S06_Post-CD Addendum Changed Sheets-SPECS IFB Sol 36C25226B0027 A-0003 CON 556-23-104_06302026.pdf

PDF 13 MB Posted

Attached to
Y1DZ--556-23-104 CON: Chilled Water Piping from Bldg. 188 to Bldg. 3
Solicitation number
36C25226B0027
Issued by

About this file

This is a Post-Construction Document Addendum containing changed sheets for technical specifications related to an Invitation for Bid (IFB) solicitation for chilled water piping infrastructure.

The document pertains to IFB Solicitation No. 36C25226B0027, Project No. 556-23-104, for chilled water piping installation from Building 188 to Buildings 1, 3, and 48 at Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. This is Amendment 0003 to the original solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The addendum modifies and clarifies the technical specifications and construction requirements originally outlined in the bid documents. The changed sheets format indicates that this amendment supersedes specific pages or sections of the original specification documents, requiring bidders to use the updated technical requirements when preparing their proposals. Contractors must incorporate these specification changes into their bid submissions to ensure compliance with the revised project requirements for this construction contract.

View the file

Other files

File Type Posted
36C25226B0027 0005.docx DOCX document
S06_SF30 Continuation Page IFB Sol 36C25226B0027 A-0005 CON 556-23-104_07222026.pdf PDF
S05_Ver4 RFI Pre-Bid IFB Sol 36C25226B0027 A-0005 CON 556-23-104 _07222026.xlsx XLSX spreadsheet
S05_Ver3 RFI Pre-Bid IFB Sol 36C25226B0027 A-0004 CON 556-23-104 _07172026.xlsx XLSX spreadsheet
36C25226B0027 0004.docx DOCX document
S06_SF30 Continuation Page IFB Sol 36C25226B0027 A-0004 CON 556-23-104_07172026.pdf PDF
S06_Tramway Report Narrative RF1 No. 22 IFB Sol 36C25226B0027 A-0003 CON 556-23-104_12072011.pdf PDF
36C25226B0027 0003.docx DOCX document
S06_SF30 Continuation Page IFB Sol 36C25226B0027 A-0003 CON 556-23-104_07092026.pdf PDF
S06_SAM Wage Rates IL IFB Sol 36C25226B0027 A-0003 CON 556-23-104_current as of 07012026.pdf PDF
S06_Bldg. 3 Report Narrative RF1 No. 22 IFB Sol 36C25226B0027 A-0003 CON 556-23-104_12142011.pdf PDF
S05_Ver2 RFI Pre-Bid IFB Sol 36C25226B0027 A-0003 CON 556-23-104 _07092026.xlsx XLSX spreadsheet
S06_Bldg. 188 Report Narrative RF1 No. 22 IFB Sol 36C25226B0027 A-0003 CON 556-23-104_12092011.pdf PDF
S05_Ver1 RFI Pre-Bid IFB Sol 36C25226B0027 A-0002 CON 556-23-104 _06232026.xlsx XLSX spreadsheet
S06_SF30 Continuation Page IFB Sol 36C25226B0027 A-0002 CON 556-23-104_06232026.pdf PDF
36C25226B0027 0002.docx DOCX document
S04_Site Visit Sign-In-Sheet IFB Sol 36C25226B0027 A-0002 CON 556-23-104_06162026.pdf PDF
36C25226B0027 0001.docx DOCX document
S06_SF30 Continuation Page IFB Sol Amendment 0001 36C25226B0027 CON 556-23-104_06022026.pdf PDF
36C25226B0027_2.docx DOCX document
S02_Att3 CD Specifications 556-23-104 IFB Sol 36C25226B0027_07262024.pdf PDF
S02_Att1 852.219-75 VA Notice of Limitations on Subcontracting-Certificate DEVIATION_REQUIRED.pdf PDF
S02_Att2 CD Drawings 556-23-104 IFB Sol 36C25226B0027_07262024.pdf PDF
S02_Att4 SAM Wage Rates IL 556-23-104 IFB Sol 36C25226B0027 current as of 04162026.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0003

Project: Captain James A. Lovell Federal Health Care Center

Chilled Water from B188 to B3

To: Tomasz M. Szafranski

Hudell D. Ballen

Re: 100% Post CD Addendum

Amendment Number: 0003

From: Jonathan Carr, AIA

Date: 06/30/2026

VA | AE Project Number: 556-23-104 | 22018

Contract Task: 36C25219D0022 | 36C25223N0287

Specification Sections: [see below] Paragraph: N/A Drawing References: [see below] Detail: N/A

Description: Amendment 0003 responds to VA’s request for a 100% Post-CD Addendum. Amendment 0003 incorporates bid document changes from the 2025 bid set into the current bid documents. Also, Amendment 0003 adds motorized isolation valves and a mechanical sequence of operation for freeze protection.

