36C25518R0298-007.pdf
PDF 19 MB Posted
- Solicitation number
- 36C25518R0298
About this file
36C25518R0298 589A5-15-115 Topeka VAMC ED Project FINAL CDs - Part 1 of 9 (52 pages).pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25518C0172-000.docx | DOCX document | |
| 36C25518R0298-00003002.docx | DOCX document | |
| 36C25518R0298-00003001.docx | DOCX document | |
| 36C25518R0298-00003000.docx | DOCX document | |
| 36C25518R0298-00002000.docx | DOCX document | |
| 36C25518R0298-00002001.pdf | ||
| 36C25518R0298-00001000.docx | DOCX document | |
| 36C25518R0298-011.pdf | ||
| 36C25518R0298-013.pdf | ||
| 36C25518R0298-008.pdf | ||
| 36C25518R0298-003.docx | DOCX document | |
| 36C25518R0298-009.pdf | ||
| 36C25518R0298-014.pdf | ||
| 36C25518R0298-015.pdf | ||
| 36C25518R0298-006.pdf | ||
| 36C25518R0298-004.pdf | ||
| 36C25518R0298-005.pdf | ||
| 36C25518R0298-010.pdf | ||
| 36C25518R0298-012.pdf | ||
| 36C25518R0298-000.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING SYMBOLS
95.00
TOC
98.5
TOC
98.5 E
B
NEW ELEVATION
EXISTING ELEVATION
EXISTING CONTOUR
NEW CONTOUR
TEST BORING (SITE PLANS ONLY)
EXISTING ELEVATION
EXISTING ELEVATION
PROPERTY LINE
/1 A101
/1 A101 MATCHLINE
SHT. REFERENCE
ELEVATION DATUM
(SECTIONS, ELEVATIONS ONLY)
BUILDING SECTION
WALL SECTION
DETAIL DRAWING
A3.1
BUILDING ELEVATION
A6.1 INTERIOR ELEVATION
A100
WINDOW ID TAG
DOOR NUMBER
ROOM
NAME
ROOM NAME & NUMBER
PARTITION SYMBOL
1 REVISION TAG
COLUMN LINE GRID
ME100E EQUIPMENT NUMBER
? SITE PLAN NOTES
DEMOLITION PLAN NOTES
VICINITY MAP
NO SCALE
-- PRECAST CONCRETE WALL
PANEL TAG
XXX
A101
A-4 ALTERNATE TAG
PT-XX PAINT COLOR TAG
# PLAN NOTES
X
X.X
X
X.X
PROJECT LOCATION
CUT STONE
STEEL
PLYWOOD
FINISH WOOD
CONT WD FRAMING
WOOD BLOCKING
MATERIAL SYMBOLS
LVC FILL
GRANULAR FILL
CONCRETE MASONRY
FACE BRICK - REF. ELEVATIONS
CONCRETE
EARTH
EXISTING CONSTRUCTION
ASPHALT
GLASS
RIGID OR TAPERED
INSULATION, EIFS
BATT INSULATION
GYPSUM BOARD
ABBREVIATIONS
PROJ(D)
PLBG
PLYWD
PREFIN
RAD(R)
RESIL
REINF
REQ'D
SECT
SHWR
SPECS
REFRIG
galvanizedGALVBMRK benchmark concrete mansonry unit ceilingCLG
CLR
CMU
COL
CLO
clear/clearance column closet
CAB
CJ
CC
CB
BW
CL
BOC
BRZ
BRK
BO
BRG
BUR
BTM
BS
built-up roof center to center chalkboard bottom of wall center line control joint/ construction joint cabinet back of curb both sides bottom of bronze brick bearing bottom foundation floor drain fire extinguisher fire extinguisher cabinet
FE
FEC
FDN
FD
east each equipment exposed each way existing electrical exterior insulation finish system elevation/elevator expansion joint existing grade electrical contractor exterior ethylene propylene diene terpolymer
ELEV
EQUIP
EW
EPDM
EXP
EXIST
EXT
E
EA
EC
EG
EIFS
EJ
ELEC
insulation interior inside diameter
INSUL
IN(")
INT
ID
inch grab bar general contractor gypsum glass/glazing hollow metal high pressure decorative laminate horizontal hardware hardwood hose bib hot water heating, ventilating & air conditioning
HDWR
HM
HORZ
HT
HPDL
HVAC
HW
height
GB
GL
GRD
GYP
GC
HDWD
HB
grade
PART
PLAS
OVHD
partition plaster overhead
SRT
SS
SQ
miscellaneous masonry opening not in contract not applicable outside diameter numberNO(#)
NTS
OC
OA
NOM
OFF
OPNG
OD
on center overall nominal not to scale office opening
MISC
N
MO
MULL
MTL
NIC
NA
north mullion metal
SHT
SF
SB
SND
SIM
S
RM
ROW
RO
SAT
SAN
architect/ architectural
AB anchor bolt
APPROX
BLDG
BD
ARCH
BM
BLK
ADJ
AFF
AC
ACCU
ALUM
ANOD
ALT
approximate block/blocking at board beam building air cooled condensing unit above finish floor adjustable alternate anodized acoustical aluminum
A/C air conditioning plus or minus constructionCONST course ceramic tile continuous carpet corridor diameter door down ditto dimension double drinking fountain detail drawing downspout
DIA
DR
DS
DN
DO
DIM
DTL
DWG
CRS
CT
CONT
CORR
CPT
DBL
DF
conference concrete
CONF
CONC
finishFIN fluorescent flow line folding field verify furnace footing fire retardant foot scraper fiberglass reinforced plastic
FV
FT(')
FURR
FURN
FTG
G
GA
foot furring gas gauge
FRP
FLR
FLDG
FL
FRT
FS
FLUOR
floor finish grade finish floor
FG
FF
joistJST low volume change masonryMAS
MANUF
MATL
MAX
MECH
MEMB
MH
MIN
MIRR
manufacturer material mechanical membrane maximum minimum manhole mirror
LDR
LF
LAV
LAM
LVC
LOCN
lineal feet ladder lavatory laminate location
REF
R
RAG
RD
PT
PR
QT
PTD
JT
JAN janitor joint
PL
under cabinet lightrequired physical therapy respiratory therapy surgical intensive care unit studded rubber tile stainless steel square specifications
YD
suspended acoustical tile similar sanitary napkin dispenser section shower sheet square feet splash block resilient south sanitary right of way rough opening room
WD
WNDW
WH
WNSCT
WC
WT
WWF
WP
VCT
VWC
VEST
VERT
W W/ W/O yard waterproofing, waterproof welded wire fabric water heater water closet window wood wainscot weight vinyl composition tile vinyl wall covering vertical vestibule west with with out
RT
SICU
central sterile long term care intensive care unit occupational therapy magnetic resonance imaging post anesthetic care unit medical intensive care unit labor-delivery-recovery-post partum operating room
FOR MEDICAL
emergency room computed tomography
FACILITIES ONLY
STORplumbing project/(projected) refer/reference roof drain radius return air grille reinforcing refrigerator riser pressure treated painted quarry tile plywood prefinished pair
TLT
TV
TW
TOC
TPH
TO
TYP
UCL
T&B T
SUSP
STRUCT
TEL
TB
T&G plate/plastic/ property line STL
STD
storage toilet paper holder top of curb toilet television top of typical top of wall tongue & groove top & bottom structure/structural tread telephone tackboard suspended
ICU
OR
LDRP
MRI
MICU
LTC
PT
PACU
OT
CS
CT
ER
steel standard
REFERENCE SECTION 01 00 00 1.3 STATEMENT OF BID ITEM(S)
A. BID ITEM 1 (BASE BID):
Bid Item 1 (Base Bid) includes all scope communicated in the drawings and specifications which includes the complete renovation of the existing Emergency Department, entrance vestibules, drop-off canopies, and decontamination room, and demolition of an existing stair with installation of a new stair from basement to second floor in a new location.
C. BID ITEM 2 (DEDUCT): All work in Bid Item 2 with the following exceptions:
1. Omit all scope related to the drop-off canopies at the new entrance vestibules. New canopy at door AC104A shall remain within the scope of this Bid Item. Refer to the drawings for additional information.
D. BID ITEM 3 (DEDUCT): All work in Bid Item 1 with the following exceptions.
1. Omit all interior signage on project with the exception of signage for toilet rooms. Exterior signage shall remain within the scope of this bid item.
2. Omit scope related to patient lift systems in all rooms. If this bid item is accepted, contractor will not be responsible to provide or install the patient lift systems or any associated above-ceiling substructure.
Associated electrical circuits to power the lift systems shall NOT be omitted and shall remain within the scope of this bid item.
