36C25518R0298-00003002.docx
DOCX document 31 KB Posted
- Solicitation number
- 36C25518R0298
About this file
36C25518R0298 00003 COST SUMMARY SHEET.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25518C0172-000.docx | DOCX document | |
| 36C25518R0298-00003001.docx | DOCX document | |
| 36C25518R0298-00003000.docx | DOCX document | |
| 36C25518R0298-00002000.docx | DOCX document | |
| 36C25518R0298-00002001.pdf | ||
| 36C25518R0298-00001000.docx | DOCX document | |
| 36C25518R0298-011.pdf | ||
| 36C25518R0298-013.pdf | ||
| 36C25518R0298-008.pdf | ||
| 36C25518R0298-003.docx | DOCX document | |
| 36C25518R0298-009.pdf | ||
| 36C25518R0298-014.pdf | ||
| 36C25518R0298-015.pdf | ||
| 36C25518R0298-006.pdf | ||
| 36C25518R0298-007.pdf | ||
| 36C25518R0298-004.pdf | ||
| 36C25518R0298-005.pdf | ||
| 36C25518R0298-010.pdf | ||
| 36C25518R0298-012.pdf | ||
| 36C25518R0298-000.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COST SUMMARY SHEET
DATE:
PROJECT NO.
589A5-15-115
LOCATION
COLMERY-O'NEIL VA MEDICAL CENTER, TOPEKA, KS
PROJECT NAME
UPGRADE EMERGENCY DEPARTMENT
TYPE OF ESTIMATE
FOR BIDDING
| GROSS AREA (NEW) (SF) |
| GROSS AREA |
(ALT.) (SF)
| INDEX NO. |
| BUILDING NO./NOS. BUILDING 1 |
| ESTIMATE NO. |
CSI# CATEGORY QTY UNIT $/UNIT $/GSF TOTAL COST SECT TOTAL
| DIV 01 |
| GENERAL REQUIREMENTS |
| 01 33 23 |
| Cloud-based Submittal Management Solution |
LS
| 01 57 13 |
| Inlet Barriers |
LS
| 01 57 19 |
| GC - phasing / infection control measures |
LS
SEE BELOW
| DIV 02 |
| EXISTING CONDITIONS |
| 02 41 00 |
| Selective Demolition (Interior) |
SF
| 02 41 19 |
| Selective Demolition (Exterior) |
LS
| 02 82 13 |
| Asbestos Abatement |
LS
| 02 83 33 |
| Lead Paint Removal |
LS
TOTAL THIS SECTION
| DIV 03 |
| CONCRETE |
| 03 30 00 |
| GPR Scanning |
HRS
| 03 30 00 |
| Cast - In - Place Concrete - Footings |
CY
| 03 30 00 |
| Cast - In - Place Concrete - Slabs |
SF
| 03 01 30 |
| Carbon Fiber Concrete Reinforcement |
LS
TOTAL THIS SECTION
| DIV 04 |
| MASONRY |
Adhered Thin Brick Veneer
SF
Modular Face Brick
SF
Lintels
EA
TOTAL THIS SECTION
| DIV 05 |
| METALS |
| 05 12 23 |
| Structural Steel |
SF
| 05 21 00 |
| Reinforce Joists |
SF
| 05 31 00 |
| Steel Decking |
SF
| 05 41 13 |
| CFMF |
SF
Stairs
LS
Guards and handrails (int and ext)
LS
| 05 58 00 |
| Exterior Column Covers |
EA
Unistrut supports ( procedure lights)
LS
Overhang at Trauma Entry (Includes all divisions)
LS
TOTAL THIS SECTION
| DIV 06 |
| WOOD, PLASTIC AND COMPONENTS |
| 06 10 00 |
| Rough Carpentry |
LS
| 06 20 00 |
| Finish Carpentry - Nurse Station |
LF
| 06 20 00 |
| Finish Carpentry - Admit Station |
LF
| 06 16 43 |
| Exterior Gyp. Sheathing |
SF
TOTAL THIS SECTION
| DIV 07 |
| THERMAL AND MOISTURE PROTECTION |
| 07 21 00 |
| Thermal Insulation (ext. wall batts + rigid) |
SF
| 07 21 16 |
| Acoustic Batts |
SF
| 07 27 26 |
| Air/Water Barrier (Liquid Applied) |
SF
| 07 41 13 |
| Metal Fascia System at Entry Canopy |
SF
| 07 84 00 |
| Joint sealants - Firestopping |
SF
| 07 92 10 |
| Joint Sealants - Caulk |
SF
| 07 52 00 |
| TPO Roofing with tapered insulation |
SF
Sheet metal, flashing, gutters
LS
TOTAL THIS SECTION
| DIV 08 |
| OPENINGS |
| 08 11 13 |
| Hollow Metal Door Frames |
EA
| 08 14 00 |
| Composite Wood Doors |
EA
| 08 71 00 |
| Door Hardware |
EA
| COST SUMMARY SHEET |
| DATE: |
PROJECT NO.