I. Drawing revisions/additions occur on twelve (12) sheets as follows:

1. GI001:

A. Removes deduct alternates from Schedule of Bid Items.

B. Adds newly issued sheet MP701 Controls.

2. MS001:

A. Keynote 4: Replace references to deduct alternates with Not Used.

B. Keynote 5: Replace references to deduct alternates with Not Used.

C. Keynote 6: Replace references to deduct alternates with Not Used.

3. MP101:

A. Added General Note C.

B. Keynote 25: Keynote is revised for clarity.

C. Detail F5: Applies Keynote 25 to above-slab piping in Building 188 and its adjacent corridor.

4. MP102:

A. Added General Note D.

B. Keynote 10: Replace references to deduct alternates with Not Used.

C. Keynote 11: Replace references to deduct alternates with Not Used.

D. Detail F4: Remove all references to deduct alternates.

E. Keynote 15: Revised to add motorized isolation valves at CWS and CWR branch to building 1.

5. MP103:

A. Added General Note D.

B. Detail F5: Remove all references to deduct alternates.

C. Keynote 4: Revised to add motorized isolation valves at CWS and CWR branch to building 5.

D. Keynote 6: Revised to add motorized isolation valves at CWS and CWR branches to building 3 and 48.

E. Keynote 14: Revised to specify motorized bypass valve attend of line freeze protection.

F. Keynote 21: Delete “Conduit up to level above” and replace with: “1-inch conduit and cabling up to level above.

See detail D1 on Sheet MP501 for conduit and cabling requirements.”

G. Keynote 22: Add the words “and cabling” after the word “conduit.”

H. Keynote 24: Add the words “and cabling” after the word “conduit.”

I. Keynote 26: Add the words “and cabling” after the word “conduit.”

J. Keynote 8: Replace references to deduct alternates, with Not Used.

K. Keynote 9: Replace references to deduct alternates, with Not Used.

6. MP401:

A. Detail B2:

1. Notes transition points for above- and below-grade, field-insulated pipe.

2. Clarifies the use of field-applied insulation with jackets in above-grade conditions.

3. Adds a note to refer to sheet AE402 for additional details.

B. Detail C9: Revises note for lockable butterfly valves to motorized butterfly valves.

C. Detail F1: Defines the transition point from pre-insulated to field-insulated pipe.

7. MP501:

A. Detail F8:

1. Updates the notes labelling insulated and pre-insulated piping.

2. Defines the transition point from pre-insulated to field-insulated pipe.

B. Detail D8:

1. Removes the reference to pre-insulated piping and replaces with insulated piping.

C. Detail D1: Revised points list to include motorized isolation valves. Revised piping diagram to add motorized isolation valves. Added sequence of operation for freeze protection.

D. Detail C8: Removes this detail.

8. MP701 [newly issued sheet]: Adds controls information.

9. EP101:

A. Adds electrical panel data.

B. Revises keynotes and drawing for added valves.

10. EP102:

A. Keynote 1: Description of conduit changed to refer to isolation valves. Deduct alternate references for bypass valves removed.

B. Keynote 2: Description has been updated for the isolation valves. Their means of disconnect are described.

C. Keynotes 3 and 4: Changed status to Not Used. References to former deduct alternates are removed.

D. Detail E4: Isolation valves are shown and keynotes are assigned. References to former deduct alternates are removed.

11. EP103:

A. Keynote 1: Description changed to include isolation valves.

B. Keynote 7: Replace references to deduct alternates, with Not Used.

C. Detail C8: Updated to show isolation valves, disconnecting means, and circuiting.

D. Detail F4: Bypass valves for deduct removed, isolation valves, circuiting, and keynotes updated per mechanical.

12. EP104:

A. Panel schedule modified to show 2 circuits for isolation valves

B. Keynote 1 modified to add circuit.

II. Specification revisions are as follows:

A. Remove the eighteen (18) sections listed below in their entirety and replace them with the revised, same-numbered sections included in Amendment 0003, as follows:

1. 00 01 10 Table of Contents

2. 00 01 15 List of Drawing Sheets

3. 01 00 00 FHCC General Requirements

4. 01 32 16.15 Project Schedules with Long Lead Times (Design/Bid/Build Projects at

FHCC)

5. 01 33 23 Shop Drawings, Product Data, and Samples

6. 01 35 26 Safety Requirements

7. 01 35 33 Infection Control Requirements

8. 01 40 00 Quality Requirements

9. 01 41 00 Regulatory Requirements

10. 01 45 00 Contractor Quality Control (FHCC) for Technically Complex Design-Bid-Build

Projects

11. 01 45 29 Testing Laboratory and Special Inspection Services (FHCC)

12. 01 57 19 Temporary Environmental Controls

13. 01 74 19 Construction Waste Management

14. 02 83 33.13 Lead-Based Paint Removal and Disposal

15. 23 07 11 HVAC and Boiler Plant Insulation

16. 23 21 13 Hydronic Piping

17. 23 22 13 Steam and Condensate Heating Piping

18. 26 05 19 Low-Voltage Electrical Power Conductors and Cables

B. Add the newly issued section listed below, in its entirety, as follows:

1. 01 33 00 Submittal Register Example

☐ Attachments: GI001, MS001, MP101, MP102, MP103, MP401, MP501, EP101, EP102, EP103, 000110, 000115, 010000, 013216.15, 013300, 013323, 013526, 013533, 014000, 014100, 014500, 014529, 015719, 017419, 028333.13, 230711, 232113, 232213, 260519.

