This is a Building 3 Report Narrative document supporting an Invitation for Bid (IFB) solicitation for chilled water piping infrastructure at Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The document is associated with IFB Solicitation Number 36C25226B0027, Project 556-23-104, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.
The solicitation pertains to the design and installation of chilled water piping infrastructure extending from Building 188 to Buildings 1, 3, and 48 at the facility. The IFB was initially released on May 7, 2026, and underwent three amendments (Amendment 0001, 0002, and 0003) to address modifications or clarifications to the contract requirements. As an Invitation for Bid, this solicitation requires contractors to submit sealed competitive bids based on firm, fixed pricing for the complete scope of work. The document referenced appears to be a narrative report specifically documenting requirements, conditions, or technical specifications related to Building 3 connections as part of the larger chilled water piping project. Bidders should review all three amendments in conjunction with the base IFB document to ensure compliance with all current contract requirements and specifications.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tropical Environmental, Inc.
10976 Fairbluff Ave.
Huntley, IL. 60142
(224) 569-3277 (224) 569-3278 fax www.TropicalEnvironmental.com
December 14, 2011
Mr. Royal Eckstein Captain James A. Lovell FHCC 3001 Green Bay Road North Chicago, Illinois 60064
RE: U.S. Department of Veterans Affairs (VA)
Captain James A. Lovell Federal Health Care Center Building # 3
Dear Mr. Eckstein:
Tropical Environmental, Inc. (Tropical) performed a limited asbestos assessment of the above referenced location in general accordance with:
• The Commercial and Public Buildings Asbestos Abatement Act (225 ILCS 207) enforced by the Illinois Department of Public Health (IDPH)
• The Asbestos Hazard Emergency Response Act (40 CFR 763) enforced by the U.S.
Environmental Protection Agency (USEPA), and
• The Asbestos Hazard Communication requirements (29 CFR 1910.1001(i) enforced by the U.S. Occupational Safety and Health Administration (OSHA).
Tropical performed the limited survey to identify and sample suspect asbestos-containing materials (ACM) in the facility. Samples of suspect asbestos-containing material (ACM) were submitted to a National Voluntary Laboratory Accreditation Program (NVLAP) certified laboratory for analysis. Laboratory results indicate that some of the suspect material contains asbestos. Please refer to the attached report for details on the survey.
Please feel free to contact me at (224) 269-3277 or by email at info@tropicalenvironmental.com with any comments or questions regarding Tropical’s investigation and this report.
Sincerely, Mark Haines President mailto:info@tropicalenvironmental.com
Table of Contents Page
Executive Summary
1.1 Project Purpose and Background
2.0 Asbestos Survey
2.1 Asbestos Survey Methodology
2.2 Asbestos Results
2.3 Applicable Regulations
3.0 Findings and Recommendations
4.0 Limitations
5.0 References & Definitions
Appendices
Appendix A: Asbestos Survey Analytical Summary Table Appendix B: Asbestos Laboratory Results, Laboratory Certifications and Chain-of-Custodies Appendix C: Tropical Employee Certifications Appendix D: Material/Sample Location Drawings Appendix E: Photographs of ACM Positives
Asbestos Survey
Building # 3 North Chicago, IL www.TropicalEnvironmental.com
Executive Summary
Tropical Environmental, Inc. (Tropical) was retained by the VA to provide an Asbestos Survey of all buildings, as defined by VA representatives, located on the Captain James A. Lovell Federal Health Care Center Campus in North Chicago, IL. The field assessment and sampling was performed from July 19, 2011 to October 5, 2011.
Building 3 is a brick clad, two story structure with attic and crawlspace used as administration offices. The building was constructed in 1926. The building has approximately 18,000 square feet of floor space.
Tropical performed a visual survey of building materials and collected representative samples of homogeneous suspect ACM, in accordance with EPA requirements, guidelines and standard industry practices. The samples were submitted to a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory for bulk analysis.
This report addresses the asbestos survey completed for Building #3.
Based on the bulk sampling and laboratory analyses, suspect materials were reported to contain asbestos, including the following:
HSA
Sample #
Material Description
Material Condition Material Quantity Material Location Laboratory
Results
FG
FITTINGS ON
FIBERGLASS
RUNS
FRIABLE ~3000 FITTINGS THROUGHOUT
1.6%-10 %
CHRYSOTILE
25%
AMOSITE
FT4
(MASTIC)
TAN MASTIC
ASSOCIATED
WITH 12”X12”
LIGHT BROWN
FLOOR TILE
NONFRIABLE 1500 SF CORRIDOR 124 2.8%
CHRYSOTILE
FT5
(MASTIC)
BLACK
MASTIC
ASSOCIATED
WITH 12”X12”
TAN FLOOR
TILE
NONFRIABLE 186 SF ROOMS 204, 205,
10.6%-24.2%
CHRYSOTILE
http://www.tropicalenvironmental.com/
Building # 3 www.TropicalEnvironmental.com
Executive Summary
Tropical Environmental, Inc. (Tropical) was retained by the VA to provide an Asbestos Survey of all buildings, as defined by VA representatives, located on the Captain James A. Lovell Federal Health Care Center Campus in North Chicago, IL. The field assessment and sampling was performed from July 19, 2011 to October 5, 2011.
Building 3 is a brick clad, two story structure with attic and crawlspace used as administration offices. The building was constructed in 1926. The building has approximately 18,000 square feet of floor space.
Tropical performed a visual survey of building materials and collected representative samples of homogeneous suspect ACM, in accordance with EPA requirements, guidelines and standard industry practices. The samples were submitted to a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory for bulk analysis.
