36C25518R0298-007.pdf

PDF 19 MB Posted

Attached to
Upgrade Emergency Department-Topeka (PN589A5-15-115), TOP
Solicitation number
36C25518R0298
Issued by

About this file

36C25518R0298 589A5-15-115 Topeka VAMC ED Project FINAL CDs - Part 1 of 9 (52 pages).pdf

View the file

Other files

File Type Posted
36C25518C0172-000.docx DOCX document
36C25518R0298-00003002.docx DOCX document
36C25518R0298-00003001.docx DOCX document
36C25518R0298-00003000.docx DOCX document
36C25518R0298-00002000.docx DOCX document
36C25518R0298-00002001.pdf PDF
36C25518R0298-00001000.docx DOCX document
36C25518R0298-011.pdf PDF
36C25518R0298-013.pdf PDF
36C25518R0298-008.pdf PDF
36C25518R0298-003.docx DOCX document
36C25518R0298-009.pdf PDF
36C25518R0298-014.pdf PDF
36C25518R0298-015.pdf PDF
36C25518R0298-006.pdf PDF
36C25518R0298-004.pdf PDF
36C25518R0298-005.pdf PDF
36C25518R0298-010.pdf PDF
36C25518R0298-012.pdf PDF
36C25518R0298-000.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING SYMBOLS

95.00

TOC

98.5

TOC

98.5 E

B

NEW ELEVATION

EXISTING ELEVATION

EXISTING CONTOUR

NEW CONTOUR

TEST BORING (SITE PLANS ONLY)

EXISTING ELEVATION

EXISTING ELEVATION

PROPERTY LINE

/1 A101

/1 A101 MATCHLINE

SHT. REFERENCE

ELEVATION DATUM

(SECTIONS, ELEVATIONS ONLY)

BUILDING SECTION

WALL SECTION

DETAIL DRAWING

A3.1

BUILDING ELEVATION

A6.1 INTERIOR ELEVATION

A100

WINDOW ID TAG

DOOR NUMBER

ROOM

NAME

ROOM NAME & NUMBER

PARTITION SYMBOL

1 REVISION TAG

COLUMN LINE GRID

ME100E EQUIPMENT NUMBER

? SITE PLAN NOTES

DEMOLITION PLAN NOTES

VICINITY MAP

NO SCALE

-- PRECAST CONCRETE WALL

PANEL TAG

XXX

A101

A-4 ALTERNATE TAG

PT-XX PAINT COLOR TAG

# PLAN NOTES

X

X.X

X

X.X

PROJECT LOCATION

CUT STONE

STEEL

PLYWOOD

FINISH WOOD

CONT WD FRAMING

WOOD BLOCKING

MATERIAL SYMBOLS

LVC FILL

GRANULAR FILL

CONCRETE MASONRY

FACE BRICK - REF. ELEVATIONS

CONCRETE

EARTH

EXISTING CONSTRUCTION

ASPHALT

GLASS

RIGID OR TAPERED

INSULATION, EIFS

BATT INSULATION

GYPSUM BOARD

ABBREVIATIONS

PROJ(D)

PLBG

PLYWD

PREFIN

RAD(R)

RESIL

REINF

REQ'D

SECT

SHWR

SPECS

REFRIG

galvanizedGALVBMRK benchmark concrete mansonry unit ceilingCLG

CLR

CMU

COL

CLO

clear/clearance column closet

CAB

CJ

CC

CB

BW

CL

BOC

BRZ

BRK

BO

BRG

BUR

BTM

BS

built-up roof center to center chalkboard bottom of wall center line control joint/ construction joint cabinet back of curb both sides bottom of bronze brick bearing bottom foundation floor drain fire extinguisher fire extinguisher cabinet

FE

FEC

FDN

FD

east each equipment exposed each way existing electrical exterior insulation finish system elevation/elevator expansion joint existing grade electrical contractor exterior ethylene propylene diene terpolymer

ELEV

EQUIP

EW

EPDM

EXP

EXIST

EXT

E

EA

EC

EG

EIFS

EJ

ELEC

insulation interior inside diameter

INSUL

IN(")

INT

ID

inch grab bar general contractor gypsum glass/glazing hollow metal high pressure decorative laminate horizontal hardware hardwood hose bib hot water heating, ventilating & air conditioning

HDWR

HM

HORZ

HT

HPDL

HVAC

HW

height

GB

GL

GRD

GYP

GC

HDWD

HB

grade

PART

PLAS

OVHD

partition plaster overhead

SRT

SS

SQ

miscellaneous masonry opening not in contract not applicable outside diameter numberNO(#)

NTS

OC

OA

NOM

OFF

OPNG

OD

on center overall nominal not to scale office opening

MISC

N

MO

MULL

MTL

NIC

NA

north mullion metal

SHT

SF

SB

SND

SIM

S

RM

ROW

RO

SAT

SAN

architect/ architectural

AB anchor bolt

APPROX

BLDG

BD

ARCH

BM

BLK

ADJ

AFF

AC

ACCU

ALUM

ANOD

ALT

approximate block/blocking at board beam building air cooled condensing unit above finish floor adjustable alternate anodized acoustical aluminum

A/C air conditioning plus or minus constructionCONST course ceramic tile continuous carpet corridor diameter door down ditto dimension double drinking fountain detail drawing downspout

DIA

DR

DS

DN

DO

DIM

DTL

DWG

CRS

CT

CONT

CORR

CPT

DBL

DF

conference concrete

CONF

CONC

finishFIN fluorescent flow line folding field verify furnace footing fire retardant foot scraper fiberglass reinforced plastic

FV

FT(')

FURR

FURN

FTG

G

GA

foot furring gas gauge

FRP

FLR

FLDG

FL

FRT

FS

FLUOR

floor finish grade finish floor

FG

FF

joistJST low volume change masonryMAS

MANUF

MATL

MAX

MECH

MEMB

MH

MIN

MIRR

manufacturer material mechanical membrane maximum minimum manhole mirror

LDR

LF

LAV

LAM

LVC

LOCN

lineal feet ladder lavatory laminate location

REF

R

RAG

RD

PT

PR

QT

PTD

JT

JAN janitor joint

PL

under cabinet lightrequired physical therapy respiratory therapy surgical intensive care unit studded rubber tile stainless steel square specifications

YD

suspended acoustical tile similar sanitary napkin dispenser section shower sheet square feet splash block resilient south sanitary right of way rough opening room

WD

WNDW

WH

WNSCT

WC

WT

WWF

WP

VCT

VWC

VEST

VERT

W W/ W/O yard waterproofing, waterproof welded wire fabric water heater water closet window wood wainscot weight vinyl composition tile vinyl wall covering vertical vestibule west with with out

RT

SICU

central sterile long term care intensive care unit occupational therapy magnetic resonance imaging post anesthetic care unit medical intensive care unit labor-delivery-recovery-post partum operating room

FOR MEDICAL

emergency room computed tomography

FACILITIES ONLY

STORplumbing project/(projected) refer/reference roof drain radius return air grille reinforcing refrigerator riser pressure treated painted quarry tile plywood prefinished pair

TLT

TV

TW

TOC

TPH

TO

TYP

UCL

T&B T

SUSP

STRUCT

TEL

TB

T&G plate/plastic/ property line STL

STD

storage toilet paper holder top of curb toilet television top of typical top of wall tongue & groove top & bottom structure/structural tread telephone tackboard suspended

ICU

OR

LDRP

MRI

MICU

LTC

PT

PACU

OT

CS

CT

ER

steel standard

REFERENCE SECTION 01 00 00 1.3 STATEMENT OF BID ITEM(S)

A. BID ITEM 1 (BASE BID):

Bid Item 1 (Base Bid) includes all scope communicated in the drawings and specifications which includes the complete renovation of the existing Emergency Department, entrance vestibules, drop-off canopies, and decontamination room, and demolition of an existing stair with installation of a new stair from basement to second floor in a new location.

C. BID ITEM 2 (DEDUCT): All work in Bid Item 2 with the following exceptions:

1. Omit all scope related to the drop-off canopies at the new entrance vestibules. New canopy at door AC104A shall remain within the scope of this Bid Item. Refer to the drawings for additional information.

D. BID ITEM 3 (DEDUCT): All work in Bid Item 1 with the following exceptions.

1. Omit all interior signage on project with the exception of signage for toilet rooms. Exterior signage shall remain within the scope of this bid item.

2. Omit scope related to patient lift systems in all rooms. If this bid item is accepted, contractor will not be responsible to provide or install the patient lift systems or any associated above-ceiling substructure.

Associated electrical circuits to power the lift systems shall NOT be omitted and shall remain within the scope of this bid item.