BID DEDUCTS
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot F
E
D
C
B
A
97 8654321
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
De pa rtm en t o f
Ve te ra ns
A ffa irs
Dwg. Of
Building Key Plan:
BLDG. 1
A/E Seal
C:\Users\bharvey\Documents\TopekaVA_ED_bharvey.rvt
As indicated GI-001
COVER SHEET
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
UPGRADE EMERGENCY DEPARTMENT
COLMERY-O'NEIL VA MEDICAL
CENTER
TOPEKA, KS
1/20/2017
CONSTRUCTION DOCUMENTS
SHEET INDEX
ELECTRICAL
E001 ELECTRICAL INFORMATION
ED101 ELECTRICAL DEMO PLANS - BSMT & 1ST
ED102 ELECTRICAL DEMOLITION PLAN - 2ND FLOOR
EL101 ELECTRICAL LIGHTING PLAN - 1ST FLOOR
EL501 ELECTRICAL LIGHTING DETAILS
EP000 ELECTRICAL OVERALL PLAN - BASEMENT
EP001 ELECTRICAL OVERALL PLAN - 1ST FLOOR
EP101 ELECTRICAL POWER PLAN - 1ST FLOOR
EP102 ELECTRICAL POWER PLAN - ROOF
EP501 ELECTRICAL POWER DETAILS
EP601 ELECTRICAL ONE-LINE DIAGRAM
EP602 ELECTRICAL SCHEDULES
EY101 ELECTRICAL SYSTEMS PLAN - 1ST FLOOR
EY501 ELECTRICAL SYSTEMS DETAILS
T101 ELECTRICAL TELECOM PLAN - 1ST FLOOR
T501 ELECTRICAL TELECOM DETAILS
SHEET INDEX
STRUCTURAL
S-001 GENERAL NOTES
S-002 TYPICAL DETAILS
S-003 TYPICAL DETAILS
S-004 TYPICAL DETAILS
S-100 LEVEL ONE FRAMING AND FOUNDATION PLAN
S-101 LEVEL TWO FRAMING PLAN
S-102 ROOF FRAMING PLAN
S-201 LEVEL 2 PARTIAL PLANS
S-300 BUILDING SECTIONS
S-500 SECTIONS AND DETAILS
S-501 SECTIONS AND DETAILS
S-502 SECTIONS AND DETAILS
S-503 SECTIONS AND DETAILS
S-504 SECTIONS AND DETAILS
MECHANICAL
FP101 FIRE PROTECTION PLAN - FIRST FLOOR
FP102 FIRE PROTECTION PLAN - BASEMENT/2ND
MM001 MECHANICAL COVER SHEET
MM002 MECHANICAL COVER SHEET
MD101 HVAC BASEMENT DEMOLITION PLAN
MD102 HYDRONICS DEMOLITION BASEMENT PLAN
MD111 HVAC FIRST FLOOR DEMOLITION PLAN
MD112 HYDRONICS DEMOLITION PLAN - FIRST FLOOR
MD121 HVAC SECOND FLOOR DEMOLITION PLAN
MH100 HVAC BASEMENT PLAN
MH111 HVAC FIRST FLOOR SA AND EA PLAN
MH112 HVAC FIRST FLOOR MED. VEL SA AND RA PLAN
MH121 HVAC SECOND FLOOR PLAN
MP100 HYDRONICS BASEMENT PLAN
MP101 HYDRONICS FIRST FLOOR PLAN
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M503 MECHANICAL DETAILS
M504 MECHANICAL DETAILS
M511 MECHANICAL CONTROL DETAILS
M512 MECHANICAL CONTROL DETAILS
M601 MECHANICAL SCHEDULES
M602 MECHANICAL SCHEDULES
M603 MECHANICAL SCHEDULES
M701 HVAC ROOM AIRFLOW PLAN
PLUMBING
PP001 PLUMBING COVER SHEET
PD100 PLUMBING DEMOLITION PLAN - BASEMENT FLOOR
PD101 PLUMBING DEMOLITION PLAN - FIRST FLOOR
PD102 PLUMBING DEMOLITION PLAN - ROOF
PD110 MED GAS DEMO PLAN - BASEMENT FLOOR
PD111 MEDICAL GAS DEMO PLAN - FIRST FLOOR
PL100 PLUMBING PLAN - BASEMENT FLOOR
PL101 PLUMBING PLAN - FIRST FLOOR
PL102 PLUMBING PLAN - ROOF
PL110 MED GAS PLAN - BASEMENT
PL111 MED GAS PLAN - FIRST FLOOR
PL401 PLUMBING DETAILS
PL501 PLUMBING SCHEDULES
SHEET INDEX
GENERAL
GI-001 COVER SHEET
GI-002 ACCESSIBILITY
GI-003 PHASING PLAN - BASEMENT/2ND
GI-004 PHASING PLAN 1ST FLOOR - PHASE 1
GI-005 PHASING PLAN 1ST FLOOR - PHASE 2
LIFE SAFETY
FS100 LIFE SAFETY PLAN - BASEMENT/ 2ND
FS101 LIFE SAFETY PLAN - 1ST FLOOR
CIVIL
GS 1 TOPOGRAPHICAL SURVEY, GENERAL NOTES, UTILITY CONTACTS
GS 2 DEMOLITION PLAN
GS 3 SITE LAYOUT AND PAVING PLAN
GS 4 GRADING PLAN
GS 5 UTILITY PLAN
GS 6 EROSION CONTROL PLAN
GS 7 EROSION CONTROL DETAILS
GS 8 DETAILS
ARCHITECTURE
AD-100 DEMOLITION PLAN - BASEMENT/2ND FLOOR
AD-101 DEMOLITION PLAN - 1ST FLOOR
AS-100 FLOOR PLAN - BASEMENT/2ND FLOOR
AS-101 FLOOR PLAN - 1ST FLOOR
AS-102 DIMENSION FLOOR PLAN - BASEMENT/ 2ND
AS-103 DIMENSIONS PLAN - 1ST FLOOR
AS-104 ENLARGED PLANS
AS-105 PLAN DETAILS
AS-107 BID DEDUCTS
AS-201 ROOF PLAN
AS-202 ROOF DETAILS
AS-301 EXTERIOR ELEVATIONS
AS-302 EXTERIOR ELEVATIONS
AS-401 BUILDING SECTIONS
AS-501 WALL SECTIONS
AS-502 WALL SECTIONS
AS-503 STAIR SECTIONS
AS-504 SECTION DETAILS
AS-505 SECTION DETAILS
AS-506 SECTION DETAILS
AS-601 DOOR SCHEDULE AND DETAILS
AS-602 DOOR & WINDOW DETAILS
AS-700 REFLECTED CEILING - BASEMENT/ 2ND FLOOR
AS-701 REFLECTED CEILING - 1ST FLOOR
AS-702 CEILING DETAILS
ARCHITECTURE INTERIORS
AI-101 FINISH & FURNITURE PLAN - 1ST FLOOR
AI-102 FINISH SCHEDULE
AI-201 EQUIPMENT PLAN FIRST FLOOR
AI-202 ENLARGED EQUIPMENT PLANS
AI-301 WALL PROTECTION & SIGNAGE PLAN
AI-401 INTERIOR ELEVATIONS
AI-402 INTERIOR ELEVATIONS
AI-403 INTERIOR HEADWALL ELEVATIONS
AI-501 MILLWORK SECTION DETAILS
AI-502 MILLWORK SECTION DETAILS
No. Description Date
CL
CL
CL
CLC L
0"
A .F
.F
AL
L
C H
AR
AC
TE
R
S
ACCESSIBLE TOILET STALLS
STANDARD STALL
HANDRAILS
STANDARD END OF WALL STALL
DIRECTIONAL
PARKING STALL
PLAN VIEW
ELEVATION A ELEVATION B
PLAN: ROLL-IN TYPE ELEVATION: ROLL-IN
PARKING SPACES
H.C. LAVATORYH.C. URINAL
H.C. FLOOR MTD. TOILET H.C. WALL MTD. TOILET
FRONT APPROACHSIDE APPROACH
LAV FLOOR SPACE
PARKING
RESERVEDHANDICAP
ENTRANCE
ACCESSIBLE
SINGLE TOILET
OUTDOOR SIGNAGE
ACCESSIBLE SHOWER
PARKING SYMBOL
MENRESTROOM
GENERAL ROOM
IDENTIFICATION RESTROOM RESTROOM
DRINKING FOUNTAINS
INTERIOR SIGNAGE
BATHROOM FIXTURES & ACCESSORIES
VICE
PRINCIPAL
OFFICE
GENERAL REACH DIMENSIONS
LAVATORY DIMENSIONS
MOUNTING HEIGHT DIMENSIONS
NEW CONSTRUCTION
1 1/2 " CLEAR
" m in
" m in
52" min.
12" max
"-1
8"
32" min4" max
" m in 66" min.
42" min latch approach 48" min other approaches
4" m ax
6" m ax
Alternate door location
42" min 12" max
"-1
8"
" m in
6" m ax
36" min
56" min for wall mounted W.C.
59" min for flr mounted W.C.
NEW CONSTRUCTION
16"-18" Lavatory
60" min
12 "
2" 2"
1" 2"
1" 6"4"
4" 2"
1' -6
5'
-0 " A
BO
VE
T.
O
. C U
R B
3"3"
2" x 2" x 1/4 " STL
POST PAINTED & SET
IN 12" DIA x 3'-0"
CONC FILLED POST HOLE
12 "
2" 2"
1" 2"
1" 6"4"
4"
1' -6
3"3"
3' -0
" T O
'-0
AB
O
VE
G R
AD
E
SIGN TO BE MOUNTED IN THE
MOST VISIBLE & CONVENANT
LOCATION
1.25"-2" DIA.
IF
CIRCULAR
NO SCALE
NO SCALE
NO SCALE
2" x 2" x 1/4 " STL
POST PAINTED & SET
IN 12" DIA x 3'-0"
CONC FILLED POST HOLE
TO
C
O N
TR
O
LS
18"
1'-6"
2'-9"
TO
C
O N
TR
O
LS
" T
O
8" M
AX
FLEXIBLE SHOWER
HEAD EXTENSION
SHOWER UNIT W/
ACCESSIBLE CONTROLS
" T
O
8"
GRAB BAR
4'-0"
" m ax
16" max
23"max
Fu ll de pt h of
St al l o r 4
8"
48" min
" m in
CLEAR FLOOR SPACE
1/2" max TRANSITION
NO SCALE
GRAB BAR
ELEV A
SEAT
SEAT
60" min
" m in
" m in
CLEAR FLOOR SPACE
27" max
GRAB BAR
1/2 " MAX TRANSITION
"-3
6"
"-3
6"
" T
O
8"
"-3
6"
16"-27"
TO
C
O N
TR
O
LS
GRAB BAR
SHOWER UNIT W/
ACCESSIBLE CONTROLS
& FLEX SHOWER HEAD
SHOWER UNIT W/
ACCESSIBLE CONTROLS
& FLEX SHOWER HEAD
SHOWER UNIT W/
ACCESSIBLE CONTROLS
& FLEX SHOWER HEAD
FOLDING SEAT
(OPTIONAL)
FOLDING SEAT
(0PTIONAL)
8'-0" MIN. 8'-0" MIN5'-0" CAR
UNIVERSAL PARKING SPACE DESIGN
NO SCALE
NO SCALE
Symbol to be White (Typ.)