This report addresses the asbestos survey completed for Building #3.
asbestos, including the following:
Material Description
Material Condition Material Quantity Material Location Laboratory
Results
FG
FITTINGS ON
FIBERGLASS
RUNS
FRIABLE ~3000 FITTINGS THROUGHOUT
1.6%-10 %
CHRYSOTILE
25%
AMOSITE
FT4
(MASTIC)
TAN MASTIC
ASSOCIATED
WITH 12”X12”
LIGHT BROWN
FLOOR TILE
NONFRIABLE 1500 SF CORRIDOR 124 2.8%
CHRYSOTILE
FT5
(MASTIC)
BLACK
MASTIC
ASSOCIATED
WITH 12”X12”
TAN FLOOR
TILE
NONFRIABLE 186 SF ROOM 204, 205,
10.6%-24.2%
Building # 3 www.TropicalEnvironmental.com
HSA
Sample #
Material Description
Material Condition Material Quantity Material Location Laboratory
Results
GG3 GLUE GLOBS
FOR CT7 NONFRIABLE 105 SF ROOM 108 1.1%-1.3%
CHRYSOTILE
WG
EXTERIOR
WINDOW
GLAZE
NONFRIABLE 600 LF THROUGHOUT 1.0%-1.8%
asbestos at less than 1%, including the following:
Material Description
Material Condition
Material Quantity
Material Location
Laboratory Results
EM EXPOSED
YELLOW MASTIC
NONFRIABLE
108 SF ROOM 102 <0.25%
CHRYSOTILE
FT2 (MASTIC)
GREY/BLACK/OFF-
WHITE MASTIC
ASSOCIATED
WITH 12”X12”
WHITE W/BROWN
STREAKS FLOOR
TILE
NONFRIABLE
301 SF ROOMS 3, 206 <0.25%-0.3%
Photographs of the ACM are included in Appendix E.
Every attempt was made to thoroughly evaluate and assess the presence and condition of suspect ACM throughout the building. Any suspect ACM identified during renovation that is not specifically listed in this report should be assumed positive until it can be thoroughly evaluated, assessed, sampled, and analyzed prior to disturbance, in accordance with applicable regulatory standards.
Building # 3 www.TropicalEnvironmental.com
1.0 Introduction
Tropical Environmental, Inc. (Tropical) was retained by the VA to provide an Asbestos Survey of all buildings, as defined by VA representatives, located on the Captain James A. Lovell Federal Health Care Center Campus in North Chicago, IL. The field assessment and sampling was performed from July 19, 2011 to October 5, 2011.
This report addresses the asbestos survey completed for Building #3.
The asbestos survey was performed by Illinois Department of Public Health (IDPH) licensed asbestos inspectors Mr. Mark Haines, license #100-00919, and Ms. Terri Lewis, license #100- 07366.
1.1 Project Purpose and Background
The asbestos survey was conducted to identify accessible asbestos containing materials in the building.
1.2 Scope of Work
Tropical performed an asbestos survey to determine and quantify ACM in accessible areas. The ACM survey included the following activities:
• Visual inspection of all accessible areas of the building, as identified by VA representatives to be included in the scope of this project.
• Collection of bulk samples of identified suspect ACM per homogeneous materials in accessible areas of the building.
• NVLAP accredited laboratory analysis of suspect ACM bulk samples by polarized light microscopy (PLM) to first positive result per homogeneous material.
• Preparation of a final report that includes sample locations of representative ACM and the laboratory’s analytical report.
Building # 3 www.TropicalEnvironmental.com
2.0 Asbestos Survey
2.1 Asbestos Survey Methodology
Only currently certified and licensed inspector(s) and (if appropriate) trainee(s) were utilized for this inspection.
The inspector(s) first reviewed supplied building documents, if applicable, which may have included the asbestos management plan, previous inspection reports, blue prints, and as built drawings, etc. A property/structure(s) walk-thru was then conducted to locate, identify, measure and separate previously identified asbestos containing materials and suspect asbestos containing materials into homogeneous areas. The material’s current condition was also evaluated during the walk-thru. Material conditions were evaluated utilizing the following terminology, Good, Damaged & Significantly Damaged.
Samples were collected using EPA approved methods specifically designed for sample collection. Samples were taken utilizing the randomly distributive manner method while simultaneously applying amended water. Samples were immediately placed in a pre-labeled re-sealable plastic bag. To prevent accidental exposure, sample containers are made of a durable plastic designed to provide and airtight seal. The sampling instrument was subsequently wiped with a clean moist cloth to decontaminate the tool, prevent the potential release of asbestos fibers, and prevent cross contamination of subsequent samples. Following the collection of each sample, the sample location was patched as appropriate. Sample areas were touched to determine friability.
The following chart, as detailed by 40 CFR 763.86, is typically used (and in certain cases, required) for sampling surfacing building materials for asbestos content:
< 1000 s/f 3 samples 1000 – 5000 s/f 5 samples >5000 s/f 7 samples
9 samples are recommended by the EPA for all samples
A group letter or combination of letter and number was assigned to each homogenous material.
This combination serves as a prefix to identify materials of similar composition, texture, color, and date of installation. Each sample was then assigned a sample number such as 01, 02, 03, etc.
All samples were identified on a signed and dated Chain-of-Custody document, which accompanied the samples to the laboratory.
Building # 3
To ensure both quality and objectivity, an independent laboratory was used. Laboratories are selected based on their current accreditations. The laboratory chosen participates in the National Voluntary Laboratory Accreditation Program (NVLAP) for quality control procedures (NVLAP Lab Code: 101202-0). As specified in 40 CFR Chapter I (1-1-87 edition) Part 763, Subpart F, Appendix A.
Suspected asbestos samples were analyzed using polarized light microscopy (PLM) / dispersion staining techniques in accordance with the EPA Method documents “US EPA 600/M4-82-020, 1982” & “US EPA 600/R-93/118, 1993”. Detection limits for this type of analysis are approximately one percent (by volume). All samples were analyzed by International Asbestos Testing Laboratories of Mt. Laurel, New Jersey (IATL), a National Voluntary Laboratory Accreditation Program (NVLAP) accredited asbestos laboratory. Laboratory accreditations are provided in Appendix B.
Some materials may not be accurately identified and/or quantified by PLM. As an example, the original fabrication of vinyl floor tile routinely involved milling of asbestos fibers to extremely small sizes. As a result, these fibers may go undetected under the standard PLM method.
Transmission Electron Microscopy (TEM) is required for a more definitive analysis of these materials. These types of flooring materials that are reported by laboratory analysis to be non-asbestos by PLM analysis are routinely submitted to an accredited laboratory for analysis under TEM for verification of asbestos content. Seventy one (71) samples were tested with TEM analysis for this building.