BID DEDUCTS

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

De pa rtm en t o f

Ve te ra ns

A ffa irs

Dwg. Of

Building Key Plan:

BLDG. 1

A/E Seal

C:\Users\bharvey\Documents\TopekaVA_ED_bharvey.rvt

As indicated GI-001

COVER SHEET

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

UPGRADE EMERGENCY DEPARTMENT

COLMERY-O'NEIL VA MEDICAL

CENTER

TOPEKA, KS

1/20/2017

CONSTRUCTION DOCUMENTS

SHEET INDEX

ELECTRICAL

E001 ELECTRICAL INFORMATION

ED101 ELECTRICAL DEMO PLANS - BSMT & 1ST

ED102 ELECTRICAL DEMOLITION PLAN - 2ND FLOOR

EL101 ELECTRICAL LIGHTING PLAN - 1ST FLOOR

EL501 ELECTRICAL LIGHTING DETAILS

EP000 ELECTRICAL OVERALL PLAN - BASEMENT

EP001 ELECTRICAL OVERALL PLAN - 1ST FLOOR

EP101 ELECTRICAL POWER PLAN - 1ST FLOOR

EP102 ELECTRICAL POWER PLAN - ROOF

EP501 ELECTRICAL POWER DETAILS

EP601 ELECTRICAL ONE-LINE DIAGRAM

EP602 ELECTRICAL SCHEDULES

EY101 ELECTRICAL SYSTEMS PLAN - 1ST FLOOR

EY501 ELECTRICAL SYSTEMS DETAILS

T101 ELECTRICAL TELECOM PLAN - 1ST FLOOR

T501 ELECTRICAL TELECOM DETAILS

SHEET INDEX

STRUCTURAL

S-001 GENERAL NOTES

S-002 TYPICAL DETAILS

S-003 TYPICAL DETAILS

S-004 TYPICAL DETAILS

S-100 LEVEL ONE FRAMING AND FOUNDATION PLAN

S-101 LEVEL TWO FRAMING PLAN

S-102 ROOF FRAMING PLAN

S-201 LEVEL 2 PARTIAL PLANS

S-300 BUILDING SECTIONS

S-500 SECTIONS AND DETAILS

S-501 SECTIONS AND DETAILS

S-502 SECTIONS AND DETAILS

S-503 SECTIONS AND DETAILS

S-504 SECTIONS AND DETAILS

MECHANICAL

FP101 FIRE PROTECTION PLAN - FIRST FLOOR

FP102 FIRE PROTECTION PLAN - BASEMENT/2ND

MM001 MECHANICAL COVER SHEET

MM002 MECHANICAL COVER SHEET

MD101 HVAC BASEMENT DEMOLITION PLAN

MD102 HYDRONICS DEMOLITION BASEMENT PLAN

MD111 HVAC FIRST FLOOR DEMOLITION PLAN

MD112 HYDRONICS DEMOLITION PLAN - FIRST FLOOR

MD121 HVAC SECOND FLOOR DEMOLITION PLAN

MH100 HVAC BASEMENT PLAN

MH111 HVAC FIRST FLOOR SA AND EA PLAN

MH112 HVAC FIRST FLOOR MED. VEL SA AND RA PLAN

MH121 HVAC SECOND FLOOR PLAN

MP100 HYDRONICS BASEMENT PLAN

MP101 HYDRONICS FIRST FLOOR PLAN

M501 MECHANICAL DETAILS

M502 MECHANICAL DETAILS

M503 MECHANICAL DETAILS

M504 MECHANICAL DETAILS

M511 MECHANICAL CONTROL DETAILS

M512 MECHANICAL CONTROL DETAILS

M601 MECHANICAL SCHEDULES

M602 MECHANICAL SCHEDULES

M603 MECHANICAL SCHEDULES

M701 HVAC ROOM AIRFLOW PLAN

PLUMBING

PP001 PLUMBING COVER SHEET

PD100 PLUMBING DEMOLITION PLAN - BASEMENT FLOOR

PD101 PLUMBING DEMOLITION PLAN - FIRST FLOOR

PD102 PLUMBING DEMOLITION PLAN - ROOF

PD110 MED GAS DEMO PLAN - BASEMENT FLOOR

PD111 MEDICAL GAS DEMO PLAN - FIRST FLOOR

PL100 PLUMBING PLAN - BASEMENT FLOOR

PL101 PLUMBING PLAN - FIRST FLOOR

PL102 PLUMBING PLAN - ROOF

PL110 MED GAS PLAN - BASEMENT

PL111 MED GAS PLAN - FIRST FLOOR

PL401 PLUMBING DETAILS

PL501 PLUMBING SCHEDULES

SHEET INDEX

GENERAL

GI-001 COVER SHEET

GI-002 ACCESSIBILITY

GI-003 PHASING PLAN - BASEMENT/2ND

GI-004 PHASING PLAN 1ST FLOOR - PHASE 1

GI-005 PHASING PLAN 1ST FLOOR - PHASE 2

LIFE SAFETY

FS100 LIFE SAFETY PLAN - BASEMENT/ 2ND

FS101 LIFE SAFETY PLAN - 1ST FLOOR

CIVIL

GS 1 TOPOGRAPHICAL SURVEY, GENERAL NOTES, UTILITY CONTACTS

GS 2 DEMOLITION PLAN

GS 3 SITE LAYOUT AND PAVING PLAN

GS 4 GRADING PLAN

GS 5 UTILITY PLAN

GS 6 EROSION CONTROL PLAN

GS 7 EROSION CONTROL DETAILS

GS 8 DETAILS

ARCHITECTURE

AD-100 DEMOLITION PLAN - BASEMENT/2ND FLOOR

AD-101 DEMOLITION PLAN - 1ST FLOOR

AS-100 FLOOR PLAN - BASEMENT/2ND FLOOR

AS-101 FLOOR PLAN - 1ST FLOOR

AS-102 DIMENSION FLOOR PLAN - BASEMENT/ 2ND

AS-103 DIMENSIONS PLAN - 1ST FLOOR

AS-104 ENLARGED PLANS

AS-105 PLAN DETAILS

AS-107 BID DEDUCTS

AS-201 ROOF PLAN

AS-202 ROOF DETAILS

AS-301 EXTERIOR ELEVATIONS

AS-302 EXTERIOR ELEVATIONS

AS-401 BUILDING SECTIONS

AS-501 WALL SECTIONS

AS-502 WALL SECTIONS

AS-503 STAIR SECTIONS

AS-504 SECTION DETAILS

AS-505 SECTION DETAILS

AS-506 SECTION DETAILS

AS-601 DOOR SCHEDULE AND DETAILS

AS-602 DOOR & WINDOW DETAILS

AS-700 REFLECTED CEILING - BASEMENT/ 2ND FLOOR

AS-701 REFLECTED CEILING - 1ST FLOOR

AS-702 CEILING DETAILS

ARCHITECTURE INTERIORS

AI-101 FINISH & FURNITURE PLAN - 1ST FLOOR

AI-102 FINISH SCHEDULE

AI-201 EQUIPMENT PLAN FIRST FLOOR

AI-202 ENLARGED EQUIPMENT PLANS

AI-301 WALL PROTECTION & SIGNAGE PLAN

AI-401 INTERIOR ELEVATIONS

AI-402 INTERIOR ELEVATIONS

AI-403 INTERIOR HEADWALL ELEVATIONS

AI-501 MILLWORK SECTION DETAILS

AI-502 MILLWORK SECTION DETAILS

No. Description Date

CL

CL

CL

CLC L

0"

A .F

.F

AL

L

C H

AR

AC

TE

R

S

ACCESSIBLE TOILET STALLS

STANDARD STALL

HANDRAILS

STANDARD END OF WALL STALL

DIRECTIONAL

PARKING STALL

PLAN VIEW

ELEVATION A ELEVATION B

PLAN: ROLL-IN TYPE ELEVATION: ROLL-IN

PARKING SPACES

H.C. LAVATORYH.C. URINAL

H.C. FLOOR MTD. TOILET H.C. WALL MTD. TOILET

FRONT APPROACHSIDE APPROACH

LAV FLOOR SPACE

PARKING

RESERVEDHANDICAP

ENTRANCE

ACCESSIBLE

SINGLE TOILET

OUTDOOR SIGNAGE

ACCESSIBLE SHOWER

PARKING SYMBOL

MENRESTROOM

GENERAL ROOM

IDENTIFICATION RESTROOM RESTROOM

DRINKING FOUNTAINS

INTERIOR SIGNAGE

BATHROOM FIXTURES & ACCESSORIES

VICE

PRINCIPAL

OFFICE

GENERAL REACH DIMENSIONS

LAVATORY DIMENSIONS

MOUNTING HEIGHT DIMENSIONS

NEW CONSTRUCTION

1 1/2 " CLEAR

" m in

" m in

52" min.

12" max

"-1

8"

32" min4" max

" m in 66" min.

42" min latch approach 48" min other approaches

4" m ax

6" m ax

Alternate door location

42" min 12" max

"-1

8"

" m in

6" m ax

36" min

56" min for wall mounted W.C.

59" min for flr mounted W.C.

NEW CONSTRUCTION

16"-18" Lavatory

60" min

12 "

2" 2"

1" 2"

1" 6"4"

4" 2"

1' -6

5'

-0 " A

BO

VE

T.

O

. C U

R B

3"3"

2" x 2" x 1/4 " STL

POST PAINTED & SET

IN 12" DIA x 3'-0"

CONC FILLED POST HOLE

12 "

2" 2"

1" 2"

1" 6"4"

4"

1' -6

3"3"

3' -0

" T O

'-0

AB

O

VE

G R

AD

E

SIGN TO BE MOUNTED IN THE

MOST VISIBLE & CONVENANT

LOCATION

1.25"-2" DIA.