Signed by: Date: June 30, 2026

Copies: ☐ ☐ ☐ ☐ ☐ ☐ ☐ File

00 01 10-1

*MODIFIED BY AMENDMENT 03 | JUNE 30, 2026

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 10 Table of Contents 00 01 13 Project Seals Page 00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 FHCC General Requirements* 12-25* 01 32 16.15 Project Schedules with Long Lead Items

(Design/Bid/Build Projects at FHCC)* 12-25*

01 33 00* Submittal Register Example* 12-25* 01 33 23 Shop Drawings, Product Data, and Samples 12-25* 01 33 23 Submittal Log 01 35 26 Safety Requirements 12-25* 01 35 33 Infection Control Requirements 04-24* 01 40 00 Quality Requirements 12-25* 01 41 00 Regulatory Requirements* 12-25* 01 42 16 Definitions, Abbreviations, and Acronyms 04-23 01 42 19 Reference Standards 11-20 01 45 00 Contractor Quality Control (FHCC) for Technically

Complex Design-Bid-Build Projects* 12-25*

01 45 29 Testing Laboratory and Special Inspection Services

(FHCC)*

11-18*

01 57 19 Temporary Environmental Controls 12-25* 01 74 19 Construction Waste Management 01-21*

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 01-21 02 41 00 Demolition 08-17 02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 30 53 (Short Form) Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 01-21 04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 50 00 Metal Fabrications 08-18

00 01 10-2

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 Bituminous Dampproofing 07 13 52 Modified Bituminous Sheet Waterproofing 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22 07 95 13 Expansion Joint Cover Assemblies 01-21

DIVISION 08 - OPENINGS

08 14 00 Wood Doors 01-21 08 31 13 Access Doors and Frames 04-22 08 71 00 Door Hardware 05-22

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 65 13 Resilient Base and Accessories 01-21 09 65 19 Resilient Tile Flooring 05-18 09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES – NOT USED

DIVISION 11 – EQUIPMENT – NOT USED

DIVISION 12 – FURNISHINGS – NOT USED

DIVISION 13 - SPECIAL CONSTRUCTION – NOT USED

DIVISION 14– CONVEYING EQUIPEMENT – NOT USED

DIVISION 21- FIRE SUPPRESSION – NOT USED

DIVISION 22 – PLUMBING – NOT USED

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-23 23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment 03-23

23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 21 13 Hydronic Piping 03-23 23 22 13 Steam and Condensate Heating Piping 04-23

DIVISION 25 – INTEGRATED AUTOMATION – NOT USED

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22 26 05 26 Grounding and Bonding for Electrical Systems 11-22 26 05 33 Raceway and Boxes for Electrical Systems 11-22 26 05 41 Underground Electrical Construction 11-22 26 24 16 Panelboards 11-22 26 27 26 Wiring Devices 11-22

00 01 10-3

26 29 21 Enclosed Switches and Circuit Breakers 11-22

DIVISION 27 – COMMUNICATIONS – NOT USED

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY – NOT

USED

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 08-23 31 23 19 Dewatering 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 90 00 Planting 08-16

DIVISION 33 – UTILITIES- NOT USED

DIVISION 34 – TRANSPORTATION – NOT USED

00 01 15 - 1

*MODIFIED BY AMENDMENT 03 | JUNE 30, 2026

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL:

GI001 COVER SHEET

CIVIL:

C101 BUILDING 3 AND 5 OVERALL CIVIL SITE PLAN

ARCHITECTURAL:

AS001 OVERALL ARCHITECTURAL SITE PLAN

AD401 ACCESS PIT DEMOLITION

AD402 DEMOLITION FOR EXIT CORRIDOR AT BUILDING 4

AE401 ACCESS PIT DETAILS

AE402 CORRIDOR PLAN AND SECTION

AE403 CORRIDOR SECTION BETWEEN BUILDINGS 188 AND 4

AE404 EXIT CORRIDOR PLAN AND SECTIONS AT BUILDING 4

AF101 FINISH PLAN AND DETAILS

MECHANICAL:

MP001 ABBREVIATIONS, LEGENDS, AND GENERAL NOTES

MS001 OVERALL MECHANICAL SITE PLAN

MP101 BUILDING 188 FLOOR PLAN

MP102 BUILDING 4 AND 9 FLOOR PLAN

MP103 BUILDING 3 AND 5 FLOOR PLAN

MP401 MECHANICAL SECTIONS AND SCHEDULES

MP501 MECHANICAL DETAILS

*MP701 CONTROLS

ELECTRICAL:

00 01 15 - 2

EG001 ABBREVIATIONS, LEGENDS, AND GENERAL NOTES

ES001 OVERALL ELECTRICAL SITE PLAN

EP101 BUILDING 188 FLOOR PLAN

EP102 BUILDING 4 FLOOR PLAN

EP103 BUILDING 3 AND 5 FLOOR PLAN

EP104 BUILDING 1 FLOOR PLAN

*EE501 DETAILS

- - - END - - -

18DEC25

01 00 00 -1

GENERAL REQUIREMENTS

ISSUED IN ITS ENTIRETY AS AMENDMENT 03 | JUNE 30, 2026

SECTION 01 00 00

FHCC GENERAL REQUIREMENTS

GENERAL

1.1 GENERAL INTENTION

1.2 PRE-BID CONFERENCE:

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 SITE-SPECIFIC REQUIREMENTS

1.6 PRECONSTRUCTION MEETING AND DOCUMENTATION

1.7 CONSTRUCTION SECURITY REQUIREMENTS

1.8 SAFETY AND INFECTION CONTROL REQUIREMENTS

1.9 CONSTRUCTION PROGRESS MEETINGS:

1.10 DAILY REPORTS:

1.11 MOBILIZATION ON SITE

1.12 OPERATIONS AND STORAGE AREAS

1.13 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.14 TEMPORARY USE OF EXISTING ELEVATORS