2.2 Asbestos Results
ASBESTOS CONTAINING MATERIALS
Suspect asbestos containing materials were identified and sampled in accordance with the above-referenced survey methodology. Laboratory results for suspect materials that were identified and sampled are included in Appendix A, entitled “Table I, Asbestos Survey Analytical Summary.”
Please reference the material location included on the drawings provided in Appendix D.
According to the AHERA Model Accreditation Plan, non-suspect material such as fiberglass, foam rubber and plastics do not warrant sampling.
2.3 Applicable Regulations
EPA's National Emission Standard for Hazardous Air Pollutants (NESHAP) (40 CFR 61, Building # 3 www.TropicalEnvironmental.com
Subpart M) categorizes asbestos-containing thermal system insulation (TSI) and sprayed-on or troweled-on asbestos as regulated ACM (RACM). Miscellaneous materials (floor tile and floor tile mastic) are classified as Category I Non-Friable Asbestos; and transite material is classified as Category II Non-Friable Asbestos, unless the material is made friable during demolition.
Friable ACM is material that can be crumbled, pulverized, or reduced to a powder by hand.
NESHAP requires at least ten working days’ notification prior to any renovation or demolition activity that will disturb greater than 160 square feet or 260 linear feet of ACM materials. ACM removed during abatement must be disposed of at a landfill approved by the EPA to receive asbestos wastes. NESHAP states that regulated asbestos-containing material (RACM), including friable ACM and non-friable ACM that has become or has a high probability of becoming friable, present in quantities exceeding 260 lineal feet on pipes or 160 square feet on facility components must be removed prior to the commencement of any demolition activities.
NESHAP also states that Category 1 non-friable ACM does not need to be removed prior to demolition if it is not in poor condition and has become friable. Friable materials (with the exception of roofing products) and transite are typically required to be removed prior to a demolition. Asbestos containing floor tile and mastic are typically required to be removed from concrete prior to recycling. Agencies such as Cook County require all asbestos containing materials be removed prior to demolition. If a facility is demolished by intentional burning, all regulated asbestos containing materials including Category I and Category II non-friable ACM must be removed before burning.
The Occupational Safety and Health Administration (OSHA) Construction Industry Standard (29 CFR 1926.1101) categorizes the removal of asbestos containing materials by “class” of material.
Specific requirements for the removal of OSHA classified materials include, but are not limited to, regulated work areas, air monitoring, engineering controls, work practices, personal protective equipment, notification and training.
The U.S. Department of Transportation (DOT) requires special procedures for packaging, labeling and transportation of asbestos wastes to disposal facilities. Other regulations may apply depending upon the contractor’s means and methods.
Tropical recommends the use of certified and licensed asbestos personnel for all planned disturbance of known and suspect asbestos containing products. In accordance with IDPH, IEPA, U.S.EPA and OSHA regulations asbestos containing materials must be removed by and disposed of by a certified/licensed asbestos abatement personnel/contractor.
Building # 3
3.0 Findings and Recommendations
Suspect materials identified, sampled and analyzed as part of this survey were reported to contain asbestos in regulated quantities.
Materials identified in this report as ACM must be handled in accordance with applicable regulations as provided herein, and must be abated if they will be impacted by any planned renovation activity.
The owner or operator of a demolition or renovation activity and prior to the commencement of the demolition or renovation shall thoroughly inspect the affected facility or part of the facility where the demolition or renovation operation will occur for the presence of asbestos, including Category I and Category II non-friable ACM.
It shall be at the owner’s discretion that a copy of this report is provided to any contractor bidding on work in the area(s) covered by this assessment. The owner may also elect to provide a copy of the report to the contractor on site during any renovation and/or demolition activities.
Contractors should use caution and be advised and directed that during renovation or demolition of a structure that concealed materials may be discovered, therefore, should suspect materials not identified in this inspection become exposed or made aware, you should cease operations that may disturb, dislodge or disrupt the material until it is sampled and analyzed for its possible asbestos content.
Although the efforts and intentions of our inspector(s) are always to sample all suspect materials, due to the nature of sampling, (destructive sampling, limited sample locations, visual assumption, etc.) some materials (such as floor tile/linoleum mastic/adhesive) may be excluded from the sampling process. These materials shall be assumed positive for asbestos unless sampled and analyzed otherwise. The client assumes and retains all responsibility and authority to conduct further sampling and analysis at their expense.
If additional suspect asbestos containing materials are identified during the renovation, those materials should be assumed to be positive for asbestos until they can be assessed, sampled, and analyzed by a NVLAP accredited laboratory.
Building # 3 www.TropicalEnvironmental.com
4.0 Limitations
The conclusions of this report are Tropical’s professional opinions, based solely upon visual site observations and interpretations of laboratory analyses, as described in this report. The opinions presented herein apply to the site conditions existing at the time of Tropical’s investigation and interpretation of current regulations pertaining to asbestos. Therefore, Tropical’s opinions and recommendations may not apply to future conditions that may exist at the site, which we have not had the opportunity to evaluate. It should be noted that conditions change and that materials constantly degrade. All applicable federal, state and local regulations should always be verified prior to any work that will disturb or dislodge materials confirmed, assumed or presumed to contain asbestos, Tropical’s assessment was limited to observation, sampling and the analysis of suspect asbestos containing products in accessible portions of the area(s) covered by this survey. Materials in the building that are not considered building materials, are unusual or de minimis, or were inaccessible, due to common construction techniques, to the inspector were excluded from the inspection. As a result, additional asbestos containing building materials may be present in inaccessible areas (e.g. between walls, ceiling spaces enclosed by wallboard, interior of fire doors, etc.) of the structure that were not observed during the survey.
This inspection report is designed to assist the client in the understanding of the regulations regarding asbestos, however, it should not be used as a substitution for obtaining and familiarizing yourself with, including the compliance of, all asbestos related regulations including, but not limited to, 40 CFR, Chapter 61, Subpart M (National Emission Standard for Asbestos) prior to the start of any renovation or demolition activity that will disturb or dislodge asbestos containing materials or suspect/assumed asbestos containing materials.