IF

CIRCULAR

NO SCALE

NO SCALE

NO SCALE

2" x 2" x 1/4 " STL

POST PAINTED & SET

IN 12" DIA x 3'-0"

CONC FILLED POST HOLE

TO

C

O N

TR

O

LS

18"

1'-6"

2'-9"

TO

C

O N

TR

O

LS

" T

O

8" M

AX

FLEXIBLE SHOWER

HEAD EXTENSION

SHOWER UNIT W/

ACCESSIBLE CONTROLS

" T

O

8"

GRAB BAR

4'-0"

" m ax

16" max

23"max

Fu ll de pt h of

St al l o r 4

8"

48" min

" m in

CLEAR FLOOR SPACE

1/2" max TRANSITION

NO SCALE

GRAB BAR

ELEV A

SEAT

SEAT

60" min

" m in

" m in

CLEAR FLOOR SPACE

27" max

GRAB BAR

1/2 " MAX TRANSITION

"-3

6"

"-3

6"

" T

O

8"

"-3

6"

16"-27"

TO

C

O N

TR

O

LS

GRAB BAR

SHOWER UNIT W/

ACCESSIBLE CONTROLS

& FLEX SHOWER HEAD

SHOWER UNIT W/

ACCESSIBLE CONTROLS

& FLEX SHOWER HEAD

SHOWER UNIT W/

ACCESSIBLE CONTROLS

& FLEX SHOWER HEAD

FOLDING SEAT

(OPTIONAL)

FOLDING SEAT

(0PTIONAL)

8'-0" MIN. 8'-0" MIN5'-0" CAR

UNIVERSAL PARKING SPACE DESIGN

NO SCALE

NO SCALE

Symbol to be White (Typ.)

3" 13"

6" 18"R.

26" (Typ.)

6"

30"

6"

18"

Dia.

15"

2'-0" 5'-2"

'-0

" t o

Fa ce o f C ur b

3' -9

6' -9

(OR REFER TO SITE PLAN FOR DIMENSIONED

ACCESSIBLE PARKING)

16"-18"

17" MIN.

19" MAX.

48" MIN.

" M

IN

NOT TO EXCEED

FOUNTAIN DEPTH

30" MIN.

" M

IN

36" min

" m ax

-1

9"

7-9"

Sanitary napkin disposal

Toilet paper dispenser

24"-42"6" max

12" max

-1 9"

7"-9"

12" max

24"-42"

42" min

Toilet paper dispenser

Sanitary napkin disposal

-3

6" 36" min 6" max

" m ax

" m in

" m in

1'-7" min

8" min6" max

9"

Clearance profile Insulate drain & supply lines 40

" m ax

Mirror

Paper towel dispenser

4"

Soap dispenser 30

" m in

19" max

48" min

17" min

6" 12" min

16"-18"

54" min 42" min

/2

/8

1/

1/32 " HIGH RAISED

CHARACTERS, TYP.

/8

/2

BRAILLE CHARACTERS, TYP

RAISED BORDER, TYPROOM NUMBER 1/32" HIGH RAISED

INTERN'L SYMBOLS, TYP

6"

1/2 " R TYP

NOTE: MOUNT ACRYLIC SIGNS W/ DOUBLE SIDED FOAM TAPE

ACRYLIC SIGNS 2 CONTRASTING FIN COLORS

TO BUBBLER

3' -6

9" M

IN

" M

AX

HIGH

FOUNTAIN

LOW

FOUNTAIN

17-19"

6" MAX

8" MIN

" M

IN

" M

AX

8" M

IN

LO

W

F O

U N

TA

IN

NO SCALE

NO SCALE

NO SCALE

" m ax

13 1/2"min

"m ax

TO FLUSH CONTROL

HANDICAP BAR

SOAP DISPENSER

MIRROR URINAL

TELEPHONE

CLOCK

LIGHT SWITCH

-1

9" 42

" M

AX

" M

AX

7' -8

"60

" M

AX

" M

AX

" M

AX

1'-2"

(TO HIGHEST

OPERABLE PART)

17" MIN

" M

IN

" M

IN

" M

AX

" M

AX

9" M

IN

6" MAX

17" MIN

" M

IN

" M

AX

" M

AX

9" M

IN

6" MAX

8" MIN

TOILET PAPER

DISPENSER

SANITARY NAPKIN

DISPOSAL

PAPER TOWEL

DISPENSER

OCCUPANCY SIGN

LATCH SIDE PERFERED

TOILET SEAT HT

THERMOSTAT

OR OTHER

CONTROL

" M

IN

" M

AX

48"

" M

IN

Z 48"

Y

X 30" 24"

" M

AX

30"

10" MAX

21" MAX

" M

IN

" M

AX

36" MIN

" M

IN

" M

AX

NOTE: X SHALL BE < 25";

Z SHALL BE > X, WHEN X < 20",

THEN Y SHALL BE 48" MAX

WHEN X IS 20"-25",

THEN Y SHALL BE 44" MAX.

INSULATE

EXPOSED PIPES

NO SCALE

NO SCALE

NO SCALE

" M

AX

COUNTER

OR

LAVATORY

-1

9"

8'-0" VAN

" m in

GRAB BARS

1 1/2 " CLEAR

1.25"-2" DIA.

IF

CIRCULAR

IF NON-

CIRCULAR

PERIMETER

MUST BE 4"-6.25"

AND DIAMETER

MUST NOT

EXCEED 2.25"

IF NON-

CIRCULAR

PERIMETER

MUST BE 4"-6.25"

AND DIAMETER

MUST NOT

EXCEED 2.25"

1/

2" m in

" m in

18" min. grab bar per

ANSI A117.1-2009 39"-41"

/4

/2

BEVELED FLOORING TRANSITIONS

/4

" m ax

/2

" m ax

CARPET ON FLOOR SURFACES

/4

" m ax

BEVELED FLOORING TRANSITIONS

ACCESSIBLE

VAN

18" min. grab bar per

ANSI A117.1-2009

EL

EV

B

PLAN: TRANSFER TYPE

CONCRETE

WHEEL STOP

4" WIDE PAINT

STRIPING,

TYP.

4' o.c.

TOP AND SIDES

MUST BE

UNOBSTRUCTED.

UP TO 20% OF

BOTTOM MAY BE

OBSTRUCTED FOR

SUPPORTS.

CARPET CUSHION/ PADDING NOT PERMITTED

MOUNTING HEIGHTS

5' -6

MEDICAL GAS

ZONE VALVE

NURSE CALL -

PATIENT TOILET

5' -6

4"

CORD

ROBE HOOK

6' -0

5' -0

CALL STATION/

FLUSH-MOUNTED

STATION

8"

RETURN AIR

REGISTER

5' -2

5' -2

O

R

FILM

ILLUMINATOR

5' -2

RECEPTACLE

& GROUND

5' -2

GROUND

FAULT

INDICATOR

5' -2

REMOTE

GROUND

INDICATOR

5' -2

VARIABLE

INTENSITY O.R.

LIGHT CONTROL

5' -0

NITROGEN

SHUT-OFF

VALVE

5' -2

O.R. RECEPTACLE

CODE BLUE

5' -2

SWITCH

NEED TO VERIFY ALL

FIXTURE TYPE & SIZES

WITH MANUFACTURER

3' -6

ELEVATOR

CALL BUTTON

O.R.

6' -0

ELEVATOR

HALL LANTERN

5' -0

" RAISED

CHARACTER

FLOOR

DESIGNATION

5' -0

2' -1

1"

ELEVATOR

CONTROL

PHONE

ELEVATOR MEDICAL EQUIPMENT

NO SCALE

WHEELCHAIR MANEUVERING

TURNING CLEAR

2' - 6"

4'

0"

5' - 0"

5'

0"

1' - 0" 3' - 0"

1' - 0"

2'

0" 3'

0"

T-SHAPED

5' - 0"

MANEUVERING CLEARANCES AT DOORS

LATCH SIDE APPROACHLATCH SIDE APPROACH

HINGE SIDE APPROACH

HINGE SIDE APPROACH

FRONT APPROACHFRONT APPROACH

Y

M

IN

.X

24" MIN.

X

Y

Y

M

IN

X

24" MIN.

X

M

IN

M

IN

18" MIN.

24" PREF.

54" MIN.

Y

M

IN

NOET: Y=48" MIN. IF DOOR

HAD BOTH A LATCH AND

CLOSER

PATIENT BEDROOM MIN. DOOR WIDTH: 3'-10"

NOTE: X=12" IF DOOR

HAS BOTH A CLOSER

AND LATCH

NOTE: X=36" MIN. IF Y=60",

X=42" MIN. IF Y=54"

NOTE: Y=48" MIN. IF

DOOR HAS CLOSER

NOTE: Y=54" MIN. IF

DOOR HAS CLOSER

PULL SIDE

PUSH SIDE

PULL SIDE PUSH SIDEPUSH SIDE

90 TURNS 180 TURN

60"

X < 48"

60"

48" 48"

60"

X < 48"

GENERAL NOTES

ALL CONSTRUCTION & RENOVATION SHALL MEET THE UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS), ADA ACCESSIBILITY GUIDELINES FOR BUILDINGS & FACILITIES (ADAAG), & ARCHITECTURAL

BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS).

SUPPLEMENTAL TO THE (ABAAS), CONSTRUCTION & RENOVATION IN HEALTH FACILITIES OF THE DEPARTMENT OF VETERAN AFFAIRS (VA) SHALL COMPLY WITH THE BARRIER FREE DESIGN GUIDE: A

SUPPLEMENT TO THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (PG-18-13).

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

De pa rtm en t o f

Ve te ra ns

A ffa irs

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

C:\Users\bharvey\Documents\TopekaVA_ED_bharvey.rvt

As indicated

1/20/2017 3:42:05 PM

GI-002

ACCESSIBILITY

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

1/20/2017

STORAGE

C148

STAIRS

C149

ROOM

B1C

STAIRS

C150

CORR.

B207

NOT IN SCOPE OF WORK

CORRIDOR

C151

PHASING NOTES & LEGEND

PHASE 1:

GENERAL DESCRIPTION: CONSTRUCT VESTIBULES, NEW STAIR, 2ND FLOOR CONNECTING CORRIDOR.