1.15 AVAILABILITY AND USE OF UTILITY SERVICES

1.16 BUILDING ALTERATIONS

1.17 MATERIAL DISPOSAL AND RETENTION

1.18 PERFORMANCE OF WORK WITHIN BUILDINGS:

1.19 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,

AND IMPROVEMENTS

1.20 USE OF ROADWAYS

1.21 RELOCATED EQUIPMENT OR OTHER ITEMS

1.22 PHOTOGRAPHIC DOCUMENTATION

1.23 ARCHITECT-ENGINEER AND COMMISSIONING AGENT COORDINATION

1.24 MECHANICAL SYSTEM TESTS

1.25 AS-BUILT DRAWINGS

1.26 ACCEPTANCE AND CLOSEOUT

1.27 WARRANTY MANAGEMENT

01 00 00 -2

GENERAL REQUIREMENTS

01 00 00 -3

GENERAL REQUIREMENTS

GENERAL

Where durations are expressed in days, this means calendar days – including weekends and holidays.

1.1 GENERAL INTENTION

A. Contractor shall completely prepare site for construction operations, and provide all work required by the contract documents.

B. The designated Architect Engineers (AE) will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmation by

Contracting Officer or his duly authorized representative.

1.2 PRE-BID CONFERENCE:

A. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation.

B. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI’s. Incomplete RFI’s may go unanswered. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI’s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM 1; BASE BID: The Contractor shall provide all necessary tools, labor, materials, equipment, permits, license, and supervision for “Chilled Water from B188 to B3,” in accordance with the drawings and specifications. Work includes general construction for the installation of chilled water piping from Building 188 to the basement of Building 3. Piping will be installed in existing utility tunnels under the tramway and, in some locations, buried. This work contains various construction elements and certain other items. There are no deduct alternates.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings, specifications, and other contract documents may be obtained from the SAM.gov website in electronic form where the solicitation is posted. All desired printing shall be at

Contractor's expense.

01 00 00 -4

GENERAL REQUIREMENTS

1.5 SITE-SPECIFIC REQUIREMENTS

1. Comply with all site-specific requirements and SOPs including and not limited to: Key Policy, Badging Policy, Rules of Behavior, and Smoking Policy.

2. Normal construction work hours are 7:00 AM to 3:30 PM Monday through Friday.

A. Normal work hours can be modified only by written approval of the COR, and at no additional cost to VA.

B. No work by the Contractor on Federal Holidays, and no work on the weekend when the Federal

Holiday is on the respective Monday or Friday.

C. Any work including and not limited to noise, vibration, dust, odors, core drilling, hammer-drilling, saw cutting, equipment moving in public corridors, soil compaction shall be performed within or adjacent to occupied buildings during the above-designated work hours only.

D. Use of equipment and tools that transmit vibrations and noises through a building structure are not permitted in buildings that are occupied by patients or medical personnel except as permitted by COR where required by limited working space.

Never allow use of powder-actuated fasteners. There have been many incidents of patients interpreting these sounds as gunfire (because it actually is if you think of it).

E. Crane lifts, or any work that closes drive isles, closes building entries, or closes public corridors shall be during low patient times and performed between Saturday 6 PM through midnight concluding by 6 PM on the following Sunday.

3. All building systems shall be maintained in full operation at all times:

A. Request utility system shutdowns in writing not less than 21 calendar days in advance and scheduled with the COR at times least impacting patient care.

B. Shutdown work shall be during low patient times and performed between Saturday 6 PM through midnight concluding by 6 PM on the following Sunday.

4. Wherever demolition is planned, ceiling tiles are to be removed, or the sprinkler system is to be disabled, GC shall first provide uniform heat detection throughout the work area, connected to the existing supervised building master fire alarm system, for the duration of the work. Fire and or smoke detection devices shall be provided prior to turnover and acceptance.

5. No music radios within work areas.

6. No noise generated within the work area can be allowed to leave it.

7. The use of powder-actuated fasteners is forbidden.

8. Performing interior demolition using motorized equipment, whether tracked or wheeled, pushed or driven, is forbidden.

01 00 00 -5

GENERAL REQUIREMENTS

9. Two-way communications radios are allowed where transmit/receive frequencies will not disrupt any hospital system.

10. FHCC has its own raceway (conduit) color-coding scheme that differs from that specified by VA via the TIL. The TIL provides direction at 09 91 00 Painting, not at 26 05 33 Raceways and Boxes for Electrical Systems, 27 05 33 Raceways and Boxes for Communications Systems, etc. because they all refer the reader to 09 91 00.

FHCC conduit color scheme:

A. Red- Fire Alarm B. Blue- Controls, HVAC, BAS C. Orange- Fiber optic, communications D. Green- Normal power E. Yellow- Emergency Power, Critical Power F. Black- Security G. Purple- Medical Systems, Nurse Call H. Note that Federal Safety Red for fire alarm signaling, etc. is a universal industry standard

(Code) and not unique to FHCC or VA. Also note that conduits for electrical feeders of 600 volts or more are always required to be Federal Safety Orange (09 91 00, 3.12, H, d and e).

11. Material Safety Requirement: Regardless of material specification, do not allow use of cast iron, or malleable iron pipe fittings in any system. Only use cast steel.

12. Material Safety Requirement: Regardless of material specification, exclusively use ASTM A193 bolts for assembly of flanged pipe systems.