3" 13"
6" 18"R.
26" (Typ.)
6"
30"
6"
18"
Dia.
15"
2'-0" 5'-2"
'-0
" t o
Fa ce o f C ur b
3' -9
6' -9
(OR REFER TO SITE PLAN FOR DIMENSIONED
ACCESSIBLE PARKING)
16"-18"
17" MIN.
19" MAX.
48" MIN.
" M
IN
NOT TO EXCEED
FOUNTAIN DEPTH
30" MIN.
" M
IN
36" min
" m ax
-1
9"
7-9"
Sanitary napkin disposal
Toilet paper dispenser
24"-42"6" max
12" max
-1 9"
7"-9"
12" max
24"-42"
42" min
Toilet paper dispenser
Sanitary napkin disposal
-3
6" 36" min 6" max
" m ax
" m in
" m in
1'-7" min
8" min6" max
9"
Clearance profile Insulate drain & supply lines 40
" m ax
Mirror
Paper towel dispenser
4"
Soap dispenser 30
" m in
19" max
48" min
17" min
6" 12" min
16"-18"
54" min 42" min
/2
/8
1/
1/32 " HIGH RAISED
CHARACTERS, TYP.
/8
/2
BRAILLE CHARACTERS, TYP
RAISED BORDER, TYPROOM NUMBER 1/32" HIGH RAISED
INTERN'L SYMBOLS, TYP
6"
1/2 " R TYP
NOTE: MOUNT ACRYLIC SIGNS W/ DOUBLE SIDED FOAM TAPE
ACRYLIC SIGNS 2 CONTRASTING FIN COLORS
TO BUBBLER
3' -6
9" M
IN
" M
AX
HIGH
FOUNTAIN
LOW
FOUNTAIN
17-19"
6" MAX
8" MIN
" M
IN
" M
AX
8" M
IN
LO
W
F O
U N
TA
IN
NO SCALE
NO SCALE
NO SCALE
" m ax
13 1/2"min
"m ax
TO FLUSH CONTROL
HANDICAP BAR
SOAP DISPENSER
MIRROR URINAL
TELEPHONE
CLOCK
LIGHT SWITCH
-1
9" 42
" M
AX
" M
AX
7' -8
"60
" M
AX
" M
AX
" M
AX
1'-2"
(TO HIGHEST
OPERABLE PART)
17" MIN
" M
IN
" M
IN
" M
AX
" M
AX
9" M
IN
6" MAX
17" MIN
" M
IN
" M
AX
" M
AX
9" M
IN
6" MAX
8" MIN
TOILET PAPER
DISPENSER
SANITARY NAPKIN
DISPOSAL
PAPER TOWEL
DISPENSER
OCCUPANCY SIGN
LATCH SIDE PERFERED
TOILET SEAT HT
THERMOSTAT
OR OTHER
CONTROL
" M
IN
" M
AX
48"
" M
IN
Z 48"
Y
X 30" 24"
" M
AX
30"
10" MAX
21" MAX
" M
IN
" M
AX
36" MIN
" M
IN
" M
AX
NOTE: X SHALL BE < 25";
Z SHALL BE > X, WHEN X < 20",
THEN Y SHALL BE 48" MAX
WHEN X IS 20"-25",
THEN Y SHALL BE 44" MAX.
INSULATE
EXPOSED PIPES
NO SCALE
NO SCALE
NO SCALE
" M
AX
COUNTER
OR
LAVATORY
-1
9"
8'-0" VAN
" m in
GRAB BARS
1 1/2 " CLEAR
1.25"-2" DIA.
IF
CIRCULAR
IF NON-
CIRCULAR
PERIMETER
MUST BE 4"-6.25"
AND DIAMETER
MUST NOT
EXCEED 2.25"
IF NON-
CIRCULAR
PERIMETER
MUST BE 4"-6.25"
AND DIAMETER
MUST NOT
EXCEED 2.25"
1/
2" m in
" m in
18" min. grab bar per
ANSI A117.1-2009 39"-41"
/4
/2
BEVELED FLOORING TRANSITIONS
/4
" m ax
/2
" m ax
CARPET ON FLOOR SURFACES
/4
" m ax
BEVELED FLOORING TRANSITIONS
ACCESSIBLE
VAN
18" min. grab bar per
ANSI A117.1-2009
EL
EV
B
PLAN: TRANSFER TYPE
CONCRETE
WHEEL STOP
4" WIDE PAINT
STRIPING,
TYP.
4' o.c.
TOP AND SIDES
MUST BE
UNOBSTRUCTED.
UP TO 20% OF
BOTTOM MAY BE
OBSTRUCTED FOR
SUPPORTS.
CARPET CUSHION/ PADDING NOT PERMITTED
MOUNTING HEIGHTS
5' -6
MEDICAL GAS
ZONE VALVE
NURSE CALL -
PATIENT TOILET
5' -6
4"
CORD
ROBE HOOK
6' -0
5' -0
CALL STATION/
FLUSH-MOUNTED
STATION
8"
RETURN AIR
REGISTER
5' -2
5' -2
O
R
FILM
ILLUMINATOR
5' -2
RECEPTACLE
& GROUND
5' -2
GROUND
FAULT
INDICATOR
5' -2
REMOTE
GROUND
INDICATOR
5' -2
VARIABLE
INTENSITY O.R.
LIGHT CONTROL
5' -0
NITROGEN
SHUT-OFF
VALVE
5' -2
O.R. RECEPTACLE
CODE BLUE
5' -2
SWITCH
NEED TO VERIFY ALL
FIXTURE TYPE & SIZES
WITH MANUFACTURER
3' -6
ELEVATOR
CALL BUTTON
O.R.
6' -0
ELEVATOR
HALL LANTERN
5' -0
" RAISED
CHARACTER
FLOOR
DESIGNATION
5' -0
2' -1
1"
ELEVATOR
CONTROL
PHONE
ELEVATOR MEDICAL EQUIPMENT
NO SCALE
WHEELCHAIR MANEUVERING
TURNING CLEAR
2' - 6"
4'
0"
5' - 0"
5'
0"
1' - 0" 3' - 0"
1' - 0"
2'
0" 3'
0"
T-SHAPED
5' - 0"
MANEUVERING CLEARANCES AT DOORS
LATCH SIDE APPROACHLATCH SIDE APPROACH
HINGE SIDE APPROACH
HINGE SIDE APPROACH
FRONT APPROACHFRONT APPROACH
Y
M
IN
.X
24" MIN.
X
Y
Y
M
IN
X
24" MIN.
X
M
IN
M
IN
18" MIN.
24" PREF.
54" MIN.
Y
M
IN
NOET: Y=48" MIN. IF DOOR
HAD BOTH A LATCH AND
CLOSER
PATIENT BEDROOM MIN. DOOR WIDTH: 3'-10"
NOTE: X=12" IF DOOR
HAS BOTH A CLOSER
AND LATCH
NOTE: X=36" MIN. IF Y=60",
X=42" MIN. IF Y=54"
NOTE: Y=48" MIN. IF
DOOR HAS CLOSER
NOTE: Y=54" MIN. IF
DOOR HAS CLOSER
PULL SIDE
PUSH SIDE
PULL SIDE PUSH SIDEPUSH SIDE
90 TURNS 180 TURN
60"
X < 48"
60"
48" 48"
60"
X < 48"
GENERAL NOTES
ALL CONSTRUCTION & RENOVATION SHALL MEET THE UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS), ADA ACCESSIBILITY GUIDELINES FOR BUILDINGS & FACILITIES (ADAAG), & ARCHITECTURAL
BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS).
SUPPLEMENTAL TO THE (ABAAS), CONSTRUCTION & RENOVATION IN HEALTH FACILITIES OF THE DEPARTMENT OF VETERAN AFFAIRS (VA) SHALL COMPLY WITH THE BARRIER FREE DESIGN GUIDE: A
SUPPLEMENT TO THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (PG-18-13).
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
De pa rtm en t o f
Ve te ra ns
A ffa irs
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
C:\Users\bharvey\Documents\TopekaVA_ED_bharvey.rvt
As indicated
1/20/2017 3:42:05 PM
GI-002
ACCESSIBILITY
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
1/20/2017
STORAGE
C148
STAIRS
C149
ROOM
B1C
STAIRS
C150
CORR.
B207
NOT IN SCOPE OF WORK
CORRIDOR
C151
PHASING NOTES & LEGEND
PHASE 1:
GENERAL DESCRIPTION: CONSTRUCT VESTIBULES, NEW STAIR, 2ND FLOOR CONNECTING CORRIDOR.
PHASE 2:
GENERAL DESCRIPTION: RENOVATE REMAINDER OF EXISTING ED
GENERAL PHASING NOTES:
THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER’S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO;
TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND EMERGENCY
PREPAREDNESS.
REFER TO THE ASBESTOS REPORT, LEAD BASED PAINT REPORT, AND ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL.
HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR
ADDITIONAL CLARIFYING INFORMATION.
THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA’S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE
ADJACENT DEPARTMENTS.
1. ED LOCATION: THE EMERGENCY DEPARTMENT (ED) WILL OPERATE OUT OF THEIR CURRENT LOCATION DURING THE MAJORITY OF THIS PHASE.
2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): THE AOD OFFICE WILL OPERATE NORMALLY. AMBULANCE AND WALK-UP ENTRY POINT FOR ED WILL THROUGH
NIGHT ENTRANCE.
3. TOILETS: EXISTING TOILETS WILL BE AVAILABLE DURING THIS PHASE.
4. TREATMENT/TRAUMA ROOMS: EXISTING ROOMS WILL BE AVAILABLE DURING THIS PHASE. EXISTING EXAM ROOM SHALL BE USED AS TEMPORARY
SUPPLY/CLEAN ROOM.
5. ACCESS/EGRESS: ACCESS TO EXTERIOR DOOR AT NURSE STATION SHALL BE MAINTAINED AS AN EGRESS PATH AT NORTH END OF ED.
6. CONSTRUCTION ZONE: AREA TO THE EAST OF THE EXISTING ED DEPARTMENT, DEMO EXISTING STAIR, BEGIN CONSTRUCTION OF ENTRY VESTIBULES, AND NEW STAIR.
7. OTHER CONSIDERATIONS: ENTRY VESTIBULE WILL REQUIRE BEING CONSTRUCTED IN TWO PHASES SUCH THAT THIS BUILDING ENTRANCE REMAINS
OPEN AT ALL TIMES. REFER TO PHASING PLAN FOR FURTHER INFORMATION.
8. WORK SHALL BEGIN ON SECOND FLOOR CONNECTING CORRIDOR.
1. ED LOCATION: THE EMERGENCY DEPARTMENT WILL RELOCATE TO THE NEWLY COMPLETE PHASE 1 AREA.
2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): ADMISSIONS AND CHECK-IN WILL BE LOCATED IN THE EAST AOD OFFICE WHILE THE WEST AOD OFFICE WILL
BE TEMPORARY TRIAGE.
3. TOILETS: 3 NEW PUBLIC TOILETS WILL BE AVAILABLE, 2 PATIENT TOILETS, AND A STAFF TOILET.
4. TREATMENT/TRAUMA ROOMS: ASSUMING TRIAGE CAN SERVE AS TEMPORARY TREATMENT, THERE WILL BE 5 TREATMENT ROOMS (INCLUDING A SECLUSION ROOM). THE NEW EAST TRAUMA ROOM WILL SERVE AS TEMPORARY NURSE STATION DURING THIS PHASE.
5. ACCESS/EGRESS: NORTHEAST EXIT WILL BE OPEN. TEMPORARY DOOR IN STAFF BREAK ROOM WILL SERVE AS TEMPORARY SOUTH ROUTE OUT OF
THE UNIT.
6. CONSTRUCTION ZONE: WEST AREA OF THE PROJECT, AN AREA GENERALLY FOLLOWING EXISTING EMERGENCY DEPARTMENT OUTLINE.
7. CONSTRUCT DECON ROOM ADDITION
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
De pa rtm en t o f
Ve te ra ns
A ffa irs
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
C:\Users\bharvey\Documents\TopekaVA_ED_bharvey.rvt
As indicated
1/20/2017 3:42:13 PM
GI-003
PHASING PLAN -
BASEMENT/2ND
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
1/20/2017
1/8" = 1'-0"GI-003
A PHASING PLAN - BASEMENT
1/8" = 1'-0"GI-003
B PHASING PLAN - 2ND FLOOR
NORTH NORTH
4' 8' 16'
1/8" = 1'-0"
0' 4' 8' 16'
1/8" = 1'-0"
0'
UP
MRI ZONE
II
C146
BLUE
TEAM
B145
CLINICAL
PHARMACIST
B147
CLINICAL
PHARMACIST
B148
CLINICAL
PHARMACIST
B149
NUTRITION
CLINIC 1
A135
NUTRITION
CLINIC 2
A136
CLINICAL
PHARMACIST
A137
SOUTH
ELEV
LOBBY
A141
NOT IN SCOPE
OF WORK
NOT IN
SCOPE OF
WORK
CORRIDOR
C144
CORRIDOR
C144
WORK
ROOM
B143
WORK
ROOM
B142
EXAM #18
B141
EXAM #17
B140
EXAM #4
B125
EXAM #3
B124
EXAM #2
B123
EXAM #1
B119
CORRIDOR
B1-02
STAIR 3
B117A
CORRIDOR
B1-02
MEN
B101
DUMBWAITER
A134
WOMEN
A113
HOUSEKEEPING
A138
ELEVATOR
LOBBY
A140
STORAGE
A129A
STORAGE
A129
EXAM #21
AC121
EXAM #23
AC123
EXAM #25
AC125PHARMACY
AC124
WORK
ROOM
AC122A
WORK
ROOM
AC122
EXAM #5
AC105
EXAM #6
AC106
EXAM #9
AC109
RED TEAM
AC108EXAM #10
AC110
EXAM #11
AC111
ELEC
CLOSET
AC116E
1 HR RATED CONSTRUCTION
BARRIER - REF SPECS
NOTE: BARRIERS ON EITHER
SIDE OF CORRIDOR SHALL NOT
EXIST CONCURRENTLY.
PROVIDE RATED CONSTRUCTION
BARRIER TO CLOSE OPENINGS
IN EXISTING WALL - TYP
TEMPORARY 1 HR RATED
CONSTRUCTION BARRIER
PROVIDE TEMP DOOR AND WALL
AFTER DEMO OF EXIST
REVOLVING DOOR AND DURING
CONSTRUCTION OF ED ENTRY
VESTIBULE
PROVIDE HARDENED COVER OVER
EGRESS PATH FOR PROTECTION
WHILE THIS SERVES AS TEMPORARY
ENTRANCE
AMBULANCE ENTRY
DURING PHASE 1
PHASE 1
NOT IN SCOPE
OF WORK
POLICE EVIDENCE LOCKER AND
ARMORY SHALL BE VACATED BY
VA PRIOR TO START OF
DEMOLITION
PHASE 1A
PHASE 1A INTENT IS TO OPEN
SOUTHWEST EGRESS TO CORRIDOR
FOR ED DURING PHASE I
PHASE 1B - THIS CORRIDOR
NOW SERVES AS SOUTH
EGRESS FROM ED.
1 HR RATED
CONSTRUCTION BARRIER
DURING PHASE 1
DEMO STAIRS IN PHASE 1
CONSTRUCT NEW ED ENTRY
VESTIBULE AND CANOPY ABOVE
DURING PHASE 1
HARDENED CONSTRUCTION
BARRIER WALLS
EXISTING REVOLVING DOOR TO BE
DEMO'D
1 HR RATED
CONSTRUCTION BARRIER
DURING PHASE 1
ROOM
B144D
ROOM
B144C
ROOM
B144
EXAM #40
AC140
EXAM #39
AC139
1 HR RATED CONSTRUCTION
BARRIER - REF SPECS
NOTE: BARRIERS ON EITHER
SIDE OF CORRIDOR SHALL NOT
EXIST CONCURRENTLY.NIGHT/WEEKEND WORK TO OPEN PASSAGE
THROUGH THIS AREA. COMPLETE ARCH/MEP AND
FINISHES IN THIS AREA AND AT VENDING AREA
ONCE CORR C144 IS AVAILABLE FOR USE
THIS DOOR AND WALKWAY
OUTSIDE SHALL REMAIN OPEN AS
A TEMPORARY EGRESS FROM
NORTH END OF ED DURING PHASE I
PHASING NOTES & LEGEND
PHASE 1:
GENERAL DESCRIPTION: CONSTRUCT VESTIBULES, NEW STAIR, 2ND FLOOR CONNECTING CORRIDOR.
PHASE 2:
GENERAL DESCRIPTION: RENOVATE REMAINDER OF EXISTING ED
GENERAL PHASING NOTES:
THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER’S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO;
TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND EMERGENCY
PREPAREDNESS.
REFER TO THE ASBESTOS REPORT, LEAD BASED PAINT REPORT, AND ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL.
HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR
ADDITIONAL CLARIFYING INFORMATION.
THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA’S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE
ADJACENT DEPARTMENTS.
1. ED LOCATION: THE EMERGENCY DEPARTMENT (ED) WILL OPERATE OUT OF THEIR CURRENT LOCATION DURING THE MAJORITY OF THIS PHASE.
2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): THE AOD OFFICE WILL OPERATE NORMALLY. AMBULANCE AND WALK-UP ENTRY POINT FOR ED WILL THROUGH
NIGHT ENTRANCE.
3. TOILETS: EXISTING TOILETS WILL BE AVAILABLE DURING THIS PHASE.
4. TREATMENT/TRAUMA ROOMS: EXISTING ROOMS WILL BE AVAILABLE DURING THIS PHASE. EXISTING EXAM ROOM SHALL BE USED AS TEMPORARY
SUPPLY/CLEAN ROOM.
5. ACCESS/EGRESS: ACCESS TO EXTERIOR DOOR AT NURSE STATION SHALL BE MAINTAINED AS AN EGRESS PATH AT NORTH END OF ED.
6. CONSTRUCTION ZONE: AREA TO THE EAST OF THE EXISTING ED DEPARTMENT, DEMO EXISTING STAIR, BEGIN CONSTRUCTION OF ENTRY VESTIBULES, AND NEW STAIR.