PHASE 2:

GENERAL DESCRIPTION: RENOVATE REMAINDER OF EXISTING ED

GENERAL PHASING NOTES:

THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER’S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO;

TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND EMERGENCY

PREPAREDNESS.

REFER TO THE ASBESTOS REPORT, LEAD BASED PAINT REPORT, AND ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL.

HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR

ADDITIONAL CLARIFYING INFORMATION.

THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA’S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE

ADJACENT DEPARTMENTS.

1. ED LOCATION: THE EMERGENCY DEPARTMENT (ED) WILL OPERATE OUT OF THEIR CURRENT LOCATION DURING THE MAJORITY OF THIS PHASE.

2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): THE AOD OFFICE WILL OPERATE NORMALLY. AMBULANCE AND WALK-UP ENTRY POINT FOR ED WILL THROUGH

NIGHT ENTRANCE.

3. TOILETS: EXISTING TOILETS WILL BE AVAILABLE DURING THIS PHASE.

4. TREATMENT/TRAUMA ROOMS: EXISTING ROOMS WILL BE AVAILABLE DURING THIS PHASE. EXISTING EXAM ROOM SHALL BE USED AS TEMPORARY

SUPPLY/CLEAN ROOM.

5. ACCESS/EGRESS: ACCESS TO EXTERIOR DOOR AT NURSE STATION SHALL BE MAINTAINED AS AN EGRESS PATH AT NORTH END OF ED.

6. CONSTRUCTION ZONE: AREA TO THE EAST OF THE EXISTING ED DEPARTMENT, DEMO EXISTING STAIR, BEGIN CONSTRUCTION OF ENTRY VESTIBULES, AND NEW STAIR.

7. OTHER CONSIDERATIONS: ENTRY VESTIBULE WILL REQUIRE BEING CONSTRUCTED IN TWO PHASES SUCH THAT THIS BUILDING ENTRANCE REMAINS

OPEN AT ALL TIMES. REFER TO PHASING PLAN FOR FURTHER INFORMATION.

8. WORK SHALL BEGIN ON SECOND FLOOR CONNECTING CORRIDOR.

1. ED LOCATION: THE EMERGENCY DEPARTMENT WILL RELOCATE TO THE NEWLY COMPLETE PHASE 1 AREA.

2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): ADMISSIONS AND CHECK-IN WILL BE LOCATED IN THE EAST AOD OFFICE WHILE THE WEST AOD OFFICE WILL

BE TEMPORARY TRIAGE.

3. TOILETS: 3 NEW PUBLIC TOILETS WILL BE AVAILABLE, 2 PATIENT TOILETS, AND A STAFF TOILET.

4. TREATMENT/TRAUMA ROOMS: ASSUMING TRIAGE CAN SERVE AS TEMPORARY TREATMENT, THERE WILL BE 5 TREATMENT ROOMS (INCLUDING A SECLUSION ROOM). THE NEW EAST TRAUMA ROOM WILL SERVE AS TEMPORARY NURSE STATION DURING THIS PHASE.

5. ACCESS/EGRESS: NORTHEAST EXIT WILL BE OPEN. TEMPORARY DOOR IN STAFF BREAK ROOM WILL SERVE AS TEMPORARY SOUTH ROUTE OUT OF

THE UNIT.

6. CONSTRUCTION ZONE: WEST AREA OF THE PROJECT, AN AREA GENERALLY FOLLOWING EXISTING EMERGENCY DEPARTMENT OUTLINE.

7. CONSTRUCT DECON ROOM ADDITION

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

De pa rtm en t o f

Ve te ra ns

A ffa irs

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

C:\Users\bharvey\Documents\TopekaVA_ED_bharvey.rvt

As indicated

1/20/2017 3:42:13 PM

GI-003

PHASING PLAN -

BASEMENT/2ND

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

1/20/2017

1/8" = 1'-0"GI-003

A PHASING PLAN - BASEMENT

1/8" = 1'-0"GI-003

B PHASING PLAN - 2ND FLOOR

NORTH NORTH

4' 8' 16'

1/8" = 1'-0"

0' 4' 8' 16'

1/8" = 1'-0"

0'

UP

MRI ZONE

II

C146

BLUE

TEAM

B145

CLINICAL

PHARMACIST

B147

CLINICAL

PHARMACIST

B148

CLINICAL

PHARMACIST

B149

NUTRITION

CLINIC 1

A135

NUTRITION

CLINIC 2

A136

CLINICAL

PHARMACIST

A137

SOUTH

ELEV

LOBBY

A141

NOT IN SCOPE

OF WORK

NOT IN

SCOPE OF

WORK

CORRIDOR

C144

CORRIDOR

C144

WORK

ROOM

B143

WORK

ROOM

B142

EXAM #18

B141

EXAM #17

B140

EXAM #4

B125

EXAM #3

B124

EXAM #2

B123

EXAM #1

B119

CORRIDOR

B1-02

STAIR 3

B117A

CORRIDOR

B1-02

MEN

B101

DUMBWAITER

A134

WOMEN

A113

HOUSEKEEPING

A138

ELEVATOR

LOBBY

A140

STORAGE

A129A

STORAGE

A129

EXAM #21

AC121

EXAM #23

AC123

EXAM #25

AC125PHARMACY

AC124

WORK

ROOM

AC122A

WORK

ROOM

AC122

EXAM #5

AC105

EXAM #6

AC106

EXAM #9

AC109

RED TEAM

AC108EXAM #10

AC110

EXAM #11

AC111

ELEC

CLOSET

AC116E

1 HR RATED CONSTRUCTION

BARRIER - REF SPECS

NOTE: BARRIERS ON EITHER

SIDE OF CORRIDOR SHALL NOT

EXIST CONCURRENTLY.

PROVIDE RATED CONSTRUCTION

BARRIER TO CLOSE OPENINGS

IN EXISTING WALL - TYP

TEMPORARY 1 HR RATED

CONSTRUCTION BARRIER

PROVIDE TEMP DOOR AND WALL

AFTER DEMO OF EXIST

REVOLVING DOOR AND DURING

CONSTRUCTION OF ED ENTRY

VESTIBULE

PROVIDE HARDENED COVER OVER

EGRESS PATH FOR PROTECTION

WHILE THIS SERVES AS TEMPORARY

ENTRANCE

AMBULANCE ENTRY

DURING PHASE 1

PHASE 1

NOT IN SCOPE

OF WORK

POLICE EVIDENCE LOCKER AND

ARMORY SHALL BE VACATED BY

VA PRIOR TO START OF

DEMOLITION

PHASE 1A

PHASE 1A INTENT IS TO OPEN

SOUTHWEST EGRESS TO CORRIDOR

FOR ED DURING PHASE I

PHASE 1B - THIS CORRIDOR

NOW SERVES AS SOUTH

EGRESS FROM ED.

1 HR RATED

CONSTRUCTION BARRIER

DURING PHASE 1

DEMO STAIRS IN PHASE 1

CONSTRUCT NEW ED ENTRY

VESTIBULE AND CANOPY ABOVE

DURING PHASE 1

HARDENED CONSTRUCTION

BARRIER WALLS

EXISTING REVOLVING DOOR TO BE

DEMO'D

1 HR RATED

CONSTRUCTION BARRIER

DURING PHASE 1

ROOM

B144D

ROOM

B144C

ROOM

B144

EXAM #40

AC140

EXAM #39

AC139

1 HR RATED CONSTRUCTION

BARRIER - REF SPECS

NOTE: BARRIERS ON EITHER

SIDE OF CORRIDOR SHALL NOT

EXIST CONCURRENTLY.NIGHT/WEEKEND WORK TO OPEN PASSAGE

THROUGH THIS AREA. COMPLETE ARCH/MEP AND

FINISHES IN THIS AREA AND AT VENDING AREA

ONCE CORR C144 IS AVAILABLE FOR USE

THIS DOOR AND WALKWAY

OUTSIDE SHALL REMAIN OPEN AS

A TEMPORARY EGRESS FROM

NORTH END OF ED DURING PHASE I

PHASING NOTES & LEGEND

PHASE 1:

GENERAL DESCRIPTION: CONSTRUCT VESTIBULES, NEW STAIR, 2ND FLOOR CONNECTING CORRIDOR.

PHASE 2:

GENERAL DESCRIPTION: RENOVATE REMAINDER OF EXISTING ED

GENERAL PHASING NOTES:

THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER’S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO;

TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND EMERGENCY

PREPAREDNESS.

REFER TO THE ASBESTOS REPORT, LEAD BASED PAINT REPORT, AND ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL.

HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR

ADDITIONAL CLARIFYING INFORMATION.

THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA’S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE

ADJACENT DEPARTMENTS.

1. ED LOCATION: THE EMERGENCY DEPARTMENT (ED) WILL OPERATE OUT OF THEIR CURRENT LOCATION DURING THE MAJORITY OF THIS PHASE.

2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): THE AOD OFFICE WILL OPERATE NORMALLY. AMBULANCE AND WALK-UP ENTRY POINT FOR ED WILL THROUGH

NIGHT ENTRANCE.

3. TOILETS: EXISTING TOILETS WILL BE AVAILABLE DURING THIS PHASE.

4. TREATMENT/TRAUMA ROOMS: EXISTING ROOMS WILL BE AVAILABLE DURING THIS PHASE. EXISTING EXAM ROOM SHALL BE USED AS TEMPORARY

SUPPLY/CLEAN ROOM.