This report has been prepared for the exclusive use of the intended client, for the specific application to the defined property as addressed in this report. Any additional user of this report shall determine the suitability of the material contained herein for their intended use, and any such user assumes all risks and liability in connection therewith. No claim is made that these findings will remain applicable to future site activities and conditions. Interpretations by any such user from information contained in this report or the drawing of conclusions by any such user from information contained in this report shall be undertaken solely at the risk of said party.
At all times during the performance of the inspection, safety was a priority. Due to the emphasis on safety, there were no injuries, there was no building contamination, and there were no asbestos exposures to either Tropical Environmental, Inc personnel or building occupants.
Building # 3 www.TropicalEnvironmental.com
The asbestos survey was conducted in a manner consistent with that level of care and skill ordinarily exercised by members of the environmental profession under similar conditions. No other warranty or guarantee, express or implied, is included or intended in this Report or otherwise.
Building # 3 www.TropicalEnvironmental.com
5.0 References & Definitions
Illinois Department of Public Health (IDPH)
Asbestos Abatement Act, 105 ILCS 105
Asbestos Abatement for Public and Private Schools and Commercial and Public Buildings in Illinois, 77 Illinois Administrative Code 855
Commercial and Public Building Asbestos Abatement Act, 225 ILCS 207
United States Environmental Protection Agency (USEPA)
Asbestos Hazard Emergency Response Act (AHERA), 40 CFR, Part 763
National Emission Standards for Hazardous Air Pollutants (NESHAP), Asbestos, 40 CFR, Part 61, November 20, 1990
Guidance for Controlling Asbestos-Containing Materials in Buildings (EPA 560/5-85/024), June
Illinois Environmental Protection Agency (IEPA)
Emission Standards and Limitations for Stationary sources, Asbestos 35 IAC, Part 228
United States Occupational Safety and Health Administration (OSHA)
Occupational Exposure to Asbestos, Final Rule, 29 CFR, Pars 1910 and 1926 (August 10, 1994)
Cook County Department of Environmental Control (CCDEC)
Cook County Environmental Control Act
Asbestos Containing Products means, according to the U.S. EPA Method 600/R-93/116, Regulated Asbestos Containing Materials (RACM) are those materials found to contain greater than 1% asbestos per volume of bulk material sampled, by PLM. The term is not intended to include de minimis or inaccessible materials that do not present a risk of harm to public health and that generally would not be the subject of enforcement actions if brought to the attentions of appropriated regulatory agencies.
Building # 3
Asbestos Types are Chrysotile (white asbestos making up approximately 95% of all asbestos used in the United States), Amosite (brown asbestos making up approximately 5% of all asbestos used in the United States), Crocidolite (blue asbestos making up approximately less than 5% of all asbestos used in the United States), and rarely found in buildings are Anthophyllite, Tremolite & Actinolite.
Category I Non-friable Asbestos-Containing Material (ACM) means asbestos-containing packing, gaskets, resilient floor covering, and asphalt roofing products containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, section 1, Polarized Light Microscopy.
Category II Non-friable ACM means any material, excluding Category I nonfriable ACM containing more than 1 percent asbestos as determined using the methods specified in appendix E, subpart E, 40 CFR part 763, section 1, Polarized Light Microscopy that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Damaged means less than 25% localized damage or less than10% distributed damage.
Demolition means the wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations or the intentional burning (i.e. practice burns) of any facility.
Facility means any institutional, commercial, public, industrial, or residential structure, installation, or building (including any structure, installation, or building containing condominiums or individual dwelling units operated as a residential cooperative, but excluding residential buildings having four or fewer dwelling units); any ship; and any active or inactive waste disposal site. For purposes of this definition, any building, structure, or installation that contains a loft used as a dwelling is not considered a residential structure, installation, or building. Any structure, installation, or building that was previously subject to the Asbestos NESHAP is not excluded, regardless of its current use or function.
Friable Asbestos Material means any material containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763 section 1, Polarized Light Microscopy, that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
Homogeneous Area -- an area of surfacing materials, thermal surface insulation, or miscellaneous material that is uniform in color and texture and has the same installation date.
Miscellaneous Material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.
Multi-layered Material means a material that has a presence of discrete individual layers. EPA does not
Building # 3 www.TropicalEnvironmental.com regard a sheet of “plasterboard,” sheetrock,” “wallboard,” or “gypsum board” by itself a multi-layered material.
Polarized Light Microscopy means an optical microscopy technique for analyzing bulk samples for asbestos in which the sample is illuminated with polarized light (light which vibrates in only one plane) to distinguish between different types of asbestos fibers by their shape and unique optical properties.
Potential Significant Damage means circumstances in which:
1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
3) The material is subject to major or continuing disturbance, due to factors including, but not limited to, accessibility or, under certain circumstances, vibration or air erosion.
Regulated Asbestos-Containing Material (RACM), as defined in 40 CFR 61.141, means
(a) Friable asbestos material,
(b) Category I non-friable ACM that has become friable,
(c) Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or
(d) Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations.
Renovation means altering a facility or one or more facility components in any way, including the stripping or removal of Regulated Asbestos Containing Materials (RACM) from a facility component. A renovation could be, but not limited to, any interior renovation or remodel not affecting load-supporting structural members or a roof replacement.
Significantly Damaged means 25% (or greater) localized damage or 10% (or greater) distributed damage.
Surfacing means any material that was sprayed-on or troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
Thermal Systems Insulation means material applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.
Building # 3 www.TropicalEnvironmental.com
Transmission Electron Microscopy means a method of microscopic analysis, which utilizes an electron beam that is focused onto a thin sample. As the beam penetrates (transmits) through the sample, the difference densities produces an image on a fluorescent screen from which samples can be identified and counted. Also used for analyzing air samples for asbestos.