7. OTHER CONSIDERATIONS: ENTRY VESTIBULE WILL REQUIRE BEING CONSTRUCTED IN TWO PHASES SUCH THAT THIS BUILDING ENTRANCE REMAINS
OPEN AT ALL TIMES. REFER TO PHASING PLAN FOR FURTHER INFORMATION.
8. WORK SHALL BEGIN ON SECOND FLOOR CONNECTING CORRIDOR.
1. ED LOCATION: THE EMERGENCY DEPARTMENT WILL RELOCATE TO THE NEWLY COMPLETE PHASE 1 AREA.
2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): ADMISSIONS AND CHECK-IN WILL BE LOCATED IN THE EAST AOD OFFICE WHILE THE WEST AOD OFFICE WILL
BE TEMPORARY TRIAGE.
3. TOILETS: 3 NEW PUBLIC TOILETS WILL BE AVAILABLE, 2 PATIENT TOILETS, AND A STAFF TOILET.
4. TREATMENT/TRAUMA ROOMS: ASSUMING TRIAGE CAN SERVE AS TEMPORARY TREATMENT, THERE WILL BE 5 TREATMENT ROOMS (INCLUDING A SECLUSION ROOM). THE NEW EAST TRAUMA ROOM WILL SERVE AS TEMPORARY NURSE STATION DURING THIS PHASE.
5. ACCESS/EGRESS: NORTHEAST EXIT WILL BE OPEN. TEMPORARY DOOR IN STAFF BREAK ROOM WILL SERVE AS TEMPORARY SOUTH ROUTE OUT OF
THE UNIT.
6. CONSTRUCTION ZONE: WEST AREA OF THE PROJECT, AN AREA GENERALLY FOLLOWING EXISTING EMERGENCY DEPARTMENT OUTLINE.
7. CONSTRUCT DECON ROOM ADDITION
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
De pa rtm en t o f
Ve te ra ns
A ffa irs
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
C:\Users\bharvey\Documents\TopekaVA_ED_bharvey.rvt
As indicated
1/20/2017 3:42:32 PM
GI-004
PHASING PLAN 1ST
FLOOR - PHASE 1
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
1/20/2017
1/8" = 1'-0"GI-004
A PHASING PLAN - 1ST FLOOR - PHASE 1 4' 8' 16'
1/8" = 1'-0"
0'
NORTH
MRI ZONE
II
C146
BLUE
TEAM
B145
CLINICAL
PHARMACIST
B147
CLINICAL
PHARMACIST
B148
CLINICAL
PHARMACIST
B149
NUTRITION
CLINIC 1
A135
NUTRITION
CLINIC 2
A136
CLINICAL
PHARMACIST
A137
SOUTH
ELEV
LOBBY
A141
NOT IN SCOPE
OF WORK
NOT IN
SCOPE OF
WORK
CORRIDOR
C144
CORRIDOR
C144
WORK
ROOM
B143
WORK
ROOM
B142
EXAM #18
B141
EXAM #17
B140
EXAM #4
B125
EXAM #3
B124
EXAM #2
B123
EXAM #1
B119
CORRIDOR
B1-02
STAIR 3
B117A
CORRIDOR
B1-02
MEN
B101
DUMBWAITER
A134
WOMEN
A113
HOUSEKEEPING
A138
ELEVATOR
LOBBY
A140
STORAGE
A129A
STORAGE
A129
EXAM #21
AC121
EXAM #23
AC123
EXAM #25
AC125PHARMACY
AC124
WORK
ROOM
AC122A
WORK
ROOM
AC122
EXAM #5
AC105
EXAM #6
AC106
EXAM #9
AC109
RED TEAM
AC108EXAM #10
AC110
EXAM #11
AC111
ELEC
CLOSET
AC116E
1 HR RATED CONSTRUCTION BARRIER
DURING PHASE 2
CORRIDOR
C144
ED
WAITING
AC101
ADMIT
AC101B
ADMIT
AC101C
WORK
AC132
NURSE
MGR
AC133
WAITING
AC137
TLT
AC135A
TRTMT 3
AC135
TRTMT 2
FEMALE
AC134
HALL
AC131
TRTMT 1
AC129TRIAGE
AC128CONSULT/
BRVMNT
AC101D
NEW
STAIR
AC103
ED ENTRY
AC100
OUTPATIENT
ENTRY
C100
VA POLICE
AC101A TLT
C130
VESTIBULE
AC104
JAN
AC127B
TRAUMA 1
B113
BREAK
AC136
TLT
AC136A
EXAM #40
AC140
EXAM #39
AC139
CLOSET
B144B
ROOM
B144C
ROOM
B144D
SECLUSION
B105
SECLUSION
AC119
TLT
AC134A
NOT IN SCOPE
OF WORK
DECON ADDITION MAY NOT BE CONSTRUCTED
UNTIL AMBULANCE GARAGE ACCESS TO THE
ED IS MADE AVAILABLE (NEAR END OF PHASE
1)
NEW TRAUMA 1 ROOM
SERVES AS TEMPORARY
NURSE STATION DURING
PHASE 2
ONCE ED ENTRY VESTIBULE IS OPEN,
COMPLETE WORK ON OUTPATIENT
ENTRY VESTIBULE
COORDINATE PHASING OF FINISHES
WORK IN FRIEGHT ELEVATOR WITH
PROJECT COR
COMPLETE WORK THIS
AREA ONCE NEW
CORRIDOR DOORS
ARE COMPLETE
3'-6" TEMPORARY
EMERGENCY EXIT
DOOR - REMOVE AT
END OF PHASE
DOOR SERVES AS EMERGENCY EXIT DURING PHASE 2 - INSTALL
ACCESS CONTROL HARDWARE AFTER NEW SOUTHEAST EXIT IS OPEN
WAIT TO INSTALL STOREFRONT
SYSTEM UNTIL OUTPATIENT ENTRY
VESTIBULE IS COMPLETE - THIS
OPENING SERVES AS TEMPORARY
ACCESS BETWEEN ED ENTRY
VESTIBULE CORRIDOR C144
CORR
B1-03B
CORR
C101
VENDING
AC138C
WAITING
AC138B
ELEVATOR
S1
TEMPORARY SUPPLY
ROOM/AREA DURING
THIS PHASE
TEMP. TRIAGE DURING
THIS PHASE
ROOM
B144
CORRIDOR
B1-03B
CORRIDOR
B1-03
ELEC
AC127A
STORAGE
B1-03C
TLT
B1-03D
PHASE 2
PHASING NOTES & LEGEND
PHASE 1:
GENERAL DESCRIPTION: CONSTRUCT VESTIBULES, NEW STAIR, 2ND FLOOR CONNECTING CORRIDOR.
PHASE 2:
GENERAL DESCRIPTION: RENOVATE REMAINDER OF EXISTING ED
GENERAL PHASING NOTES:
THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER’S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO;
TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND EMERGENCY
PREPAREDNESS.
REFER TO THE ASBESTOS REPORT, LEAD BASED PAINT REPORT, AND ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL.
HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR
ADDITIONAL CLARIFYING INFORMATION.
THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA’S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE
ADJACENT DEPARTMENTS.
1. ED LOCATION: THE EMERGENCY DEPARTMENT (ED) WILL OPERATE OUT OF THEIR CURRENT LOCATION DURING THE MAJORITY OF THIS PHASE.
2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): THE AOD OFFICE WILL OPERATE NORMALLY. AMBULANCE AND WALK-UP ENTRY POINT FOR ED WILL THROUGH
NIGHT ENTRANCE.
3. TOILETS: EXISTING TOILETS WILL BE AVAILABLE DURING THIS PHASE.
4. TREATMENT/TRAUMA ROOMS: EXISTING ROOMS WILL BE AVAILABLE DURING THIS PHASE. EXISTING EXAM ROOM SHALL BE USED AS TEMPORARY
SUPPLY/CLEAN ROOM.
5. ACCESS/EGRESS: ACCESS TO EXTERIOR DOOR AT NURSE STATION SHALL BE MAINTAINED AS AN EGRESS PATH AT NORTH END OF ED.
6. CONSTRUCTION ZONE: AREA TO THE EAST OF THE EXISTING ED DEPARTMENT, DEMO EXISTING STAIR, BEGIN CONSTRUCTION OF ENTRY VESTIBULES, AND NEW STAIR.
7. OTHER CONSIDERATIONS: ENTRY VESTIBULE WILL REQUIRE BEING CONSTRUCTED IN TWO PHASES SUCH THAT THIS BUILDING ENTRANCE REMAINS
OPEN AT ALL TIMES. REFER TO PHASING PLAN FOR FURTHER INFORMATION.
8. WORK SHALL BEGIN ON SECOND FLOOR CONNECTING CORRIDOR.
1. ED LOCATION: THE EMERGENCY DEPARTMENT WILL RELOCATE TO THE NEWLY COMPLETE PHASE 1 AREA.
2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): ADMISSIONS AND CHECK-IN WILL BE LOCATED IN THE EAST AOD OFFICE WHILE THE WEST AOD OFFICE WILL
BE TEMPORARY TRIAGE.
3. TOILETS: 3 NEW PUBLIC TOILETS WILL BE AVAILABLE, 2 PATIENT TOILETS, AND A STAFF TOILET.
4. TREATMENT/TRAUMA ROOMS: ASSUMING TRIAGE CAN SERVE AS TEMPORARY TREATMENT, THERE WILL BE 5 TREATMENT ROOMS (INCLUDING A SECLUSION ROOM). THE NEW EAST TRAUMA ROOM WILL SERVE AS TEMPORARY NURSE STATION DURING THIS PHASE.
5. ACCESS/EGRESS: NORTHEAST EXIT WILL BE OPEN. TEMPORARY DOOR IN STAFF BREAK ROOM WILL SERVE AS TEMPORARY SOUTH ROUTE OUT OF
THE UNIT.