589A5-15-115
LOCATION
COLMERY-O'NEIL VA MEDICAL CENTER, TOPEKA, KS
PROJECT NAME
UPGRADE EMERGENCY DEPARTMENT
TYPE OF ESTIMATE
FOR BIDDING
| GROSS AREA (NEW) (SF) |
| GROSS AREA |
(ALT.) (SF)
| INDEX NO. |
| BUILDING NO./NOS. BUILDING 1 |
| ESTIMATE NO. |
CSI# CATEGORY QTY UNIT $/UNIT $/GSF TOTAL COST SECT TOTAL
Bullet Resistant Glazing
SF
Bullet Resistant Door
EA
Bullet resistant wall panels
SF
| 08 44 13 |
| Aluminum Storefront |
SF
Alum Interior Frames with Glazing
SF
Automatic Sliding Doors
EA
ICU Room Doors
EA
TOTAL THIS SECTION
| DIV 09 |
| FINISHES |
| 09 29 00 |
| Interior Partition - 2 HR wall |
LF
| 09 29 00 |
| Interior Partition - 3 5/8", gyp Both Sides |
LF
| 09 29 00 |
| Interior Partition - 6", gyp Both Sides |
LF
| 09 29 00 |
| Gyp Board Furring |
LF
| 09 29 00 |
| Gypsum Board Ceiling (No Soffits included) |
SF
| 09 30 13 |
| Ceramic/Procelain Tiling |
SF
| 09 65 19 |
| Resilient Tile Flooring Luxury Vinyl Tile (LVT) |
SF
| 09 67 23 |
| Epoxy Resinous Flooring (EPX) |
SF
| 09 72 61 |
| Solid Surface Shower Walls and Pans |
EA
| 09 65 16 |
| Welded Sheet Vinyl Flooring (WSF) |
SF
| 09 91 03 |
| Painting-Doors and Frames |
EA
| 09 91 03 |
| Painting- Walls Roller 3 coats |
SF
| 09 65 13 |
| Rubber Cove (RB) |
LF
| 09 67 23 |
| Base- Epoxy (EPX) |
LF
| 09 65 13 |
| Coved Sheet Vinyl |
LF
| 09 51 00 |
| Acoustical Ceilings |
SF
TOTAL THIS SECTION
| DIV 10 |
| SPECIALTIES |
| 10 14 00 |
| Signage |
EA
| 10 14 19 |
| Exterior Signage |
LS
| 10 26 00 |
| Wall and Door Protection - Corner Guards |
EA
| 10 26 00 |
| Wall and Door Protection - Rigid Vinyl Sheeting |
SF
| 10 26 00 |
| Wall and Door Protection - Hand Rail/Base Rail |
LF
| 10 28 00 |
| Toilet & Bath Accessories |
LS
| 10 21 23 |
| Cubicle Curtain Tracks |
LS
| 10 25 13 |
| Patient Bed Service Walls |
EA
| 10 51 23 |
| Plastic Laminate Clad Lockers |
EA
| 10 90 00 |
| Security Dome Mirrors |
EA
TOTAL THIS SECTION
| DIV 11 |
| EQUIPMENT |
| 11 73 10 |
| Patient Lift System |