Key to Common Asbestos Related Abbreviations
ACM ........................................ Asbestos-Containing Material
ACBM ................................. Asbestos-Containing Building Material
AHERA............................. Asbestos Hazard Emergency Response Act
CFR ..........................................Code of Federal Regulations
DOT ......................................... Department of Transportation
EPA ..................................... Environmental Protection Agency
FR ................................................... Federal Register
HEPA ....................................... High Efficiency Particulate Air
HVAC ....................... Heating, Ventilating and Air Conditioning Systems
IDPH ................................... Illinois Department of Public Health
LEA ............................................. Local Education Agency
MAP ............................................ Model Accreditation Plan
NESHAP ............... National Emission Standards for Hazardous Air Pollutants
NIOSH ...................... National Institute of Occupational Safety and Health
NIST .......................... National Institute for Standards and Technology
NVLAP .................... National Voluntary Laboratory Accreditation Program
OSHA .......................... Occupational Safety and Health Administration
Building # 3 www.TropicalEnvironmental.com
PACM ................................ Presumed Asbestos Containing Material
PCM .......................................... Phase Contrast Microscopy
PLM .......................................... Polarized Light Microscopy
RACM ................................ Regulated Asbestos Containing Material
TEM .................................... Transmission Electron Microscopy
TSI .......................................... Thermal Systems Insulation
TWA ............................................. Time Weighted Average
APPENDIX A
Asbestos Survey Analytical Summary
INSPECTORS: Terri Lewis and Mark Haines
DATE: 8/19/2011
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 3
1 OF 7 Last Modified By: cwesthoff On: 12/14/11
KEY:
ACCESSIBILITY: 1-Low 2-Medium 3-High NAD - No Asbestos Detected
1 2 3 4 N F 1 2 3
Room 103 NAD
Room 113 Chrysotile - 0.4% 270 S.F.
Room 108
Room 105
Room 105D
Room 101
Room 123
QAQC
In hallway outside Room 208
In hallway outside Room 202
Carpet adhesive yellow light grey w/ small black spots
Carpet adhesive yellow or grey w/ small black spots
BM MM Black mastic walls of basement mechanical area
CA2 MM
CB MM Ceiling board brown
Notes
FRIABILITY ACCESS
ASSESSMENT
CATEGORY QuantityASBESTOS RESULTSHSA ID
CONDITION: 1-No damage 2-Slighly Damaged 3-Damaged 4-Significantly Damaged
5 = ACBM with potential for damage.
2 = Damaged friable surfacing ACM. 4 = Damaged or significantly damaged friable miscellaneous ACM.
MATERIAL TYPE: Thermal System Insulation (TSI), Surfacing Material (SM), Miscellaneous Material (MM)
AHERA Assessment Categories:
6 = ACBM with potential for significant damage.
7 = Any remaining friable ACBM or friable suspected ACBM.1 = Damaged or significantly damaged TSI ACM. 3 = Significantly damaged friable surfacing ACM.
SAMPLE # MATERIAL SAMPLE LOCATION
CONDITION
MATERIAL DESCRIPTION & DRAWING
MAP INDICATOR SYMBOLMATERIAL TYPE
CA1 MM
Basement Mechanical Area
X
X
XX
5XX
X
NAD
NAD
Room 109
In hallway outside Room 203
NAD
NADRoom 9
5XXX
5X
6X
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 3
2 OF 7 Last Modified By: cwesthoff On: 12/14/11
KEY:
ACCESSIBILITY: 1-Low 2-Medium 3-High NAD - No Asbestos Detected
1 2 3 4 N F 1 2 3
Notes
FRIABILITY ACCESS
ASSESSMENT
CATEGORY QuantityASBESTOS RESULTSHSA ID
CONDITION: 1-No damage 2-Slighly Damaged 3-Damaged 4-Significantly Damaged
5 = ACBM with potential for damage.
2 = Damaged friable surfacing ACM. 4 = Damaged or significantly damaged friable miscellaneous ACM.
MATERIAL TYPE: Thermal System Insulation (TSI), Surfacing Material (SM), Miscellaneous Material (MM)
AHERA Assessment Categories:
6 = ACBM with potential for significant damage.
7 = Any remaining friable ACBM or friable suspected ACBM.1 = Damaged or significantly damaged TSI ACM. 3 = Significantly damaged friable surfacing ACM.
SAMPLE # MATERIAL SAMPLE LOCATION
CONDITION
MATERIAL DESCRIPTION & DRAWING
MAP INDICATOR SYMBOLMATERIAL TYPE
Room 110
Room 105C
Room 105F
Room 4
Room COG1
Room 104
Hallway in front of Room 109
Room 101
Room 122
Room 101
Room 105D
Room 105
Room 114
Room 105C
Tan Mastic
Hallway in front of Room 105E
Hallway in front of Room 120
Hallway in front of Room 111
Hallway in front of Room 107
QAQC
NAD
NAD
CT2 MM
5 Room 121
XCT1 MM
CT3 MM
Ceiling Tile 2x4 white fissured
Ceiling 1x1 white w/ large block
MMCT4 Ceiling Tile, 2x2 white fissured
NAD
Room 101
Ceiling Tile 1x1 white large fissures
Ceiling Tile 1x1 whole deep fissures
Ceiling 1x1 white deep fissured
NAD
5XX
6XXX
6XXX
X 5XX
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 3
3 OF 7 Last Modified By: cwesthoff On: 12/14/11
KEY:
ASSESSMENT
CATEGORY QuantityASBESTOS RESULTSHSA ID
CONDITION: 1-No damage 2-Slighly Damaged 3-Damaged 4-Significantly Damaged
5 = ACBM with potential for damage.
2 = Damaged friable surfacing ACM. 4 = Damaged or significantly damaged friable miscellaneous ACM.
MATERIAL TYPE: Thermal System Insulation (TSI), Surfacing Material (SM), Miscellaneous Material (MM)
AHERA Assessment Categories:
6 = ACBM with potential for significant damage.
7 = Any remaining friable ACBM or friable suspected ACBM.1 = Damaged or significantly damaged TSI ACM. 3 = Significantly damaged friable surfacing ACM.