13. Compatible system procurements shall include the following:

A. Locks and Keys: Temporary and permanent door hardware shall be compatible with Best® uncombinated Cormax 7 pin cores is 1CX7 X66 or X64 W 1 626 , interchangeable core. The contractor shall provide VA with documented evidence that the cores have been ordered (long lead). Supply blank cores; quantity matching the number of openings planned. VA shall then provide construction coring, and a key for same to the General Contractor, who will sign acknowledgement and receipt and responsibility for the key until returned to the VA COR. Final pinout and keying is provided by VA.

B. Exit Signs: All exit signs shall be City of Chicago approved specification red letters on white edge-lit LED fixtures continuously illuminated 90 mins. after loss of power, push-to-test switch and LED pilot light on the housing, available as single or double-sided models, and meeting

UL924.

C. Building Automation: Components, programming and start up: Native BACnet communications protocol for Building Automation and Control (BAC) connected to the existing

Johnson Controls head end equipment.

01 00 00 -6

GENERAL REQUIREMENTS

D. 27 15 00 Communications Cabling (and other specifications which include telecom cabling):

All new telecom cabling shall be Cat 6a vs. 5e. Cat 6a telecom cable, termination punch-down

T-568-(B.1, B.2, C.2, etc.), tested and certified (submit result to COR), 6-port modular wall jacks with two RJ45 on top and bottom and two blanks in middle. While VA facilities generally do not include plenum return spaces above ceilings, it nonetheless requires plenum-rated teledata cabling complying with codes pertaining to plenum environments.

14. Facility standards: The contractor shall provide fully functional complete systems, equivalent to the following special systems when included in the project:

A. Fire Alarm: Components, programming and start up within the West Campus is by Johnson

Controls/Simplex.

B. Building Automation: Components, programming and start up: Automated Logic Company of

Chicago.

C. Proximity card reader and door lock release entry system: Components, programming and start up: eNorman

1.6 PRECONSTRUCTION MEETING AND DOCUMENTATION

1) The contractor’s Project Manager and Field Supervisor shall attend a Preconstruction Safety and Coordination Meeting to discuss project details IAW the SOW.

A. Refer to 01 32 16.15 Project Schedules (Long Lead) FHCC or 01 32 16.15 Project Schedules

(Small Projects) FHCC included in this contract, and fulfill the specified requirements.

B. Prepare and submit for review and acceptance a DRAFT Critical Path Method (CPM) Baseline

Schedule reflecting each phase and activity of the work beginning with mobilization, including each critical activity, and each essential task required to optimally meet the objectives of the project.

C. The Baseline Schedule must also include all activities to be performed by VA, including maintenance shops support, safety and infection control, the AE, the Commissioning Agent, etc.

D. For projects that include long lead procurement, it is expected that this timeline will list all activities of the work leading up to the delivery of long lead items, the target dates of long lead items, installation of long lead items, and each work activity that follows until all work is complete, compliant, and ready for acceptance. The durations of each phase will change once the

GC completes all procurement activities and submits for review and approval the FINAL

Baseline Schedule.

E. To enable objective assessment of costs and progress, the Baseline Schedule shall be cost-loaded at each work activity (essentially Division 02 – on), ensuring that the total cost of each phase and

01 00 00 -7

GENERAL REQUIREMENTS

Division of work match the corresponding Schedule of Values, and the total of the construction contract at Award.

1. Develop the CPM schedule in sufficient detail to enable readers to understand all planned activities, their predecessors, and successors, who is performing the work, durations, and costs. Activity durations shall not exceed two calendar weeks. Indicate resource SDVOSB status.

2. The Project Manual index of specifications is a useful guide for starting the CPM schedule and Schedule of Values in sufficient detail. For example: Simply listing “HVAC” is unacceptable for projects including more than basic work in this category. The inclusion of specifications for an AHU, controls, ductwork, demolition of each, testing and balancing, etc.

also prompt their inclusion as categories of activities and tasks in the schedule. In fact, for larger work categories, breaking down the cost by system/material and installation and testing enables partial payment for higher cost items upon delivery into the facility work area.

3. Always include both material and labor values for each line item. Do not list categories by lump sum.

4. Should the contractor elect to include submittal planning in their internal use schedule do not generate a list and then assign the same due date to them all. For this content to be meaningful, the activity dates must be logical and reasonable.

5. Include all expected utility system shutdowns, road closures, crane lifts, and off-hours work in the CPM schedule.

6. Where large equipment deliveries (impacting use of corridors) are part of the project, ensure that these are included in the schedule.

7. It is the Contractor’s responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measures to be used during the work, and a schedule defining the duration of the work with sufficient detail enabling all stakeholders to understand the plan and have the ability to follow it.

8. Contractor failure to appropriately plan their work and communicate with VA, resulting in delays, are never grounds for government caused delays.

1.7 CONSTRUCTION SECURITY REQUIREMENTS

A. VA reserves the right to close or shut down the project site and or require Contractor employees to leave the premises in the event of a civil emergency or operational requirement. The

Contractor may return to the site only with the written approval of the VA-CO.

01 00 00 -8

GENERAL REQUIREMENTS

B. Security Plan:

1. The GC security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The GC is responsible for assuring that all subcontractor personnel working on the project comply with all security requirements.

C. Security Procedures:

1. General Contractor and Subcontractor’s employees shall not enter the project site without authorization (business need).