EA
| 11 73 10 |
| Procedure Light |
EA
TOTAL THIS SECTION
DIV 12
| 12 32 00 |
| Manufactured Wood Casework - Base Cabinets |
LF
| 12 32 00 |
| Manufactured Wood Casework - Upper Cabinets |
LF
| 12 36 00 |
| Counter Tops - Solid Surface |
SF
| 12 36 00 |
| Countertops - laminate |
SF
| 12 34 00 |
| Manufactured Plastic Casework |
LS
| 12 48 13 |
| Entrance Flooring Systems |
SF
TOTAL THIS SECTION
| DIV 13 |
| SPECIAL CONSTRUCTION |
TOTAL THIS SECTION
| COST SUMMARY SHEET |
| DATE: |
PROJECT NO.
589A5-15-115
LOCATION
COLMERY-O'NEIL VA MEDICAL CENTER, TOPEKA, KS
PROJECT NAME
UPGRADE EMERGENCY DEPARTMENT
TYPE OF ESTIMATE
FOR BIDDING
| GROSS AREA (NEW) (SF) |
| GROSS AREA |
(ALT.) (SF)
| INDEX NO. |
| BUILDING NO./NOS. BUILDING 1 |
| ESTIMATE NO. |
CSI# CATEGORY QTY UNIT $/UNIT $/GSF TOTAL COST SECT TOTAL
| DIV 21 |
| FIRE PROTECTION |
Demo
SF
Piping
SF
TOTAL THIS SECTION
| DIV 22 |
| PLUMBING |
Plumbing Demo
SF
Water Closets
EA
Clinical Sink
EA
Scrub Sink
EA
Janitor Sink
EA
Lavatory
EA
Shower Valve
EA
Sink
EA
Shower Drains
EA
Eyewash ea
Domestic Water Piping
LF
Waste and Vent Piping
LF
Piping relocation
EA
Decontamination Tank
EA
Roof Drains
EA
Medical Gas
SF
Medical Gas Demo
SF
TOTAL THIS SECTION
| DIV 23 |
| HEATING VENTILATING & AIR CONDITIONING |
Demo
SF
VAV Boxes
EA
Exhaust Fan - standard upblast
EA
Exhaust Fan - High plume Redundant
EA
Ductwork
SF
Steam to Steam humidifier
EA
Steam to Hot-water Exchanger
EA
Hot Water Pump (3 HP)
EA
Hot Water Radiant Panels
EA
Chilled Water Piping
LF
Steam Piping
LF
Heating Water Piping
LF
Energy Recovery Piping
LF
Hot Water Coils
EA
Energy Recovery Coils
EA
Energy Recovery Pump
EA
Diffusers/Grilles
EA
Mini Split Heat Pump
EA
In-line HEPA filters
EA
Exhaust air valves
EA
New AHU
EA
Controls
EA
TOTAL THIS SECTION
| DIV 26 |
| ELECTRICAL |
Electrical Demo
SF
Light Fixtures
EA
New Panelboard (Normal Power)
EA
New Automatic Transfer Switch
EA
Receptacle
EA
COST SUMMARY SHEET
DATE:
PROJECT NO.