6. CONSTRUCTION ZONE: WEST AREA OF THE PROJECT, AN AREA GENERALLY FOLLOWING EXISTING EMERGENCY DEPARTMENT OUTLINE.
7. CONSTRUCT DECON ROOM ADDITION
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
De pa rtm en t o f
Ve te ra ns
A ffa irs
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
C:\Users\bharvey\Documents\TopekaVA_ED_bharvey.rvt
As indicated
1/20/2017 3:42:54 PM
GI-005
PHASING PLAN 1ST
FLOOR - PHASE 2
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
1/20/2017
1/8" = 1'-0"GI-005
1 PHASING PLAN - 1ST FLOOR - PHASE 2
NORTH
4' 8' 16'
1/8" = 1'-0"
0'
STAIRS
STORAGE
STORAGE
ELEC./ IT
STORAGE
ROOM
IT CLOSET
FEC
VACANT
E X
IT
12/1 2.4" 48"
GROUP S OCCUPANCY
TYPE II (000) CONSTRUCTION
FULLY SPRINKLERED = YES
TOTAL OCCUPANTS : 12
OCCUPANCY 1 : BASEMENT = 5,628 SF
STAIRS
CORR.
DENTAL
SURGERY
DECON
ROOM
DENTAL
OFFICE
DENTAL
OFFICE
X-RAY
ROOM
ISOLATION
PATIENT
EXAM
LAB
SUPPLIES
DENTAL
ADMINISTRATION
OFFICE
DENTAL
RECEPTION
CORRIDOR
DENTAL
TREATMENT
SUITE
DENTAL
TREATMENT
ROOM
AUTHORIZED
PERSONNEL
ONLY
SUPPLY
ROOM
BREAK
ROOM
FEC
VACANT
HORIZONTAL EXIT
EXTERIOR WALL
RATED 1 HR FOR
10'-0"
EXTERIOR WALL
RATED 1 HR FOR 10'-0"
44/2 4.4" 48"
BUSINESS OCCUPANCY
TYPE I (332) CONSTRUCTION
FULLY SPRINKLERED = YES
TOTAL OCCUPANTS : 42
OCCUPANCY 1 : SECOND FLOOR = 4,461 SF
CORRIDOR
BUSINESS OCCUPANCY
TYPE II (000) CONSTRUCTION
FULLY SPRINKLERED = YES
TOTAL OCCUPANTS : 0
OCCUPANCY 2 : SECOND FLOOR = 668 SF
LEGEND
BUILDING & LIFE SAFETY REQUIREMENTS
DESCRIPTION
WALL
RATING
NEW
PARTITION KEY
NFPA 2015
(NEW HC)
NFPA 2015
(EXIST. HC)
OPENINGS DAMPERS
RATING RFRNC. TYPE RFRNC.
BUILDING SEPARATION:
FIRE BARRIER
2 HR NOT
APPLICABLE
90 MIN IBC 705.8
TABLE 715.4
FIRE
90 MIN
IBC 705.11
IBC 715.5.1
IBC 716.5.1
NOT
APPLICABLE
OCCUPANCY/AREA SEPARATION
FIRE BARRIER
1 HR 60 MIN NFPA 8.2.3.2.3.1 (1)
IBC 706.7
NFPA 6.1.14
NFPA 8.2.3.1.2
NFPA 8.2.3.2.4.1
IBC 706.10
IBC 716.3.1
IBC 716.5.2
NFPA 6.1.14
NFPA 8.2.3.1.2
VERT. OPG. (EXIT ENCLSR/SHAFT)
FIRE BARRIER
(2 HR = 4 OR MORE STORIES)
(1 HR = LESS THAN 4 STORIES)
NFPA 19.3.1.1
NFPA 8.2.5.4
NFPA 18.3.1.1
NFPA 8.2.5.4
NFPA 8.2.3.2.3.1
IBC 715.4/714.2
NOT
ALLOWED
NFPA 1005.3.4.1
NFPA 1020.12
IBC 715.5.3
IBC 716.5.21 HR
2 HR
60 MIN
90 MIN
1 H R
2 HR
EXIT PASSAGEWAY (HORIZ.)
FIRE BARRIER
NFPA 8.2.3.2.3.1 IBC
715.4/714.2
NFPA 18.2.2.7
NFPA 7.2.6
NOT
ALLOWED
NFPA 1005.3.4.1
NFPA 1021.5
NFPA 19.2.2.7
NFPA 7.2.6
60 MIN
90 MIN
HAZ./INCIDENTAL USE
FIRE BARRIER
1 HR 45 MIN
NFPA 8.2.3.2.3.1 (2)
IBC 706.7
IBC 715.4
NFPA 18.3.2.1
NFPA 8.4.1.1
FIRE
90 MIN
NFPA 18.3.2.1
NFPA 8.4.1.1
IBC 715.3.1
IBC 716.3.1
IBC 715.5.2
IBC 716.5.2
HAZ./INCIDENTAL USE
SMOKE PARTITIONS (SPRINKLERED)
NR-
RESIST
SMK
NR
SELF OR AUTO
CLOSING
IBC 710.5.3
IBC 715.4.7.3
IBC 508.2.2.1
NFPA 8.4.1.2 SEE
NOTE B
NFPA 8.4.1.2
SUBDIVIDING SPACES
SMOKE BARRIER
20 MIN NFPA 8.3.4.2 (1)
IBC 709.5
NFPA 18.3.7.1
NFPA 18.3.7.3
SMOKE
90 MIN
SEE NOTE [A]
NFPA 8.3.5.1
IBC 709.8
IBC 716.5.5
SEE NOTE [C]
NFPA 19.3.7.1
1/2
HR
1 HR
SUITE SEPARATION
SMOKE PARTITION
NR NFPA 18.2.5 IBC 710.5.3
IBC 715.4.7.3
SEE
NOTE [B]
NR
SELF OR AUTO
CLOSING
NFPA 18.2.5
10/1 2"
34"
REQ'D. EXIT WIDTH
NO. OF OCC. EXITING
ACTUAL EXIT WIDTH
NO. OF OCC./
NO. OF EXITS
NO. OCC. EXITING
(SMALLER ROOMS)
MAXIMUM OCCUPANCY
AREA
OCC. LOAD FACTOR
1:50
FIRE EXTINGUISHER AND CABINET
FIRE ALARM CONTROL PANEL
FIRE SYSTEM ANNUNCIATOR ALARM
ANNUNCIATOR PANEL
PROPERTY LINE
FEC
FACP
FSA
FAAP
100'
(50)
STARTING
LOCATION
EXITING #
TRAVEL
DISTANCE
TRAVEL PATH
[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS WHERE
HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)
[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS (NFPA
8.2.4.4.3) (IBC 710.7)
[C] SMOKE DAMPERS ARE NOT REQUIRED WHERE OPENINGS IN DUCT ARE LIMITED TO A
SINGLE SMOKE COMPARTMENT & DUCTS ARE MADE OF STEEL (IBC 716.5.5)
[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED
ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)
NOTES
SYMBOLS
OCCUPANCY/AREA SEPARATION
FIRE BARRIER
90 MIN NFPA 8.2.3.2.3.1 (1)
IBC 706.7
FIRE
90 MIN
NFPA 6.1.14
NFPA 8.2.3.1.2
NFPA 8.2.3.2.4.1
IBC 706.10
IBC 716.3.1
IBC 716.5.2
NFPA 6.1.14
NFPA 8.2.3.1.2
2 HR
RATED UL
ASSEMBLES
UL U412
UL U419
UL U412
UL U419
UL U412
UL U419
UL U415(B)
UL U412
UL U419
UL U412
UL U419
UL U415(A)
HORIZONTAL BUILDING SEPARATION:
FIRE BARRIER
2 HR NOT
APPLICABLE
90 MIN IBC 705.8
TABLE 715.4
FIRE
90 MIN
IBC 705.11
IBC 715.5.1
IBC 716.5.1
NOT
APPLICABLE
UL U412
UL U419
CODE INFORMATION
PROJECT INFORMATION:
1. CONSTRUCTION PURPOSE: ADDITION / RENOVATION
2. REASON FOR SUBMITTAL: NEW CONSTRUCTION
3. I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE THE
SUBMITTED PLANS FOR THE ABOVE-REFERENCED PROJECT
COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING:
2015 LIFE SAFETY CODE (NFPA-101)
2014 NATIONAL ELECTRICAL CODE (NFPA-70)
CURRENT ABA ACCESSIBILITY STANDARDS
2014 INTERNATIONAL BUILDING CODE (IBC)
2014 INTERNATIONAL MECHANICAL CODE (IMC)
2014 INTERNATIONAL PLUMBING CODE (IPC)
4. LOCATION OF ANTICIPATED FUTURE ADDITIONS: UNKNOWN
5. OWNER:
COLMERY - O'NEIL VA MEDICAL CENTER
2200 SW GAGE BLVD.
TOPEKA, KS 66622
PH (785) 350-3111
7. DESIGN TEAM:
ARCHITECT:
HEALTH FACILITIES GROUP, LLC
142 N. MOSLEY ST., SUITE 300
WICHITA, KS 67202 316-262-2500
CONTACT: BEN HARVEY
DESIGN CONSULTANTS:
STRUCTURAL:
KH ENGINEERING GROUP, P.A.