2. All contractor personnel shall be subject to inspection of their personal effects and or vehicles at any time while on campus.

3. General Contractor shall not mobilize or begin work without approval of the assigned COR following submission, review, and acceptance of all prerequisite submittals.

4. Construction documentation requirements include daily reports accompanied by photographs of work performed that day. Under no circumstances shall patients and or VA staff be photographed.

5. All workers are subject to rules of the Medical Center applicable to their conduct.

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security and or technical compliance inspections of every area of the project.

2. Prior to the installation of door and cabinet locks using Best 7-pin cores, the General

Contractor shall provide blank key cores for programming and final installation by the VA locksmith Quantity provided shall match requirements of the project (the number of core openings in hardware included in the contract.

E. Document Control:

1. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information whether printed or electronic. This information shall be shared only with those with a specific business need to accomplish the project.

2. Certain documents, sketches, videos, photographs, and drawings may be marked “FOR

OFFICIAL USE ONLY”. Secure such information in separate containers or password-protected electronic folder and limit access to only those who will need it for the project.

3. Notify Contracting Officer and VA Contracting Officer’s Representative when there is a loss or compromise of controlled documents.

01 00 00 -9

GENERAL REQUIREMENTS

4. All paper waste or electronic media such as CD-ROM’s shall be shredded and destroyed in a manner acceptable to VA.

F. Motor Vehicle Security

Contractor company and privately owned vehicles shall:

1. Only park at designated locations (not reserved for VA staff or patients),

2. Comply with all traffic and parking regulations,

3. Be subject to search by VA Police,

4. Report any vehicle damage or theft to VA Police,

5. Not be left running and unattended,

6. Not parked at any loading dock or other building entrance.

1.8 SAFETY AND INFECTION CONTROL REQUIREMENTS

A. VHA Directive 7715, Safety and Health During Construction requires all construction contracts for construction include the appropriate FAR and VAAR clauses, and the following specifications for safety and infection control.

B. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and 01 35 33 INFECTION

CONTROL REQUIREMENTS for infection control.

C. The General Contractor shall have a Competent Supervisory Person on site at all times when any worker(s) or subcontractor(s) are present. The General Contractor is also required to maintain on site a competent Site Safety and Health Officer (see 01 35 26 Safety Requirements) when any worker(s) or subcontractor(s) are present. The Competent Supervisory Person may also act as the

SSHO and or Competent Person – if they hold valid credentials, based on demonstrated competency and performance in the two roles. If demonstrated lack of competency or effectiveness in either role is observed, the VA Contracting Officer may require replacement of the supervisory person and or site safety and health officer.

D. Safe Work Planning:

1. Prior to any activity, review the following with all project and craft team leaders: 01 35 26

Safety Requirements.

2. As required at 01 35 26 Safety Requirements: Develop and submit a Project-Specific

Construction Safety and Accident Prevention Plan with project-specific procedures, processes, analysis, and details, including but not limited to:

a. Access and use the U.S. Army Corps of Engineers EM 385-1-1 Safety and Health

Requirements and its Appendix A – Minimum Basic Outline for Accident Prevention

Plans for development of meaningful, effective, and compliant project safety plans.

01 00 00 -10

GENERAL REQUIREMENTS

b. Submission of generic, non-project specific safety plans will be rejected, resulting in a contractor-caused delay in commencement of the work.

c. Project-specific Activity Hazard Analysis (AHA), which forms the basis of the

Construction Safety and Accident Prevention Plan highlighting identified risks such as isolation of stored energy (Lock-Out*), fall protection, or confined space access.

(*) Note that tag-out is not an acceptable form of isolation, therefore it was intentional not to use the term LOTO.

d. Submit an electronic copy of the GC and all subcontractor Competent Persons OSHA

30-hour Construction Safety Training certificates along with documentation supporting competency in the craft or activity they are proposed for assignment to, along with project-specific Construction Safety and Accident Prevention Plan.

e. Submit an electronic copy of all workers OSHA 30-hour Construction Safety Training certificates or cards prior to allowing entry to the site.

f. Assist the COR in completing project-specific VA Infection Control Risk Assessment

(ICRA) and Interim Life Safety Measures (ILSM) documentation.

3. Because each contractor-employer is required to be solely responsible for the health and safety of its employees, part of a compliant and effective safety management program requires each employer to plan and implement their own compliant permit-required work – including written permits. DO NOT rely on, or request that VA generate required permits such as Hot Work or

Confined Space documents.

4. Prior to the beginning of any work, fire extinguisher(s) complying with NFPA 10 shall be pedestal-mounted in the work area. Inspection of the work area includes verification that inspection tags are current. Where non-compliant, the contractor may be required to remove and replace the unit(s) before resuming work activity.

5. All work in crawl spaces shall be planned and carried out as OSHA Permit-Required

Confined Space.

6. Immediately stop work and notify the COR if asbestos is noticed or suspected in the area of work.

Exception: The above will not necessarily apply to areas where the documents call for abatement activities. This item is concerned with unplanned locations.

7. Fire-seal all penetrations made or discovered through any wall or floor assembly with UL

Listed fire-rated products or systems. See 07 84 00 Firestopping.

E. Infection Control:

01 00 00 -11

GENERAL REQUIREMENTS

1. 01 35 33 Infection Control Requirements is included in its entirety in this contract. Its construct is enabling for each condition experienced through each phase of the work. The following are high-level requirements most often found deficient during inspections yet required.