5. ACCESS/EGRESS: ACCESS TO EXTERIOR DOOR AT NURSE STATION SHALL BE MAINTAINED AS AN EGRESS PATH AT NORTH END OF ED.

6. CONSTRUCTION ZONE: AREA TO THE EAST OF THE EXISTING ED DEPARTMENT, DEMO EXISTING STAIR, BEGIN CONSTRUCTION OF ENTRY VESTIBULES, AND NEW STAIR.

7. OTHER CONSIDERATIONS: ENTRY VESTIBULE WILL REQUIRE BEING CONSTRUCTED IN TWO PHASES SUCH THAT THIS BUILDING ENTRANCE REMAINS

OPEN AT ALL TIMES. REFER TO PHASING PLAN FOR FURTHER INFORMATION.

8. WORK SHALL BEGIN ON SECOND FLOOR CONNECTING CORRIDOR.

1. ED LOCATION: THE EMERGENCY DEPARTMENT WILL RELOCATE TO THE NEWLY COMPLETE PHASE 1 AREA.

2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): ADMISSIONS AND CHECK-IN WILL BE LOCATED IN THE EAST AOD OFFICE WHILE THE WEST AOD OFFICE WILL

BE TEMPORARY TRIAGE.

3. TOILETS: 3 NEW PUBLIC TOILETS WILL BE AVAILABLE, 2 PATIENT TOILETS, AND A STAFF TOILET.

4. TREATMENT/TRAUMA ROOMS: ASSUMING TRIAGE CAN SERVE AS TEMPORARY TREATMENT, THERE WILL BE 5 TREATMENT ROOMS (INCLUDING A SECLUSION ROOM). THE NEW EAST TRAUMA ROOM WILL SERVE AS TEMPORARY NURSE STATION DURING THIS PHASE.

5. ACCESS/EGRESS: NORTHEAST EXIT WILL BE OPEN. TEMPORARY DOOR IN STAFF BREAK ROOM WILL SERVE AS TEMPORARY SOUTH ROUTE OUT OF

THE UNIT.

6. CONSTRUCTION ZONE: WEST AREA OF THE PROJECT, AN AREA GENERALLY FOLLOWING EXISTING EMERGENCY DEPARTMENT OUTLINE.

7. CONSTRUCT DECON ROOM ADDITION

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

De pa rtm en t o f

Ve te ra ns

A ffa irs

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

C:\Users\bharvey\Documents\TopekaVA_ED_bharvey.rvt

As indicated

1/20/2017 3:42:32 PM

GI-004

PHASING PLAN 1ST

FLOOR - PHASE 1

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

1/20/2017

1/8" = 1'-0"GI-004

A PHASING PLAN - 1ST FLOOR - PHASE 1 4' 8' 16'

1/8" = 1'-0"

0'

NORTH

MRI ZONE

II

C146

BLUE

TEAM

B145

CLINICAL

PHARMACIST

B147

CLINICAL

PHARMACIST

B148

CLINICAL

PHARMACIST

B149

NUTRITION

CLINIC 1

A135

NUTRITION

CLINIC 2

A136

CLINICAL

PHARMACIST

A137

SOUTH

ELEV

LOBBY

A141

NOT IN SCOPE

OF WORK

NOT IN

SCOPE OF

WORK

CORRIDOR

C144

CORRIDOR

C144

WORK

ROOM

B143

WORK

ROOM

B142

EXAM #18

B141

EXAM #17

B140

EXAM #4

B125

EXAM #3

B124

EXAM #2

B123

EXAM #1

B119

CORRIDOR

B1-02

STAIR 3

B117A

CORRIDOR

B1-02

MEN

B101

DUMBWAITER

A134

WOMEN

A113

HOUSEKEEPING

A138

ELEVATOR

LOBBY

A140

STORAGE

A129A

STORAGE

A129

EXAM #21

AC121

EXAM #23

AC123

EXAM #25

AC125PHARMACY

AC124

WORK

ROOM

AC122A

WORK

ROOM

AC122

EXAM #5

AC105

EXAM #6

AC106

EXAM #9

AC109

RED TEAM

AC108EXAM #10

AC110

EXAM #11

AC111

ELEC

CLOSET

AC116E

1 HR RATED CONSTRUCTION BARRIER

DURING PHASE 2

CORRIDOR

C144

ED

WAITING

AC101

ADMIT

AC101B

ADMIT

AC101C

WORK

AC132

NURSE

MGR

AC133

WAITING

AC137

TLT

AC135A

TRTMT 3

AC135

TRTMT 2

FEMALE

AC134

HALL

AC131

TRTMT 1

AC129TRIAGE

AC128CONSULT/

BRVMNT

AC101D

NEW

STAIR

AC103

ED ENTRY

AC100

OUTPATIENT

ENTRY

C100

VA POLICE

AC101A TLT

C130

VESTIBULE

AC104

JAN

AC127B

TRAUMA 1

B113

BREAK

AC136

TLT

AC136A

EXAM #40

AC140

EXAM #39

AC139

CLOSET

B144B

ROOM

B144C

ROOM

B144D

SECLUSION

B105

SECLUSION

AC119

TLT

AC134A

NOT IN SCOPE

OF WORK

DECON ADDITION MAY NOT BE CONSTRUCTED

UNTIL AMBULANCE GARAGE ACCESS TO THE

ED IS MADE AVAILABLE (NEAR END OF PHASE

1)

NEW TRAUMA 1 ROOM

SERVES AS TEMPORARY

NURSE STATION DURING

PHASE 2

ONCE ED ENTRY VESTIBULE IS OPEN,

COMPLETE WORK ON OUTPATIENT

ENTRY VESTIBULE

COORDINATE PHASING OF FINISHES

WORK IN FRIEGHT ELEVATOR WITH

PROJECT COR

COMPLETE WORK THIS

AREA ONCE NEW

CORRIDOR DOORS

ARE COMPLETE

3'-6" TEMPORARY

EMERGENCY EXIT

DOOR - REMOVE AT

END OF PHASE

DOOR SERVES AS EMERGENCY EXIT DURING PHASE 2 - INSTALL

ACCESS CONTROL HARDWARE AFTER NEW SOUTHEAST EXIT IS OPEN

WAIT TO INSTALL STOREFRONT

SYSTEM UNTIL OUTPATIENT ENTRY

VESTIBULE IS COMPLETE - THIS

OPENING SERVES AS TEMPORARY

ACCESS BETWEEN ED ENTRY

VESTIBULE CORRIDOR C144

CORR

B1-03B

CORR

C101

VENDING

AC138C

WAITING

AC138B

ELEVATOR

S1

TEMPORARY SUPPLY

ROOM/AREA DURING

THIS PHASE

TEMP. TRIAGE DURING

THIS PHASE

ROOM

B144

CORRIDOR

B1-03B

CORRIDOR

B1-03

ELEC

AC127A

STORAGE

B1-03C

TLT

B1-03D

PHASE 2

PHASING NOTES & LEGEND

PHASE 1:

GENERAL DESCRIPTION: CONSTRUCT VESTIBULES, NEW STAIR, 2ND FLOOR CONNECTING CORRIDOR.

PHASE 2:

GENERAL DESCRIPTION: RENOVATE REMAINDER OF EXISTING ED

GENERAL PHASING NOTES:

THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER’S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO;

TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND EMERGENCY

PREPAREDNESS.

REFER TO THE ASBESTOS REPORT, LEAD BASED PAINT REPORT, AND ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL.

HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR

ADDITIONAL CLARIFYING INFORMATION.

THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA’S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE

ADJACENT DEPARTMENTS.

1. ED LOCATION: THE EMERGENCY DEPARTMENT (ED) WILL OPERATE OUT OF THEIR CURRENT LOCATION DURING THE MAJORITY OF THIS PHASE.

2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): THE AOD OFFICE WILL OPERATE NORMALLY. AMBULANCE AND WALK-UP ENTRY POINT FOR ED WILL THROUGH

NIGHT ENTRANCE.

3. TOILETS: EXISTING TOILETS WILL BE AVAILABLE DURING THIS PHASE.

4. TREATMENT/TRAUMA ROOMS: EXISTING ROOMS WILL BE AVAILABLE DURING THIS PHASE. EXISTING EXAM ROOM SHALL BE USED AS TEMPORARY

SUPPLY/CLEAN ROOM.

5. ACCESS/EGRESS: ACCESS TO EXTERIOR DOOR AT NURSE STATION SHALL BE MAINTAINED AS AN EGRESS PATH AT NORTH END OF ED.

6. CONSTRUCTION ZONE: AREA TO THE EAST OF THE EXISTING ED DEPARTMENT, DEMO EXISTING STAIR, BEGIN CONSTRUCTION OF ENTRY VESTIBULES, AND NEW STAIR.

7. OTHER CONSIDERATIONS: ENTRY VESTIBULE WILL REQUIRE BEING CONSTRUCTED IN TWO PHASES SUCH THAT THIS BUILDING ENTRANCE REMAINS

OPEN AT ALL TIMES. REFER TO PHASING PLAN FOR FURTHER INFORMATION.

8. WORK SHALL BEGIN ON SECOND FLOOR CONNECTING CORRIDOR.

1. ED LOCATION: THE EMERGENCY DEPARTMENT WILL RELOCATE TO THE NEWLY COMPLETE PHASE 1 AREA.

2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): ADMISSIONS AND CHECK-IN WILL BE LOCATED IN THE EAST AOD OFFICE WHILE THE WEST AOD OFFICE WILL

BE TEMPORARY TRIAGE.