15377 W. 95TH ST.
LENEXA, KS 66219 913-825-9381
CONTACT:
KATHY HAGEN
KHAGEN@KHEGROUP.COM
CIVIL, MECHANICAL, ELECTRICAL, & PLUMBING:
PROFESSIONAL ENGINEERING CONSULTANTS
303 S. TOPEKA
WICHITA, KS 67202 316-262-2691
CONTACT:
DARIN CROWDER
DARIN.CROWDER@PEC1.COM
8. ARCHITECTS SEAL: SEE STAMP AT BELOW
9. FIRE SERVICE: TOPEKA, KANSAS FIRE DEPARTMENT
10. INSPECTION: VISN SAFETY OFFICER
11. OCCUPANCY GROUP TYPE:
OCCUPANCY 1 - BUSINESS
OCCUPANCY 2 - NEW AMBULATORY HEALTH CARE
12. CONSTRUCTION TYPE: NFPA TYPE I (332) & NFPA TYPE II (000)
13. STRUCTURAL CODE REQUIREMENTS
A. ALLOWABLE FLOOR AREA FROM NFPA 5000 TABLE 7.4.1:
TOTAL ALLOWABLE FLOOR AREA:
TYPE I (332) = UNLIMITED
TYPE II (000) = 23,000
NEW FLOOR AREA ADDED W/ THIS PROJECT:
OCCUPANCY 1 - BUSINESS
FIRST FLOOR = 15,261 SF
SECOND FLOOR = 659 SF
OCCUPANY 2 - NEW AMBULATORY HEALTH CARE
FIRST FLOOR = 177 SF
EXISTING FLOOR AREA :
OCCUPANCY 1 - BUSINESS
FIRST FLOOR = 98 SF
SECOND FLOOR = 4,461 SF
OCCUPANY 2 - NEW AMBULATORY HEALTH CARE
FIRST FLOOR = 7,008 SF
GRAND TOTAL
FIRST FLOOR = 22,446 SF
SECOND FLOOR = 5,120 SF
B. ALLOWABLE HEIGHT CALCULATIONS
OCCUPANCY 1 - BUSINESS
TYPE OF CONSTRUCTION: TYPE II (000)
ALLOWABLE STORIES: 5
ALLOWABLE HEIGHT: 75'
ACTUAL STORIES: 1
ACTUAL HEIGHT: 25'-8"
NO HEIGHT MODIFICATIONS REQUIRED
OCCUPANCY 2 - NEW AMBULATORY HEALTH CARE
TYPE OF CONSTRUCTION: TYPE II (000)
ALLOWABLE STORIES: 5
ALLOWABLE HEIGHT: 75'
ACTUAL STORIES: 1
ACTUAL HEIGHT: 26'-4"
NO HEIGHT MODIFICATIONS REQUIRED
ALLOWABLE AREA CALCULATIONS:
NO AREA MODIFICATIONS TAKEN
C. FIRE-RESISTANCE RATING FOR BUILDING ELEMENTS:
TYPE I (332)
1. BEARING WALLS:
A. EXTERIOR: 3HR
B. INTERIOR: 3HR
2. NONBEARING WALLS:
A. EXTERIOR: 0HR, 1HR, SEE NFPA 5000 TABLE 7.3.2.1
B. INTERIOR: 0HR
3. COLUMNS: 2HR
4.BEAMS, GIRDERS,
TRUSSES, AND ARCHES: 2HR
5. FLOOR/CEILING
ASSEMBLIES: 2HR
6. ROOF/CEILING
ASSEMBLIES: 1.5HR
7. SHAFT ENCLOSURES: 1HR NFPA 101 8.6, 18.3.1
TYPE II (000)
1. BEARING WALLS:
A. EXTERIOR: 0HR
B. INTERIOR: 0HR
2. NONBEARING WALLS:
A. EXTERIOR: 0HR, 1HR, SEE NFPA 5000 TABLE 7.3.2.1
B. INTERIOR: 0HR
3. COLUMNS: 0HR
4.BEAMS, GIRDERS,
TRUSSES, AND ARCHES: 0HR
5. FLOOR/CEILING
ASSEMBLIES: 0HR
6. ROOF/CEILING
ASSEMBLIES: 0HR
7. SHAFT ENCLOSURES: 1HR NFPA 101 8.6, 18.3.1
OTHER REQUIREMENTS:
1. NFPA 101 18.3.2.1:
1 HR OCCUPANCY SEPARATION REQUIRED AT STORAGE ROOMS OVER 100 SF
(NEW HEALTH CARE OCCUPANCY)
2. NFPA 101 TABLE 6.1.14.4.1 (a):
2 HR OCCUPANCY SEPARATION REQUIRED BETWEEN NEW HEALTH CARE
OCCUPANCY & NEW AMBULATORY HEALTH CARE OCCUPANCIES
14. ACTIVE FIRE SAFETY SYSTEMS
* NOTE:
ALL AREAS OF NEW & EXISTING CONSTRUCTION
OF THIS PROJECT WILL BE FULLY SPRINKLERED.
SPRINKLER SYSTEM SHALL COMPLY WITH NFPA 13
IN ALL AREAS
(a) SMOKE DETECTORS THROUGHOUT
(b) GENERATOR POWERED EMERGENCY LIGHTING
(c) PORTABLE EXTINGUISHERS
(d) AUTOMATIC AIR-HANDLING SHUT-DOWN
(e) FIRE ALARM SYSTEM
15. WATER SUPPLY: CITY OF TOPEKA, KANSAS
16. SEWAGE TREATMENT: CITY OF TOPEKA, KANSAS
17. HANDICAP PROVISIONS:
ACCESSIBLE ROUTE, TOILETS, LAVATORIES, SIGNAGE AND PARKING
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
De pa rtm en t o f
Ve te ra ns
A ffa irs
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
C:\Users\bharvey\Documents\TopekaVA_ED_bharvey.rvt
As indicated
1/20/2017 3:41:45 PM
FS100
LIFE SAFETY PLAN -
BASEMENT/ 2ND
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
1/20/2017
1/8" = 1'-0"FS100
A LIFE SAFETY PLAN - BASEMENT
1/8" = 1'-0"FS100
B LIFE SAFETY PLAN - 2nd FLOOR
4' 8' 16'
1/8" = 1'-0"
0'
4' 8' 16'
1/8" = 1'-0"
0'
NORTH
NORTH
NURSE
CORR
NURSE
DICT
TRAUMA 1
TRAUMA 2
TRTMT 5
TRTMT 6
CLEAN
BREAK
TRIAGE
ON-CALL
SHWR
TRTMT 1
TRTMT 2
FEMALE
TRTMT 3
WORK
ADMIT
ADMIT
HALL
CLOSET
DECON
CORR
CORR
CORR
VESTIBULE
ED ENTRY
OUTPATIENT
ENTRY
EXAM #39
NURSE MGR
ROOM
CHIEF ED
SOILED
SECLUSION 1
SECLUSION
JAN
EQUIP RM
WAITING
TLT
CONSULT/
BRVMNT
VA POLICE
TLT
ANTE
TRTMT 4
(ISO)
TLT
MEDS
TLT
NOURISHEQUIP
LINEN
CARTS
TLT
EXAM #40
ED WAITING
ROOM
33/1 6.6" 48"
218/5 8.8" 96"
218/5 8.8" 96"
MRI ZONE II
BLUE TEAM
CLINICAL
PHARMACIST
CLINICAL
PHARMACIST
CLINICAL
PHARMACIST
NUTRITION
CLINIC 1
NUTRITION
CLINIC 2
CLINICAL
PHARMACIST
SOUTH ELEV
LOBBY
SCANNER
CONTROL
ROOM
UTILITY
EXAM #12 EXAM #13
EXAM #14 EXAM #15 CHASE EXAM #18 EXAM #19
CORRIDOR
RED TEAM
EXAM #9
EXAM #10
ELEC
CLOSET
EXAM #11
RESTROOM
EXAM #6
EXAM #5
STORAGE
WORK
ROOM
WORK
ROOM
PHARMACY
EXAM #25
EXAM #23
EXAM #21
EXAM #20
RESTROOM
EXAM #1 EXAM #2
WORK
ROOM
BLUE TEAM
CLINICS
STAIR 3
SUPPLY
CORRIDOR
WOMEN
MEN
DUMBWAITER
HOUSEKEEPING
ELEVATOR
LOBBY
STORAGE
STORAGE
NEW STAIR
CORRIDOR
CORRIDOR
CORR
FACP
FA
C P
FA
A P
ROOM
STORAGE
TLT
ELEC
TLT
CORRIDOR
DASHED LINE INDICATES
PERIMETER OF SECOND
FLOOR ABOVE AND
SEPARATE BUILDING (TYPE I
(332)) - 2 HR RATED FLOOR
ASSEMBLY
WAITING
VENDING
CLINICAL
PHARMACIST
WORK
ROOM
EXAM
PATIENT
TOILETEQUIPEXAMEXAM
SPECIALTY
EXAM CORRIDOR CORRIDOR
OCCUPANCY AMBULATORY HEALTH CARE
TYPE II (000) CONSTRUCTION
FULLY SPRINKLERED = YES
TOTAL OCCUPANTS : 54
OCCUPANCY 2 : FIRST FLOOR = 7,013 SF
BUSINESS OCCUPANCY
TYPE II (000) CONSTRUCTION
FULLY SPRINKLERED = YES
TOTAL OCCUPANTS : 218
OCCUPANCY 1 : FIRST FLOOR = 15,376 SF
25/1 6.6" 48"
218/5 8.8" 36"
218/5 8.8" 42"
FA
C P
FUTURE OCCUPANCY
SEPARATION
F E C
F E C
F E C
F E C
F E
C
LEGEND
BUILDING & LIFE SAFETY REQUIREMENTS
DESCRIPTION
WALL
RATING
NEW
PARTITION KEY
NFPA 2015
(NEW HC)
NFPA 2015
(EXIST. HC)
OPENINGS DAMPERS
RATING RFRNC. TYPE RFRNC.