2. Prior to any activity, review the following with all project team leaders: 01 35 33 Infection

Control Requirements.

3. Review and comply with containment construction and sequence described in the design and specification documents.

4. Provide a modular dust-tight system designed and manufactured specifically to be used as a temporary construction isolation barrier.

5. Before the start of work provide pressure differential monitoring system at the entry door to the construction area to prove that the construction area is under negative pressure. Maintain daily logs of readings and submit to the COR weekly. Remove at the completion of construction.

6. Walk-off sticky mats are required at all times inside and outside all entry / exit points to all workspaces. Sticky mats must be changed at least once per shift, or more as required by the construction or COR. Size sticky mats to match the width of the door opening and ensure that no less than 24” depth is provided.

7. Block off all HVAC return ductwork and louvers to prevent introduction of dust into the

HVAC system.

8. Where existing HVAC ducts are being removed, immediately, permanently, and compliantly seal off the opening.

9. Provide High-Efficiency Particulate Air Filtration (HEPA) recirculating air equipment inside the workspace. Size the air filtration system sufficiently large enough to ensure that negative pressure remains effective when doors are opened.

10. When working above the ceiling outside of the work area, such as in a corridor, open only one ceiling tile at a time, and provide dust containment tent or portable containment cube, with

HEPA filtering negative air system to seal the one opening.

11. Broom-sweep the work area at the end of each day (or shift during days with multiple shifts).

Provide HEPA vacuum and damp (not wet) mop daily where broom sweeping creates airborne dust.

12. Provide fire-sealing of all existing wall and ceiling openings in area of work needed to allow the HEPA filtration equipment to effectively generate negative air pressure within the work area, with respect to the surrounding area.

13. Provide HEPA-filtered vacuum cleaning of all surfaces, and damp mop the work area every

01 00 00 -12

GENERAL REQUIREMENTS

day.

14. Do not allow corrugated carboard to be stored for any period of time within the hospital.

Upon arrival, unpack, and transfer all products from cardboard containers to sealed plastic containers, and immediately dispose of the cardboard – outside of the building.

1.9 CONSTRUCTION PROGRESS MEETINGS:

B. The Contractor’s Project Manager and Field Supervisor shall provide on-site weekly construction progress meetings with the COR for the entire period of performance.

C. Include preparation of meeting agendas, and subsequent minutes of the meeting for each event not later than 1 day (next business day) after each meeting.

D. Construction Progress Meeting Agenda’s and Minutes shall include no less than: List of invitees/attendees, list of past/ongoing and new issues or concerns, indicate days remaining per the contract, detail any safety incidents, and include current updated copies of the RFI

Log, the Shop Drawing Log, and a detailed 3-week look-ahead and utility shutdown schedule.

1.10 DAILY REPORTS:

E. The Contractor shall provide a Daily Report each day, along with accompanying digital photos and other supporting documents. The Daily Report shall include: List of issues or concerns, days remaining per the contract, detail regarding any safety incidents, detail of daily safety inspections (including items checked and corrective actions taken), notations regarding any visitors to the work area.

F. Use of VA Form 10101 Contractor Production Report (fillable PDF at https://www.va.gov/vaforms/va/pdf/VA10101.pdf) is required each day – even on days with no contractor activity, which is what to report on such days. Contractor may and should provide more information than shown in the standard form, but the standard form is required.

G. The report must be accompanied by relevant time and date-stamped photos of construction progress of sufficient quantity and detail to enable viewers to clearly see the progress of all work to-date, all issues discovered (including those which become the subject of RFI’s). Email the VA Form 10101 Contractor Production Report and photos to the COR not later than 9 AM the next working day.

1) In no case shall the GC allow any team member to take photographs with patients, visitors, or employees in the picture.

H. VA Green Environmental Management System (GEMS) program and policy requires contractors to collect and submit Waste Diversion Reports for each and every dumpster removed from this https://www.va.gov/vaforms/va/pdf/VA10101.pdf

01 00 00 -13

GENERAL REQUIREMENTS

site. These reports are commonplace and readily available from waste haulers if you tell them you need them.

I. Monthly applications for payment will not be approved unless and until all required documentation has been submitted, and reviewed and approved by VA.

1.11 MOBILIZATION ON SITE

A. The contractor shall not mobilize on site until all required pre-construction submittals such as all

Division 01, all Division 2+ product data, coordination and or installation drawings, and the like are prepared, transmitted, reviewed, and accepted by VA.

B. Critical components and other long lead items shall require proof of procurement and the factory-established delivery date transmitted to the Contracting Officer and COR prior to VA approval of the schedule.

C. Approval to mobilize shall be in writing by the COR in consultation with Facility Safety

Manager.

D. Prior to beginning work, post and maintain at each work area all current emergency contact information, VA Infection Control Risk Assessment (ICRA)/Permit, Interim Life Safety Measures

(ILSM), and other information required by VA and the GC project-specific safety plan, at all entry points to the work area.

E. The target mobilization date is determined by first establishing the delivery date of the longest lead time material or system along the critical path, which in this project is predominantly HVAC equipment, but is likely to also consider shop-fabricated doors and frames, and then working back along the critical path listing all predecessor work activities.

F. The medical center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

G. The Mobilization Plan submission shall indicate if and where a construction dumpster is intended to be placed. The contractor shall provide a construction dumpster with a locked safety fence surrounding it, at a location submitted to and approved by the COR. Pavement, concrete surfaces, and landscaping shall be protected from damage resulting from delivery and retrieval, loading and unloading, and dumpster weight.