3. TOILETS: 3 NEW PUBLIC TOILETS WILL BE AVAILABLE, 2 PATIENT TOILETS, AND A STAFF TOILET.

4. TREATMENT/TRAUMA ROOMS: ASSUMING TRIAGE CAN SERVE AS TEMPORARY TREATMENT, THERE WILL BE 5 TREATMENT ROOMS (INCLUDING A SECLUSION ROOM). THE NEW EAST TRAUMA ROOM WILL SERVE AS TEMPORARY NURSE STATION DURING THIS PHASE.

5. ACCESS/EGRESS: NORTHEAST EXIT WILL BE OPEN. TEMPORARY DOOR IN STAFF BREAK ROOM WILL SERVE AS TEMPORARY SOUTH ROUTE OUT OF

THE UNIT.

6. CONSTRUCTION ZONE: WEST AREA OF THE PROJECT, AN AREA GENERALLY FOLLOWING EXISTING EMERGENCY DEPARTMENT OUTLINE.

7. CONSTRUCT DECON ROOM ADDITION

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

De pa rtm en t o f

Ve te ra ns

A ffa irs

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

C:\Users\bharvey\Documents\TopekaVA_ED_bharvey.rvt

As indicated

1/20/2017 3:42:54 PM

GI-005

PHASING PLAN 1ST

FLOOR - PHASE 2

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

1/20/2017

1/8" = 1'-0"GI-005

1 PHASING PLAN - 1ST FLOOR - PHASE 2

NORTH

4' 8' 16'

1/8" = 1'-0"

0'

STAIRS

STORAGE

STORAGE

ELEC./ IT

STORAGE

ROOM

IT CLOSET

FEC

VACANT

E X

IT

12/1 2.4" 48"

GROUP S OCCUPANCY

TYPE II (000) CONSTRUCTION

FULLY SPRINKLERED = YES

TOTAL OCCUPANTS : 12

OCCUPANCY 1 : BASEMENT = 5,628 SF

STAIRS

CORR.

DENTAL

SURGERY

DECON

ROOM

DENTAL

OFFICE

DENTAL

OFFICE

X-RAY

ROOM

ISOLATION

PATIENT

EXAM

LAB

SUPPLIES

DENTAL

ADMINISTRATION

OFFICE

DENTAL

RECEPTION

CORRIDOR

DENTAL

TREATMENT

SUITE

DENTAL

TREATMENT

ROOM

AUTHORIZED

PERSONNEL

ONLY

SUPPLY

ROOM

BREAK

ROOM

FEC

VACANT

HORIZONTAL EXIT

EXTERIOR WALL

RATED 1 HR FOR

10'-0"

EXTERIOR WALL

RATED 1 HR FOR 10'-0"

44/2 4.4" 48"

BUSINESS OCCUPANCY

TYPE I (332) CONSTRUCTION

FULLY SPRINKLERED = YES

TOTAL OCCUPANTS : 42

OCCUPANCY 1 : SECOND FLOOR = 4,461 SF

CORRIDOR

BUSINESS OCCUPANCY

TYPE II (000) CONSTRUCTION

FULLY SPRINKLERED = YES

TOTAL OCCUPANTS : 0

OCCUPANCY 2 : SECOND FLOOR = 668 SF

LEGEND

BUILDING & LIFE SAFETY REQUIREMENTS

DESCRIPTION

WALL

RATING

NEW

PARTITION KEY

NFPA 2015

(NEW HC)

NFPA 2015

(EXIST. HC)

OPENINGS DAMPERS

RATING RFRNC. TYPE RFRNC.

BUILDING SEPARATION:

FIRE BARRIER

2 HR NOT

APPLICABLE

90 MIN IBC 705.8

TABLE 715.4

FIRE

90 MIN

IBC 705.11

IBC 715.5.1

IBC 716.5.1

NOT

APPLICABLE

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

1 HR 60 MIN NFPA 8.2.3.2.3.1 (1)

IBC 706.7

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

IBC 706.10

IBC 716.3.1

IBC 716.5.2

NFPA 6.1.14

NFPA 8.2.3.1.2

VERT. OPG. (EXIT ENCLSR/SHAFT)

FIRE BARRIER

(2 HR = 4 OR MORE STORIES)

(1 HR = LESS THAN 4 STORIES)

NFPA 19.3.1.1

NFPA 8.2.5.4

NFPA 18.3.1.1

NFPA 8.2.5.4

NFPA 8.2.3.2.3.1

IBC 715.4/714.2

NOT

ALLOWED

NFPA 1005.3.4.1

NFPA 1020.12

IBC 715.5.3

IBC 716.5.21 HR

2 HR

60 MIN

90 MIN

1 H R

2 HR

EXIT PASSAGEWAY (HORIZ.)

FIRE BARRIER

NFPA 8.2.3.2.3.1 IBC

715.4/714.2

NFPA 18.2.2.7

NFPA 7.2.6

NOT

ALLOWED

NFPA 1005.3.4.1

NFPA 1021.5

NFPA 19.2.2.7

NFPA 7.2.6

60 MIN

90 MIN

HAZ./INCIDENTAL USE

FIRE BARRIER

1 HR 45 MIN

NFPA 8.2.3.2.3.1 (2)

IBC 706.7

IBC 715.4

NFPA 18.3.2.1

NFPA 8.4.1.1

FIRE

90 MIN

NFPA 18.3.2.1

NFPA 8.4.1.1

IBC 715.3.1

IBC 716.3.1

IBC 715.5.2

IBC 716.5.2

HAZ./INCIDENTAL USE

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

NR

SELF OR AUTO

CLOSING

IBC 710.5.3

IBC 715.4.7.3

IBC 508.2.2.1

NFPA 8.4.1.2 SEE

NOTE B

NFPA 8.4.1.2

SUBDIVIDING SPACES

SMOKE BARRIER

20 MIN NFPA 8.3.4.2 (1)

IBC 709.5

NFPA 18.3.7.1

NFPA 18.3.7.3

SMOKE

90 MIN

SEE NOTE [A]

NFPA 8.3.5.1

IBC 709.8

IBC 716.5.5

SEE NOTE [C]

NFPA 19.3.7.1

1/2

HR

1 HR

SUITE SEPARATION

SMOKE PARTITION

NR NFPA 18.2.5 IBC 710.5.3

IBC 715.4.7.3

SEE

NOTE [B]

NR

SELF OR AUTO

CLOSING

NFPA 18.2.5

10/1 2"

34"

REQ'D. EXIT WIDTH

NO. OF OCC. EXITING

ACTUAL EXIT WIDTH

NO. OF OCC./

NO. OF EXITS

NO. OCC. EXITING

(SMALLER ROOMS)

MAXIMUM OCCUPANCY

AREA

OCC. LOAD FACTOR

1:50

FIRE EXTINGUISHER AND CABINET

FIRE ALARM CONTROL PANEL

FIRE SYSTEM ANNUNCIATOR ALARM

ANNUNCIATOR PANEL

PROPERTY LINE

FEC

FACP

FSA

FAAP

100'

(50)

STARTING

LOCATION

EXITING #

TRAVEL

DISTANCE

TRAVEL PATH

[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS WHERE

HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)

[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS (NFPA

8.2.4.4.3) (IBC 710.7)

[C] SMOKE DAMPERS ARE NOT REQUIRED WHERE OPENINGS IN DUCT ARE LIMITED TO A

SINGLE SMOKE COMPARTMENT & DUCTS ARE MADE OF STEEL (IBC 716.5.5)

[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED

ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)

NOTES

SYMBOLS

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

90 MIN NFPA 8.2.3.2.3.1 (1)

IBC 706.7

FIRE

90 MIN

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

IBC 706.10

IBC 716.3.1

IBC 716.5.2

NFPA 6.1.14

NFPA 8.2.3.1.2

2 HR

RATED UL

ASSEMBLES

UL U412

UL U419

UL U412

UL U419

UL U412

UL U419

UL U415(B)

UL U412

UL U419

UL U412

UL U419

UL U415(A)

HORIZONTAL BUILDING SEPARATION:

FIRE BARRIER

2 HR NOT

APPLICABLE

90 MIN IBC 705.8

TABLE 715.4

FIRE

90 MIN

IBC 705.11

IBC 715.5.1

IBC 716.5.1

NOT

APPLICABLE

UL U412

UL U419

CODE INFORMATION

PROJECT INFORMATION:

1. CONSTRUCTION PURPOSE: ADDITION / RENOVATION

2. REASON FOR SUBMITTAL: NEW CONSTRUCTION

3. I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE THE

SUBMITTED PLANS FOR THE ABOVE-REFERENCED PROJECT

COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING:

2015 LIFE SAFETY CODE (NFPA-101)

2014 NATIONAL ELECTRICAL CODE (NFPA-70)

CURRENT ABA ACCESSIBILITY STANDARDS

2014 INTERNATIONAL BUILDING CODE (IBC)

2014 INTERNATIONAL MECHANICAL CODE (IMC)

2014 INTERNATIONAL PLUMBING CODE (IPC)

4. LOCATION OF ANTICIPATED FUTURE ADDITIONS: UNKNOWN

5. OWNER:

COLMERY - O'NEIL VA MEDICAL CENTER

2200 SW GAGE BLVD.

TOPEKA, KS 66622

PH (785) 350-3111

7. DESIGN TEAM:

ARCHITECT:

HEALTH FACILITIES GROUP, LLC

142 N. MOSLEY ST., SUITE 300

WICHITA, KS 67202 316-262-2500

CONTACT: BEN HARVEY

DESIGN CONSULTANTS:

STRUCTURAL:

KH ENGINEERING GROUP, P.A.