BUILDING SEPARATION:
FIRE BARRIER
2 HR NOT
APPLICABLE
90 MIN IBC 705.8
TABLE 715.4
FIRE
90 MIN
IBC 705.11
IBC 715.5.1
IBC 716.5.1
NOT
APPLICABLE
OCCUPANCY/AREA SEPARATION
FIRE BARRIER
1 HR 60 MIN NFPA 8.2.3.2.3.1 (1)
IBC 706.7
NFPA 6.1.14
NFPA 8.2.3.1.2
NFPA 8.2.3.2.4.1
IBC 706.10
IBC 716.3.1
IBC 716.5.2
NFPA 6.1.14
NFPA 8.2.3.1.2
VERT. OPG. (EXIT ENCLSR/SHAFT)
FIRE BARRIER
(2 HR = 4 OR MORE STORIES)
(1 HR = LESS THAN 4 STORIES)
NFPA 19.3.1.1
NFPA 8.2.5.4
NFPA 18.3.1.1
NFPA 8.2.5.4
NFPA 8.2.3.2.3.1
IBC 715.4/714.2
NOT
ALLOWED
NFPA 1005.3.4.1
NFPA 1020.12
IBC 715.5.3
IBC 716.5.21 HR
2 HR
60 MIN
90 MIN
1 H R
2 HR
EXIT PASSAGEWAY (HORIZ.)
FIRE BARRIER
NFPA 8.2.3.2.3.1 IBC
715.4/714.2
NFPA 18.2.2.7
NFPA 7.2.6
NOT
ALLOWED
NFPA 1005.3.4.1
NFPA 1021.5
NFPA 19.2.2.7
NFPA 7.2.6
60 MIN
90 MIN
HAZ./INCIDENTAL USE
FIRE BARRIER
1 HR 45 MIN
NFPA 8.2.3.2.3.1 (2)
IBC 706.7
IBC 715.4
NFPA 18.3.2.1
NFPA 8.4.1.1
FIRE
90 MIN
NFPA 18.3.2.1
NFPA 8.4.1.1
IBC 715.3.1
IBC 716.3.1
IBC 715.5.2
IBC 716.5.2
HAZ./INCIDENTAL USE
SMOKE PARTITIONS (SPRINKLERED)
NR-
RESIST
SMK
NR
SELF OR AUTO
CLOSING
IBC 710.5.3
IBC 715.4.7.3
IBC 508.2.2.1
NFPA 8.4.1.2 SEE
NOTE B
NFPA 8.4.1.2
SUBDIVIDING SPACES
SMOKE BARRIER
20 MIN NFPA 8.3.4.2 (1)
IBC 709.5
NFPA 18.3.7.1
NFPA 18.3.7.3
SMOKE
90 MIN
SEE NOTE [A]
NFPA 8.3.5.1
IBC 709.8
IBC 716.5.5
SEE NOTE [C]
NFPA 19.3.7.1
1/2
HR
1 HR
SUITE SEPARATION
SMOKE PARTITION
NR NFPA 18.2.5 IBC 710.5.3
IBC 715.4.7.3
SEE
NOTE [B]
NR
SELF OR AUTO
CLOSING
NFPA 18.2.5
10/1 2"
34"
REQ'D. EXIT WIDTH
NO. OF OCC. EXITING
ACTUAL EXIT WIDTH
NO. OF OCC./
NO. OF EXITS
NO. OCC. EXITING
(SMALLER ROOMS)
MAXIMUM OCCUPANCY
AREA
OCC. LOAD FACTOR
1:50
FIRE EXTINGUISHER AND CABINET
FIRE ALARM CONTROL PANEL
FIRE SYSTEM ANNUNCIATOR ALARM
ANNUNCIATOR PANEL
PROPERTY LINE
FEC
FACP
FSA
FAAP
100'
(50)
STARTING
LOCATION
EXITING #
TRAVEL
DISTANCE
TRAVEL PATH
[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS WHERE
HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)
[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS (NFPA
8.2.4.4.3) (IBC 710.7)
[C] SMOKE DAMPERS ARE NOT REQUIRED WHERE OPENINGS IN DUCT ARE LIMITED TO A
SINGLE SMOKE COMPARTMENT & DUCTS ARE MADE OF STEEL (IBC 716.5.5)
[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED
ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)
NOTES
SYMBOLS
OCCUPANCY/AREA SEPARATION
FIRE BARRIER
90 MIN NFPA 8.2.3.2.3.1 (1)
IBC 706.7
FIRE
90 MIN
NFPA 6.1.14
NFPA 8.2.3.1.2
NFPA 8.2.3.2.4.1
IBC 706.10
IBC 716.3.1
IBC 716.5.2
NFPA 6.1.14
NFPA 8.2.3.1.2
2 HR
RATED UL
ASSEMBLES
UL U412
UL U419
UL U412
UL U419
UL U412
UL U419
UL U415(B)
UL U412
UL U419
UL U412
UL U419
UL U415(A)
HORIZONTAL BUILDING SEPARATION:
FIRE BARRIER
2 HR NOT
APPLICABLE
90 MIN IBC 705.8
TABLE 715.4
FIRE
90 MIN
IBC 705.11
IBC 715.5.1
IBC 716.5.1
NOT
APPLICABLE
UL U412
UL U419
CODE INFORMATION
PROJECT INFORMATION:
1. CONSTRUCTION PURPOSE: ADDITION / RENOVATION
2. REASON FOR SUBMITTAL: NEW CONSTRUCTION
3. I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE THE
SUBMITTED PLANS FOR THE ABOVE-REFERENCED PROJECT
COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING:
2015 LIFE SAFETY CODE (NFPA-101)
2014 NATIONAL ELECTRICAL CODE (NFPA-70)
CURRENT ABA ACCESSIBILITY STANDARDS
2014 INTERNATIONAL BUILDING CODE (IBC)
2014 INTERNATIONAL MECHANICAL CODE (IMC)
2014 INTERNATIONAL PLUMBING CODE (IPC)
4. LOCATION OF ANTICIPATED FUTURE ADDITIONS: UNKNOWN
5. OWNER:
COLMERY - O'NEIL VA MEDICAL CENTER
2200 SW GAGE BLVD.
TOPEKA, KS 66622
PH (785) 350-3111
7. DESIGN TEAM:
ARCHITECT:
HEALTH FACILITIES GROUP, LLC
142 N. MOSLEY ST., SUITE 300
WICHITA, KS 67202 316-262-2500
CONTACT: BEN HARVEY
DESIGN CONSULTANTS:
STRUCTURAL:
KH ENGINEERING GROUP, P.A.
15377 W. 95TH ST.
LENEXA, KS 66219 913-825-9381
CONTACT:
KATHY HAGEN
KHAGEN@KHEGROUP.COM
CIVIL, MECHANICAL, ELECTRICAL, & PLUMBING:
PROFESSIONAL ENGINEERING CONSULTANTS
303 S. TOPEKA
WICHITA, KS 67202 316-262-2691
CONTACT:
DARIN CROWDER
DARIN.CROWDER@PEC1.COM
8. ARCHITECTS SEAL: SEE STAMP AT BELOW
9. FIRE SERVICE: TOPEKA, KANSAS FIRE DEPARTMENT
10. INSPECTION: VISN SAFETY OFFICER
11. OCCUPANCY GROUP TYPE:
OCCUPANCY 1 - BUSINESS
OCCUPANCY 2 - NEW AMBULATORY HEALTH CARE
12. CONSTRUCTION TYPE: NFPA TYPE I (332) & NFPA TYPE II (000)
13. STRUCTURAL CODE REQUIREMENTS
A. ALLOWABLE FLOOR AREA FROM NFPA 5000 TABLE 7.4.1:
TOTAL ALLOWABLE FLOOR AREA:
TYPE I (332) = UNLIMITED
TYPE II (000) = 23,000
NEW FLOOR AREA ADDED W/ THIS PROJECT:
OCCUPANCY 1 - BUSINESS
FIRST FLOOR = 15,261 SF
SECOND FLOOR = 659 SF
OCCUPANY 2 - NEW AMBULATORY HEALTH CARE
FIRST FLOOR = 177 SF
EXISTING FLOOR AREA :
OCCUPANCY 1 - BUSINESS
FIRST FLOOR = 98 SF
SECOND FLOOR = 4,461 SF
OCCUPANY 2 - NEW AMBULATORY HEALTH CARE
FIRST FLOOR = 7,008 SF
GRAND TOTAL
FIRST FLOOR = 22,446 SF
SECOND FLOOR = 5,120 SF
B. ALLOWABLE HEIGHT CALCULATIONS
OCCUPANCY 1 - BUSINESS
TYPE OF CONSTRUCTION: TYPE II (000)
ALLOWABLE STORIES: 5
ALLOWABLE HEIGHT: 75'
ACTUAL STORIES: 1
ACTUAL HEIGHT: 25'-8"
NO HEIGHT MODIFICATIONS REQUIRED
OCCUPANCY 2 - NEW AMBULATORY HEALTH CARE
TYPE OF CONSTRUCTION: TYPE II (000)
ALLOWABLE STORIES: 5
ALLOWABLE HEIGHT: 75'
ACTUAL STORIES: 1
ACTUAL HEIGHT: 26'-4"
NO HEIGHT MODIFICATIONS REQUIRED
ALLOWABLE AREA CALCULATIONS:
NO AREA MODIFICATIONS TAKEN
C. FIRE-RESISTANCE RATING FOR BUILDING ELEMENTS:
TYPE I (332)
1. BEARING WALLS:
A. EXTERIOR: 3HR
B. INTERIOR: 3HR
2. NONBEARING…