SAMPLE # MATERIAL SAMPLE LOCATION
CONDITION
Room 106A
Room 103
Hallway in front of Room 108
QAQC
Chrysotile- Trace Detected at < 0.25%
Room 123
Room 120
Room 123
Room 121
Room 122
Amosite - 25%
Chrysotile - 10%
Crawlspace Chrysotile - PC 2.8%
Crawlspace Chrysotile - PC 1.6%
Room 104
CT7
CT5 MM Ceiling Tile 1x1 white fissures
EM MM Exposed mastic yellow (floor of room 102) 108 S.F.
EWC MM Exterior window caulk
FS MM Firestopping red
CT6 MM Ceiling Tile 2x4 deep fissures w/ holes white
23 each
MM Ceiling Tile 2x1 white small holes
FG TSI Fittings on fiberglass
Room 115A
Room 202
Room 102
NAD
NAD
NADRoom 202
4XXX
X
4XXX
X X 4
6XXX
6XXX
X
5XXX
5XX
NAD
NAD
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 3
4 OF 7 Last Modified By: cwesthoff On: 12/14/11
KEY:
ASSESSMENT
CATEGORY QuantityASBESTOS RESULTSHSA ID
CONDITION: 1-No damage 2-Slighly Damaged 3-Damaged 4-Significantly Damaged
5 = ACBM with potential for damage.
2 = Damaged friable surfacing ACM. 4 = Damaged or significantly damaged friable miscellaneous ACM.
MATERIAL TYPE: Thermal System Insulation (TSI), Surfacing Material (SM), Miscellaneous Material (MM)
AHERA Assessment Categories:
6 = ACBM with potential for significant damage.
7 = Any remaining friable ACBM or friable suspected ACBM.1 = Damaged or significantly damaged TSI ACM. 3 = Significantly damaged friable surfacing ACM.
SAMPLE # MATERIAL SAMPLE LOCATION
CONDITION
Tan Floor Tile; 12x12 NAD
Tan Mastic Insufficient Material for Analysis PLM stated NAD
Tan Floor Tile; 12x12 NAD
Tan Mastic Insufficient Material for Analysis PLM stated NAD
Tan Floor Tile; 12x12 NAD
Tan Mastic Insufficient Material for Analysis PLM stated NAD
Floor Tile 12x12 off white w/ brown streaks NAD
Grey mastic Chrysotile - Trace Detected @ <0.25%; Per TEM report
Floor Tile 12x12 off white w/ brown streaks NAD
Black/grey mastic Chrysotile - Trace Detected @ <0.25%; Per TEM report
Floor Tile 12x12 off white w/ brown streaks NAD
Off-white mastic Chrysotile - Trace Detected @ <0.25%; Per TEM report
Floor Tile 12x12 green splotchy
Yellow mastic
Floor Tile 12x12 green splotchy
Yellow mastic
Floor Tile 12x12 green splotchy
Yellow mastic
Floor Tile 12x12 green splotchy
QAQC
Floor Tile 12x12 light brown
Tan Mastic
Floor Tile 12x12 light brown
Tan Mastic
Floor Tile 12x12 light brown
Tan Mastic Chrysotile - 2.80% 42 sf
Floor Tile 12x12 light brown
QAQC NAD
Hallway in front of Room 115A
Hallway in front of Room 115
Hallway in front of Room 118
FT4
FT MM
MM
FT3 MM
FT2 MM 301 S.F.
Room 6
Room 7
Room 4
Room 3
Room 109
NAD
Room 206
X 5
XXX
X 5
5XX X
X X
XX
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 3
5 OF 7 Last Modified By: cwesthoff On: 12/14/11
KEY:
ASSESSMENT
CATEGORY QuantityASBESTOS RESULTSHSA ID
CONDITION: 1-No damage 2-Slighly Damaged 3-Damaged 4-Significantly Damaged
5 = ACBM with potential for damage.
2 = Damaged friable surfacing ACM. 4 = Damaged or significantly damaged friable miscellaneous ACM.
MATERIAL TYPE: Thermal System Insulation (TSI), Surfacing Material (SM), Miscellaneous Material (MM)
AHERA Assessment Categories:
6 = ACBM with potential for significant damage.
7 = Any remaining friable ACBM or friable suspected ACBM.1 = Damaged or significantly damaged TSI ACM. 3 = Significantly damaged friable surfacing ACM.
SAMPLE # MATERIAL SAMPLE LOCATION
CONDITION
Floor Tile 12x12 tan splotchy NAD
Black mastic Chrysotile - 11.8% Per TEM report
Floor Tile 12x12 tan splotchy NAD
Black mastic Chrysotile - 24.2% Per TEM report
Floor Tile 12x12 tan splotchy NAD
Black mastic Chrysotile - 10.6% Per Tem report
Chrysotile - PC 1.1%
Chrysotile - PC 1.1%
Chrysotile - PC 1.3%
Room 202
Hallway in front of Room 203
Room 201
QAQC
Room 105C
Room 115A
Room 123
Hallway outside Room 105A
Hallway outside Room 113
QAQC
Room 108
X
Room 204
PL1 SM Plaster Throughout
GG3 MM Glue Globs brown for CT5 105 S.F.
GG2 MM Glue Globs brown for CT2
NAD
NAD7XX
GG4 MM Glue globs for CT7 brown speckles
GG MM Glue globs
FT5 MM 186 S.F.
Room 205
Room 9 NAD
Room 104 NAD
X X X
XXX
6XXX
5XXX
6XXX
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 3
6 OF 7 Last Modified By: cwesthoff On: 12/14/11
KEY:
ASSESSMENT
CATEGORY QuantityASBESTOS RESULTSHSA ID
CONDITION: 1-No damage 2-Slighly Damaged 3-Damaged 4-Significantly Damaged
5 = ACBM with potential for damage.
2 = Damaged friable surfacing ACM. 4 = Damaged or significantly damaged friable miscellaneous ACM.
MATERIAL TYPE: Thermal System Insulation (TSI), Surfacing Material (SM), Miscellaneous Material (MM)
AHERA Assessment Categories:
6 = ACBM with potential for significant damage.
7 = Any remaining friable ACBM or friable suspected ACBM.1 = Damaged or significantly damaged TSI ACM. 3 = Significantly damaged friable surfacing ACM.