15377 W. 95TH ST.

LENEXA, KS 66219 913-825-9381

CONTACT:

KATHY HAGEN

KHAGEN@KHEGROUP.COM

CIVIL, MECHANICAL, ELECTRICAL, & PLUMBING:

PROFESSIONAL ENGINEERING CONSULTANTS

303 S. TOPEKA

WICHITA, KS 67202 316-262-2691

CONTACT:

DARIN CROWDER

DARIN.CROWDER@PEC1.COM

8. ARCHITECTS SEAL: SEE STAMP AT BELOW

9. FIRE SERVICE: TOPEKA, KANSAS FIRE DEPARTMENT

10. INSPECTION: VISN SAFETY OFFICER

11. OCCUPANCY GROUP TYPE:

OCCUPANCY 1 - BUSINESS

OCCUPANCY 2 - NEW AMBULATORY HEALTH CARE

12. CONSTRUCTION TYPE: NFPA TYPE I (332) & NFPA TYPE II (000)

13. STRUCTURAL CODE REQUIREMENTS

A. ALLOWABLE FLOOR AREA FROM NFPA 5000 TABLE 7.4.1:

TOTAL ALLOWABLE FLOOR AREA:

TYPE I (332) = UNLIMITED

TYPE II (000) = 23,000

NEW FLOOR AREA ADDED W/ THIS PROJECT:

OCCUPANCY 1 - BUSINESS

FIRST FLOOR = 15,261 SF

SECOND FLOOR = 659 SF

OCCUPANY 2 - NEW AMBULATORY HEALTH CARE

FIRST FLOOR = 177 SF

EXISTING FLOOR AREA :

OCCUPANCY 1 - BUSINESS

FIRST FLOOR = 98 SF

SECOND FLOOR = 4,461 SF

OCCUPANY 2 - NEW AMBULATORY HEALTH CARE

FIRST FLOOR = 7,008 SF

GRAND TOTAL

FIRST FLOOR = 22,446 SF

SECOND FLOOR = 5,120 SF

B. ALLOWABLE HEIGHT CALCULATIONS

OCCUPANCY 1 - BUSINESS

TYPE OF CONSTRUCTION: TYPE II (000)

ALLOWABLE STORIES: 5

ALLOWABLE HEIGHT: 75'

ACTUAL STORIES: 1

ACTUAL HEIGHT: 25'-8"

NO HEIGHT MODIFICATIONS REQUIRED

OCCUPANCY 2 - NEW AMBULATORY HEALTH CARE

TYPE OF CONSTRUCTION: TYPE II (000)

ALLOWABLE STORIES: 5

ALLOWABLE HEIGHT: 75'

ACTUAL STORIES: 1

ACTUAL HEIGHT: 26'-4"

NO HEIGHT MODIFICATIONS REQUIRED

ALLOWABLE AREA CALCULATIONS:

NO AREA MODIFICATIONS TAKEN

C. FIRE-RESISTANCE RATING FOR BUILDING ELEMENTS:

TYPE I (332)

1. BEARING WALLS:

A. EXTERIOR: 3HR

B. INTERIOR: 3HR

2. NONBEARING WALLS:

A. EXTERIOR: 0HR, 1HR, SEE NFPA 5000 TABLE 7.3.2.1

B. INTERIOR: 0HR

3. COLUMNS: 2HR

4.BEAMS, GIRDERS,

TRUSSES, AND ARCHES: 2HR

5. FLOOR/CEILING

ASSEMBLIES: 2HR

6. ROOF/CEILING

ASSEMBLIES: 1.5HR

7. SHAFT ENCLOSURES: 1HR NFPA 101 8.6, 18.3.1

TYPE II (000)

1. BEARING WALLS:

A. EXTERIOR: 0HR

B. INTERIOR: 0HR

2. NONBEARING WALLS:

A. EXTERIOR: 0HR, 1HR, SEE NFPA 5000 TABLE 7.3.2.1

B. INTERIOR: 0HR

3. COLUMNS: 0HR

4.BEAMS, GIRDERS,

TRUSSES, AND ARCHES: 0HR

5. FLOOR/CEILING

ASSEMBLIES: 0HR

6. ROOF/CEILING

ASSEMBLIES: 0HR

7. SHAFT ENCLOSURES: 1HR NFPA 101 8.6, 18.3.1

OTHER REQUIREMENTS:

1. NFPA 101 18.3.2.1:

1 HR OCCUPANCY SEPARATION REQUIRED AT STORAGE ROOMS OVER 100 SF

(NEW HEALTH CARE OCCUPANCY)

2. NFPA 101 TABLE 6.1.14.4.1 (a):

2 HR OCCUPANCY SEPARATION REQUIRED BETWEEN NEW HEALTH CARE

OCCUPANCY & NEW AMBULATORY HEALTH CARE OCCUPANCIES

14. ACTIVE FIRE SAFETY SYSTEMS

* NOTE:

ALL AREAS OF NEW & EXISTING CONSTRUCTION

OF THIS PROJECT WILL BE FULLY SPRINKLERED.

SPRINKLER SYSTEM SHALL COMPLY WITH NFPA 13

IN ALL AREAS

(a) SMOKE DETECTORS THROUGHOUT

(b) GENERATOR POWERED EMERGENCY LIGHTING

(c) PORTABLE EXTINGUISHERS

(d) AUTOMATIC AIR-HANDLING SHUT-DOWN

(e) FIRE ALARM SYSTEM

15. WATER SUPPLY: CITY OF TOPEKA, KANSAS

16. SEWAGE TREATMENT: CITY OF TOPEKA, KANSAS

17. HANDICAP PROVISIONS:

ACCESSIBLE ROUTE, TOILETS, LAVATORIES, SIGNAGE AND PARKING

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

De pa rtm en t o f

Ve te ra ns

A ffa irs

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

C:\Users\bharvey\Documents\TopekaVA_ED_bharvey.rvt

As indicated

1/20/2017 3:41:45 PM

FS100

LIFE SAFETY PLAN -

BASEMENT/ 2ND

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

1/20/2017

1/8" = 1'-0"FS100

A LIFE SAFETY PLAN - BASEMENT

1/8" = 1'-0"FS100

B LIFE SAFETY PLAN - 2nd FLOOR

4' 8' 16'

1/8" = 1'-0"

0'

4' 8' 16'

1/8" = 1'-0"

0'

NORTH

NORTH

NURSE

CORR

NURSE

DICT

TRAUMA 1

TRAUMA 2

TRTMT 5

TRTMT 6

CLEAN

BREAK

TRIAGE

ON-CALL

SHWR

TRTMT 1

TRTMT 2

FEMALE

TRTMT 3

WORK

ADMIT

ADMIT

HALL

CLOSET

DECON

CORR

CORR

CORR

VESTIBULE

ED ENTRY

OUTPATIENT

ENTRY

EXAM #39

NURSE MGR

ROOM

CHIEF ED

SOILED

SECLUSION 1

SECLUSION

JAN

EQUIP RM

WAITING

TLT

CONSULT/

BRVMNT

VA POLICE

TLT

ANTE

TRTMT 4

(ISO)

TLT

MEDS

TLT

NOURISHEQUIP

LINEN

CARTS

TLT

EXAM #40

ED WAITING

ROOM

33/1 6.6" 48"

218/5 8.8" 96"

218/5 8.8" 96"

MRI ZONE II

BLUE TEAM

CLINICAL

PHARMACIST

CLINICAL

PHARMACIST

CLINICAL

PHARMACIST

NUTRITION

CLINIC 1

NUTRITION

CLINIC 2

CLINICAL

PHARMACIST

SOUTH ELEV

LOBBY

SCANNER

CONTROL

ROOM

UTILITY

EXAM #12 EXAM #13

EXAM #14 EXAM #15 CHASE EXAM #18 EXAM #19

CORRIDOR

RED TEAM

EXAM #9

EXAM #10

ELEC

CLOSET

EXAM #11

RESTROOM

EXAM #6

EXAM #5

STORAGE

WORK

ROOM

WORK

ROOM

PHARMACY

EXAM #25

EXAM #23

EXAM #21

EXAM #20

RESTROOM

EXAM #1 EXAM #2

WORK

ROOM

BLUE TEAM

CLINICS

STAIR 3

SUPPLY

CORRIDOR

WOMEN

MEN

DUMBWAITER

HOUSEKEEPING

ELEVATOR

LOBBY

STORAGE

STORAGE

NEW STAIR

CORRIDOR

CORRIDOR

CORR

FACP

FA

C P

FA

A P

ROOM

STORAGE

TLT

ELEC

TLT

CORRIDOR

DASHED LINE INDICATES

PERIMETER OF SECOND

FLOOR ABOVE AND

SEPARATE BUILDING (TYPE I

(332)) - 2 HR RATED FLOOR

ASSEMBLY

WAITING

VENDING

CLINICAL

PHARMACIST

WORK

ROOM

EXAM

PATIENT

TOILETEQUIPEXAMEXAM

SPECIALTY

EXAM CORRIDOR CORRIDOR

OCCUPANCY AMBULATORY HEALTH CARE

TYPE II (000) CONSTRUCTION

FULLY SPRINKLERED = YES

TOTAL OCCUPANTS : 54

OCCUPANCY 2 : FIRST FLOOR = 7,013 SF

BUSINESS OCCUPANCY

TYPE II (000) CONSTRUCTION

FULLY SPRINKLERED = YES

TOTAL OCCUPANTS : 218

OCCUPANCY 1 : FIRST FLOOR = 15,376 SF

25/1 6.6" 48"

218/5 8.8" 36"

218/5 8.8" 42"

FA

C P

FUTURE OCCUPANCY

SEPARATION

F E C

F E C

F E C

F E C

F E

C

LEGEND

BUILDING & LIFE SAFETY REQUIREMENTS

DESCRIPTION

WALL

RATING

NEW

PARTITION KEY

NFPA 2015

(NEW HC)

NFPA 2015

(EXIST. HC)

OPENINGS DAMPERS

RATING RFRNC. TYPE RFRNC.

