. SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES

LISTED ARE GAGE PRESSURE UNLESS OTHERWISE

NOTED.

10.SIZES…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.