SAMPLE # MATERIAL SAMPLE LOCATION
CONDITION
Room 8
Vinyl Baseboard 6" grey
Room 5
Vinyl Baseboard 6" grey
Tan Mastic
Vinyl Baseboard 6" grey
Room 114
Vinyl Baseboard 6" grey
Room 105D
Vinyl Baseboard 6" grey
Room 119
Room 121
Room 120
Tan Mastic
Vinyl Baseboard dark grey 6"
Tan Mastic
Vinyl Baseboard dark grey 6"
Tan Mastic
Vinyl Baseboard dark grey 6"
Tan Mastic
Vinyl Baseboard dark grey 6"
Tan Mastic
Vinyl Baseboard dark grey 6"
Tan Mastic
2 Hallway in front of Room 106
Room 109
Hallway in front of Room 109
Hallway in front of Room 207
Room 208
Room 208
XVB3 MM
Brown Rubber Baseboard; 6"
X
Room 105E
XX
5X
5X
X
MM Vinyl Baseboard 4" grey 5
Room 116
Room COG1
MM
TB
VB2 MM
X
VB
MM
Tactum board white and blue NAD
NAD
NAD
XX
XX
VB4 X 5X X
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 3
7 OF 7 Last Modified By: cwesthoff On: 12/14/11
KEY:
ASSESSMENT
CATEGORY QuantityASBESTOS RESULTSHSA ID
CONDITION: 1-No damage 2-Slighly Damaged 3-Damaged 4-Significantly Damaged
5 = ACBM with potential for damage.
2 = Damaged friable surfacing ACM. 4 = Damaged or significantly damaged friable miscellaneous ACM.
MATERIAL TYPE: Thermal System Insulation (TSI), Surfacing Material (SM), Miscellaneous Material (MM)
AHERA Assessment Categories:
6 = ACBM with potential for significant damage.
7 = Any remaining friable ACBM or friable suspected ACBM.1 = Damaged or significantly damaged TSI ACM. 3 = Significantly damaged friable surfacing ACM.
SAMPLE # MATERIAL SAMPLE LOCATION
CONDITION
Hallway in front of Room 102
Hallway in front of Room 115A
Room 109
Room 105C Chrysotile -1.8%
Room 102 Chrysotile - 1.5%
Room 122A Chrysotile - 1.00%
600 L.F.
VT MM Vinyl Threshold 1" grey
Attic
UE MM Unexcavated Earth
NAD
WG MM Window glazing exterior of windows
Room 208VD MM
VD2 MM Vibration Damper black
Vibration Damper white X
5XXX
5XX
Crawlspace 7XXX
X
5XXX
5XX
NAD
APPENDIX B
Asbestos Laboratory Results, Laboratory Certification and Chain-of-Custody
9000 Commerce Parkway, Ste B
Mount Laurel, NJ 08054
Toll Free 877-428-4285
Local: 856-231-9449
Fax: 856-231-9818
CERTIFICATE OF ANALYSIS
Client: Report Date:
Project No.:
Project:
BULK SAMPLE ANALYSIS SUMMARY
Tropical Environmental, Inc.
10976 Fairbluff Ave
Huntley IL 60142-9046 CaptainJamesALovell FHCC; Bldg.#3
9/1/2011
Report No: 250407
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 CT7-1
4408718 Description / Location:
None Detected None Detected 100 Cellulose None Detected
Dk.Tan Ceiling Tile; 2x1
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 CT7-2
4408719 Description / Location:
None Detected None Detected 100 Cellulose None Detected
Dk.Tan Ceiling Tile; 2x1
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 CT7-3
4408720 Description / Location:
None Detected None Detected 100 Cellulose None Detected
Dk.Tan Ceiling Tile; 2x1
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 EWC-1
4408721 Description / Location:
Exterior Window
None Detected None Detected None Detected None Detected 100
Grey Non Fibrous
NIST-NVLAP No. 101165-0 NY-DOH No. 11021 AIHA-LAP, LLC No. 100188 This confidential report relates only to those item(s) tested and does not represent an endorsement by NIST-NVLAP, AIHA or any agency of the U.S. government
This report shall not be reproduced except in full, without written approval of the laboratory.
Accreditation
EPA 600/R-93/116Analytical Method:
Comments: (PC) Indicates Stratified Point Count Method performed. Method not performed unless stated. Quantification at <0.25% by volume is possible with this method. (PC–Trace) represents this limit of quantitation. (PC-Trace) means that asbestos was detected but is not quantifiable under the Point Counting regimen. Analysis includes all distinct separable layers in accordance with EPA 600 Method. If not reported or otherwise noted, layer is either not present or the client has specifically requested that it not be analyzed. Small asbestos fibers may be missed by PLM due to resolution limitations of the optical microscope. Therefore, negative PLM results cannot be guaranteed. Electron Microscopy can be used as a confirming technique. Regulatory Limit is based upon the sample matrix.
Analysis Performed By:
Approved By:
Frank E. Ehrenfeld, III
Laboratory Director 9/1/2011
E. Smith
Date:
Toll Free 877-428-4285
Local: 856-231-9449
Fax: 856-231-9818
CERTIFICATE OF ANALYSIS
Client: Report Date:
Project No.:
Project:
BULK SAMPLE ANALYSIS SUMMARY
Tropical Environmental, Inc.
10976 Fairbluff Ave
Huntley IL 60142-9046 CaptainJamesALovell FHCC; Bldg.#3
9/1/2011
Report No: 250407
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 EWC-2
4408722 Description / Location:
Exterior Window
None Detected None Detected None Detected None Detected 100
Grey Non Fibrous
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 EWC-3
4408723 Description / Location:
Exterior Window
None Detected None Detected None Detected None Detected 100
Grey Non Fibrous
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 EWC-4
4408724 Description / Location:
Exterior Window
None Detected None Detected None Detected None Detected 100
Grey Non Fibrous
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 EWC-5
4408725 Description / Location:
Exterior Window
None Detected None Detected None Detected None Detected 100
Grey Non Fibrous
NIST-NVLAP No. 101165-0 NY-DOH No. 11021 AIHA-LAP, LLC No. 100188 This confidential report relates only to those item(s) tested and does not represent an endorsement by NIST-NVLAP, AIHA or any agency of the U.S. government
This report shall not be reproduced except in full, without written approval of the laboratory.