589A5-15-115
LOCATION
COLMERY-O'NEIL VA MEDICAL CENTER, TOPEKA, KS
PROJECT NAME
UPGRADE EMERGENCY DEPARTMENT
TYPE OF ESTIMATE
FOR BIDDING
| GROSS AREA (NEW) (SF) |
| GROSS AREA |
(ALT.) (SF)
| INDEX NO. |
| BUILDING NO./NOS. BUILDING 1 |
| ESTIMATE NO. |
| CSI# | CATEGORY | QTY | UNIT |
| $/UNIT | |||
| $/GSF | TOTAL COST | SECT TOTAL |
Special Outlet TV
EA
Basic Materials
SF
Mech Equip Connections
SF
Lightning Protection System
LS
TOTAL THIS SECTION
| DIV 27 |
| COMMUNICATIONS |
Demo
SF
Phone/Data Drop
EA
PA Speakers
EA
Remove/Reinstall Telemetry Antennas
LS
Remove/Reinstall Cellular Antennas
LS
Nurse Call System
LS
Exterior Door Video/Intercom System
LS
Cabletray
LF
48 Port RJ-45 110 Patch Panels
EA
TOTAL THIS SECTION
| DIV 28 |
| ELECTRONIC SAFETY AND SECURITY |
Demo
SF
Fire Alarm System
SF
Relocation of Lynxs I/O Panel & Flood Alarms
LS
Access Controll System (Per Door)
EA
Lobby TV
EA
CCTV Cameras
EA
TOTAL THIS SECTION
| DIV 31 |
| EARTHWORK |
| 31 20 00 |
| Subgrade Preparation |
SY
TOTAL THIS SECTION
| DIV 32 |
| EXTERIOR IMPROVEMENTS |
| 32 13 13 |
| PCC Pavement |
SY
| 32 13 13 |
| Curb & Gutter |
LF
| 32 13 13 |
| Sidewalk |
SY
| 32 17 13 |
| Pipe Bollards |
EA
Handrail
LS
Pavement Markings
LS
TOTAL THIS SECTION
| DIV 33 | UTILITIES (N/A) |
| BARE COST SUB-TOTAL BID ITEM 1 (BASE BID) |
HOOH
BOND
PROFIT
CONTINGENCY
GENERAL CONDITIONS
TOTAL CONSTRUCTION COST BID ITEM 1 (BASE BID)
COST SUMMARY SHEET
DATE:
PROJECT NO.
589A5-15-115
LOCATION
COLMERY-O'NEIL VA MEDICAL CENTER, TOPEKA, KS
PROJECT NAME
UPGRADE EMERGENCY DEPARTMENT
TYPE OF ESTIMATE
FOR BIDDING
| GROSS AREA (NEW) (SF) |
| GROSS AREA |
(ALT.) (SF)
| INDEX NO. |
| BUILDING NO./NOS. BUILDING 1 |
| ESTIMATE NO. |
| CSI# | |||
| CATEGORY | QTY | UNIT | |
| $/UNIT | |||
| $/GSF | TOTAL COST | SECT TOTAL |
COST SUMMARY SHEET
DATE:
PROJECT NO.
589A5-15-115
LOCATION
COLMERY-O'NEIL VA MEDICAL CENTER, TOPEKA, KS
PROJECT NAME
UPGRADE EMERGENCY DEPARTMENT
TYPE OF ESTIMATE
FOR BIDDING
| GROSS AREA (NEW) (SF) |
| GROSS AREA |
(ALT.) (SF)
| INDEX NO. |
| BUILDING NO./NOS. BUILDING 1 |
| ESTIMATE NO. |
| BID ITEM 1 (BASE BID) |
| All base bid scope. |
| Bid Item 1 Total Construction Cost |
| BID ITEM 2 (DEDUCT) |
| All scope for BID ITEM 1 (BASE BID) except delete all scope related to dropoff canopies at new entrance. |
| Const. Cost if Bid Item 2 Accepted |
| BID ITEM 3 (DEDUCT) |
| All scope for BID ITEM 2 (DEDUCT) except omit majority of interior signage and all patient lift systems. |
| Const. Cost if Bid Item 3 Accepted |