1. Construction Waste Diversion Reports are required for every dumpster removed from every construction site at every VA facility. Provide these reports to VA COR immediately after the waste hauler removes each dumpster to comply with VA GEMS Policy.

2. No trash, used packaging, or construction spoils shall be stored in the work area. Never use dumpsters other than those rented for this work. Severe penalties, including potential criminal

01 00 00 -14

GENERAL REQUIREMENTS

charges may be levied for use of government-rented or owned containers, or those of other contractors.

3. Trash removal from the work area shall be within gondolas which have sealed covers (completely enclosed), and during non-business hours, via the freight elevators.

1.12 OPERATIONS AND STORAGE AREAS

A. Execute work to prevent disruption of normal functioning of the Medical Center, including operation of utility services, fire protection systems, and any existing equipment, and with work being performed by others. In no case can contractor activity affect patient care.

B. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the COR.

C. Temporary facilities (e.g., storage sheds, shops, offices, temporary toilets, etc.) are not included in the SOW by default, and therefore not compensable. Temporary facilities for large NRM and

Minor projects may be considered for approval by the COR conditional on 1) Shall be built with labor and materials furnished by the Contractor without expense to the Government, and 2) The temporary buildings and utilities shall be removed by the Contractor at its expense upon completion of the work.

D. Construction Fence: Where necessary to isolate outdoor temporary facilities and storage areas from public view and access, before construction operations begin, Contractor shall provide a chain link construction fence, seven feet minimum height, around the construction area indicated on the drawings (or approved mobilization plan). Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 15 inches. Bottom of fences shall extend to one inch above grade. Remove the fence when directed by COR, VA Police, or VA safety manager.

E. Contractor shall ensure that planning for mobile cranes, mobile construction equipment, or delivery of materials or systems of the work do not exceed the bearing capacity of campus roadways – including where necessary the retention of a licensed professional civil engineer to assess current conditions – especially at bridges. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, roads, and or utility infrastructure.

F. Keep roads clear of construction materials, debris, standing construction equipment, and vehicles at all times.

01 00 00 -15

GENERAL REQUIREMENTS

G. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 40 degrees F throughout the area at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment.

In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with the COR, who will coordinate with the Navy fire departments as appropriate.

H. Utilities Services: Maintain existing utility services for at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer, or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems, after detailed pre-coordination with the COR, cut and cap at suitable places where shown in the documents, or in absence of such indication, where approved by the COR.

In no case can domestic hot or cold water piping be modified to result in creating a dead leg

(legionella risk).

I. Contractor shall submit a request to interrupt any such services to the COR, in writing, no less than 14 calendar days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

J. Contractor will be advised (in writing) of approval of request, or of an alternative date(s) and/or time(s) such interruption will cause least inconvenience to operations of the Medical Center.

Interruption time approved by Medical Center may be required to occur at other than Contractor's normal working hours.

K. In case of a contract construction emergency, service will be interrupted on approval of COR.

Such approval will be confirmed in writing as soon as practical.

L. Abandoned Lines Prohibited: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports no longer needed following completion of this project, shall be removed back to their source.

M. No on-site office or storage container shall be allowed. Provide “just-in-time” delivery and pickup. Coordinate with the COR for staging within the area of work.

N. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:

01 00 00 -16

GENERAL REQUIREMENTS

1. Keep roads, walks, and entrances to grounds, to parking, and to occupied areas of buildings clear of construction materials, debris, and standing construction equipment and vehicles.

Wherever excavation for utility lines work crosses existing roads, at least one lane must be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

O. Coordinate the work for this contract with other construction operations as directed by COR.

This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

1.13 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical

Code, (Current Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned. Vibrations must be eliminated.

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

01 00 00 -17

GENERAL REQUIREMENTS

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use;

maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.

1.14 TEMPORARY USE OF EXISTING ELEVATORS

A. Contractor will not be allowed the use of existing elevators. Outside type hoist shall be used by

Contractor for transporting materials and equipment.

B. Use of existing elevator(s) for handling building materials and Contractor personnel will be permitted subject to following provisions:

1. Contractor makes all arrangements with the COR for use of elevators, including verification of suitability for planned loads.

2. Contractor covers and provides maximum protection of following elevator components:

a) Entrance jambs, heads soffits and threshold plates.

b) Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.

c) Finish flooring.

3. Government will accept hoisting ropes of elevator and rope of each speed governor if they are worn under normal operation. However, if these ropes are damaged by action of foreign matter such as sand, lime, grit, stones, etc., during temporary use, they shall be removed and replaced by new hoisting ropes at the contractor expense.

4. If brake lining of elevators are excessively worn or damaged during temporary use, they shall be removed and replaced by new brake lining at the contractors expense.

5. All parts of main controller, starter, relay panel, selector, etc., worn or damaged during temporary use shall be removed and replaced with new parts at contractor expense, if recommended by elevator inspector after elevator is released by Contractor.

6. Place elevator in condition equal, less normal wear, to that existing at time it was placed in service of Contractor as approved by Contracting Officer.

01 00 00 -18

GENERAL REQUIREMENTS

1.15 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the

Contractor from existing outlets and supplies, as specified in the contract. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the

Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.

C. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may become fire or smoke hazards will not be permitted.