Accreditation
EPA 600/R-93/116Analytical Method:
Comments: (PC) Indicates Stratified Point Count Method performed. Method not performed unless stated. Quantification at <0.25% by volume is possible with this method. (PC–Trace) represents this limit of quantitation. (PC-Trace) means that asbestos was detected but is not quantifiable under the Point Counting regimen. Analysis includes all distinct separable layers in accordance with EPA 600 Method. If not reported or otherwise noted, layer is either not present or the client has specifically requested that it not be analyzed. Small asbestos fibers may be missed by PLM due to resolution limitations of the optical microscope. Therefore, negative PLM results cannot be guaranteed. Electron Microscopy can be used as a confirming technique. Regulatory Limit is based upon the sample matrix.
Analysis Performed By:
9/1/2011
E. Smith
Toll Free 877-428-4285
Local: 856-231-9449
Fax: 856-231-9818
CERTIFICATE OF ANALYSIS
Client: Report Date:
Project No.:
Project:
BULK SAMPLE ANALYSIS SUMMARY
Tropical Environmental, Inc.
10976 Fairbluff Ave
Huntley IL 60142-9046 CaptainJamesALovell FHCC; Bldg.#3
9/1/2011
Report No: 250407
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 FS-1
4408726 Description / Location:
Firestopping
None Detected None Detected 1 Fibrous Glass 99
Red Fibrous
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 FS-2
4408727 Description / Location:
Firestopping
None Detected None Detected 1 Fibrous Glass 99
Red Fibrous
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 FS-3
4408728 Description / Location:
Firestopping
None Detected None Detected 1 Fibrous Glass 99
Red Fibrous
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 FT5-1
4408729 Description / Location:
PC 1.2 Chrysotile None Detected None Detected PC 98.8
Off-White Floor Tile; 12x12
NIST-NVLAP No. 101165-0 NY-DOH No. 11021 AIHA-LAP, LLC No. 100188 This confidential report relates only to those item(s) tested and does not represent an endorsement by NIST-NVLAP, AIHA or any agency of the U.S. government
This report shall not be reproduced except in full, without written approval of the laboratory.
Accreditation
EPA 600/R-93/116Analytical Method:
Comments: (PC) Indicates Stratified Point Count Method performed. Method not performed unless stated. Quantification at <0.25% by volume is possible with this method. (PC–Trace) represents this limit of quantitation. (PC-Trace) means that asbestos was detected but is not quantifiable under the Point Counting regimen. Analysis includes all distinct separable layers in accordance with EPA 600 Method. If not reported or otherwise noted, layer is either not present or the client has specifically requested that it not be analyzed. Small asbestos fibers may be missed by PLM due to resolution limitations of the optical microscope. Therefore, negative PLM results cannot be guaranteed. Electron Microscopy can be used as a confirming technique. Regulatory Limit is based upon the sample matrix.
Analysis Performed By:
9/1/2011
Toll Free 877-428-4285
Local: 856-231-9449
Fax: 856-231-9818
CERTIFICATE OF ANALYSIS
Client: Report Date:
Project No.:
Project:
BULK SAMPLE ANALYSIS SUMMARY
Tropical Environmental, Inc.
10976 Fairbluff Ave
Huntley IL 60142-9046 CaptainJamesALovell FHCC; Bldg.#3
9/1/2011
Report No: 250407
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 FT5-2
4408730 Description / Location:
PC 1.2 Chrysotile None Detected None Detected PC 98.8
Off-White Floor Tile; 12x12
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 FT5-3
4408731 Description / Location:
PC 1.3 Chrysotile None Detected None Detected PC 98.7
Off-White Floor Tile; 12x12
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 GG4-1
4408732 Description / Location:
None Detected None Detected Trace Other 100
Brown Mastic; A/W Ceiling Tile
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 GG4-2
4408733 Description / Location:
None Detected None Detected Trace Other 100
Brown Mastic; A/W Ceiling Tile
NIST-NVLAP No. 101165-0 NY-DOH No. 11021 AIHA-LAP, LLC No. 100188 This confidential report relates only to those item(s) tested and does not represent an endorsement by NIST-NVLAP, AIHA or any agency of the U.S. government
This report shall not be reproduced except in full, without written approval of the laboratory.
Accreditation
EPA 600/R-93/116Analytical Method:
Comments: (PC) Indicates Stratified Point Count Method performed. Method not performed unless stated. Quantification at <0.25% by volume is possible with this method. (PC–Trace) represents this limit of quantitation. (PC-Trace) means that asbestos was detected but is not quantifiable under the Point Counting regimen. Analysis includes all distinct separable layers in accordance with EPA 600 Method. If not reported or otherwise noted, layer is either not present or the client has specifically requested that it not be analyzed. Small asbestos fibers may be missed by PLM due to resolution limitations of the optical microscope. Therefore, negative PLM results cannot be guaranteed. Electron Microscopy can be used as a confirming technique. Regulatory Limit is based upon the sample matrix.
Analysis Performed By:
9/1/2011
Toll Free 877-428-4285
Local: 856-231-9449
Fax: 856-231-9818
CERTIFICATE OF ANALYSIS
Client: Report Date:
Project No.:
Project:
BULK SAMPLE ANALYSIS SUMMARY
Tropical Environmental, Inc.
10976 Fairbluff Ave
Huntley IL 60142-9046 CaptainJamesALovell FHCC; Bldg.#3
9/1/2011
Report No: 250407
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 GG4-3
4408734 Description / Location:
None Detected None Detected Trace Other 100
Brown Mastic; A/W Ceiling Tile
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 GG4-4
4408735 Description / Location:
None Detected None Detected Trace Other 100
Brown Mastic; A/W Ceiling Tile
% Asbestos Type % Non-Asbestos Fibrous Material Type % Non-Fibrous Material
Client No.:
Lab No.:
VA3 TB-1
4408736 Description / Location:
Tactum Board
None Detected None Detected 80 Cellulose 20
White/Tan Fibrous
%…