BUILDING SEPARATION:

FIRE BARRIER

2 HR NOT

APPLICABLE

90 MIN IBC 705.8

TABLE 715.4

FIRE

90 MIN

IBC 705.11

IBC 715.5.1

IBC 716.5.1

NOT

APPLICABLE

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

1 HR 60 MIN NFPA 8.2.3.2.3.1 (1)

IBC 706.7

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

IBC 706.10

IBC 716.3.1

IBC 716.5.2

NFPA 6.1.14

NFPA 8.2.3.1.2

VERT. OPG. (EXIT ENCLSR/SHAFT)

FIRE BARRIER

(2 HR = 4 OR MORE STORIES)

(1 HR = LESS THAN 4 STORIES)

NFPA 19.3.1.1

NFPA 8.2.5.4

NFPA 18.3.1.1

NFPA 8.2.5.4

NFPA 8.2.3.2.3.1

IBC 715.4/714.2

NOT

ALLOWED

NFPA 1005.3.4.1

NFPA 1020.12

IBC 715.5.3

IBC 716.5.21 HR

2 HR

60 MIN

90 MIN

1 H R

2 HR

EXIT PASSAGEWAY (HORIZ.)

FIRE BARRIER

NFPA 8.2.3.2.3.1 IBC

715.4/714.2

NFPA 18.2.2.7

NFPA 7.2.6

NOT

ALLOWED

NFPA 1005.3.4.1

NFPA 1021.5

NFPA 19.2.2.7

NFPA 7.2.6

60 MIN

90 MIN

HAZ./INCIDENTAL USE

FIRE BARRIER

1 HR 45 MIN

NFPA 8.2.3.2.3.1 (2)

IBC 706.7

IBC 715.4

NFPA 18.3.2.1

NFPA 8.4.1.1

FIRE

90 MIN

NFPA 18.3.2.1

NFPA 8.4.1.1

IBC 715.3.1

IBC 716.3.1

IBC 715.5.2

IBC 716.5.2

HAZ./INCIDENTAL USE

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

NR

SELF OR AUTO

CLOSING

IBC 710.5.3

IBC 715.4.7.3

IBC 508.2.2.1

NFPA 8.4.1.2 SEE

NOTE B

NFPA 8.4.1.2

SUBDIVIDING SPACES

SMOKE BARRIER

20 MIN NFPA 8.3.4.2 (1)

IBC 709.5

NFPA 18.3.7.1

NFPA 18.3.7.3

SMOKE

90 MIN

SEE NOTE [A]

NFPA 8.3.5.1

IBC 709.8

IBC 716.5.5

SEE NOTE [C]

NFPA 19.3.7.1

1/2

HR

1 HR

SUITE SEPARATION

SMOKE PARTITION

NR NFPA 18.2.5 IBC 710.5.3

IBC 715.4.7.3

SEE

NOTE [B]

NR

SELF OR AUTO

CLOSING

NFPA 18.2.5

10/1 2"

34"

REQ'D. EXIT WIDTH

NO. OF OCC. EXITING

ACTUAL EXIT WIDTH

NO. OF OCC./

NO. OF EXITS

NO. OCC. EXITING

(SMALLER ROOMS)

MAXIMUM OCCUPANCY

AREA

OCC. LOAD FACTOR

1:50

FIRE EXTINGUISHER AND CABINET

FIRE ALARM CONTROL PANEL

FIRE SYSTEM ANNUNCIATOR ALARM

ANNUNCIATOR PANEL

PROPERTY LINE

FEC

FACP

FSA

FAAP

100'

(50)

STARTING

LOCATION

EXITING #

TRAVEL

DISTANCE

TRAVEL PATH

[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS WHERE

HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)

[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS (NFPA

8.2.4.4.3) (IBC 710.7)

[C] SMOKE DAMPERS ARE NOT REQUIRED WHERE OPENINGS IN DUCT ARE LIMITED TO A

SINGLE SMOKE COMPARTMENT & DUCTS ARE MADE OF STEEL (IBC 716.5.5)

[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED

ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)

NOTES

SYMBOLS

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

90 MIN NFPA 8.2.3.2.3.1 (1)

IBC 706.7

FIRE

90 MIN

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

IBC 706.10

IBC 716.3.1

IBC 716.5.2

NFPA 6.1.14

NFPA 8.2.3.1.2

2 HR

RATED UL

ASSEMBLES

UL U412

UL U419

UL U412

UL U419

UL U412

UL U419

UL U415(B)

UL U412

UL U419

UL U412

UL U419

UL U415(A)

HORIZONTAL BUILDING SEPARATION:

FIRE BARRIER

2 HR NOT

APPLICABLE

90 MIN IBC 705.8

TABLE 715.4

FIRE

90 MIN

IBC 705.11

IBC 715.5.1

IBC 716.5.1

NOT

APPLICABLE

UL U412

UL U419

CODE INFORMATION

PROJECT INFORMATION:

1. CONSTRUCTION PURPOSE: ADDITION / RENOVATION

2. REASON FOR SUBMITTAL: NEW CONSTRUCTION

3. I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE THE

SUBMITTED PLANS FOR THE ABOVE-REFERENCED PROJECT

COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING:

2015 LIFE SAFETY CODE (NFPA-101)

2014 NATIONAL ELECTRICAL CODE (NFPA-70)

CURRENT ABA ACCESSIBILITY STANDARDS

2014 INTERNATIONAL BUILDING CODE (IBC)

2014 INTERNATIONAL MECHANICAL CODE (IMC)

2014 INTERNATIONAL PLUMBING CODE (IPC)

4. LOCATION OF ANTICIPATED FUTURE ADDITIONS: UNKNOWN

5. OWNER:

COLMERY - O'NEIL VA MEDICAL CENTER

2200 SW GAGE BLVD.

TOPEKA, KS 66622

PH (785) 350-3111

7. DESIGN TEAM:

ARCHITECT:

HEALTH FACILITIES GROUP, LLC

142 N. MOSLEY ST., SUITE 300

WICHITA, KS 67202 316-262-2500

CONTACT: BEN HARVEY

DESIGN CONSULTANTS:

STRUCTURAL:

KH ENGINEERING GROUP, P.A.

15377 W. 95TH ST.

LENEXA, KS 66219 913-825-9381

CONTACT:

KATHY HAGEN

KHAGEN@KHEGROUP.COM

CIVIL, MECHANICAL, ELECTRICAL, & PLUMBING:

PROFESSIONAL ENGINEERING CONSULTANTS

303 S. TOPEKA

WICHITA, KS 67202 316-262-2691

CONTACT:

DARIN CROWDER

DARIN.CROWDER@PEC1.COM

8. ARCHITECTS SEAL: SEE STAMP AT BELOW

9. FIRE SERVICE: TOPEKA, KANSAS FIRE DEPARTMENT

10. INSPECTION: VISN SAFETY OFFICER

11. OCCUPANCY GROUP TYPE:

OCCUPANCY 1 - BUSINESS

OCCUPANCY 2 - NEW AMBULATORY HEALTH CARE

12. CONSTRUCTION TYPE: NFPA TYPE I (332) & NFPA TYPE II (000)

13. STRUCTURAL CODE REQUIREMENTS

A. ALLOWABLE FLOOR AREA FROM NFPA 5000 TABLE 7.4.1:

TOTAL ALLOWABLE FLOOR AREA:

TYPE I (332) = UNLIMITED

TYPE II (000) = 23,000

NEW FLOOR AREA ADDED W/ THIS PROJECT:

OCCUPANCY 1 - BUSINESS

FIRST FLOOR = 15,261 SF

SECOND FLOOR = 659 SF

OCCUPANY 2 - NEW AMBULATORY HEALTH CARE

FIRST FLOOR = 177 SF

EXISTING FLOOR AREA :

OCCUPANCY 1 - BUSINESS

FIRST FLOOR = 98 SF

SECOND FLOOR = 4,461 SF

OCCUPANY 2 - NEW AMBULATORY HEALTH CARE

FIRST FLOOR = 7,008 SF

GRAND TOTAL

FIRST FLOOR = 22,446 SF

SECOND FLOOR = 5,120 SF

B. ALLOWABLE HEIGHT CALCULATIONS

OCCUPANCY 1 - BUSINESS

TYPE OF CONSTRUCTION: TYPE II (000)

ALLOWABLE STORIES: 5

ALLOWABLE HEIGHT: 75'

ACTUAL STORIES: 1

ACTUAL HEIGHT: 25'-8"

NO HEIGHT MODIFICATIONS REQUIRED

OCCUPANCY 2 - NEW AMBULATORY HEALTH CARE

TYPE OF CONSTRUCTION: TYPE II (000)

ALLOWABLE STORIES: 5

ALLOWABLE HEIGHT: 75'

ACTUAL STORIES: 1

ACTUAL HEIGHT: 26'-4"

NO HEIGHT MODIFICATIONS REQUIRED

ALLOWABLE AREA CALCULATIONS:

NO AREA MODIFICATIONS TAKEN

C. FIRE-RESISTANCE RATING FOR BUILDING ELEMENTS:

TYPE I (332)

1. BEARING WALLS:

A. EXTERIOR: 3HR

B. INTERIOR: 3HR

2. NONBEARING…